  • 8/11/2019 Draft LTP Presentation Document

    1/50

    Long-term Plan 2015 2025Options workshop

    Presentations7 July 2014

  • 8/11/2019 Draft LTP Presentation Document

    2/50

    Feedback following the workshop?If you have any further feedback aftertodays workshop please send itthrough [email protected]

    Copies of presentationsElected members: M:\Publications\LTP2015 - 2025\20140707_Options adviceworkshop

    Staff: U:\CityWide\Permanent\LTP2015-2025\14 LTP Options 7 Julyworkshop

    Internet WIFI Instructions:

    1. Search and connect to the networkcalled RFA Events Network

    2. If prompted for a wirelesspassphrase enter: eventswifi

    3. Open web browser and enter yourunique username and password(case sensitive)

    Username User0780Password vqxg93

  • 8/11/2019 Draft LTP Presentation Document

    3/50

    Table of contents

    A) Mayors Opening Address (Mayor Len Brown)

    To be tabled

    1

    B) Transforming Auckland Stephen Town (CE) 5

    C) Opportuni ties to create capacity & deliver better valueAndrew McKenzie (CFO)

    To be tabled

    19

    D) Resourc ing for critical infrastructure 23

    Water supply and waste water pricing and efficiencies (Brian Monk) 25

    Transport strategic options (David Warburton) 35

    Alternate funding (Peter Winder) 41

  • 8/11/2019 Draft LTP Presentation Document

    4/50

  • 8/11/2019 Draft LTP Presentation Document

    5/50

    Mayors Opening Address(Mayor Len Brown)

    1

  • 8/11/2019 Draft LTP Presentation Document

    6/502

  • 8/11/2019 Draft LTP Presentation Document

    7/50

    To be tabled

    3

  • 8/11/2019 Draft LTP Presentation Document

    8/50

    4

  • 8/11/2019 Draft LTP Presentation Document

    9/50

    Transforming AucklandStephen Town (CE)

    5

  • 8/11/2019 Draft LTP Presentation Document

    10/50

    LongtermPlan20152025

    Transforming

    Auckland

    Affordabilityrequiresfocusonthe

    thingsthatwillmakethemost

    difference

    Approach

    The Mayor has set the political direction

    Today provides an overview of the

    organisations response

    The detail comes later Seven Budget Committee workshops

    Local boards and IMSB consider and provide

    feedback to the Mayor

    Sept 1 Come together to consider Mayoral proposal

    Nov 5 - Decision-making for draft LTP

    6

  • 8/11/2019 Draft LTP Presentation Document

    11/50

    Delivering on our visionThis session will cover:

    What were doing to deliver the Auckland Plan

    What are we currently doing?

    What is planned?

    What else could we be doing?

    The prioritisation tools that will be used toensure focus and affordability

    TheAuckland

    Planisourticket

    tothe

    global

    competition

    amongstcities

    7

  • 8/11/2019 Draft LTP Presentation Document

    12/50

    The Auckland Plan

    Two

    Geographic

    Projects

    Six

    Transformational

    Shifts

    Auckland

    Plan

    Outcomes

    Prioritisation This LTP needs to align our 10 year budget and our 30

    year vision in the Auckland Plan

    Ensuring affordability means we cant afford to do

    everything now

    Lower rates increases will require a significant overall costreduction

    Our prioritisation tools are:

