50
0 DELHI STATE INDUSTRIAL & INFRASTRUCTURE DEV. CORP. LTD UDYOG SADAN BUILDING, 419, FIE PATPARGANJ, DELHI-92 OFFICE OF THE CHIEF PROJECT MANAGER (KBI) Name of work:- Engagement of consultant for Development, Planning, Design & Architectural/ other allied engineering consultancy services for the development of Knowledge Based Industrial Park ( KBI) at Baprola, Delhi. Index S. No. Description Page No. 1 Press Notice 1 2 Information for submission of offers 2 3 Part- I (Technical bid) 3 4 Check list 4 5 Back ground 5-6 6 Eligibility 6-11 7 Other information to be submitted 11-12 8 Other General information & Instructions. 12-14 9 Scope of work 15-19 10 Schedule of services 19-21 11 Payment of Remuneration 21-22 12 Consultancy fee 23-28 13 Award of contract. 29 14 Termination 29 15 Arbitration 29-31 16 Number of drawings sets and copyright. 31 17 Security deposit 32 18 Time schedule 32 19 Abandonment of work. 32-33 20 Guarantee 33 21 Determination of recession of agreement 33-34 22 General 34-35 23 Acceptance 36 24 Undertaking form (A-H) 37-48 25 Part-II (Financial bid) 49 26 Key Plan 50 27 Site plan 51 Certified that this NIT contains page No.1 to 51 only. CPM (KBI)

Dsiidc Kbi Park Baprola

Embed Size (px)

Citation preview

Page 1: Dsiidc Kbi Park Baprola

0

DELHI STATE INDUSTRIAL & INFRASTRUCTURE DEV. CORP. LTD UDYOG SADAN BUILDING, 419, FIE PATPARGANJ, DELHI-92

OFFICE OF THE CHIEF PROJECT MANAGER (KBI) Name of work:- Engagement of consultant for Development, Planning, Design &

Architectural/ other allied engineering consultancy services for the development of Knowledge Based Industrial Park ( KBI) at Baprola, Delhi.

Index

S. No. Description Page No.

1 Press Notice 1 2 Information for submission of offers 2 3 Part- I (Technical bid) 3 4 Check list 4 5 Back ground 5-6 6 Eligibility 6-11 7 Other information to be submitted 11-12 8 Other General information & Instructions. 12-14 9 Scope of work 15-19 10 Schedule of services 19-21 11 Payment of Remuneration 21-22 12 Consultancy fee 23-28 13 Award of contract. 29 14 Termination 29 15 Arbitration 29-31 16 Number of drawings sets and copyright. 31 17 Security deposit 32 18 Time schedule 32 19 Abandonment of work. 32-33 20 Guarantee 33 21 Determination of recession of agreement 33-34 22 General 34-35 23 Acceptance 36 24 Undertaking form (A-H) 37-48 25 Part-II (Financial bid) 49 26 Key Plan 50 27 Site plan 51

Certified that this NIT contains page No.1 to 51 only. CPM (KBI)

Page 2: Dsiidc Kbi Park Baprola

1

DELHI STATE INDUSTRIAL & INFRASTRUCTURE DEVELOPMENT CORPORATION LTD.

Udyog Sadan

Patparganj Industrial Area , Delhi 92

OFFICE OF THE CHIEF PROJECT MANAGER -CPM(KBI)

Press Notice No.CPM(KBI)/10/2010

Item rate tenders are invited for the work of “Engagement of consultant for Development,

Planning, Design & Architectural / other allied engineering consultancy services for the

development of Knowledge Based Industrial Park (KBI) at Baprola, Delhi”

Cost of Tender Document : Rs. 10,000/-

Pre bid meeting : 29/11/10 at 11.00 A.M.

Last date of sale of tender document : 15/12/10 up to 4.00 P.M.

Last date of submission of tenders : 16/12/10 up to 3.00 P.M.

Opening of Tender (Technical Bid ) : 16/12/2010 at 3.30 P.M.

Further detailed terms & condition can be seen at our website: www.dsiidc.org.

CPM (KBI)

Page 3: Dsiidc Kbi Park Baprola

2

INFORMATION FOR SUBMISSION OF OFFERS

1. Name of Department Delhi State Industrial & Infrastructure

Development Corporation Ltd.

2. Address for Sale of Tender Office of the CPM (KBI), Udyog Sadan,

Patparganj Industrial Area, Delhi 92

3. Address for submission of

tender document

Office of the CPM (KBI), Udyog Sadan, Patparganj

Industrial Area , Delhi 92

4. Name of work Engagement of consultant for Development,

Planning, Design & Architectural / other allied

engineering consultancy services for the

development of Knowledge Based Industrial Park

(KBI) at Baprola, Delhi

5. Contact Persons Sh.S.K.Gupta, PD((KBI), Mob.No.+91 9717894730

Smt.Namrita Kalsi, Sr.Arch. Mob.No.+91 9650064499

Sh.S.N.Sharan, CPM(KBI), Mob.No.+91 9958050251

6. Date and time for submission

of offers

On or before 16.12.2010 upto 3.00 PM.

7. Place for opening of offers Office of CPM (KBI)

Plot No. F.I.E.-419, Patparganj Industrial Area ,

III Floor, Udyog Sadan , Delhi 92

8. Whether it can be

downloaded from the website

Yes, the offer document can be downloaded from

the DSIIDC website and a demand draft of Rs.

10,000/- (Rs. Ten Thousand only) should be made

in favour of DSIIDC- CPM (KBI) which can be

submitted along with the offer. The bid shall be

submitted on or before due date & time mentioned

in the offer document.

Page 4: Dsiidc Kbi Park Baprola

3

DELHI STATE INDUSTRIAL & INFRASTRUCTURE DEVELOPMENT CORPORATION LTD.

Udyog Sadan Patparganj Industrial Area , Delhi 92

OFFICE OF THE CPM/ EXECUTIVE ENGINEER ( CD-KBI)

NOTICE INVITING TENDER

Tender ID No.CPM(KBI)/01/2010

PART – I (TECHNICAL BID) Item Rate Tenders are invited in two bid system i.e Part-I ( Technical Bid ) and Part-II ( Financial

Bid ) on behalf of the Managing Director DSIIDC, from reliable, well established, competent and

experienced Architectural Consultancy Firms for the following works

S.

No

Name of Work Cost of Tender

(in Rs.)

Construction

Division

1. Pre bid meeting 2. Last date of sale of

tender Document 3. Date of submission of

tender 4. Date of opening of

Tender ( Part-I- Technical )

1. Engagement of consultant for

Development, Planning,

Design & Architectural /

other allied engineering

consultancy services for

Development of Knowledge

Based Industrial Park (KBI)

at Baprola, Delhi

Rs. 10,000/-

CPM/ Ex.

Engineer

(CD-KBI)

DSIIDC

Udyog Sadan

Patparganj

Industrial Area

, Delhi 92

29/11/10 at 11.00 A.M.

15/12/10 up to 4.00 P.M.

16/12/10 up to 3.00 P.M.

16/12/2010 at 3.30 P.M.

Tender document can be purchased from the office of the undersigned. The tender document can be downloaded

from our website www.dsiidc.org The Managing Director, DSIIDC reserves the right to reject any or all the

tenders without assigning any reason.

