30-Jan-12 31-Jan-12 01-Feb-12 ### ### ### 05-Feb-12 06-Feb-12 07-Feb-12 08-Feb-12 09-Feb-12 10-Feb-12 Name of the Site:- Sricity Man Power Masons 1 1 1 1 1 Mc 9 9 9 8 9 Fc 4 3 3 4 Masons Mc Fc Masons Mc Fc Masons 1 1 1 1 1 Mc 2 1 Fc Masons Mc Fc Fitters 5 4 4 4 4 Helpers 3 2 2 2 2 Barbending (T.Ravi) Fitters Helpers Total :- 23 20 20 22 18 0 0 0 0 0 0 0 Work Description:- Dust fillin Dust levelRaft area Reinforce Reinforcement for walls and haunch portion bending and tying, reinforcement Material Used Cement Sand Steel Conc M10 in (Cum) 8.90 Conc M15 Conc M30 3.66 1 Dust filling & Consolidation in (C 8.58 Shuttering Qty in (Sqm) Diesel in (Ltrs) Labour contractor (Inamul Haque) Local Labour contractor (Guna Sekhar) Local Labour contractor (Selvam) Local Labour contractor (K.Venkatesh) Local Labour contractor (Murugan) Shuttering Contractor (S.Raja)

Dpr Format of Civil engineers in excel format

Embed Size (px)

DESCRIPTION

Please use the file, who are wanted for reference for DPR

Citation preview

Page 1: Dpr Format of Civil engineers in excel format

30-Jan-12 31-Jan-12 01-Feb-12 02-Feb-12 03-Feb-12 04-Feb-12 05-Feb-12 06-Feb-12 07-Feb-12 08-Feb-12 09-Feb-12 10-Feb-12 11-Feb-12 12-Feb-12Name of the Site:- Sricity

Man PowerMasons 1 1 1 1 1

Mc 9 9 9 8 9Fc 4 3 3 4Masons

Mc

Fc

Masons

Mc

Fc

Masons 1 1 1 1 1

Mc 2 1Fc

Masons

Mc

Fc

Fitters 5 4 4 4 4

Helpers 3 2 2 2 2

Barbending (T.Ravi)Fitters

Helpers

Total :- 23 20 20 22 18 0 0 0 0 0 0 0 0 0

Work Description:- Dust filling,C Dust levellinRaft area botReinforcemeReinforcement for walls and haunch portion bending and tying, reinforcement shifting,shuttering plates cleaning and applying shuttering oil and shifting ply boards for 2nd lift. And Curing works.

Material Used

Cement

SandSteel

Conc M10 in (Cum) 8.90

Conc M15

Conc M30 3.66 1

Dust filling & Consolidation in (Cum) 8.58

Shuttering Qty in (Sqm)

Diesel in (Ltrs)

Labour contractor (Inamul Haque)

Local Labour contractor (Guna

Sekhar)

Local Labour contractor (Selvam)

Local Labour contractor

(K.Venkatesh)

Local Labour contractor (Murugan)

Shuttering Contractor (S.Raja)

Page 2: Dpr Format of Civil engineers in excel format

Petrol in (Ltrs) 2.72

Machinery Used

Jcb Company OwnedJcb HiredTractor Company OwnedTractor HiredWater Tanker Company OwnedBaby Millar HiredLift HiredGenerator Hired

Name of the Site:- SouthMan Power

Masons

Mc 3 3 3Fc 10 13 8Masons

Mc 6 6Fc 8 11Masons

Mc

Fc

Masons

Mc

Fc

Fitters

Helpers

Total :- 13 16 14 17 11 0 0 0 0 0 0 0 0 0

Work Description:- CC Blocks shiSand,& CC BSand shiftingBallies,ply Brick shifting for 1st, and 2nd floors,

Material Used

Cement

SandSteel

Conc M10

Conc M15

Conc M20

Labour contractor (Ramanamma)

Local Labour contractor

(A.Seenaiah)

Brick Masonry contractor (G.Hari

Babu)

Brick Masonry contractor (T.Prasad)

Shuttering Contractor (Malli)

Page 3: Dpr Format of Civil engineers in excel format

Machinery Used

Jcb Company OwnedJcb HiredTractor Company OwnedTractor HiredWater Tanker Company Owned 1 1 1 1 1Baby Millar Hired 1 1 1 1 1Lift Hired 1 1 1 1 1Generator Hired 1 1 1 1 1

Name of the Site:- CVR FMan Power

Masons

Mc 7 5Fc 11 10Masons

Mc 5 6 6

Fc 5 9 10

Masons

Mc

Fc

Masons

Mc

Fc

Masons 4 5 4 3 4

Mc

Fc 4 4 4 4 4

Masons

Mc

Fc

Fitters 2 2 1

Helpers 2 2 1

Fitters

Helpers

Fitters 2Helpers 2

Labour contractor (Ramanamma)

Local Labour contractor

(A.Seenaiah)

Brick Masonry contractor (G.Hari

Babu)

Brick Masonry contractor (T.Prasad)

Brick Masonry contractor

(K.Sreenivasulu)

Brick Masonry contractor (T.Prasad)

Shuttering Contractor (Malli)

Electrical Contractor (V.Ravi)

Plumbing Contractor (Mahesh)

home:Electrical and Plumbing materials are not available at site, so workers arenot working at site.

