District Irrigation Plan
West Jaintia Hills, Meghalaya
NABARD CONSULTANCY SERVICES
District Irrigation Plan
NABARD Consultancy Services 2
District Irrigation Plan
West Jaintia Hills District, Meghalaya
District Irrigation Plan
NABARD Consultancy Services 3
District Irrigation Plan
NABARD Consultancy Services 4
District Irrigation Plan
NABARD Consultancy Services 5
District Irrigation Plan
NABARD Consultancy Services 6
Message from the Chairman, DLIC
Water is of vital importance for human & animal life, for maintaining ecological
balance and for development efforts. With the ever increasing demand for water due to population
growth, urbanization and industrialization, making water available to multiple uses, planning and
management of water resources and utilization of water economically, optimally and equitably
assumes greater significance. Government of India formulated PMKSY with the vision of
extending the coverage of irrigation (Har Khet ko Pani) and improving water use efficiency (More
Crop Per Drop) in a focused manner with end to end solution on water resource creation,
distribution, management, field application and extension activities. Under PMKSY an integrated
planning and management of water resources, through estimation of water budget for each of the
district and sub districts and preparation of strategic action plan to address the water gap through
District Irrigation Plan (DIP) was envisaged.
PMKSY will be implemented in area development mode only by adopting a
‘decentralized State level planning and projectised execution’ structure that will allow States to
draw up their own irrigation development plans based on DIPs and SIPs with a horizon of 5-7
years. A three tier structure at national, state and district level will oversee implementation and
coordination of the program. The District Level Implementation Committee will form the third
tier of the PMKSY. The DLIC will be chaired by the Deputy Commissioner, West Jaintia Hills
and is comprised of the Departments of Agriculture, Horticulture, Water Resource Department,
Soil and Water Conservation Department, District Rural Development Agency (DRDA), Lead
Bank of the District and any other line Departments in the District. The DLIC will oversee the
implementation and inter-departmental coordination at district level.
District Irrigation Plan is prepared based on an assessment of water resource
availability and demand for water resource from multiple uses. Water balance at district and sub
district level is obtained by estimating availability of surface and ground water resource using
hydro geological and meteorological information and estimating demand for water resources from
domestic use, animal husbandry, irrigation purpose, industrial purpose and power generation
purpose. Based on the above information, present and future water balance at block and district
level is estimated along with multiple strategies to augment water resources and improve efficiency
of existing water facilities through Strategic Action Plan under PMKSY in West Jaintia Hills
District.
District Irrigation Plan
NABARD Consultancy Services 7
District Irrigation Plan (DIP) preparation required coordinated efforts by multiple
stakeholders and departments. The efforts made by the Departments of Agriculture, which is the
nodal Department for implementation of PMKSY, Water Resource Department, Horticulture
Department, Soil and Water Conservation Department, District Rural Development Agency
(DRDA), other line departments in the District and the support received from NABARD
Consultancy Services (NABCONS) in preparation of the District Irrigation Plan of West Jaintia
Hills is acknowledged. I am not only hopeful but also confident that the District Irrigation Plan
(DIP) of West Jaintia Hills, 2016-20 helps District Level Implementation Committee (DLIC) and
nodal department in addressing the multiple challenges of water resource planning and
management in the district.
Sh. Ryntihlang Rapthap
Deputy Commissioner-cum Chairman (DLIC)
West Jaintia Hills District, Meghalaya
District Irrigation Plan
NABARD Consultancy Services 8
Abbreviations
NDC National Development Council
GoI Government of India
C-DAP Comprehensive District Agriculture Plan
ICT Information and Communications Technology
BCM Billion Cubic Meters
GDP Gross Domestic Product
AIBP Accelerated Irrigation Benefits Programme
CADWM Command Area Development and Water Management
MI Micro Irrigation
SWMA Supplementary Water Management Activities
NITI Aayog National Institution for Transforming India Aayog
NRM Natural resource Management
IWMP Integrated Watershed Management Programme
PRI Panchayati Raj Institutions
DRDA District Rural Development Agencies
NRLM National Rural Livelihoods Mission
C.D. Blocks Community development block
BPL Below Poverty Line
SC/ST Scheduled Caste/ Scheduled Tribe
Nos. Number
ATMA Agriculture Technology Management Agency MSL
TGA Total Geographical Area
GCA Gross Cropped Area
GIA Gross Irrigated Area
NSA Net Sown Area
MGNREGA Mahatma Gandhi National Rural Employment Guarantee Act
CI Cropping Intensity
Qtl/yr Quintal per year
GIA Gross Irrigated Area
District Irrigation Plan
NABARD Consultancy Services 9
MCM Million Cubic Meters
Bgl Below ground Level
CCA Cultivable Command Area
LPD Litre Per Day
CAD Command Area Development
DIP District Irrigation Plan
SIP State Irrigation Plan
DLIC District Level Implementation Committee
STP Sewage Treatment Plant
WRD Water Resource Department
RWD Rural Work Department
ATMA Agricultural Technology and Management Agency
WJH West Jaintia Hills
District Irrigation Plan
NABARD Consultancy Services 10
Contents
Executive Summery ...................................................................................................................... 15
Introduction ................................................................................................................................. 18
Chapter 1 General Profile of the District .......................................................................................... 29
1.1 District Profile ......................................................................................................................... 29
1.2 Demography ........................................................................................................................... 34
1.3 Biomass and Livestock ............................................................................................................. 35
1.4 Agro Ecology, Climatic, Hydrology and Topography .................................................................. 39
1.5 Soil Profile .............................................................................................................................. 41
1.6 Soil Erosion and Run-off Status ................................................................................................ 42
1.7 Land Use Patterns ................................................................................................................... 42
Chapter 2 District Water profile ....................................................................................................... 45
2.1 Area-wise, Crop-wise Irrigation status ....................................................................................... 45
2.2 Production and Productivity of major Crop ................................................................................ 48
2.3 Irrigation based classification .................................................................................................... 51
Chapter 3 Water Availability ........................................................................................................... 54
3.1 Status of water availability ....................................................................................................... 55
3.2 Status of Ground Water Availability ......................................................................................... 57
3.3 Status of Command Area ......................................................................................................... 58
3.4 Existing type of Irrigation ......................................................................................................... 59
Chapter 4 Water Requirement/ Demand ......................................................................................... 60
4.1 Domestic Water Demand ......................................................................................................... 60
4.2 Crop Water Requirement ......................................................................................................... 61
4.3 Livestock Water Demand ......................................................................................................... 62
4.4 Industrial Water Demand ........................................................................................................ 64
4.5 Water Demand for power generation ......................................................................................... 65
4.6 Total Water Demand of the district for various sectors ................................................................. 65
4.7 Water Budget .......................................................................................................................... 67
Chapter 5 Strategic Action Plan for Irrigation in District under PMKSY .......................................... 68
5.1 Strategic Action Plan for Irrigation under PMKSY ..................................................................... 68
5.2 Department wise total plan of district ......................................................................................... 68
5.3 Component wise Plan ............................................................................................................... 69
District Irrigation Plan
NABARD Consultancy Services 11
5.4 Block wise Plan under PMKSY ................................................................................................ 71
5.5 Suggestions ............................................................................................................................. 73
5.6 Expected Outcome ................................................................................................................... 74
Annexure ..................................................................................................................................... 75
Strategic Action Plan for Irrigation under PMKSY (Water Resource Department) ........................ 76
Strategic Action Plan for Irrigation under PMKSY for the year 2016-17 to 2020-2021 ........................ 77
21.3. Strategic Action Plan for State Planned Scheme of Irrigation from State Irrigation Department ... 81
24. Strategic Action Plan for Externally aided projects from State Irrigation Department/ other funding
agencies and NABARD ................................................................................................................. 83
Strategic Action Plan for Irrigation in District under PMKSY
(Soil and Water Conservation Department) .................................................................................. 93
Strategic Action Plan for Irrigation under PMKSY for the year 2016-17 to 2020-2021 ........................ 94
Strategic Action Plan for Irrigation under PMKSY (Agriculture Department) .............................. 161
Strategic Action Plan for Irrigation under PMKSY for the year 2016-17 ........................................... 162
Strategic Action Plan for Irrigation under PMKSY for the year 2017-18 ........................................... 174
Strategic Action Plan for Irrigation under PMKSY for the year 2018-19 ........................................... 189
Strategic Action Plan for Irrigation under PMSY for the year 2019-20 .............................................. 204
Strategic Action Plan for Irrigation under PMSY for the year 2020-21 .............................................. 216
Strategic Action Plan for Externally aided projects from State Irrigation Department/ other funding
agencies and NABARD ................................................................................................................ 228
Strategic Action Plan for Irrigation under PMKSY (Horticulture Department) ............................ 230
Strategic Action Plan for Irrigation under PMSKY for the Year 2016-2017 ....................................... 231
Strategic Action Plan for Irrigation under PMSKY for the Year 2017-2018 ....................................... 232
Strategic Action Plan for Irrigation under PMSKY for the Year 2018-2019 ....................................... 233
Strategic Action Plan for Irrigation under PMSKY for the Year 2019-2020 ....................................... 234
Strategic Action Plan for Irrigation under PMSKY for the Year 2020-2021 ....................................... 235
Strategic Action Plan for Irrigation under PMKSY (ATMA Department) .................................... 236
Strategic Action Plan for Irrigation under PMSKY for the Year 2016-2017 ....................................... 237
Strategic Action Plan for Irrigation under PMSKY for the Year 2017-2018 ....................................... 242
Strategic Action Plan for Irrigation under PMSKY for the Year 2018-2019 ....................................... 247
Strategic Action Plan for Irrigation under PMSKY for the Year 2019-2020 ....................................... 252
Strategic Action Plan for Irrigation under PMSKY for the Year 2020-2021 ....................................... 256
Maps .......................................................................................................................................... 260
District Irrigation Plan
NABARD Consultancy Services 12
List of Tables
Table 1.1: Block wise profile of the district ............................................................................... 29
Table 1.2: District Profile ...................................................................................................... 30
Table 1.3: Block wise demographic pattern of West Jaintia Hills District................................... 34
Table 1.4: Livestock Population 2012 Census and Growth Rate as compared to 2007 Census...... 36
Table 1.5: Block wise livestock and poultry population in West Jaintia Hills district .................. 37
Table 1.6: Agro-climatic Zones in West Jaintia Hills District ................................................... 39
Table 1.7: Monthly rainfall data (in mm) for the year 2013...................................................... 40
Table 1.8: Major type of Soils in the district ............................................................................ 41
Table 1.9: Soil Profile ........................................................................................................... 42
Table 1.10: Land use pattern ................................................................................................. 43
Table 1.11: Block wise classification of land use pattern in the district for the year 2014-15 (Area in
hectares) ............................................................................................................................... 44
Table 2.1: Crop-wise status of irrigated and rainfed area in the district ...................................... 46
Table 2.2: Status of irrigated and rainfed area of horticultural crops in the district...................... 47
Table 2.3: Season wise area, production and yield of agricultural crops in the district ................. 49
Table 2.4: Production & productivity of major horticulture Crops in the district ......................... 49
Table 2.5: Block-wise Irrigation based classification ................................................................. 51
Table 3.1: Status of water availability .................................................................................... 56
Table 3.2: Status of Ground Water Availability (CGWB report-2013) ...................................... 57
Table 3.3: Net ground water availability (ham) ....................................................................... 57
Table 3.4: Categorization of ground water resources ................................................................. 58
Table 3.5: Status of Command Area (hectares) ........................................................................ 58
Table 3.6: Status of Command Area from existing type of Irrigation ......................................... 59
Table 4.1: Block wise Domestic Water Demand in the district (MCM) ...................................... 60
Table 4.2: Crop Water Requirement* ..................................................................................... 62
Table 4.3: Livestock water requirement and percentage growth rate ........................................... 63
Table 4.4: Livestock Water Demand ...................................................................................... 64
Table 4.5: Industrial water demand ....................................................................................... 64
Table 4.6: Water demand for power generation ....................................................................... 65
Table 4.7: Total sector wise present water demand ................................................................... 65
Table 4.8: Total sector wise projected (2020) water demand ...................................................... 66
Table 4.9: Water Budget ....................................................................................................... 67
Table 5.1: Department wise budget for the district ................................................................... 69
Table 5.2: Component wise budget for the district .................................................................... 70
Table 5.3: Block wise budget for district .................................................................................. 71
District Irrigation Plan
NABARD Consultancy Services 13
List of Figures
Figure 1.1: Demography of the district .................................................................................... 35
Figure 1.2: Livestock and Poultry population .......................................................................... 38
Figure 1.3: Land use pattern in the district .............................................................................. 43
Figure 2.1: Block-wise irrigation based classification ................................................................ 52
Figure 4.1: Domestic Water Demand ..................................................................................... 61
Figure 4.2: Livestock Water demand ...................................................................................... 64
Figure 4.3: Present Water Demand for various sectors .............................................................. 66
Figure 4.4: Water Demand in 2020 for various sectors ............................................................. 66
Figure 5.1: Department wise budget for West Jaintia Hills’ district ........................................... 69
Figure 5.2: Component wise budget for West Jaintia Hills’ district ............................................ 71
Figure 5.3: Block wise allocation of budget by Soil & Water Conservation Department ............... 72
Figure 5.4: Block wise allocation of budget by Agriculture Department ...................................... 72
Figure 5.5: Block wise allocation of budget by Water Resource Department ............................... 73
District Irrigation Plan
NABARD Consultancy Services 14
List of Maps
Map 1: Location of District .................................................................................................... 32 Map 2: Agro-Climatic Zones Map of West Jaintia Hills.......................................................... 261 Map 3: Contour Map ........................................................................................................... 262 Map 4: Drainage Map ......................................................................................................... 263 Map 5: Forest Map .............................................................................................................. 264 Map 6: Land Resources Map ................................................................................................ 265 Map 7: Land Use 10K Map ................................................................................................. 266 Map 8: Land Use Map ......................................................................................................... 267 Map 9: Slope (%Rise) Map................................................................................................... 268 Map 10: Soil Map ............................................................................................................... 269 Map 11: Watershed Map ..................................................................................................... 270 Map 12: Sub-Watershed Prioritization Map .......................................................................... 271 Map 13: Wetland Map ........................................................................................................ 272 Map 14: Wasteland Map ..................................................................................................... 273 Map 15: Land Degradation Map .......................................................................................... 274
District Irrigation Plan
NABARD Consultancy Services 15
Executive Summary
In an agrarian economy like India, agriculture utilizes the major share of country’s
exploitable water resources. Though the sector utilizes the maximum share of exploitable water
resources, availability of the same at different locations to different extent makes it vital to adopt
effective utilization of water through storage, channelizing and judicial use. At some places like
Punjab and Haryana, the environmental and socio-economic rationale for this capture by the
sector is now being questioned. Accordingly, it is needed to challenge and change the
fundamentals of the prevailing view of water resources exploitation. A new and more suitable
approach to water resources allocation is necessary if the population is to be adequately fed,
without further degradation and destruction of the critical ecosystem services. Water productivity
needs to be enhanced considerably, and economic cost-benefit analysis and pricing regimes can
play a significant role in such a process. However, these economic measures will not be sufficient
on their own. They will need to be buttressed by technological innovation and institutional changes
in order to encourage a more equitable distribution of resources and to mitigate potential
international conflicts across 'shared' water basins.
Water has unique characteristics that determine both its allocation and use as a
resource by agriculture. Agricultural use of water for irrigation is itself contingent on land
resources. In a situation of growing water scarcity and rising demands for non-agricultural
(household and industrial) use of water, reassessment of sectoral allocations of water are inevitable.
In developing countries, irrigated
agriculture plays a vital role in
contributing towards domestic food
security and poverty alleviation.
Therefore, achievement of these objectives
is dependent on adequate allocations of
water to agriculture. Justification of such
allocations requires that irrigated
agriculture be a cost-effective means of
achieving stated political or social objectives, such as food security or poverty alleviation, and that
all externalities be taken into account in the pricing mechanism. Improved allocation of irrigation
water is required within the agriculture sectors in order to achieve greater efficiency in the use of
irrigation water and existing irrigation infrastructure. Reallocation is also required in order to
reduce water logging and salinization of irrigated land, to decrease the negative environmental
District Irrigation Plan
NABARD Consultancy Services 16
impacts and other externalities of irrigation (caused by over extraction of groundwater and
depletion and pollution of surface water).
Government of India launched Pradhan Mantri Krishi Sinchayee Yojana
(PMKSY) to address the constraints in providing assured irrigation as well as increasing efficiency
and productivity of current water use to bring more prosperity to the rural areas. Priorities of
Government of India were reflected in the Hon’ble President’s address to the joint Session of the
Parliament of 16th Lok Sabha where he indicated that “Each drop of water is precious.
Government is committed to giving high priority to water security. It will complete the long
pending irrigation projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee Yojana’
with the motto of ‘Har Khet KO Pani’. There is a need for seriously considering all options
including linking of rivers, where feasible; for ensuring optimal use of our water resources to
prevent the recurrence of floods and drought. By harnessing rain water through ‘Jal Sanchay’ and
‘Jal Sinchan’, we will nurture water conservation and ground water recharge. Micro irrigation will
be popularized to ensure ‘Per drop-More crop”.
PMKSY has been approved with an indicative outlay of Rs.50, 000 crore over a
period of five years from 2015-16 to 2019-20. The programme is an amalgamation of on-going
schemes of Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry
of Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP,
CADWM, MI, SWMA, and Watershed & Convergence with MGNREGA were brought together
under the umbrella program of PMKSY. Further the scheme seeks convergence with scheme like
Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS), Rashtriya
Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural Electrification
programme (JLNNSM&REP), Rural Infrastructure Development Fund (RIDF), Members of
Parliament Local Area Development Scheme (MPLAD), Members of Legislative Assembly Local
Area Development Fund (MLALAD), Local Body Funds (LBF), Working Plan of State Forest
Department (WPSFD) etc. The PMKSY will be implemented in an area development mode only
by adopting a decentralized state level planning and projected execution structure that will allow
the state to draw up their own irrigation development plans based on DIPs and SIPs with a horizon
of 5-7 years. The program will be supervised and coordinated utilizing the existing mechanism and
structure available under Rashtriya Krishi Vikas Yojana (RKVY) program with state agriculture
department acting as the State Nodal Agency for implementation of PMKSY. However, the
implementing departments for the four components like AIBP, PMKSY (Har Khet KO Pani),
PMKSY (Per drop more crop) and PMKSY (watershed development) will be decided by the
respective program ministry/department.
District Irrigation Plan
NABARD Consultancy Services 17
The 05 chapters along with introduction chapter, explains the profile of district, its
water requirement for agriculture and allied sector, water availability, assessment of water
requirement for various sectors and strategic action plan for augmentation and effective
management of available water resources.
PMKSY Financial Proposal:
Total plan for West Jaintia Hills’ district for four years works out to be Rs. 44105.60 lakh (Table
5.1). Maximum share of Rs. 16445.49 lakh (37.29%) is for Water Resource Dept. followed by
Soil and Water Conservation Dept. with Rs. 13911.67 lakh (31.54%) while share of Agriculture
Dept. is Rs. 13748.44 Lakh (31.17%). Moreover, the component wise budget for the district has
also been calculated and it is observed that maximum share of 38.67% is for Har Khet Ko Pani
with a share of Rs. 17055.85 Lakh followed by Per Drop More Crop with a share of Rs. 13615.08
Lakh (30.87%) and Watershed has a share of Rs. 2671.56 Lakh (6.06%) while State Planned
Irrigation Schemes, RIDF- NABARD, AIBP and ATMA has a share of Rs. 4537.87 Lakh
(10.29%), Rs. 3225.68 Lakh (7.31%), Rs. 2866.19 Lakh (6.50%) and Rs. 133.36 Lakh (0.30%)
respectively. Thus, the departments’ viz. Water Resource, Agriculture and Soil and Water
Conservation have allocated a budget of Rs. 19694.47 Lakhs (44365%) to Thadlaskein Block
followed by Laskein Block with a budget of Rs. 15999.44 Lakh (36.28%) while Amlarem Block
has been allocated a budget of Rs. 8411.68 Lakh (19.07%).
Expected Outcome:
The gross irrigated area in the district is 4256.45 hectare which is around only 25.03% of 17000.99
hectare of the gross cropped area. Various departments of the district have proposed to bring
additional acreage of land under irrigated cultivation system. As the water requirement of crops
for the existing cropping pattern works out to be 30.59 MCM and if the gross cropped area is to
be brought under irrigated area, 73.25 MCM additional water is required. Keeping in view the
above, a plan to develop irrigation potential of 12744.54 ha has been proposed under Strategic
Action Plan of West Jaintia Hills’ district. Further, in order to create an irrigation potential, Water
Resource dept. has proposed to create a potential of 13028.34 hectare. Department of Soil and
Water Conservation has proposed to create an irrigation potential of 3408.50 hectare while
Agriculture department has proposed to create and irrigation potential of 19585 hectare. Sprinkler
and drip irrigation schemes have been proposed by the Horticulture department.
District Irrigation Plan
NABARD Consultancy Services 18
Introduction
Background
Preparation of decentralized area specific district planning process visualized in
various plans took concrete shape through the years and initiatives like specific guidelines on
methodologies and processes for preparation of district plans; framework for preparation of
perspective plan, medium term and annual plans by then planning commission in 1969 and the
73rd and 74th constitutional amendments conferring constitutional status to Panchayats at district
and sub district level; local self-government in urban areas; constitution of district planning
committee to consolidate the plans prepared at Panchayats and municipalities and prepare a draft
development plan for the whole district.
The decentralized planning process was further strengthened through emphasis by
planning commission on preparation of district level plans and making it an integral part of the
process of preparation of the state’s 11th five year plan. The Planning commission issued
guidelines in August 2006 for preparation of the district plans. The guidelines define the District
Planning as ‘the process of preparing an integrated plan for the local government sector in a district
taking into account the resources (natural, human and financial) available and covering the
sectorial activities and schemes assigned to the district level and below and those implemented
through local governments in a state. The document that embodies this statement of resources and
their allocation for various purposes is known as the District Plan”.
Government of India through a resolution in National Development Council on
29th May 2007 conceived a special Additional Central Assistance Scheme (ACAS) to address the
slow growth of agriculture and allied sectors by incentivizing states to draw up plans for their
agriculture sectors more comprehensively. The NDC resolution states "GoI will introduce a new
Additional Central Assistance Scheme to incentivize states to draw up plans for their agriculture
sector more comprehensively, taking agro-climatic conditions, natural resource issues and
technology into account, and integrating livestock, poultry and fisheries, etc. This will involve a
new scheme for Additional Central Assistance (ACA) to State Plans, administered by the Union
Ministry of Agriculture over and above its existing Centrally Sponsored Schemes, to supplement
the State-specific strategies including special schemes for beneficiaries of land reforms. The newly
created National Rainfed Area Authority will, on request, assist States in planning for rainfed
areas".
District Irrigation Plan
NABARD Consultancy Services 19
The NDC in its resolution advised the states to prepare a comprehensive district
agriculture plans (C-DAP) that will fully utilize available resources and will include allied
agriculture sectors. Further, GOI issued a manual on preparation of comprehensive district
agriculture plans to help the states prepare C-DAP. As per these guidelines, the objective of district
planning is ‘to design an integrated and participatory action plan for the development of local area
in general and agriculture and allied sectors in particular’. The objectives of Comprehensive
District Agriculture Plan (C-DAP) are:
To prepare a Comprehensive District Agriculture Plan (C-DAP) through participatory
process involving various organizations and stakeholders.
To enable optimum utilization of scarce natural, physical & financial resources.
To assess and plan for the infrastructure required to support the agriculture development.
To establish linkages with the required institutional support services, like credit,
technology transfer, ICT, research etc.
To evolve an action plan for achieving sustainable agricultural growth with food security
and cropping system that will improve farmers’ income.
The guidelines required the state/district authorities to (i) ensure that the agricultural plans
are prepared for the district and then integrated into the agricultural plans of the State based
on the agro-climatic conditions, availability of technology, trained manpower and natural
resources; (ii) local needs / crops / feed and fodder / animal husbandry / dairying /
fisheries / priorities are reflected in the plan; (iii) productivity gaps for important crops
and livestock and fisheries are reduced; and (iv) the returns to the farmers from these are
maximized.
The latest move in the process of strengthening of decentralized planning process
was the Government of India guidelines issued in 2015 in the form of a template for the preparation
of District Irrigation Plan (DIP) and State Irrigation Plan (SIP) as part of the Pradhan Mantri
Krishi Sinchayee Yojana (PMKSY) program and made the preparation of DIP and SIP mandatory
for the states to receive funds from the program. The present report is a product of these long drawn
efforts of Government of India to strengthen the decentralized planning process in the country
focusing on the vital resource i.e., water.
Water is of vital importance for human & animal life, maintenance of ecological
balance and promotion of developmental activities. Considering its vital importance and ever
increasing demand for water, in the face of population growth, urbanization & industrialization
and considerations of climatic change, making water, an increasingly a scarce resource, available
District Irrigation Plan
NABARD Consultancy Services 20
to multiple uses, planning and management of this vital resources, utilization of water
economically, optimally and equitably assumes greater importance.
According to the 12th Five year Plan, the water budget estimates of India by
Ministry of Water Resources suggests an availability of 1123 million cubic meters (MCM) against
a current estimated demand of 710 MCM. The Standing Committee of the Ministry of Water
Resources estimates that this water demand will rise to 1093 MCM by 2025. Though the existing
water availability in the immediate future seems to be adequate, with the near constant supply of
water resources in the face of increasing demand on account of population growth, urbanization
and industrialization will strain the water supply-demand balance.
The per capita water availability which stood at 5,177 cubic meters in 1951 was
reduced to 1820 cubic meters in 2001 while the international prescribed limit is 1800 cubic meters.
The projected per capita availability of water is 1341 cubic meters in 2025 and 1140 cubic meters
in 2050 suggesting shortage of water in the medium term1. Further, the all India water balance
estimates does not reflect the variations in water balance across time and space- certain areas
having a positive water balance and the others facing acute shortage. The problem is further
accentuated by water quality related issues.
With the abundant surface and ground water supply in the first five decades since
independence, more than 80 percent of the total available water resources were allocated for
irrigation purposes and the rest meeting the domestic and industrial demands. In a recent study2,
on the demand for water from agriculture, domestic and industrial uses in 2000, 2025 and 2050
seems to suggest that domestic demand (34 MCM in 2000, 66 MCM in 2025 and 101 MCM in
2050) and industrial demand (42 MCM in 2000, 92 MCM in 2025 and 161 MCM in 2050) for
water will utilize the total balance water available while agriculture demand for water will be (605
MCM in 2000, 675 MCM in 2025 and 637 MCM in 2050). This change is partly because of the
changing sectorial contributions of India’s GDP and also partly because of dynamics of irrigation
development in the country where the initial expansion in area under irrigation is propelled by the
availability of abundant water resources and availability of good quality land. This is no longer the
case in many of the states where the availability of land and water are serious constraints for further
1 Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, Government of India, New Delhi. 2 Amarasinghe, U.A., Shah T., Turral, H. and Anand, B.K. 2007, India’s water future to 2025-2050: Business-as-usual scenario and deviations. Research Report 123, International Water Management Institute, Colombo.
District Irrigation Plan
NABARD Consultancy Services 21
expansion of irrigation. Further, as per the erstwhile planning commission up to March 2012 out
of 141 million hectares of net sown area in the country 114 (or 81%) million hectares is Irrigation
Potential Created (IPC) and 88 (or 62%) million hectares is Irrigation Potential Utilized (IPU)
leaving almost 20% of irrigated potential unutilized. This leaves 40 percent of the net sown area in
the country dependent on rainfall which makes farming a high risk and less productive.
The competing demands for water resources and the emerging issues and concerns
were to be addressed through certain basic principles and commonality in approaches in dealing
with planning, development and management of water resources3 under an Integrated Water
Resource Management framework. The main objectives of water resource management as
delineated in National Water Policy 2012 are:
Planning, development and management of water resources need to be governed
by common integrated perspective considering local, regional, State and national context, having
an environmentally sound basis, keeping in view the human, social and economic needs.
a. Principle of equity and social justice must inform use and allocation of water.
b. Good governance through transparent informed decision making is crucial to the
objectives of equity, social justice and sustainability. Meaningful intensive participation,
transparency and accountability should guide decision making and regulation of water
resources.
c. Water needs to be managed as a common pool community resource held, by the state,
under public trust doctrine to achieve food security, support livelihood, and ensure
equitable and sustainable development for all.
d. Water is essential for sustenance of eco-system, and therefore, minimum ecological needs
should be given due consideration.
e. Safe Water for drinking and sanitation should be considered as pre-emptive needs,
followed by high priority allocation for other basic domestic needs (including needs of
animals), achieving food security, supporting sustenance agriculture and minimum eco-
system needs. Available water, after meeting the above needs, should be allocated in a
manner to promote its conservation and efficient use.
f. All the elements of the water cycle, i.e., Evapo-transpiration, precipitation, runoff, river,
lakes, soil moisture, and ground water, sea, etc., are interdependent and the basic
3 Ministry of Water Resources, National Water Policy, 2012 Government of India, New Delhi.
District Irrigation Plan
NABARD Consultancy Services 22
hydrological unit is the river basin, which should be considered as the basic hydrological
unit for planning.
g. Given the limits on enhancing the availability of utilizable water resources and increased
variability in supplies due to climate change, meeting the future needs will depend more
on demand management, and hence, this needs to be given priority, especially through (a)
evolving an agricultural system which economizes on water use and maximizes value from
water, and (b) bringing in maximum efficiency in use of water and avoiding wastages.
h. Water quality and quantity are interlinked and need to be managed in an integrated
manner, consistent with broader environmental management approaches inter-alia
including the use of economic incentives and penalties to reduce pollution and wastage.
i. The impact of climate change on water resources availability must be factored into water
management related decisions. Water using activities need to be regulated keeping in mind
the local geo climatic and hydrological situation.
Government of India launched Pradhan Mantri Krishi Sinchayee Yojana
(PMKSY) to address the constraints in providing assured irrigation as well as increasing efficiency
and productivity of current water use to bring more prosperity to the rural areas. Priorities of
Government of India were reflected in the Hon’ble President’s address to the joint Session of the
Parliament of 16th Lok Sabha where he indicated that “Each drop of water is precious. Government
is committed to giving high priority to water security. It will complete the long pending irrigation projects
on priority and launch the ‘Pradhan Mantri Krishi Sinchayee Yojana’ with the motto of ‘Har Khet KO
Pani’. There is a need for seriously considering all options including linking of rivers, where feasible; for
ensuring optimal use of our water resources to prevent the recurrence of floods and drought. By harnessing
rain water through ‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation and ground
water recharge. Micro irrigation will be popularized to ensure ‘Per drop-More crop”.
PMKSY has been approved with an indicative outlay of Rs.50, 000 crore over a
period of five years from 2015-16 to 2019-20. The programme is an amalgamation of on-going
schemes of Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry
of Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP,
CADWM, MI, SWMA, and Watershed & Convergence with MGNREGA were brought together
under the umbrella program of PMKSY. Further, the scheme seeks convergence with scheme like
Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS), Rashtriya
Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural Electrification
programme (JLNNSM&REP), Rural Infrastructure Development Fund (RIDF), Members of
Parliament Local Area Development Scheme (MPLAD), Members of Legislative Assembly Local
District Irrigation Plan
NABARD Consultancy Services 23
Area Development Fund (MLALAD), Local Body Funds (LBF), Working Plan of State Forest
Department (WPSFD) etc. The PMKSY will be implemented in an area development mode only
by adopting a decentralized state level planning and projected execution structure that will allow
the state to draw up their own irrigation development plans based on DIPs and SIPs with a horizon
of 5-7 years. The program will be implemented as part of Rashtriya Krishi Vikas Yojana (RKVY)
with state agriculture department acting as the State Nodal Agency. However, the implementing
departments for the four components like AIBP, PMKSY (Har Khet KO Pani), PMKSY (Per drop
more crop) and PMKSY (watershed development) will be decided by the respective program
ministry/department.
The funds under this program would be provided to the states as per the pattern of
assistance of Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance and NITI
Aayog. During 2015-16, the existing pattern of assistance of on-going scheme was continued. An
outlay of Rs. 50,000 crore has been approved for 2015-20. The financial assistance provided to the
state governments from this centrally sponsored scheme is subject to fulfilment of certain
conditions. Firstly, a state will become eligible to access PMKSY fund only if it has prepared the
District Irrigation Plans (DIP) and State Irrigation Plan (SIP), except for the initial year, and the
expenditure in water resource development for agriculture sector in the year under consideration
is not less than the baseline expenditure, which is defined as the average of the expenditure in
irrigation sector irrespective of the department in the state plan in three years prior to the year
under consideration. Secondly, States will be given additional weightage for levying charges on
water and electricity for irrigation purposes, so as to ensure sustainability of the programme.
Thirdly, interstate allocation of PMKSY fund will be decided based on
Share of percentage of unirrigated area in the state vis-à-vis national average including
prominence of areas classified under Desert Development Programme (DDP) and
Drought Prone Area Development Programme (DPAP)
Increase in percentage share of expenditure on water resource development for agriculture
sector in State Plan expenditure in the previous year over three years prior to it and
Improvement in irrigation efficiency in the state.
Vision
The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
will be to ensure access to some means of protective irrigation to all agricultural farms in the
country, to produce ‘per drop more crop’, thus bringing much desired rural prosperity.
District Irrigation Plan
NABARD Consultancy Services 24
Objective
The objectives of the PMKSY are to:
a. Achieve convergence of investments in irrigation at the field level (preparation of district
level and, if required, sub district level water use plans).
b. Enhance the physical access of water on the farm and expand cultivable area under assured
irrigation (Har Khet ko Pani),
c. Integration of water source, distribution and its efficient use, to make best use of water
through appropriate technologies and practices.
d. Improve on-farm water use efficiency to reduce wastage and increase availability both in
duration and extent,
e. Enhance the adoption of precision-irrigation and other water saving technologies (More
crop per drop).
f. Enhance recharge of aquifers and introduce sustainable water conservation practices
g. Ensure the integrated development of rainfed areas using the watershed approach towards
soil and water conservation, regeneration of ground water, arresting runoff, providing
livelihood options and other NRM activities.
h. Promote extension activities relating to water harvesting, water management and crop
alignment for farmers and grass root level field functionaries.
i. Explore the feasibility of reusing treated municipal waste water for peri-urban agriculture,
and
j. Attract greater private investments in irrigation.
Strategy/approach
To achieve these objectives PMKSY adopted strategies that include
a. Creation of new water sources; repair, restoration and renovation of defunct water sources;
construction of water harvesting structures, secondary & micro storage, groundwater
development, enhancing potentials of traditional water bodies at village level like Jal
Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo (Nagaland); Eri, Ooranis (T.N.); Dongs
(Assam); Katas, Bandhas (Odisha and M.P.) etc.
b. Developing/augmenting distribution network where irrigation sources (both assured and
protective) are available or created;
District Irrigation Plan
NABARD Consultancy Services 25
c. Promotion of scientific moisture conservation and run off control measures to improve
ground water recharge so as to create opportunities for farmers to access recharged water
through shallow tube/dug wells;
d. Promoting efficient water conveyance and field application devices within the farm viz,
underground piping system, Drip & Sprinklers, pivots, rain-guns and other application
devices etc.;
e. Encouraging community irrigation through registered user groups/farmer producers’
organizations/NGOs; and
f. Farmer oriented activities like capacity building, training and exposure visits,
demonstrations, farm schools, skill development in efficient water and crop management
practices (crop alignment) including large scale awareness on more crop per drop of water
through mass media campaign, exhibitions, field days, and extension activities through
short animation films etc.
Programme Components
PMKSY has following four components:
1. Accelerated Irrigation Benefit Programme (AIBP) to focus on faster completion of on-
going Major and Medium Irrigation including National Projects.
2. PMKSY (Har Khet ko Pani): This component focuses on-
a. Creation of new water sources through Minor Irrigation (both surface and ground
water)
b. Repair, restoration and renovation of water bodies; strengthening carrying capacity
of traditional water sources, construction rain water harvesting structures (Jal
Sanchay);
c. Command area development, strengthening and creation of distribution network
from source to the farm;
d. Ground water development in the areas where it is abundant, so that sink is created
to store runoff/ flood water during peak rainy season.
e. Improvement in water management and distribution system for water bodies to
take advantage of the available source which is not tapped to its fullest capacity
(deriving benefits from low hanging fruits). At least 10% of the command area to
be covered under micro/precision irrigation.
f. Diversion of water from source of different location where it is plenty to nearby
water scarce areas, lift irrigation from water bodies/rivers at lower elevation to
District Irrigation Plan
NABARD Consultancy Services 26
supplement requirements beyond IWMP and MGNREGS irrespective of
irrigation command.
g. Creating and rejuvenating traditional water storage systems like Khatri, Kuhl etc.
at feasible locations.
3. PMKSY (Per Drop More Crop)
a. Programme management, preparation of State/District Irrigation Plan, approval
of annual action plan, Monitoring etc.
b. Promoting efficient water conveyance and precision water application devices like
drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan);
c. Topping up of input cost particularly under civil construction beyond permissible
limit (40%), under MGNREGS for activities like lining inlet, outlet, silt traps,
distribution system etc.
d. Construction of micro irrigation structures to supplement source creation activities
including tube wells and dug wells (in areas where ground water is available and
not under semi critical/ critical/ over exploited category of development) which
are not supported under AIBP, PMKSY (Har Khet ko Pani), PMKSY (Watershed)
and MGNREGS as per Block/district irrigation plan.
e. Secondary storage structures at tail end of canal system to store water when
available in abundance (rainy season) or from perennial sources like streams for
use during dry periods through effective on-farm water management;
f. Water lifting devices like diesel/ electric/ solar pump sets including water carriage
pipes, underground piping system.
g. Extension activities for promotion of scientific moisture conservation and
agronomic measures including cropping alignment to maximize use of available
water including rainfall and minimize irrigation requirement (Jal Sarankchan);
h. Capacity building, training and awareness campaign including low cost
publications, use of Pico projectors and low cost films for encouraging potential
use water source through technological, agronomic and management practices
including community irrigation.
i. The extension workers will be empowered to disseminate relevant technologies
under PMKSY only after requisite training is provided to them especially in the
area of promotion of scientific moisture conservation and agronomic measures,
improved/ innovative distribution system like pipe and box outlet system, etc.
Appropriate Domain Experts will act as Master Trainers.
District Irrigation Plan
NABARD Consultancy Services 27
j. Information Communication Technology (ICT) interventions through NeGP-A to
be made use in the field of water use efficiency, precision irrigation technologies,
on farm water management, crop alignment etc. and also to do intensive
monitoring of the Scheme.
4. PMKSY (Watershed Development)
a. Effective management of run-off water and improved soil & moisture conservation
activities such as ridge area treatment, drainage line treatment, rain water
harvesting, in-situ moisture conservation and other allied activities on watershed
basis.
b. Converging with MGNREGS for creation of water source to full potential in
identified backward rainfed Blocks including renovation of traditional water
bodies.
Rationale/ Justification
In reference to the status and need of irrigation, the water resource management
including irrigation related priorities was identified for West Jaintia Hills’ district by the people
representatives of district with support from administration and technical experts. For instance,
the reports of Strategic Research and Extension Plan (SREP) prepared under ATMA program,
Comprehensive District Agriculture Plan (C-DAP) prepared as part of Rashtriya Krishi Vikas
Yojana (RKVY), Potential Linked Credit Plans (PLP) of NABARD and the Integrated District
Development Plan etc. identified number of irrigation related issues for West Jaintia Hills’ district
including (i) promoting water use efficiency through sprinkler and drip irrigation; (iii) promoting
protected polyhouse cultivation to minimize risk factors and enhance quality and productivity; (iv)
Improvement of on-farm water delivery and efficiency of existing irrigation systems; (v) promotion
of soil conservation of arable & non-arable land through engineering measures; (vi) creation of
new water harvesting structures, check dams, ponds, tanks, etc. (vii) increase the forest cover in
the district and (viii) land improvement measures.
Methodology
During the course of preparation of District Irrigation Plan (DIP), the team visited
West Jaintia Hills’ district to collect data and have interaction with all the stakeholders.
Methodology adopted to prepare DIP is outlined in brief as under:
District Irrigation Plan
NABARD Consultancy Services 28
a. Collection of primary and secondary data from field from various sources
including published documents and websites.
b. Various meetings were held to obtain ground level realities and data from key
personnel/stakeholders through structured, unstructured interviews, focused
group discussions etc.
c. Meetings with State Government departments and related institutions were held
d. Meeting was also held with State Level authorities.
e. GIS maps of the areas/clusters were studied to understand the land morphology,
topography of the district.
f. Focused group discussions and interaction with agriculture officers, horticulture
officers, soil conservation officers, extension officers, rural development
department, animal husbandry department, irrigation officers both at Blocks and
district level for identifying the key issues and focus areas of the region.
g. Discussion with NABARD officer of the district was also held during the visit.
On the basis of detailed discussion and analysis of data, the team arrived at the
projections of various components of PMKSY and Department wise plan for four years from 2016-
17 to 2019-20 as detailed in the plan.
District Irrigation Plan
NABARD Consultancy Services 29
Chapter 1 General Profile of the District
1.1 District Profile
West Jaintia Hills District is one of the 11 (eleven) districts of the state of
Meghalaya. With the bifurcation of the erstwhile Jaintia Hills District into East and West Jaintia
Hills District, West Jaintia Hills District came into existence on 31st July 2012 with its Head
Quarter at Jowai. Jowai is the host of all the heads of important governmental offices and
establishments, educational institutions, hospitals, banking institutions, etc. It lies between 91o
58’E to 92o 50’E longitude and 25o 02’N to 25o 45’N Latitude. The District is bounded in the north
and east by the state of Assam, west by East Khasi hills district of the state and south by Bangladesh
and East Jaintia Hills district.
The district comprises of 1 (one) Civil-Sub-Division viz. Amlarem Civil-Sub-
Division and 3 (three) Community and Rural Development Blocks viz. Amlarem C&RD Block,
Laskein C&RD Block and Thadlaskein C&RD Block. Moreover, the urban population of the
Thadlaskein block lives in Jowai and the Headquarter for urban Thadlaskein C.D. Block.
Table 1.1: Block wise profile of the district
Name of
district/C.D.
Block/Town
Total/
Rural/
Urban
Area
in
Km2
Headquarter
Total
number
of
villages
Number of
inhabited
villages
Number of
uninhabited
villages
Thadlaskein C.D. Block
Total 904.60 Thadlaskein 133 124 9
Rural 896.60 - 133 124 9
Urban 8.00 Jowai 13 13 0
Laskein C.D.
Block
Total 390.40 Laskein 100 87 13
Rural 390.40 - 100 87 13
Amlarem C.D. Block
Total 398.00 Amlarem 98 95 3
Rural 398.00 - 98 95 3
Source: Census 2011
District Irrigation Plan
NABARD Consultancy Services 30
The total geographical area of the district is 1693.00 Sq. Kms out of which 1685.00
Sq. Kms is rural and 8.00 Sq. Km is urban (Census 2011). The altitude of district varies from 76m
to 1627m above the mean sea level (MSL). Jowai, the urban Head quarter of the district is
connected with Shillong and Silchar by NH 44. All 3 Block Head Quarters in the district have also
been connected by roads. Important places connected by metaled roads are Khanduli, Garampani
and Dawki. Recently, Jowai-Amlarem-Dawki Road has been declared as National Highway NH
40(E).
Table 1.2: District Profile
Name of the District District Code Latitude Longitude
West Jaintia Hills 25o 02’N to 25o 45’N 91o 58’E to 92o 50’E
Source: District Agriculture Office, Jowai, West Jaintia Hills
Agriculture is the major occupation in West Jaintia Hills District, in which about
70% of the population depends primarily on agriculture for their livelihood. Rice and maize are
the major food crops grown throughout the district with appreciable improvement in yield. Wheat
has been introduced recently and the result is quite encouraging. Potato, ginger, garlic and turmeric
are some of the important cash crops of the district. The district is the native of the world famous
turmeric Lakadong variety. Special emphasis is presently laid on the non-traditional crops like
Oilseeds (Sesamum, Rapeseeds, Mustard seeds, Soybean), Medicinal plants, orchids and
commercial flowers.
Administrative Setup
The Deputy Commissioner is the head of the District Administration. The Deputy
Commissioner is the Executive head as well as judicial head of the district. The Deputy
Commissioner is aided by a number of officers like Additional Deputy Commissioner, Sub-
Divisional Officer of Civil Sub-Division and Extra Assistant Commissioners to assist him in
different types of activities. As the executive head, the Deputy Commissioner plays a vital role in
coordinating with all developmental heads of the district for all round developmental activities.
Maintenance of law and order is another important aspect of district
administration to give proper security and to safeguard the lives and properties of the citizens. In
this regard, the Deputy Commissioner acts as the District Magistrate for maintenance of law and
order in the district. The District Magistrate is assisted by Additional Deputy Magistrate, Sub-
Division Magistrate and other Executive Magistrates and keeps close link with police department
District Irrigation Plan
NABARD Consultancy Services 31
for necessity. The Superintendent of Police is the head of the Police Administration. The Office of
the Deputy Commissioner, West Jaintia Hills District is located at Iawmusiang, Jowai.
The district consists of 5 (five) Assembly Constituencies, viz. 1-Nartiang (ST), 2-
Jowai (ST), 3-Raliang (ST), 4-Mowkaiaw (ST) and 5-Amlarem (ST). The members of the
Legislative Assemblies are elected by Adult suffrage for a term of 5 (five) years.
There is one Autonomous
District Council, viz. Jaintia Hills Autonomous
District Council which is headed by the Chief
Executive Member, assisted by the Executive
Members. The council discharges the functions
and duties as assigned to it under the provisions
of the Sixth Schedule to the Constitution of
India.
The functions and duties of the
council are discharged through the Executive, Legislative and Judiciary wings. The members of
the council are elected by adult suffrage for a term of 5 (five) years.
The office of the Jaintia Hills Autonomous District Council is located at
Iawmusiang, Jowai.
District Irrigation Plan
NABARD Consultancy Services 32
Map 1: Location of District
District Irrigation Plan
NABARD Consultancy Services 33
District Irrigation Plan
NABARD Consultancy Services 34
1.2 Demography
As per 2011 census, the total population of West Jaintia Hills is 2,72,185 out of
which 135052 are males and 137133 are females. The density of Population is 161 per Sq. Km.,
which is higher than the state average of 132. The decadal variation of population in West and
East Jaintia Hills as for 2001-2011 is 32.10 percent.
Witness quite a sluggish process of urbanization, the overwhelming majority of
people in the district lives in villages. The district is predominantly rural with 89.55 percent of the
total population in the district is residing in rural areas while the urban population is 10.45 percent
which is lower than the state average of 20.07 percent.
Table 1.3: Block wise demographic pattern of West Jaintia Hills District
Source: Census 2011
The district is basically agrarian, where more than 4.68 percent of the population
is engaged in agriculture and allied activities and works as agricultural labourers. Out of the total
population, 11.34 percent population is involved in agriculture as a main source of income and
livelihood. Moreover, males are predominantly involved in agriculture with 63.14 percent while
females share is 36.86 percent of the total population of cultivators in the district. Further, women
are also engaged in agricultural labourers.
As per 2011 census, the Literacy rate of the district is 63.23%, male is 59.75% and
female is 66.71 %. The district has a lower literacy rate as compared to state which is 74.43%.
Name of
the
District
Total/
Rural/
Urban
No. of
House
holds
Populati
on Male Female SC ST
Literate
s
Sex
Ratio
Thadlask
ein C.D.
Block
Total 18,205 1,09,509 54,230 55,279 207 1,04,483 46,987 1019.34
Rural 18,205 1,09,509 54,230 55,279 207 1,04,483 46,987 1019.34
Urban - - - - - - - -
Laskein
C.D.
Block
Total 14,379 90,402 45,244 45,158 72 87,041 39,314 998.10
Rural 14,379 90,402 45,244 45158 72 87,041 39,314 998.10
Urban - - - - - - - -
Amlarem
C.D.