Page 5: Dsiidc Kbi Park Baprola

4

The Tenderer shall submit with the following ( Checklist ) :-

1. Tender cost of Rs. 10,000/-

2. Undertaking ( as per Form A)

3. Copy of PAN Number

4. Copy of Service Tax Number

5. Copy of proof of having submitted the latest service tax returns. 6. Form B1 ( works completed during last 7 years )

7. Form B2 ( works in hand)

8. Form C ( list of associated consultants)

9. Form D1 ( International / National Awards )

10. Form D2 ( other Awards / appreciation etc )

11. Form E (Particulars of Litigation / Arbitration Cases

12. Form F ( Technical Staff )

13. Form G ( Document regarding Financial Turnover )

14. Form H ( Empanelment with Govt. / Semi Govt. etc )

CPM/Executive Engineer CD-KBI, DSIIDC.

For & on behalf of Managing Director, DSIIDC Udyog Sadan

Patparganj Industrial Area , Delhi 92

Page 6: Dsiidc Kbi Park Baprola

5

Background

1) The Corporation stands committed to provide developed, organized and

Hi-Tech work space to clean, green and knowledge based industries in

Delhi under the Industrial Policy for Delhi 2010-2021 and employment

for skilled work force and walk to work concept, wherever possible.

2) DSIIDC had acquired lease-hold rights for 99 years for land measuring

130.71 acres at Baprola from the Directorate of Rural Development,

Govt. of NCT of Delhi in December 2006. DSIIDC has decided that

Knowledge Based Industrial Park (KBI) may be constructed on the

land measuring 70.6 acres on two pockets of approx 65.62 acres and

4.99 acres situated on either side of Nangloi - Najafgarh Road.

3) The Government of Delhi has approved proposal of DSIIDC to develop

a Knowledge Based Industrial Park at Baprola.

4) Broad financial outlay of the project is tabulated hereunder:

Page 7: Dsiidc Kbi Park Baprola

6

S/n Built up Space Area in

Sqm Unit

Rate in

Rs./Sqmt.

Estimated Cost in Rs.

in crore

a. Industrial Covered Area in the super structure 398328 Sqm 25,000 995.8

B Residential Covered Area in the super structure 40887 Sqm 23,000 94.0

C

Covered Area for parking & services ( Transportation & MSPL not counted) 104471 Sqm 15,000 156.7

D Infrastructure Development 199416 Sqm 3500 69.8

E Sub Total 1316.30

F Green building components 10% is to be taken Extra 131.63

Total project Cost 1448.0

Say = Rs.1450 crores Note:- The final area would emerge after the finalization of road alignments etc.

Eligibility

Tenders will be issued to individual, proprietary firms, firms in partnership or limited

companies / corporations. Joint Ventures will not be permitted.

The Tenders shall have to fulfill the Eligibility Criteria as laid down in para 1A of the

tender, failing which his financial bid will be returned unopened.

The procedure to be followed for submission and opening of Tenders has been described

in para 1A4.

Page 8: Dsiidc Kbi Park Baprola

7

1A. PREQUALIFICATION CRITERIA & WORK EXPERIENCE

i) The applicant should be registered with Council of Architecture India,

during the last 03 years on the date of submission of bid. Architect firm must

qualify at their own (JV partnership is not allowed).

ii) In case of consulting firms from abroad, firm should have a permanent

establishment in the NCR of Delhi. In case of consulting firms from India, they

should have an office in NCR of Delhi.

iii) In case of foreign consulting firms, they should be conversant with local

statutory laws and follow all rules and regulations in India especially laid down

by Ministry of Commerce, any other GOI Department, Statutory Body ,

Council Of Architecture, Tribunal, GOI Tax requirements etc. They should be

in possession of Indian Pan & Service Tax number.

iv) Average Turnover: The applicant should have an average annual turnover of

not less than Rs. 5 crores (1.1 million USD) per annum from the Consultancy

service during the last three years (Attested copies of audited financial

statements along with copies of Income Tax Return filed with Income Tax

Deptt. to be enclosed)

v) The consultant should not have been blacklisted by any Govt. department /

agency during the last seven years.

vi) The Architect Consultant should have all necessary CAD/CAM equipments for

successful execution of project.

vii) Work Experience :The applicant should have experience of rendering

consultancy service in its own name during the last 7 years ending 30

September 2010 at least of having satisfactorily completed from concept to

commissioning of similar hi tech, office or commercial complex approx. of :

Page 9: Dsiidc Kbi Park Baprola

8

One similar project 50% each of - site area of 70.6 acres, built up area of

5,50,000 sq.m. and cost of 1,450 crores.

OR

Two similar projects of 30% each of - site area of 70.6 acres, built up

area of 5,50,000 sq.m. and cost of 1,450 crores.

OR

Three similar projects of 20% each of - site area of 70.6 acres, built up

area of 5,50,000 sq.m. and cost of 1,450 crores.

viii) Minimum Configuration of the team of the consultant for this project: The

Architect Consultant should have sufficient number of Technical and

Administrative permanent employees and the following permanent staff should

have been engaged by the firm during the last three years before 30th

September, 2010. The Consultant must furnish CV/Bio data of the

professionals / employees.

s/n Professional Criteria

I a) Team Leader (1 no.) B.Arch. with minimum 25 years professional

experience and minimum 5 years in the field

of designing of hi tech office, or commercial

buildings , complex and housing.

b) Support Team:- Must comprise of :

(i) Structural Engg.(1 no.) M. Tech in structural engineering with

minimum 20 years experience in the field of

designing of hi tech, office or commercial

buildings , complex .

(ii) Architect (02 nos.) B.Arch. with minimum 15 years experience in

the field of designing of hi tech, office or

commercial buildings, complex.

Page 10: Dsiidc Kbi Park Baprola

9

(iii) Quantity surveyor (02

nos.)

Diploma in Civil Engineering with 15 years

experience.

(iv) Civil Engineer (02 nos.) B.E. in Civil Engineering with 15 years

experience in housing projects.

II Consultants/

Engineers

In case following staff is not available in

house, the same could be hired or arranged or

hired:

(i) Structural Engg. Consultant

Having minimum 20 years of experience.

(ii) Environmental

Engineer

/EIA Consultants

Experience in preparation of EIA report and

getting EIA clearance for large Hi Tech

projects and housing.

(iii) PHE Plumbing and

Sewerage

Consultant/Engineer

Consultant/Engineer should have experience

of designing Plumbing & Sewerage system of

large Hi Tech projects and housing.

(iv) Electrical Engg./

Consultant

B.E. in Electrical Engineering with 15 years

experience is designing of Electrical &

communication system for large techno savvy

Hi Tech projects and housing.

(v) HVAC Consultant 15 years experience in designing

(vi) Landscape &

Horticulture Consultant

15 years experience in designing

(vii) Transport Consultant

15 years experience in designing

1A.4 Submission of Tender

The bidders shall submit the tender in the following manner : -

1A4.1 Tender cost of Rs. 10,000/- in the form of demand draft of a scheduled bank issued in

favour of “CPM/Executive Engineer, (CD-KBI), DSIIDC, Delhi -110 092.

1A4.2 A sealed envelope marked as Part I (Technical Bid ) will contain Technical Bid of the

tender document.