    1. Six Transformational Shifts

    2. Two Geographic Priorities

    3. Ten Spatial Priorities

    8

  • 8/11/2019 Draft LTP Presentation Document

    13/50

    Prioritisation other things considered

    LTP scene setting workshop

    Draft Local Board Plans released today

    Aspirations for local communities

    Public transport and

    quality urban living

    seen as the key driversof transformation

    Transformational Shifts

    The six Transformational Shifts

    describe the change required to

    achieve our vision

    PrioritisationTool1

    9

  • 8/11/2019 Draft LTP Presentation Document

    14/50

    Move to outstanding public transport

    within one network

    Transf

    ormingAuckland

    What we do now to deliver this shift

    Rail system carries over 11 million trips per year

    Bus network carries 53 million trips per year

    Integrated ticketing

    What is currently planned

    Enhance and extend Rapid Transit Network

    City Rail Link

    57 electric trains

    Improve bus and ferry network Improve access to quality PT

    Enable and support growth close to PT

    Radically improve the quality of urban living

    TransformingAuckland

    What we currently do

    Plan and implement enabling housing (HPO), PAUP, open space,

    recreation and facilities network

    Influence and design buildings and public spaces

    Deliver and operate Community and recreational facilities

    Encourage healthy lifestyles parks, facilities, walking/cycling

    Transport, water, wastewater, stormwater

    What else we could do

    Further enhance Aucklands Waterfront

    Focus on spatial priorities

    Embed Te Aranga Maori Design Principles

    Seismic Stabilisation Fund for Privately Owned Heritage Homes

    10

  • 8/11/2019 Draft LTP Presentation Document

    15/50

    Significantly lift Mori social and

    economic wellbeing

    Transf

    ormingAuckland

    What we currently do

    Events

    Marae redevelopment and housing initiatives

    Identification and protection of sites significant to

    Maori

    Co-management of parks and reserves

    What else we could do

    Te Whai Painga - Mori social well-being Te Whai Tiaki Mori cultural well-being

    Te Whai Rawa Mori economic well-being

    Treaty settlements

    Mori effectiveness

    Substantially raise the living standards for all Aucklanders

    and focus on those most in need

    TransformingAuckland

    What we currently do

    Knowledge, literacy, skills and competencies

    Support economic growth at regional and local levels

    Investment in events, innovations hubs and tourism infrastructure

    Enable healthy, dry and warm homes

    Community-based social development initiatives

    What else we could do

    Auckland Investment Office

    Business, Attraction and Employment Growth Fund

    Business Growth and Competitiveness

    Transforming Aucklands Visitor Economy

    Regional Innovation Hubs

    Digital Auckland

    11

  • 8/11/2019 Draft LTP Presentation Document

    16/50

    Transf

    ormingAuckland

    Dramatically accelerate the prospects of Aucklands

    children and young people

    What we currently do and have planned

    I am Auckland Implement action plan

    Playgrounds and play spaces

    Youth development and civic participation

    Youth facilities and community programmes

    Youth grants and scholarships

    Youth connections

    What else we could do

    Expand Youth connections across Auckland More Aucklanders, More Active, More Often

    Auckland Skills and Employment Hub

    Strategic Regional Grants Programme (all shifts)

    TransformingAuckland

    Strongly commit to environmental action and

    green growth

    What we currently do or have planned

    Waste minimisation and resource recovery

    Rural fencing and planting

    Monitoring, research and investigations

    Maintain and optimise storm water network

    Plant / animal pest control

    Central interceptor Investment in public transport

    What else we could do

    Waste Minimisation

    Low Carbon Auckland

    Healthy Waterways

    12

  • 8/11/2019 Draft LTP Presentation Document

    17/50

    Discussion/questions?

    Geographic Projects

    PrioritisationTool2

    13

  • 8/11/2019 Draft LTP Presentation Document

    18/50

    The Southern Initiative

    Transf

    ormingAuckland

    What we currently do

    Deliver, coordinate, facilitate, partner

    What is currently planned

    A cadetship programme between employers and MIT

    Working with central government and NGOs to improve

    numeracy and literacy in South Auckland

    Support social and affordable housing projects

    What else we could do

    An integrated TSI Work Programme

    City CentreThe City Centre

    TransformingAuckland

    What we currently do

    Shared spaces

    Parks and open spaces

    Roading, cycling and pedestrian infrastructure

    What is currently planned

    Planning, design and construction of new shared spaces

    Major street transformations - Quay Street, Victoria Street

    Wynyard Quarter

    Investment in PT infrastructure

    Drive residential and commercial investment

    14

  • 8/11/2019 Draft LTP Presentation Document

    19/50

    Discussion/ Questions?