Block
Total 7,746 43,844 21,903 21,941 463 40,476 24,584 1001.74
Rural 7,746 43,844 21,903 21,941 463 40,476 24,584 1001.74
Urban - - - - - - - -
Jowai
(Urban) Urban 4,942 28,430 13,675 14,755 102 25,941 22,387 1078.98
Total 45,272 2,72,185 1,35,052 1,37,133 844 2,57,941 1,33,272 1,015
District Irrigation Plan
NABARD Consultancy Services 35
According to census 2011, the sex ratio in the district is 1015 females per 1000
males, which is higher than the state average of 989. The sex ratio in rural and urban West Jaintia
Hills is 1006 and 1079 per 1000 males respectively. Therefore, it shows that sex ratio in rural areas
is less than in urban area of the district. The total number of households in the district are 45272.
1.3 Biomass and Livestock
Livestock
The Animal Husbandry and Veterinary department is the core sector of the state
economy and has played a vital role in developing the livestock and poultry component by
implementing certain development schemes both in rural and urban sector for increasing
production and generating employment opportunities.
Agricultural operations in Meghalaya have limitations due to its topography,
climatic situation and socio-economic conditions claiming only about 10% of the total land for
cultivation, therefore, livestock and poultry plays a vital role in the economic growth of the state
and provide the only alternative avocation the villagers fall upon for a subsidiary living.
Application of modern technologies have brought a high hope for commercial livestock and
poultry farming as a full time occupation for a decent living. Though the present output of livestock
0
20,000
40,000
60,000
80,000
1,00,000
1,20,000
Thadlaskein Laskein Amlarem Jowai (Urban)
Po
pu
lati
on
Demography of the district
Total Population No. of SCs No. of STs Literates
Figure 1.1: Demography of the district
District Irrigation Plan
NABARD Consultancy Services 36
production in the State has been increasing at higher proportion to the growth of human
population, the overall availability situation is not encouraging with only 75 grams of milk per
person per day is now available in the State. Similarly, availability of eggs per person per year has
been estimated at 38 Nos. only as against the NRC recommendation of 180. In case of meat, the
availability situation meets the requirement, taking the import from other States into
consideration. However, greater efforts are necessary to bridge the gap between production and
the requirement considering the following plus points:
Traditional dependency of rural tribal population in livestock for livelihood;
Food habits of the people are mostly non-vegetarian in nature.
Absence of any taboo for consumption of chicken meat, pork or beef.
Absence of sentiments for slaughter of livestock including cattle for meat supply.
Readiness of the farmers to adopt modern technologies for breeding, feeding,
management.
Availability of favorable markets within the State as well as in the adjoining States.
Availability of manpower for control of Livestock and Poultry diseases.
Table 1.4: Livestock Population 2012 Census and Growth Rate as compared to 2007 Census
Sl. No. Species Population (Numbers) Total Growth Rate (%)
1 Cattle
Crossbred Male 5602
26458 -1.45 Female 20856
Indigenous Male 355705
879295 2.2 Female 523590
2 Buffalo Indigenous Male 16363
24894 10.02 Female 8531
3 Goat Indigenous Male 179502
472325 29.23 Female 292823
4 Pig
Exotic/ Crossbred Male 72834
137984 96.68 Female 65150
Indigenous Male 224672
431317 -5.04 Female 206645
5 Sheep
Exotic/ Crossbred Male 299
805 232.64 Female 506
Indigenous Male 7434
20186 -2.95 Female 12752
6 Poultry
Fowl Improved 344157
3541716 25.84
Desi 3197559 16.15
Duck Improved 514
22845 -93.56
Desi 22331 -61.76
Others Turkey 498 498 2271.43
7 Dog 256972 256972 14.66
District Irrigation Plan
NABARD Consultancy Services 37
The Department of Animal Husbandry and Veterinary is entrusted with the
responsibility of all aspect of Livestock and Poultry Development, like, production, processing and
marketing of livestock and poultry and their products through augmentation of production of milk,
meat, eggs and wool. Animal health care service and prevention of animal diseases is a priority for
maintenance of a healthy stock for optimum production. Creation of suitable infrastructure for
breeding, feeding and management of livestock and poultry, processing of milk, meat and eggs and
marketing of livestock and livestock products is also given due importance. Besides, the
Department is engaged in providing the required training and extension support to livestock
producers so as to promote scientific rearing of livestock and poultry amongst them with
consequent generation of employment avenues in the rural areas. To bring about a developmental
change in livestock and poultry sector, number of programme and infrastructure development were
undertaken by the Government where the activities of the Department were mainly centered round
the following broad objectives:
1. Providing protection to livestock and poultry from the ravages of diseases
through treatments and preventive vaccinations.
2. Introducing improved breeding techniques for upgrading the local stock.
3. Ensuring better Animal Husbandry practices through adoption of Extension and
Research.
4. Building up of adequate technical and professional man-power through Education and
Training.
5. Encouraging setting of Livestock and Poultry Industries.
Table 1.5: Block wise livestock and poultry population in West Jaintia Hills district
Block
Small Animals Large Animal
Dra
ft A
nim
al
(Bu
ffalo
/ y
ak
/
bu
lls/
an
y
oth
er
(No
s.)
Poultr
y
(No.)
Ducks
(No.)
Pigs
(Nos.)
Goats
(Nos.)
Sheep
(Nos.)
Ind
igen
ou
s C
ow
(No
s.)
Hyb
rid
Co
w
(No
s.)
Ind
iscr
ipt
ive
Bu
ffalo
(No
s.)
Hyb
rid
Bu
ffalo
(No
’s)
Thadlask
ein 44813 18 9919 4381 22 17574 104 774 0 0
Laskein 72476 1111 12515 3563 8 8713 554 869 0 0
Amlarem 27746 381 14692 5373 0 7288 19 23 0 0
Total 145035 1510 37126 13317 30 33575 677 1666 0 0
Source: District Animal Husbandry and Veterinary Department, Jowai, West Jaintia Hills
District Irrigation Plan
NABARD Consultancy Services 38
Figure 1.2: Livestock and Poultry population
0
10000
20000
30000
40000
50000
60000
70000
80000
Poultry Ducks Pigs Goats Sheep Total Cows Indescriptive
Buffalo
Po
pu
lati
on
Thadlaskein Laskein Amlarem
District Irrigation Plan
NABARD Consultancy Services 39
1.4 Agro Ecology, Climatic, Hydrology and Topography
Table 1.6: Agro-climatic Zones in West Jaintia Hills District
Source: Official District Website/KVK-Jaintia Hills
Climate and Rainfall
The State is directly influenced by the South West monsoon and North Eastern
winds. The region experiences tropical monsoon climate that varies from Western to Eastern part
of the plateau. Garo Hills’ district has tropical climate characterized by high rainfall and humidity
generally warm summer and moderately cold winter. Khasi and Jaintia Hills have rainfall,
Sl.
No
Agro-climatic
Zone Characteristics
1
Temperate
and sub-
alpine zone
This Zone confined in the Central plateau of the District in an area around Jowai, part of Thadlaskein Block. Climate: The rainfall in this Zone is around 2800 - 6000mm which is well distributed. It is Humid
and moderately warm and severe winter. The dominant geographic unit is upper and middle plateau. Cropping pattern: The main crops grown in this zone are paddy, potato. Vegetables like Tomato, bean, radish, carrot is also grown wherever irrigation facility is available.
2 Sub-Tropical
Hill Zone
This zone spread over the Northern Part of the District. i.e. (Laskein, and part of Thadlaskein,) are under this Zone. Climate : The average rainfall of this zone ranges from 1270- 2032 mm received in 150 days, about 70-80 % of annual rainfall is received during Monsoon period( June –September. The Maximum temperature of this Zone goes up to 20-27°C during April-May while minimum temperature is 6-9°C during December-January. It is humid and Warm. Land use pattern: One of the
characteristic of this zone is high percentage of cultivable land. The dominant geographic unit Hills is rolling and undulating piedmont Cropping Pattern: Major crops grown in this Zone are Paddy and Maize.
3 Mild Tropical
Hill Zone
This zone situated in the south western part of the district. Climate: Humid and warm, Very high rainfall which ranges from 4000 - 10000 mm mostly covered by semi deciduous forest. The maximum temperature ranges from 25-30°C and minimum temperature ranges from 8-10°C. The dominant geographic unit is severely dissected and undulating low hills, gentle to steep slope. The land is mostly covered with forest, land sometimes acidic in nature having poor fertility. Due to steep and undulated topography with high rainfall, soils are prone to erosion leading to heavy degradation. The soil type varies from red to
loamy. Cropping pattern: This zone has most of the forest area of the District .The population of this region depends on Natural resources and forest products like broomsticks etc. The main crops grown in this zone are areca nut, Betel leaf, banana, and fruits.
District Irrigation Plan
NABARD Consultancy Services 40
moderately warm summer and severe winter with periodic depression below freezing point marked
by appearance of ground frost at night and morning over higher elevated areas. The lower elevated
areas experience fairly high temperature for most part of the year having a mean maximum of 23°
to 26°C and a mean minimum of 12° to 17°C. The mean summer temperature is 26°C and
the mean winter temperature is 9°C. The mean annual rainfall varies from 2000-4000 mm
with most rainfall concentrated from May to September.
The Climate of West Jaintia Hills District is uniquely pleasant and caressing. It is
neither too warm in summer nor too cold in winter. The rainfall profile is very high during the
south west monsoon, which usually starts from the middle of May and declines towards the last
part of September. The intensity of rainfall in the district during the last few years has registered a
rising trend, due to the untimely vagary of monsoon coupled by the existence of fogs, mists and
nimbus clouds which loom large during the rainy season. The Average Relative Humidity is the
highest during the month of July while December records the lowest Relative Humidity.
Table 1.7: Monthly rainfall data (in mm) for the year 2013
Sr.
No. Months
Rainfall in
mm
No. of Rainy
Days
1 January 0
164
2 February 0
3 March 18.00
4 April 91.20
5 May 553.40
6 June 672.60
7 July 438.00
8 August 376.70
9 September 260.40
10 October 197.80
11 November 0
12 December 0
Total 2608.10 164
Source: Directorate of Agriculture. Shillong
Topography
The relative relief of the District is 1200 m. The elevation ranges from 76m (at
Dawki) and 1627m (at Maryngksi).Physio-graphically the District is divided into three broad
divisions. They are (i) the Northern Hills (ii) the Central plateau or the central Jowai upland and
(iii) the Southern escarpment. The Northern hills exhibit undulating topography. Denudation Hills
and less dissected topography cover the Northern part of the District. The area is less dissected
showing youthful topography with Denudation Hills, highly dissected undulating topography with
District Irrigation Plan
NABARD Consultancy Services 41
Denudation Hills trending N-S, E-W, NE-SW. The Central plateau is characterized by rolling
mounds and hummocks of gentle height and show flat topography. The Southern escarpment
exhibits denude structural Hills, highly dissected undulating topography with sharp crested hills,
deep gorges and waterfalls. The region is at higher elevation than the northern hills. Physio-
graphically the district may also be divided into Highlands-80.389(000ha), Midlands- 233.57
(000ha), Lowlands-67.941 (000ha) and Hilly tract-67.940 (000ha).
1.5 Soil Profile
The soil formation in the Meghalaya State (pathogenesis) has been
influenced by the geology, relief and climatic conditions prevailing in the region. There
are four distinct categories of soil in the State. The red loamy soils are found in the central
Garo Hills region and upland zones in the Khasi and the Jaintia hills. The laterite soils
are found in a broad belt extending from west to east in the northern parts of the st ate.
Red and yellow soils with a fine texture ranging from loam to silty loam are found in the
foothill regions along the east-west belt. These type of soils are suitable for rice and fruit
cultivation. The northern, western and southern parts of the plateau feature alluvial soils.
These soils vary from sandy to clayey loam with varying amount of nitrogen content.
These are rich in potash but have low phosphate content.
The following table shows the major soils found in the district:
Table 1.8: Major type of Soils in the district
Sl. No. Major Soils Area (ha) Percent (%) of Total
1. Black Soils 16082.4 2%
2. Red Soils 264899 37%
3. Alluvial Soils 16631.6 2%
4. Sandy Soils 36522.6 5%
5. Acid Soils 381100 53%
Total 715236 100%
Source: ICAR Report-2015, Umiam
District Irrigation Plan
NABARD Consultancy Services 42
Entisol, Inceptisol and Alfisol are the Soil group classifications present in the
district. Soil fertility status is generally low to medium. The soil is mostly sandy, reddish brown to
yellow brown in color, acidic in reaction with low water holding capacity and has poor contents
of organic matter and nutrients. The PH value ranges between 4.1 to 5.6 .The concentrations of
organic carbon content varies from 0.28 to 3.1 percent. Low phosphorus content is the
characteristics of the soil of the District varying between 1.8 and 4.5 Kg/ha. The Potassium content
ranges between 28.0 and 112.0 Kg/ha, which is quite lower than normal soil.
Table 1.9: Soil Profile
District/Block Soil Type Area (ha)
Land Slope
0-3%
(ha)
3-8%
(ha)
8-25%
(ha)
>25%
(ha)
West Jaintia
Hills
Fine Loam
137537 NA 22490 10725 139915
Thadlaskein NA NA NA NA NA NA
Laskein NA NA NA NA NA NA
Amlarem NA NA NA NA NA NA
Source: District Agriculture Office, Jowai, West Jaintia Hills
1.6 Soil Erosion and Run-off Status
Soil erosion is a major problem in the state. An estimated 120 tons of soil per
hectare are eroded every year. The most prominent cause of soil erosion in the State is Jhum
cultivation and unscientific quarrying and mining. Nearly 1.102 million hectares in Meghalaya
have been categorized as problem areas in terms of risk of soil erosion.
1.7 Land Use Patterns
Meghalaya is one of the smaller States of the country. Similarly, West Jaintia Hills
is also one of the smaller districts of the State with a total geographical area of 169300 hectares.
The man to land ratio is quite favorable as compared to some of the other States and the population
density is 161 persons per square kilometer. As per the land use statistics for 2014-15, a large part
of the geographical area of the district is under forests. The net sown area is about 24,155 hectares,
which is 14.35% of the total geographical area of the district. More than 4% of the area is fallow.
District Irrigation Plan
NABARD Consultancy Services 43
Table 1.10: Land use pattern
Land Use Area in hectares Percentage
Total geographical area 169300
Reporting area for land utilization 168379 100%
Forests 60970 36.21%
Not available for cultivation 16195 9.62%
Land under misc. tree crops and groves 11739 6.97%
Cultivable wasteland 43656 25.93%
Fallow lands other than current fallows 7523 4.47%
Current fallows 4141 2.46%
Net area sown 24155 14.35%
Source: District Agriculture Office, Jowai, West Jaintia Hills
Forests
34%
Not available
for cultivation
9%
Cultivable
wasteland
24%
Fallow lands
other than
current fallows
4%
Current
fallows
2%
Total cropped
area
14%Net area sown
13%
Figure 1.3: Land use pattern in the district
Table 1.11: Block wise classification of land use pattern in the district for the year 2014-15 (Area in hectares)
Source: District Agriculture Office, Jowai, West Jaintia Hills
Sl/ Blocks
Geo
gra
ph
ical
Are
a
Rep
ort
ing A
rea f
or
Lan
d U
tili
zati
on
Sta
tist
ics
Area under Agriculture
Are
a u
nd
er
fore
st
Not available for cultivation Other uncultivated
excluding fallow land Fallow Lands
Area under non-agricultural uses
To
tal/
Gro
ss C
rop
ped
Are
a (
3)
Net
Are
a S
ow
n (
4)
Are
a s
ow
n m
ore
th
an
on
ce (
3-4
)
Cro
pp
ing i
nte
nsi
ty (
%)
So
cial
Fo
rest
ry
Lan
d u
nd
er
stil
l w
ate
r (b
)
Oth
er
lan
d ©
Total
(8a to
8c)
Barr
en
& U
ncu
ltiv
ab
le l
an
d
Total
(8d+9)
Lan
d u
nd
er
mis
c. t
ree c
rop
s &
gro
ves
(no
t in
clu
ded
in
net
are
a
sow
n)
Cu
ltiv
ab
le w
ast
e l
an
d
Total
(11+12)
Fall
ow
lan
ds
oth
er
than
cu
rren
t
fall
ow
s
Cu
rren
t fa
llo
w
Total
1 2 3 4 5 6 7 8a 8b 8c 8d 9 10 11 12 13 14 15 16
Thadlaskein 90460 89642 14442 14213 229 98% 34895 1441 744 2257 4442 3989 8431 8029 21790 29819 1356 928 2284
Laskein 39040 39005 5806 5691 115 98% 12277 331 737 1035 2103 1036 3139 1377 11050 12427 3703 1768 5471
Amlarem 39800 39732 4288 4251 37 99% 13798 571 819 1538 2928 1697 4625 2333 10816 13149 2464 1445 3909
West Jaintia
Hills (Total) 169300 168379 24536 24155 381 98.45% 60970 2343 2300 4830 9473 6722 16195 11739 43656 55395 7523 4141 11664
Chapter 2 District Water profile
2.1 Area-wise, Crop-wise Irrigation status
The district has a forest area of 609.70 sq. km., i.e. about 36.21% of the total
geographical area. The net area sown is 241.55 sq. km. and the total cropped area is 245.36 sq.
km. Fallow land covers about 4.47%, net area sown is about 14.35%, while the total cropped area
is also about 14.57%.
The district has plenty of natural resources for irrigation. The source of irrigation
in the district is mainly through surface irrigation wherein minor irrigation tanks and rain water
harvesting are the major sources. However, there is no source of irrigation from ground water.
Agriculture is the main livelihood of the people of West Jaintia Hills as nearly
89.55% of the district population lives in rural areas. The development of agriculture in the district
depends on a number of factors, including the method of cultivation, the ownership of land, the
availability of irrigational facilities, the
extent of soil conservation, the
availability of cultivable land and its
fertility. Ownership of land including
most of the forest areas is mainly private
i.e., with local tribals. Majority of people
living in rural areas are dependent on the
forest for their day-to-day needs of food
supplements, fodder, medicines, and fuel
wood and construction materials. In
addition to this, they also derive some
income from forests by way of extraction and sale of forest products and employment in forest
based industries. Still some farmers follow the conventional methods of cultivation known as Jhum
or shifting cultivation which is widely practiced in some part of the state.
West Jaintia hills district has a total cropped area of 24536 Hectares out of which
only 381 hectares (1.55%) is sown more than once or under double cropping and the rest under
single or mono cropping system. About 70 percent of the total cultivated area is under rain fed
condition and is used mainly for cultivation of Kharif crops like Rice, Maize, and Soybean etc.
Land utilization for Rabi crops is very less. The major crops are rice (occupying an area of 72.13%),
District Irrigation Plan
NABARD Consultancy Services 46
maize (24%), soybean (2.84%), Arecanut (25.90%), turmeric (20.11%), Pea (0.53%) and Khasi
mandarin (13.84%) and rest are vegetables and other crops.
Table 2.1: Crop-wise status of irrigated and rainfed area in the district
Crop
Type
Kharif (Area in ha) Rabi Area in ha Summer Crop
(Area in ha) Total (Area in ha
Irriga
ted
Rain
fed
Tota
l
Irriga
ted
Rain
fed
Tot
al
Irriga
ted
Rain
fed
Tot
al
Irriga
ted
Rain
fed
Tota
l
A) Cereals
1. Rice
Autum
n - 58 58 - - - - - - - 58 58
Winter 2597.
29
5320.
71
7918
.00 - - - - - -
2597.
29
5320.
71
7918
.00
Spring - - - 70 0 70 - - - 70 - 70
B) Coarse Cereals
Maize - 2259.
84
2259
.84
422.1
6 -
422.
16 - - -
422.1
6
2259.
84 2682
C) Pulses
Pea - 59 59 63 - 63 - - - 63 59 122
Cowpe
a - 22 22 - - - - - - - 22 22
D) Oil Seeds
Sesamu
m - 23 23 - - - - - - - 23 23
Rapese
ed and
Mustar
d
- 10 10 - - - - - - - 10 10
Soya
bean - 317 317 - - - - - - - 317 317
E) Fibre - - - - - - - - - - - -
F) Any other crops
Sugar
Cane - 2 2 - - - - - - - 2 2
Source: District Agriculture Office, Dept. of Agriculture, Jowai, West Jaintia Hills
District Irrigation Plan
NABARD Consultancy Services 47
Table 2.2: Status of irrigated and rainfed area of horticultural crops in the district
Crop
Type
Kharif (Area in ha) Rabi Area in ha Summer Crop (Area
in ha)
Horticulture &
Plantation
Crops (Area in ha)
Irriga
ted
Rain
fed
Tot
al
Irriga
ted
Rain
fed
Tot
al
Irriga
ted
Rain
fed
Tot
al
Irriga
ted
Rain
fed
Tot
al
Pineapp
le - 73 73 - - - - - - - 73 73
Khasi
mandari
n
- 801 801 - - - - - - - 801 801
Assam
lemon - 22 22 - - - - - - - 22 22
Carrot - 40 40 10 - 10 - - - 10 40 50
radish - 20 20 16 - 16 - - - 16 20 36
Potato - 120 120 50 - 50 - - - 50 120 170
Sweet
Potato - 771 771 - - - - - - - 771 771
Ginger - 336 336 - - - - - - - 336 336
Turmeri
c - 1164
116
4 - - - - - - - 1164
116
4
Chillies - 32 32 15 - 15 - - - 15 32 47
Tomato - 316 316 150 - 150 - - - 150 316 466
Cabbag
e - 21 21 38 - 38 - - - 38 21 59
Cauliflo
wer - 25 25 40 - 40 - - - 40 25 65
Lettuce - 5 5 20 - 20 - - - 20 5 25
Mustard
(leaf) - 22 22 30 - 30 - - - 30 22 52
Arecanu
t - 764 764 735 - 735 - - - 735 764
149
9
Banana - 141 141 - - - - - - - 141 141
Total - 4673 467
3 1104 -
110
4 - - - 1104 4673
577
7
Source: District Horticulture Office, Dept. of Agriculture, Jowai, West Jaintia Hills
District Irrigation Plan
NABARD Consultancy Services 48
2.2 Production and Productivity of major Crop
Maize cultivation both Kharif and rabi are taken up by the farmers of the district
as maize not only provides source of income but also provides feed for animals. In the past, farmers
grow paddy once a year but now the farmers have come forward to cultivate this type of Boro
Paddy, as it increase the crop production. In the lower altitude areas, boro paddy cultivation is
taken up. In mid altitude and high altitude, multiple cropping was taken up in areas where
irrigation is assured with a view to
increase the cropping system, also
converting mono cropping into
double cropping system like
growing potato and vegetables in
paddy field. This was done after
harvesting of paddy and then
followed by potato or vegetables in
the same areas and it was observed
that production is more from both
paddy and vegetables.
The season-wise area, production and productivity of major agricultural crops and
horticultural crops in Jaintia hills district are given in the tables.
Table 2.3: Season wise area, production and yield of agricultural crops in the district
Season
Crop Sown
Area
(ha)
Rainfed Irrigated Total
Cereals
Coarse
Cereal
s
Pulses Oil seeds
Fibre
Crop
s
Any
other
crops
Produc
tion
(MT/h
a)
Produc
tivity
or
Yield
(Kgs/h
a)
Cost of
Cultivat
ion
(Rs./ha)
Producti
on
(qtl/yr)
Producti
vity or
Yield
(Kgs/ha
)
Cost
of
Cultiv
ation
(Rs./h
a)
Produc
tion
(qtl/yr
)
Produc
tivity
or
Yield
(Kgs/h
a)
Cost of
Cultivati
on
(Rs./ha)
Kharif
Rice
a) Autumn 58 94 3240 26,312/- 94 3240 26,312/-
b) Winter 7928 14719 5292 26,312/- 14719 5292 26,312/-
Rabi c) Spring 77 347 4506 26,312/- 347 4506 26,312/-
Kharif Maize 2682 3189 3575 27,732/- 3189 3575 27,732/-
Kharif
Pea 54 43 2389 43 2389
Cowpea 21 14 1880 14 1880
Kharif Sesamum 23 12 1555 12 1555
Rabi Rapeseed
&
Mustard
10 5.5 1650 5.5 1650
Kharif Soybean 317 404 3559 404 3559
Kharif Sugar
cane 2 2 2000 2 2000
Source: District Agriculture Office, Dept. of Agriculture, Jowai, West Jaintia Hills
Table 2.4: Production & productivity of major horticulture Crops in the district
Seaso
n
Horticulture Crop Sown/Grown Rainfed Area Irrigated Area Total
Fruit
Crops
Vegetabl
es Crops
Plantati
on
Crops
Rhizoma
tic
Spices
Tempera
te Fruits
Peren
nial
Spice
Producti
on
(Qtl/Ye
ar
Producti
vity or
Yield
(Kg/ha
Cost of
Cultivati
on `/Ha
Producti
on
(Qtl/Ye
ar
Producti
vity or
Yield
(Kg/ha
Cost of
Cultivati
on `/Ha
Producti
on
(Qtl/Ye
ar
Producti
vity or
Yield
(Kg/ha
Cost of
Cultivati
on `/Ha
SU
MM
ER
Orange 800-
1000
80000-
100000 33,474/- 800-
1000
80000-
100000 33,474/-
District Irrigation Plan
NABARD Consultancy Services 50
Banana 150-200 15000-
20000 60,000/- 150-200
15000-
20000 60,000/-
Naspati 100-120 10000-
12000 35,500/- 100-120
10000-
12000 35,500/-
Pineappl
e 500-800
5000-
8000 40,500/- 500-800
5000-
8000 40,500/-
Litchi 120-150 12000-
15000 45,250/- 120-150
12000-
15000 45,250/-
Guava 120-150 12000-
15000 35,950/- 120-150
12000-
15000 35,950/-
Tomato 350-400 35000-
40000 68,059/- 350-400
35000-
40000 68,059/-
Potato 85-100 8500-
10000 60,039/- 85-100
8500-
10000 60,039/-
Cabbage 200-250 20000-
25000 60,429/- 200-250
20000-
25000 60,429/-
Carrot 200-250 20000-
25000 42,914/- 200-250
20000-
25000 42,914/-
Cauliflo
wer 175-200
17500-
20000 60,429/- 175-200
17500-
20000 60,429/-
Arecan
ut 15-20
1500-
2000 45,392/- 15-20
1500-
2000 45,392/-
Betelvin
e 15-30
1500-
3000 53,325/- 15-30
1500-
3000 53,325/-
Ginger 150-200 1500-
2000 80,600/- 150-200
1500-
2000 80,600/-
Turmeric 300-350 30000-
35000 55,106/- 300-350
30000-
35000 55,106/-
Tempera
te Fruits 90-150
9000-
15000 38,500/- 90-150
9000-
15000 38,500/-
Black
Peppe
r
60-70 6000-
7000 80,500/- 60-70
6000-
7000 80,500/-
Source: District Horticulture Office, Dept. of Agriculture, Jowai, West Jaintia Hill
2.3 Irrigation based classification
The District has adequate water resources for sowing crops and efficient utilization
of available water resources can enhanced the production and productivity of crops and would be
sufficient for local consumption. Further, the district is drained by the rivers of Myngngot
(Umngot), Myntang and in the Southern part, the District is drained by Myntdu River and its
tributaries. The main tributaries are Umlatang, Lynriang, Lubha, Umlanar, and Lukha. In the
West Myngngot River separating the East Khasi Hills District with the Jaintia Hills.
The present irrigation status in West Jaintia Hills is quite low. The gross irrigated
area in the district is 5624.60 ha while the
gross cropped area is 24536 ha i.e. total
irrigated area is only 22.92% of the gross
cropped area. Amlarem sub-divisional
block has a highest net irrigated area of
2937.00 hectares (52.66%). Thadlaskein
block ranks second in the net irrigated
area which is 1588.78 hectares (28.25%).
In addition, the total partially irrigated
area/protective irrigation in the district is
13227.43 hectares.
Table 2.5: Block-wise Irrigation based classification
Block
Irrigated (Area in ha) Rainfed (Area in ha)
Gross Irrigated
Area Net Irrigated Area
Partially
Irrigated/Protective
Irrigation
Un-
Irrigated
or Totally
Rainfed
Thadlaskein 1588.78 1549.43 4858.84 NA
Laskein 1073.82 968.02 3042.91 NA
Amlarem 2962.00 2937.00 5325.68 NA
West Jaintia
Hills (Total) 5624.60 5454.45 13227.43 -
Source: Water Resource Dept., Jowai, West Jaintia Hills
District Irrigation Plan
NABARD Consultancy Services 52
Figure 2.1: Block-wise irrigation based classification
1588.78
1073.82
2962
1549.43
968.02
2937
4858.84
3042.91
5325.68
0
1000
2000
3000
4000
5000
6000
Thadlaskein Laskein Amlarem
Are
a i
n h
ect
are
s
Block
Gross Irrigated Area Net Irrigated Area Partially Irrigated Area
District Irrigation Plan
NABARD Consultancy Services 53
District Irrigation Plan
NABARD Consultancy Services 54
Chapter 3 Water Availability
Irrigation and Water Resources Development provides the basic infrastructure for
the growth of economy of the country and large investment has been made for the purpose in our
country. Irrigation is an artificial application of water to the soil for crop production by
constructing headworks (weir) across a river in case of flow irrigation system. In lift irrigation
system water required for irrigation purpose has been lifted from the river as the situation
commands by diesel operated or electricity power operated barge mounted pump. In third case
where these two systems are not feasible required water are extracted from the water bearing
aquifer beneath the ground level by means of deep tube well assembly. Besides these popular
system of irrigation there are sprinkler system and drip irrigation system. In a world of explosive
population growth, particularly in developing nations, it is the need of the time to enhance the
growth of food grain production keeping in conformity with the increase in population. The
increase in agricultural production in general and food grain production in particular has not kept
pace with the growth of the population by ushering the traditional cultivation system. Every means
must therefore be sought to increase agricultural production. In the arid and semi-arid zones of the
world one of the principal means to achieve this is development of irrigation. Our country, India
also needs irrigation to keep pace with the growth of its huge population, which has crossed one
billion marks in this millennium.
Out of total geographical area of 22, 42,900 hectares of Meghalaya, the net
cropped area is only about 9.87% i.e. 2, 21,374.23 ha of the total geographical area of the State.
Meghalaya is basically an agrarian State with about 70-80% of its population depending on
Agriculture and allied activities, yet the state is deficit in food grain production. One of the major
inputs for increasing food grain production in the State is undoubtedly providing of assured
irrigation so that the farmers can take up double/triple cropping. The identified ultimate irrigation
potential of the State is approximately 2.18 Lakhs hectare. The irrigation potential created through
the 266 no’s of Departmental schemes completed by the end of 2009-10 is about 29,213.77 hectares
which is within 13.40% of the ultimate potential. Out of this, 27,300.32 Ha is under Surface water
and 1913.45 Ha is under Ground water. The number of completed schemes is 246 Surface Water
Schemes, 9 Nos. Deep Tube Wells and a cluster of Shallow Tube Wells. The main function of the
Water Resources Dept. is the implementation of Irrigation Projects consisting of Surface Flow and
Surface Lift Irrigation schemes in all the Districts of the State. Ground Water Irrigation schemes
are also implemented in areas where they are found feasible. Besides these, there are also Centrally
Sponsored Schemes which are being implemented by the Department such as the Accelerated
District Irrigation Plan
NABARD Consultancy Services 55
Irrigation Benefit Programme (AIBP), RIDF schemes of NABARD, Command Area
Development and Water Management (CAD&WM) Programme and Rationalization of Minor
Irrigation Statistics (RMIS). Besides Minor Irrigation which are the only schemes implemented by
the Directorate of Irrigation, the Water Resources Department will also implement Medium
Irrigation Projects and take up flood protection and flood management works for Agricultural
lands. During 2009-10 there were 72 no’s of On-going Minor Irrigation schemes under A.I.B.P at
a total estimated cost of Rs 10122.876 Lakh to cover a command area of 8600.602 Ha and to
benefit 4208 families. There were also 17
no’s under State Plan at a total estimated
cost of Rs 1030.052 Lakh to cover a
command area of 1004.08 ha and to benefit
461 families. The on-going RIDF schemes
under NABARD were 24 in no’s at a total
estimated cost of Rs 2717.42 Lakh, to cover
a total command area of 3261.58 Ha and
benefit 2149 families. There was no on-
going CADWM scheme during 2009-10.
However, recently the Govt. of India has sanctioned a CADWM scheme for a cluster of 6 (six)
M.I projects at the estimated cost of Rs.122.25 Lakh. Regarding the RMIS, the Department has
just completed the conduct of the 4th Minor Irrigation Census with reference year 2006-07.
(Source: www.meghalaya.gov.in/megportal/department)
3.1 Status of water availability
In the district there are no major or medium irrigation projects, hence the
agricultural development in the area is dependent on minor irrigation schemes. The existing
irrigation schemes are based only on surface water and the source is mainly through non-monsoon
base flow. The total command area is 4545.29 ham in the district. Piped water supply schemes and
spot source water schemes are the main source of water supply schemes and play a major role for
the water requirement of the people especially in the rural areas. Piped water supply schemes are
categorized into (i) Gravity Feed Schemes and (ii) River Pumping Schemes. Spot source water
supply scheme are classified into (i) Hand pump, (ii) Spring tapped chamber and (iii) Well (dug,
ring) maintained by Public Health Engineering Department, Meghalaya (PHED).
The availability of water through surface irrigation in the district is 81.45 MCM in
which majorly the availability of water is through minor irrigation and has a share of 76.80 MCM
District Irrigation Plan
NABARD Consultancy Services 56
(94.29%) while from various water bodies including rain water harvesting is 4.65 MCM (5.71%).
However, there is no ground water availability from various sources in the district.
Table 3.1: Status of water availability
Source: Water Resource Dept., Jowai, West Jaintia Hills
S.No Sources (in BCM) Kharif Rabi Perennial Total
Thadlaskein C & RD Block
1. Surface Irrigation
(i) Minor Irrigation 0.044 0.0003 - 0.0443
(ii) Various Water Bodies Including Rain
Water Harvesting 0.0003 0.00001 - 0.00031
Laskein C & RD Block
1. Surface Irrigation
(i) Minor Irrigation 0.025 0.0008 - 0.0258
(ii) Various Water Bodies Including Rain
Water Harvesting 0.003 0.00008 - 0.0031
Amlarem C & RD Block
1. Surface Irrigation
(i) Minor Irrigation 0.006 0.0007 0.02 0.0067
(ii) Various Water Bodies Including Rain
Water Harvesting 0.001 0.00004 0.0002 0.00124
S.No Sources (in BCM) Kharif Rabi Perennial Total
Thadlaskein C & RD Block
2. Ground Water
(i) Open Well Nil Nil Nil Nil
(ii) Deep Tube Well Nil Nil Nil Nil
(iii) Medium Tube Well Nil Nil Nil Nil
(iv) Shallow Tube Wells Nil Nil Nil Nil
Laskein C & RD Block
2. Ground Water
(i) Open Well Nil Nil Nil Nil
(ii) Deep Tube Well Nil Nil Nil Nil
(iii) Medium Tube Well Nil Nil Nil Nil
(iv) Shallow Tube Wells Nil Nil Nil Nil
Amlarem C & RD Block
2. Ground Water
(i) Open Well Nil Nil Nil Nil
(ii) Deep Tube Well Nil Nil Nil Nil
(iii) Medium Tube Well Nil Nil Nil Nil
(iv) Shallow Tube Wells Nil Nil Nil Nil
District Irrigation Plan
NABARD Consultancy Services 57
3.2 Status of Ground Water Availability
The geography of the district is characterized by undulatory terrain due to which
the development of ground water in the district is practically negligible. However, the scope of
development of ground water lies in low lying depression and valley fills which hold good
prospects for the ground water development. Moreover, in the district all the minor irrigation
scheme are executed by the surface water only and as per Ground water resources estimation, the
stage of ground water development is only 0.006% which leaves a greater scope for ground water
development. (CGWB report, 2013)
According to CGWB report-2013, the ground water resource potential is
calculated using the Rainfall Infiltration Factor method where in recharge from sources other than
rainfall, ground water irrigation, recharge from ponds and tanks, check dams Nalla bunds is taken
as nil for the district and only surface water irrigation is taken into account. The total annual
recharge is obtained as the arithmetic sum of recharge from rainfall and the recharge from sources
other than rainfall. Thus, table 3.2 and 3.3 shows ground water resource potential (as on March
2009) in ham.
Table 3.2: Status of Ground Water Availability (CGWB report-2013)
In hectare metre
District
Status of Block as per
Central Ground Water Board
Notification
Ground Water (ham)
Critica
l
Semi-
Critical Safe
Draft
(ham)
Recharge
(ham)
Gap
(ham)
West Jaintia Hills Safe 1.98 37800.00 37798.02
Source: Water Resource Dept., Jowai, West Jaintia Hills
Table 3.3: Net ground water availability (ham)
In hectare metre
Annual Replenishable GW resources Total
annual
ground
water
recharge
Natural
discharge
during non-
monsoon
season
Net ground
water
availability
Monsoon season Non-monsoon season
Rainfall
recharge
Recharge
from other
source
Recharge
from
rainfall
Recharge
from other
source
30750 Nil 7050 Nil 37800 3780 34020
Source: CGWB Report-2013, MoWR, GoI
District Irrigation Plan
NABARD Consultancy Services 58
Table 3.4: Categorization of ground water resources
In hectare metre
Net
Ground
Water
availabili
ty
Annual GW draft Domestic
and
industrial
uses upto
2025
Ground
Water
availabilit
y for
future
irrigation
Stage of
ground
water
developme
nt (%)
Categori
zation Irrigati
on
Domestic
and
industrial
uses
Total
34020 Nil 1.98 1.98 1319 32701 0.006 Safe
Source: CGWB Report-2013, MoWR, GoI
“The calculated figures of ground water resource and the stage of development computed, it can be seen
that, ground water development is yet to be picked up in the area. The stage of development during the
last decade is negligible and the district can be developed further by utilizing the abundant ground water
available in the district.”
3.3 Status of Command Area
The total command area in the district is 7163.51 ha. Out of which 7021.07 ha
(98.01%) is under developed command area and 142.44 ha (1.99%) is under underdeveloped
command area. Further, the total area under canal command is 6987.17 ha of which 98.04% area
is developed and only 1.96% is underdeveloped area. Maximum command area under canal is
covered in Amlarem block (3167.50 ha) followed by Thadlaskein (2568.40 ha) and Laskein
(1251.27 ha). On the other hand, in Laskein and Amlarem Blocks, the total command area under
other services is 95.80 ha and 69.00 ha.
Table 3.5: Status of Command Area (hectares)
Source: Water Resource Dept., Jowai,
Name of the
Block
Information of Canal Command Information on other
services Command Total Area (ha)
Total Area
Develo
ped
Area
Undevel
oped
Area
Total
Area
Develo
ped
Area
Undevel
oped
Area
Develo
ped
Comm
and
Undevel
oped
Comma
nd
1 2 3 4 5 6 7 3+6 4+7
Thadlaskein 2568.40 2526.19 42.21 11.54 11.54 0.00 2537.73 42.21
Laskein 1251.27 1221.10 30.17 95.80 90.34 5.46 1311.44 35.63
Amlarem 3167.50 3102.90 64.60 69.00 69.00 0.00 3171.90 64.60
Total 6987.17 6850.19 136.98 176.34 170.88 5.46 7021.07 142.44
District Irrigation Plan
NABARD Consultancy Services 59
3.4 Existing type of Irrigation
The total command area covered from surface irrigation is 18843.73 ha. However,
due to underdevelopment of ground water resources, the command area covered from ground
water sources is zero. The availability of water in the district is only through surface irrigation
wherein the irrigation from community or private canals covers the maximum command area of
13219.13 ha while govt. canals covers 5624.60 ha. In surface irrigation category, canal based
irrigation is a prominent source of irrigation in the district while in ground water category, no
major source of irrigation is available. Around 70.15% of the command area under irrigation is
mainly done by community or private canals while only 29.85% is done by govt. canals in the
district. Amlarem block ranks first which covers an area of 5322.38 ha from community or private
canals for the irrigation followed by Thadlaskein block, which covers an area of 4853.84 ha. On
the other hand, Amlarem block covers maximum a command area of 2962.00 ha under irrigation
from govt. canals followed by Thadlaskein block with an area 1588.78 ha.
Table 3.6: Status of Command Area from existing type of Irrigation
Sources of
Irrigation
Surface Irrigation Ground Water
Total Canal based
Tank/Pon
ds/Reserv
oirs
Tube Wells Open
wells Bore well
Govt.
Canal
Communi
ty/Pvt.
Canals
Ponds Govt
.
Pvt
.
Comm
unity/
Govt.
/ Pvt.
Go
vt.
Pvt
.
Surface flow Irrigation
Thadlaskein 1588.78 4853.84 NA NA NA NA NA NA 6442.62
Laskein 1073.82 3042.91 NA NA NA NA NA NA 4116.73
Amlarem 2962.00 5322.38 NA NA NA NA NA NA 8284.38
Total 5624.60 13219.13 18843.73
Source: Water Resource Dept., Jowai, West Jaintia Hills
District Irrigation Plan
NABARD Consultancy Services 60
Chapter 4 Water Requirement/ Demand
The earlier Chapters deal with the general profile, water profile and water
availability of Udalguri district. The present chapter deals with the last year (2015) and projected
(2020) demand of water for various sectors. The demand for water has been assessed on the basis
of data obtained from different departments.
4.1 Domestic Water Demand
Data of Census 2011 and 2001 has considered to arrive at the growth rate of
population of the district. As per Census 2011, the district has shown an annual growth rate of
3.21%. Table 4.1 below indicates the Block-wise population of the district. The population in 2015
has been calculated by assuming a growth rate of 1.13% over a period of four years (from 2011-
2015). Projected population has been calculated in similar way by assuming a growth rate of 1.06%
over the period of five years (from 2015-2020).
It has been assumed that per capita daily water requirement of people residing in
urban areas of the district is 150 Litres and for population in rural areas, the daily per capita daily
water requirement is 70 Litres. Using the same norms domestic water supply demand has been
worked out and given in table 4.1 below.
Table 4.1: Block wise Domestic Water Demand in the district (MCM)
Blocks 2011 2015
Gross water
demand in MCM
(2015)
Projected
Population
2020
Gross water
demand in MCM
(2020)
Thadlaskein 109509 124262 3.17 131473 3.36
Laskein 90402 102581 2.62 108534 2.77
Amlarem 43844 49750 1.27 52638 1.34
Jowai (Urban) 28430 30080 1.65 31826 1.74
Total 272185 306673 8.71 324471 9.22
Source: Census-2011
District Irrigation Plan
NABARD Consultancy Services 61
Figure 4.1: Domestic Water Demand
It can be inferred from the table that considering the growth rate of population of
the district, the quantity of water required in 2020 for domestic consumption shall be
approximately 9.22 MCM while the water requirement in 2015 is 8.71 MCM.
4.2 Crop Water Requirement
Taking into account, the water requirement of various crops, average water
requirement per hectare of land has been worked out to for each crop separately. The irrigation
efficiency of water has also been considered while working out the water requirement. It has been
observed that most of the field is rainfed.
Further, as discussed in Chapter 2, cereals are cultivated on major part of the gross
cropped area in the district. Hence, the crop water requirement for major cereals viz. Paddy,
Maize, etc. as assumed by KVK, East Khasi Hills has been taken. The assumptions are as under:
For paddy: 0.01 MCM/ha,
For Maize: 0.007 MCM/ha,
For Pea and Cowpea: 0.00425 MCM/ha,
For Sesamum: 0.002 MCM/ha
3.1
7
2.6
2
1.2
7
1.6
5
3.3
6
2.7
7
1.3
4
1.7
4
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
T H A D L A S K E I N L A S K E I N A M L A R E M J O W A I ( U R B A N )
WA
TE
R D
EM
AN
D I
N M
CM
Gross water demand in MCM (2015) Gross water demand in MCM (2020)
District Irrigation Plan
NABARD Consultancy Services 62
For Rapeseed and Mustard: 0.0016 MCM/ha, and
For Soybean: 0.00575 MCM/ha
The small portion of area under other crops has been taken in category of vegetables and same
assumption has been made.
Table 4.2: Crop Water Requirement*
Block
Area
sown
(Ha)
Irrigated
area (ha)
Crop
Water
Demand
in MCM
Water
Potential
Required in
MCM
Existing
Water
Potential
MCM
Water
Potential to
be created
MCM
Thadlaskein 5483.80 1330.45 12.47 12.47 -25.98 38.45
Laskein 4786.19 1730.00 16.57 16.57 -9.75 26.32
Amlarem 954.00 92.00 1.55 1.55 -6.93 8.48
Total 11224.00 3152.00 30.60 30.60 -42.66 73.25
*The table excludes crop water requirement for horticultural crops due to unavailability of block wise
data, hence crop water requirement is only calculated for cereals, course cereals, pulses, oilseeds and
sugarcane.
Water potential required has been derived from water required by crops cultivated
under rainfed conditions. Therefore, the existing water potential represents the water requirement
of crops cultivated in irrigated areas.
It can be concluded from the table that a total water potential of 73.26 MCM is to
be created in the district to fulfill the requirement of crops.
4.3 Livestock Water Demand
The requirement of water for livestock for the district has been derived from
livestock census 2012. Data from livestock census 2012 have been considered to arrive at the
growth rate as compared to 2007 census of livestock in the district. As per census 2012, the district
has shown the following growth rate as compared to 2007 census.
District Irrigation Plan
NABARD Consultancy Services 63
Table 4.3: Livestock water requirement and percentage growth rate
Livestock Water Requirement (litre/day)** Growth Rate (%)
Poultry 0.50 25.84
Ducks 0.50 -77.66*
Exotic Pig 15.00 96.68
Sheep 3.00 232.64
Goats 3.00 29.23
Indigenous Cow 29.00 2.20
Hybrid Cow 60.00 -1.45*
Indiscriptive Buffalo 45.00 10.02
Source: Livestock Census 2012, Meghalaya
*For calculating the population of livestock in the year 2020, negative growth rate was taken as 0.
** The data for water requirement for the livestock has been taken from the district animal husbandry
and veterinary department.
Table 4.3 below indicates the block-wise livestock population of the district.
Projected livestock population (in 2020) has been calculated by assuming the annual growth rates
from table 4.2 over a period of 5 years (from 2015-2016).
Based on the projected water requirement for livestock in 2020, the gap has been
assessed. The total potential which has to be created for livestock in 2020 is 1.095 MCM. This has
been assessed on the terms of the following:
The water requirement for indigenous and hybrid cows is 29 and 60 litres/day while for
indiscriptive buffaloes is 65 litres. However, for small animals such as sheep’s, goats and
pigs are 3, 3 and 15 litres/day and for poultry and ducks 0.50 litres/day.
For projecting the water demand of livestock, growth rate as deduced from census has been
considered during calculations. In case of livestock with decreasing growth rate of
population, the present population has been considered. It is assumed that present water
requirement of livestock is met from existing water usage and hence existing potential is
equal to existing demand.
District Irrigation Plan
NABARD Consultancy Services 64
Table 4.4: Livestock Water Demand
Block
Livestock Population
(No.)
Water Requirement
(MCM) Existing
Water
Potential
(MCM)
Water
Potential
to be
created
(MCM) 2015 2020 2015 2020
Thadlaskein 77605 192620 0.268 0.576 0.268 0.308
Laskein 99809 261277 0.204 0.577 0.204 0.373
Amlarem 55522 171452 0.169 0.583 0.169 0.414
Total 232936 625349 0.642 1.737 0.642 1.095
4.4 Industrial Water Demand
No small, medium or large industry exists in the district and hence, the industrial
water demand has been indicated to be zero.
Table 4.5: Industrial water demand
Block No. of
Industries
Present
water
demand
(MCM)
Water
demand in
2020 (MCM)
Existing
water
potential
(MCM)
Water
potential to be
created (MCM)
Thadlaskein NA NA NA NA NA
0.2683
0.20450.1694
0.5764 0.5770 0.5833
0.0000
0.1000
0.2000
0.3000
0.4000
0.5000
0.6000
0.7000
Thadlaskein Laskein Amlarem
Wate
r R
equ
irem
en
t in
MC
M
Block
Livestock Water Demand
2015 2020
Figure 4.2: Livestock Water demand
District Irrigation Plan
NABARD Consultancy Services 65
Laskein NA NA NA NA NA
Amlarem NA NA NA NA NA
4.5 Water Demand for power generation
Power is not generated in the district and hence, water requirement has been
indicated to be zero. The power requirement of district is met through common grid system of the
state.