Page 11: Dsiidc Kbi Park Baprola

10

1A4.3 A sealed envelope marked as Part II (Financial Bid) will contain Financial Bid of the

tender document

1A4.4 Part-I containing “Technical Bid” and the Part-2 containing “ Financial Bid” will be

placed in a sealed (bigger) envelope which shall be sealed and addressed to the CPM /

Executive Engineer ( CD-KBI), DSIIDC and bear on its cover the name of work, the

name and address of the Tenderer, and the due date of opening. The Envelope shall be

submitted in the office of CPM/ Executive Engineer, DSIIDC–KBI at Udyog Sadan , Patparganj Industrial Area , Delhi 92

,

1A4.5 The inner envelope i.e Part-I mentioned in Para 1A4.2 above as well as Part-2 mentioned

in 1A4.3 above will also bear on the cover the name of work and the name and address of

the Tenderer, and shall be addressed to the CPM / Executive Engineer ( CD-KBI),

DSIIDC

1B. EVALUATION OF BIDS

The bids will be evaluated on Combined Quality cum Cost Based System wherein Technical Bid will be given a weightage of 70% and financial bid will be given a weightage of 30%. Criteria, Sub-criteria and point system for evaluation of technical bid is as under (Total 100 marks) :-

i) Specific experience of the consultant firm relevant to the Project

assignment (Max. 15 marks)

Experience of rendering consultancy service in its own name during the last 7 years ending 30 September 2010 satisfactorily completed from concept to commissioning of similar hi tech industrial park, office or commercial complex.

ii) Adequacy of the proposed methodology and work plan in response

to the terms of reference. (Max. 15 marks).

Technical approach & methodology

iii) Key professional staff: Qualification & competence for the Project assignment. (Max. 15 marks).

The maximum marks for key professionals will be further divided as under:- a) Team leader (Max. 5 marks) b) Other professionals. (Max 10 marks)

Page 12: Dsiidc Kbi Park Baprola

11

For evaluation of each of the key professionals the following sub-criteria shall be followed:-

c) Educational Qualifications (30%) d) Experience & Adequacy for the Project assignment. (50%) e) Experience of the region & language (20%)

iv) Presentation by the pre-qualified consultants( Max. 55 marks ) :-

After short listing based on the prequalification criteria by the committee a presentation is to be done by the prequalified firms before duly appointed Jury to be evaluated broadly on the following parameters:- a) Site layout, Human and vehicular traffic management (Max.15

marks) b) Urban Context & aesthetics (Max. 15 marks) c) Concept & Design of buildings (Max. 15 marks) d) Building efficiency, green building component and FAR

utilization (Max. 10 marks)

v) Pre-qualified consultants alone will be considered at the presentation stage. Bids securing a minimum of 60% and above marks in technical evaluation with 50% marks in each sub-criteria will be considered for opening of financial bid. The bids with the lowest cost will be given a financial score of 100 and the other bids will be given financial score that are inversely proportionate to their prices. The total score, both technical and financial, shall be obtained by weighing the Technical and Financial scores and adding them up. The bid will be ranked in terms of total points scored. The proposal with the highest total points (H-1) will be considered for award of contract and will be called for negotiations, if required.

2. Other Information to be submitted:- 2.1 The Architect Consultant should have sufficient number of Technical staff and

Consultants/Associates for the proper execution of the contract. The applicant should submit a list of staff. Details should be furnished in FORM “C” & “F”.

2.2 List of completed similar works shall be submitted separately in Form ‘B-I’. List of

ongoing similar works shall be submitted separately in Form- “B-2”. 2.3 If the firm is registered/empanelled with other Organization/Statutory bodies such as

CPWD, PWD, MES, Banks, World Bank, ADB or any other International body etc. furnish their Name, Category and date of registration, if any. (Form H)

Page 13: Dsiidc Kbi Park Baprola

12

2.4 Furnish list of Awards / recognitions / competition won (Form D1 & D2)

2.5 If the offer is submitted by a proprietary firm it shall be signed by the proprietor above

his full type written name and the full name of his firm with its current address.

2.6 If the offer is submitted by a firm in partnership, it shall be signed by all the partners of

the firm with their full names and current addresses or by a partner holding the power of

attorney for the firm by signing the offer in which case a certified copy of the power of

attorney shall accompany the offer. A certified copy of the partnership deed, current

address of the firm and the full names of partners shall also accompany the offer.

2.7 The bidder should furnish an undertaking in the form of an affidavit guaranteeing the

truth and accuracy of all statements and information furnished in the format given (Form

A)

Note: The Architect Consultant is required to furnish all information in all the

Presentation FORMS A to H and their appurtenant format along with proof, failing

which the proposal is liable to be rejected.

3. OTHER GENERAL INFORMATION & INSTRUCTIONS

3.1 The firm will provide consultancy services for preparing complete Detailed Project

Report (DPR) and complete Architectural and Engineering services in respect of the work

“Engagement of consultant for Development, Planning, Design & Architectural /

other allied engineering consultancy services for the development of Knowledge

Based Industrial Park (KBI) at Baprola, Delhi

3.2 All information called should be furnished against the relevant columns. Additional

information may be furnished on a separate sheet, by mentioning the same against the

relevant column. If any particulars / query is not applicable, it should be stated as `Not-

Applicable`. Incomplete information shall be summarily rejected.

Page 14: Dsiidc Kbi Park Baprola

13

3.3 Credentials, references, information and certificates from the client certifying

performance along with list of important works executed during the last seven years etc.

should be furnished in the prescribed formats

3.4 If any information furnished by the applicant is found incorrect at a later stage, the firm

shall be liable to be debarred from bidding/taking up of work in DSIIDC. The

Corporation reserves the right to verify the particulars furnished by the applicant

independently.

3.5 Canvassing whether directly or indirectly, in connection with proposals is strictly

prohibited and the proposals bids submitted by the applicants who resort to canvassing

will be liable to rejection.

3.6 All documents enclosed should be signed with seal.

3.7 The competent authority on behalf of MD of DSIIDC reserves the right of accepting the

whole or any part of the proposal.

3.8 Managing Director, DSIIDC, reserves the right to reject any or/ all the bids without

assigning any reason thereof and no correspondence in this regard shall be entrained.

3.9 Tender shall be valid for 90 days from the date of opening of tender. The DSIIDC reserves the right to

reject any or all tenders without assigning any reason.

3.10 The time allowed for preparation of DPR etc. as per Clause 4.1.15 in accordance with the phasing,,

indicated in the tender documents.

3.11 The site for the work shall be available.

3.12 Sealed Tenders will be received in the Tender Box placed in the office of CPM/Executive Engineer, (CD-

KBI), DSIIDC, Udyog Sadan Patparganj Industrial Area , Delhi 92

3.13 The Consultant, whose tender is accepted, will be required to furnish performance Bank Guarantee of 5%

(five percent) of the tendered amount within 15 days of Award letter. This Bank Guarantee shall be issued

Page 15: Dsiidc Kbi Park Baprola

14

from any Scheduled Bank or the State Bank of India in accordance with the prescribed form. In case the

consultant fails to deposit the said performance guarantee within the prescribed period including the

extended period, if any, the offer will be cancelled and offer may be given to next preferred bidder.