    LTP

    Spatial

    Priorities

    SHAsNetwork

    Requirements

    Other

    priorities

    Auckland Development Strategy

    identifies:

    growth areas over 30 year

    timeframe

    network of centres

    different roles and scales rural and future urban

    areas Spatial prioritisation will enable

    Council and CCOs to unlock

    growth and development

    opportunities

    TransformingAuckland

    Spatial Priorities

    15

  • 8/11/2019 Draft LTP Presentation Document

    20/50

    Spatial Priorities

    Spatial prioritisation includes:

    10 proposed spatial priority areas

    Proposed future planning spatial priorities

    Special Housing Areas (SHAs)

    Network requirements

    Other priorities

    Provides lens to help prioritise and focus Council and CCO work

    programme still investing across Auckland

    This spatial prioritisation will inform the next phase of 2015-2025 LTP

    New spatial priorities expected around every 5-10 years

    Transf

    ormingAuckland

    Spatial

    prioritisationInitial areas of focus

    10 proposed spatial

    priorities in yellow

    Approved SHAs in red

    Proposed future

    planning spatial

    priorities in green

    (initial work required

    to complete strategic

    frameworks)

    TransformingAuckland

    16

  • 8/11/2019 Draft LTP Presentation Document

    21/50

    Draft local board plans

    Transf

    ormingAuckland

    Emerging themes align to Transformational Shifts

    Protect, enhance and restore the natural environment

    A transport system that is well connected and offers a range of

    options

    Communities with a sense of belonging

    Places and opportunities for active and healthy lifestyles

    Well planned vibrant town centres

    Strong local economies

    For consideration through this process

    Discussion/questions?

    17

  • 8/11/2019 Draft LTP Presentation Document

    22/50

    Feedback session 1

    Transf

    ormingAuckland

    Where should our focus lie in

    delivering the Auckland Plan in

    a financially constrained

    environment?

    Does our current

    plan provide the

    right level of

    focus on each

    priority area?

    Of the opportunities identified for

    possible investment, what doyou see as the Top 3 to make a

    difference?

    Are there anygaps?

    18

  • 8/11/2019 Draft LTP Presentation Document

    23/50

    Opportunities to create capacity& deliver better valueAndrew McKenzie (CFO)

    19

  • 8/11/2019 Draft LTP Presentation Document

    24/5020

  • 8/11/2019 Draft LTP Presentation Document

    25/50

    To be tabled

    21

  • 8/11/2019 Draft LTP Presentation Document

    26/5022

  • 8/11/2019 Draft LTP Presentation Document

    27/50

    Resourcing for criticalinfrastructure

    23

  • 8/11/2019 Draft LTP Presentation Document

    28/50

    24

  • 8/11/2019 Draft LTP Presentation Document

    29/50

    LTPOptionsandEvaluationPhase

    7July2014

    WatercareServicesLimited

    FinancialManagementFunding

    Funding

    Watercareisselffunding noincomefromrates

    Preventedbylawfrompayingadividend

    Allrevenueisusedtofundourexistingoperationsandto

    developnewinfrastructure

    Primaryrevenuestreamscomprisewaterandwastewater

    revenueandinfrastructure growthcharges(IGCs)whichcover

    aportionofnewgrowthbasedcapitalexpenditure.

    Watercaresrevenueandfinancingpolicyisalignedwith

    AucklandCouncilguidingprinciples equity,transparency,

    sustainability,efficiency

    25

  • 8/11/2019 Draft LTP Presentation Document

    30/50

    Growth

    AucklandCouncilsgrowthforecastsunderpin

    Watercaresplanning

    Populationgrowthwillincreasedemandfor

    potablewater

    800,000people(35yearsgrowthatmedium

    forecast)

    200,000m3/day

    additional

    water

    demand

    Growthcapexis42%oftotalcapitalspend

    AlignmenttoAucklandCouncil

    Plans Wherepossible,Watercareisprioritising

    projectstodelivertheadditionalcapacity

    requiredtosupportthegrowthprojectedinthe

    AucklandPlan,

    Unitary

    Plan,

    Special

    Housing

    Areas

    26

  • 8/11/2019 Draft LTP Presentation Document

    31/50

    AssetManagementPlanning

    Driversofcapitalinvestment Renewals: replacementofexistingassetsattheendof

    theirlifetomaintaincurrentservicelevels

    LevelsofServiceImprovement: upgradingofexistingassetsandtheprovisionofnewassetstomeethigherservicelevels

    Growth: 1)upsizingofexistingassetsandtheprovisionofnewinfrastructuretoincreasecapacitytocaterforgrowth