Table 4.6: Water demand for power generation
Block
Power
requirement
(MW)
Water
demand
(MCM)
Water
demand in
2020
(MCM)
Existing
water
potential
(MCM)
Water
potential to be
created
(MCM)
Thadlaskein NA NA NA NA NA
Laskein NA NA NA NA NA
Amlarem NA NA NA NA NA
4.6 Total Water Demand of the district for various sectors
This section presents the total water demand of the district and has been calculated
by summing up all major sectors consuming water. The current water demand has been indicated
in Table 4.6 and the projected water demand has been depicted in Table 4.7.
Table 4.7: Total sector wise present water demand
Block
Sector-wise water demand (2015)
Total
(MCM) Domestic
(MCM)
Crop
(MCM)
Livestock
(MCM)
Industries
(MCM)
Power
Generation
(MCM)
Thadlaskein 3.175 12.470 0.268 NA NA 15.913
Laskein 2.621 16.570 0.204 NA NA 19.395
Amlarem 1.271 1.550 0.169 NA NA 2.991
Total 7.067 30.590 0.642 - - 38.299
District Irrigation Plan
NABARD Consultancy Services 66
Table 4.8: Total sector wise projected (2020) water demand
Block
Sector-wise water demand (2020)
Total (MCM) Domestic
(MCM)
Crop
(MCM)
Livestock
(MCM)
Industries
(MCM)
Power
Generation
(MCM)
Thadlaskein 3.359 38.450 0.576 NA NA 42.385
Laskein 2.773 26.320 0.577 NA NA 29.670
Amlarem 1.345 8.480 0.583 NA NA 10.408
Total 7.477 73.250 1.736 - - 82.463
0.000
2.000
4.000
6.000
8.000
10.000
12.000
14.000
16.000
18.000
Domestic Crop Livestock Industries Power Generation
wate
r d
em
an
d i
n M
CM
Sector
Water Demand in 2015
Thadlaskein Laskein Amlarem
Figure 4.3: Present Water Demand for various sectors
0.000
5.000
10.000
15.000
20.000
25.000
30.000
35.000
40.000
45.000
Domestic Crop Livestock Industries Power
Generation
Wate
r d
em
an
d i
n M
CM
Sectors
Water Demand in 2020
Thadlaskein Laskein Amlarem
Figure 4.4: Water Demand in 2020 for various sectors
District Irrigation Plan
NABARD Consultancy Services 67
4.7 Water Budget
Water budget reflects the relationship between input and output of water through
a region. Thus, we have a direct comparison of supply of water and the natural demand for water.
The following data provides current water gap and projected water gap for the year 2020.
Table 4.9: Water Budget
Block
Existing water
availability (MCM) Total
(MCM)
Water Demand
(MCM) Water Gap (MCM)
Surface
Water
Ground
Water
Present
(2015)
Projected
(2020)
Present
(2015)
Projected
(2020)
Thadlaskein 44.61 Nil 44.61 15.913 42.386 -28.697 -2.224
Laskein 28.90 Nil 28.90 19.395 29.670 -9.505 0.770
Amlarem 7.94 Nil 7.94 2.991 10.408 -4.949 2.468
Total 81.45 - 81.45 38.299 82.464 -43.151 1.014
District Irrigation Plan
NABARD Consultancy Services 68
Chapter 5 Strategic Action Plan for Irrigation
in District under PMKSY
The vision of the scheme PMKSY is to ensure access to some means of protective
irrigation to all agricultural farms in the country, to increase water use efficiency by its ‘per drop
more crop’ subcomponent, thus bringing much desired rural prosperity. The need of the hour is to
have well managed watershed resources which not only enhances the ecological resource base of
a rural economy but will also create sustainable livelihood opportunity.
5.1 Strategic Action Plan for Irrigation under PMKSY
At present, the schemes implemented by all the departments are broadly based and
are required to be specific and location/ problem based. A systematic integrated approach having
full participation of the users in the planning process is the need of the hour and extension
facilitation should be inter-disciplinary. On the basis of methodology described above, a strategic
plan for four years has been prepared starting from 2016-17 to 2019-20.
The schemes have been prepared by the proper consultation with the actual
beneficiaries. The plan in brief is detailed below.
5.2 Department wise total plan of district
Estimated plan for whole district under the scheme for four years works out to be
Rs. 44105.60 Lakhs. Water Resource Department accounts for the maximum share of about Rs.
16445.49 Lakhs (37.29%) and is followed by Soil and Water Conservation department with a
budget of Rs. 13911.67 Lakh (31.54%) while Agriculture Department has a share of Rs. 13748.44
Lakh (31.17%). While working out the plan, phasing of ongoing irrigation projects has been
considered. However, from the proposal of departments, eligible activities under RIDF will be
covered as per the funds requirement of the State. Capacity building, extension and training are
important components for successful execution of the plan. Department wise plan for 2016-17,
2017-18, 2018-19, 2019-20 and 2020-21 has been proposed.
District Irrigation Plan
NABARD Consultancy Services 69
Table 5.1: Department wise budget for the district
Name of the
District
Water Resource Soil Conservation Agriculture Total
No. of
Scheme
Estimated
Amount
(Rs. In
Lakh)
No. of
Scheme
Estimated
Amount
(Rs. In
Lakh)
No. of
Scheme
Estimated
Amount
(Rs. In
Lakh)
No. of
Schemes
Amount
(Rs. In
Lakh)
West
Jaintia Hills 380 16445.49 38279 13911.67 19734 13748.44 58393 44105.60
Rs. In Crore 380 164.45 38279 139.12 19734 137.48 58393 441.05
5.3 Component wise Plan
The plan is prepared component wise also. Table 5.2 shows component wise plan
for 4 years starting from 2016-17 to 2019-20. AIBP component has to be executed mainly by Soil
and Water Conservation Department. Her Khet KO Pani and Per Drop More Crop components
will be executed by Water Resource and Agriculture and Horticulture department mainly.
Watershed component will be taken care of by the Soil and Water Conservation Department and
Rural Development Department. Extension & training component will be executed by ATMA.
However, all the stakeholders need to have coordination among themselves to have the maximum
irrigation efficiency and to avoid duplicity. It is observed that maximum share of 38.67% is for
Har Khet KO Pani followed by Per Drop More Crop (30.87%) and Watershed has 6.06%.
Water
Resource
37.29%
Soil & Water
Conservation
31.54%
Agriculture
31.17%
Department wise budget
Water Resource Soil & Water Conservation Agriculture
Figure 5.1: Department wise budget for West Jaintia Hills’ district
Table 5.2: Component wise budget for the district
Block
AIBP Har Khet ko Pani Per Drop
More Crop Watershed
RIDF-
NABARD /
NABARD Loan
State Planned
Irrigation Scheme ATMA Total
No.
of
Sche
mes
Esti
mate
d
Cost
(Rs.
In
Lakh
)
No. of
Schemes /
Capacity
(cum)
Estim
ated
Cost
(Rs.
In
Lakh)
No.
of
Sche
mes
Estim
ated
Cost
(Rs.
In
Lakh)
No. of
Schem
es
Estim
ated
Cost
(Rs.
In
Lakh)
No.
of
Sche
mes
Estimate
d Cost
(Rs. In
Lakh)
No. of
Schemes
/
Capacity
(cum)
Estimat
ed Cost
(Rs. In
Lakh)
No.
of
Sche
mes
/
Cap
acity
(cum
)
Estimat
ed Cost
(Rs. In
Lakh)
No.
of
Sche
mes
Estimated
Cost (Rs.
In Lakh)
Thadlask
ein 288
1639.
21
552 / 31619520
cum
6763.3
4 9241
6618.7
7 28310 841.35 354 1639.29
95 / 9492480
cum
2146.91 169 45.60 39009 19694.47
Laskein 204 1081.
02
295 / 59146560
cum
5637.35
6946 4686.7
8 3346
1459.38
84 896.93 103 /
17544960 cum
2191.58 173 46.40 11151 15999.44
Amlare
m 28
145.96
102 / 14266368
cum
4655.16
3068 2309.5
3 4839 370.83 14 689.46 45 199.38 137 41.36 8233 8411.68
Total 520 2866
.19
949 /
105032448
17055
.85 19255
13615
.08 36495
2671.5
6 452 3225.68
243 /
27037440
cum
4537.87 479 133.36 58393 44105.59
5.4 Block wise Plan under PMKSY
Out of the total budget of 44105.60 Lakh, the maximum allocation of fund is by
Water Resource department has allocated a maximum share of 39.18% to Laskein Block
followed by Thadlaskein Block (32.74%) and Amlarem (28.07%).While the Soil and Water
Conservation department has allocated a share of 54.96% to Thadlaskein Block followed by
Laskein (34.66%) and Amlarem (10.38%). On the other hand, the Agriculture department has
allocated a maximum share of 48.47% to Thadlaskein Block followed by Laskein (34.43%) and
Amlarem has been allocated a share of 17.10%.
Table 5.3: Block wise budget for district
Name of the
Block
Water Resource Soil & Water
Conservation Agriculture
No. of
Scheme
Estimated
Amount
(Rs. In lakh)
No. of
Scheme
Estimated
Amount
(Rs. In lakh)
No. of
Scheme
Estimated
Amount
(Rs. In lakh)
Thadlaskein 148 5384.66 29343 7645.45 9410 6664.37
Laskein 209 6443.79 3944 4822.47 7119 4733.18
Amlarem 23 4617.04 4992 1443.75 3205 2350.89
Total 380 16445.49 38279 13911.67 19734 13748.44
Figure 5.2: Component wise budget for West Jaintia Hills’ district
AIBP
6.50%
Har Khet Ko
Pani
38.67%Per Drop More
Crop
30.87%
Watershed
6.06%
RIDF/Loan-
NABARD
7.31%
State Govt.
Schemes
10.29%
ATMA
0.30%
Component wise Budget
District Irrigation Plan
NABARD Consultancy Services 72
Figure 5.3: Block wise allocation of budget by Soil & Water
Conservation Department
Thadlaskein
55%Laskein
35%
Amlarem
10%
Soil & Water Conservation
Figure 5.4: Block wise allocation of budget by Agriculture
Department
Thadlaskein
48.37%
Laskein
34.43%
Amlarem
17.10%
Agriculture
District Irrigation Plan
NABARD Consultancy Services 73
5.5 Suggestions
For successful implementation of PMKSY plan it is suggested that:
All the stakeholders should convene meeting of Panchayat Samities and then finalize the
village plan and prepare DPR.
There should not be any duplicity of project.
The Department should supplement each other so that the maximum irrigation efficiency
is achieved.
Agriculture and Horticulture Department should take micro irrigation projects in the
command of minor irrigation projects which are either completed or likely to be completed
in near future.
All the irrigation projects should have a component of water conveyance so that the each
drop of water is judiciously utilized.
Where ever feasible, solar pump sets should be installed.
All the structures planned should be geo tagged and marked on map, so that social
monitoring of the projects can be conducted. This will also avoid the duplicity.
Priority should be given to projects to minimize the gap in potential created and potential
utilized.
Wherever sites with low head LIS have already been exhausted, higher per hectare norms
should be allowed.
Thadlaskein
33%
Laskein
39%
Amlarem
28%
Water Resource
Figure 5.5: Block wise allocation of budget by Water Resource
Department
District Irrigation Plan
NABARD Consultancy Services 74
Execution of the scheme should be expeditiously completed.
There should be smooth fund flow for timely completion of the project and to avoid cost
escalation.
5.6 Expected Outcome
As stated above in earlier chapters gross sown area of the district is 17000.99
hectare of which 4256.45 hectare is irrigated. Thus there is a gap of 12744.54 hectare which can
be converted from rainfed to area under assured irrigation. As the water requirement of crops for
the existing cropping pattern works out to be 30.59 MCM and if the gross cropped area is to be
brought under irrigated area, 73.25 MCM water is required. However, only surface water is
available in the district and there is a need for the development of ground water resources but still
it will not be feasible to create irrigation potential to the extent of 100% as the construction of
irrigation project may not be economically viable even if it is technically feasible. In hilly area due
to tough terrain, high head, small and fragmented land holdings, per hectare cost may be very
high. Moreover it may not be feasible to develop all the sources within a short spell of four years
for which the plan is being prepared.
It is proposed to create irrigation potential by installing new lift irrigation and flow
irrigation schemes tapping surface water and installation of tube wells and bore wells where ground
water is available. Besides, water harvesting structures have also been proposed which will harvest
rainwater as also spring water.
Potential of 13028.34 hectare is proposed to be created by Water Resource
department. Department of Soil and Water Conservation has proposed to create an irrigation
potential of 3408.50 hectare while Agriculture department has proposed to create an irrigation
potential of 19585 hectare. Sprinkler and drip irrigation schemes have been proposed by the
Horticulture department. On completion of these projects, it is expected that an additional
irrigation potential will be created due to saving of water through adoption of water saving
methods of irrigation.
The scheme also includes training and awareness programs and livelihood
programme for creation of water sources to full potential in identified backward rainfed blocks
including renovation of traditional water bodies, creation of new water conservation and water
harvesting structures, irrigation canals and drains, land development, etc. but the plan of
convergence schemes has not been prepared as there were no such convergence scheme going on
in the district as of date.
District Irrigation Plan
NABARD Consultancy Services 75
Annexure
Strategic Action Plan for Irrigation under PMKSY
(Water Resource Department)
District Irrigation Plan
NABARD Consultancy Services 77
Strategic Action Plan for Irrigation under PMKSY for the year 2016-17 to 2020-2021
S.
No
Name of
Block
Concern
ed
Ministr
y /
Depart
ment
Compo
nent Activity
Name of the
Village Co-ordinates
Total
Number/
Capacity
(Cum)
Command
Area/
Irrigation
Potential
(Ha)
Period
of
imple
mentat
ion (
5/7
years )
Estimated
Cost (in
Lakhs)
1 Thadlaske
in Block MOWR
Har
Khet
Ko Pani
I Surface Minor Irrigation
1 Khloomynskut MIP Nongbah N 25°31'0" E 92°13'0" 12,64,320 43.90 5 years 109.398
2 Salai Kmai MIP Larnai N 25°34'30" E 92°8'40" 17,28,000 60.00 5 143.757
3 Wah Lashen MIP Sanaro N 25°38'20" E 92°21'75" 43,48,800 151.00 5 301.756
4 Umlidoh Neng MIP Mihmyntdu N 25°26'48.82" E 92°13'44.37" 13,82,400 48.00 5 94.952
5 Madan Ionglamajra MIP Nongbah N 25°30'47.20" E 92°15'39.04" 10,08,000 35.00 5 70.000
6 Mynshlem MIP Nartiang N 25°35'50.16" E 92°13'32.47" 10,08,000 35.00 5 70.000
7 Wahsama MIP Nangbah N 25°31'51.9" E 92°13'50.6" 7,20,000 25.00 5 50.000
8 Wahsohngang MIP Nongkhroh N 25°37'43.58" E 92°08'45.82" 20,16,000 70.00 5 140.000
9 Ban Kya MIP Sung Valley N 25°33'00.99" E 92°07'53.27" 5,76,000 20.00 5 40.000
10 Lyntair Lakhmi MIP Sung Valley N 25°33'35.56" E 92°08'22.04" 28,80,000 100.00 5 200.000
11 Madan Sylwen MIP Sung Valley N 25°34'34.02" E 92°07'12.73" 17,28,000 60.00 5 120.000
12 Dwar Khyndaw MIP Thadmusem N 25°34'57.71" E 92°10'37.85" 23,04,000 80.00 5 160.000
13 Khyndai Rakut MIP Sohphoh N 25°34'43.04" E 92°09'41.76" 5,76,000 20.00 5 40.000
14 Saidngiem MIP Nongkhroh N 25°37'49.84" E 92°08'17.45" 57,60,000 200.00 5 400.000
15 Umjyrlud - Wahiongmat
MIP Nongdhar N 25°38'37.21" E 92°12'46.91" 28,80,000 100.00 5 200.000
District Irrigation Plan
NABARD Consultancy Services 78
16 Laru Ladaw MIP Laru N 25°40'42.70" E 92°12'32.60" 14,40,000 50.00 5 100.000
Total 1 316,19,520 1097.90 2,239.863
2 Laskein
Block MOWR
Har
Khet
Ko Pani
1 Rahoh MIP Near Laskein N 25°32'0" E 92°26'0" 58,60,800 203.50 5
Years 402.455
2 Rud wah Myntang MIP Mooshrot N 25°32'30" E 92°28'30" 119,52,000 415.00 5 829.510
3 Pynthor Mynso MIP Thadialong N 25°33'60" E 92°18'0" 86,74,560 301.20 5 598.910
4 Umkynruh MIP Umsalang N 25°36'18.73" E 92°21'42.55" 18,72,000 65.00 5 130.000
5 Tre iongkhran MIP Barato N 25°34'01.01" E 92°28'29.47" 17,28,000 60.00 5 120.000
6 Iongkalong MIP Musiaw N 25°35'54.94" E 92°21'28.93" 8,64,000 30.00 5 60.000
7 Mannar MIP Khliehrangna
h shangpung N 25°27'45.70" E 92°22'03.57" 14,40,000 50.00 5 100.000
8 Thrang MIP Shai bnai N 25°41'51.67" E 92°25'05.91" 7,20,000 25.00 5 50.000
9 San tyngka MIP Latymphu N 25°35'59.07" E 92°22'32.53" 28,80,000 100.00 5 200.000
10 Shetdoh MIP Umsalang N 25°37'41.43" E 92°22'54.63" 20,16,000 70.00 5 140.000
11 Kylla U long MIP Mootyrshiah N 25°30'28.89" E 92°27'43.46" 34,56,000 120.00 5 240.000
12 Iongkasna MIP Shiliang
Myntang N 25°35'36.96" E 92°24'29.90" 34,56,000 120.00 5 240.000
13 Khlieh Rashu MIP Raliang N 25°49'43.82" E 92°43'97.82" 10,36,800 36.00 5 72.000
14 Wahlarun MIP Biar N 25°30'17.60" E 92°26'43.27" 12,96,000 45.00 5 90.000
15 Ionglasngi MIP Mulieh N 25°31'15.13" E 92°21'35.10" 7,20,000 25.00 5 50.000
16 Wah Lynnger MIP Rtiang N 25°28'19.09" E 92°27.970" 8,06,400 28.00 5 56.000
17 Riat Larang MIP Rtiang N 25°28'32.09" E 92°27.943" 7,20,000 25.00 5 50.000
18 Moosyiem Ialip MIP Shangpung N 25°29'29.31" E 92°21'56.73" 5,76,000 20.00 5 40.000
19 Pynthor ionglang MIP Ionglang N 25°51'27.78" E 92°50'47.22" 23,04,000 80.00 5 160.000
20 Wahsung MIP Laskein N 25°50'58.20" E 92°40'38.50" 25,92,000 90.00 5 180.000
21 Umpliang MIP Mukhap N 25°52'13.30" E 92°44'38.50" 8,64,000 30.00 5 60.000
District Irrigation Plan
NABARD Consultancy Services 79
22 Umlakhon MIP Iooksi N 25°50'36.30" E 92°56'64.70" 7,20,000 25.00 5 50.000
23 Madan Myllep MIP Iooksi N 25°55'39.36" E 92°60'97.80" 25,92,000 90.00 5 180.000
Total 2 591,46,560 2053.70 4,098.875
3 Amlarem
Block MOWR
Har
Khet
Ko Pani
1 Amkshar MIP Kudengrim,
Mawngap N 25°13'0" E 92°10'30" 94,14,144 1135.00
5
Years 2836.444
2 Ski Wahstar MIP Khonglah N 25°19'20.61" E 92°04'34.26"
3 Ampyot MIP Jongushen N 25°22'82.40" E 92°13'12.58" 4,14,720 95.00 5 190.000
4 Kor Amsning MIP Umladkhur N 25°18'43.45" E 92°08'30.95" 2,90,304 50.00 5 100.000
5 Umshymphu MIP Shken Pyrsit N 25°21'08.12" E 92°09'02.31" 2,07,360 35.00 5 70.000
6 Umraiang MIP Shken Pyrsit N 25°21'36.78" E 92°08'13.72" 2,48,832 25.00 5 50.000
7 Ampohlangiah MIP Thangbuli N 25°30'00" E 92°14'40" 16,58,880 30.00 5 60.000
8 Amkrem MIP Khonglah N 25°25'20" E 92°01'90" 2,90,304 200.00 5 400.000
9 Amsohbatan MIP Nongbareh N 25°14'17.04" E 92°01'14.88" 2,90,304 35.00 5 70.000
10 Amjokta MIP Kharkhana N 25°10'20.92" E 92°11'10.23" 6,63,552 35.00 5 70.000
11 Amsniang MIP Umladkhur N 25°18'35.14" E 92°10'21.78" 12,44,160 80.00 5 160.000
Total 3 142,66,368 1,720.00 4,006.444
TOTAL I ( 1+2+3 ) 1050,32,448 4,871.60 10,345.182
1 Thadlaske
in Block MOWR
Har
Khet
Ko Pani
II Command Area Development & Water management (CADWM)
Development & Water
Management
1 CAD of Bamdolloi FIP N 25°33'12" E 92°17'80" 1 no 33.50 5
Years 20.19
2 CAD of Madan
Iongkarnong FIP N 25°34'793" E 92°06'92" 1 no 48.80 5 31.37
3 CAD of Barsabang FIP N 25°29'85" E 92°13'533" 1 no 40.00 5 23.54
District Irrigation Plan
NABARD Consultancy Services 80
4 CAD of Syrmi FIP N 25°32'272" E 92°16'420" 1 no 60.00 5 30.12
5 CAD of Trekidoh FIP N 25°27'370" E 92°13'836" 1 no 25.00 5 17.93
6 CAD of Madan Par
Myntang FIP N 25°28'567" E 92°16'19" 1 no 116.00 5 34.4
7 CAD of Khloomynskut
MIP N 25°31'0" E 92°13'0" 1 no 43.90 5 4.50
8 CAD of Salai Kmai MIP N 25°34'30" E 92°08'40" 1 no 60.00 5 6.00
9 CAD of Wah Lashen
MIP N 25°38'20" E 92°21'75" 1 no 151.00 5 15.00
10 CAD of Umlidoh Neng
MIP N 25°26'482" E 92°13'44.3" 1 no 48.00 5 5.00
Total 1 10 no’s 626.20 188.05
2 Laskein
Block MOWR
Har
Khet
Ko Pani
1 CAD of Myntrong FIP N 25°31'35.9" E 92°24'26" 1 no 26.00 5
Years 12.32
12 CAD of Mynsar Neng
FIP N 25°30'282" E 92°26'36" 1 no 15.00 5 8.62
3 CAD of Myntwa FIP E 92°17'68" 1 no 25.00 5 14.25
4 CAD of Sungkhah FIP N 25°36'15" E 92°33'14" 1 no 23.00 5 14.14
5 CAD of Rahoh MIP N 25°32'0" E 92°26'0" 1 no 203.50 5 20.00
6 CAD of Pynthor Mynso
MIP N 25°32'30" E 92°28'30" 1 no 301.20 5 30.00
7 CAD of Rud wah
Myntang MIP N 25°33'60" E 92°18'0" 1 no 415.00 5 41.50
Total 2 7 no’s 1008.70 5 140.83
TOTAL II (1+2) 17 no’s 1634.90 328.88
Grand Total (I+II) [Surface Minor Irrigation and CADWM] 6506.50 10,674.06
District Irrigation Plan
NABARD Consultancy Services 81
21.3. Strategic Action Plan for State Planned Scheme of Irrigation from State Irrigation Department
Sl
No
Name of
Block
Concerne
d
Ministry
/
Departme
nt
Compon
ent Activity Location Co-ordinates
Total
Number/
Capacity
(Cum)
Comma
nd
Area/
Irrigatio
n
Potentia
l (Ha)
Period
of
imple
mentat
ion (
5/7
years )
Estimate
d Cost
(in
Lakhs)
1 Thadlaskei
n Block
State
Irrigation
Departme
nt
Surface
Flow
Irrigatio
n
Minor Irrigation
I Flow Irrigation
Projects
1 Umbluh khyrweng
F.I.P Near Bamkamar N 25°39'73.20" E 92°10'07.13" 7,20,000 25.00
5
Years 62.38
2 Iongkajied FIP Pdeiniadaw N 25°41'54.17" E 92°25'07.43" 4,32,000 15.00 5 30.00
3 Mooiong FIP Sehlama N 25°38'43.05" E 92°19'22.22" 2,88,000 10.00 5 20.00
4 Iongiang FIP Lumlakhiat N 25°41'54.17" E 92°25'07.43" 2,88,000 10.00 5 20.00
5 WahMynngor FIP Mynngor N 25°42'48.70" E 92°21'18.43" 4,32,000 15.00 5 30.00
6 Pdeinkhatnar FIP Near Mynkrem N 25°40'42.70" E 92°12'32.60" 4,32,000 15.00 5 30.00
Total 1 25,92,000 90.00 192.38
2 Laskein
Block
State
Irrigation
Departme
nt
Surface
Flow
Irrigatio
n
1 Shrah Pohdein FIP Near Lumkya N 25°36.71" E 92°12.13" 4,60,800 16.00 5
Years 32.00
2 Kammaya FIP Near Shangpung N 25°29.107" E 92°19.369" 4,32,000 15.00 5 30.00
3 Syllai Mynniang Maitdein N 25°36'01.06" E 92°28'23.41" 2,88,000 10.00 5 20.00
4 Umdarong FIP Shangpung N 25°29'25.90" E 92°21'11.51" 4,03,200 14.00 5 28.00
5 Lakyrshi FIP Shangpung N 25°29'46.37" E 92°20'29.66" 4,32,000 15.00 5 30.00
6 Pyntei FIP Raliang N 25°30.249" E 92°08'26.360" 2,88,000 10.00 5 20.00
District Irrigation Plan
NABARD Consultancy Services 82
7 Khlieh Sniangbri
FIP Rtiang N 25°28.924" E 92°27'7.40" 2,88,000 10.00 5 20.00
8 Lalong FIP Raliang N 25°30'07.54" E 92°24'19.76" 4,60,800 16.00 5 32.00
9 Laittyrkhoi FIP Mukhap N 25°51'39.3" E 92°43'26.6" 2,88,000 10.00 5 20.00
10 Wah umtyrngai
madanskong FIP Lakadong N 25°49'10" E 92°56'7.34" 3,45,600 12.00 5 24.00
11 Wahmooskur FIP Thadmuthlong N 25°28'18.66" E 092°18'03.48" 2,88,000 10.00 5 20.00
12 Wahumnuir FIP Barato N 25°06'18" E 92°42'8" 2,88,000 10.00 5 20.00
13 Mynsnait FIP Mootyrchiah (B) N 25°50'4" E 92°45'2" 5,18,400 18.00 5 36.00
Total 2 47,80,800 166.00 332.00
TOTAL I (1+2) 73,72,800 256.00 524.38
II Improvement of
existing projects 27 no’s 2341.29 5 1639.91
III
Command Area
Development
Activities
5 no’s 281.90 5 259.15
IV Water Use
Efficiency 7 no’s 275.22 5 235.00
V Flood Damage
Restoration 10 no’s 300.00 5 300.00
VI Maintenance of
completed projects 50 no’s 1500.00 5 25.00
Total 3 99 4698.41 2459.06
Grand Total (State Irrigation Dept./ Surface Flow Irrigation) 4954.41 2,983.44
District Irrigation Plan
NABARD Consultancy Services 83
24. Strategic Action Plan for Externally aided projects from State Irrigation Department/ other funding agencies and NABARD
S.
No
.
Name of
Block
Concerne
d
Ministry
/
Departm
ent
Compone
nt Activity Location Co-ordinates
Total
Number/
Capacity
(Cum)
Comma
nd
Area/
Irrigatio
n
Potentia
l (Ha)
Period
of
imple
mentat
ion (
5/7
years )
Estimate
d Cost
(in
Lakhs)
1 Thadlaskei
n Block
Other
Funding
agencies
Jalkunds
I Construction of Jalkunds- Type 1
1 Wang Kymbur Saitsama N 25°43'24.7" E92°24’40.8" 1,44,000 5.00 5
Years 3.454
2 Umlatngab Sohmynting N 25°26'27.4" E92°08’35.1" 1,44,000 5.00 5 3.472
3 Lumstung Demthring N 25°26'17.2" E92°09’6.79" 86,400 3.00 5 1.717
4 Lumsunar Khanduli N 25°43'27.1" E92°25’56.9" 86,400 3.00 5 2.678
5 Thynra Nongbah N 25°31'06.9" E92°14’40.1" 86,400 3.00 5 2.989
6 Iongthulein Nongbah N 25°31'22.9" E92°14’48.3" 86,400 3.00 5 2.989
7 Murang Nongbah N 25°31'45.98" E92°15'06.81" 86,400 3.00 5 2.989
8 Wahlumpyrdi Khanduli N 25°43'35.6" E92°25’38.1" 86,400 3.00 5 2.989
9 Kdaitwakhah Larnai N 25°34'71.5" E92°09’79.5" 1,44,000 5.00 5 4.946
10 Banchutia Moobakhon N 25°38'62.1" E92°17’32.2" 86,400 3.00 5 3.000
11 Iongkarang Moobakhon N 25°38'91.4" E92°17’69.9" 86,400 3.00 5 3.000
12 Kharlalieh Moobakhon N 25°38'98.7" E92°17’39.3" 1,44,000 5.00 5 5.000
13 Muthlong Moobakhon N 25°31'06.9" E92°17’65.6" 1,15,200 4.00 5 4.000
14 Umlaron Moobakhon N 25°39'64" E92°17’46.0" 86,400 3.00 5 3.000
15 Umpawiat (A) Moobakhon N 25°39'35.4" E92°17’64.1" 86,400 3.00 5 3.000
16 Umpawiat (B) Moobakhon N 25°39'48.5" E92°17’85.9" 86,400 3.00 5 3.000
17 Kseh sumer Demthring N 25°25'97.5" E092°10’35.9" 86,400 3.00 5 3.000
18 Ksehsama Demthring N 25°25'69.3" E092°10’06.6" 1,44,000 5.00 5 5.000
District Irrigation Plan
NABARD Consultancy Services 84
19 Kutkasem Demthring N 25°26'68.9" E092°09’35.3" 72,000 2.50 5 2.500
20 Myntnger Demthring N 25°26'34" E092°09’76.6" 57,600 2.00 5 2.000
21 Synrang Rymbai Demthring N 25°25'77.7" E092°10’15.1" 57,600 2.00 5 2.000
22 Umsyncher Demthring N 25°26'32.3" E092°08’79.3" 1,44,000 5.00 5 5.000
23 Wah demthring Demthring N 25°26'00" E092°10’41.2" 1,44,000 5.00 5 5.000
24 Lumchyrngan saitsama N 25°43'34.3" E092°23’51.7" 86,400 3.00 5 3.000
25 Wah Pamdkhar saitsama N 25°43'56.2" 092°23’06.4" 86,400 3.00 5 3.000
26 Madan Bol khanduli N 25°43'51.2" E092°25’54.1" 86,400 3.00 5 3.000
27 Wah umdih
dongiaw Khanduli N 25°43'43.9" E092°25’09.9" 86,400 3.00 5 3.000
28 Moosakhia Khanduli N 25°43'49.4" E092°26’23.6" 86,400 3.00 5 3.000
29 Pohshnong Khanduli N 25°43'29.8" E092°28’35.0" 1,29,600 4.50 5 4.500
30 Bamsarmen Khanduli N 25°43'24.6" E092°25’53.5" 1,29,600 4.50 5 4.500
31 Wahshnong Khanduli N 25°43'30.9" E092°25’66.3" 86,400 3.00 5 3.000
32 Shilliang
Lumjingtep Khanduli N 25°43'32.2" E092°26’36.8" 86,400 3.00 5 3.000
33 Siah Tnum Bamkamar N 25°37'14.3" E092°09’08.5" 1,23,840 4.30 5 4.300
34 Madan Kba lum Tamu N25°40'37.46" E092°23'45.77" 1,46,880 5.10 5 5.100
35 Poh Khyllem Pynthorwah
(Jowai) N 25°26'51.2" E092°14’04.5" 1,29,600 4.50 5 4.500
36 Umsorkar Nongbah N 25°31'25.00" E092°15’52.6" 1,15,200 4.00 5 4.000
37 Tre Mulain Pynthornein
(Jowai) N 25°27'64.8" E092°12’11.2" 1,55,520 5.40 5 5.400
38 Umkhangiong Khonsaro N25°41'12.05" E092°20'20.14" 1,35,360 4.70 5 4.700
39 Khlieh Sangam Bamkamar N25°38'10.30" E092°09'07.86" 1,03,680 3.60 5 3.600
40 Lum rynsang Sabah Muswang N25°28'56.70" E092°15'00.94" 1,06,560 3.70 5 3.700
41 Wah Rya Sabah Muswang N25°28'51.69" E092°14'47.68" 92,160 3.20 5 3.200
42 Pyrnap Ialong Ialong N25°27' 37.02" E092°14' 36.94" 1,00,800 3.50 5 3.500
43 Thwai Niriang Ialong N25°26' 22.11" E092°15' 30.48" 86,400 3.00 5 3.000
44 Wah Rya Sabah musiang N25°28' 51.47" E092°14' 48.52" 86,400 3.00 5 3.000
District Irrigation Plan
NABARD Consultancy Services 85
45 Wah Sein Somer Sabah musiang N25°28' 05.78" E092°14' 33.56" 86,400 3.00 5 3.000
46 Pohsyrtieh Nongbah N25°31' 41.86" E092°14' 56.19" 1,00,800 3.50 5 3.500
47 Paiung Ialong
(Pynthorwah) N25°27' 02.44" E092°15' 26.84" 1,00,800 3.50 5 3.500
48 Khlookriat Sanaro N25°38'44.3" E092°22'06.8" 1,18,080 4.10 5 4.100
49 Lynram/Longsu
nai Pdeiniadaw N25°38'09.39" E092°21'32.79" 1,12,320 3.90 5 3.900
50 Myntliah Sanaro N25°38'19.8" E092°22'01.6" 1,49,760 5.20 5 5.200
51 Wahumhali Pdeiniadaw N25°38'16.00" E092°21'30.8" 1,26,720 4.40 5 4.400
52 Wah iongkur Mukhla N 25°29'41.53" E 092°11'41.60" 1,00,800 3.50 5 3.500
53 Umsorkar Nongbah N 25°31'16.95" E 092°14'47.74" 86,400 3.00 5 3.000
54 Liar Umkoi Nongbah N 25°31'21.72" E 092°15'47.32" 86,400 3.00 5 3.000
55 Khloopanoo Nongbah N 25°31'12.75" E 092°15'01.92" 86,400 3.00 5 3.000
56 Khyndaw
Syrngoh Nongbah N 25°31'34.06" E 092°15'54.79" 86,400 3.00 5 3.000
57 Mynkseh Nongbah N 25°29'25.44" E 092°13'49.25" 57,600 2.00 5 2.000
58 Jalatein Nangbah N 25 31' 39.86'' E 92 14' 28.15" 1,29,600 4.50 5 4.500
59 Ummusiang Nangbah N 25°31'35.78" E 092°14'07.41" 86,400 3.00 5 3.000
60 Lum Sunar Near Khanduli N 25°43'26.45" E 092°24'38.85" 86,400 3.00 5 3.000
61 Umramai Mukhla
Nongrim N 25°29'48.20" E 092°11'42.13" 72,000 2.50 5 2.500
62 Umkrem Mukhla
Nongrim N 25°29'49.73" E 092°11'47.38" 1,00,800 3.50 5 3.500
63 Lakhma Mukhla
Nongrim N 25°30'06.82" E 092°11'39.04" 86,400 3.00 5 3.000
64 Tre-riat Mukhla
Nongrim N 25°29'33.47" E 092°11'58.64" 72,000 2.50 5 2.500
65 Moojem Mukhla
Nongrim N 25°29'38.54" E 092°12'03.45" 72,000 2.50 5 2.500
66 Skiah Mukhla
Nongrim N 25°30'12.48" E 092°11'37.97" 1,00,800 3.50 5 3.500
67 Riaturiem Near Myntdu
nein Jowai N 25°27'26.57" E 092°11'16.69" 2,01,600 7.00 5 7.000
District Irrigation Plan
NABARD Consultancy Services 86
Total 1 69,00,480 239.60 234.82
2 Laskein
Block
Other
Funding
agencies
Jalkunds
1 Tre Pyntei Near Pyntei N25°29’9.04" E92°26’56.5" 1,03,680 3.60 5
Years 3.372
2 Tre Ummulong Near Raliang N25°29’9.72" E92°23’6.75" 1,03,680 3.60 5 3.372
3 Iongbong Niawkmai N25°33’73.3" E92°29’46.2" 92,160 3.20 5 3.195
4 Tre Saphai Mukhap N25°30’84.4" E92°26'41.4" 92,160 3.20 5 3.195
5 Kharai Saphai Mukhap N25°30’75.5" E92°26'56.2" 92,160 3.20 5 3.195
6 Tymbud
Umiurem Shangpung N25°36’15.2" E92°27'81.5" 92,160 3.20 5 3.195
7 Pohsain Iongulang N25°30’52.3" E92°30'02.2" 86,400 3.00 5 2.989
8 Pohsynrang Nongkynrih N25°31’11.65" E92°24'00.97" 86,400 3.00 5 2.989
9 Sata Shilliang
Myntang N25°34’04.13" E92°21'56.37" 86,400 3.00 5 2.989
10 Bamkhniang Laskein N25°30’91.3" E92°25'51.2" 92,160 3.20 5 3.195
11 Tyngkla Mawkyndeng N25°30’75.2" E92°22'87.2" 1,72,800 6.00 5 5.971
12 Trelum Tiniang Mootyrshiah N25°30’97.1" E92°27'50.3" 1,87,200 6.50 5 6.497
13 Shrah Syngki Nongryngkoh N25°29’12.9" E92°31'30.8" 1,49,760 5.20 5 5.187
14 Umpliang Mowkaiaw N25° 31’27.9 " E92° 26'49.1" 1,87,200 6.50 5 6.500
15 Mowkalong Mowkaiaw N25°31’95.3 " E92°26'84.7" 1,52,640 5.30 5 5.300
16 Umlaroh Mowkaiaw N25°32’39.7" E92°28'03.4" 1,58,400 5.50 5 5.500
17 Pyrdiriat Mowkaiaw N25°31’67.9" E92°27'02.2" 1,26,720 4.40 5 4.400
18 Lumpdang Mowkaiaw N25°31’46.9" E092°27'53.4" 1,87,200 6.50 5 6.500
19 Mynsiang Sahsniang N25°33’00.00" E092°31'43.2" 1,49,760 5.20 5 5.200
20 Riat khableh Sahsniang N25°33’75.3" E092°32'98.3" 1,49,760 5.20 5 5.200
21 Shew shew Sahsniang N25°33’75.7" E092°32'98.0" 1,49,760 5.20 5 5.200
22 Wiarliat Sahsniang N25°31’28.7" E092°32'68.7" 1,49,760 5.20 5 5.200
23 Iurimbhoi Sahsniang N25°33’51.5" E092°32'21.9" 1,72,800 6.00 5 6.000
24 Mowkynraw Sahsniang N25°32’48.2" E092°31'33.3" 1,72,800 6.00 5 6.000
25 Riat Samat Sahsniang N25°33’28.8" E092°31'21.1" 1,72,800 6.00 5 6.000
26 Umpyrsieh Sahsniang N25°33’74.0" E092°32'74.5" 1,72,800 6.00 5 6.000
District Irrigation Plan
NABARD Consultancy Services 87
27 Umtalew Sahsniang N25°33’12.9" E092°30'18.5" 1,72,800 6.00 5 6.000
28 Umlabit Mukhap N25°31’26.1" E092°26’26.9" 92,160 3.20 5 3.200
29 Wah Tiniang Mootyrshiah N25°31’65.00" E 092°27’48.0" 1,44,000 5.00 5 5.000
30 Mulain Mynksan N25°31’59.4" E092°30’07.4" 89,280 3.10 5 3.100
31 Mooshadep Niawkmai N25°32’97.9" E092°29’90.0" 1,72,800 6.00 5 6.000
32 Khlieh hali Mulum N25°30’80.0" E092°23’76.8" 92,160 3.20 5 3.200
33 Kring Thadmuthlong N25°29’15.9" E092°18’55.3" 1,72,800 6.00 5 6.000
34 Moosem Raliang N25°29’99.2" E092°26’96.0" 1,72,800 6.00 5 6.000
35 Ummudong Raliang N25°30’53.3" E092°24’48.8" 1,49,760 5.20 5 5.200
36 Hot kalait Raliang N25°30’25.1" E092°23’44.9" 1,72,800 6.00 5 6.000
37 Bam jyndem Raliang N25°29’82.1" E092°25’19.7" 1,49,760 5.20 5 5.200
38 Pohsyrdong Raliang N25°29’97.2" E092°24’27.5" 1,72,800 6.00 5 6.000
39 Lalong riat
saploo Raliang N25°29’65.6" E092°27’10.6" 1,72,800 6.00 5 6.000
40 Pampyrthat Raliang N25°29’98.9" E092°24’16.9" 1,03,680 3.60 5 3.600
41 Shlain Raliang N25°29’95.6" E092°26’37.7" 1,03,680 3.60 5 3.600
42 Khlieh Iaw Raliang N25°29’69.3" E092°23’53.2" 1,49,760 5.20 5 5.200
43 Pyntei Nein Raliang N25°29’93.6" E092°26’26.1" 1,49,760 5.20 5 5.200
44 Ramaiang Nongkynrih N25°31’36.1" E092°24’18.7" 1,49,760 5.20 5 5.200
45 Umlangkdait Raliang N25°29’62.8" E092°22’96.9" 1,03,680 3.60 5 3.600
46 Moosynnah Raliang N25°30’24.9" E092°24’85.9" 1,03,680 3.60 5 3.600
47 Riat Lakma Raliang N25°29’79.1" E092°26’52.5" 1,03,680 3.60 5 3.600
48 Pohsain Nongkynrih N25°31’28.3" E092°24’02.9" 1,03,680 3.60 5 3.600
49 Pohsurok Nein Nongryngkoh N25°28’98.3" E092°30’86.3" 1,49,760 5.20 5 5.200
50 Pohmot Nongryngkoh N25°28’53.6" E092°30’30.4" 1,03,680 3.60 5 3.600
51 Khlieh Mynsiang Nongryngkoh N25°28’81.4" E092°30’79.4" 1,03,680 3.60 5 3.600
52 Iangi Nongryngkoh N25°29’23.7" E092°31’36.0" 1,72,800 6.00 5 6.000
53 Beit sian Nongryngkoh N25°28’91.7" E092°31’31.4" 1,03,680 3.60 5 3.600
54 Mynsiang padui Nongryngkoh N25°29’00.0" E092°31’22.6" 1,49,760 5.20 5 5.200
District Irrigation Plan
NABARD Consultancy Services 88
55 Pohsurok wah Nongryngkoh N25°29’92.1" E092°30’96.1" 1,03,680 3.60 5 3.600
56 Iapsyiar Nongryngkoh N25°28’84.7" E092°30’28.1" 1,03,680 3.60 5 3.600
57 Liar larun Nein Nongryngkoh N25°29’40.4" E092°30’69.9" 1,03,680 3.60 5 3.600
58 Liar larun Wah Nongryngkoh N25°28’81.4" E092°30’69.7" 1,03,680 3.60 5 3.600
59 Muiong Kyrwen N25°32’59.2" E092°28’24.3" 1,44,000 5.00 5 5.000
60 Makalein Kyrwen N25°32’50.5" E092°28’03.3" 1,49,760 5.20 5 5.200
61 Umkyrsan Kyrwen N25°32’39.7" E092°28’03.4" 1,58,400 5.50 5 5.500
62 Treimooliang
khla Mooshrot N25°34’41.95" E092°30' 48.42" 1,87,200 6.50 5 6.500
63 Iapsyiar Khonshnong N25°28’45.70" E092°30'07.70" 86,400 3.00 5 3.000
64 Ummynso Khonshnong N25°29’26.05" E092°31'42.48" 28,800 1.00 5 1.000
65 Tyrhom Nongryngkoh N25°29’18.55" E092°30'36.51" 1,15,200 4.00 5 4.000
66 Larun Nongryngkoh N25°29'21.74" E092°30'44.45" 1,44,000 5.00 5 5.000
67 Riat Samat Sahsniang N25°33'19.64" E092°31'01.28" 86,400 3.00 5 3.000
68 Lumthymmai Sahsniang N25°33'15.24" E092°31'17.25" 57,600 2.00 5 2.000
69 Mynsiang Sahsniang N25°33'02.36" E092°31'14.96" 86,400 3.00 5 3.000
70 Rymblei Sahsniang N25°33'31.60" E092°32'03.94" 1,15,200 4.00 5 4.000
71 Umpyrsih Sahsniang N25°33'50.71" E092°32'40.31" 86,400 3.00 5 3.000
72 Wiarliat Near Priang N25°31'50.28" E092°33'00.20" 57,600 2.00 5 2.000
73 Pohtlang
Saitwait Mookhap N 25°30’94.2" E092°26’49.2" 57,600 2.00 5 2.000
74 Kyndong Tuber Kyndong Tuber N 25°30'18.46" E092°19'01.45" 57,600 2.00 5 2.000
75 Biar Nohrong Thadmuthlong N 25°29'00.04" E 092°18'50.23" 86,400 3.00 5 3.000
76 Mooshut Thadmuthlong N 25°29'01.56" E 092°18'28.45" 57,600 2.00 5 2.000
77 Dum u Sniang Thadmuthlong N 25°28'48.58" E 092°18'31.14" 86,400 3.00 5 3.000
78 Tre Rymbai Thadmuthlong N 25°29'05.99" E 092°18'56.78" 72,000 2.50 5 2.500
79 Pam Pyrthat Thadmuthlong N 25°29'09.53" E 092°18'48.70" 57,600 2.00 5 2.000
80 Liar Luhong Thadmuthlong N 25°29'12.00" E 092°18'52.52" 72,000 2.50 5 2.500
81 Moodka at Thadmuthlong N 25°29'03.05" E 092°18'47.33" 86,400 3.00 5 3.000
District Irrigation Plan
NABARD Consultancy Services 89
82 Iong Niang Thadmuthlong N 25°29'21.30" E 092°18'44.73" 57,600 2.00 5 2.000
83 Khloo Lympat
Dong Thadmuthlong N 25°28'52.87" E 092°19'16.14" 1,00,800 3.50 5 3.500
84 Lum Mujang Thadmuthlong N 25°29'22.22" E 092°19'05.57" 86,400 3.00 5 3.000
85 Khlieh Tongum Thadmuthlong N 25°29'06.74" E 092°18'35.45" 72,000 2.50 5 2.500
86 Trei Kper Maitdein N 25°36'44.11" E 092°27'37.88" 72,000 2.50 5 2.500
87 Iongkakam Maitdein N 25°36'56.07" E 092°27'54.69" 57,600 2.00 5 2.000
88 Trei Kper Maitdein N 25°36'44.11" E 092°27'37.88" 72,000 2.50 5 2.500
89 Lakadong Maitdein N 25°36'26.34" E 092°27'08.98" 1,00,800 3.50 5 3.500
90 Iongkyrsoh Maitdein N 25°36'52.97" E 092°28'03.65" 72,000 2.50 5 2.500
91 Ionglamet Maitdein N 25°36'41.60" E 092°27'54.45" 1,00,800 3.50 5 3.500
92 Lapatad Maitdein N 25°36'53.16" E 092°28'21.62" 72,000 2.50 5 2.500
93 Pamper Mukroh N 25°37'08.23" E 092°29'02.35" 1,15,200 4.00 5 4.000
94 Thangsniang Shangpung N 25°29'36.30" E 092°20'50.12" 86,400 3.00 5 3.000
95 Muriap Nein Near Mulieh N 25°30'76.2" E 092°22’32" 1,00,800 3.50 5 3.500
96 Khlosang Mootyrchiah (A) N 25°52'40" E 92°44’7" 43,200 1.50 5 1.500
97 Kremkrong Mootyrchiah (B) N 25°50'70" E 92°45’7" 46,080 1.60 5 1.600
98 Wah Iung Mookhap N 25°51'60" E 92°43’6" 51,840 1.80 5 1.800
99 Thangsnaing Laskein N 25°62'20" E 92°41’5" 28,800 1.00 5 1.000
100 Plainspiar Khonshnong N 25°41'90" E 92°52’4" 86,400 3.00 5 3.000
101 Umsoo Khonshnong N 25°49'10" E 92°52’8" 57,600 2.00 5 2.000
102 Khliehsynrang Mookaiaw N 25°52'60" E 92°43’4" 43,200 1.50 5 1.500
103 Kharumpliang Mootyrchiah (B) N 25°31'16.84" E 092°27'13.50" 1,72,800 6.00 5 6.000
104 Dok Mootyrchiah N 25°31'25.32" E 092°27'10.82" 86,400 3.00 5 3.000
105 Satad Barato N 25°36'14.74" E 092°27'29.45" 57,600 2.00 5 2.000
106 Treikya Barato N 25°36'26.89" E 092°27'26.48" 86,400 3.00 5 3.000
107 Umshyngiar Shilliang
Myntang N 25°38'73.8" E 092°28’04.6" 57,600 2.00 5 4.000
108 Liar Shat Khlaw Shilliang
Myntang N 25°33'73.8" E 092°23’01.6" 86,400 3.00 5 6.000
District Irrigation Plan
NABARD Consultancy Services 90
109 Liar Nangjngi
FIP
Shilliang
Myntang N 25°34'48.2" E 092°22’41.9" 86,400 3.00 5 6.000
110 Liar Suchiang
FIP
Shilliang
Myntang N 25°34'47.9" E 092°22’41.9" 57,600 2.00 5 4.000
111 Sah Dalloi Thad
Muthlong
Shilliang
Myntang N 25°27'52.4" E 092°18’12.8" 86,400 3.00 5 6.000
112
Shangpung
Pohshnong
Umiurem FIP
Shangpung N 25°28'19.07" E 092°21'7.02" 2,01,600 7.00 5 7.000
113 Lyrmung Mootyrchiah 'B' N 25°30'23.49" E 092°26'50.13" 57,600 2.00 5 2.00
114 Mynsar Mootyrchiah 'B' N 25°30'10.74" E 092°27'21.52" 72,000 2.50 5 2.50
115 Pohkper Mootyrchiah 'B' N 25°30'53.36" E 092°26'49.95" 72,000 2.50 5 2.50
116 Umlakashiang Mootyrchiah 'B' N 25°33'04.16" E 092°30'16.14" 1,00,800 3.50 5 3.50
117 Mokathaw Khlieh Mushut,
Shangpung N 25°29'06.19" E 092°20'34.45" 86,400 3.00 5 3.000
Total 2 127,64,160 443.20 455.64
3 Amlarem
Block
Other
Funding
agencies
Jalkunds
1 Khlieh Leshka Near Iongnoh N 25°23'11.15'' E 92°13'21.22" 86,400 3.00 5
Years 3.000
2 Kdong Shiwait Pynthor
Langtein N 25°24'58.30'' E 92°09'29.75" 57,600 2.00 5 2.000
3 Nongtalang Nongtalang N 25°12'32.41'' E 92°03'58.21" 16,589 2.00 5 2.000
4 Kudengrim Kudengrim N 25°13'06.94'' E 92°02'39.13" 24,883 3.00 5 3.000
5 Thangbuli Thangbuli N 25°17'17.64'' E 92°09'37.19" 24,883 3.00 5 3.000
6 Shawat Pynthorlangtein N 25°24'53.10'' E 92°09'35.44" 1,15,200 4.00 5 4.000
7 Kmen Pynthorlangtein N 25°25'08.53'' E 92°09'09.32" 86,400 3.00 5 3.000
8 Tiporman Thangbuli N 25°17'24.02'' E 92°10'02.11" 57,600 2.00 5 2.000
9 Iurida Amsohkhti N 25°11' 36.78'' E 92°06' 44.10" 1,00,800 3.50 5 3.500
Total 3 5,70,355 25.50 - 25.500
TOTAL I ( 1+2+3 ) 201,62,995 705.80 - 715.96
1 Thadlaskei
n Block
Other
Funding
agencies
Multipurpo
se
Reservoirs
II Construction of Multipurpose Reservoirs
1 Kaikada MR Moophiang N25°33'0" E092°13'10" 1 no. 5 years 133.65
2 Tahar MR Nartiang N25°34'10" E092°14'10" 1 no. 5 153.03
District Irrigation Plan
NABARD Consultancy Services 91
3 Sahksaw Shamsham N25°22'10.07" E092°12'48.49" 1 no. 5
4 Umraniang Umjalisiaw N25°40'21.16" E092°20'28.97" 1 no. 5 50.00
Total 1 2 no’s - 336.68
2 Laskein
Block
Other
Funding
agencies
Multipurpo
se
Reservoirs
1 Lumtiniang MR
North Mootyrshiah N 25°31'20" E 92°27'30" 1 no. 5 years 79.40
2 Lakasiang MR Mukhap N 25°30'36.0" E 92°26'7.26" 1 no. 5 23.51
3 Klip MR Mukhap N 25°30'22.50" E 92°26'49.2" 1 no 5 30.00
Total 2 3 no’s - 132.91
3 Amlarem
Block
Other
Funding
agencies
Multipurpo
se
Reservoirs
1 Wahliar
Amralang MR Pdengkarong N 25°14'84.10" E 92°06'6.83" 1 no 5 years 32.81
2 Ampynlang
Mawkariam Kudengrim N 25°15'14" E 92°05'17.2" 1 no 5 43.57
Total 3 2 no’s - 76.38
TOTAL II (1+2+3) 7 no’s - 545.97
1 Thadlaskei
n Block
Other
Funding
agencies
NABARD
Loan
III Renovation Projects
1
Matlang
Kdonglapa thah
FIP
3859200 134.00 5 years 256.33
2 Mynrud
Moopasor FIP 2419200 84.00 5 126.00
3 Nongbah FIP 10080000 365.00 5 525.00
Total 1 16358400 583.00 - 907.33
2 Laskein
Block
Other
Funding
agencies
NABARD
Loan 1
Umlanghong
FIP 2163744 75.13 5 years 110.00
Total 2 2163744 75.13 - 110.00
3 Amlarem
Block
Other
Funding
agencies
NABARD
Loan 1
Pdengkarong
FIP 1687910 203.50 5 years 508.72
Total 3 1687910 203.50 - 508.72
District Irrigation Plan
NABARD Consultancy Services 92
TOTAL III (1+2+3) 20210054 861.63 - 1526.05
Grand Total (I+II+III) [Jalkunds, Multipurpose reservoir &
Renovation Projects] 1,567.43 - 2787.98
District Irrigation Plan
NABARD Consultancy Services 93
Strategic Action Plan for Irrigation in District
under PMKSY
(Soil and Water Conservation Department)
District Irrigation Plan
NABARD Consultancy Services 94
Strategic Action Plan for Irrigation under PMKSY for the year 2016-17 to 2020-2021
Block – Laskein
Sl
N
o.