3.14 FINANCIAL BID

3.14.1 The Financial offer would provide fee for whole consultancy job as per TOR and shall be submitted as per

Bid (Part-II)

3.14.2 The bidders are required to quote item rate fee for comprehensive Consultancy job work inclusive of all

prevailing taxes and levies except the statutory service tax for the Consultancy Services as per TOR

3.14.3 Bids securing overall 60% and above marks and minimum 50% marks in each sub-head in technical

evaluation will only be considered for opening of Financial Bids. The Bids with the lowest cost may be

given a financial score of 100 and the other bids given financial score that are inversely proportionate to

their prices.

3.14.4 The total score, both technical and financial, shall be obtained by weighing the Technical and Financial

scores and adding them up. On the basis of the combined weighted score for Technical and Financial, the

consultant shall be ranked in terms of the total score obtained. The bid obtaining the highest total combined

score in evaluation of quality and cost will be ranked as H-1 followed by the bids securing lesser marks as

H-2, H-3 etc.

Total points = T (w) x T (s) + F (w) x LEC / EC, where

T (w) stands for weight of the technical score.

T (s) stands for technical score.

F (w) stands for weight of the financial proposal.

EC stands for Evaluation Cost of the financial proposal.

LEC stands for Lowest Evaluation Cost of the financial proposal.

The proposal will be ranked in terms of total points scored. The proposal with the highest

total points (H-1) will be considered for award of contract and will be called for negotiations, if

required.

3.15 NA

Page 16: Dsiidc Kbi Park Baprola

15

4. Scope of work

The Architect consultant shall base his proposal on MPD 2021, Industrial policy 2010-

2020 and broad concepts prepared by DSIIDC. The architect is required to provide

services in respect of the following:

i. Taking clients instructions and preparation of design brief with :

Preliminary Project Reports

Project cost estimations based on PAR 2007

All statutory approvals / clearances

Preparation of bill of quantities(BOQ) for detailed estimates

Preparation of Bid documents etc.

Detailed Project Reports, Working , structural & Detailed

Drawings

As built Drawings & Completion

ii. The scope of work of architect-consultant will be all

encompassing comprising of all tests & Site survey, evaluation,

analysis and impact of existing and / or proposed development

on its immediate environs inclusive of preparation of General

Layout of all proposed Buildings and Services or any other

requirement for Environmental Impact Assessment ( EIA of built

up space) & implementing Environment Impact Assessment

(EIA)

iii. Building Design, site layout & development.

iv. Preparation and Approval of plans from all competent authorities

/ Statutory Bodies, Change and conversion in land use.

v. Models on a suitable scale, 3-D perspectives & input for

marketing Brochures,

Page 17: Dsiidc Kbi Park Baprola

16

vi. All engineering services required for successful construction &

completion of project , comprising following but not limited to

works:

a. Building specifications, Quantity surveying, preparation of

BOQ and all estimates like Preliminary & Detailed

estimates for AA & TS, Bid Documents for tendering

purposes based on CPWD Manual (or DSIIDC Works

Manual) and General Conditions of contract. Detailed

measurement sheet and rate analysis of non schedule items.

b. Structural design of structures & building basement etc.

c. Transport Infrastructure, provision for parking, landscape,

beautification, irrigation & Arboriculture Architecture.

d. Sewerage and Sewerage Treatment Plant.

e. Internal & external Electricity , street lighting , electronic

& communication systems,

f. Storm water and rain water harvesting

g. Hygiene , Waste collection, accessories , Graphic signage,

facilities & street furniture

h. Internal & external water supply, R.O. and Fire fighting,

Fire detection, Fire protection and Security systems, etc.

i. Internal & external public health engineering system like

Sanitary, plumbing ,drainage and water recycle,

j. Heating, ventilation and air conditioning design (HVAC)

and other mechanical systems.

k. Cable TV & Internet wires, solar energy use, façade

lighting, security, Traffic & Building management systems.

l. Elevators, escalators & travelators etc.

However DSIIDC reserves the right to allocate the selected consultant, the

consultancy work for building work in batches keeping in mind his past

performance , work in hand and time schedules.

Page 18: Dsiidc Kbi Park Baprola

17

4.1.14 Scope of work shall also include visit to the sites, collection of

data/information for services technical features, visits to different agencies

for liaison. No extra consideration shall be paid for such visits.

4.1.15

TIME FRAME:- Tentative milestones of the project are as follows:-

S/n Milestones Key dates 1. Preparation of DPR and submission of proposal for Clearances of

the Project from different Govt./ competent Authorities for phase-I May 2011

2. Preparation of preliminary and detailed estimates BOQ , Bid Documents, AS, TS ,call of tenders and award of work. for phase-I

June 2011

3. Procurement of the contractors for development work of 25% industrial building work and 50% housing building work (Phase-I)

Aug 2011

4 Completion of Development work Aug 2012 5 Completion of Building Work (Phase-1 ) Dec 2012 6 Submission of proposal for Clearances of the Project from

different Govt./ competent Authorities for phase-II & III Oct 2011

8 Preparation of preliminary and detailed estimates BOQ , Bid Documents, AS, TS , call of tenders and award of work. for phase-II

August 2012

9 Procurement of the contractors for development work of 50% industrial building work and 50% housing building work (Phase-II)

Dec. 2012

10 Completion of Building Work (Phase-II ) . April 2014 11 Preparation of preliminary and detailed estimates BOQ , Bid

Documents, AS, TS , call of tenders and award of work. for Phase III

Feb 2013

12 Procurement of the contractors for development work of 2 5% housing building work (Phase-III)

June 2013

13 Completion of Building Work (Phase-III ) & remaining works. Dec. 2014

4.1.16 The site survey Plan and Soil Testing reports (if any ) available with DSIIDC

shall be provided to the Consultant for preparation of DPR any other

information/data shall be collected by the Consultant on his own.

Page 19: Dsiidc Kbi Park Baprola

18

4.2 Part II: Architectural & Engineering Services :

The Consultant shall provide service in respect of the following services.

4.2.1 Getting approval of the scheme, from various local bodies like DUAC, DFS, DJB, NDPL, BSES,MCD

and Building & Town Planning of MCD/DDA, etc. and other Statutory Authorities (including

Ministry of Environmental / DPCC) after getting the drawings approval from the DSIIDC.

4.2.2 Civil and Architectural work like detailed Architectural and Structural drawings, structural design,

including interiors, estimation, preparation of all related drawings, detailed calculations and BOQ etc.

including approval from all concerned local bodies, wherever required

(i) Complete water supply system (internal & external)

(ii) Complete sewerage disposal system (internal & external)

(iii) Complete drainage system (internal & external)

(iv) Complete electrification system (internal : external)

(v) Complete provision for fire fighting system.

(vi) Complete telephones lines layout, if required

(vii) Complete work of road, park, pump room etc.

(viii) Complete horticulture and landscaping scheme.

(ix) Complete layout including graphics signages.

(x) To prepare the scheme for rain water harvesting.

4.2.3 Visiting the site, discussing details with DSIIDC’s representatives and attending meetings etc. as and when

required.

4.2.4 Preparation of drawings and designs sketches plans elevation, sections, perspective etc. and all types of

models as required adequate to explain general planning and nature of the work with basic dimensions.

4.2.5 Obtaining approval of the plans from the all local authorities concerned as mentioned above.

4.2.6 Preparation of Preliminary estimate of cost on cubical contents or area basis etc. supported with details

of rates adopted as per CPWD norms for obtaining A/A & E/S sanctions.