F107
home: Electrical and Plumbing materials are not available at site, so workers arenot working at site.
G107
home: Electrical and Plumbing materials are not available at site, so workers arenot working at site.
Page 4: Dpr Format of Civil engineers in excel format

Total :- 18 28 30 26 26 0 0 0 0 0 0 0 0 0

Work Description:- Septic tank eSeptic Tank Pcc for septi3rd Floor BRaft Concrete Completed, 3rd Floor Bricks 600 nos and 2 units Sand shifted.Curing & Cleaning for coast guard rooms, Coast Guard rooms corridor parapet wall completed.

Material Used

Cement

SandSteel

Conc M10 in (Cum) 12.032

Conc M15 in (Cum) 7.29

Conc M20 in (Cum)

Machinery Used

Jcb Company OwnedJcb HiredTractor Company OwnedTractor HiredWater Tanker Company OwnedBaby Millar HiredLift HiredGenerator Hired

14-Feb-12 15-Feb-12 16-Feb-12 17-Feb-12 18-Feb-12 19-Feb-12 20-Feb-12 21-Feb-12 22-Feb-12 23-Feb-12 24-Feb-12 25-Feb-12 26-Feb-12 27-Feb-12

Name of the Site:- SricityMan Power

Masons

Mc

Fc

Masons

Mc

Fc

Masons

Mc

Fc

Masons

Mc

Fc

Labour contractor (Inamul Haque)

Local Labour contractor (Guna

Sekhar)

Local Labour contractor (Selvam)

Local Labour contractor

(K.Venkatesh)

Page 5: Dpr Format of Civil engineers in excel format

Masons

Mc

Fc

Fitters

Helpers

Barbending (T.Ravi)Fitters

Helpers

Total :- 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Work Description:-

Material Used

Cement

SandSteel

Conc M10

Conc M15

Conc M20

Machinery Used

Jcb Company OwnedJcb HiredTractor Company OwnedTractor HiredWater Tanker Company OwnedBaby Millar HiredLift HiredGenerator Hired

Name of the Site:- SouthMan Power

Masons

Mc

Fc

Masons

Mc

Fc

Local Labour contractor (Murugan)

Shuttering Contractor (S.Raja)

Labour contractor (Ramanamma)

Local Labour contractor

(A.Seenaiah)

Page 6: Dpr Format of Civil engineers in excel format

Masons

Mc

Fc

Masons

Mc

Fc

Fitters

Helpers

Total :- 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Work Description:-

Material Used

Cement

SandSteel

Conc M10

Conc M15

Conc M20

Machinery Used

Jcb Company OwnedJcb HiredTractor Company OwnedTractor HiredWater Tanker Company OwnedBaby Millar HiredLift HiredGenerator Hired

Name of the Site:- CVR FMan Power

Masons

Mc

Fc

Masons

Mc

Fc

Brick Masonry contractor (G.Hari

Babu)

Brick Masonry contractor (T.Prasad)

Shuttering Contractor (Malli)

Labour contractor (Ramanamma)

Local Labour contractor

(A.Seenaiah)

Page 7: Dpr Format of Civil engineers in excel format

Masons

Mc

Fc

Masons

Mc

Fc

Masons

Mc

Fc

Masons

Mc

Fc

Fitters

Helpers

Fitters

Helpers

Fitters

Helpers

Total :- 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Work Description:-

Material Used

Cement

SandSteel

Conc M10

Conc M15

Conc M20

Machinery Used

Jcb Company OwnedJcb HiredTractor Company OwnedTractor HiredWater Tanker Company OwnedBaby Millar Hired

Brick Masonry contractor (G.Hari

Babu)

Brick Masonry contractor (T.Prasad)

Brick Masonry contractor

(K.Sreenivasulu)

Brick Masonry contractor (T.Prasad)

Shuttering Contractor (Malli)

Electrical Contractor (V.Ravi)

Plumbing Contractor (Mahesh)

Page 8: Dpr Format of Civil engineers in excel format

Lift HiredGenerator Hired

Page 9: Dpr Format of Civil engineers in excel format

13-Feb-12

0

Reinforcement for walls and haunch portion bending and tying, reinforcement shifting,shuttering plates cleaning and applying shuttering oil and shifting ply boards for 2nd lift. And Curing works.

Page 10: Dpr Format of Civil engineers in excel format

0

Page 11: Dpr Format of Civil engineers in excel format
Page 12: Dpr Format of Civil engineers in excel format

0

Raft Concrete Completed, 3rd Floor Bricks 600 nos and 2 units Sand shifted.Curing & Cleaning for coast guard rooms, Coast Guard rooms corridor parapet wall completed.

28-Feb-12

Page 13: Dpr Format of Civil engineers in excel format

0

Page 14: Dpr Format of Civil engineers in excel format

0

Page 15: Dpr Format of Civil engineers in excel format

0

Page 16: Dpr Format of Civil engineers in excel format