Nam
e of
the
Bloc
k
Concerne
d
Ministry
/
Departm
ent
Compo
-nent
Name of
Project Village
Finan
cial
Year
Name of Activity
Total
Num
ber
Comm
and
Area/
Irrigati
on
Potenti
al
(HA)
Estimate
d Cost
(Rs.)
REMA
RKS
Period of
Implement
ation
(5/7Yrs).
1 2 3 4 5 6 7 8 9 10 11 12 13
Lask
ein MoWR
AIBP
Myntwa,
Wahsawian,
Wah Yiangkar
Mynsoo,
Kyndong
Tuber,
Takhiang,
Moolepha
w
2016-
17
Surface Minor Irrigation - Construction of
RCC/CC Weirs 54 107
15771273
.00
Ongoin
g
Har
Khet
Ko
Pani
Ground Water Development - Water
Harvesting Structure/Farm
Pond/ProtectionWall
38 66 9635629.
00
RRR of Water Bodies
Line filled channels - Construction of CC
Channels 48 99
14626452
.00
TOTAL OF 2016-17 140 272 40033354
.00
Lask
ein MoWR
AIBP
Latnga,
Myntkung-A,
Myntkung-B,
Upper
Wahmynthang
, Myntrong
Nongkynr
ih,
laskein,
Mookaia
w,
Mookhap,
Mookynd
eng,
Pammani
k,
Myntkung
2017-
18
Surface Minor Irrigation - Construction of
RCC/CC Weirs 139 264
63488960
.00
Har
Khet
Ko
Pani
Ground Water Development - Water
Harvesting Structure/Farm
Pond/ProtectionWall
RRR of Water Bodies
Line filled channels - Construction of CC
Channels 39 95
22572710
.00
TOTAL OF 2017-18 178 359
86061670
.00
AIBP Surface Minor Irrigation - Construction of
RCC/CC Weirs
District Irrigation Plan
NABARD Consultancy Services 95
Har
Khet
Ko
Pani
,
Thadbam
on,
Muriap,
Thadialon
g,
Samatan,
Mulum,
2018-
19
Ground Water Development - Water
Harvesting Structure/Farm
Pond/ProtectionWall
20 115 27445100
.00
RRR of Water Bodies
Line filled channels - Construction of CC
Channels 99 177
42592055
.00
TOTAL OF 2018-19 119 292 70037155
.00
Lask
ein MoWR
AIBP
Wah Iongnoh,
Wah Manar
Sahsniang
,
Mooshrot
,
Niawkmai
, Mynska,
Khlo
Kynrin,
2019-
20
Surface Minor Irrigation - Construction of
RCC/CC Weirs 11 143
28841790
.00
Har
Khet
Ko
Pani
Ground Water Development - Water
Harvesting Structure/Farm
Pond/ProtectionWall
6 15 3182640.
00
RRR of Water Bodies
Line filled channels - Construction of CC
Channels
TOTAL OF 2019-20 17 158
32024430
.00
AIBP
2020-
21
Surface Minor Irrigation - Construction of
RCC/CC Weirs
Har
Khet
Ko
Pani
Ground Water Development - Water
Harvesting Structure/Farm
Pond/ProtectionWall
4 9 2025120.
00
RRR of Water Bodies
Line filled channels - Construction of CC
Channels 11 88
17684670
.00
TOTAL OF 2020-21 15 97 19709790
.00
GRAND TOTAL OF PROJECTS UNDER MoWR 469 1178 24786639
9.00
1 Lask
ein
(DOLR)
Soil &
Waters
hed
IWMP-VII
Khlieh Mynsar Raliang
2016-
17
ARABLE LAND TREATMENT Ongoing
. The
Comma3
Improvement of Existing Paddy Field 665.69 365500.0
0
District Irrigation Plan
NABARD Consultancy Services 96
Water
Conserva
tion
Departm
ent
Bench Terrace 387800.0
0
nd area
includes
total
benefitte
d area
from
different
activitie
s
Loose Boulder Contour bund 1452500.
00
DRAINAGE LINE TREATMENT
Protection Wall/ Retaining Wall 16 730560.0
0
Water Harvesting Structure 13 852800.0
0
Run-off Disposal Channel/ Diversion
Drains(Rmt)
1474.
6 38340.00
LIVELIHOOD ACTIVITIES 97 485000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 20
525000.0
0
Administrative 562500.0
0
Monitoring 56250.00
Evaluation 56250.00
Institutional & Capacity building 112500.0
0
Sub Total 146 5625000.
00
2017-
18
ARABLE LAND TREATMENT
Agro- Horticulture 607500.0
0
Improvement of Existing Paddy Field 215000.0
0
Bench Terrace 180000.0
0
Loose Boulder Contour bund 150000.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 479000.0
0
District Irrigation Plan
NABARD Consultancy Services 97
Afforestation 435000.0
0
DRAINAGE LINE TREATMENT
Protection Wall/ Retaining Wall 8 365280.0
0
Check Dam/ Diversion Dam/ Head
Water Dam 1 59800.00
Water Harvesting Structure 1 65600.00
Run-off Disposal Channel/ Diversion
Drains(Rmt)
1166.
2 30320.00
LIVELIHOOD ACTIVITIES 173 1125000.
00
PRODUCTION SYSTEM & MICRO
ENTERPRISES 47
1350000.
00
Administrative 3% 675000.0
0
Monitoring 0.2% 45000.00
Evaluation 0.3% 67500.00
Institutional & Capacity building 1% 225000.0
0
Sub Total 230 6075000.
00
2018-
19 Consolidation Phase 3%
675000.0
0
Total of Khlieh Mynsar 376 665.69 12375000
.00
2 IWMP-VII
Liar Rtiang Rtiang
2016-
17
ARABLE LAND TREATMENT Ongoing
. The
Comma
nd area
includes
total
benefitte
d area
3
Bench Terrace
306.2
187900.0
0
Loose Boulder Contour bund 208500.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 406600.0
0
District Irrigation Plan
NABARD Consultancy Services 98
Afforestation 220000.0
0
from
different
activitie
s DRAINAGE LINE TREATMENT
Protection Wall/ Retaining Wall 5 228300.0
0
Water Harvesting Structure 2 131200.0
0
LIVELIHOOD ACTIVITIES 12 125000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 4
105000.0
0
Administrative 2.50
%
187500.0
0
Monitoring 0.25
% 18750.00
Evaluation 0.25
% 18750.00
Institutional & Capacity building 0.50
% 37500.00
Sub Total 23 1875000.
00
2017-
18
ARABLE LAND TREATMENT
Agro- Horticulture 202500.0
0
Bench Terrace 250000.0
0
Loose Boulder Contour bund 48000.00
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 214000.0
0
Afforestation 116000.0
0
DRAINAGE LINE TREATMENT
Farm Ponds/ Dug Out Ponds 1 32000.00
District Irrigation Plan
NABARD Consultancy Services 99
LIVELIHOOD ACTIVITIES 56 375000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 15
450000.0
0
Administrative 3% 225000
Monitoring 0.2% 15000.00
Evaluation 0.3% 22500.00
Institutional & Capacity building 1% 75000.00
Sub Total 72 2025000.
00
2018-
19 Consolidation Phase 3%
225000.0
0
Total of Liar Rtiang 95 306.2 4125000.
00
3
IWMP-VII
Wah
Langdeng
Biar,
Sarhen
2016-
17
ARABLE LAND TREATMENT
420.15
Ongoing
. The
Comma
nd area
includes
total
benefitte
d area
from
different
activitie
s
3
Bench Terrace 915000
Improvement of Existing Paddy Field 387000
Peripheral Bunding(Rmt) 69.6 3480
Loose Boulder Contour bund 345000
DRAINAGE LINE TREATMENT
Protection Wall/ Retaining Wall 12 547920
Farm Ponds/ Dug Out Ponds 8 256000
Run-off Disposal Channel/ Diversion
Drains(Rmt) 600 15600
LIVELIHOOD ACTIVITIES 92 395000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 15
360000.0
0
Administrative 2.50
% 375000
Monitoring 0.25
% 37500
Evaluation 0.25
% 37500
District Irrigation Plan
NABARD Consultancy Services 100
Institutional & Capacity building 0.50
% 75000
Sub Total 127 3750000
2017-
18
ARABLE LAND TREATMENT
Agro- Horticulture 405000.0
0
Bench Terrace 150000.0
0
Peripheral Bunding(Rmt) 2448 122400.0
0
Loose Boulder Contour bund 240000.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 340000.0
0
Afforestation 348000.0
0
DRAINAGE LINE TREATMENT
Check Dam/ Diversion Dam/ Head
Water Dam 2
119600.0
0
LIVELIHOOD ACTIVITIES 103 750000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 35
900000.0
0
Administrative 3% 450000.0
0
Monitoring 0.2% 30000.00
Evaluation 0.3% 45000.00
Institutional & Capacity building 1% 150000.0
0
Sub Total 140 4050000.
00
2018-
19 Consolidation Phase 3%
450000.0
0
District Irrigation Plan
NABARD Consultancy Services 101
Total of Wah Langdeng 267 420.15 8250000.
00
4
IWMP-VII
Khlieh
Umkhirmi
Mukroh
2016-
17
ARABLE LAND TREATMENT
322.15
Ongoing
. The
Comma
nd area
includes
total
benefitte
d area
from
different
activitie
s
3
Bench Terrace 915000.0
0
Peripheral Bunding(Rmt) 10480.00
Loose Boulder Contour bund 345000.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 646000.0
0
DRAINAGE LINE TREATMENT
Protection Wall/ Retaining Wall 12 547920.0
0
Run-off Disposal Channel/ Diversion
Drains(Rmt) 600 15600.00
LIVELIHOOD ACTIVITIES 67 295000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 18
450000.0
0
Administrative 2.50
% 375000
Monitoring 0.25
% 37500
Evaluation 0.25
% 37500
Institutional & Capacity building 0.50
% 75000
Sub Total 97 3750000.
00
2017-
18
ARABLE LAND TREATMENT
Agro- Horticulture 405000.0
0
District Irrigation Plan
NABARD Consultancy Services 102
Bench Terrace 150000.0
0
Peripheral Bunding(Rmt) 2448 122400.0
0
Loose Boulder Contour bund 240000.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 340000.0
0
Agro forestry 348000.0
0
DRAINAGE LINE TREATMENT
Check Dam/ Diversion Dam/ Head
Water Dam 2
119600.0
0
LIVELIHOOD ACTIVITIES 103 750000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 35
900000.0
0
Administrative 3% 450000.0
0
Monitoring 0.2% 30000.00
Evaluation 0.3% 45000.00
Institutional & Capacity building 1% 150000.0
0
Sub Total 140 4050000.
00
2018-
19 Consolidation Phase 3%
450000.0
0
Total of Khlieh Umkhirmi 237 322.15 8250000.
00
5 IWMP IX
Umbloo
Saphai A,
Saphai B
2016-
17
ARABLE LAND TREATMENT
805.88
Ongoing
. The
Comma3
Agro horticulture 312800.0
0
District Irrigation Plan
NABARD Consultancy Services 103
Improvement of Existing Paddy Field 546100.0
0
nd area
includes
total
benefitte
d area
from
different
activitie
s
Peripheral Bunding(Rmt) 423.6
7 50840.00
Loose Boulder Contour bund 555000.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 209000.0
0
Afforestation 946000.0
0
Agroforestry 400200.0
0
Strip Plantation 269100.0
0
DRAINAGE LINE TREATMENT
Farm ponds/ dug out ponds 8 256000.0
0
Water Harvesting Structure 11 721600.0
0
Check Dam/ Diversion Dam/ Head
Water Dam 10
598000.0
0
Protection Wall/ Retaining Wall 15 684900.0
0
Run-off Disposal Channel/ Diversion
Drains(Rmt)
339.8
8 28210.00
LIVELIHOOD ACTIVITIES 141 452250.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 148
452250.0
0
Administrative 5% 753750.0
0
Monitoring 0.50
% 75375.00
Evaluation 0.50
% 75375.00
District Irrigation Plan
NABARD Consultancy Services 104
Institutional & Capacity building 1% 150750.0
0
Sub Total 333 7537500.
00
2017-
18
ARABLE LAND TREATMENT
Agro- Horticulture 183600.0
0
Bench Terrace
Peripheral Bunding(Rmt) 120.6
2 14475.00
Loose Boulder Contour bund 555000.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 110000.0
0
Afforestation 498800.0
0
Agroforestry 234900.0
0
Strip Plantation 136850.0
0
LIVELIHOOD ACTIVITIES 148 753750.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 32
904500.0
0
Administrative 3% 452250.0
0
Monitoring 0.2% 30150.00
Evaluation 0.3% 45225.00
Institutional & Capacity building 1% 150750.0
0
Sub Total 180 4070250.
00
2018-
19 Consolidation Phase 3%
452250.0
0
District Irrigation Plan
NABARD Consultancy Services 105
Total of Umbloo 513 805.88 12060000
.00
6
IWMP-IX
Middle
Mynsar
Umsalait,
Thangthri
ng,
Iooksi,
Iongkasar
o,
Tongkiad
2016-
17
ARABLE LAND TREATMENT
1326.3
3
Ongoing
. The
Comma
nd area
includes
total
benefitte
d area
from
different
activitie
s
3
Contour Bunds 1050000.
00
Half Moon Terrace 525000.0
0
Peripheral Bunding(Rmt) 352.8
3 42340.00
Improvement of Existing Paddy Field 946000.0
0
Agro horticulture 437000.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 459800.0
0
Afforestation 1628000.
00
Agroforestry 883200.0
0
DRAINAGE LINE TREATMENT
Farm ponds/ dug out ponds 8 256000.0
0
Water Harvesting Structure 13 852800.0
0
Check Dam/ Diversion Dam/ Head
Water Dam 11
657800.0
0
Protection Wall/ Retaining Wall 14 639240.0
0
Run-off Disposal Channel/ Diversion
Drains(Rmt) 374.4 31070.00
LIVELIHOOD ACTIVITIES 167 681750.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 23
681750.0
0
District Irrigation Plan
NABARD Consultancy Services 106
Administrative 5% 1136250.
00
Monitoring 0.50
%
113625.0
0
Evaluation 0.50
%
113625.0
0
Institutional & Capacity building 1% 227250.0
0
Sub Total 236 11362500
.00
2017-
18
ARABLE LAND TREATMENT
Contour Bunds 720000.0
0
Peripheral Bunding(Rmt) 150.6
3 18075.00
Agro horticulture 256500.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 242000.0
0
Afforestation 858400.0
0
Agroforestry 518400.0
0
LIVELIHOOD ACTIVITIES 294 1136250.
00
PRODUCTION SYSTEM & MICRO
ENTERPRISES 49
1363500.
00
Administrative 3% 681750.0
0
Monitoring 0.2% 45450.00
Evaluation 0.3% 68175.00
Institutional & Capacity building 1% 227250.0
0
District Irrigation Plan
NABARD Consultancy Services 107
Sub Total 343 6135750.
00
2018-
19 Consolidation Phase 3%
681750.0
0
Total of Middle Mynsar 579 1326.3
3
18180000
.00
7 IWMP-IX
Mynlep
Iawthym
me,
Priang,
Umdienlie
ng
2016-
17
ARABLE LAND TREATMENT
436.44
Ongoing
. The
Comma
nd area
includes
total
benefitte
d area
from
different
activitie
s
3
Half Moon Terrace 420000.0
0
Peripheral Bunding(Rmt) 149 17880.00
Improvement of Existing Paddy Field 236500.0
0
Agro horticulture 257600.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 237500.0
0
Afforestation 418000.0
0
Agroforestry 197800.0
0
DRAINAGE LINE TREATMENT
Water Harvesting Structures 4 262400.0
0
Check Dam 3 179400.0
0
Protection Wall 12 547920.0
0
LIVELIHOOD ACTIVITIES 45 225000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 8
225000.0
0
District Irrigation Plan
NABARD Consultancy Services 108
Administrative 5% 375000.0
0
Monitoring 0.50
% 37500.00
Evaluation 0.50
% 37500.00
Institutional & Capacity building 1% 75000.00
Sub Total 72 3750000.
00
2017-
18
ARABLE LAND TREATMENT
Peripheral Bunding(Rmt) 110.8
3 13300.00
Improvement of Existing Paddy Field 236500.0
0
Agro horticulture 151200.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 125000.0
0
Afforestation 220400.0
0
Agroforestry 116100.0
0
LIVELIHOOD ACTIVITIES 85 375000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 16
450000.0
0
Administrative 3% 225000.0
0
Monitoring 0.2% 15000.00
Evaluation 0.3% 22500.00
Institutional & Capacity building 1% 75000.00
District Irrigation Plan
NABARD Consultancy Services 109
Sub Total 101 2025000.
00
2018-
19 Consolidation Phase 3%
225000.0
0
Total of Mynlep 173 436.44 6000000.
00
8 IWMP-XI
Myntkung
Myntkung
,
Khliehum
buit,
Pammani
k A
2016-
17
ARABLE LAND TREATMENT
810
Ongoing
. The
Comma
nd area
includes
total
benefitte
d area
from
different
activitie
s
4
Loose Boulder Contour bund 56400.00
Half Moon Terrace 45000.00
Peripheral Bunding(Rmt) 488.7
5 58650.00
Crop Demonstration 1 5000.00
Improvement of existing paddy field 120400.0
0
Agro horticulture 90900.00
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 79200.00
Afforestation 101000.0
0
Agroforestry 90900.00
DRAINAGE LINE TREATMENT
Water harvesting structures 1 168200.0
0
Protection Wall/ Retaining Wall 1 95600.00
LIVELIHOOD ACTIVITIES 42 121500.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 5
121500.0
0
Administrative 2% 243000.0
0
Monitoring 0.3% 36450.00
Evaluation 0.2% 24300.00
District Irrigation Plan
NABARD Consultancy Services 110
Institutional & Capacity building 2% 243000.0
0
Sub Total 50 1701000.
00
2017-
18
ARABLE LAND TREATMENT
Loose Boulder Contour bund 235000.0
0
Half Moon Terrace 262500.0
0
Peripheral Bunding(Rmt) 275 33000.00
Improvement of existing paddy field 232200.0
0
Agro horticulture 333300.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 223200.0
0
Afforestation 323200.0
0
Agroforestry 343400.0
0
DRAINAGE LINE TREATMENT
Water harvesting structures 6 1046200.
00
CC Weir 2 369000.0
0
Protection Wall/ Retaining Wall 5 783000.0
0
RCC Weir 1 311500.0
0
LIVELIHOOD ACTIVITIES 68 364500.0
0
District Irrigation Plan
NABARD Consultancy Services 111
PRODUCTION SYSTEM & MICRO
ENTERPRISES 14
364500.0
0
Administrative 5% 607500.0
0
Monitoring 0.5% 60750.00
Evaluation 0.5% 60750.00
Institutional & Capacity building 1% 121500.0
0
Sub Total 96 6075000.
00
2018-
19
ARABLE LAND TREATMENT
Loose Boulder Contour bund 47000.00
Half Moon Terrace 67500.00
Peripheral Bunding(Rmt) 211.2
5 25350.00
Improvement of existing paddy field 47300.00
Agro horticulture 161600.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 122400.0
0
Afforestation 202000.0
0
Agroforestry 202000.0
0
DRAINAGE LINE TREATMENT
Water harvesting structures 1 205200.0
0
RCC Weir 1 316900.0
0
LIVELIHOOD ACTIVITIES 93 607500.0
0
District Irrigation Plan
NABARD Consultancy Services 112
PRODUCTION SYSTEM & MICRO
ENTERPRISES 27
729000.0
0
Administrative 3% 364500.0
0
Monitoring 0.2% 24300.00
Evaluation 0.3% 36450.00
Institutional & Capacity building 1% 121500.0
0
Sub Total 122 3280500.
00
2019-
20 Consolidation Phase 3%
364500.0
0
Total of Mynkung 268 810 11421000
.00
9 IWMP-XI
Liar Moolain
Pammani
k B
2016-
17
ARABLE LAND TREATMENT
1020
Ongoing
. The
Comma
nd area
includes
total
benefitte
d area
from
different
activitie
s
4
Loose Boulder Contour bund 112800.0
0
Peripheral Bunding(Rmt) 72.5 8700.00
Crop Demonstration 1 5000.00
Improvement of existing paddy field 94600.00
Agro horticulture 131300.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 147600.0
0
Afforestation 181800.0
0
Agroforestry 131300.0
0
DRAINAGE LINE TREATMENT
CC Canal 2 160000.0
0
District Irrigation Plan
NABARD Consultancy Services 113
Protection Wall/ Retaining Wall 1 174400.0
0
LIVELIHOOD ACTIVITIES 28 153000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 6
153000.0
0
Administrative 2% 306000.0
0
Monitoring 0.3% 45900.00
Evaluation 0.2% 30600.00
Institutional & Capacity building 2% 306000.0
0
Sub Total 38 2142000.
00
2017-
18
ARABLE LAND TREATMENT
Loose Boulder Contour bund 300800.0
0
Half Moon Terrace 187500.0
0
Peripheral Bunding(Rmt) 362.5 43500.00
Crop Demonstration 1 5000.00
Improvement of existing paddy field 335400.0
0
Agro horticulture 444400.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 399600.0
0
Afforestation 585800.0
0
Agroforestry 464600.0
0
DRAINAGE LINE TREATMENT
District Irrigation Plan
NABARD Consultancy Services 114
Water Harvesting Structures 1 233100.0
0
CC weir 5 1430200.
00
CC Canal 2 200000.0
0
Protection Wall/ Retaining Wall 3 586200.0
0
RCC Weir 1 444900.0
0
LIVELIHOOD ACTIVITIES 91 459000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 18
459000.0
0
Administrative 5% 765000.0
0
Monitoring 0.5% 76500.00
Evaluation 0.5% 76500.00
Institutional & Capacity building 1% 153000.0
0
Sub Total 122 7650000.
00
2018-
19
ARABLE LAND TREATMENT
Loose Boulder Contour bund 150400.0
0
Half-moon terrace 187500.0
0
Peripheral Bunding(Rmt) 147.5 17700.00
Improvement of existing paddy field 150500.0
0
Agro horticulture 252500.0
0
NON- ARABLE LAND TREATMENT
District Irrigation Plan
NABARD Consultancy Services 115
Improvement of Degraded Forest 226800.0
0
Afforestation 303000.0
0
Agroforestry 262600.0
0
DRAINAGE LINE TREATMENT
CC Weir 1 208500.0
0
LIVELIHOOD ACTIVITIES 155 765000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 34
918000.0
0
Administrative 3% 459000.0
0
Monitoring 0.2% 30600.00
Evaluation 0.3% 45900.00
Institutional & Capacity building 1% 153000.0
0
Sub Total 190 4131000.
00
2019-
20 Consolidation Phase 3%
459000.0
0
Total of Liar Moolain 350 1020 14382000
.00
10 IWMP-XI
Phur Saphoh Pasyih
2016-
17
ARABLE LAND TREATMENT
940
Ongoing
. The
Comma
nd area
includes
total
benefitte
d area
from
4
Loose Boulder Contour bund 112800.0
0
Half-moon terrace 82500.00
Peripheral Bunding(Rmt) 366.2
5 43950.00
Crop Demonstration 1 5000.00
Improvement of existing paddy field 150500.0
0
District Irrigation Plan
NABARD Consultancy Services 116
Agro horticulture 90900.00 different
activitie
s NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 118800.0
0
Afforestation 101000.0
0
Agroforestry 101000.0
0
DRAINAGE LINE TREATMENT
Water Harvesting Structures 1 104370.0
0
Protection Wall 2 146680.0
0
LIVELIHOOD ACTIVITIES 27 141000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 5
141000.0
0
Administrative 2% 282000.0
0
Monitoring 0.3% 42300.00
Evaluation 0.2% 28200.00
Institutional & Capacity building 2% 282000.0
0
Sub Total 36 1974000.
00
2017-
18
ARABLE LAND TREATMENT
Loose Boulder Contour bund 413600.0
0
Half-moon terrace 322500.0
0
Peripheral Bunding(Rmt) 400.5 48060.00
Crop Demonstration 1 5000.00
District Irrigation Plan
NABARD Consultancy Services 117
Improvement of existing paddy field 288100.0
0
Agro horticulture 353500.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 327600.0
0
Afforestation 353500.0
0
Agroforestry 373700.0
0
DRAINAGE LINE TREATMENT
Water Harvesting Structures 4 989970.0
0
CC Weir 3 684480.0
0
Protection Wall 8 1056990.
00
LIVELIHOOD ACTIVITIES 81 423000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 15
423000.0
0
Administrative 5% 705000.0
0
Monitoring 0.5% 70500.00
Evaluation 0.5% 70500.00
Institutional & Capacity building 1% 141000.0
0
Sub Total 112 7050000.
00
2018-
19
ARABLE LAND TREATMENT
Loose Boulder Contour bund 28200.00
Half-moon terrace 90000.00
Peripheral Bunding(Rmt) 177 21240.00
District Irrigation Plan
NABARD Consultancy Services 118
Improvement of existing paddy field 12900.00
Agro horticulture 161600.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 172800.0
0
Afforestation 252500.0
0
Agroforestry 202000.0
0
DRAINAGE LINE TREATMENT
CC Weir 1 680260.0
0
LIVELIHOOD ACTIVITIES 122 705000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 32
846000.0
0
Administrative 3% 423000.0
0
Monitoring 0.2% 28200.00
Evaluation 0.3% 42300.00
Institutional & Capacity building 1% 141000.0
0
Sub Total 155 3807000.
00
2019-
20 Consolidation Phase 3%
423000.0
0
Total of Phur Saphoh 303 940 13254000
.00
11 IWMP-XI
Wah Syrti Mynkrem
2016-
17
ARABLE LAND TREATMENT
510
Ongoing
. The
Comma
nd area
includes
4 Loose Boulder Contour bund 103400.0
0
Peripheral Bunding(Rmt) 248.7
5 29850.00
District Irrigation Plan
NABARD Consultancy Services 119
Crop demonstration 1 5000.00 total
benefitte
d area
from
different
activitie
s
Improvement of existing paddy field 38700.00
Agro horticulture 60600.00
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 64800.00
Afforestation 60600.00
Agroforestry 40400.00
DRAINAGE LINE TREATMENT
CC Weir 1 170400.0
0
LIVELIHOOD ACTIVITIES 13 76500.00
PRODUCTION SYSTEM & MICRO
ENTERPRISES 3 76500.00
Administrative 2% 153000.0
0
Monitoring 0.3% 22950.00
Evaluation 0.2% 15300.00
Institutional & Capacity building 2% 153000.0
0
Sub Total 18 1071000.
00
2017-
18
ARABLE LAND TREATMENT
Loose Boulder Contour bund 75200.00
Half-moon terrace 45000.00
Peripheral Bunding(Rmt) 432.7
5 51930.00
Improvement of existing paddy field 236500.0
0
Agro horticulture 191900.0
0
NON- ARABLE LAND TREATMENT
District Irrigation Plan
NABARD Consultancy Services 120
Improvement of Degraded Forest 183600.0
0
Afforestation 191900.0
0
Agroforestry 181800.0
0
DRAINAGE LINE TREATMENT
Water Harvesting Structures 5 1160750.
00
CC Weir 1 294280.0
0
RCC Weir 1 217640.0
0
LIVELIHOOD ACTIVITIES 50 229500.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 9
229500.0
0
Administrative 5% 382500.0
0
Monitoring 0.5% 38250.00
Evaluation 0.5% 38250.00
Institutional & Capacity building 1% 76500.00
Sub Total 66 3825000.
00
2018-
19
ARABLE LAND TREATMENT
Loose Boulder Contour bund 28200.00
Half-moon terrace 45000.00
Peripheral Bunding(Rmt) 274 32880.00
Improvement of existing paddy field 17200.00
Agro horticulture 101000.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 93600.00
District Irrigation Plan
NABARD Consultancy Services 121
Afforestation 111100.0
0
Agroforestry 151500.0
0
DRAINAGE LINE TREATMENT
Water harvesting structure 1 299270.0
0
LIVELIHOOD ACTIVITIES 83 382500.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 17
459000.0
0
Administrative 3% 229500.0
0
Monitoring 0.2% 15300.00
Evaluation 0.3% 22950.00
Institutional & Capacity building 1% 76500.00
Sub Total 101 2065500.
00
2019-
20 Consolidation Phase 3%
229500.0
0
Total of Wah Syrti 185 510 7191000.
00
12
IWMP-XIII
Wah
Mynthang
Thadialon
g,
Samatan,
Lum
Muriap
2016-
17
4 % fund for EPA activities in all villages
NA 1020
612000.0
0 DPR
has not
yet been
prepare
d.
Amount
for the
financial
year
2020-21
has also
been
5
1% fund for Institutional & Capacity
building
153000.0
0
1% fund for preparation of DPR 153000.0
0
Sub Total (6%)
918000.0
0
2017-
18
2% fund for Administrative expenses 306000.0
0
0.2 % fund for Monitoring 30600.00
District Irrigation Plan
NABARD Consultancy Services 122
0.3 % fund for Evaluation 45900.00 included
. The
Comma
nd area
includes
total
benefitte
d area
from
different
activitie
s
2% fund for Institutional & Capacity
building
306000.0
0
7.5% fund for Watershed Treatment /
Development Works
1147500.
00
1% fund for Livelihood Activities 153000.0
0
1% fund for Production system & Micro-
enterprise
153000.0
0
Sub Total (14%)
2142000.
00
2018-
19
5% fund for Administrative expenses 765000.0
0
0.5 % fund for Monitoring 76500.00
0.5 % fund for Evaluation 76500.00
1% fund for Institutional & Capacity
building
153000.0
0
37% fund for Watershed Treatment /
Development Works
5661000.
00
3% fund for Livelihood Activities 459000.0
0
3% fund for Production system & Micro-
enterprise
459000.0
0
Sub Total (50%)
7650000.
00
2019-
20
3% fund for Administrative expenses 459000.0
0
0.3 % fund for Monitoring 45900.00
0.2 % fund for Evaluation 30600.00
1% fund for Institutional & Capacity
building
153000.0
0
11.5% fund for Watershed Treatment /
Development Works
1759500.
00
District Irrigation Plan
NABARD Consultancy Services 123
5% fund for Livelihood Activities 765000.0
0
6% fund for Production system & Micro-
enterprise
918000.0
0
Sub Total (27%)
4131000.
00
2020-
21 3% fund for Consolidation Phase
459000.0
0
Total of wah Mynthang 1020 15300000
.00
13 IWMP-XIII
Wah Sawian
Mynsoo
A,
Mynsoo B
2016-
17
5 % fund for EPA activities in all villages
NA 1010
606000.0
0 DPR
has not
yet been
prepare
d.
Amount
for the
financial
year
2020-21
has also
been
included
. The
Comma
nd area
includes
total
benefitte
d area
from
different
activitie
s
5
1% fund for Institutional & Capacity
building
151500.0
0
1% fund for preparation of DPR 151500.0
0
Sub Total (6%)
909000.0
0
2017-
18
2% fund for Administrative expenses 303000.0
0
0.2 % fund for Monitoring 30300.00
0.3 % fund for Evaluation 45450.00
2% fund for Institutional & Capacity
building
303000.0
0
7.5% fund for Watershed Treatment /
Development Works
1136250.
00
1% fund for Livelihood Activities 151500.0
0
1% fund for Production system & Micro-
enterprise
151500.0
0
Sub Total (14%)
2121000.
00
District Irrigation Plan
NABARD Consultancy Services 124
2018-
19
5% fund for Administrative expenses 757500.0
0
0.5 % fund for Monitoring 75750.00
0.5 % fund for Evaluation 75750.00
1% fund for Institutional & Capacity
building
151500.0
0
37% fund for Watershed Treatment /
Development Works
5605500.
00
3% fund for Livelihood Activities 454500.0
0
3% fund for Production system & Micro-
enterprise
454500.0
0
Sub Total (50%)
7575000.
00
2019-
20
3% fund for Administrative expenses 454500.0
0
0.3 % fund for Monitoring 45450.00
0.2 % fund for Evaluation 30300.00
1% fund for Institutional & Capacity
building
151500.0
0
11.5% fund for Watershed Treatment /
Development Works
1742250.
00
5% fund for Livelihood Activities 757500.0
0
6% fund for Production system & Micro-
enterprise
909000.0
0
Sub Total (27%)
4090500.
00
2020-
21 3% fund for Consolidation Phase
454500.0
0
Total of Wah Sawian 1010 15150000
.00
Grand Total 3346
9592.8
4
14593800
0.00
District Irrigation Plan
NABARD Consultancy Services 125
Irrigation
Schemes
of Line
Departm
ent of
State
Governm
ent
Soil &
water
conser
vation
works
in rural
areas
DPR yet to
prepare
2016-
17
Surface Minor Irrigation - Construction of
small RCC/CC Weir & CC Channel 3 7
900000.0
0
DPR yet
to
propose,
dependi
ng on
availabil
ity of
Fund
under
State
Plan for
a
particul
ar year
1
Construction of Water Harvesting
Structures/Farm Ponds 3 5
600000.0
0
Other Ground Water Recharge -
Protection Walls 3 4
450000.0
0
Total of 2016-17 9 16 1950000.
00
DPR yet to
prepare
2017-
18
Surface Minor Irrigation - Construction of
small RCC/CC Weir & CC Channel 3 7
900000.0
0
Construction of Water Harvesting
Structures/Farm Ponds 3 5
600000.0
0
Other Ground Water Recharge -
Protection Walls 3 4
450000.0
0
Total of 2017-18 9 16 1950000.
00
DPR yet to
prepare
2018-
19
Surface Minor Irrigation - Construction of
small RCC/CC Weir & CC Channel 3 7
900000.0
0
Construction of Water Harvesting
Structures/Farm Ponds 3 5
600000.0
0
Other Ground Water Recharge -
Protection Walls 3 4
450000.0
0
Total of 2018-19 9 16 1950000.
00
DPR yet to
prepare
2019-
20
Surface Minor Irrigation - Construction of
small RCC/CC Weir & CC Channel 3 7
900000.0
0
Construction of Water Harvesting
Structures/Farm Ponds 3 5
600000.0
0
Other Ground Water Recharge -
Protection Walls 3 4
450000.0
0
Total of 2019-20 9 16 1950000.
00
DPR yet to
prepare
2020-
21
Surface Minor Irrigation - Construction of
small RCC/CC Weir & CC Channel 3 7
900000.0
0
Construction of Water Harvesting
Structures/Farm Ponds 3 5
600000.0
0
District Irrigation Plan
NABARD Consultancy Services 126
Other Ground Water Recharge -
Protection Walls 3 4
450000.0
0
Total of 2020-21 9 16 1950000.
00
GRAND TOTAL OF IRRIGATION SCHEMES - LINE DEPARTMENT 45 80 9750000.
00
Rural
Infrastru
cture
Develop
ment
Fund -
NABAR
D LOAN
Soil &
water
conser
vation
works
in
River
Valleys
2016-
17
Surface Minor Irrigation - Construction of
small RCC/CC Weir
DPR
already
prepare
d and
submitte
d but yet
to
sanction
2
Construction of Water Harvesting
Structures/Farm Ponds
Other Ground Water Recharge -
Protection Walls
Total of 2016-17
Ramut -
Umpaai
Khliehran
gnah &
Mynkrem
2017-
18
Surface Minor Irrigation - Construction of
small RCC/CC Weir 54 135
38684230
.00
Construction of Water Harvesting
Structures/Farm Ponds - - -
Other Ground Water Recharge -
Protection Walls 9 20
13191060
.00
Total of 2017-18 63 155 51875290
.00
2018-
19
Surface Minor Irrigation - Construction of
small RCC/CC Weir 12 30
17629620
.00
Construction of Water Harvesting
Structures/Farm Ponds - - -
Other Ground Water Recharge -
Protection Walls 9 13
9187940.
00
Total of 2018-19 21 43 26817560
.00
2019-
20
Surface Minor Irrigation - Construction of
small RCC/CC Weir
Construction of Water Harvesting
Structures/Farm Ponds
Other Ground Water Recharge -
Protection Walls
Total of 2019-20
District Irrigation Plan
NABARD Consultancy Services 127
2020-
21
Surface Minor Irrigation - Construction of
small RCC/CC Weir
Construction of Water Harvesting
Structures/Farm Ponds
Other Ground Water Recharge -
Protection Walls
Total of 2020-21
GRAND TOTAL OF RIDF - NABARD LOAN 84 198 78692850
.00
Block- Thadlaskein
Sl
N
o.
Name of
the
Block
Concern
ed
Ministry
/
Departm
ent
Compo
-nent
Name of
Project Villages
Financ
ial
Year
Name of Activity
Total
Numb
er
Comm
and
Area/
Irrigati
on
Potenti
al (HA)
Estimate
d Cost
(Rs)
Remarks
Period
of
Implem
en-
tation
(5/7Yrs
).
1 2 3 4 5 6 7 8 9 10 11 12 13
MoWR
AIBP Sasein,
Nartiang,
Nongjngi,
Parmupli
ang,
Thlu-
Ummmul
ong,
Umpawai
, Wah
Sabkjat,
Wah
Synshar,
Middle
Nartiang,
Moodop,
Ionglwit,
Nongjngi,
Myrjai,
Moopasi,
Ummulong,
Moodymmai
, Mukhla,
Wahiajer,
Tyrshang,
Saphoh,
Nongbah,
Mupliang,
2016-
17
Surface Minor Irrigation - Construction of
RCC/CC Weirs 173 726
92362740
.00
Ongoing
Har
Khet
Ko
Pani
Ground Water Development - Water
Harvesting Structure/Farm
Pond/ProtectionWall
155 1099 13236245
0.00
RRR of Water Bodies 3 50 49240800
.00
Line filled channels - Construction of CC
Channels 208 792
97790770
.00
District Irrigation Plan
NABARD Consultancy Services 128
Myntdu,
Umplu
Ialong,
Chyrmang,
Khanduli,
Saitsama,
Umshangiar,
Lumlakhiat,
Pdein
Iawmusiang,
Tamu
TOTAL OF 2016-17 539 2667 37175676
0.00
AIBP
Umlidoh,
Ummyns
ei,
Mynkro,
Thakuni
Mihmyntdu,
Sohmynting,
Tamu,
Mawkhnang,
Sanaro,
Sohmynting
2017-
18
Surface Minor Irrigation - Construction of
RCC/CC Weirs 105 186
45338920
.00
Har
Khet
Ko
Pani
Ground Water Development - Water
Harvesting Structure/Farm
Pond/ProtectionWall
RRR of Water Bodies 3 50 49240800
.00
Line filled channels - Construction of CC
Channels 82 222
51323440
.00
TOTAL OF 2017-18 190 458 14590316
0.00
AIBP
2018-
19
Surface Minor Irrigation - Construction of
RCC/CC Weirs
Har
Khet
Ko
Pani
Ground Water Development - Water
Harvesting Structure/Farm
Pond/ProtectionWall
20 150 14748600
.00
RRR of Water Bodies
Line filled channels - Construction of CC
Channels 37 79
18588230
.00
TOTAL OF 2018-19 57 229 33336830
.00
AIBP Mynriang Morpushai,
Ionglwit,
Surface Minor Irrigation - Construction of
RCC/CC Weirs 10 132
26219700
.00
District Irrigation Plan
NABARD Consultancy Services 129
Har
Khet
Ko
Pani
Nongjngi
Khlieh
Shnong,
Lumstong,
Kseh
Rynshang,
Moobakhon
2019-
20
Ground Water Development - Water
Harvesting Structure/Farm
Pond/ProtectionWall
5 14 2652000.
00
RRR of Water Bodies
Line filled channels - Construction of CC
Channels
TOTAL OF 2019-20 15 146 28871700
.00
AIBP
2020-
21
Surface Minor Irrigation - Construction of
RCC/CC Weirs
Har
Khet
Ko
Pani
Ground Water Development - Water
Harvesting Structure/Farm
Pond/ProtectionWall
3 8 1518840.
00
RRR of Water Bodies
Line filled channels - Construction of CC
Channels 10 80
16076970
.00
TOTAL OF 2020-21 13 88 17595810
.00
GRAND TOTAL OF MoWR 814 3588.3 59746426
0.00
1 Thadlas
kein
(DOLR)
Soil &
Water
Conserva
tion
Departm
ent
Waters
hed
IWMP-
06-Liar
Lakhiat
Watershe
d
Lumla khiat 2016-
2017
ARABLE LAND TREATMENT
182
Ongoing
-The
Comman
d area
includes
total
benefitted
area from
different
activities
3
Contour Bunding 99000.00
Peripheral Bunding 29200.00
Improvement of Existing Paddy Field 1900.00
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 95000.00
Afforestation 353125.0
0
Strip Plantation 105300.0
0
DRAINAGE LINE TREATMENT
Stone Masonary Wall /Protection Wall 23 529000.0
0
District Irrigation Plan
NABARD Consultancy Services 130
Run-off Disposal Channel 3846 100000.0
0
LIVELIHOOD ACTIVITIES 70 125000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 6
175000.0
0
Administrative 2.50% 187500.0
0
Monitoring 0.25% 18750.00
Evaluation 0.25% 18750.00
Institutional & Capacity building 0.50% 37500.00
Total of Liar Lakhiat Watershed 3945 1875025.