4.2.7 Modifying Drawings, above if necessary and obtaining DSIIDC’s final approval to the same before

submitting to local bodies.

Page 20: Dsiidc Kbi Park Baprola

19

4.2.8 Preparation of working drawings and details, structural designs including interiors (if required) etc. for

all aspects of the work including architectural, sanitary, water supply, drainage, electrical works and

obtaining approval of the DSIIDC for the same.

4.2.9 Preparation of site plans, landscaping, design of roads and compound wall and external electrification

etc.

4.2.10 Coordinating overall designing, drawings and detailing work pertaining to various services and other

engineering works as may be necessary.

4.2.11 Formulation of specifications.

4.2.12 Assisting main executing agency in preparation of PERT/CPM Charts for the total project for ensuring

timely completion of the work and review the progress all through.

4.2.13 Preparation of all necessary schedules of quantities and detailed specifications for the purpose of

tenders.

4.2.14 Preparation of necessary tender documents and Market Rate Justification thereafter.

4.2.15 Maintaining liaison with DSIIDC and local authority in connection with successful completion of this

project.

4.2.16 Assisting in arbitration and litigation cases that may arise out of the contracts entered into in respect of

any of the related works.

4.2.17 Making available one copy of each original tracing/ Soft Copy to DSIIDC on a good quality tracing

paper/ DVD as required by DSIIDC.

4.2.18 Making available as many as 10 (ten) number of prints of the plans / drawings and working drawings

and detailed drawings etc. as may be required during the progress of the work.

4.2.19 Requiring to incorporate all the changes in drawings, which DSIIDC might require to incorporate at

any stage during the process of implementation of the project.

4.2.20 Preparation of the as built drawings at the completion of the project and providing necessary hard and

soft copies for record.

5. SCHEDULE OF SERVICES :-

Consultants shall be responsible for :-

Page 21: Dsiidc Kbi Park Baprola

20

5.1 Planning Stage :-

a) Understanding the client’s requirements

b) Preparing preliminary conceptual scheme with design of individual units, cluster plan, block plan,

layout as per Master Plan / Building Byelaws and National Building Code or other IS codes and

norms applicable.

c) Revising the scheme to suit the client’s need till approval.

d) Preparing preliminary estimates.

e) Preparing specifications.

f) Revising the specifications to suit the various parameters required.

5.2 Statutory Approval Stage:-

a) On approval of conceptual scheme from the client, prepare drawings and other documents for

submission to statutory authorities like MCD, DDA, DUAC, DFS,DJB , NDPL, BSES, DMRC,

Ministry of Environment .

b) Liaison with various Authorities and obtaining approvals.

c) Doing necessary corrections / amendments / modifications, if required, for approvals from

Statutory Authorities.

d) Any modification at this stage shall be got approved from DSIIDC before submitting to Statutory

Authorities.

e) The Consultant will appoint independent EIA Consultant, if not available in house and will get

EIA study conducted and obtain approval from the DPCC/ Ministry of Environment.

5.3 Working Drawing Stage:-

a) Preparation of detailed architectural, structural, services drawings and including drawings showing

details of all utilities and services, internal and external including and incorporating all revisions

and including details of specifications of all special item of work.

b) Obtaining approval of the employer to above and modifying them if considered necessary by the

DSIIDC and/or if the cost exceed the estimated cost by over 5% (Five percent)

c) If required, prepare drawings for obtaining approval of local and other authorities mentioned

above and making any change required by them.

Page 22: Dsiidc Kbi Park Baprola

21

d) Preparing and coordinating the Architectural, Structural engineering, surveying work, and

prepare complete working details, schedules, specifications, and bill of quantities etc. to describe

the whole project adequately for the purpose of placing the main and other subsidiary contracts by

the DSIIDC.

e) Preparing and supplying bills of quantities, along with details of calculation of all items of work

together with details of specification of all special items complete with necessary architectural

drawings, structural drawings, detailed estimates on standard schedule of rates and based on

market rates for non schedule items including tender documents to enable the DSIIDC to invite

tenders.

5.4 Construction Stage :-

The Consultants would:-

a) Release such architectural, structural and services drawings specification and details, which may

be required for proper execution of the work.

b) Obtain DSIIDC’s approval for any material deviation in design or cost of the working drawings,

schedules and specification from the approved scheme.

c) Vetting of structural drawings through independent agency or BMTPC or CBRI.

d) Site visits whenever required

e) Preparation of completion drawings

f) The CPM / Pert Chart prepared by executing agency shall be vetted by the consultant.

g) Attending progress review meetings and suggest remedial measures for achieving the desired

targets

6.1 STRUCTURAL STABILITY

The consultant shall give Certification regarding Structural stability of the structures.

6.2 EARTHQUAKE RESISTANT :

The consultant shall ensure that the building has been designed as earthquake resistant

building.

7 PAYMENT OF REMUNERATION :

The employer agrees to pay the following fees to Consultants for the professional

Services rendered by them.

Page 23: Dsiidc Kbi Park Baprola

22

7.1 NA

7.2 Service tax as applicable shall be paid to the consultants by the employer on the

fee.

7.3 The above fee at clause (7.1) is inclusive of fees payable by the Consultant to any

other sub consultant and associated consultant and nothing extra shall be payable

by the Employer.

7.4 DSIIDC shall not pay any expenditure to consultant on any local or outstation

visit for the purpose of the project. Consultant has to bear all such type of

transportation and any other expenses. DSIIDC shall not pay any expenditure

towards liaison with various statutory authorities for obtaining their approvals.

7.5 The Consultants shall have to make all arrangements for any other facilities

required by his staff at their own cost.

7.6 The compensation of Rs. 50,000/- per default shall be recovered by the employer

from the Consultants for not attending prefixed meetings for discussions,

assistance to employer in completing the project. Provided that no such

compensation will be recoverable, if in the opinion of the Executive Engineer of

DSIIDC that such failure to attend the meeting was for reason beyond the control

of the Consultants.

7.7 Consultants shall acquaint himself with all the legislation, Court and standards

prescribed from time to time.

Page 24: Dsiidc Kbi Park Baprola

23

8. CONSULTANCY FEE :-

8.1 The amount of fees will be paid in instalments as specified below :-

STAGE as per allocated phase %age %age

of PAY

MENT Stage-I

Preliminary planning of scheme and its

approval from local authorities:

30%

of the

total

(i) On approval of concept drawing and scheme

drawings from DSIIDC authorities

7% of the total fees payable 7%

(ii) Preparation of draft/submission drawing of

building and development work of project

including its submission and approval from local

authorities like fire Department, DDA,

MCD,DUAC,AAI, CIOF and other local bodies,

if any, including submission of original approval

of drawing so obtained to DSIIDC :

a) On Submission to MCD 14% of the total fees payable less

payment already made at stage-I(i)

7%

b) On Submission to other

Authorities/departments

16% of the total fees payable less

payment already made at stage-

I(i)&(ii)(a)

2%

c)On Approval from MCD 24% of the total fees payable less

payment already made at stage-

I(ii) b)

8%

d) Approval from other Authorities/departments

DJB,DPCC/SLEIAA of services drawings

28% of the total fees payable less

payment already made at stage-

I(ii) c)

4%

(iii)Submission of preliminary estimate covering all

aspect of the project.