    2)Support

    Auckland

    Councils

    plans

    Infrastructureprojectsoftenaddressmultipledrivers

    CapitalExpenditure

    LastAMPforecast$4.8bn20152025

    LatestAMPforecasts$4.1bn

    Reductionof$700million

    Currentyear

    AMP

    projected

    $336

    million

    Yearendforecast$310million

    Watercareisactivelylookingforopportunitiestoreduceexpenditure,optimisecapitalinvestmentanddeliverefficiencysavings

    27

  • 8/11/2019 Draft LTP Presentation Document

    32/50

  • 8/11/2019 Draft LTP Presentation Document

    33/50

    Financial

    Management

    Pricing Pricing

    Abalancebetweenfuturepriceincreasesanddebtlevelsis

    requiredtofundtheAMP

    Rangeofpriceincreasesmodelled

    Projectedincreasesforwaterandwastewaterarecurrently

    lookinglikeapprox.1%realperannum

    IGCs

    Fundnewgrowthcapitalexpenditure

    Partiallysubsidisedbyexistingcustomers

    Projectedincreasesatthisstageinlinewithwaterand

    wastewater

    FinancialManagementDebt

    Debt

    Alloptionstomitigateoveralldebtlevelsarebeing

    reviewedincluding:

    AMPexpenditureandtimingofexpenditure

    Priceincreases

    Expenditureefficiencies

    Watercarestreasurystructureallowsaccesstobenefits

    availabletoCouncil(lowerinterestrate)while

    maintainingtheindependencethatensuresatight

    focusonourfinancialobjectives,ourdebtandgearing

    29

  • 8/11/2019 Draft LTP Presentation Document

    34/50

    Aucklandsnext

    water

    source

    Waikato

    Waikatoriveristheonlymajornextsource

    Derisk ArdmoreandRedoubtRoad

    Consentforadditional200,000m3/daywatertakelodgedwithWaikatoRegionalCouncillate2013

    Lookingtosecureadditionaltakebyend2017

    Contributionto

    Auckland

    Plan:

    A

    fair,

    safe

    andhealthyAuckland,wherepeoplevaluethe

    excellentservicesandfacilitiesavailable

    Whenwillitbeneeded?

    Timingofthe2nd Waikatoplantandpipelinedependsonactualdemandvssupply

    WaterDemandinfluencedbymanyfactors difficulttoforecastaccurately Climate

    Demandsavings

    (factored

    in

    15%

    savings

    to

    2025)

    Rateofpopulationgrowth

    Customerbehaviours

    Supplysidevariations Plantavailability

    Lake(source)availability algalblooms

    Peakcapacityaugmentation

    Couldberequiredasearlyas2021

    30

  • 8/11/2019 Draft LTP Presentation Document

    35/50

    Timingof

    2nd

    WaikatoPlant

    &

    Pipeline

    TimingRiskMitigationPlans

    HuiaWTPReplacement

    Eliminatesludgebottleneckatexistingplant

    Removeaverageandpeakcapacityconstraint

    BoostpumpingexistingWaikatofrom150,000to

    175,000m3/day

    under

    consideration

    Requiresconsentforadditionaltake

    Requiressecuringresourceconsentfortakeofwater

    treatmentplantandnewpipeline

    Planningandpreliminarydesignfor2nd PlantandPipelineFY20152016

    31

  • 8/11/2019 Draft LTP Presentation Document

    36/50

    CentralInterceptor

    Project

    ReplacementfortheHillsboroughTunnelandManukauSiphon(Enterpriserisksassinglepointsoffailure)

    ProvidescapacityforgrowthforInnerWestIsthmus,CentralCBDandEasternsuburbs

    Reducesthefrequencyandvolumeofoverflowsfromthecombinedseweragesystem

    ContributiontoAucklandPlanAgreenAuckland,

    where

    our

    waterways

    and

    coastlines

    are

    clean

    andfulloflife

    NoadditionalriskstoManukauorWaitemataharboursactuallyreducesrisks

    SchemeTiming

    Mainspinetunnelcurrentlyprogrammedtobecompletein2023

    CollectorsewersconnectingCSOstomaintunnelprogrammedtobecompletein2034

    Schemetiming

    could

    be

    modified

    to

    defer

    capitalexpenditure

    2Stageconstruction

    Stage1fromMangereWWTPtoMaysRoad(toaddressEnterpriserisk)