00
2017-
2018
ARABLE LAND TREATMENT
Bench Terrace 200000.0
0
Peripheral Bundind 11450.00
Agro-Horticulture 243000.0
0
NON-ARABLE LAND TREATMENT
Improvement of Degraded Forest 50000.00
Afforestation 304500.0
0
Strip Plantation 53550.00
LIVELIHOOD 104 375000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 16
450000.0
0
Administrative 3% 225000.0
0
Monitoring 0.25% 18750.00
Evaluation 0.25% 18750.00
District Irrigation Plan
NABARD Consultancy Services 131
Institutional & Capacity building 1% 75000.00
Total of Liar Lakhiat Watershed 120 2025000.
00
2018-
2019 Consolidation & With Drawal Phase 3%
450000.0
0
Grand Total of Liar Lakhiat 4065 182 4350025.
00
2
IWMP-
06-
Mynksi
Watershe
d
Lapangap,
Shai Bnai,
Pdengtaloo
2016-
17
ARABLE LAND TREATMENT
512
Ongoing
The
Comman
d area
includes
total
benefitted
area from
different
activities
3
Contour Bunding 450000.0
0
Bench Terrace 360000.0
0
Peripheral Bunding 36800.00
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest 703000.0
0
Strip Plantation 70200.00
DRAINAGE LINE TREATMENT
Stone Masonary Wall /Protection Wall 35 805000.0
0
Run-off Disposal channel 5769 150000.0
0
LIVELIHOOD ACTIVITIES 70 300000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 13
350000.0
0
Administrative 2.50% 375000.0
0
Monitoring 0.25% 37500.00
Evaluation 0.25% 37500.00
Institutional & Capacity building 0.50% 75000.00
District Irrigation Plan
NABARD Consultancy Services 132
Total of Mynksi Watershed 5887 3750000.
00
2017-
2018
ARABLE LAND TREATMENT
Bench Terrace 40000.00
Peripheral Bunding
103100.0
0
Agro-Horticulture
459000.0
0
NON-ARABLE LAND TREATMENT
Improvement of Degraded Forest
370000.0
0
Afforestation
261000.0
0
Strip Plantation 35700.00
DRAINAGE LINE TREATMENT
Water Harvesting Structure 2
131200.0
0
Check Dam/ Diversion Dam/ Head
Water Dam 1 60000.00
Stone Masonary Wall /Protection Wall 5
115000.0
0
Run-off Disposal Channel 5769
150000.0
0
LIVELIHOOD 233
750000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 32
900000.0
0
Administrative 3%
450000.0
0
Monitoring 0.25% 37500.00
Evaluation 0.25% 37500.00
Institutional & Capacity building 1%
150000.0
0
District Irrigation Plan
NABARD Consultancy Services 133
Total of Mynksi Watershed 6042 4050000.
00
2018-
19 Consolidation & With Drawal Phase 3%
450000.0
0
Grand Total of Mynksi 11929 512 8250000.
00
3
IWMP-
06-Wah
Pyrhut
Umladang
2016-
17
ARABLE LAND TREATMENT
214
Ongoing
The
Comman
d area
includes
total
benefitted
area from
different
activities
3
Contour Bunding 127200.0
0
Peripheral Bunding 39700.00
Agro- Horticulture 400000.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest
228000.0
0
Afforestation 220000.0
0
Strip Plantation 35100.00
DRAINAGE LINE TREATMENT
Stone Masonary Wall /Protection Wall 15
345000.0
0
LIVELIHOOD 41 92500.00
PRODUCTION SYSTEM & MICRO
ENTERPRISES 5
125000.0
0
Administrative 2.50% 187500.0
0
Monitoring 0.25% 18750.00
Evaluation 0.25% 18750.00
Institutional & Capacity building 0.50% 37500.00
Total of Wah Pyrhut WS 61 1875000.
00
ARABLE LAND TREATMENT
District Irrigation Plan
NABARD Consultancy Services 134
2017-
18
Peripheral Bunding 15650.00
Agro-Horticulture 243000.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest
120000.0
0
Afforestation
232000.0
0
Strip Plantation 17850.00
Avenue plantation
DRAINAGE LINE TREATMENT
Stone Masonary Wall /Protection Wall 8
184000.0
0
Run-off Disposal Channel 1923 50000.00
LIVELIHOOD ACTIVITIES 135 375000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 7
450000.0
0
Administrative 3% 225000.0
0
Monitoring 0.25% 18750.00
Evaluation 0.25% 18750.00
Institutional & Capacity building 1% 75000.00
Total of Wah Pyrhut WS 2073 2025000.
00
2018-
19 Consolidation & With Drawal Phase 3%
225000.0
0
Grand Total of Wah Pyrhut WS 2134 214 4125000.
00
4
IWMP-
06-Khlieh
Myngi
Saphoh,
Larnai
2016-
2017
ARABLE LAND TREATMENT
564
Ongoing
The
Comman
3
Contour Bunding
330000.0
0
District Irrigation Plan
NABARD Consultancy Services 135
Bench Terrace
1100000.
00
d area
includes
total
benefitted
area from
different
activities
peripheral Bunding 34800.00
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest
760000.0
0
Afforestation
330000.0
0
Strip Plantation 70200.00
LIVELIHOOD 115
250000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 12
350000.0
0
Administrative 2.50% 375000.0
0
Monitoring 0.25 37500.00
Evaluation 0.25% 37500.00
Institutional & Capacity building 0.50% 75000.00
Total of Khlieh Myngi WS 127 3750000.
00
2017-
2018
ARABLE LAND TREATMENT
Contour Bunding 75000.00
Bench Terrace
200000.0
0
Peripheral Bunding
209300.0
0
Agro-Horticulture
351000.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest
400000.0
0
Afforestation
348000.0
0
District Irrigation Plan
NABARD Consultancy Services 136
Strip Plantation 35700.00
DRAINAGE LINE TREATMENT
Check Dam/ Diversion Dam/ Head
Water Dam 1 60000.00
Stone Masonary Wall /Protection Wall 2 46000.00
LIVELIHOOD 245
750000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 32
900000.0
0
Administrative 3% 450000.0
0
Monitoring 0.25% 37500.00
Evaluation 0.25% 37500.00
Institutional & Capacity building 1% 150000.0
0
Total of Khlieh Myngi WS 280 4050000.
00
2018-
2019 Consolidation & With Drawal Phase 3%
450000.0
0
Grand Total of Khlieh Myngi WS 407 564 8250000.
00
5
IWMP-
06-
Kyrtem
Ws
Rakabah,No
ngrim
Bamthong
2016-
2017
ARABLE LAND TREATMENT
365
Ongoing
The
Comman
d area
includes
total
benefitted
area from
different
activities
3
Contour Bunding
450000.0
0
Peripheral Bunding
408100.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest
570000.0
0
Afforestation
363000.0
0
Strip Plantation 81900.00
DRAINAGE LINE TREATMENT
District Irrigation Plan
NABARD Consultancy Services 137
Stone Masonary Wall /Protection Wall 24
552000.0
0
Run-off Disposal Channel 7692
200000.0
0
LIVELIHOOD 20
250000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 10
350000.0
0
Administrative 2.50% 375000.0
0
Monitoring 0.25 37500.00
Evaluation 0.25% 37500.00
Institutional & Capacity building 0.50% 75000.00
Total of Kyrtem WS 7746 3750000.
00
2017-
2018
ARABLE LAND TREATMENT
Bench Terrace
206350.0
0
Agro-Horticulture
432000.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest
300000.0
0
Afforestation
377000.0
0
Strip Plantation 41650.00
DRAINAGE LINE TREATMENT
Stone Masonary Wall /Protection Wall 16
368000.0
0
LIVELIHOOD 245
750000.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 36
900000.0
0
District Irrigation Plan
NABARD Consultancy Services 138
Administrative 3% 450000.0
0
Monitoring 0.25% 37500.00
Evaluation 0.25% 37500.00
Institutional & Capacity building 1% 150000.0
0
Total of Kyrtem WS 297 4050000.
00
2018-
2019 Consolidation & With Drawal Phase 3%
450000.0
0
Grand Total of Kyrtem WS 8043 365 8250000.
00
6
IWMP-
08-
Thadmuk
roh WS
Nongkhroh
Thadmusem 2016-
2017
ARABLE LAND TREATMENT
768
Ongoing
The
Comman
d area
includes
total
benefitted
area from
different
activities
3
Contour Bunding
1350000.
00
Half Moon Terrace
562500.0
0
Peripheral Bunding 42840.00
Improvement of Existing Paddy Field
774000.0
0
Crop Demonstration 30000.00
Agro-Horticulture
1067200.
00
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest
695400.0
0
Afforestation
1248500.
00
Agro-Forestry
920000.0
0
Strip Plantation
177840.0
0
DRAINAGE LINE TREATMENT
District Irrigation Plan
NABARD Consultancy Services 139
Farm Ponds/Dug out Ponds 6
192000.0
0
Water Harvesting Structures 28
1836800.
00
Check Dam/ Diversion Dam/ Head
Water Dam 20
1196000.
00
Stone Masonary Wall /Protection Wall 20
913200.0
0
Run-off Disposal Channel
460.48
rm 38220.00
LIVELIHOOD 202
895500.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 35
895500.0
0
Administrative 5% 1492500.
00
Monitoring 0.50% 149250.0
0
Evaluation 0.50% 149250.0
0
Institutional & Capacity building 1% 298500.0
0
Total of Thadmukroh WS 311 14925000
.00
2017-
2018
ARABLE LAND TREATMENT
Contour Bunding
105000.0
0
Half Moon Terrace 75000.00
Peripheral Bunding 23950.00
Improvement of Existing Paddy Field 64500.00
Crop Demonstration 10000.00
Agro-Horticulture
626400.0
0
NON- ARABLE LAND TREATMENT
District Irrigation Plan
NABARD Consultancy Services 140
Improvement of Degraded Forest
366000.0
0
Afforestation
658300.0
0
Agro-Forestry
540000.0
0
Strip Plantation 90440.00
DRAINAGE LINE TREATMENT
Farm Ponds/Dug out Ponds 1 32000.00
Water Harvesting Structures 5
328000.0
0
Check Dam/ Diversion Dam/ Head
Water Dam 4
239200.0
0
Stone Masonary Wall /Protection Wall 6
273960.0
0
LIVELIHOOD 309
1492500.
00
PRODUCTION SYSTEM & MICRO
ENTERPRISES 67
1791000.
00
Administrative 3% 895500.0
0
Monitoring 0.25% 74625.00
Evaluation 0.25% 74625.00
Institutional & Capacity building 1% 298500.0
0
Total of Thadmukroh WS 392 8059500.
00
2018-
2019 Consolidation & With Drawal Phase 3%
895500.0
0
Grand Total of Thadmukroh WS 703 768 23880000
.00
7 Umlarpa
mg WS
Sabamuswan
g 2016-
2017
ARABLE LAND TREATMENT
302
Ongoing
The
Comman
3
Contour Bunding
337500.0
0
District Irrigation Plan
NABARD Consultancy Services 141
Bench Terrace
200000.0
0
d area
includes
total
benefitted
area from
different
activities
Peripheral Bunding 462 55440.00
Improvement of Existing Paddy Field
602000.0
0
Agro-Horticulture
409400.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest
385700.0
0
Afforestation
495000.0
0
Agro-Forestry
754400.0
0
Strip Plantation
238680.0
0
DRAINAGE LINE TREATMENT
Farm Ponds/Dug out Ponds 96000.00
Water Harvesting Structures
656000.0
0
Check Dam/ Diversion Dam/ Head
Water Dam
657800.0
0
Stone Masonary Wall /Protection Wall
593580.0
0
Run-off Disposal Channel 13000.00
LIVELIHOOD 94
445500.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 15
445500.0
0
Administrative 5% 742500.0
0
Monitoring 0.50% 74250.00
Evaluation 0.50% 74250.00
District Irrigation Plan
NABARD Consultancy Services 142
Institutional & Capacity building 1% 148500.0
0
Total of Umlarpang WS 571 7425000.
00
2017-
2018
ARABLE LAND TREATMENT
Bench Terrace
100000.0
0
Peripheral Bunding 89.58 10750.00
Improvement of Existing Paddy Field
111800.0
0
Agro-Horticulture
240300.0
0
NON- ARABLE LAND TREATMENT
Improvement of Degraded Forest
203000.0
0
Afforestation
261000.0
0
Agro-Forestry
442800.0
0
Strip Plantation
121380.0
0
DRAINAGE LINE TREATMENT
Water Harvesting Structures 1 65600.00
Check Dam/ Diversion Dam/ Head
Water Dam 1 59800.00
Stone Masonary Wall /Protection Wall 2 91320.00
LIVELIHOOD 152
742500.0
0
PRODUCTION SYSTEM & MICRO
ENTERPRISES 32
891000.0
0
Administrative 3% 445500.0
0
Monitoring 0.25% 37125.00
District Irrigation Plan
NABARD Consultancy Services 143
Evaluation 0.25% 37125.00
Institutional & Capacity building 1% 148500.0
0
Total of Umlarpang WS 277.58 4009500.
00
2018-
2019 Consolidation & With Drawal Phase 3%
445500.0
0
Grand Total of Umlarpang WS 848.58 302 11880000
.00
8
IWMP-
12-Thwai
Maring
WS
Iongnoh
2016-
2017
4 % fund for EPA activities in all villages
NA 520
312000.0
0
DPR has
not yet
been
prepared
. Amount
for the
financial
year
2020-21
has also
been
included.
The
Comman
d area
includes
total
benefitted
area from
different
activities
5
1% fund for Institutional & Capacity
building 78000.00
1% fund for preparation of DPR 78000.00
Sub Total (6%) 468000.0
0
2017-
2018
2% fund for Administrative expenses
156000.0
0
0.2 % fund for Monitoring 15600.00
0.3 % fund for Evaluation 23400.00
2% fund for Institutional & Capacity
building
156000.0
0
7.5% fund for Watershed Treatment /
Development Works
585000.0
0
1% fund for Livelihood Activities 78000.00
1% fund for Production system & Micro-
enterprise 78000.00
Sub Total (14%) 1092000.
00
2018-
2019
5% fund for Administrative expenses
390000.0
0
0.5 % fund for Monitoring 39000.00
0.5 % fund for Evaluation 39000.00
District Irrigation Plan
NABARD Consultancy Services 144
1% fund for Institutional & Capacity
building 78000.00
37% fund for Watershed Treatment /
Development Works
2886000.
00
3% fund for Livelihood Activities
234000.0
0
3% fund for Production system & Micro-
enterprise
234000.0
0
Sub Total (50%) 3900000.
00
2019-
2020
3% fund for Administrative expenses
234000.0
0
0.3 % fund for Monitoring 23400.00
0.2 % fund for Evaluation 15600.00
1% fund for Institutional & Capacity
building 78000.00
11.5% fund for Watershed Treatment /
Development Works
897000.0
0
5% fund for Livelihood Activities
390000.0
0
6% fund for Production system & Micro-
enterprise
468000.0
0
Sub Total (27%) 2106000.
00
2020-
2021 Consolidation & With Drawal Phase
234000.0
0
Total of Thwai Maring WS 520 7800000.
00
IWMP-
12-
Umkhein
WS
Chyrmang
Nein,
Chyrmang
Wah
2016-
2017
4 % fund for EPA activities in all villages
NA 490
294000.0
0 DPR has
not yet
been
prepared
. Amount
5 1% fund for Institutional & Capacity
building 73500.00
1% fund for preparation of DPR 73500.00
District Irrigation Plan
NABARD Consultancy Services 145
Sub Total (6%) 441000.0
0
for the
financial
year
2020-21
has also
been
included.
The
Comman
d area
includes
total
benefitted
area from
different
activities
2017-
2018
2% fund for Administrative expenses
147000.0
0
0.2 % fund for Monitoring 14700.00
0.3 % fund for Evaluation 22050.00
2% fund for Institutional & Capacity
building
147000.0
0
7.5% fund for Watershed Treatment /
Development Works
551250.0
0
1% fund for Livelihood Activities 73500.00
1% fund for Production system & Micro-
enterprise 73500.00
Sub Total (14%) 1029000.
00
2018-
2019
5% fund for Administrative expenses
367500.0
0
0.5 % fund for Monitoring 36750.00
0.5 % fund for Evaluation 36750.00
1% fund for Institutional & Capacity
building 73500.00
37% fund for Watershed Treatment /
Development Works
2719500.
00
3% fund for Livelihood Activities
220500.0
0
3% fund for Production system & Micro-
enterprise
220500.0
0
Sub Total (50%) 3675000.
00
2019-
2020
3% fund for Administrative expenses
220500.0
0
0.3 % fund for Monitoring 22050.00
0.2 % fund for Evaluation 14700.00
District Irrigation Plan
NABARD Consultancy Services 146
1% fund for Institutional & Capacity
building 73500.00
11.5% fund for Watershed Treatment /
Development Works
845250.0
0
5% fund for Livelihood Activities
367500.0
0
6% fund for Production system & Micro-
enterprise
441000.0
0
Sub Total (27%) 1984500.
00
2020-
2021 Consolidation & With Drawal Phase
220500.0
0
Total of Umkein WS 490 7350000.
00
GRAND TOTAL (IWMP Projects) 28130 3917 84135025
.00
Irrigation
Schemes
of Line
Departm
ent of
State
Governm
ent
Soil &
water
conser
vation
works
in rural
areas
DPR yet
to prepare
2016-
17
Surface Minor Irrigation - Construction of
small RCC/CC Weir/ CC Channel 3 7
900000.0
0
DPR yet
to
propose,
dependin
g on
availabilit
y of Fund
under
State
Plan for a
particular
year
1
Construction of Water Harvesting
Structures/Farm Ponds 3 5
600000.0
0
Other Ground Water Recharge -
Protection Walls 3 4
450000.0
0
Total of 2016-17 9 16 1950000.
00
DPR yet
to prepare
2017-
18
Surface Minor Irrigation - Construction of
small RCC/CC Weir/ CC Channel 3 7
900000.0
0
Construction of Water Harvesting
Structures/Farm Ponds 3 5
600000.0
0
Other Ground Water Recharge -
Protection Walls 3 4
450000.0
0
Total of 2017-18 9 16 1950000.
00
DPR yet
to prepare
2018-
19 Surface Minor Irrigation - Construction of
small RCC/CC Weir/ CC Channel 3 7
900000.0
0
District Irrigation Plan
NABARD Consultancy Services 147
Construction of Water Harvesting
Structures/Farm Ponds 3 5
600000.0
0
Other Ground Water Recharge -
Protection Walls 3 4
450000.0
0
Total of 2018-19 9 16 1950000.
00
DPR yet
to prepare
2019-
20
Surface Minor Irrigation - Construction of
small RCC/CC Weir/ CC Channel 3 7
900000.0
0
Construction of Water Harvesting
Structures/Farm Ponds 3 5
600000.0
0
Other Ground Water Recharge -
Protection Walls/Terraces/ Contour
Bunding
3 4 450000.0
0
Total of 2019-20 9 16 1950000.
00
DPR yet
to prepare
2020-
21
Surface Minor Irrigation - Construction of
small RCC/CC Weir/ CC Channel 3 7
900000.0
0
Construction of Water Harvesting
Structures/Farm Ponds 3 5
600000.0
0
Other Ground Water Recharge -
Protection Walls/Terraces/ Contour
Bunding
3 4 450000.0
0
Total of 2020-21 9 16 1950000.
00
GRAND TOTAL OF IRRIGATION SCHEMES OF LINE DEPARTMENT 45 80 9750000.
00
Rural
Infrastruc
ture
Develop
ment
Fund -
Soil &
water
conser
vation
works
in
Mynrut
Nartiang,
Mookabeng,
Mynsngat,
Nongkhyllep
2016-
17
Surface Minor Irrigation - Construction of
small RCC/CC Weir & CC Channel 40 110
10722880
.00
ongoing 2 Construction of Water Harvesting
Structures/Farm Ponds 15 30
4258080.
00
Other Ground Water Recharge -
Protection Walls/Terraces/ Contour
Bunding
89 90 6484440.
00
District Irrigation Plan
NABARD Consultancy Services 148
NABAR
D
River
Valleys Total of 2016-17 144 230
21465400
.00
Umlabar
Moodymmai
, Madur,
Niriang,
Phlong
Ingkhaw,
Lumkhudun
g
2017-
18
Surface Minor Irrigation - Construction of
small RCC/CC Weir & CC Channel 29 73
7261920.
00
DPR
already
prepared
but yet to
Sanction
Construction of Water Harvesting
Structures/Farm Ponds 10 15
918000.0
0
Other Ground Water Recharge -
Protection Walls/Terraces/ Contour
Bunding
32 63 6623988.
00
Total of 2017-18 71 151 14803908
.00
2018-
19
Surface Minor Irrigation - Construction of
small RCC/CC Weir & CC Channel 19 48
6824580.
00
Construction of Water Harvesting
Structures/Farm Ponds - - -
Other Ground Water Recharge -
Protection Walls/Terraces/ Contour
Bunding
8 10 3693000.
00
Total of 2018-19 27 58 10517580
.00
Wah
Myntliah
Sanaro,
Pdein Iadaw
2019-
20
Surface Minor Irrigation - Construction of
small RCC/CC Weir & CC Channel 14 25
3536360.
00
new
Proposal
Construction of Water Harvesting
Structures/Farm Ponds 1 3
420300.0
0
Other Ground Water Recharge -
Protection Walls/Terraces/ Contour
Bunding
45 75 10500000
.00
Total of 2019-20 60 103 14456660
.00
2020-
21
Surface Minor Irrigation - Construction of
small RCC/CC Weir & CC Channel 12 15
2619540.
00 new
Proposal Construction of Water Harvesting
Structures/Farm Ponds 0 0 0
District Irrigation Plan
NABARD Consultancy Services 149
Other Ground Water Recharge -
Protection Walls/Terraces/ Contour
Bunding
40 67 9333000.
00
Total of 2020-21 52 82 11952540
.00
GRAND TOTAL OF RIDF - NABARD LOAN 354 624 73196088
.00
Block- Amlarem
Sl
No
.
Name
of the
Block
Concerned
Ministry/
Departme
nt
Com
po
nent
Name of
Project Village
Financi
al Year Name of Activity
Total
Numb
er
Comma
nd
Area/
Irrigatio
n
Potenti
al (HA)
Estimate
d Cost
(Rs.)
Remarks
Period of
Implementat
ion
(5/7Yrs).
1 2 3 4 5 6 7 8 9 10 11 12 13
MoWR
AIBP
Amraya
ng
Umshyr
pu
Moopyut
, Madan
Tyrpait,
Shken
pyrsit
2016-17
Surface Minor Irrigation - Construction
of RCC/CC Weirs 6 24 3231586
Ongoing
Har
Khet
Ko
Pani
Ground Water Development - Water
Harvesting Structure/Farm
Pond/ProtectionWall
27 208 28709719
RRR of Water Bodies
Line filled channels - Construction of
CC Channels
TOTAL OF 2016-17 33 232 31941305
.00
AIBP Umtalu Moosakh
ia, 2017-18
Surface Minor Irrigation - Construction
of RCC/CC Weirs 22 76.97
11364345.
00
District Irrigation Plan
NABARD Consultancy Services 150
Har
Khet
Ko
Pani
Samanon
g
Ground Water Development - Water
Harvesting Structure/Farm
Pond/ProtectionWall
RRR of Water Bodies
Line filled channels - Construction of
CC Channels 28 150
22073115.
00
TOTAL OF 2017-18 50 226.52 33437460
.00
AIBP
Umtalu
Moosakh
ia,
Samanon
g
2018-19
Surface Minor Irrigation - Construction
of RCC/CC Weirs
Har
Khet
Ko
Pani
Ground Water Development - Water
Harvesting Structure/Farm
Pond/ProtectionWall
11 95 14089530.
00
RRR of Water Bodies
Line filled channels - Construction of
CC Channels
TOTAL OF 2018-19 11 95 14089530
.00
AIBP
2019-20
Surface Minor Irrigation - Construction
of RCC/CC Weirs
Har
Khet
Ko
Pani
Ground Water Development - Water
Harvesting Structure/Farm
Pond/ProtectionWall
RRR of Water Bodies
Line filled channels - Construction of
CC Channels
TOTAL OF 2019-20
AIBP
2020-21
Surface Minor Irrigation - Construction
of RCC/CC Weirs
Har
Khet
Ko
Pani
Ground Water Development - Water
Harvesting Structure/Farm
Pond/ProtectionWall
RRR of Water Bodies
District Irrigation Plan
NABARD Consultancy Services 151
Line filled channels - Construction of
CC Channels
TOTAL OF 2020-21
GRAND TOTAL OF MoWR 94 554 79468295
.00
1 Amlare
m
(DOLR)
Soil &
Water
Conservati
on
Departme
nt
Wate
r
shed
IWMP-
10
Upper
Umtalu
Samanon
g
2016-
2017
ARABLE LAND TREATMENT
Peripheral Bunding 172.5
609.5
20700.00
Ongoing
The
Command
area
includes
total
benefitted
area from
different
activities
4
Improvement of existing paddy field 21500.00
Agro Horticulture 101000.00
NON- ARABLE LAND
TREATMENT
Improvement of Degraded Forest 61200.00
Afforestation 131300.00
Agro forestry 101000.00
DRAINAGE LINE TREATMENT
Water Harvesting Structure 1 136010.00
CC Weir 2 113540.00
LIVELIHOOD ACTIVITIES
Tailoring 3 24000.00
Vegetables Production/ Kitchen
Gardening 15 37500.00
Carpentry / Blacksmith 6 30000.00
PRODUCTION SYSTEM & MICRO
ENTERPRISES
Sericulture 2 42000.00
Integrated Farming System 1 25500.00
Miscellaneous Enterprises for (SHG)
(Agriculture & Veterinary Services) 1 24000.00
Administrative 2% 183000.00
Monitoring 0.20% 18300.00
Evaluation 0.30% 27450.00
Institutional & Capacity building 2% 183000.00
Sub total 204 1281000.
00
District Irrigation Plan
NABARD Consultancy Services 152
2017-18
ARABLE LAND TREATMENT
Contour Bunding 206800.00
Half Moon Terrace 187500.00
Improvement of Existing Paddy Field 266600.00
Peripheral Bunding (Rmt) 376.5 45180.00
Crop Demonstration 1 5000.00
Agro-Horticulture 323200.00
NON- ARABLE LAND
TREATMENT
Afforestation 424200.00
Improvement of Existing Paddy Field 169200.00
Agro-Forestry 383800.00
DRAINAGE LINE TREATMENT
Farm Ponds/ Dug out Ponds 2 118030.00
C.C. Weir 5 747410.00
Water Harvesting Structure 3 508580.00
LIVELIHOOD ACTIVITIES 38 274500.00
PRODUCTION SYSTEM & MICRO
ENTERPRISES 10 274500.00
Administrative 5% 457500.00
Monitoring 0.50% 45750.00
Evaluation 0.50% 45750.00
Institutional & Capacity building 1% 91500.00
Sub total 436 4575000.
00
2018-19
ARABLE LAND TREATMENT
Improvement of Existing Paddy Field 81700.00
Peripheral Bunding (Rmt) 622 74640.00
Agro- Horticulture 161600.00
NON- ARABLE LAND
TREATMENT
Afforestation 232300.00
Improvement of Degraded Forest 93600.00
District Irrigation Plan
NABARD Consultancy Services 153
Agro forestry 191900.00
DRAINAGE LINE TREATMENT
Farm ponds/ Dug out Ponds 1 67160.00
C.C. Weir 1 149350.00
LIVELIHOOD ACTIVITIES 82 457500.00
PRODUCTION SYSTEM & MICRO
ENTERPRISES 22 549000.00
Administrative 3% 274500.00
Monitoring 0.20% 18300.00
Evaluation 0.30% 27450.00
Institutional & Capacity building 1% 91500.00
Sub total 728 2470500.
00
2019-20 Consolidation & With Drawal Phase 3% 274500.00
Total of Upper Umtalu 1367 609.5 8601000.
00
2 Amlare
m
(DOLR)
Soil &
Water
Conservati
on
Departme
nt
Wate
r
shed
IWMP-
10
Umkrem
Ammuto
ng,
Pemtado
ng,
Mawlong
2016-17
ARABLE LAND TREATMENT
1090
Ongoing
The
Command
area
includes
total
benefitted
area from
different
activities
4
Contour Bunding 18800.00
Peripheral Bunding (Rmt) 572.5 68700.00
Improvement of Existing Paddy Field 38700.00
Agro-Horticulture 121200.00
NON- ARABLE LAND
TREATMENT
Afforestation 181800.00
Improvement of Degraded Forest 133200.00
Agro forestry 151500.00
DRAINAGE LINE TREATMENT
Water Harvesting Structure 2 352680.00
RCC Weir 2 159670.00
LIVELIHOOD ACTIVITIES 33 163500.00
PRODUCTION SYSTEM & MICRO
ENTERPRISES 6 163500.00
Administrative 2% 327000.00
Monitoring 0.20% 32700.00
District Irrigation Plan
NABARD Consultancy Services 154
Evaluation 0.30% 49050.00
Institutional & Capacity building 2% 327000.00
Sub total 615.5 2289000.
00
2017-18
ARABLE LAND TREATMENT
Contour Bunding 291400.00
Half Moon Terrace 187500.00
Peripheral Bunding (Rmt) 352 42240.00
Crop Demonstration 2 10000.00
Agro-Horticulture 616100.00
Improvement of Existing Paddy Field 107500.00
NON- ARABLE LAND
TREATMENT
Improvement of Degraded Forest 356400.00
Afforestation 565600.00
Agro forestry 565600.00
DRAINAGE LINE TREATMENT
Water Harvesting Structure 4 705360.00
RCC Weir 11
1294630.0
0
Stone Masonry/Protection Wall/
Retaining Wall 2
1307170.0
0
LIVELIHOOD ACTIVITIES 97 490500.00
PRODUCTION SYSTEM & MICRO
ENTERPRISES 18 490500.00
Administrative 5% 817500.00
Monitoring 0.50% 81750.00
Evaluation 0.50% 81750.00
Institutional & Capacity building 1% 163500.00
Sub total 486 8175000.
00
2018-19
ARABLE LAND TREATMENT
Contour Bunding 94000.00
Half Moon Terrace 90000.00
District Irrigation Plan
NABARD Consultancy Services 155
Peripheral Bunding (Rmt) 529.25 63510.00
Improvement of Existing Paddy Field 25800.00
Agro-Horticulture 252500.00
NON- ARABLE LAND
TREATMENT
Improvement of Degraded Forest 180000.00
Afforestation 303000.00
Agro forestry 303000.00
DRAINAGE LINE TREATMENT
Water Harvesting Structure 2 351890.00
RCC Weir 2 216550.00
LIVELIHOOD ACTIVITIES 174 817500.00
PRODUCTION SYSTEM & MICRO
ENTERPRISES 36 981000.00
Administrative 3% 490500.00
Monitoring 0.20% 32700.00
Evaluation 0.30% 49050.00
Institutional & Capacity building 1% 163500.00
Sub total 743.2
5
4414500.
00
2019-20 Consolidation & With Drawal Phase
3% 490500.0
0
Total of Umkrem 1844.
75 1090
15369000
.00
3 Amlare
m
(DOLR)
Soil &
Water
Conservati
on
Departme
nt
Wate
r
shed
IWMP-
10
Amsohk
hri
Khongla
h 2016-17
ARABLE LAND TREATMENT
Contour Bunding
930
131600.00 Ongoing
The
Command
area
includes
total
benefitted
area from
4
Peripheral Bunding (Rmt) 469.25 56310.00
NON- ARABLE LAND
TREATMENT
Improvement of Degraded Forest 75600.00
Betel leaf 203000.00
Agro forestry 131300.00
DRAINAGE LINE TREATMENT
C.C. Weir 3 223060.00
District Irrigation Plan
NABARD Consultancy Services 156
RCC Weir 1 225380.00 different
activities LIVELIHOOD ACTIVITIES 28 139500.00
PRODUCTION SYSTEM & MICRO
ENTERPRISES 5 139500.00
Administrative 2% 279000.00
Monitoring 0.20% 27900.00
Evaluation 0.30% 41850.00
Institutional & Capacity building 2% 279000.00
Sub total 506.2
5
1953000.
00
2017-18
ARABLE LAND TREATMENT
Contour Bunding 169200.00
Half Moon Terrace 150000.00
Peripheral Bunding (Rmt) 249.75 29970.00
Crop Demonstration 2 10000.00
Agro-Horticulture 545400.00
NON- ARABLE LAND
TREATMENT
Improvement of Degraded Forest 205200.00
Betel leaf 735000.00
Agro forestry 454500.00
DRAINAGE LINE TREATMENT
Water Harvesting Structure 4 705360.00
C.C. Weir 12
1102120.0
0
RCC Weir 5
1054750.0
0
LIVELIHOOD ACTIVITIES 91 418500.00
PRODUCTION SYSTEM & MICRO
ENTERPRISES 17 418500.00
Administrative 5% 697500.00
Monitoring 0.50% 69750.00
Evaluation 0.50% 69750.00
Institutional & Capacity building 1% 139500.00
District Irrigation Plan
NABARD Consultancy Services 157
Sub total 380.7
5
6975000.
00
2018-19
ARABLE LAND TREATMENT
Half Moon Terrace 45000.00
Peripheral Bunding (Rmt) 564.25 67710.00
Agro-Horticulture 393900.00
NON- ARABLE LAND
TREATMENT
Improvement of Degraded Forest 108000.00
Betel leaf 168000.00
Agro forestry 272700.00
DRAINAGE LINE TREATMENT
C.C. Weir 3 288610.00
RCC Weir 1 260330.00
LIVELIHOOD ACTIVITIES 143 697500.00
PRODUCTION SYSTEM & MICRO
ENTERPRISES 29 837000.00
Administrative 3% 418500.00
Monitoring 0.20% 27900.00
Evaluation 0.30% 41850.00
Institutional & Capacity building 1% 139500.00
Sub total 740.2
5
3766500.
00
Consolidation & With Drawal Phase 3% 418500.00
Total of Amsohkhri 1627.
25 930
13113000
.00
GRAND TOTAL (I+II+ III) 4839 2629.5 37083000
.00
Irrigation
Schemes of
Line
Departme
nt of State
Soil
&
water
conse
r
DPR yet
to
prepared
villages
yet to
select 2016-17
Surface Minor Irrigation - Construction
of small RCC/CC Weir & CC
Channels
3 7 900000.00 DPR yet to
propose,
depending
on
availability
1 Construction of Water Harvesting
Structures/ Farm Ponds 3 5 600000.00
District Irrigation Plan
NABARD Consultancy Services 158
Governme
nt
vatio
n
work
s in
rural
areas
Other Ground Water Recharge -
Protection Walls 3 4 450000.00
of Fund
under State
Plan for a
particular
year
Total of 2016-17 9 16 1950000.
00
DPR yet
to
prepared
villages
yet to
select 2017-18
Surface Minor Irrigation - Construction
of small RCC & CC Weir & CC
Channel
3 7 900000.00
Construction of Water Harvesting
Structures/Farm Ponds 3 5 600000.00
Other Ground Water Recharge -
Protection Walls 3 4 450000.00
Total of 2017-18 9 16 1950000.
00
DPR yet
to
prepared
villages
yet to
select 2018-19
Surface Minor Irrigation - Construction
of small RCC/CC Weir & CC
Channels
3 7 900000.00
Construction of Water Harvesting
Structures/Farm Ponds 3 5 600000.00
Other Ground Water Recharge -
Protection Walls 3 4 450000.00
Total of 2018-19 9 16 1950000.
00
DPR yet
to
prepared
villages
yet to
select 2019-20
Surface Minor Irrigation - Construction
of small RCC/CC Weir & CC
Channels
3 7 900000.00
Construction of Water Harvesting
Structures/Farm Ponds 3 5 600000.00
Other Ground Water Recharge -
Protection Walls 3 4 450000.00
Total of 2019-20 9 16 1950000.
00
DPR yet
to
prepared
villages
yet to
select 2020-21
Surface Minor Irrigation - Construction
of small RCC/CC Weir & CC
Channels
3 7 900000.00
District Irrigation Plan
NABARD Consultancy Services 159
Construction of Water Harvesting
Structures/Farm Ponds 3 5 600000.00
Other Ground Water Recharge -
Protection Walls 3 4 450000.00
Total of 2020-21 9 16 1950000.
00
GRAND TOTAL OF IRRIGATION SCHEMES OF LINE
DEPARTMENT 45 80
9750000.
00
Rural
Infrastruct
ure
Develop
ment Fund
-
NABARD
LOAN
Soil
&
water
conse
r
vatio
n
work
s in
River
Valle
ys
2016-17
Surface Minor Irrigation - Construction
of small RCC/CC Weir & CC
Channels
2
Construction of Water Harvesting
Structures/Farm Ponds
Other Ground Water Recharge -
Protection Walls
Total of 2016-17
2017-18
Surface Minor Irrigation - Construction
of small RCC/CC Weir & CC
Channels
Construction of Water Harvesting
Structures/Farm Ponds
Other Ground Water Recharge -
Protection Walls
Total of 2017-18
2018-19
Surface Minor Irrigation - Construction
of small RCC/CC Weir & CC
Channels
Construction of Water Harvesting
Structures/Farm Ponds
Other Ground Water Recharge -
Protection Walls
Total of 2018-19
Amjalon
g FIP
Amjalon
g 2019-20
Surface Minor Irrigation - Construction
of small RCC/CC Weir & CC
Channels
4 65 7463640.0
0
New
Proposal
District Irrigation Plan
NABARD Consultancy Services 160
Construction of Water Harvesting
Structures/Farm Ponds 4 11
2579700.0
0
Other Ground Water Recharge -
Protection Walls 0 0 0
Total of 2019-20 8 76 10043340
.00
Amjalon
g FIP
Amjalon
g 2020-21
Surface Minor Irrigation - Construction
of small RCC/CC Weir & CC
Channels
3 60 5630460.0
0
New
Proposal Construction of Water Harvesting
Structures/Farm Ponds 3 9
2400000.0
0
Other Ground Water Recharge -
Protection Walls 0 0 0.0
Total of 2020-21 6 69 8030460.
00
GRAND TOTAL OF RIDF - NABARD LOAN 14 145 18073800
.00
District Irrigation Plan
NABARD Consultancy Services 161
Strategic Action Plan for Irrigation under PMKSY
(Agriculture Department)
District Irrigation Plan
NABARD Consultancy Services 162
Strategic Action Plan for Irrigation under PMKSY for the year 2016-17
Sl
no
Name of the
Block
Sub/Sub
District
Concerned
Ministry/Dept. Components Activities (Check Dams)
Total
no./Capacity
(cum)
Command
area/Irrigation
potential (in
ha)
Estimated
cost (Rs.
in Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more
crop
(Drought
proofing)
Checkdam at Ladmukhla, Wahiajer, Niriang Larnai,
Moodymmai, Nongjngi, Umladang Nartiang,
Sohphoh, Mookyndur Village under ADO
Thadlaskein. (4 no's. per village and Rs.3.5 lacs each
check dam) No.of village -10 no's.
40 no’s 80 ha 140.00 2016-17
Checkdam at Sohmynting -7 no’s Phlonginkhaw- 3
nos, Lumkhudung- 3 nos. Madur- 4 no’s, Mustem – 6
nos ,Pynthorlangtein – 7 no’s under ADO
Sohmynting circle @ Rs.3.5 lacs each check dam)
No.of village -6 nos.
30 no’s 60 ha 105.00 2016-17
Check dam at Namdong A, Namdong B,
Umjalasiaw, Thadmynri, Khonsaro, 3 no’s each
village under ADO Namdong Circle @ Rs.3.5 lacs
each check dam) No.of village -5 nos.
15 no’s 30 ha 52.50 2016-17
Check dam at Pynthor Wah, Pynthor Nein, Sabah
Muswang, Ialong, Mihmyntdu 3 nos. each village
under ADO Hqr Jowai @ Rs.3.5 lacs each check
dam). No.of village -5 nos.
15 no’s 30 ha 52.50 2016-17
2 Laskein
Block
Agriculture
PMKSY Per
drop more
crop
(Drought
proofing)
Check dam at Mookyndeng, Nongkynrih, Laskein,
Thadmuthlong, Nongryngkoh, Mookaiaw, Barato,
Shilliang Myntang, Samatan and Bhain. 4 no’s each
village @ Rs.3.5 lacs each check dam) under ADO
Laskein. No.of village -10 nos.
40 no’s 240 ha 140.00 2016-17
3
Amlarem
Sub
Division
Agri.Officer
Check dam at Muktapur, Hawai Bhoi, Lakroh,
Syndai, Mupyut, Umladkhur, Amlarem,
Moosakhiah, Shkenpyrsit and Amjalong. 4 no’s each
villages @ Rs.3.5 lacs each check dam) under SDAO
Amlarem. No.of village -10 nos.
40 no’s 160 ha 140.00 2016-17
Total 180 no's 600 ha 630.00
District Irrigation Plan
NABARD Consultancy Services 163
Sl
no
Name of the
Block Sub/Sub
District
Concerned
Ministry/Dept. Components Activities (Water Harvesting structure)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more crop
(Drought
proofing)
Water Harvesting at Mookyndur,
Umlangshor, Wahiajer, Sohphoh, Myrjai,
Mupliang, Nongbah and Khanduli under
ADO Thadlaskein (5 nos. each village @
Rs.1 lac each)
40 no’s 40 ha 40.00 2016-17
Water Harvesting at Pynthor Langtein,
Muphlang, Mustem, Sohmynting,
Phlonginkhaw and Iongnoh under ADO
Sohmynting Circle (5 nos. each village @
Rs.1 lac each)
30 nos 30 ha. 30.00 2016-17
Water Harvesting at Umjalasiaw, Lumrot
and Ksehrynshang under ADO Namdong
circle (5 nos. each village @ Rs.1 lac each)
15 no’s 15 ha. 15.00 2016-17
Water Harvesting at Pynthorwah,
Pynthornein, Ialong, Sabah Muswang,
Mihmyntdu under ADO Hqr Jowai (5
nos. each village @ Rs.1 lac each)
15 no’s 15 ha. 15.00 2016-17
2 Laskein Block Agriculture
PMKSY Per
drop more crop
(Drought
proofing)
Water Harvesting at Mootyrshiah,
Mynksan, Muthlong Rim, Raliang,
Iooksi, Khonshnong, Mooshrut, Mynso,
Shangpung Mission, Pasyih
Kyndongtuber, Myntkung, Pamanik,
Shilliang and Myntang villages under
ADO Laskein (5 nos. each village @ Rs.1
lac each) .
70 no’s 70 ha 70.00 2016-17
3
Amlarem Sub
Division
Agri.Officer
Agriculture
PMKSY Per
drop more crop
(Drought
proofing)
Water Harvesting at Thangbuli,
Umladkhur, Shkentalang, Amlarem,
Jarain and Jaralud under SDAO
Amlarem (5 nos. each village @ Rs.1 lac
each)
30 nos. 30 ha 30.00 2016-17
Total 200 no’s 200 ha 200.00
District Irrigation Plan
NABARD Consultancy Services 164
Sl
no
Name of the
Block Sub/Sub
District
Concerned
Ministry/Dept. Components Activities (Dug Well)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
Dug Well (5 nos. each village @ Rs.2
lacs each) at Madur, Ummulong,
Tyrshang, Nongbah, Myrjai, Umladang,
Mookbu, Ionglwit under ADO
Thadlaskein.
40 no’s 40 ha 80.00 2016-17
Dug well (5 nos. each village @Rs.2 lacs
each) at Sohmynting, Phlonginkhaw,
Lumkhudung, Madur, Niriang and
Mustem under ADO Sohmynting.
30 no’s 30 ha 60.00 2016-17
Dug well (5 nos. each village @ Rs.2
lacs each) at Thadmukoh, Lumrot,
Namdong B under ADO Namdong
15 no’s 15 ha 30.00 2016-17
Dug well (5 nos. each village @ Rs.2
lacs each) at Ialong, Mookaswan,
Mihmyntdu Under ADO Hqr Jowai
15 no’s 15 ha 30.00 2016-17
2 Laskein Block Agriculture
PMKSY Per
drop more crop
(Drought
proofing)
Dug well (5 nos. each village @ Rs.2
lacs each) at Madanrwan, Niawkmai,
Mukhap, Nongkynrih, Shangpung
Moolibang, Thadsning, Musiaw,
Iongkwang, Khlookynring, Pasyih,
Pamanik, Nongryngkoh, Thadbamon,
Thadialong under ADO Laskein .
70 no’s 70 ha 140.00 2016-17
3
Amlarem Sub
Division
Agri.Officer
Agriculture
Dug well (5 nos. each village @ Rs.2
lacs each) at Samanong, Madantyrpait,
Jarain, Lakroh, Hawai Bhoi, Umsalang
under SDAO Amlarem
30 no’s 30 ha 60.00 2016-17
Total 200 no’s 200 ha 400.00
District Irrigation Plan
NABARD Consultancy Services 165
Sl
no
Name of the
Block Sub/Sub
District
Concerned
Ministry/Dept. Components Activities (Tube Well)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block
Agriculture
PMKSY Per
drop more crop
(Drought
proofing)
Tube Well (5 nos. each village @
Rs.1.5 lacs each) at Mookyndur,
Umlangshor, Sohphoh, Larnai,
Mupliang Larnai, Nongrim, Bambtong
and Kdiap under ADO Thadlaskein.
40 no’s 40 ha 60.00 2016-17
Tube well (5 nos. each village @ Rs.1.5
lacs each) at Niriang, Sung valley,
letang, Chyrmang, Sohmynting and
Madur under ADO Sohmynting.
30 no’s 30 ha 45.00 2016-17
Tube well (5 nos. each village @ Rs.1.5
lacs each) at Kremlabit, Thadmynri
and Namdong A under ADO
Namdong circle.
15 nos 15 ha 22.50 2016-17
Tube well (5 nos. each village @ Rs.1.5
lacs each) at Ialong, Mihmyntdu,
Sabamuswang under ADO Hqr Jowai.
15 no’s 15 ha 22.50 2016-17
2 Laskein Block
Tube well (5 nos. each village @ Rs.1.5
lacs each) at Mynksan, Madanrwan,
Mukhap, Biar, Shangpung,
Pohshnong, Latymphu, Mynska,
Phramer, Iooksi, Umsalait, Mooshrot,
TumTum and Sammatan under ADO
Laskein.
70 no’s 70 ha 105.00 2016-17
3
Amlarem Sub
Division
Agri.Officer
Tube well (5 nos. each village @ Rs.1.5
lacs each) at Amlanai, Amlari, Jarain,
Lakroh, Hawai Bhoi and Umsalang
under SDAO Amlarem.
30 no’s 30 ha 45.00 2016-17
Total 200 no’s 200 ha 300.00
District Irrigation Plan
NABARD Consultancy Services 166
Sl
no
Name of the
Block
Sub/Sub
District
Concerned
Ministry/Dept. Components Activities (Storage reservoir Tank)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block
Agriculture
PMKSY Per
drop more crop
(Secondary
Storage
Structure)
Storage reservoir Tank at Mookyndur,
Umlangshor, Wahiajer, Sohphoh
Myrjai, Mupliang, Nongbah, Khanduli
under ADO Thadlaskein (5 nos. each
village @Rs.1 lac each)
40 no’s 40 ha 40.00 2016-17
Storage reservoir Tank at Pynthor
Langtein, Muphlang, Mustem,
Sohmynting, Phlonginkhaw, Iongnoh
under ADO Sohmynting Circle (5 nos.
each village @Rs.1 lac each)
30 no’s 30 ha. 30.00 2016-17
Storage reservoir Tank at Umjalasiaw,
Lumrot, Ksehrynshang under ADO
Namdong circle (5 nos. each village
@Rs.1 lac each)
15 no’s 15 ha. 15.00 2016-17
Storage reservoir Tank at Pynthorwah,
Pynthor nei nailing, Sabah Muswang,
Mihmyntdu under ADO Hqr Jowai(5
nos. each village @Rs.1 lac each)
15 no’s 15 ha. 15.00 2016-17
2 Laskein Block
Storage reservoir Tank at Mootyrshiah
Mynksan, Muthlong Rim, Raliang,
Iooksi, Khonshnong, Mooshrut Mynso
,Shangpung Mission, Pasyih
Kyndongtuber, Myntkung, ,Pamanik,
Shilliang Myntang villages under ADO
Laskein (5 nos. each village @Rs.1 lac
each) .