29 % of the total fees payable less

payment already made at stage-

I(ii) d)

1%

Page 25: Dsiidc Kbi Park Baprola

24

(iv) Submission of model of project 30% of the total fees payable less

payment already made at stage-

I(iii)

1%

Stage-II

A) On submission of post qualification/ tender

document, estimate and on approval of

specifications /PQ/ Estimate and draft NIT by

competent authority

50% of the total fees payable less

payment already made at Stage-I

(iv)

20 %

of the

total

i) Tender document for civil, electrical (internal &

external), networking and communication

(conducting) sanitation, water supply,

development work including bulk services, rain

water harvesting, STP (if required), water

boosting arrangement, Solar Heaters and its

arrangement. The Estimate of the service shall be

prepared on the basis of with bldg. drawings*

ii) On submission of estimates including Operation

and Maintenance provisions for the required

works, Draft NIT’s and the approval of Deptt.

CIVIL WORK

i) Civil & Internal Electrification work upto 1st

Manhole and Main Electrical Board/ LT Pannel of

Building i/c Main Gate provisions

(10%)

ii) Service Block, Boring of Tubewels, Water

Boosting arrangement with required Water Treatment

Plants i/c Electrical & Mechanical work

(1%)

iii) Fire fighting (internal & external), fire alarm, Fire

Check Doors etc.

(1%)

iv) False Ceiling with Electrical Fittings & Fixtures (1%)

v) External Development work i/c Sewerage, Water

supply, Drainage, and Rain Water Harvesting

(1%)

Page 26: Dsiidc Kbi Park Baprola

25

vi) Interior Designing work like reception, lift lobby,

corridor ( Not loose furniture) i/c signages and any

other estimate, if required

ELECTRICAL WORK

i) HVAC (low & high side) (1%)

ii) Lift and escalators (1%)

iii) LT & HT Pannel/ Cable Work & Substation

equipments (1.5%)

iv) EPBAX, LAN, WAN System and any other

estimate, if required (.25%)

(1%)

HORTICULTURE AND OTHER WORK

i) Landscape and horticulture work with Operation

and maintenance for five years (1%)

ii) Cosmetics & facade lighting/ art work any other

remaining services/item for successful construction of

project On submission and theirs approvals. (25%)

1.25%

Stage-II

B) Preparing of detailed working drawing:* On

preparation and finalization of detailed working,

architectural, structural, water supply, sanitation,

fire fighting, electrical, mechanical HVAC, rain

water harvesting, interior designing and drawing

etc i.e. of all disciplines broadly as under :

70% of the total fees payable less

payment already made at Stage-II

A

20 %

of the

total

i) Building Block including incorporation of

structures etc.

62% of the total fees payable less

payment already made at Stage-II

B (I)

ii) Incorporation of services 64% of the total fees payable less

payment already made at Stage-II

B (ii)

Page 27: Dsiidc Kbi Park Baprola

26

iii) Development Works 66 % of the total fees payable less

payment already made at Stage-II

B (iii)

iv) Joinery & Details like kitchen, toilets, pantry,

stairs, flooring , façade details etc

68% of the total fees payable less

payment already made at Stage-II

B (iv)

v) Iron works & HVAC, Lifts, on coordinating,

resolving & vetting of the shop floor drawings

68% of the total fees payable less

payment already made at Stage-II

B (v)

* (All drawings shall be marked as good for construction during

progress of work incorporating any changes, amendments etc.)

Stage-II

C) On preparation and approval of revised

estimate with extra, substitute and deviation, if

there during the execution and completion of

work, if required otherwise would be adjusted in

stage III A (v)

71% of the total fees payable less

payment already made at Stage-II

B (v)

1 %

Stage-III

Construction & Supervision Stage

A) On completion of

89% of the total fees payable less

payment already made at Stage-II

C

19%

(i) 20% work 75% of the total fees payable less

payment already made at stage-II

C

(ii) 40% work 80% of the total fees payable less

payment already made at Stage-III

A(i)

(iii)60% work 85% of the total fees payable less

payment already made at Stage-III

A(ii)

(iv) 80% work 87% of the total fees payable less

payment already made at Stage-III

A(iii)

Page 28: Dsiidc Kbi Park Baprola

27

(v) 100% of work and on providing defect list, if any 89% of the total fees payable less

payment already made at Stage-III

A(iv)

Stage-III

B) Draft replies to queries/point raised by

different agencies related to planning, PQ

estimate, tender document, extra/ substitute/

deviation item if any, otherwise would be

adjusted in stage III A (V)

91% of the total fees payable less

payment already made at Stage-III

A(v)

1 % of

the

total

Stage-IV

Completion Stage

A) After completion of work and submission of

all completion drawings for approval from all

local bodies & as built drawings.

95% of the total fees payable less

payment already made at Stage-III

B

5 % of

the

total

B) After obtaining completion certificate from

local bodies, drawings for connections

/service, and obtaining occupancy certificate

etc.

100% of the total fees payable less

payment already made at Stage-IV

A

4 % of

the

total

100%

NOTE:

Two sets of all drawing shall be submitted along with soft copies.

“Z” denotes the Commencement Date as per the Contract Agreement.

“Y” denotes the Completion of Construction Work.

Time period for the Consultancy shall be excluding time taken by DSIIDC for approval.

Payment can be released on prorate basis at each stage.

9.0 COST TO BE EXCLUDED FOR PAYMENT TO CONSULTANTS

NA

10.0 ADDITION AND ALTERATION

Page 29: Dsiidc Kbi Park Baprola

28

10.1 The employer shall have the right to request in writing changes, additions, `modifications

or deletions in the design and drawing of any part of the work and to request in writing

additional work in connection therewith and the Consultants shall comply with such

request. If the Employer deviates substantially from the original scheme which involves

for its proper execution extra services, expenses and extra labour on the part of the

Consultants for making changes and additions to the drawings specifications or other

documents due to rendering major part or the whole of his work infructous and the

Consultants may then be compensated for such extra services and expenses on quantum

merit basis at percentage applicable under this agreement and to be determined mutually

unless such changes, alterations are due to Consultants own commission and/or

discrepancies including changes required by Consultants of all internal, external utilities

and services, the decision of the employer shall be final on whether the deviations and

additions are substantial as requiring any compensation to be paid to the Consultants.

However for the minor modification or alteration which does not affect the entire design

planning etc. no amount will be payable.

10.2 If it is found after call of tender that the acceptable tender is not within the amount

sanction then the Consultants shall if so desired by the employer take steps to carry out

necessary modification in the design and specification to see that tendered cost does not

exceed. The Consultants shall not be paid anything extra for such modification. If the

employer is convinced that the trend of market rates is such that work can not be done

within the amount of approved estimate, the Consultants shall submit a revised estimate

expeditiously for obtaining revised approval.

10.3 The Consultants shall not make any deviation, alterations, additions to or omission from

the work shown / described and awarded to the Consultant except through and with prior

approval of the Engineer-in-Charge in writing.

Page 30: Dsiidc Kbi Park Baprola

29

11. Award of Contact :

11.1 The Contract will be awarded after successful negotiations with the successful

consultants

11.2 Upon successful completion of the negotiations, the Engineer-in-charge will

inform the successful bidder about the intention to award the work through a

Letter of Intent.