    Stage2fromMaysRoadtoWesternSprings

    willdefercapitalbutathighertotalandNPVcost,limitsgrowthanddelaysenvironmentalimprovements

    32

  • 8/11/2019 Draft LTP Presentation Document

    37/50

    CentralInterceptor

    InService2023

    CentralInterceptorOption

    Constructin

    Stages

    CSOCollectorSewers

    Progressivelyinservicefrom2025to2033

    CentralInterceptor:Possiblealternative

    staging

    Stage1:MangereWTPtoMayRoad

    Stage2:

    May

    Road

    to

    Western

    Springs

    AdditionalStagingCost

    Demobilisation/Remobilisation

    Additionalcivilworks

    33

  • 8/11/2019 Draft LTP Presentation Document

    38/5034

  • 8/11/2019 Draft LTP Presentation Document

    39/50

  • 8/11/2019 Draft LTP Presentation Document

    40/50

    3

    AP & Basic Transpor t Networks 30yr Spend Profi le

    Airport Rail Line and Mt Roskill Rail Spur Parnell Station and electrification Papakura to Pukekohe

    Penlink and funding for regional arterials (e.g. Lake Road, GreatNorth Road, Great South Road, Mill Road)

    Walking and cycling initiatives 20% less of the cycle networkdelivered by 2025

    Higher amenity and customer friendly infrastructure supporting thenew integrated PT network

    50% funding to remove rail level crossings North Western Busway and other bus rapid transit improvements 60% less funding for greenfield growth areas in second and third

    decades Reduced renewal funding leads to decreased asset condition over

    time and increased maintenance

    AP Transport Netwo rk

    Basic Transport Network

    $m

    $m

    Example projects in the AP Transport Network

    CRL completed Half Airport Rail Line & Mt Roskill Rail Spur or equivalent Regional arterial improvements Walking and cycling initiatives 60% of cycle network by 2025 Customer focussed new integrated PT network completed Funding to support removal of rail level crossings Rollout of busways and bus rapid transit in the North West and

    South East Full delivery of transport infrastructure for greenfields Full funding to renew transport assets (to deliver existing levels of

    service)

    Under Auckland Plan priorit isation, projects unlikely inthe Basic Transport Network

    AC providedenvelope inclNZTAsubsidy to AT(ExclsCRLand EMUs)

    4

    Level of service 2

    No assets worse thancondition grade 4

    Level of service 2

    No assets worse thancondition grade 4

    Increasin

    grisksafety,public

    perceptio

    n,networkperformance

    Renewals expenditure tomaintain level of service

    Increasing m aintenance costs as conditi on deteriorates

    New

    Maintenancecosts $

    Possible delay

    Years

    No delayBridge

    Footpath

    Optimising asset management / renewals

    36

  • 8/11/2019 Draft LTP Presentation Document

    41/50

    5

    Project lifecycle new capital

    Glenfield Road Corridor Upgrade

    Dominion Road Corridor Upgrade

    6

    0

    0.5

    1

    1.5

    2

    2.5

    3

    3.5

    Auckland PlanTransport Network

    BasicTransport Network

    Renewals ActiveSystems, Local Board Initiatives etc SafetyRoads PT - other PT - EMUs PT - CRL

    4yr CAPEX (2014/15 2017/18)

    $b

    Set as a response to AucklandPlan transport targets

    Set basedon AucklandCouncilreducedfundingenvelope(2.5% rates)

    37

  • 8/11/2019 Draft LTP Presentation Document

    42/50

    7

    Potential 2014/15 Impacts

    Reducedspendonrenewalsbasedon$45mreduction:

    30%(70km)reductioninfootpathandcycleways pa

    20%(90km)reductioninroadrehabilitationandresealingpa

    30%reductioninspendonroading projects

    40%reductioninspendonPTprojects(exclCRLandEMUs)