70 no’s 70 ha 70.00 2016-17
3
Amlarem Sub
Division
Agri.Officer
Storage reservoir Tank at Thangbuli,
Umladkhur, Shkentalang, Amlarem,
Jarain, Jaralud under SDAO Amlarem(5
nos. each village @Rs.1 lac each)
30 no’s 30 ha 30.00 2016-17
Total 200 no’s 200 ha 200.00
District Irrigation Plan
NABARD Consultancy Services 167
Sl
no
Name of the
Block
Sub/Sub
District
Concerned
Ministry/Dept. Components Activities (Contour bund)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block
Agriculture
PMKSY Per
drop more crop
(On Farm
Activities)
Contour Bund at 16 nos Villages under ADO
Thadlaskein (Ummulong, Maskut, Ladmukhla,
Wahiajer, Nongbah, Mihmyntdu, Mupliang,
Kdiap, Lumkya, Ladaw, Nongjngi, Iangkar,
Iongthma, Sanaro, Khyndawwaso, Saitsama)
No. of beneficiaries-160 nos
No. of beneficiaries/village-10nos @
30,000/- each
160 nos 80 ha 24.00 2016-17
Contour bund at 6 nos Villages under ADO
Sohmynting (Sohmynting, Phlongingkhaw,
Lumkhudung, Madur, Niriang, Mustem)
No of beneficiaries-60 ha
No of beneficiaries/villages-10 nos @
30,000/- each
60 nos 60 ha 18.00 2016-17
Contour bund at 3 nos Villages under ADO
Namdong (Namdong A, Namdong B,
Umjalasiaw)
No of beneficiaries-30 nos
No of beneficiaries/village-10 nos @ 30,000/-
each
30 nos 30 ha 9.00 2016-17
Contour bund at 3 nos village under ADO
HQR (Mupyut, Moosakhia, Samanong,)
No of beneficiaries - 30 nos
No of Beneficiaries/village-10 nos @
30,000/- each
30 nos 30 ha 9.00 2016-17
2 Laskein
Block
Contour bund at 28 nos villages under ADO
Laskein (Mookaiaw, Mootyrshiah, Mynksan,
Madanrwan, Laskein, Nongkynrih, Mulum,
Raliang, Madankynsaw, Rtiang, Shilliang
Myntang, Thadsning, Phain, Musiaw, Barato,
Thangrain, Myngkrem, Khlookynrin,
Thadmuthlong, Muthlongrim, Pasyih,
280 nos 140 ha 42.00 2016-17
District Irrigation Plan
NABARD Consultancy Services 168
Sl
no
Name of the
Block
Sub/Sub
District
Concerned
ministry/Dept. Components Activities (Soil And water conservation)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1
Thadlaskein
Block
Agriculture
PMKSY Per
drop more crop
(On Farm
Activities)
Soil & Water conservation at 4 nos village
under ADO Thadlaskein (Mookyndur,
Mukhla, Larnai, Moodymmai)
No. of beneficiaries-40 nos
Area covered /beneficiaries-1 ha
@20,000/- each
40 nos 40 ha 8.00 2016-17
Soil &Water conservation at 3 nos village
under ADO Sohmynting (Sohmynting,
Lumkhudung, Mustem)
No of beneficiaries-30 nos
Area covered/beneficiaries-1ha @20,000/-
each
30 nos 30ha 6.00 2016-17
Soil &Water conservation at 5 nos village
under ADO Namdong (Kremmyrsiang, 15 nos 15ha 3.00 2016-17
Kyndongtuber, Mynso, Iooksi, Khonshnong,
Sahsniang, Iongkasaro, Priang.
No. of beneficiaries- 280 nos
No. of beneficiaries/village-10 nos @
30,000/- each
3
Amlarem Sub
Division
Agril Officer
Contour bund at 12 nos Villages under ADO
Amlarem (Mupyut, Shkenpyrsit, Moosakhia,
Umsalang, Samanong, Madantyrpait,
Thangbuli, Umladkhur, Shkentalang,
Amlarem, Pdengkarong, Pamtbuh)
No of beneficiaries-120 nos
No of beneficiaries/village-10 nos @ 30,000/-
each
120 nos 60 ha 18.00 2016-17
Total 680 nos 400 ha 120.00
District Irrigation Plan
NABARD Consultancy Services 169
Thadmukoh, Lumrot, Khonsaro,
Mynkhnang)
No of beneficiaries-15 nos
Area covered/beneficiaries-1ha@20,000/-
each
Soil &Water conservation at 5 nos villages
under ADO HQR (Ialong, Mihmyntdu,
Mookaswan, Sabamuswang, Khliehtyrshi)
No. of baneficiaries-15 nos
Area covered/beneficiaries-1h@20,000/-
each
15 nos 15ha 3.00 2016-17
2 Laskein Block
Soil &Water conservation at 7 nos villages
Under ADO Laskein (Kyrwen, Tongulang,
Niawkmai, Mulien, Mookyndeng,
Shangpung, Iongkwang,
No of beneficiaries-70 nos
Area covered/beneficiaries-1ha@20,000/-
each
70 nos 70ha 14.00 2016-17
3
Amlarem Sub
Division
Agril Officer
Soil & Water conservation at 3 nos villages
under ADO Amlarem (Shkenpyrsit,
Moosakhia, Shkentalang)
No of beneficiaries - 30nos
Area covered/beneficiaries-1ha@20,000/-
each
30 nos 30ha 6.00 2016-17
Total 200 nos 200 ha 40.00
Sl
no
Name of the
Block
Sub/Sub
District
Concerned
ministry/Dept. Components Activities (Agronomic)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more crop
Agronomic at 4 nos villages under ADO
Thadlaskein (Wahrymbai, Larnai, Moopasi,
Moodop)
40 nos 40 ha 8.00 2016-17
District Irrigation Plan
NABARD Consultancy Services 170
(On Farm
Activities)
No of beneficiaries-40 nos
Area covered/beneficiaries-1 ha@ 20,000/-
each
Agronomic at 3 nos villages under ADO
Sohmynting (Madur, Muphlang ,Iongnoh)
No of beneficiaries-30 nos
Area covered/beneficiaries-1ha@ 20,000/-
each
30 nos 30 ha 6.00 2016-17
Agronomic at 5 nos villages under ADO
Namdong (Namdong A, Namdong
B,Thadmukoh,Thadmynri, Khonsaro)
No of beneficiaries-15nos
Area covered/beneficiaries -1ha @ 20,000/-
each
15 nos 15ha 3.00 2016-17
Agronomic at 5 nos villages under ADO
HQR (Khliehtyrshi, Wahrymbai, Larnai,
Ialong, Mihmyntdu)
No of beneficiaries-15nos
Area covered/beneficiaries-1ha @ 20,000/-
each
15 nos 15 ha 3.00 2016-17
2 Laskein
Block
Agronomic at 7 nos villages under ADO
Laskein (Mynso, Khonshnong, Sahsniang,
Saphai, Maitdieng, Thadbamon, Samatan)
No of beneficiaries-70 nos
Area covered/beneficiaries-1ha @ 20,000/-
each
70 nos 70 ha 14.00 2016-17
3
Amlarem Sub
Division
Agril Officer
Agronomic at 3 nos villages under DAO
Amlarem (Moopyut, Samanong, Umladkhur)
No of Beneficiaries-30 nos
Area covered/beneficiaries-1ha @ 20,000/-
each
30 nos 30 ha 6.00 2016-17
Total 200 nos 200 ha 40.00
District Irrigation Plan
NABARD Consultancy Services 171
Sl
no
Name of the
Block
Sub/Sub
District
Concerned
ministry/Dept. Components
Activities (Pipe HDPE)
Pipe HDPE 2” @ 190.70 per mtr
Total
no/Capacity
(cum)
Command
area/Irrigat
ion
potential
(in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block
Agriculture
PMKSY Per
drop more crop
(On Farm
Activities)
Pipe HDPE at 20 nos villages under ADO
Thadlaskein (Wahiajer, Mupliang, Myrjai, Rakabah,
Kdiap, Mooker, Ladaw, Nongjngi, Lumtrep, Sanaro,
Khanduli, Saitsama, Mukoiram, Nongkhroh
Mookabeng, Moobakhon, Mynsngat, Ksehrynshang
Mookjat, Moorap
No of beneficiaries-100 nos
No of pipe/beneficiaries-2 rolls @ 20,000/- per roll
No of beneficiaries/villages-5
200 rolls 200ha 40.00 2016-17
Pipe HDPE at 5 nos villages under ADO Sohmynting
(Sohmynting, Lumkhudung, Mustem, Demthring,
Iongnoh) No of beneficiaries- 50 nos
No of beneficiaries/village-10 nos
Pipe/beneficiary-3 rolls @ 20,000/- per roll
150 rolls 150ha 30.00 2016-17
Pipe HDPE at 5 nos villages under ADO Namdong
(Namdong, Umjalasiaw, Thadmynri, Thadmukoh,
Khonsaro)
No of beneficiaries-25 nos
No of beneficiaries/village-5 nos
Pipe/beneficiary-3rolls @ 20,000/- per roll
75 rolls 75ha 15.00 2016-17
Pipe HDPE at 5 nos villages under ADO HQR
(Pynthorwah, Pynthornein, Ialong Mihmyntdu,
Sabah)
No of beneficiaries-25 nos
No of beneficiaries/village-5 nos
Pipe/beneficiary-3 rolls @ 20,000/- per roll
75 rolls 75ha 15.00 2016-17
2 Laskein
Block
Pipe HDPE at 25 nos villages under ADO Laskein
(Mootyrshiah, Niawkmai, Laskein Mukhap
Madankynsaw, Mushai, Shangpung mission,
Shilliangmyntang, Thadsning, Bhain, Barato,
Kongwang, Khliehrangnah, Myngkrem,
350 rolls 350ha 70.00 2016-17
District Irrigation Plan
NABARD Consultancy Services 172
Thadmuthlong, Muthlongrim, Pasyih, Kyndongtuber,
Mynso, Iooksi, Umsalait, Nongryngkoh,
Myntangihwieh, Iawthymmei, Iongkynshur)
No of beneficiaries-175 nos
No of beneficiaries/village-7
No of pipe/beneficiary-2 rolls @ 20,000/- per roll
3
Amlarem Sub
Division
Agril Officer
Pipe HDPE at 10 nos villages under ADO Amlarem
(Amlarem, Jaralud, Sohkha, Hawaibhoi, Amsohtai,
Syndaimission, Pdengshakap, Mawlong, Amtapoh,
Nongtalang)
No of beneficiary - 50 nos
No of pipe/beneficiary - 3 rolls
No of beneficiary/village - 5 nos @ 20,000 per roll
150 rolls 150ha 30.00 2016-17
Total 1000 rolls 1000ha 200.00
Sl
no
Name of the
Block
Sub/Sub
District
Concerned
Ministry/Dept. Components Activities (Water Pump)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per drop
more crop (On
farm
Development)
Distribution of Water pump 5 nos each
village @ 45000/- each to Mookbu,
Ladaw, Kremmyrsiang, Mookyndur,
Pdein Iawmusiang, Moodymmai,
Moobakhon, Mynsngat Under ADO
Thadlaskein.
40 nos 40 ha 18.00 2016-17
Distribution of Water pump 5 nos each
village @ 45000/- each to Sohmynting,
Pynthorlangtein Mustem, Muphlang,
Phlonginkhaw, Lumkhudung under
ADO Sohmynting Circle
30 nos 30 ha 13.50 2016-17
Distribution of Water pump 5 nos each
village @ 45000/- each to Namdong A,
Namdong B, Umjalasiaw under ADO
Namdong Circle
15 nos 15 ha 6.75 2016-17
District Irrigation Plan
NABARD Consultancy Services 173
Distribution of Water pump 5 nos each
village @ 45000/- each to Pynthorwah,
Ialong, Sabah under ADO Hqr Jowai.
15 nos 15 ha 6.75 2016-17
2 Laskein Block
Distribution of Water pump 5 nos each
village @ 45000/- each to Mootyrshiah,
Laskein, Shangpung Mission, Barato
Shilliangmyntang, Mynska,
Thadmuthlong, Mynso, Iooksi,
Kyndongtuber, Sahsniang, Priang,
Maitdieng Villages under ADO Laskein
70 nos. 70 ha 31.50 2016-17
3
Amlarem Sub
Division
Agri.Officer
Distribution of Water pump 5 nos each
village @ 45000/- to Moosakhiah,
Umladkhur, Pdengkarong, Khonglah,
Sohkha, Nongtalang under SDAO
Amlarem
30 nos 30 ha 13.50 2016-17
Total 200 nos 200 ha 90.00
District Irrigation Plan
NABARD Consultancy Services 174
Strategic Action Plan for Irrigation under PMKSY for the year 2017-18
Sl no
Name of
the Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(CHECK DAM)
Total
no/Capacity
(cum)
Command
area/Irrigatio
n potential (in
ha)
Estimated
cost (Rs in
Lakh)
Period of
Implementati
on
1. Thadlaskei
n Block Agriculture
PMKSY
Per drop more
crop (Drought
proofing)
Checkdam at Laru, Ionglwit, Lumtrep,
Mynkrem, Pdeiniadaw, Saitsama, Tamu,
Nonglatem, Nongkhroh, Saitsama ,under ADO
Thadlaskein.(4 nos. per village and Rs.3.5 lacs
each check dam)
No.of village -10 nos
40 nos 160 ha 140
2017-18
Checkdam at Sohmynting Wah, Demthring,
Muphlang, Iongnoh, Chyrmang, Pynthorlangtein
under ADO Sohmynting circle(5nos. per village
@ Rs.3.5 lacs each check dam)
No.of village -6 nos
30 nos 120 ha 105
Check dam at Kremmyrsiang, Thadmukoh,
Lumrot, Khonsaro, Moorap, , 3 nos each village
under ADO Namdong Circle @ Rs.3.5 lacs each
check dam)
No.of village -5 nos
15 nos 45 ha 52.5
Check dam at Pynthor Wah, Pynthor Nein,
Sabah Muswang, Ialong, Mihmyntdu
3 nos. each village under ADO Hqr Jowai @
Rs.3.5 lacs each check dam).
No.of village -5 nos
15 nos 45 ha 52.5
Total 100 nos 370 ha 350 lakh
District Irrigation Plan
NABARD Consultancy Services 175
2. Laskein Block Agriculture
PMKSY
Per drop more
crop( Drought
proofing)
Check dam at Kyrwen, Mynksan, Iongulang,
Madanrwan, Niawkmai Mulum, Raliang, Mulieh,
Rtiang, Biar, Shangpung Mission, Thangrain,
Iongkwang, Khliehrangnah, Mynkrem,(4 nos each
village @ Rs.3.5 lacs each check dam) under ADO
Laskein.
No.of village -15 nos
60 nos 240 ha 210
2017-18
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
Check dam at Thangbuli, Khonglah, Mawngap,
Nongtalang, Twausdiah, Amsku, Amjalong,
Amsohtai, Jonguchen, Amlari (4 nos each villages@
Rs.3.5 lacs each check dam) under SDAO Amlarem.
No.of village -10 nos
40 nos 160 ha 140
Total 100 400 ha 350 lakh
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Water Harvesting structure)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY
Per drop more
crop( Drought
proofing)
Water Harvesting at Sung valley, Letang,
Mukhla, Tyrshang, Moopasi, Nartiang,
Rakabah, Umladang
under ADO Thadlaskein (5 nos. each
village @ Rs.1 lac each)
No.of villages – 8 nos.
40 nos. 40 ha 40
2017-18
Water Harvesting at Demthring, Iongnoh,
Chyrmang , Lumkhudung, Madur,
Niriang under ADO Sohmynting Circle
(5 nos. each village @ Rs.1 lac each)
No.of villages – 6 nos.
30 nos. 30 ha. 30
Water Harvesting at Namdong A,
Thadmynri, Thadmukoh, 15 nos. 15 ha. 15
District Irrigation Plan
NABARD Consultancy Services 176
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Dug Well)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1. Thadlaskein
Block Agriculture
Dug Well (5 nos. each village @ Rs.2 lacs
each) at Ladaw Kpermynsnieh,
Nongrimbambtong, Kdiap, Mooker,
Lumkya Laru, Nongjngi under ADO
Thadlaskein.
No. Of villages=8 nos.
40 nos 40 ha 80.0
under ADO Namdong circle (5 nos. each
village @ Rs.1 lac each)
No.of villages – 3 nos.
Water Harvesting at Ialong,
Sabamuswang, Mookaswan under ADO
Hqr Jowai(5 nos. each village @Rs.1 lac
each)
No.of villages – 3 nos.
15 nos. 15 ha. 15
2 Laskein Block Agriculture
PMKSY
Per drop more
crop(Drought
proofing)
Water Harvesting at Thadialong, ,Saba,
Maitdieng, Mukroh, Umdienlieng,
Priang, Iongkasaro, Myntangihwieh,
Saphai, Khyndawwaso, Psiar,
Thangthring, Tum Tum, Mooshrot,
villages under ADO Laskein (5 nos. each
village @Rs.1 lac each)
No.of villages – 14 nos.
70 nos. 70 ha
70
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
PMKSY
Per drop more
crop (Drought
proofing)
Water Harvesting at Umsalang,
Moosakhiah, Pamtbuh, Pdengkarong,
Paduwah, Khonglah under SDAO
Amlarem(5 nos. each village @Rs.1 lac
each)
No.of villages – 6 nos.
30 nos. 30 ha 30
Total 200 nos. 200 ha 200 lakh
District Irrigation Plan
NABARD Consultancy Services 177
PMKSY
Per drop more
crop (Drought
proofing)
Dug well (5 nos. each village @Rs.2 lacs
each) at Demthring, Muphlang, Iongnoh,
Chyrmang, Moobyrni, Pynthorlangtein,
under ADO Sohmynting.
No. Of villages=6 nos
30 nos 30 ha 60.0
2017-18
Dug well (5 nos. each village @Rs.2 lacs
each)at NamdongB,
Umjalasiaw,Thadmynri ,
No. Of villages=3 nos
15 nos. 15 ha 30.0
Dug well (5 nos. each village @Rs.2 lacs
each) at Sabamuswang, Khliehtyrshi,
Mihmyntdu,
No. Of villages=3 nos
15 nos. 15 ha 30.0
2. Laskein Block Agriculture
Dug well (5 nos. each village @Rs.2 lacs
each) at Mookaiaw, Mootyrshiah, Kyrwen,
Mynksan, Iongulang,
Laskein, Mulum, Raliang, Mulieh,
Madankynsaw, Rtiang,
Mushai, Biar, Latanai under ADO Laskein
No. Of villages=14 nos
70 nos 70 ha 140
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
Dug well (5 nos. each village @Rs.2 lacs
each) at Syndai Mission, Amjalong,
Jonguchen, Pamtadong, Mawlong, Amkoi
under SDAO Amlarem
No. Of villages=6 nos
30nos 30 ha 60.0
Total 200 nos 200 ha 400 lakh
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Tube Well)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1. Thadlaskein
Block Agriculture
Tube Well (5 nos. each village @Rs.1.5 lacs
each) at Nartiang, Moodop, Rakabah,
Mookbu, Mooker, Lumkya,
Laru, Ladaw, under ADO Thadlaskein.
40 nos. 40 ha 60.00
District Irrigation Plan
NABARD Consultancy Services 178
PMKSY
Per drop more
crop (Drought
proofing)
No. Of villages=8 nos
2017-18
Tube well (5 nos. each village @Rs.1.5 lacs
each) at Phlonginkhaw, Lumkhudung,
Niriang, Mustem, Demthring, Mustem,
under ADO Sohmynting.
No. Of villages=6 nos
30 nos. 30 ha 45.00
Tube well (5 nos. each village @Rs.1.5 lacs
each) at Khonsaro, Lumrot, Kremmyrsiang
under ADO Namdong circle.
No. Of villages=3 nos
15 nos. 15 ha 22.50
Tube well (5 nos. each village @Rs.1.5 lacs
each) at Ialong, Mookaswan, Mihmyntdu,
under ADO Hqr Jowai.
No. Of villages=3 nos
15 nos. 15 ha 22.50
2. Laskein Block Agriculture
Tube well (5 nos. each village @Rs.1.5 lacs
each) at Kyrwen, Iongulang, Niawkmai,
Laskein, Nongkynrih, Mulum, Raliang,
Mulieh, Madankynsaw, Rtiang,
Shilliangmyntang, Thadsning, Bhain,
Latymphu, under ADO Laskein.
No. Of villages=14 nos
70 nos. 70 ha 105.00
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
Tube well (5 nos. each village @Rs.1.5 lacs
each) at Padubah, Khonglah, Lamin,
Nongtalang, Tawahusdiah,
Muktapur under SDAO Amlarem
No. Of villages=6 nos
30 nos. 30 ha 45.00
Total 200 nos. 200 ha 300
District Irrigation Plan
NABARD Consultancy Services 179
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Storage Reservoir Tank)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY
Per drop
more crop
(Secondary
storage
structure)
Storage Reservoir Tank at Sung valley, Letang,
Mukhla, Tyrshang, Moopasi, Nartiang, Rakabah,
Umladang
under ADO Thadlaskein (5 nos. each village
@Rs.1 lac each)
No.of villages – 8 nos.
40 nos. 40 ha 40
2017-18
Storage Reservoir Tank at Demthring, Iongnoh,
Chyrmang ,Lumkhudung, Madur, Niriang under
ADO Sohmynting Circle (5 nos. each village
@Rs.1 lac each)
No.of villages – 6 nos.
30 nos. 30 ha. 30
Storage Reservoir Tank at NamdongA,
Thadmynri, Thadmukoh,
under ADO Namdong circle (5 nos. each village
@Rs.1 lac each)
No.of villages – 3 nos.
15 nos. 15 ha. 15
Storage Reservoir Tank at Ialong, Sabamuswang,
Mookaswan under ADO Hqr Jowai(5 nos. each
village @Rs.1 lac each)
No.of villages – 3 nos.
15 nos. 15 ha. 15
2 Laskein
Block Agriculture
PMKSY
Per drop
more crop
(Secondary
storage
structure)
Storage Reservoir Tank at Thadialong, ,Saba,
Maitdieng, Mukroh, Umdienlieng, Priang,
Iongkasaro, Myntangihwieh, Saphai,
Khyndawwasoo,Psiar,Thangthring, Tum Tum,
Mooshrot, villages under ADO Laskein (5 nos.
each village @Rs.1 lac each) .
No.of villages – 14 nos.
70 nos. 70 ha
70
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
PMKSY
Per drop
more crop
Storage Reservoir Tank at Umsalang,
Moosakhiah, Pamtbuh, Pdengkarong, Paduwah,
Khonglah under SDAO Amlarem(5 nos. each
village @Rs.1 lac each)
30 nos. 30 ha 30
District Irrigation Plan
NABARD Consultancy Services 180
(Secondary
storage
structure)
No.of villages – 6 nos.
Total 200 nos. 200 ha 200
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/De
pt.
Components
Activities
(Pipes and boxes)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in
ha)
Estimated
cost (Rs in
Lakh)
Period of
implementatio
n
1 Thadlaskein
Block Agriculture
PMKSY
Per drop
more crop
( On Farm
Development
Distribution
of Pipes And
Box)
Distribution of Pipes And Box at 5 nos Villages under
ADO Thadlaskein (Tyrshang, Larnai, Umladang,
Mookbu, Ionglwit)
No of beneficiaries-20
No of pipe/beneficiary-4nos @ 20,000/- each
80 nos. 80ha 16 lakh
2017-18
Distribution of Pipes and Box at 4 nos Villages under
ADO Sohmynting (Phlongingkhaw, Niriang,
Sohmynting, Muphlang)
No. of beneficiaries-15nos
No. of pipes/beneficiaries-4 @ 20,000/- each
60 nos. 60ha 12 lakh
Distribution of Pipes and Box at 3 nos Villages under
ADO Namdong (Namdong B, Kremmyrsiang,
Nongthymme)
No. of beneficiaries-10 nos
No. of pipe/beneficiaries-3nos @ 20,000/- each
30 nos. 30ha 6 lakh
Distribution of Pipes and Box at 3 nos Villages under
ADO HQR(Sabamuswang, Mihmyntdu,
Pynthorwah)
No. of beneficiaries-10nos
No. of pipes/beneficiaries-3nos @ 20,000/- each
30 nos. 30ha 6 lakh
2 Laskein
Block Agriculture
PMKSY
Per drop
more crop
Distribution of Pipes and Box at 5 nos Villages under
ADO Laskein (Mootyrshiah, Laskein, Madanrwan,
Iooksi, Thadmuthlong A)
No. of beneficiaries-28 nos
140 nos. 140ha 28 lakh
District Irrigation Plan
NABARD Consultancy Services 181
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components Activities (Contour bund)
Total
no./Capacity
(cum)
Command
area/Irrigation
potential (in
ha)
Estimated cost
(Rs. in Lakh)
Period of
Implementation
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more
crop (On
Farm
Activities)
Contour Bund at 16 nos Villages under ADO
Thadlaskein (Moodymmai, Ummulong,
Umlangshor, Shohshrieh, Tyrshang,
Sohphoh, Myrjai, Rakabah, Mooker Ladaw,
Lumstong, Takhiang, Pdieniawmusiang,
Khanduli, Bamkamar, Lapangap)
No. of beneficiaries-160 nos.
No of beneficiaries/village-10nos. @
30,000/- each
160 nos. 80 ha 24 lakh 2017-18
Contour bund at 6 nos Villages under ADO
Sohmynting (Demthring, Muphlang,
Moobyrni, Iongnoh, Chyrmang,
Pynthorlangtein)
No. of beneficiaries-60 ha
No. of beneficiaries/villages-10nos @
30,000/- each
60 nos. 60 ha 18 lakh 2017-18
Contour bund at 3 nos Villages under ADO
Namdong (Thadmynri, Kremmyrsiang,
Thadmukoh)
No. of beneficiaries-30nos.
30 nos. 30 ha 9 lakh 2017-18
No. of pipes/beneficiaries-4nos @ 20,000/- each
3
Amlarem
Sub-Division
Agri.Officer
Agriculture
PMKSY
Per drop
more crop
Distribution of Pipes and Box at 4 nos Villages under
ADO Amlarem (Hawai Bhoi, Hawai Sutnga, Lakroh
North, Lakroh South)
No. of beneficiaries-15nos
No. of pipe/beneficiaries-4 nos @ 20,000/- each
60 nos. 60ha 12 lakh
Total 400 nos. 400ha 80 lakh
District Irrigation Plan
NABARD Consultancy Services 182
No. of beneficiaries/village-10 nos. @
30,000/- each
Contour bund at 3 nos village under ADO
HQR (Sabahmuswang, Pynthowah,
Pynthornein)
No. of beneficiaries-30 nos.
No. of Beneficiaries/village-10 nos. @
30,000/- each.
30 nos. 30 ha 9 lakh 2017-18
2 Laskein
Block Agriculture
PMKSY Per
drop more
crop
Contour bund at 28 nos villages under ADO
Laskein (Kyrwen, Niawkmai, Laskein
Mukhap, Mulien, Mookyndeng, Biar,
Latymphu, Umsalang Iongkwang,
Khliehrangnah, Mynska, Pamanik, Mynskiah,
Myntkhung, Khliehumbuit, Umsalait,
Nongryngkoh, Madanrwai, Shetjahadem,
Lakadong ,Madanpohkseh, Mooshrot,
TumTum, Pdeinlapatein, Myntangtihwieh,
Thangthring, Saphai)
No. of beneficiaries/village-10 nos. @
30,000/- each.
No. of beneficiaries-280 nos.
280 nos. 140 ha 42 lakh 2017-18
3
Amlarem
Sub
Division
Agril Officer
Agriculture
PMKSY Per
drop more
crop
Contour bund at 12 nos Villages under ADO
Amlarem (Jaralud, Wahrong, Jarain Padubah,
Khonglah, Mawngap, Sohkha, Lamin,
Kudengthymmai, Nongtalang, Twahusdiah)
No. of beneficiaries-120 nos.
No. of beneficiaries/village-10 nos. @
30,000/- each
120 nos. 60 ha 18 lakh 2017-18
Total 680 400 120 Lakh
District Irrigation Plan
NABARD Consultancy Services 183
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept. Components
Activities (Soil And water
conservation)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential(in ha)
Estimated
cost(Rs in
Lakh)
Period of
implementation
1
Thadlaskein
Block
Agriculture
PMKSY Per
drop more crop
(On Farm
Activities)
Soil & Water conservation at 4 nos.
Village under ADO Thadlaskein
(Sohphoh, Kdiap, Lumstong,
Myngkrem)
No. of beneficiaries-40 nos.
Area covered /beneficiaries-1ha
@20,000/- each
40 nos. 40 ha 8 lakh 2017-18
Soil & Water conservation at 3 nos.
village under ADO Sohmynting
(Phlongingkhaw, Madur, Muphlang)
No. of beneficiaries -30 nos.
Area covered/beneficiaries-1ha
@20,000/- each
30 nos. 30 ha 6 lakh 2017-18
Soil & Water conservation at 5 nos.
village under ADO Namdong
(Namdong A, Namdong B,
Umjalasiaw, Thadmynri, Moorap)
No. of beneficiaries-15 nos.
Area covered/beneficiaries-1ha @
20,000/- each
15 nos. 15 ha 3 lakh 2017-18
Soil & Water conservation at 5 nos.
villages under ADO HQR
(Mihmyntdu, Ialong, Sabahmuswang,
Mookaswan, Khliehtyrshi) No. of
baneficiaries-15 nos.
Area covered/beneficiaries-
1h@20,000/- each
15 nos. 15 ha 3 lakh 2017-18
2 Laskein Block Agriculture PMKSY Per
drop more crop
Soil &Water conservation at 7 nos.
villages under ADO Laskein
(Latymphu, Barato, Khliehrangnah,
Pasyih, Pamanik, Mynso, Myntkhung)
No. of beneficiaries-70 nos.
70 nos. 70 ha 14 lakh 2017-18
District Irrigation Plan
NABARD Consultancy Services 184
Area covered/beneficiaries-1ha @
20,000/- each
3
Amlarem Sub
Division Agril
Officer
Agriculture PMKSY Per
drop more crop
Soil &Water conservation at 3 nos.
villages under ADO Amlarem
(Moosakhia, Samanong, Moopyut)
No. of beneficiaries-30 nos.
Area covered/beneficiaries-
1ha@20,000/- each.
30 nos. 30 ha 6 lakh 2017-18
Total 200 nos. 200 ha 40 Lakh
Sl no Name of the Block
Sub/Sub District
Connected
ministry/Dept. Components
Activities
(Agronomic)
Total
no/Capacity
(cum)
Command
area/Irrigatio
n potential(in
ha)
Estimated
cost(Rs in
Lakh)
Period of
implementation
1.
Thadlaskein
Block
Agriculture
PMKSY
Per drop more
crop (On Farm
Activities)
Agronomic at 4 nos. villages under ADO
Thadlaskein (Bamkamar, Thadmusem,
Nongkharai, Moorathud)
No. of beneficiaries-40 nos.
Area covered/beneficiaries-1 ha @ 20,000/-
each
40 nos. 40 ha 8 lakh
2017-18
Agronomic at 3 nos villages under ADO
Sohmynting (Pynthorlangtein, Iongnoh,
Mustem)
No. of beneficiaries-30 nos.
Area covered/beneficiaries-1ha@ 20,000/-
each
30 nos. 30 ha 6 lakh
Agronomic at 5 nos. villages under ADO
Namdong (Kremlabit, Namdong A,
Umjalasiaw, Mukjat, Nongmulieh)
No. of beneficiaries-15nos
Area covered/beneficiaries-1ha@ 20,000/-
each
15 nos. 15ha 3lakh
Agronomic at 5 nos. villages under ADO
HQR (Khliehtyrshi, Ialong, Sabahmuswang, 15 nos. 15 ha 3 lakh
District Irrigation Plan
NABARD Consultancy Services 185
Mihmyntdu, Mookaswan)
No. of beneficiaries-15 nos.
Area covered/beneficiaries-1ha@ 20,000/-
each
2. Laskein Block Agriculture
PMKSY
Per drop more
crop
Agronomic at 7 nos. villages under ADO
Laskein (Shilliangmyntang, Thangrain,
Mynskiah, Umsalait, Mooshrot,
Thangthring, Maitdieng)
No. of beneficiaries-70 nos
Area covered/beneficiaries-1ha@ 20,000/-
each
70 nos. 70 ha 14 lakh
3.
Amlarem Sub
Division Agril
Officer
Agriculture
PMKSY
Per drop more
crop
Agronomic at 3 nos villages under DAO
Amlarem (Shkentalang, Madantyrpait, Jarein)
No. of Beneficiaries-30 nos
Area covered/beneficiaries-1ha@ 20,000/-
each
30 nos. 30 ha 6 lakh
Total 200 nos. 200 ha 40 Lakhs
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept Components
Activities
(Pipe HDPE) Pipe HDPE 2” @190.70 per mtr.
Total
no./Capacity
(cum)
Command
area/Irrigation
potential (in
ha)
Estimated
cost (Rs in
Lakh)
Period of
Implementa
tion
1
Thadlaskein
Block
Agriculture
PMKSY Per
drop more
crop (On
Farm
Activities)
Pipe HDPE at 20 nos. villages under ADO Thadlaskein
(Nongdhar, Thadmusem, Bamkamar, Nonglatem,
Pdeintalo, Lapangap, Lakaroi, Pdieniawmusiang,
Myngkrem, Maskut, Umlangshor, Tyrshang,
Kdohkule, Nangbah, Nartiang) Lumstong, Laru,
Moodymmai, Ummulong, Mookyndur.
No. of beneficiaries -100 nos.
No. of pipe/beneficiaries - 2 rolls @20,000/- per roll
No. of beneficiaries/villages - 5
200 rolls 200 40 lakh 2017-18
District Irrigation Plan
NABARD Consultancy Services 186
Pipe HDPE at 5 nos. villages under ADO Sohmynting
(Phlongingkhaw, Madur, Niriang, Mawphlang,
Chyrmang)
No. of beneficiaries-50 nos.
No. of beneficiaries/village-10 nos.
Pipe/beneficiary-3 rolls @ 20,000/- per roll
150 rolls 150 30 lakh 2017-18
Pipe HDPE at 5 nos. villages under ADO Namdong
(Kremlabit, Mookjat, Nongthymme, Namdong B,
Thadmukoh)
No. of beneficiaries-25 nos.
No. of beneficiaries/village-5 nos.
Pipe/beneficiary-3 rolls @ 20,000/- per roll
75 rolls 75 15 lakh 2017-18
Pipe HDPE at 5 nos. villages under ADO HQR
(Pynthorwah, Pynthornein, Ialong Mihmyntdu, Sabah)
No. of beneficiaries-25 nos.
No. of beneficiaries/village-5 nos.
Pipe/beneficiary-3 rolls @ 20,000/- per roll.
75 rolls 75 15 lakh 2017-18
2 Laskein
Block Agriculture
PMKSY Per
drop more
crop
Pipe HDPE at 25 nos villages under ADO Laskein
(Samatan, Thadialong, Thadbamon, Mukroh,
Maitdieng, Umdienlieng, Saphai, Thangthring,
Iongkasaro, TumTum, Lakadong, Madanrwai,
Myntkhung, Pamanik, Mynska, Thangrain, Moobando,
Shangpung Pohshnong, Raliang, Mulieh, Nartiang,
Myngksan, Madanrwan, Biar)
No. of beneficiaries-175 nos.
No. of beneficiaries/village-7
No. of pipe/beneficiary-2 rolls @ 20,000/- per roll.
350 rolls 350 rolls 70 lakh 2017-18
3
Amlarem Sub
Division
Agril Officer
Agriculture
PMKSY Per
drop more
crop
Pipe HDPE at 10 nos villages under ADO Amlarem
(Khonglah, Dawki, Kudengthymmai, Nongtalang,
Ammutong, Amtapoh, Nongbareh, Kudengrim,
Darang, Amlanai)
No. of beneficiary-50 nos
No. of pipe/beneficiary-3 rolls
No. of beneficiary/village-5nos @ 20,000 per roll.
150 rolls 150 30 lakh 2017-18
Total 1000 rolls 1000 200 Lakh
District Irrigation Plan
NABARD Consultancy Services 187
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Water Pump)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential(in ha)
Estimated
cost(Rs in
Lakh)
Period of
implementation
1. Thadlaskein
Block Agriculture
PMKSY
Per drop more
crop
(On farm
Development)
Distribution of Water pump 5 nos. each
village @ 45000/- each to Wahiajer,
Tyrshang, Sohphoh, Larnai, Nongbah,
Nartiang, Moodop, Mupliang under ADO
Thadlaskein.
No. of villages=8 nos.
40 nos 40 ha
18.00
2017-18
Distribution of Water pump 5 nos. each
village @ 45000/- each to Sohmynting,
Madur, Niriang , Demthring, Iongnoh,
Chyrmang under ADO Sohmynting Circle
No. of villages=6 nos.
30 nos 30 ha 13.50
Distribution of Water pump 5 nos. each
village @ 45000/- each to, Thadmynri,
Kremmyrsiang, Thadmukoh under ADO
Namdong Circle.
No. of villages=3 nos.
15 nos 15 ha 6.75
Distribution of Water pump 5 nos. each
village @ 45000/- each to Mihmyntdu,
Mookaswan, Khliehtyrshi under ADO Hqr
Jowai.
No. of villages=3 nos.
15 nos 15 ha 6.75
2. Laskein Block Agriculture
Distribution of Water pump 5 nos. each
village @ 45000/- each to Samatan,
Thadialong, Thadbamon, Saba, Mukroh
Iongkynshur, Umdiengling, Iawthymme,
Saphai, Psiar Iongkasaro, Myntangtihwieh,
Thangthring Villages under ADO Laskein
No. of villages=14 nos.
70 nos. 70 ha
31.50
District Irrigation Plan
NABARD Consultancy Services 188
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
Distribution of Water pump 5 nos. each
village @ 45000/- to Dawki Bakur,
Amlympiang, Lamin, Kudengthymmai,
Twausdiah, Rhongkumunder SDAO
Amlarem
No. of villages=6 nos.
30 nos 30 ha 13.50
Total 200 nos 200 ha 90.00 lakh
District Irrigation Plan
NABARD Consultancy Services 189
Strategic Action Plan for Irrigation under PMKSY for the year 2018-19
Sl no
Name of the
Block
Sub/Sub
District
Connected
ministry/De
pt.
Components Activities
(CHECK DAM)
Total
no/Capacity
(cum)
Command area
(in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementatio
n
1. Thadlaskein
Block Agriculture
PMKSY
Per drop
more crop
(Drought
proofing)
Checkdam at Moodymmai, Ummulong,
Mookyndur, Wahiajer, Tyrshang, Sohphoh,
Larnai under ADO Thadlaskein.(4 nos. per
village and Rs.3.5 lacs each check dam)
No.of village -10 nos.
40 nos. 160 ha 140.00
2018-19
Checkdam at Sohmynting Wah, Demthring,
Muphlang, Iongnoh, Chyrmang,
Pynthorlangtein under ADO Sohmynting
circle (5nos. per village @ Rs.3.5 lacs each
check dam)
No.of village -6 nos.
30 nos. 120 ha 105.00
Check dam at Namdong A, Thadmynri,
Moorap Umjalasiaw, Nongthymme, 3 nos.
each village under ADO Namdong Circle @
Rs.3.5 lacs each check dam)
No.of village -5 nos.
15 nos. 45 ha 52.50
Check dam at Khlietyrshi, Mookaswan,
Ialong, Sabah Muswang, Mihmyntdu 3 nos.
each village under ADO Hqr Jowai @ Rs.3.5
lacs each check dam).
No.of village -5 nos.
15 nos. 45 ha 52.50
Total 100 nos. 370 ha 350.00 lakh
District Irrigation Plan
NABARD Consultancy Services 190
2. Laskein
Block Agriculture
PMKSY
Per drop
more crop
(Drought
proofing)
Check dam at Moobando, Umsalang, Barato,
Khliehsniriang, Thangrain, Khliehrangnah,
Mynkrem, Mynska, Thadmuthlong,
Muthlongrim, Kyndongtuber, Pamanik,
Mynso, Mynskiah, Myntkung (4 nos each
village @ Rs.3.5 lacs each check dam) under
ADO Laskein.
No.of village -15 nos.
60 nos.
240 ha 210
2018-19
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
Check dam at Lurniang, Ammutong,
Amtapoh, Nongbareh, Kudengrim,
Shnongpdeng, Darrang, Amsohrhong,
Amlanai, Pasadwar (4 nos. each villages@
Rs.3.5 lacs each check dam) under SDAO
Amlarem.
No.of village -10 nos.
40 nos. 160 ha 140
Total 100 nos. 400 ha 350 lakh
Grand Total 200 nos. 770 ha 700 lakh
Sl no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Water Harvesting structure)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY
Per drop
more crop
(Drought
proofing)
Water Harvesting at Nongrimbambtong,
Kdiap, Mooker, Lumkya, Laru, Nongjngi,
Ionglwit, Lumstong under ADO Thadlaskein
(5 nos. each village @Rs.1 lac each)
No.of villages – 8 nos.
40 nos. 40 ha 40
2018-19
Water Harvesting at Sohmynting Nein,
Iongnoh, Niriang, Lumkhudung, Madur,
Pynthorlangtein under ADO Sohmynting
Circle (5 nos. each village @Rs.1 lac each)
30 nos. 30 ha. 30
District Irrigation Plan
NABARD Consultancy Services 191
No.of villages – 6 nos.
Water Harvesting at Khonsaro, Mynkhnang,
Namdong B circle (5 nos. each village @Rs.1
lac each)
No.of villages – 3 nos.
15 nos. 15 ha. 15
Water Harvesting at Mihmyntdu, Ialong,
Sabahmuswang, Mookaswan, Pynthorwah,
under ADO Hqr Jowai(5 nos. each village @
Rs.1 lac each)
No.of villages – 3 nos.
15 nos. 15 ha. 15
2 Laskein
Block Agriculture
PMKSY
Per drop
more
crop(Drought
proofing)
Water Harvesting at Mookaiaw,
Mootyrshaih, Mukhap, Nongkynrih, Mulum,
Mulieh, Madankynsaw, Raliang, Rtiang,
Biar, Shangpung Khliemuchut,
Shilliangmyntang, Bhain, Thadsning villages
under ADO Laskein (5 nos. each village
@Rs.1 lac each) .
No.of villages – 14 nos.
70 nos. 70 ha
70
3.
Amlarem
Sub
Division
Agri.Officer
Agriculture
PMKSY
Per drop
more crop
(Drought
proofing)
Water Harvesting at Mupyut, Shkenpyrsit,
Samanong, Madantyrpait, Mawngap, Dawki
under SDAO Amlarem(5 nos. each village
@Rs.1 lac each)
No.of villages – 6 nos.
30 nos. 30 ha 30
Total 200 nos. 200 ha 200 lakh
District Irrigation Plan
NABARD Consultancy Services 192
Sl no
Name of the
Block
Sub/Sub
District
Connected
ministry/De
pt.
Components Activities (Dug Well)
Total
no/Capacity
(cum)
Command area
(in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more
crop
(Drought
proofing)
Dug Well (5 nos. each village @Rs.2 lacs each)
at Mookyndur, Moodymmai, Umlangshor,
Shohshrieh, Wahiajer, Sohphoh, Larnai,
Moopasi, under ADO Thadlaskein.
No. of villages=8 nos.
40 nos. 40 ha 80.00 2018-19
Dug well (5 nos. each village @Rs.2 lacs each) at
Sohmynting, Demthring, Muphlang, Iongnoh,
Niriang, Pynthorlangtein under ADO
Sohmynting.
No. of villages=6 nos.
30 nos. 30 ha 60.00 2018-19
Dug well (5 nos. each village @Rs.2 lacs each) at
Khonsaro, Mynkhnang, Moorap
No. of villages=3 nos.
15 nos. 15 ha 30.00 2018-19
Dug well (5 nos. each village @Rs.2 lacs each) at
Ialong, Khliehtyrshi, Mihmyntdu.
No. of villages=3 nos.
15 nos. 15 ha 30.00 2018-19
2 Laskein
Block Agriculture
Dug well (5 nos. each village @Rs.2 lacs each) at
Iooksi, Umsalait, Nongryngkoh, Madanrwai,
Lakadong, Sahsniang, Mooshrot, TumTum,
Pdeinlapatein, Myntangtihwieh, Iongkasaro,
Thangthring, Psiar, Saphai, under ADO Laskein.
No. of villages=14 nos.
70 nos. 70 ha 140.00 2018-19
3
Amlarem Sub
Division
Agri.Officer
Agriculture
Dug well (5 nos. each village @Rs.2 lacs each) at
Sohkha, Lamin, Muktapur, Amsku, Hawai
Sutnga, Sankhad under SDAO Amlarem.
No. of villages=6 nos.
30 nos. 30 ha 60.00 2018-19
Total 200 nos. 200 ha 400 lakh
District Irrigation Plan
NABARD Consultancy Services 193
Sl no
Name of the
Block
Sub/Sub
District
Connected
ministry/De
pt.
Components Activities
(Tube Well)
Total
no./Capacity
(cum)
Command area
(in ha)
Estimated cost
(Rs in Lakh)
Period of
implementation
1. Thadlaskein
Block Agriculture
PMKSY
Per drop
more crop
(Drought
proofing)
Tube Well (5 nos. each village @ Rs.1.5 lacs
each) at Myrjai, Umladang, Moolephaw,
Iangkar, Lumtrep, Madansynrang, Mynkrem,
Pdeiniadaw under ADO Thadlaskein.
No. of villages=8 nos.
40 nos. 40 ha 60.00
2018-19
Tube well (5 nos. each village @ Rs.1.5 lacs
each) at Iongnoh, Pynthorlangtein, Sohmynting,
Muphlang, Mustem, Lumkhudung under ADO
Sohmynting.
No. of villages=6 nos.
30 nos. 30 ha 45.00
Tube well (5 nos. each village @ Rs.1.5 lacs
each) at Umjalasiaw, Namdong B, Moorap
under ADO Namdong circle.
No. of villages=3 nos.
15 nos. 15 ha 22.50
Tube well (5 nos. each village @ Rs.1.5 lacs
each) at Sabahmuswang, Khliehtyrshi, Ialong
under ADO Hqr Jowai.
No. of villages=3 nos.
15 nos. 15 ha 22.50
2. Laskein
Block Agriculture
Tube well (5 nos. each village @Rs.1.5 lacs each)
at, Musiaw, Umsalang, Khliehsniriang, Barato,
Thangrain, Iongkwang, Mynkrem
Khliehrangnah, Mynska, Khlookynrin,
Thadmuthlong, Muthlongrim, Pasyih,
Kyndongtuber under ADO Laskein.
No. of villages=14 nos.
70 nos. 70 ha 105.00
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
Tube well (5 nos. each village @Rs.1.5 lacs each)
at Amjalong, Syndai Mission, Amsohtai,
Jonguchen, Pdengshakap, Lurniang under
SDAO Amlarem.
No. of villages=6 nos.
30 nos. 30 ha 45.00
Total 200 nos. 200 ha 300 lakh
District Irrigation Plan
NABARD Consultancy Services 194
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Storage Reservoir Tank)
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY
Per drop more
crop
(Secondary
storage
Structure)
Storage Reservoir Tank at Nongrimbambtong,
Kdiap, Mooker, Lumkya, Laru, Nongjngi,
Ionglwit, Lumstong under ADO Thadlaskein (5
nos. each village @Rs.1 lac each)
No.of villages – 8 nos.
40 nos 40 ha 40
2018-19
Storage Reservoir Tank at Sohmynting Nein,
Iongnoh, Niriang ,Lumkhudung, Madur,
Pynthorlangtein under ADO Sohmynting Circle
(5 nos. each village @ Rs.1 lac each)
No.of villages – 6 nos.
30 nos. 30 ha. 30
Storage Reservoir Tank at Khonsaro,
Mynkhnang,
Namdong B, under ADO Namdong circle (5 nos.
each village @Rs.1 lac each)
No.of villages – 3 nos.
15 nos. 15 ha. 15
Storage Reservoir Tank at Mihmyntdu ,Ialong,
Sabahmuswang, Mookaswan, Pynthorwah,
under ADO Hqr Jowai (5 nos. each village
@Rs.1 lac each)
No.of villages – 3 nos.