11.3 Remuneration received as per the contract will be subject to tax deductions at

source at the rate as applicable at that point of time

11.4 Formal agreement will be drawn by the CPM/Executive Engineer CD- KBI

11.0 TERMINATION

That this agreement may be terminated at any time by either party upon giving one

months notice to the other and in the event of such termination, the Consultants shall be

entitled to all such fee for the services rendered and liable to refund the excess payment,

if any made to him over and above than what is due in terms of this agreement on the

date of termination and the employer may make full use of all or any of the drawings

prepared by the Consultants.

12.0 ARBITRATION

In the event of any dispute between the parties hereto arising out of or in any way

touching or concerning this agreement (except those the decision where of is otherwise

herein before provided for), disputes or differences shall be referred for adjudication

through arbitration by a sole arbitrator appointed by the Chief Engineer, DSIIDC, in

charges of the work or if there be no Chief Engineer, the Administrative head of the

DSIIDC. If the arbitrator so appointed is unable or unwilling to act or resign his

appointment or vacates his office due to any reason whatsoever, another sole arbitrator

Page 31: Dsiidc Kbi Park Baprola

30

shall be appointed in the manner aforesaid. Such person shall be entitled to proceed with

the reference from the stage at which it was left by his predecessor.

It is a term of this contract that the party invoking arbitration shall give a list of disputes

with amounts claimed in respect of each such dispute along with the notice for

appointment of arbitrator and giving reference to the rejection by the Chief Engineer of

the appeal.

It is also a term of this contract that no person, other than a person appointed by such

Chief Engineer DSIIDC or the administrative head of the DSIIDC, as aforesaid, should

act as arbitrator and if for any reason that is not possible, the matter shall not be referred

to arbitration at all.

It is also a term of this contract that if the consultant does not make any demand for

appointment of arbitrator in respect of any claims in writing as aforesaid within 120 days

of receiving the information from the Engineer-in-charge that the final bill is ready for

payment, the claim of the consultant shall be deemed to have been waived and absolutely

barred and the DSIIDC shall be discharged and released of all liabilities under the

contract in respect of these claims.

The arbitration shall be conducted in accordance with the provisions of the Arbitration

and Conciliation Act, 1996 (26 of 1996) or any statutory modifications or re-enactment

thereof and the rules made thereunder and for the time being in force shall apply to the

arbitration proceeding under this clause.

It is also a term of this contract that the arbitrator shall adjudicate on only such disputes

as are referred to him by the appointing authority and give separate award against each

dispute and claim referred to him and in all cases where the total amount of the claims by

any party exceeds Rs. 1,00,000/-, the arbitrator shall give reasons for the award.

It is also a term of the contract that if any fees are payable to the arbitrator, these shall be

paid equally by both the parties.

Page 32: Dsiidc Kbi Park Baprola

31

It is also a term of the contract that the arbitrator shall be deemed to have entered on the

reference on the date he issues notice to both the parties calling them to submit their

statement of claims and counter statement of claims. The venue of the arbitration shall be

such place as may be fixed by the arbitrator in his sole discretion. The fees, if any, of the

arbitrator shall, if required to be paid before the award is made and published, be paid

half and half by each of the parties. The cost of the reference and of the award (including

the fees, if any, of the arbitrator) shall be in the discretion of the arbitrator who may

direct to any by whom and in what manner, such costs or any part thereof shall be paid

and fix or settle the amount of costs to be so paid.

13.0 NUMBER OF DRAWINGS SETS AND COPYRIGHT

All estimates, bill of quantities with detailed measurement of details of quantities,

detailed designs with calculation, reports and any other details envisaged under this

agreement shall be supplied in triplicate and all drawings architectural or other services /

utilities (internal and external) would be supplied by the Consultants as required on

submission to all the local bodies and other authorities plus sets required by the Employer

itself being no less than ten sets of prints and one reproducible copy in the same size. If

there is any revision of any detail in any drawing for any reason same number of

drawings shall be reissued without any extra charge. All the drawings will become the

property of the Employer and it will have the right to use the same anywhere else but

only at its own risk and responsibility. In that event, the Employer will pay a royalty to

the consultants on mutually acceptable basis.

The drawings cannot be issued to any other person, firm or authority, except to the

associates and sub consultants of the Consultants or used by the Consultants for any other

project. No copies of any drawings or documents shall be issued to any one except the

Employer and / or his authorised representative.

Page 33: Dsiidc Kbi Park Baprola

32

14.0 SECURITY DEPOSIT

NA

15.0 TIME SCHEDULE

Commencement of Work :-

The date of commencement of work will be considered on 3rd day after the date of issue

of commencement letter.

15.1 Completion of various services mentioned in Clause (5.1 to 5.4) from the date of

commencement excluding time taken by the local bodies after confirmation of complying

with all requirements and furnishing certified copies of site plan and model shall be

completed within the stipulated time.

15.2 The time must be strictly observed by the Consultants and shall be deemed to be an

essence of the contract on the part of the Consultants. The work shall (throughout the

stipulated period of contract) be processed with all diligence and in the event of failure of

the Consultants of complete the work within time schedule as specified above or

subsequently notified to him, the Consultants shall pay to owners as compensation

amount equal to 1(one) percent of total fee payable to the Consultants per week the work

remains unfinished after specific date subject to maximum of 10% (ten percent) of total

fees.

16.0 ABANDONMENT OF WORK

That if the Consultants abandons the work for any reasons whatsoever or becomes

incapacitated from acting as Consultants as aforesaid, the employer may make full use of

all or any of the drawings prepared by the Consultants and that the Consultants shall be

liable to pay such damages as may be assessed by the Employer subject to a maximum of

10% (ten percent) of the total fee payable to the Consultants under this agreement.

Page 34: Dsiidc Kbi Park Baprola

33

Provided, however, that in the event of the termination of the agreement being under

proper notice as provided in the clause hereinafter, the Consultants shall be entitled to all

such fee for the services rendered and liable to refund any excess payment made to him

over/and above which is due to him in accordance with the terms of this agreement, for

the service rendered by him till the date of termination of the agreement.

17.0 GUARANTEE

The Consultants shall agree to re-design at his cost any portion of his engineering design

work, which due to his failure to use a reasonable degree of design skill, shall be found

defective within two years from the date of start of regular use of the portion of work

affected.

The employer shall grant right of access to the Consultants of these portions of the work

claimed to be defective for inspection.

The employer may make good the loss by recovery from the dues of the Consultants in

case of failure to comply with the above clause.

18.0 DETERMINATION OR RECESSION OF AGREEMENT

The Employer without any prejudice to its right against the consultant in respect of any delay

by notice in writing absolutely determine the contract in any of the following cases: -

18.1 If the Consultant being a firm/company shall pass a resolution or the court shall make any

order that the firm / company shall be wound up or if a receiver or a manager on behalf

of the creditor shall be appointed or if circumstances shall arise which entitle the court or

creditor to appoint a receiver or a manager or which entitled the court to make up a

winding order.

18.2 If the consultant is in breach of any of terms of agreement

Page 35: Dsiidc Kbi Park Baprola

34

18.3 When the consultant has made himself liable for action under any of the clauses aforesaid

the Employer shall have powers :

18.3.1 To determine or rescind the agreement.

18.3.2 To engage another consultants to carry out the balance work debiting the consultant the

excess amount if any so spent.