    30%

    reduction

    in

    spend

    on

    walking

    and

    cycling

    initiatives

    8

    Challenges - transport

    Industry

    - impact on the construction sector

    - productivity and momentum

    - programme cant be turned on and off

    PT new network infrastructure and services, limited RTN

    Assets - levels of service

    Freight economic impact on freight and commercial vehicle movement

    Congestion managing a more congested roading network

    38

  • 8/11/2019 Draft LTP Presentation Document

    43/50

    9

    Challenges community / funders Community - expectation management

    Reduced jobs

    Growth supporting projected population growth acrossAuckland

    Messaging to funders

    39

  • 8/11/2019 Draft LTP Presentation Document

    44/5040

  • 8/11/2019 Draft LTP Presentation Document

    45/50

    AlternativeTransportFunding

    Phase2

    IndependentAdvisoryBody

    FormerlytheConsensusBuildingGroup

    Newnamereflectstheneedtoactasan

    advisortocouncilwhileretaining

    independenceduring

    the

    LTP

    consultation

    period.

    Theirroleistodeveloptwopotentialfunding

    pathwaysforconsiderationbytheGoverning

    Body.

    41

  • 8/11/2019 Draft LTP Presentation Document

    46/50

    ProjectAim

    TosupporttheGoverningBodytomakea

    decisioninJune2015aspartoftheadoption

    ofthe20152025LongTermPlan,onhowto

    respondtotherecommendationsfromthe

    CBG,byundertakingfurtherworktorefinethe

    choiceoffundingpathway.

    Projectobjectives

    Tocompletetheanalysis,evaluationand

    reportingnecessarytoenabletheGoverning

    Bodytomakeaninformedandrobustdecision

    over

    which

    funding

    pathways

    to

    include

    in

    theDraftLongTermPlaninDecember2014.

    Toproviderobust,evidencebasedadvicetothe

    GoverningBodyonwhichfundingpathwaysto

    includeforconsultationintheDraftLongTerm

    Plan,basedontheviewoftheIAB.

    42

  • 8/11/2019 Draft LTP Presentation Document

    47/50

    TheIAB

    StewartMilne(Chairman)

    GarryTaylor(EDS)

    StephenSelwood(NZCID)

    KimCampbell(AucklandBusinessForum)

    TonyGarnier(AucklandBusinessForum)

    ShaunAwatere(LandcareResearch)

    DonnaWynd(ChildPovertyAction)

    RobertReid(FirstUnion)

    CameronPitches(CampaignforBetterTransport)

    DavidAitken

    (National

    Road

    Carriers)

    PaulShortland(CycleActionAuckland)

    AndySmith(WalkAuckland)

    SimonLambourne(AIAL)

    AucklandPlanTransportNetwork(withnewfunding)

    43

  • 8/11/2019 Draft LTP Presentation Document

    48/50

    BasicTransportNetwork(without

    new

    funding)

    FundingGapProfile

    44

  • 8/11/2019 Draft LTP Presentation Document

    49/50

    Approachto

    LTP

    Transport Network StatusQuo(low

    investment)

    Existing toolsfunding

    pathway

    high

    investment

    Roadchargingfunding

    pathway

    high

    investment

    BasicTransport

    Network

    Auckland Plan

    TransportNetwork

    Fundamentalchoices:

    Twolevelsofinvestment

    Twofundingpathwaysforhighinvestment

    FundingPathwayOptions

    1. ExistingTools:

    SignificantincreaseinRates,FuelExciseandRUCplus

    Tollsonnewroads(i.e.Penlink,ornewHarbourCrossing)

    Usesexistingfundingmechanisms

    Exploringdifferent

    targeted

    rates

    Exploringregionalvnationalfueltax

    2. RoadCharging:

    SingleCordon,IsthmusCordon,MotorwayNetwork

    Charges

    Motorwaynetworkchargeisthemostpromising

    Requireslegislation

    45

  • 8/11/2019 Draft LTP Presentation Document

    50/50

    Investigations RoadChargingSchemeDesignDeloitte

    Stage1drawsoninternationalexperience

    Stage2willdevelopanAucklandoperatingmodelandcostconstructionandoperation

    ImpactonBusiness&Households MarketEconomics

    Targetedinterviews

    Econometricmodelingtodemonstrateimpactsandpossiblemitigation

    Investigations

    TransportSystemModelling Council,AT

    UsesCouncilsART3model

    SupportedbyAT

    Exploringoptions

    for

    more

    detailed

    networkmodels

    EvaluationandEconomicAnalysis

    Multicriteriaassessmentprocess

    EconomicevaluationbasedonNZTAmethod