15 nos. 15 ha. 15
2 Laskein Block Agriculture
PMKSY
Per drop more
crop
(Secondary
storage
Structure)
Storage Reservoir Tank at Mookaiaw
,Mootyrshaih, Mukhap, Nongkynrih, Mulum,
Mulieh, Madankynsaw, Raliang, Rtiang, Biar,
Shangpung Khliemuchut, Shilliangmyntang,
Bhain, Thadsning, villages under ADO Laskein
(5 nos. each village @Rs.1 lac each) .
No.of villages – 14 nos.
70 nos. 70 ha 70
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
PMKSY
Per drop more
crop
Storage Reservoir Tank at Mupyut, Shkenpyrsit,
Samanong, Madantyrpait, Mawngap, Dawki
under SDAO Amlarem (5 nos. each village @
Rs.1 lac each)
No.of villages – 6 nos.
30 nos. 30 ha 30
District Irrigation Plan
NABARD Consultancy Services 195
(Secondary
storage
Structure)
Total 200 nos. 200 ha 200 lakh
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Pipes and boxes)
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY
Per drop more crop
( On Farm
Development
Distribution of
Pipes And Box)
Distribution of Pipes And Box at 5 nos.
Villages under ADO Thadlaskein
(Nongkharai, Thadmusem, Lumlakhiat,
Khyndawwaso, Ionglawit)
No. of beneficiaries-20
No. of pipe/beneficiary-4nos @
20,000/- each
80 nos. 80 ha 16 lakh
2018-19
Distribution of Pipes and Box at 4 nos.
Villages under ADO Sohmynting
(Chyrmang, Iongnoh, Pynthorlangtein,
Muphlang)
No. of beneficiaries-15 nos.
No. of pipes/beneficiaries-4 @ 20,000/-
each
60 nos. 60 ha 12 lakh
Distribution of Pipes and Box at 3 nos.
Villages under ADO Namdong
(Namdong B,Thadmynri,Thadmukoh)
No. of beneficiaries-10 nos.
No. of pipe/beneficiaries-3nos @
20,000/- each
30 nos. 30 ha 6 lakh
District Irrigation Plan
NABARD Consultancy Services 196
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components Activities (Contour bund)
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementatio
n
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more crop
(On Farm
Activities)
Contour Bund at 16 nos. Villages under ADO
Thadlaskein (Mookyndur, Moopyllaitsyiar,
Tyrshang, Sohphoh, Lyrnai, Kdohkule, Moopasi,
Moodop, Nartiang, Rakabah, Nongrimbambtong,
Umladang, Mukboo, Mooker, Laru, Lumstong)
No. of beneficiaries-160 nos.
160 nos. 80 ha 24 2018-19
Distribution of Pipes and Box at 3 nos.
Villages under ADO HQR (Pynthorwah,
Pynthornein, Ialong)
No. of beneficiaries-10 nos.
No. of pipes/beneficiaries-3nos @
20,000/- each
30 nos. 30 ha 6 lakh
2 Laskein Block Agriculture PMKSY
Per drop more crop
Distribution of Pipes and Box at 5 nos
Villages under ADO Laskein (Samatan,
Mukroh, Sahsniang, Umsalait,
Mynskiah)
No. of beneficiaries-28 nos.
No. of pipes/beneficiaries-4nos @
20,000/- each
140 nos. 140 ha 28 lakh
3
Amlarem Sub-
Division
Agri.Officer
Agriculture PMKSY
Per drop more crop
Distribution of Pipes and Box at 4 nos
Villages under ADO
Amlarem(Hawai Sutnga, Lakroh North,
Lakroh South, Muktapur)
No. of beneficiaries-15nos.
No. of pipe/beneficiaries- 4 nos. @
20,000/- each
60 nos. 60 ha 12 lakh
Total 400 nos. 400 ha 80 lakh
District Irrigation Plan
NABARD Consultancy Services 197
No. of beneficiaries/village-10nos @ 30,000/-
each
Contour bund at 6 nos Villages under ADO
Sohmynting (Demthring, Muphlang, Iongnoh,
Chyrmang, Pynthorlangtein, Moobyrni)
No. of beneficiaries-60 ha
No. of beneficiaries/villages-10nos @ 30,000/-
each
60 nos. 60 ha 18 2018-19
Contour bund at 3 nos. Villages under ADO
Namdong (Thadmynri, Kremmyrsiang,
Thadmukoh)
No. of beneficiaries-30 nos.
No. of beneficiaries/village-10nos @ 30,000/-
each
30 nos. 30 ha 9 2018-19
Contour bund at 3 nos. village under ADO HQR
(Mookaswan, Sabahmuswang, Ialong)
No. of beneficiaries-30 nos.
No. of Beneficiaries/village-10 nos @ 30,000/-
each.
30 nos. 30 ha 9 2018-19
2 Laskein Block Agriculture PMKSY Per
drop more crop
Contour bund at 28 nos. villages under ADO
Laskein (Moobandu, Latymphu, Musiaw,
Umsalang, Khliehsniriang, Barato, Thangrain,
Khliehrangnah, Mynska, Khlookynrin,
Thadmuthlong, Muthlongrim, Phramer, Pasyih,
Kyndongtuber, Pamanik, Mynso ,Mynskiah,
Myntkhung, Khliehumbuit, Iooksi, Umsalait,
Nongryngkoh, Khonshnong, Madanrwai,
Shetjahadem, Madanpohkseh, Lakadong)
No. of beneficiaries-280 nos.
No. of beneficiaries/village-10nos @ 30,000/-
each
280 nos. 140 ha 42 2018-19
District Irrigation Plan
NABARD Consultancy Services 198
3
Amlarem Sub
Division
Agril Officer
Agriculture PMKSY Per
drop more crop
Contour bund at 12 nos Villages under ADO
Amlarem (Jaralud, Wahrong, Jarain, Paduwah,
Khonglah, Mawngap, Dawkibukur, Latang,
Tamabil, Riahjalong, Amlangpiang, Sohkha)
No. of beneficiaries-120 nos.
No. of beneficiaries/village-10 nos @ 30,000/-
each
120 nos. 60 ha 18 2018-19
Total 680 400 120 Lakh
Sl
n
o
Name of the
Block Sub/Sub
District
Connected
ministry/Dept
.
Components Activities (Soil And water conservation)
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs
in Lakh)
Period of
implementati
on
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more crop
(On Farm
Activities)
Soil & Water conservation at 4 nos village under
ADO Thadlaskein (Maskut, Umlangshor,
Shohshrieh, Mookynniang)
No. of beneficiaries-40 nos.
Area covered /beneficiaries-1ha @20,000/- each
40 nos. 40 ha 8 lakh
Soil & Water conservation at 3 nos village under
ADO Sohmynting (Phlongingkhaw, Madur,
Niriang)
No. of beneficiaries-30 nos.
Area covered/beneficiaries-1ha @ 20,000/- each
30 nos. 30ha 6 lakh 2018-19
Soil &Water conservation at 5 nos village under
ADO Namdong (Kremlabit, Nongmulieh, Mookjat,
Nongthymme, Moorap)
No. of beneficiaries-15 nos.
Area covered/beneficiaries-1ha @ 20,000/- each
15 nos. 15ha 3lakh
Soil &Water conservation at 5 nos villages under
ADO HQR (Ialong, Mihmyntdu, Mookaswan,
Sabahmuswang, Khliehtyrshi)
No. of baneficiaries-15 nos.
Area covered/beneficiaries-1h@20,000/- each
15 nos. 15ha 3 lakh
2 Laskein Block Agriculture PMKSY Per
drop more crop
Soil &Water conservation at 7 nos villages Under
ADO Laskein (Shilliangmyntang, Thadsning, 70 nos. 70ha 14 lakh
District Irrigation Plan
NABARD Consultancy Services 199
Thangrain, Barato, Samatan, Thadialong,
Thadbamon)
No. of beneficiaries-70 nos.
Area covered/beneficiaries-1ha @ 20,000/- each
3
Amlarem Sub
Division Agril
Officer
Agriculture PMKSY Per
drop more crop
Soil &Water conservation at 3 nos villages under
ADO Amlarem (Nongtalang, Syndai Shnong,
Pdeinshakap)
No. of beneficiaries-30 nos.
Area covered/beneficiaries-1ha@20,000/- each.
30 nos. 30ha 6 lakh
Total 200 nos 200 ha 40 Lakh
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept. Components Activities (Agronomic)
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated
cost(Rs in
Lakh)
Period of
implementation
1 Thadlaskein Agriculture
PMKSY Per drop
more crop (On
Farm Activities)
Agronomic at 4 nos villages under ADO
Thadlaskein (Myrjai, Umladang, Mukbu,
Nongjngi)
No. of beneficiaries - 40 nos.
Area covered/beneficiaries-1 ha @
20,000/- each
40 nos. 40 ha 8 lakh 2018-19
Agronomic at 3 nos villages under ADO
Sohmynting (Sohmynting,
Phlongingkhaw, Lumkhudung)
No. of beneficiaries - 30 nos.
Area covered/beneficiaries-1ha @
20,000/- each
30 nos. 30 ha 6 lakh 2018-19
Agronomic at 5 nos villages under ADO
Namdong (Lumrot, Kremmyrsiang,
Moorap, Nongthymme, Mookjat)
No. of beneficiaries-15 nos.
Area covered/beneficiaries-1ha @
20,000/- each
15 nos. 15ha 3lakh 2018-19
District Irrigation Plan
NABARD Consultancy Services 200
Agronomic at 5 nos villages under ADO
HQR (Khliehtyrshi, Ialong, Mihmyntdu,
Mookaswan, Sabahmuswang)
No. of beneficiaries-15 nos.
Area covered/beneficiaries-1ha@
20,000/- each.
15 nos. 15 ha 3 lakh 2018-19
2 Laskein Block Agriculture PMKSY Per drop
more crop
Agronomic at 7 nos villages under ADO
Laskein (Mookaiaw, Mookhap, Raliang,
Madankynsaw, Shangpung Mission,
Shilliangmyntang, Bhain)
No. of beneficiaries-70 nos.
Area covered/beneficiaries-1ha @
20,000/- each.
70 nos. 70 ha 14 lakh 2018-19
3
Amlarem Sub
Division Agril
Officer
Agriculture PMKSY Per drop
more crop
Agronomic at 3 nos villages under DAO
Amlarem (Moosakhia, Thangbuli,
Amlarem)
No. of Beneficiaries-30 nos.
Area covered/beneficiaries-1ha @
20,000/- each.
30 nos. 30 ha 6 lakh 2018-19
Total 200 nos 200 ha 40 Lakh
Sl
n
o
Name of the
Block Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Pipe HDPE)
Pipe HDPE 2” @190.70per mtr
Total
no/Capacity
(cum)
Command area
(in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementatio
n
1.
Thadlaskein
Block
Agriculture
PMKSY
Pipe HDPE at 20 nos villages under
ADO Thadlaskein (Shohshrieh,
Ladmukhla, Tyrshang, Larnai,
Ionglwit, Madansynrang, Takhniang,
Ringkyrtein, Tamu, Umshangiar,
Nongkharai, Moorathud, Nongmulieh,
Shiabnai, Khyndawwaso, Moolephaw,
Lumkya, Umbluh Mynsning, Mookbu,
Umladang)
No. of beneficiaries-100 nos.
200 rolls 200 40 lakh
District Irrigation Plan
NABARD Consultancy Services 201
Per drop more
crop(On Farm
Activities)
No. of pipe/beneficiaries-2 rolls
@20,000/- per roll
No. of beneficiaries/villages-5
2018-19
Pipe HDPE at 5 nos villages under
ADO Sohmynting (Phlongingkhaw,
Madur, Niriang, Muphlang,
Pynthorlangtein)
No. of beneficiaries-50 nos
No. of beneficiaries/village-10 nos
Pipe/beneficiary-3 rolls @ 20,000/-
per roll
150 rolls 150 30 lakh
Pipe HDPE at 5 nos villages under
ADO Namdong (Thadmukoh,
Kremmyrsiang, Namdong B,
Nongthymme, Kremlabit)
No. of beneficiaries-25 nos
No. of beneficiaries/village-5nos
Pipe/beneficiary-3rolls @ 20,000/-
per roll
75 rolls 75 15 lakh
Pipe HDPE at 5 nos villages under
ADO HQR (Khliehtyrshi,
Pynthorwah, Pynthornein, Ialong,
Sabahmuswang)
No. of beneficiaries-25 nos
No. of beneficiaries/village-5 nos
Pipe/beneficiary-3 rolls @ 20,000/-
per roll
75 rolls 75 15 lakh
2. Laskein Block Agriculture
PMKSY
Per drop more
crop
Pipe HDPE at 25 nos villages under
ADO Laskein (Mookaiaw, Kyrwen,
Myngksan, Iongulang, Madanrwan,
Nongkynrih, Mulom, Raliang, Mulieh,
Mookyndeng, Rtiang, Biar,
Shangpung mission, Moobandu,
Latymphu Musiaw, Umsalang,
350 rolls 350 70 lakh
District Irrigation Plan
NABARD Consultancy Services 202
Khliehsniriang, Thangrein, Mynska,
Khlookynrin, Pamanik, Mynskiah,
Myntkhung, Khliehumbuit)
No. of beneficiaries-175 nos.
No. of beneficiaries/village-7
No. of pipe/beneficiary-2 rolls @
20,000/- per roll
3.
Amlarem Sub
Division Agril
Officer
Agriculture
PMKSY
Per drop more
crop
Pipe HDPE at 10 nos villages under
ADO Amlarem (Muktapur, Hawai
Sutnga, Lakroh North, Lakroh South,
Syndaimission, Lurniang, Amlari,
Pdengkseh, Shnongpdeng, Amtra)
No. of beneficiary-50 nos
No. of pipe/beneficiary-3 rolls
No. of beneficiary/village-5nos @
20,000 per roll
150 roll 150 30 lakh
Total 1000 rolls 1000 200 Lakhs
Sl
n
o
Name of the
Block
Sub/Sub
District
Connected
ministry/Dep
t.
Components
Activities
(Water Pump)
Total
no/Capacit
y (cum)
Command
area (in ha)
Estimated
cost (Rs. in
Lakh)
Period of
implement
ation
1. Thadlaskein
Block Agriculture
PMKSY
Per drop more
crop
Distribution of Water pump 5 nos each village @ 45000/-
each to Mynkrem, Pdeiniadaw, Khanduli, Saitsama.
Tamu, Nonglatem, Bamkamar, Thadmusem under ADO
Thadlaskein.
No. of villages=8 nos.
40 nos 40 ha 18.00
Distribution of Water pump 5 nos each village @ 45000/-
each to Sohmynting ,Demthring, Mustem, Muphlang,
Niriang, Pynthorlangtein, Under ADO Sohmynting Circle
No. of villages=6 nos.
30 nos 30 ha 13.50
Distribution of Water pump 5 nos each village @ 45000/-
each to Kremlabit, Mookjat, Nongmulieh Under ADO
Namdong Circle
15 nos 15 ha 6.75
District Irrigation Plan
NABARD Consultancy Services 203
(On farm
Development)
No. of villages=3 nos. 2018-19
Distribution of Water pump 5 nos each village @ 45000/-
each to Mihmyntdu, Sabahmuswang, Khliehtyrshi, Under
ADO Hqr Jowai.
No. of villages=3 nos.
15 nos 15 ha 6.75
2. Laskein
Block Agriculture
Distribution of Water pump 5 nos each village @ 45000/-
each to Mooshrot, TumTum, Umsalait, Nongryngkoh,
Khonshnong, Madanrwai, Shetjahadem, Madanpohkseh,
Lakadong, Pasyih Khliehumbuit, Myntkung, Mynskiah,
Pamanik, Villages under ADO Laskein
No. of villages=14 nos.
70 nos. 70 ha 31.50
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
Distribution of Water pump 5 nos each village @ 45000/-
to Umsalang, Wahrong, Muktapur, Hawaibhoi,
Hawaisutnga, Lakrohsouth, Amjalong under SDAO
Amlarem
No. of villages=6 nos.
30 nos 30 ha 13.50
Total 200 nos 200 ha 90.00 lakh
District Irrigation Plan
NABARD Consultancy Services 204
Strategic Action Plan for Irrigation under PMSY for the year 2019-20
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept. Components Activities
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs. in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more crop
(Drought
proofing)
Checkdam at Nangbah, Moopasi, Nartiang,
Mupliang, Rakabah, Nongrimbambtong,
Myrjai, Kdiap Village under ADO
Thadlaskein. (5 nos. per village @ Rs.3.5 lacs
each check dam) No. of village: 8 nos.
40 nos. 160 ha 140.00 2019-20
Checkdam at Sohmynting, Pynthorlangtein
Niriang, Muphlang, Mustemunder ADO
Sohmynting circle. (5 nos. per village @ Rs.3.5
lacs each check dam) No. of village: 6 nos.
30 nos. 120 ha 105.00 2019-20
Check dam at Nongthymme, Moorap, Lumrot
( 5nos each village under ADO Namdong
Circle @ Rs.3.5 lacs each check dam) No. of
village: 3 nos.
15 nos. 45 ha 52.50 2019-20
Check dam at Pynthor Wah, Pynthor Nein,
abah Muswang, (5nos. each village under
ADO Hqr Jowai @ Rs.3.5 lacs each check
dam). No. of village: 3 nos.
15 nos. 45 ha 52.50 2019-20
Total 100 nos. 370 ha 350.00 lakh
2 Laskein Block Agriculture PMKSY Per
drop more crop
(Drought
proofing)
Check dam at Mukhap, Mulieh, Muchai, Biar,
Shangpung Mission, Latymphu, Umsalang,
Khliehsniriang, Lummuphan,
Chutwakhusarhen, Lumlyntur, Shangpung
Moolibang. (5 nos each village @ Rs.3.5 lacs
each check dam) under ADO Laskein. No.of
village : 12 nos.
60 nos. 240 ha 210.00 2019-20
3
Amlarem Sub
Division
Agri.Officer
Agriculture
Check dam at Lymba, Lumpyngad, Jaliakhola,
Hawaibhoi, Lakroh North, Hawaisutnga,
Muktapur Pdengkarong, Syndai Shnong, 40 nos. 160 ha 140.00 2019-20
District Irrigation Plan
NABARD Consultancy Services 205
Amjalong. (4 nos. each villages @ Rs.3.5 lacs
each check dam) under SDAO Amlarem.
No.of village: 10 nos.
Total 100 nos. 400 ha 350.00 lakh
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Water Harvesting Structures)
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block
Agriculture
PMKSY
Per drop more
crop
(Drought
proofing)
PMKSY
Water Harvesting at Wahrymbai, Kdohkule,
Moolephaw Kpermynsnieh, Mookbu, Umbluh
Mynsning, Ladaw, Iangkar, Laru, Ladaw, Lumtrep.
Madansynrang, Mynkrem, Takhniang, Pdeiniadaw,
Sanaro, Pdieniawmusiang, Ringkyrtein
Khyndawwaso, Saphohwaiong, under ADO
Thadlaskein (5 nos. each village @Rs.1 lac each)
No. of village: 20 nos.
100 nos.
100 ha
100
2019-20
2 Laskein
Block
Water Harvesting at Samatan, Sookhlieh,
Lumuriap, Thadbamon, Saba, Iongkynshur,
Khatkasla, Nohkrei Pdeinlapatein, Sahsniang,
Pohriat, Chutwakhusarhen, Lakadong,
Madanpohkseh villages under ADO Laskein (5 nos.
each village @ Rs.1 lac each) .
No. of village: 14 nos.
70 nos. 70 ha 70
3.
Amlarem
Sub Division
Agri.Officer
Water Harvesting at Wahrong, Padubah, Khonglah,
Latang, Tamabil, Riahjalong under SDAO
Amlarem (5 nos. each village @ Rs.1 lac each)
No. of village:6 nos.
30 nos. 30 ha 30
Total 200 nos. 200 ha 200 lakh
District Irrigation Plan
NABARD Consultancy Services 206
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept
.
Components
Activities
(Dug Well)
Total
no./Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1. Thadlaskein
Block Agriculture
PMKSY
Per drop more
crop (Drought
proofing)
Dug Well at Moobakhon, Mynsngat, Moolyngkein,
Ksehrynshang, Nonglatem, Bamkamar, Thadmusem,
Nongkhroh, Umrakia, Nongkharai, Moorathud,
Mookabeng, Nongdhar, Ionshiwait, Nongkhyllep,
Khanduli, Saitsama, Tamu, Mukoiram, Umshangiar
(5 nos. each village @ Rs.2 lacs each) under ADO
Thadlaskein.
No. of village: 20 nos.
100 nos. 100 ha 200.00
2019-20 2.
Laskein
Block Agriculture
Dug well at Umdiengling, Mukroh, Maitdieng,
Sookhlieh Iongkynshur, Saba, Thadbamon,
Lummuriap, Thadialong, Samatan, Iongkalang,
Khliehumbuit, Phramer, Shangpung Pohshnong (5
nos. each village @ Rs.2 lacs each) under ADO
Laskein .
No. of village: 14 nos.
70 nos. 70 ha 140.00
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
Dug well at Satpator, Trangblang, Ammutong,
Amtapoh, Amsohtai, Pdengshakap (5 nos. each
village @ Rs.2 lacs each) under SDAO Amlarem
No. of village: 6 nos.
30 nos. 30 ha 60.00
Total 200 nos. 200 ha 400.00 lakh
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Tube Well)
Total
no./Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more
Tube Well at Moobakhon, Mynsngat, Moolyngkein,
Ksehrynshang, Kremlabit, Nongmulieh, Mookjat,
Nongthymme, Nonglatem, Bamkamar, Thadmusem,
100 nos. 100 ha 150.00
District Irrigation Plan
NABARD Consultancy Services 207
crop
(Drought
proofing)
Nongkhroh, Nongkharai, Moorathud, Mookabeng,
Nongdhar, Ionshiwait, Khanduli, Saitsama, Tamu (5
nos. each village @ Rs.1.5 lacs each) under ADO
Thadlaskein. No. of village: 20 nos.
2 Laskein
Block
Tube well at Shangpung Moolibang, Mookyndeng,
Iongulang, Kyrwen, Mynso, Mynskiah, Myntkung,
Khliehumbuit, Nongryngkoh, Khonshnong,
Madanrwai, Shetjahadem, Madanpohkseh, Lakadong
(5 nos. each village @ Rs.1.5 lacs each under ADO
Laskein . No. of village: 14 nos.
70 nos. 70 ha 105.00 2019-20
3
Amlarem Sub
Division
Agril.
Officer
Tube well at Thangbuli, Umladkhur, Shkentalang,
Jaralud, Pamtbuh, Sohkha (5 nos. each village
@Rs.1.5 lacs each) under SDAO Amlarem
No. of village: 6 nos.
30 nos. 30 ha 45.00 2019-20
Total 200 nos. 200 ha 300.00 lakh
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Storage Reservoir Tank)
Total
no./Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY
Per drop more
crop
(Secondary
storage
structure)
Storage Reservoir Tank at Wahrymbai, Kdohkule,
Moolephaw, Kpermynsnieh, Mookbu, Umbluh
Mynsning, Ladaw, Iangkar, Laru, Ladaw,
Lumtrep. Madansynrang, Mynkrem, Takhniang,
Pdeiniadaw, Sanaro, Pdieniawmusiang,
Ringkyrtein Khyndawwaso, Saphohwaiong, under
ADO Thadlaskein (5 nos. each village @Rs.1 lac
each)
No. of village: 20 nos.
100 nos.
100 ha
100
2019-20 2 Laskein Block Agriculture PMKSY
Storage Reservoir Tank at Samatan, Sookhlieh,
Lumuriap, Thadbamon, Saba, Iongkynshur, 70 nos. 70 ha 70
District Irrigation Plan
NABARD Consultancy Services 208
Per drop more
crop
(Secondary
storage
structure)
Khatkasla, Nohkrei Pdeinlapatein, Sahsniang,
Pohriat, Chutwakhusarhen, Lakadong,
Madanpohkseh villages under ADO Laskein (5
nos. each village @ Rs.1 lac each).
No. of village: 14 nos.
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
PMKSY
Per drop more
crop
(Secondary
storage
structure)
Storage Reservoir Tank at Wahrong, Padubah,
Khonglah, Latang, Tamabil, Riahjalong under
SDAO Amlarem (5 nos. each village @Rs.1 lac
each)
No. of village: 6 nos.
30 nos. 30 ha 30
Total 200 nos. 200 ha 200 lakh
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Pipes and boxes)
Total
no./Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY
Per drop
more crop
( On Farm
Development
Distribution
of Pipes And
Box)
Distribution of Pipes And Box at 5 nos. Villages under
ADO Thadlaskein (Nongkharai, Thadmusem,
Lapangap, Umshangiar, Saitsama)
No. of beneficiaries - 20
No. of pipe/beneficiary - 4nos. @ 20,000/- each
80 nos. 80 ha 16 lakh
2019-20
Distribution of Pipes and Box at 4 nos Villages under
ADO Sohmynting (Lumkhudung, Madur, Niriang,
Demthring)
No.of beneficiaries-15 nos.
No. of pipes/beneficiaries - 4 @ 20,000/- each
60 nos. 60 ha 12 lakh
Distribution of Pipes and Box at 3 nos Villages under
ADO Namdong (Thadmynri, Thadmukoh, Lumrot)
No. of beneficiaries- 10 nos.
No. of pipe/beneficiaries s- 3 nos. @ 20,000/- each
30 nos. 30 ha 6 lakh
District Irrigation Plan
NABARD Consultancy Services 209
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components Activities (Contour bund)
Total no.
/Capacity
(cum)
Command
area (in ha)
Estimated
cost
(Rs.in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more
crop (On
Farm
Activities)
Contour Bund at 16 nos. Villages under ADO
Thadlaskein (Lumcharatoh, Umlangshor, Shohshrieh,
Mukhla, Mookynniang, Kpermynsnieh, Myrjai,
Mookhoniung, Umbluh Mynsning, Ionglwit,
Moolephaw, Lumtrep, Madansynrang, Myngkrem,
Takhniang, Pdeiniadaw)
No. of beneficiaries - 160 nos.
No. of beneficiaries/village - 10nos. @ 30,000/-
each
160 nos. 80 ha 24 lakh 2019-20
Contour bund at 6 nos Villages under ADO
Sohmynting (Sohmynting, Phlongingkhaw,
Lumkhudung, Madur, Niriang, Mustem)
60 nos. 60 ha 18 lakh 2019-20
Distribution of Pipes and Box at 3 nos Villages under
ADO HQR(Pynthorwah, Sabahmuswang,
Khliehtyrshi)
No. of beneficiaries -10 nos.
No. of pipes/beneficiaries- 3nos. @ 20,000/- each
30 nos. 30 ha 6 lakh
2 Laskein Block Agriculture
PMKSY
Per drop
more crop
Distribution of Pipes and Box at 5 nos Villages under
ADO Laskein (Shangpung mission, Thadsning,
Moobandu, Thangrein, Thadmuthlong)
No. of beneficiaries - 28 nos.
No. of pipes/beneficiaries - 4nos @ 20,000/- each
140 nos. 140 ha 28 lakh
3
Amlarem Sub-
Division
Agri.Officer
Agriculture
PMKSY
Per drop
more crop
Distribution of Pipes and Box at 4 nos Villages under
ADO Amlarem (Tarangblang, Nongbareh,
Pyrsadwar, Pamtadong,)
No. of beneficiaries -15 nos.
No. of pipe/beneficiaries - 4 nos. @ 20,000/- each
60 nos. 60 ha 12 lakh
Total 400 nos. 400 ha 80 lakh
District Irrigation Plan
NABARD Consultancy Services 210
No. of beneficiaries - 60 ha
No. of beneficiaries/villages -10 nos. @ 30,000/-
each
Contour bund at 3 nos. Villages under ADO
Namdong (Lumrot, Khonsaro, Moorap)
No. of beneficiaries-30 nos.
No. of beneficiaries/village-10 nos @ 30,000/- each
30 nos. 30 ha 9 lakh
Contour bund at 3 nos. village under ADO HQR
(Mihmyntdu, Ialong, Sabah)
No of beneficiaries - 30 nos.
No of Beneficiaries/village-10 nos. @ 30,000/- each
30 nos. 30 ha 9lakh 2019-20
2 Laskein
Block Agriculture
PMKSY Per
drop more
crop
Contour bund at 28 nos. villages under ADO Laskein
(Chutwakhu, Sarhen, Sahsniang, Mooshrot, Tum-
Tum, Pdeinlapatein, Myntangtihwieh, Iongkasaro,
Thangthring, Psiar, Khyndawwaso Khatkasla, Saphai
,Iawthymme, Priang, Umdiengling, Mukroh,
Maitdieng, Ikynshor, Saba, Thadbamon, Lummuriap,
Sookhlieh, Thadialong, Samatan, Iongkalang,
Pohriat, Iongkwang)
No. of beneficiaries-280 nos.
No. of beneficiaries/village-10 nos. @ 30,000/-
each
280 nos. 140 ha 42 lakh 2019-20
3
Amlarem Sub
Division
Agril Officer
Agriculture
PMKSY Per
drop more
crop
Contour bund at 12 nos Villages under ADO
Amlarem (Thohlamin, Kudengthymmai,
Wahlyngdoh, Nongtalang, Twahusdiah, Rhongkum,
Muktapur, Kyrweng, Amsku, Amjalong, Amsohtai,
Jongushen)
No. of beneficiaries-120 nos.
No. of beneficiaries/village-10 nos. @ 30,000/-
each
120 nos. 60 ha 18 lakh 2019-20
Total 680 nos. 400 120 Lakh
District Irrigation Plan
NABARD Consultancy Services 211
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components Activities (Soil And water conservation)
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs
in Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more
crop(On
Farm
Activities)
Soil &Water conservation at 4 nos village under ADO
Thadlaskein (Moodymmai, Ummulong, Ladmukhla,
Sohphoh)
No. of beneficiaries-40 nos.
Area covered /beneficiaries-1 ha @20,000/- each
40 nos. 40 ha 8 lakh 2019-20
Soil &Water conservation at 3 nos village under ADO
Sohmynting (Mustem, Demthring, Muphlang)
No. of beneficiaries-30 nos.
Area covered/beneficiaries-1ha @20,000/- each
30 nos. 30 ha 6 lakh 2019-20
Soil &Water conservation at 5 nos village under ADO
Namdong(Namdong A, Namdong B, Umjalasiaw,
Thadmynri, Mookjat)
No. of beneficiaries-15 nos.
Area covered/beneficiaries-1 ha @20,000/- each
15 nos. 15 ha 3 lakh 2019-20
Soil &Water conservation at 5 nos villages under
ADO HQR (Ialong, Mihmyntdu, Mookaswan,
Sabahmuswang, Khliehtyrshi)
No. of baneficiaries-15 nos.
Area covered/beneficiaries-1 h @20,000/- each
15 nos. 15 ha 3 lakh 2019-20
2 Laskein
Block Agriculture
PMKSY Per
drop more
crop
Soil &Water conservation at 7 nos. villages Under
ADO Laskein (Kyndongtuber, Pamanik, Mynso,
Mynskiah, Myntkhung, Iooksi, Umsalait)
No. of beneficiaries-70 nos.
Area covered/beneficiaries-1ha @ 20,000/- each
70 nos. 70 ha 14 lakh 2019-20
3
Amlarem Sub
Division
Agril Officer
Agriculture
PMKSY Per
drop more
crop
Soil &Water conservation at 3 nos villages under
ADO Amlarem Lurniang, Amlari, Mawlong)
No. of beneficiaries-30 nos.
Area covered/beneficiaries-1ha @ 20,000/- each
30 nos. 30 ha 6 lakh 2019-20
Total 200 nos. 200 ha 40 Lakh
District Irrigation Plan
NABARD Consultancy Services 212
Sl no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Agronomic)
Total
no./Capacity
(cum)
Command
area (in
ha)
Estimated
cost (Rs
in Lakh)
Period of
implementation
1.
Thadlaskein
Block
Agriculture
PMKSY
Per drop more
crop
(On Farm
Activities)
Agronomic at 4 nos villages under ADO Thadlaskein
(Lumstong, Iangkar, Myngkrem, Takhniang)
No. of beneficiaries - 40 nos.
Area covered/beneficiaries -1 ha @ 20,000/- each
40 nos 40 ha 8 lakh
2019-20
Agronomic at 3 nos villages under ADO Sohmynting
(Niriang, Mustem, Demthring)
No. of beneficiaries-30 nos.
Area covered/beneficiaries-1ha @ 20,000/- each
30 nos 30 ha 6 lakh
Agronomic at 5 nos villages under ADO Namdong
(Namdong A, Nongmulieh, Kremlabit, Mynkhnang,
Moolyngkein)
No. of beneficiaries -15nos.
Area covered/beneficiaries -1ha @ 20,000/- each
15 nos 15ha 3lakh
Agronomic at 5 nos villages under ADO
HQR(Khliehtyrshi, Wahrymbai, Larnai, Ialong,
Mihmyntdu)
No. of beneficiaries-15 nos.
Area covered/beneficiaries-1ha @ 20,000/- each.
15 nos 15 ha 3 lakh
2. Laskein Block Agriculture
PMKSY
Per drop more
crop
Agronomic at 7 nos villages under ADO Laskein
(Madanrwai, Mooshrot, Priang, Mukroh,
Thadialong, Thadmuthlong, Pasyih)
No. of beneficiaries-70 nos.
Area covered/beneficiaries-1ha @ 20,000/- each
70 nos 70 ha 14 lakh
3.
Amlarem Sub
Division Agril
Officer
Agriculture
PMKSY
Per drop more
crop
Agronomic at 3 nos villages under DAO Amlarem
(Padu, Khonglah, Amlympiang)
No. of Beneficiaries-30 nos.
Area covered/beneficiaries-1ha @ 20,000/- each.
30 nos 30 ha 6 lakh
Total 200 nos 200 ha 40 Lakh
District Irrigation Plan
NABARD Consultancy Services 213
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept
.
Components
Activities
(Pipe HDPE)
Pipe HDPE 2” @190.70per mtr
Total
no/Capacity
(cum)
Command
area (in
ha)
Estimated
cost (Rs in
Lakh)
Period of
implementa
tion
1.
Thadlaskein
Block
Agriculture
PMKSY
Per drop
more crop
(On Farm
Activities)
Pipe HDPE at 20 nos villages under ADO Thadlaskein
(Sohphoh, Moopasi, Moodop, Nongrimbambtong
,Pdeiniadaw, Umrakya, Iongchiwait, Wahrymbai,
Kdohkule, Kpermynsnieh, Iangkar, Moorapuchai,
Iongthma, Saphohwaiong, Moopyndur, Moobakhon,
Nongkhroh, Musiaw, Khyndawaso, Mynngor)
No. of beneficiaries -100 nos.
No. of pipe/beneficiaries - 2 rolls @ 20,000/-per roll
No. of beneficiaries/villages- 5
200 rolls 200 40 lakh
2019-20
Pipe HDPE at 5 nos villages under ADO Sohmynting
(Phlongingkhaw, Niriang, Mustem, Moobyrni,
Lumcharatoh)
No. of beneficiaries - 50 nos.
No. of beneficiaries/village - 10 nos.
Pipe/beneficiary - 3 rolls @ 20,000/- per roll
150 rolls 150 30 lakh
Pipe HDPE at 5 nos villages under ADO Namdong
(Moolyngkeing, Namdong B, Umjalasiaw, Mynkhnang,
Kremmyrsiang)
No. of beneficiaries - 25 nos.
No. of beneficiaries/village - 5nos.
Pipe/beneficiary -3 rolls @ 20,000/- per roll
75 rolls 75 15 lakh
Pipe HDPE at 5 nos villages under ADO HQR
(Pynthorwah, Pynthornein, Ialong Mihmyntdu, Sabah)
No. of beneficiaries-25 nos.
No. of beneficiaries/village-5 nos.
Pipe/beneficiary-3 rolls @ 20,000/- per roll
75 rolls 75 15 lakh
2. Laskein
Block Agriculture
PMKSY
Per drop
more crop
Pipe HDPE at 25 nos villages under ADO Laskein
(Samatan, Thadialong, Sookhlieh, Lummuriap,
Thadbamon, Saba, Iongkynshor, Maitdieng, Mukroh,
Umdiengling, Priang, Iawthymme, Saphai, Khyndawaso,
Psiar, Thangthring, Iongkasaro, Myntangtihwieh,
350 rolls 350 70 lakh
District Irrigation Plan
NABARD Consultancy Services 214
Pdeinlapatein, TumTum, Mooshrot, Sahsniang,
Chutwakhu, Sarhen, Pohriat)
No. of beneficiaries-175 nos.
No. of beneficiaries/village-7
No. of pipe/beneficiary - 2 rolls @ 20,000/- per roll
3.
Amlarem Sub
Division
Agril Officer
Agriculture
PMKSY
Per drop
more crop
Pipe HDPE at 10 nos villages under ADO Amlarem
(Pyrsadwar, Kharkhana, Sankhat, Jongushen, Amjalong,
Kyrweng, Twausdiah, Rhongkum, Amlympiang, Jarain)
No. of beneficiary - 50 nos.
No. of pipe/beneficiary - 3 rolls
No. of beneficiary/village - 5 nos. @ 20,000 per roll
150 rolls 150 30 lakh
Total 1000 rolls 1000 200 Lakh
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept
.
Components
Activities
(Water Pump)
Total
no./Capacity
(cum)
Command
area (in
ha)
Estimated
cost (Rs in
Lakh)
Period of
implementa
tion
1. Thadlaskein
Block Agriculture
PMKSY
Per drop
more crop
(On farm
Development
)
Distribution of Water pump 5 nos each village @ 45000/-
each to Kdohkule, Moopasi, Myrjai, Umladang, Lakaroi
Takhniang, Ringkyrtein, Khyndawwasoo, Myngngor,
Mukoiram, Umshangiar, Shiahbnai, Lapangap, Pdeintalo,
Nongkhroh, Nongkharai, Moorathud, Mookabeng
Nongdhar, Iongshiwait under ADO Thadlaskein.
No. of village: 20 nos.
100 nos. 100 ha 45.00
2019-20
2. Laskein
Block Agriculture
Distribution of Water pump 5 nos each village @ 45000/-
each to Thadbamon ,Khatkasla, Khyndawwasoo, Pohriat,
Pdeinlapatein, Chutwakhu Sarhen, Mynskiah, Pamanik,
Muthlongrim, Khlookynrin, Mynkrem, Khliehrangnah,
Thangrain, Iongkwang under ADO Laskein
No. of village: 14 nos.
70 nos. 70 ha 31.50
District Irrigation Plan
NABARD Consultancy Services 215
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
Distribution of Water pump 5 nos each village @ 45000/-
to Pdengshakap, Lurniang, Amlari, Mupyut, Amlarem,
Kyrweng under SDAO Amlarem
No. of village: 6 nos.
30 nos. 30 ha 13.50
Total 200 nos. 200 ha 90.00 lakh
District Irrigation Plan
NABARD Consultancy Services 216
Strategic Action Plan for Irrigation under PMSY for the year 2020-21
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Check Dam)
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per drop
more crop (Drought
proofing)
Checkdam at Wahrymbai, Umbluh Mynsning,
Rimain, Mookjat, Ksehrynshang, Kremlabit,
Village under ADO Thadlaskein. (5 nos. per
village and Rs.3.5 lacs each check dam)
Nongmulieh, Moodymmai, Waiajer, Nongbah,
Nartiang, Rakabah, Laru, Ionglwit,
Pdeiniadaw, Sanaro, Lapangap, Nonglatem,
Bamkamar, Thadmusem
No. of village: 20 nos.
100 nos. 100 ha 350.00 2020-21
2 Laskein
Block Agriculture
Check dam at Shilliangmyntang, Samatan,
Barato, Mookaiaw, Mootyrshiah,
Nongryngkoh, Khonshnong, Saphai, Priang,
Mulieh, Nongkynrih, Thadbamon (5 nos each
village @ Rs.3.5 lacs each check dam) under
ADO Laskein.
No. of village: 12 nos.
60 nos. 60 ha 210.00 2020-21
3
Amlarem Sub
Division
Agri.Officer
Agriculture
Check dam at Pasadwar, Sankhad, Hawai
Bhoi, Hawai Sutnga, Lakroh North (5 nos each
villages @ Rs.3.5 lacs each check dam) under
SDAO Amlarem.
No. of village: 8 nos.
40 nos. 40 ha 140.0l 2020-21
Total 200 nos. 200 ha 700.01 lakh
District Irrigation Plan
NABARD Consultancy Services 217
Sl no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Water Harvesting structure)
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated cost
(Rs. in Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY
Per drop more
crop (Drought
proofing)
Water Harvesting at Ummulong, Mookyndur,
Maskut, Shohshrieh, Larnai, Madansynrang,
Mookabeng, Iongthmu, Pdeiniadaw, Saitsama,
Tamu, Umshangiar, Nonglatem, Bamkamar,
Lakaroi, Thadmusem, Nongkhroh,, Moorathud,
Shiahbnai, Lapangap under ADO Thadlaskein
(5 nos. each village @ Rs.1 lac each)
No. of village: 20 nos.
100 nos. 100 ha 100.00
2020-21
2 Laskein
Block Agriculture
PMKSY
Per drop more
crop (Drought
proofing)
Water Harvesting at Iooksi, Umsalait,
Khonshnong, Nongryngkoh, Khlieumbuit,
Myntkung, Mynso, Kyndongtuber, Pamanik,
Pasyih, Phramer, Thadmuthlong, Muthlongrim,
Khliehrangnah villages under ADO Laskein (5
nos. each village @ Rs.1 lac each) .
No. of village: 14 nos.
70 nos. 70 ha
70.00
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
PMKSY
Per drop more
crop (Drought
proofing)
Water Harvesting at Sohkha, Lamin,
Kudengthymmai, Mawlong, Ammutong,
Pamtadong under SDAO Amlarem (5 nos. each
village @ Rs.1 lakh each)
No. of village: 6 nos.
30 nos. 30 ha 30.00
Total 200 nos. 200 ha 200 lakh
District Irrigation Plan
NABARD Consultancy Services 218
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Dug Well)
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated cost
(Rs in Lakh)
Period of
implementation
1. Thadlaskein
Block Agriculture
PMKSY
Per drop more
crop (Drought
proofing)
Dug Well (5 nos. each village @ Rs.2 lacs each)
at Lumstong, Lumtrep, Madansynrang,
Mynkrem, Takhniang, Pdeiniadaw, Sanaro,
Pdeiniawmusiang, Ringkyrtein, Khyndawwasoo,
Lakaroi, Shiahbnai, Lapangap, Pdeintalo,
Saphohwaiong, Wahiajer, Tyrshang, Larnai,
Moodop Mupliang, under ADO Thadlaskein.
No. of village: 20 nos.
100 nos. 100 ha 200.00
2020-21 2.
Laskein
Block Agriculture
Dug well (5 nos. each village @Rs.2 lacs each) at
Shangpung Moosyiem, Khlookynrin,
Mootyrshiah, Mulieh, Madankynsaw,
Shilliangmyntang, Samatan, Thangrain, Barato,
Thadmuthlong, Mynso, Kyndongtuber, Mukroh,
Saphai. Under ADO Laskein.
No. of village: 14 nos.
70 nos. 70 ha 140.00
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
Dug well (5 nos. each village @ Rs.2 lacs each)
at Pdengkseh, Lakroh South, Rhongkum,
Kudengthymmai, Riahjalong, Pdengkarong
under SDAO Amlarem
No. of village: 6 nos.
30 nos. 30 ha 60.00
Total 200 nos. 200 ha 400.00
District Irrigation Plan
NABARD Consultancy Services 219
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Tube Well)
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated cost
(Rs in Lakh)
Period of
implementation
1. Thadlaskein
Block Agriculture
PMKSY
Per drop more
crop
(Drought
proofing)
Tube Well (5 nos. each village @Rs.1.5 lacs
each) at Wahiajer, Tyrshang, Nongbah,
Nongjngi, Ionglwit, Takhniang, Sanaro,
Pdeiniawmusiang, Ringkyrtein, Khyndawwasoo,
Saphohwaiong, Mukoiram, Umshangiar,
Lakaroi, Shiahbnai, Lapangap, Pdeintalo,
Umrakia, Rimain, Nongkhyllep under ADO
Thadlaskein.
No. of village: 20 nos.
100 nos. 100 ha 150.00
2020-21
2. Laskein
Block Agriculture
Tube well (5 nos. each village @Rs.1.5 lacs each)
at Myntangtihwieh, Iongkasaro, Thangthring,
Saphai, Iawthymme, Priang, Umdiengling,
Mukroh, Maitdieng, Saba Thadbamon,
Lummuriap, Thadialong, Samatan under ADO
Laskein .
No. of village: 14 nos.
70 nos. 70 ha 105.00
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
Tube well (5 nos. each village @Rs.1.5 lacs each)
at Mupyut, Shkenpyrsit, Moosakhiah,
Samanong, Madantyrpait, Tamabil under SDAO
Amlarem
No. of village: 6 nos.
30 nos. 30 ha 45.00
Total 200 nos. 200 ha 300 lakh
District Irrigation Plan
NABARD Consultancy Services 220
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Storage reservoir Tank)
Total
no/Capacity
(cum)
Command
area (in
ha)
Estimated cost
(Rs in Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY
Per drop more
crop
(Secondary
storage
development)
Storage reservoir Tank at Ummulong,
Mookyndur, Maskut, Shohshrieh, Larnai,
Madansynrang, Mookabeng, Iongthmu,
Pdeiniadaw, Saitsama, Tamu, Umshangiar,
Nonglatem, Bamkamar, Lakaroi, Thadmusem,
Nongkhroh,, Moorathud, Shiahbnai, Lapangap
under ADO Thadlaskein (5 nos. each village @
Rs.1 lac each)
No. of village: 20 nos.
100 nos. 100 ha 100.00
2020-21
2 Laskein
Block Agriculture
PMKSY
Per drop more
crop
(Secondary
storage
development)
Storage reservoir Tank at Iooksi, Umsalait,
Khonshnong, Nongryngkoh, Khlieumbuit,
Myntkung, Mynso, Kyndongtuber, Pamanik,
Pasyih, Phramer, Thadmuthlong, Muthlongrim,
Khliehrangnah villages under ADO Laskein (5
nos. each village @ Rs.1 lac each) .
No. of village: 14 nos.
70 nos. 70 ha 70.00
3.
Amlarem
Sub Division
Agri.Officer
Agriculture
PMKSY
Per drop more
crop
(Secondary
storage
development)
Storage reservoir Tank at Sohkha, Lamin,
Kudengthymmai, Mawlong, Ammutong,
Pamtadong under SDAO Amlarem (5 nos. each
village @ Rs.1 lac each)
No. of village: 6 nos.
30 nos. 30 ha 30.00
Total 200 nos. 200 ha 200 lakh
District Irrigation Plan
NABARD Consultancy Services 221
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Pipes and boxes)
Total
no/Capacity
(cum)
Command
area in
ha)
Estimated
cost (Rs
in Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY
Per drop more
crop
(On Farm
Development
Distribution of
Pipes And
Box)
Distribution of Pipes And Box at 5 nos Villages under
ADO Thadlaskein (Moorathud, Khanduli, Musiang,
Laru, Nongjngi)
No. of beneficiaries – 20 nos.
No. of pipe/beneficiary - 4nos @ 20,000/- each
80 nos. 80ha 16 lakh
2020-21
Distribution of Pipes and Box at 4 nos Villages under
ADO Sohmynting (Pynthorlangtein, Moobyrni,
Demthring, Niriang)
No. of beneficiaries – 15 nos
No. of pipes/beneficiaries - 4 @ 20,000/- each
60 nos. 60ha 12 lakh
Distribution of Pipes and Box at 3 nos Villages under
ADO Namdong (Namdong B, Khonsaro, Mynkhnang)
No. of beneficiaries -10 nos.
No. of pipe/beneficiaries - 3nos @ 20,000/- each
30 nos. 30ha 6 lakh
Distribution of Pipes and Box at 3 nos Villages under
ADO HQR (Pynthorwah, Pynthornein, Ialong)
No. of beneficiaries – 10 nos.