19.0 GENERAL

19.1 The Consultant shall be fully responsible for the technical soundness of the work

including those of the specialists engaged, if any, by him and also ensure that the work is

carried out generally in accordance with drawings, specifications and his conception.

19.2 The Employer will have the work of Consultant and/or his sub-consultants

supervise/inspected at any time by any officer nominated by him who shall be at liberty

to examine the records, check estimates and designs.

19.3 The appointment of Employer’s own supervisory staff, if any, does not absolve the

Consultant of his responsibility of general supervision. The Consultant shall be

responsible for designs of structures and all provisions / services of the work entrusted to

him so as to satisfy their requirement.

19.4 The Consultant hereby agrees that the fees to be paid as provided herein will be in full

discharge of functions to be performed by him and no claim whatsoever shall be against

the Employer in respect of any proprietary rights or copy right on the part of any other

party relating to the plans, models and drawings.

Page 36: Dsiidc Kbi Park Baprola

35

19.5 The Consultant shall indemnify and keep indemnified the Employer against any such

claims and against all cost and expenses paid by the Employer in defending himself

against such claims.

19.6 It is hereby further agreed between the parties that the stamp duty payable under the law in

respect of this agreement shall be borne by the Consultant.

In witness whereof the parties hereunder have set their hands and seals the day and year first

written

Signed & delivered by the for and behalf of

Consultant Managing Director

Witness CPM/Executive Engineer – CD-KBI

Page 37: Dsiidc Kbi Park Baprola

36

ACCEPTANCE

The above tender ( as modified by you as mentioned in the letters mentioned hereunder ) is accepted by me for and on behalf of the M.D., DSIIDC for a sum of Rs. ( Rupees. ) The letters referred to below shall form part of the this contract Agreement :- i) ii) iii) for & on behalf of the M.D., DSIIDC Signature …………………………… Dated …………………………… Designation ……………………………

Page 38: Dsiidc Kbi Park Baprola

37

FORM - A

UNDERTAKING

I / We have read and understood the instructions and the terms and conditions contained in the document. I/ we do hereby declare that the information furnished in the application and in the supplementary sheets from page …… to page ……is correct to the best of my/our knowledge and belief. It is certified that we have not been blacklisted by any Organization of Government of India including CVC. I / We have neither failed to perform on any agreement nor been expelled from any project or agreement nor have any agreement terminated for breach during the last three years. The undersigned is fully authorized to sign and submit this document on behalf of the Organization. We authorize _____ to approach individuals, employers, firms and Corporations to verify our competence and general reputation.

Signature __________________ Name __________________ Designation __________________ Address __________________ __________________ Seal

Place :_____________ Date : _____________

Page 39: Dsiidc Kbi Park Baprola

38

FORM-B-1

PARTICULARS IN RESPECT OF WORK COMPLETED/EXECUTED

( DURING PAST 7 YEARS)

(ONLY SIMILAR PROJECTS)

Sl.No.

Name of the work

Short description of work executed

Name and address of owner/client

Value of work executed In INR In USD

Land Area of the Project

Built up Area of the Project

Date of commencement

Date of completion

Any other relevant information

1

2

3

4

Consultant shall submit the certificate of satisfactory completion of the work from the respective client along with the copy of award letter/ work order. Certified that above information is correct.

Signature of Applicant

Page 40: Dsiidc Kbi Park Baprola

39

FORM-B-2

PARTICULARS IN REPSECT OF WORK IN HAND/ONGOING WORKS

(ONLY SIMILAR PROJECTS)

Sl.No.

Name of the work

Short description of work executed

Name and address of owner/client

Value of work executed In INR In USD

Land Area of the Project

Built up Area of the Project

Date of commencement

Date of completion

Any other relevant information

1

2

3

4

Consultant shall submit the award letter / work order from the respective clients Certified that above information is correct.

Signature of Applicant

Page 41: Dsiidc Kbi Park Baprola

40

FORM-B-3

NA

Page 42: Dsiidc Kbi Park Baprola

41

FORM-C

LIST OF CONSULTANTS ASSOCIATED

Sl.

No

Nature of Consultancy Name & Address of Consultants

Experience of housing projects

only

Important Projects Handled

Since When

Associated

Architect Consultant

Structural Consultant

Civil Engineer

Quantity/estimation

/Quantity Surveyor

Consultant

HVAC Consultant

Landscape & Horticulture

Consultants

Electrical Consultant

EIA Consultant

/Environmental Engineer

ETP/WTP consultant

Page 43: Dsiidc Kbi Park Baprola

42

Transport Consultant

PHE Consultant Other services consultant

Consultant shall submit the award letter / work order from the respective clients Certified that above information is correct.

Signature of Applicant

Page 44: Dsiidc Kbi Park Baprola

43

FORM-D1

COMPETITIONS WON AND AWARDS CONFERRED (International / National Awards)

S.No. Name of Organization Year of

Competition / Awards

Award conferred Remarks

Signature of Applicant

Page 45: Dsiidc Kbi Park Baprola

44

FORM-D2

COMPETITIONS WON AND AWARDS CONFERRED (Others Awards / Appreciation etc. )

S.No. Name of Organization Year of

Competition / Awards

Award conferred Remarks

Page 46: Dsiidc Kbi Park Baprola

45

FORM “E”

PARTICULARS OF LITIGATION / ARBITRATION CASES

S.No. Name of the project

under litigation Period of Litigation

Outcome of Arbitration

Remarks

Signature of Applicant

Page 47: Dsiidc Kbi Park Baprola

46

FORM- F

LIST OF TECHNICAL STAFF

S.No

Particular Name Designation Qualification

Experience

Years with the Firm

Experience in similar projects only

Region of project executed

Language spoken

Signature of the Applicant

Page 48: Dsiidc Kbi Park Baprola

47

FINANCIAL TURNOVER

FORM “G” Financial year ( Amount) Architectural Consultancy Only 2009 – 2010 2008 – 2009 2007 – 2008

Note : Consultant shall submit proof in support of the Financial turnover ( Balance Sheet / CA Certificate /TDS etc )

Signature of Applicant

Page 49: Dsiidc Kbi Park Baprola

48

FORM “H”

EMPANELMENT WITH GOVT. / SEMI GOVT. / PSU’S / INTERNATIONAL BODIES FOR ARCHITECTURAL CONSULTANCY WORKS

S.No. Name of Organization Category / Classification if any

Date of Empanelment

Signature of Applicant

Page 50: Dsiidc Kbi Park Baprola

49

DELHI STATE INDUSTRIAL & INFRASTRUCTURE DEVELOPMENT CORPORATION LTD.

Part – II (Financial Bid)

Name of Work:-

Acceptance : -

I/We certify that I/we have read all the scope of work and all the terms and condition mentioned above in Bid document and I/we agree to accept each of them.

(Consultants Signature & Address)

with Stamp

S. No.

Description of item (A)

Area (Sqm.)

(B)

Rate per Sqm

Total AxB

In INR

1.

Consultancy for Development work 199416

2 Consultancy for Built up space (industrial & residential covered area)

439215

3 Consultancy for Built up space (parking & services)

104471

Total

Note :- 1.The Land Area and Built-up Area defined above can vary on either side.

(Consultants Signature & Address) with Stamp

47