No. of pipes/beneficiaries - 3.nos. @ 20,000/- each
30 nos. 30ha 6 lakh
2 Laskein
Block Agriculture
PMKSY
Per drop more
crop
Distribution of Pipes and Box at 5 nos Villages under
ADO Laskein (Mynso, Nongryngkoh, Lakadong,
Sahsniang, Tum-Tum)
No. of beneficiaries - 28 nos.
No. of pipes/beneficiaries – 4 nos. @ 20,000/- each
140 nos. 140ha 28 lakh
3
Amlarem
Sub-
Division
Agri.Officer
Agriculture
PMKSY
Per drop more
crop
Distribution of Pipes and Box at 4 nos Villages under
ADO Amlarem (Amkoi, Amtapoh, Amsohrhong,
Amjalong)
No. of beneficiaries – 15 nos.
No. of pipe/beneficiaries - 4 nos. @ 20,000/- each
60 nos. 60ha 12 lakh
Total 400 nos. 400ha 80 lakh
District Irrigation Plan
NABARD Consultancy Services 222
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/De
pt.
Components Activities
(Contour bund)
Total
no./Capacity
(cum)
Command
area (in
ha)
Estimated
cost (Rs
in Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more crop
(On Farm
Activities)
Contour Bund at 16 nos. Villages under ADO Thadlaskein
(Pdeiniawmusiang, Ringkyrtein, Saphohwaiong, Khanduli,
Tamu, Mynngor, Mukoiram, Umshangiar, Lakaroi,
Shiabnai, Lapangap, Pdeintalo, Nonglatem, Bamkamar,
Thadmusem, Nongkhroh)
No. of beneficiaries - 160 nos.
No. of beneficiaries/village-10 nos. @ 30,000/- each
160 nos. 80 ha 24.00 2020-21
Contour bund at 6 nos. Villages under ADO Sohmynting
(Sohmynting, Phlongingkhaw, Lumkhudung, Madur,
Niriang, Mustem)
No. of beneficiaries - 60 ha
No. of beneficiaries/villages-10 nos. @ 30,000/- each
60 nos. 60 ha 18.00 2020-21
Contour bund at 3 nos. Villages under ADO Namdong
(Lumrot, Khonsaro, Nongthymme)
No. of beneficiaries - 30 nos.
No. of beneficiaries/village-10nos @ 30,000/- each
30 nos. 30 ha 9.00 2020-21
Contour bund at 3 nos. village under ADO HQR
(Sabahmuswang, Mookaswan, Mihmyntdu)
No. of beneficiaries - 30 nos.
No.of Beneficiaries/village-10 nos. @ 30,000/- each.
30 nos. 30 ha 9.00 2020-21
2 Laskein
Block Agriculture
PMKSY Per
drop more crop
Contour bund at 28 nos. villages under ADO Laskein
(Mookaiaw, Mootyrshiah, Mynksan, Madanrwan,
Laskein, Nongkynrih, Mulum, Raliang, Madankynsaw,
Rtiang, Shilliangmyntang, Thadsning, Phain, Musiaw,
Barato, Thangrain, Myngkrem, Khlookynrin,
Thadmuthlong, Muthlongrim, Pasyih, Kyndongtuber,
Mynso, Iooksi, Khonshnong, Sahsniang, Iongkasaro,
Priang,)
No. of beneficiaries - 280 nos.
No. of beneficiaries/village - 10 nos. @ 30,000/- each
280 nos. 140 ha 42.00 2020-21
District Irrigation Plan
NABARD Consultancy Services 223
3
Amlarem Sub
Division
Agril Officer
Agriculture PMKSY Per
drop more crop
Contour bund at 12 nos. Villages under ADO Amlarem
(Lurniang, Pdeinshakap, Pdengkseh, Amlar, I , Mawlong,
Amutong, Pamtadong, Amtapoh, Nongbareh, Amkoi,
Kudengrim, Darang)
No. of beneficiaries - 120 nos.
No. of beneficiaries/village - 10 nos. @ 30,000/- each
120 nos. 60 ha 18.00 2020-21
Total 680 nos. 400 120 Lakh
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/De
pt.
Components Activities
(Soil And water conservation)
Total
no./Capacity
(cum)
Command
area (in
ha)
Estimated
cost ( Rs.
in Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more crop
(On Farm
Activities)
Soil &Water conservation at 4 nos village under ADO
Thadlaskein (Ladaw, Nongjngi, Takhniang ,Sanaro)
No. of beneficiaries - 40 nos.
Area covered /beneficiaries-1ha @20,000/- each
40 nos. 40 ha 8 lakh 2020-21
Soil &Water conservation at 3 nos village under ADO
Sohmynting (Sohmynting, Phlongingkhaw, Madur)
No. of beneficiaries-30 nos.
Area covered/beneficiaries - 1ha @ 20,000/- each
30 nos. 30 ha 6 lakh 2020-21
Soil &Water conservation at 5 nos village under ADO
Namdong (Kremmyrsiang, Thadmukoh, Lumrot,
Khonsaro, Mynkhnang)
No. of beneficiaries-15 nos.
Area covered/beneficiaries-1ha @ 20,000/- each
15 nos. 15 ha 3lakh
Soil &Water conservation at 5 nos villages
underADOHQR(Ialong,Mihmyntdu,Mookaswan,Sabahm
uswang,Khliehtyrshi)
No. of baneficiaries-15 nos.
Area covered/beneficiaries - 1h @ 20,000/- each
15 nos. 15 ha 3 lakh
2 Laskein
Block Agriculture
PMKSY Per
drop more crop
Soil &Water conservation at 7 nos villages Under ADO
Laskein (Khonshnong, Madanrwai, Lakadong, Sahsniang,
Mooshrot, Tum-Tum, Pdeinlapatein)
70 nos. 70 ha 14 lakh
District Irrigation Plan
NABARD Consultancy Services 224
No. of beneficiaries-70 nos.
Area covered/beneficiaries-1 ha @ 20,000/- each
3
Amlarem Sub
Division
Agril Officer
Agriculture PMKSY Per
drop more crop
Soil &Water conservation at 3 nos villages under ADO
Amlarem (Pyrsadwar, Amlanai, Satpator)
No. of beneficiaries-30 nos.
Area covered/beneficiaries-1ha @ 20,000/- each
30 nos. 30 ha 6 lakh
Total 200 nos. 200 ha 40 Lakh
Sl
no
Name of
the Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Agronomic)
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more crop
(On Farm
Activities)
Agronomic at 4 nos villages under ADO Thadlaskein
(Ladaw, Sanaro, Pdeiniawmusiang, Saitsama)
No. of beneficiaries - 40 nos.
Area covered/beneficiaries - 1 ha @ 20,000/- each
40 nos. 40 ha 8 lakh 2020-21
Agronomic at 3 nos. villages under ADO Sohmynting
(Niriang, Moobyrni, Chyrmang)
No. of beneficiaries – 30 nos.
Area covered/beneficiaries - 1ha @ 20,000/- each
30 nos. 30 ha 6 lakh 2020-21
Agronomic at 5 nos villages under ADO Namdong
(Umjalasiaw, Mynkhnang, Namdong A, Lumrot,
Khonsaro)
No. of beneficiaries - 15 nos. Area
covered/beneficiaries - 1 ha @ 20,000/- each
15 nos. 15 ha 3 lakh 2020-21
Agronomic at 5 nos villages under ADO HQR Ialong,
Mihmyntdu, Sabah, Mookaswan, Khliehtyrshi)
No. of beneficiaries – 15 nos. Area
covered/beneficiaries - 1ha @ 20,000/- each
15 nos. 15 ha 3 lakh 2020-21
2 Laskein
Block Agriculture
PMKSY Per
drop more crop
Agronomic at 7 nos villages under ADO Laskein (Priang,
Saba, Iongkasaro, Lakadong, Myntkhung,
Kyndongtuber, Pamanik)
No. of beneficiaries - 70 nos.
70 nos 70 ha 14 lakh 2020-21
District Irrigation Plan
NABARD Consultancy Services 225
Area covered/beneficiaries - 1ha @ 20,000/- each
3
Amlarem
Sub
Division
Agril
Officer
Agriculture PMKSY Per
drop more crop
Agronomic at 3 nos villages under DAO Amlarem
(Nongtalang, Syndai Shnong, Pdengshakap)
No. of Beneficiaries-30 nos.
Area covered/beneficiaries-1 ha @ 20,000/- each
30 nos. 30 ha 6 lakh 2020-21
Total 200 nos. 200 ha 40 Lakh
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/De
pt.
Components
Activities
(Pipe HDPE)
Pipe HDPE 2” @ 190.70per mtr
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs
in Lakh)
Period of
implementation
1.
Thadlaskein
Block
Agriculture
PMKSY
Per drop
more crop
(On Farm
Activities)
Pipe HDPE at 20 nos villages under ADO Thadlaskein
(Moodop, Nongrimbambtong, Iangkar, Lumlakhiat,
Wahiajer, Sophoh, Nangbah, Nartiang, Lumkya, Lumstong,
Madansynrang, Laru, Saitsama, Myngkoiram, Lakaroi,
Lapangap, Nongkhroh, Thadmusem, Pdeintalo, Bamkamar)
No. of beneficiaries - 100 nos.
No. of pipe/beneficiaries - 2 rolls @ 20,000/- per roll
No. of beneficiaries/villages - 5
200 rolls 200 40 lakh
2020-21
Pipe HDPE at 5 nos villages under ADO
Sohmynting (Sohmynting, Lumkhudung, Mustem,
Demthring, Iongnoh)
No. of beneficiaries - 50 nos.
No. of beneficiaries/village - 10 nos.
Pipe/beneficiary - 3 rolls @ 20,000/- per roll
150 rolls 150 30 lakh
Pipe HDPE at 5 nos villages under ADO Namdong
(Namdong, Umjalasiaw, Thadmynri, Thadmukoh,
Khonsaro)
No. of beneficiaries - 25 nos.
No. of beneficiaries/village - 5 nos.
75 rolls 75 15 lakh
District Irrigation Plan
NABARD Consultancy Services 226
Pipe/beneficiary - 3 rolls @ 20,000/- per roll
Pipe HDPE at 5 nos villages under ADO HQR
(Pynthorwah, Pynthornein, Ialong Mihmyntdu, Sabah)
No. of beneficiaries - 25 nos.
No. of beneficiaries/village - 5 nos.
Pipe/beneficiary - 3 rolls @ 20,000/- per roll
75 rolls 75 15 lakh
2. Laskein
Block Agriculture
PMKSY
Per drop
more crop
Pipe HDPE at 25 nos villages under ADO Laskein
(Mootyrshiah, Niawkmai, Laskein Mukhap Madankynsaw,
Mushai, Shangpung mission, Shilliangmyntang, Thadsning,
Bhain, Barato, Kongwang, Khliehrangnah, Myngkrem,
Thadmuthlong, Muthlongrim, Pasyih, Kyndongtuber,
Mynso, Iooksi, Umsalait, Nongryngkoh, Myntangihwieh,
Iawthymmei, Iongkynshur)
No. of beneficiaries - 175 nos.
No. of beneficiaries/village - 7
No. of pipe/beneficiary - 2 rolls @ 20,000/- per roll
350 rolls 350 70 lakh
3.
Amlarem Sub
Division
Agril Officer
Agriculture
PMKSY
Per drop
more crop
Pipe HDPE at 10 nos villages under ADO Amlarem
(Kharkhana, Sankhat, Kongwang, Amsohtai, Jongushen,
Hawaibhoi, Kyrweng, Amsku, Nongtalang)
No. of beneficiary - 50 nos.
No. of pipe/beneficiary - 3 rolls
No. of beneficiary/village - 5nos @ 20,000 per roll
150 rolls 150 30 lakh
Total 1000 rolls 1000 200 Lakh
District Irrigation Plan
NABARD Consultancy Services 227
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(Water Pump)
Total
no./Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs. in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per drop
more crop (On
farm
Development)
Distribution of Water pump to Moobakhon,
Mynsngat, Moolyngkein, Ksehrynshang,
Nongthymme, Moorap, Moolephaw, Iangkar,
Lumtrep, Madansynrang, Moorapushai,
Umlangshor, Shohshrieh, Ladmukhla,
Mukhla, Maskut, Mookyndur, Nongbah,
Moodymmai, Wahiajer (5 nos. each village @
45000/- each) under ADO Thadlaskein.
No. of village: 20 nos.
100 nos. 100 ha 45.00 2020-21
2 Laskein Block
Distribution of Water pump to Kyrwen,
Mynksan, Mulieh Madanrwan, Niawkmai,
Mukhap, Nongkynrih, Mulum, Raliang,
Madankynsaw, Thadsning, Bhain, Latymphu,
Musiaw ( 5 nos. each village @ 45000/- each )
under ADO Laskein.
No. of village: 14 nos.
70 nos. 70 ha 31.50 2020-21
3
Amlarem Sub
Division
Agri.Officer
Distribution of Water pump to Syndai
Shnong, Amsohtai, Jonguchen, Amtapoh,
Nongbareh, Amkoi (5 nos. each village @
45000/- each ) under SDAO Amlarem
No. of village: 6 nos.
30 nos. 30 ha 13.50 2020-21
Total 200 nos. 200 ha 90.00 lakh
District Irrigation Plan
NABARD Consultancy Services 228
Strategic Action Plan for Externally aided projects from State Irrigation Department/ other funding agencies and NABARD
S.
No.
Name of
Block
Concerned
Ministry /
Department
Compo
nent
Activity
(Jalkunds) Location Co-ordinates
Total
Number/
Capacity
(Cum)
Command
Area/
Irrigation
Potential
(Ha)
Period of
implemen
tation
(5/7
years)
Estimate
d Cost
(in
Lakhs)
1
Thadlaskein
Block
Other
Funding
agencies
Per
Drop
More
Crop
Thynra Nongbah N 25°31'06.9" E92°14’40.1" 86,400 3 5 2.989
2 Iongthulein Nongbah N 25°31'22.9" E92°14’48.3" 86,400 3 5 2.989
3 Murang Nongbah N 25°31'45.98" E92°15'06.81" 86,400 3 5 2.989
4 Wahlumpyrdi Khanduli N 25°43'35.6" E92°25’38.1" 86,400 3 5 2.989
5 Kdaitwakhah Larnai N 25°34'71.5" E92°09’79.5" 1,44,000 5 5 4.946
Grand Total [Rs. In Lakh] 4,89,600 17 - 16.90
S.
No.
Name of
Block
Concerne
d
Ministry
/
Departme
nt
Compone
nt
Activity
(Jalkunds) Location Co-ordinates
Total
Number/
Capacity
(Cum)
Comman
d Area/
Irrigatio
n
Potential
(Ha)
Period
of
implem
entation
( 5/7
years )
Estimat
ed Cost
(in
Lakhs)
1 Laskein
Other
Funding
agencies
Per Drop
More
Crop
Iongbong Niawkmai N25°33’73.3" E92°29’46.2" 92,160 3.2 5 3.195
2 Tre Saphai Mukhap N25°30’84.4" E92°26'41.4" 92,160 3.2 5 3.195
District Irrigation Plan
NABARD Consultancy Services 229
3 Kharai Saphai
Mukhap N25°30’75.5" E92°26'56.2" 92,160 3.2 5 3.195
4 Tymbud Umiurem
Shangpung N25°36’15.2" E92°27'81.5" 92,160 3.2 5 3.195
5 Pohsain Iongulang N25°30’52.3" E92°30'02.2" 86,400 3 5 2.989
6 Pohsynrang Nongkynrih N25°31’11.65" E92°24'00.97" 86,400 3 5 2.989
7 Sata Shilliang Myntang
N25°34’04.13" E92°21'56.37" 86,400 3 5 2.989
8 Bamkhniang Laskein N25°30’91.3" E92°25'51.2" 92,160 3.2 5 3.195
9 Tyngkla Mawkyndeng N25°30’75.2" E92°22'87.2" 1,72,800 6 5 5.971
10 Trelum Tiniang
Mootyrshiah N25°30’97.1" E92°27'50.3" 1,87,200 6.5 5 6.497
Grand Total [Rs. In Lakh] 10,80,000 38 - 37.410
District Irrigation Plan
NABARD Consultancy Services 230
Strategic Action Plan for Irrigation under PMKSY
(Horticulture Department)
District Irrigation Plan
NABARD Consultancy Services 231
Strategic Action Plan for Irrigation under PMSKY for the Year 2016-2017
Sl.
No
Name of the
Block/Sub
District
Connected
Ministry/
Department
Component Activities
Total
Number/
Capacity
(cum)
Command Area/
Irrigation
Potential (in Ha)
Estimated
Cost (Rs. in
Lakhs)
Period of
Implementation
1. Horticulture Dev.
Officer,
Thadlaskein
Agriculture Drip
Irrigation
Khlietyrshi, Mukhla, Wahiajer,
Tyrchang, Larnai, Ummulong,
Madur, Moodymmai, Niriang
24 Nos.
(0.5 Ha/Unit) 12 Ha 39
2016-2017
2. Horticulture Dev.
Officer, Laskein Agriculture
Drip
Irrigation
Mulum, Shangpung, Kyndong,
Mukhap, Mookaiaw, Laskein
24 Nos.
(0.5 Ha/Unit) 12 Ha 39
3. Horticulture Dev.
Officer, Amlarem Agriculture
Drip
Irrigation
Moosakhia, Shkenpyrsit,
Mustem, Shkentalang, Sohkha,
Lamin
12 Nos.
(0.5/unit) 6 Ha 19.50
Total [Rs. in Lakh] 60 Nos. 30 Ha 97.50
1. Horticulture Dev.
Officer,
Thadlaskein
Agriculture Sprinkler
Irrigation
Khlietyrshi, Mukhla, Wahiajer,
Tyrchang, Larnai, Ummulong,
Madur, Moodymmai, Niriang
24 Nos.
(0.5 Ha/Unit) 12 Ha 51.96
2. Horticulture Dev.
Officer, Laskein Agriculture
Sprinkler
Irrigation
Mulum, Shangpung, Kyndong,
Mukhap, Mookaiaw, Laskein
24 Nos.
(0.5 Ha/Unit) 12 Ha 51.96
3. Horticulture Dev.
Officer, Amlarem Agriculture
Sprinkler
Irrigation
Moosakhia, Shkenpyrsit,
Mustem, Shkentalang, Sohkha,
Lamin
12 Nos.
(0.5 Ha/unit) 6 Ha 25.98
Total [Rs. in Lakh] 60 Nos. 30 Ha 129.90
District Irrigation Plan
NABARD Consultancy Services 232
Strategic Action Plan for Irrigation under PMSKY for the Year 2017-2018
Sl.
No
Name of the
Block/Sub
District
Connected
Ministry/
Department
Component Activities
Total
Number/
Capacity
(cum)
Command Area/
Irrigation Potential
(in Ha)
Estimated
Cost (Rs. in
Lakhs)
Period of
Implementation
1. Horticulture Dev.
Officer,
Thadlaskein
Agriculture Drip
Irrigation
Nartiang, Nongbah, Nongjngi,
Bamkamar, Rakabah,
Mynsngat
28 Nos.
(0.5 Ha/unit) 14 Ha 46.80
2017-2018
2. Horticulture Dev.
Officer, Laskein Agriculture
Drip
Irrigation
Barato, Maitdieng,
Nongryngkoh, Saphai,
Umsalait, Sahsniang, Mooshrot
28 Nos.
(0.5 Ha/unit) 14 Ha 46.80
3. Horticulture Dev.
Officer, Amlarem Agriculture
Drip
Irrigation
Syndai, Lumpyngngad, Hawai
Bhoi, Kudeng, Shnongpdeng,
Muktapur, Dawki
16 Nos.
(0.5 Ha/unit) 8 Ha 23.40
Total [Rs. in Lakh] 72 Nos. 36 Ha 117.00
1. Horticulture Dev.
Officer,
Thadlaskein
Agriculture Sprinkler
Irrigation
Nartiang, Nongbah, Nongjngi,
Bamkamar, Rakabah,
Mynsngat
28 Nos.
(0.5 Ha/unit) 14 Ha 62.352
2. Horticulture Dev.
Officer, Laskein Agriculture
Sprinkler
Irrigation
Barato, Maitdieng,
Nongryngkoh, Saphai,
Umsalait, Sahsniang, Mooshrot
28 Nos.
(0.5 Ha/unit) 14 Ha 62.352
3. Horticulture Dev.
Officer, Amlarem Agriculture
Sprinkler
Irrigation
Syndai, Lumpyngngad, Hawai
Bhoi, Kudeng, Shnongpdeng,
Muktapur, Dawki
16 Nos.
(0.5 Ha/unit) 8 Ha 34.64
Total [Rs. in Lakh] 72 Nos. 36 Ha 159.344
District Irrigation Plan
NABARD Consultancy Services 233
Strategic Action Plan for Irrigation under PMSKY for the Year 2018-2019
Sl.
No
Name of the
Block/Sub
District
Connected
Ministry/
Department
Component Activities
Total
Number/
Capacity
(cum)
Command Area/
Irrigation
Potential (in Ha)
Estimated
Cost (Rs. in
Lakhs)
Period of
Implementation
1. Horticulture Dev.
Officer,
Thadlaskein
Agriculture Drip
Irrigation
Kdiap, Mookbu, Umladang,
Ksehrynshang, Moobakhon,
Namdong, Umjalasiaw, Lumstong,
Morapushai, Mynkrem
32 Nos.
(0.5 Ha/unit) 16 Ha 56.16
2018-2019
2. Horticulture Dev.
Officer, Laskein Agriculture
Drip
Irrigation
Khlokynring, Mynska, Mynksan,
Kyrwen, Madanrwan, Pyntei,
Raliang, Khonshnong
32 Nos.
(0.5 Ha/unit) 16 Ha 56.16
3. Horticulture Dev.
Officer, Amlarem Agriculture
Drip
Irrigation
Trangblang, Amlanai, Amjalong,
Kudengrim, Amsku, Pdengshakap
16 Nos.
(0.5 Ha/unit) 8 Ha 28.08
Total [Rs. in Lakh] 80 Nos. 40 Ha 140.40
1. Horticulture Dev.
Officer,
Thadlaskein
Agriculture Sprinkler
Irrigation
Kdiap, Mookbu, Umladang,
Ksehrynshang, Moobakhon,
Namdong, Umjalasiaw, Lumstong,
Morapushai, Mynkrem
32 Nos.
(0.5 Ha/unit) 16 Ha 74.822
2. Horticulture Dev.
Officer, Laskein Agriculture
Sprinkler
Irrigation
Khlokynring, Mynska, Mynksan,
Kyrwen, Madanrwan, Pyntei,
Raliang, Khonshnong
32 Nos.
(0.5 Ha/unit) 16 Ha 74.822
3. Horticulture Dev.
Officer, Amlarem Agriculture
Sprinkler
Irrigation
Trangblang, Amlanai, Amjalong,
Kudengrim, Amsku, Pdengshakap
16 Nos.
(0.5 Ha/unit) 8 Ha 41.568
Total [Rs. in Lakh] 191.212
District Irrigation Plan
NABARD Consultancy Services 234
Strategic Action Plan for Irrigation under PMSKY for the Year 2019-2020
Sl.
No
Name of the
Block/Sub
District
Connected
Ministry/
Department
Component Activities
Total
Number/
Capacity
(cum)
Command Area/
Irrigation
Potential (in Ha)
Estimated
Cost (Rs. in
Lakhs)
Period of
Implementation
1. Horticulture Dev.
Officer,
Thadlaskein
Agriculture Drip
Irrigation
Saitsama, Tamu, Myngngor,
Khonsaro, Khanduli,
Umpawiang, Saphoh, Nongkhroh,
Mookabeng
40 Nos.
(0.5 Ha/unit) 20 Ha 67.392
2019-2020
2. Horticulture Dev.
Officer, Laskein Agriculture
Drip
Irrigation
Iongsaro, Mynso, Shilliang
Myntang, Thadbamon, Musiaw,
Latymphu, Umsalang, Ionglang,
Samatan
40 Nos.
(0.5 Ha/unit) 20 Ha 67.392
3. Horticulture Dev.
Officer, Amlarem Agriculture
Drip
Irrigation
Amlari, Amlarem, Jarain,
Moopyut, Amladkhur, Padu,
Khonglah
20 Nos.
(0.5 Ha/unit) 10 Ha 33.696
Total [Rs. in Lakh] 100 Nos. 50 Ha 168.48
1. Horticulture Dev.
Officer,
Thadlaskein
Agriculture Sprinkler
Irrigation
Saitsama, Tamu, Myngngor,
Khonsaro, Khanduli,
Umpawiang, Saphoh, Nongkhroh,
Mookabeng
40 Nos.
(0.5 Ha/unit) 20 Ha 89.7864
2. Horticulture Dev.
Officer, Laskein Agriculture
Sprinkler
Irrigation
Iongsaro, Mynso, Shilliang
Myntang, Thadbamon, Musiaw,
Latymphu, Umsalang, Ionglang,
Samatan
40 Nos.
(0.5 Ha/unit) 20 Ha 89.7864
3. Horticulture Dev.
Officer, Amlarem Agriculture
Sprinkler
Irrigation
Amlari, Amlarem, Jarain,
Moopyut, Amladkhur, Padu,
Khonglah
20 Nos.
(0.5 Ha/unit) 10 Ha 49.8816
Total [Rs. in Lakh] 100 Nos. 50 Ha 229.4544
District Irrigation Plan
NABARD Consultancy Services 235
Strategic Action Plan for Irrigation under PMSKY for the Year 2020-2021
Sl.
No
Name of the
Block/Sub
District
Connected
Ministry/
Department
Component Activities
Total
Number/
Capacity
(cum)
Command Area/
Irrigation
Potential (in Ha)
Estimated
Cost (Rs. in
Lakhs)
Period of
Implementation
1. Horticulture Dev.
Officer,
Thadlaskein
Agriculture Drip
Irrigation
Takhniang, Moolephaw, Kremlabit,
Iongsmit, Pdeiniadaw, Lumrot,
Umshangiar, Rtiang sanphaw,
Lumlakhiat
44 Nos.
(0.5 Ha/unit) 22 Ha 80.870
2020-2021
2. Horticulture Dev.
Officer, Laskein Agriculture
Drip
Irrigation
Saba, Mukroh, Iongkwang,
Nongkynrih, Madankynsaw,
Thangthring, Psiar, Moolber,
Khatkasla
44 Nos.
(0.5 Ha/unit) 22 Ha 80.870
3. Horticulture Dev.
Officer, Amlarem Agriculture
Drip
Irrigation
Darang, Pasadwar, Jonguchen,
Twahusdiah, Amsohtai, Nongtalang
20 Nos.
(0.5 Ha/unit) 10 Ha 40.435
Total [Rs. in Lakh] 108 Nos. 54 Ha 202.175
1. Horticulture Dev.
Officer,
Thadlaskein
Agriculture Sprinkler
Irrigation
Takhñiang, Moolephaw, Kremlabit,
Iongsmit, Pdeiniadaw, Lumrot,
Umshangiar, Rtiang sanphaw,
Lumlakhiat
44 Nos.
(0.5 Ha/unit) 22 Ha 107.743
2. Horticulture Dev.
Officer, Laskein Agriculture
Sprinkler
Irrigation
Saba, Mukroh, Iongkwang,
Nongkynrih, Madankynsaw,
Thangthring, Psiar, Moolber,
Khatkasla
44 Nos.
(0.5 Ha/unit) 22 Ha 107.743
3. Horticulture Dev.
Officer, Amlarem Agriculture
Sprinkler
Irrigation
Darang, Pasadwar, Jonguchen,
Twahusdiah, Amsohtai, Nongtalang
20 Nos.
(0.5 Ha/unit) 10 Ha 59.857
Total [Rs. in Lakh] 108 Nos. 54 Ha 275.343
District Irrigation Plan
NABARD Consultancy Services 236
Strategic Action Plan for Irrigation under PMKSY
Agricultural Technology Management Agency
(ATMA)
District Irrigation Plan
NABARD Consultancy Services 237
Strategic Action Plan for Irrigation under PMSKY for the Year 2016-2017
Sl
no
Name of the
Block
Sub/Sub
District
Concerned
Ministry/Dept. Components
Activities
(TRAINING PROGRAMME)
Total
no./Capacity
(cum)
Command
area/Irrigation
potential (in
ha)
Estimated
cost (Rs.
in Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more crop
(Supplementary
water
management
activities)
Training programme at Phlongingkhaw, Sohmynting,
Mustem under ADO Sohmynting circle. (1 training per
Village @ 20000/- each)
3 No's - 0.60 2016-17
Training Programme atThadmynri,Kremmyrsiang,Lumrot
under ADO Namdong B. (1 training per Village@ 20000/-
each))
3 No's - 0.60 2016-17
Training programme at Ialong, Sabah, Mookaswan under
ADO HQR. (1 training per Village@ 20000/- each)) 3 No's - 0.60 2016-17
Training programme at Kdohkule, Kpermynsnieh,
Pdeiniadaw, Moorathud under ADO Thadlaskein. (1
training per Village@ 20000/- each))
4 No's - 0.80 2016-17
2 Laskein
Block Agriculture
PMKSY Per
drop more crop
(Supplementary
water
management
activities)
Training at Mynksan,Laskein,shangpung
Moolibang,Shilliangmyntang,Latymphu,Barato,Iongwang,
Thadmuthlong, Pamanik,Mynso,Iooksi,Thadbamon,
Maitdieng ,Kyrwen under ADO Laskein Block. (1 training
per Village@ 20000/- each)
14 No's - 2.80 2016-17
3
Amlarem
Sub-
Division
Agri.Officer
Agriculture
PMKSY Per
drop more crop
(Supplementary
water
management
activities)
Training at Moosakhia, Shkentalang, Pamtbuh, Dawki,
Sohkha, Nongtalang, Amsku, Mawlong, Umsalang,
Mupyut, Shkenpyrsit, Darang, and Amlanai under SDAO
Amlarem. (1 training per Village@ 20000/- each)
13 no's. - 2.60 2016-17
Total [Rs. in Lakh] 40 no's. - 8.00
District Irrigation Plan
NABARD Consultancy Services 238
Sl
no
Name of the
Block Sub/Sub
District
Concerned
ministry/Dept. Components
Activities
(AWARENESS PROGRAMME)
Total
no./Capaci
ty (cum)
Command
area/Irrigation
potential (in ha)
Estimated
cost (Rs. in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more crop
(Supplementary
water
management
activities)
Awareness programme at Lumkhudung,
Demthring and Niriang under ADO
Sohmynting circle. (1 no. per village @
20,000/-)
3 No's - 0.60 2016-17
Awareness programme at Thadmukoh,
Lumrot and Umjalasiaw under ADO
Namdong circle. (1 no. per village @
20,000/-)
3 No's - 0.60 2016-17
Awareness programme at Khliehtyrshi,
Pynthorwah and Pynthornein under ADO
HQR. (1 no. per village @ 20,000/-)
3 No's - 0.60 2016-17
Awareness programme at Rakabah,
Lumstong, Ksehrynshang and Nonglatem
under ADO Thadlaskein. (1 no. per village
@ 20,000/-)
4 No's - 0.80 2016-17
2 Laskein Block Agriculture
Awareness programme at Mookaiaw,
Mynksan, Mukhap, Mulum, Nongkynrih,
Rtiang, Bhain, Khliehsniriang, Mynkrem,
Saba, Khlookynring, Pasyih, Sahsniang,
and Thangthring under ADO Laskein
Block. (1 no. per village @ 20,000/-).
14 No's - 2.80 2016-17
3
Amlarem Sub
Division Agril
Officer
Agriculture
Awareness programme at Samanong,
Madantyrpait, Thangbuli, Pamtbuh, Jarain,
Khonglah, Lamin, Hawai Bhoi, Syndai
Mission, Pdengshakap, Amtapoh, Satpator,
and Amsohrhong under SDAO Amlarem.
(1 no. per village @ 20,000/-).
13 no's. - 2.60 2016-17
Total [Rs. in Lakh] 44 no's. - 8.00
District Irrigation Plan
NABARD Consultancy Services 239
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(TRAINING PROGRAMME OUTSIDE THE
STATE)
Total
no/Capacit
y (cum)
Command
area/Irrigation
potential (in
hec)
Estimated
cost (Rs. in
Lakh)
Period of
impleme
ntation
1 Thadlaskein
Block Agriculture
PMKSY
Per drop more crop
(Supplementary
water management
activities)
Training programme at NERIWALM-
TEZPUR (10 farmers for 5 days @ 1000/-each )
1 Nos
-
0.50
2016-17
Training Programme at Jorhat Agril.University,
Assam for 10 nos farmers for 3 days @1000/-
each.
1 Nos
-
0.30
2 Laskein Block Agriculture
Training programme at NERIWALM-TEZPUR
(10 farmers for 5 days @ 1000/-each )
1 Nos
-
0.50
Training Programme at Jorhat Agril.University,
Assam for 10 nos farmers for 3 days @1000/-
each.
1 Nos
-
0.30
3
Amlarem Sub-
Division
Agri.Officer
Agriculture
Training programme at NERIWALM-TEZPUR
(10 farmers for 5 days @ 1000/-each )
1 Nos
-
0.50
Training Programme at Jorhat Agril.University,
Assam for 10 nos farmers for 3 days @1000/-
each.
1 Nos
-
0.30
Total [Rs. in Lakh] 6 nos. - 2.40
District Irrigation Plan
NABARD Consultancy Services 240
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(EXPOSURE VISIT OUTSIDE THE STATE)
Total
no/Capac
ity (cum)
Command
area/Irrigation
potential (in
hec)
Estimated
cost (Rs. in
Lakh)
Period of
impleme
ntation
1 Thadlaskein
Block Agriculture
PMKSY
Per drop more crop
(Supplementary
water management
activities)
Exposure visit outside the State (20 farmers for
10 days @ 1000/-each )
1 Nos
-
2.00
2016-17
2 Laskein Block Agriculture Exposure visit outside the State (20 farmers for
10 days @ 600/-each )
1 Nos
-
2.00
3
Amlarem Sub-
Division
Agri.Officer
Agriculture Exposure visit outside the State (20 farmers for
10 days @ 600/-each )
1 Nos -
2.00
Total [Rs. in Lakh] 3 nos. - 6.00
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(EXPOSURE VISIT WITHIN THE STATE)
Total
no/Capac
ity (cum)
Command
area/Irrigation
potential (in
hec)
Estimated
cost (Rs. in
Lakh)
Period of
implement
ation
1 Thadlaskein
Block Agriculture PMKSY
Per drop more
crop
(Supplementar
y water
management
activities)
Exposure visit outside the State (20 farmers for 5
days @ 500/-each )
1 Nos
-
0.50
2016-17
2 Laskein Block Agriculture Exposure visit outside the State (20 farmers for 5
days @ 500/-each )
1 Nos
-
0.50
3
Amlarem Sub-
Division
Agri.Officer
Agriculture Exposure visit outside the State (20 farmers for
5Days @ 500/-each )
1 Nos -
0.50
Total [Rs. in Lakh] 3 nos. - 1.50
District Irrigation Plan
NABARD Consultancy Services 241
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(EXPOSURE VISIT WITHIN THE DISTRICT)
Total
no/Capa
city (cum)
Command
area/Irrigatio
n potential (in
hec)
Estimated
cost (Rs. in
Lakh)
Period of
implemen
tation
1 Thadlaskein
Block Agriculture
PMKSY Per drop
more crop
(Supplementary
water management
activities)
Exposure visit within the District (20 farmers for 1
days @ 300/-each ) 1 Nos - 0.06
2 Laskein Block Agriculture Exposure visit within the District (20 farmers for 1
days @ 300/-each ) 1 Nos - 0.06 2016-17
3
Amlarem Sub-
Division
Agri.Officer
Agriculture Exposure visit within the District (20 farmers for 1
days @ 300/-each ) 1 Nos - 0.06
Total [Rs. in Lakh] 3 nos. - 0.18
District Irrigation Plan
NABARD Consultancy Services 242
Strategic Action Plan for Irrigation under PMSKY for the Year 2017-2018
Sl
n
o
Name of the
Block
Sub/Sub
District
Connected
ministry/
Dept.
Components Activities
(TRAINING PROGRAMME)
Total
no/Capacity
(cum)
Command
area/Irrigati
on potential
(in ha)
Estimated
cost (Rs.
in Lakh)
Period of
Implementa
tion
1 Thadlaskein
Block Agriculture
PMKSY
Per drop more
crop
(Supplementary
water
management
activities)
Training programme at Lumkhudung, Niriang and
Moophlang, under ADO Sohmynting circle.(1 training per
Village @ 20000/- each)
3 no’s
-
0.60
2017-18
Training Programme at Namdong B, Thadmukoh and
Mynkhnang, under ADO Namdong (1 training per Village
@ 20000/- each)
3 no’s
-
0.60
Training programme at Mookyndur, Lad Mukhla, Sohphoh,
Myrjai, Rakabah, Umladang and Mookbu under ADO
Thadlaskein.(1 training per Village @ 20000/- each)
7 no’s - 1.40
2 Laskein
Block Agriculture
Training at Mookaiaw, Mootyrshiah, Madanrwan, Mulum,
Muchai, Madankynsaw, Rtiang, Biar, Shangpung Mission,
Bhain, Musiaw, Khliehsniriang, Thangrain and
Khliehrangnah under ADO Laskein Block.(1 training per
Village @ 20000/- each)
14 no’s - 2.80
3
Amlarem
Sub-Division
Agri.Officer
Agriculture
Training at Jaralud, Wahrong, Jarain, Padubah, Khonglah,
Mawngap, Latang, Tamabil, Wahlyngdoh, Rhongkum,
Muktapur, Kyrweng and Hawaibhoi under SDAO Amlarem
(1 training per Village @ 20000/- each)
13 no’s - 2.60
Total [Rs. in Lakh] 40 no’s - 8.00
District Irrigation Plan
NABARD Consultancy Services 243
Sl
n
o
Name of the
Block
Sub/Sub
District
Connected
ministry/D
ept.
Components Activities
(AWARENESS PROGRAMME)
Total
no/Capacit
y (cum)
Command
area/Irrigat
ion
potential
(in ha)
Estimated
cost (Rs. in
Lakh)
Period of
implementat
ion
1. Thadlaskein
Block Agriculture
PMKSY
Per drop
more crop
(Supplementa
ry water
management
activities)
Awareness programme at Phlonginkhaw, Sohmynting and
Madur, under ADO Sohmynting circle. (1 no per village @
20,000/-)
3 Nos
-
0.60
2017-18
Awareness programme at Namdong A, Namdong B and
Thadmynri under ADO Namdongcircle. (1 no per village @
20,000/-)
3 Nos.
-
0.60
Awareness programme at Ialong, Mookaswan and
Sabamuswangnein under ADO HQR. .(1 no per village @
20,000/-)
3 Nos.
-
0.60
Awareness programme at Moodymmai, Ummulong,
Shohshrieh and Wahiajer under ADO Thadlaskein. (1 no per
village @ 20,000/-)
4 Nos. - 0.80
2. Laskein
Block Agriculture
Awareness programme at Mootyrshiah, Kyrwen, Laskein,
Raliang, Mookyndeng, Shangpung Moosyiem,
Shilliangmyntang, Musiaw, Khyndawwaso, Maitdieng,
Lumuriap, Samatan, Iongkalang, and Shetjahadem under ADO
Laskein Block. (1 no per village@20,000/-).
14 Nos. - 2.80
3.
Amlarem Sub
Division
Agril Officer
Agriculture
Awareness programme at Moopyut, Shkenpyrsit, Umsalang,
Moosakhiah, Umladkhur, Shkentalang, Amlarem, Jaralood,
Wahrong, Padubah, Mawngap, Dawki and bakur under SDAO
Amlarem (1 no per village @ 20,000/-).
13 Nos. - 2.60
Total [Rs. in Lakh] 40 Nos. - 8.00
District Irrigation Plan
NABARD Consultancy Services 244
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(TRAINING PROGRAMME OUTSIDE THE
STATE)
Total
no/Capac
ity (cum)
Command
area/Irrigat
ion
potential
(in hec)
Estimated
cost (Rs. in
Lakh)
Period of
implementa
tion
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more crop
(Supplementary
water
management
activities)
Training programme at NERIWALM,TEZPUR (10
farmers for 5 days @ 1000/-each) 1 Nos - 0.5
2017-18
Training Programme at Jorhat Agril.University, Assam
for 10 nos farmers for 3 days @1000/- each. 1 Nos - 0.3
2 Laskein Block Agriculture
Training programme at NERIWALM,TEZPUR (10
farmers for 5 days @ 1000/-each) 1 Nos - 0.5
Training Programme at Jorhat Agril.University, Assam
for 10 nos farmers for 3 days @1000/- each. 1 Nos - 0.3
3
Amlarem Sub-
Division
Agri.Officer
Agriculture
Training programme at NERIWALM,TEZPUR (10
farmers for 5 days @ 1000/-each ) 1 Nos - 0.5
Training Programme at Jorhat Agril.University, Assam
for 10 nos. farmers for 3 days @1000/- each. 1 Nos - 0.3
Total [Rs. in Lakh] 6 nos. - 2.4
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(EXPOSURE VISIT OUTSIDE THE STATE)
Total
no/Capac
ity (cum)
Command
area/Irrigat
ion
potential
(in hec)
Estimated
cost (Rs. in
Lakh)
Period of
implementa
tion
1 Thadlaskein
Block Agriculture PMKSY Per
drop more
crop
Exposure visit outside the State (20 farmers for 10 days
@ 1000/-each ) 1 Nos - 2
2017-18
2 Laskein Block Agriculture Exposure visit outside the State (20 farmers for 10 days
@ 600/-each ) 1 Nos - 2
District Irrigation Plan
NABARD Consultancy Services 245
3
Amlarem Sub-
Division
Agri.Officer
Agriculture
(Supplementar
y water
management
activities)
Exposure visit outside the State (20 farmers for 10 days
@ 600/-each ) 1 Nos - 2
Total [Rs. in Lakh] 3 nos. - 6
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(EXPOSURE VISIT WITHIN THE STATE)
Total
no/Capac
ity (cum)
Command
area/Irrigat
ion
potential
(in hec)
Estimated
cost (Rs. in
Lakh)
Period of
implementa
tion
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more
crop
(Supplementa
ry water
management
activities)
Exposure visit outside the State (20 farmers for 5 days @
500/-each ) 1 Nos - 0.5
2017-18 2 Laskein Block Agriculture
Exposure visit outside the State (20 farmers for 5 days @
500/-each ) 1 Nos - 0.5
3
Amlarem Sub-
Division
Agri.Officer
Agriculture Exposure visit outside the State (20 farmers for 5Days @
500/-each ) 1 Nos - 0.5
Total [Rs. in Lakh] 3 nos. - 1.5
District Irrigation Plan
NABARD Consultancy Services 246
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(EXPOSURE VISIT
WITHIN THE DISTRICT)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in
hec)
Estimated
cost (Rs. in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per drop more
crop (Supplementary
water management
activities)
Exposure visit within the
District (20 farmers for 1 days
@ 300/-each )
1 Nos - 0.06
2017-18 2 Laskein Block Agriculture
Exposure visit within the
District (20 farmers for 1 days
@ 300/-each )
1 Nos - 0.06
3
Amlarem Sub-
Division
Agri.Officer
Agriculture
Exposure visit within the
District (20 farmers for 1 days
@ 300/-each )
1 Nos - 0.06
Total [Rs. in Lakh] 3 nos. - 0.18
District Irrigation Plan
NABARD Consultancy Services 247
Strategic Action Plan for Irrigation under PMSKY for the Year 2018-2019
Sl no
Name of the
Block
Sub/Sub
District
Connected
ministry/De
pt.
Components
Activities
(TRAINING PROGRAMME)
Total
no/Capacity
(cum)
Command
area (in
ha)
Estimated
cost (Rs.
in Lakh)
Period of
Implementati
on
1 Thadlaskein
Block Agriculture
PMKSY
Per drop
more crop
(Supplementa
ry water
management
activities)
Training programme at Moobyrni, Iongnoh and Chyrmang
under ADO Sohmynting circle. (1 training per Village @
20000/- each)
3 nos.
-
0.60
2018-19
Training Programme at Moorap, Nongthymme and Mookjat,
under ADO Namdong. (1 training per Village @ 20000/-
each)
3 nos.
-
0.60
Training programme at Umbluh Mynsning, Ladaw,
Moolephaw, Iangkar, Mynkrem, Nonglatem and Umrakia
under ADO Thadlaskein. (1 training per Village @ 20000/-
each)
7 nos. - 1.40
2 Laskein
Block Agriculture
Training at Mynkrem, Mynska, Khlookynring, Muthlongrim,
Pasyih, Kyndontuber, Myntkung, Khliehumbuit, Umsalait,
Nongryngkoh, Khonshnong, Madanrwan, Shetjahadem and
Madanpohkseh under ADO Laskein Block. (1 training per
Village @ 20000/- each)
14 nos. - 2.80
3
Amlarem
Sub-Division
Agri.Officer
Agriculture
Training at Lakroh South Syndai, Shnong , Amjalong,
Amsohtai, Jonguchen, Pdengshakap, Lurniang, Pdengkseh,
Amlari, Ammutong, Pamtadong, Amtapoh and Nongbareh
under SDAO Amlarem1 training per Village @ 20000/- each)
13 nos. - 2.60
Total [Rs. in Lakh] 40 nos. - 8.00
District Irrigation Plan
NABARD Consultancy Services 248
Sl no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(AWARENESS PROGRAMME)
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs. in
Lakh)
Period of
implementati
on
1. Thadlaskein
Block Agriculture
PMKSY
Per drop
more crop
(Supplementa
ry water
management
activities)
Awareness programme at Mustem,
Pynthorlangtein and Moobyrni under ADO
Sohmynting circle.(1 no per village @ 20,000/-)
3 nos.
-
0.60
2018-19
Awareness programme at Kremmyrsiang,
Khonsaro and Mynkhnang under ADO
Namdongcircle. (1 no. per village @ 20,000/-)
3 nos.
-
0.60
Awareness programme at Mookynniang, ATS
and Mihmyntdunein under ADO HQR. (1 no.
per village @ 20,000/-)
3 nos.
-
0.60
Awareness programme at Tyrshang, Nangbah,
Moopasi and Moodop under ADO
Thadlaskein. (1 no. per village @ 20,000/-)
4 nos. - 0.80
2. Laskein
Block Agriculture
Awareness programme at Madanpohkseh,
Khonshnong, Lakadong, Mynso, Mooshrot,
Myntkung, Kyndongtuber, Pamanik,
Pdeinlapatein, Iongkasaro, Thadbamon,
Nohkrei, Khatkasla and Moobando under
ADO Laskein Block (1 no. per village @
20,000/-).
14 nos. - 2.80
3.
Amlarem
Sub
Division
Agril
Officer
Agriculture
Awareness programme at Tamabil,
Amlympiang, Sohkha, Kudengthymmai,
Riahjalong, Nongtalang, Twahusdiah,
Rhongkum, Muktapur, Amsko, Mawlong,
Ammutong and Lurniang under SDAO
Amlarem. (1 no. per village @ 20,000/-).
13 nos. - 2.60
Total [Rs. in Lakh] 40 nos. - 8.00
District Irrigation Plan
NABARD Consultancy Services 249
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(TRAINING PROGRAMME OUTSIDE THE
STATE)
Total
no/Capacity
(cum)
Command
area/Irrigat
ion
potential
(in hec)
Estimated
cost (Rs. in
Lakh)
Period of
implementat
ion
1 Thadlaskein
Block Agriculture
PMKSY Per drop
more crop
(Supplementary
water
management
activities)
Training programme at NERIWALM,TEZPUR
(10 farmers for 5 days @ 1000/-each ) 1 Nos - 0.50
2018-19
Training Programme at Jorhat Agril.University,
Assam for 10 nos farmers for 3 days @1000/-
each.
1 Nos - 0.30
2 Laskein Block Agriculture
Training programme at NERIWALM,TEZPUR
(10 farmers for 5 days @ 1000/-each ) 1 Nos - 0.50
Training Programme at Jorhat Agril.University,
Assam for 10 nos farmers for 3 days @1000/-
each.
1 Nos - 0.30
3
Amlarem Sub-
Division
Agri.Officer
Agriculture
Training programme at NERIWALM,TEZPUR
(10 farmers for 5 days @ 1000/-each ) 1 Nos - 0.50
Training Programme at Jorhat Agril.University,
Assam for 10 nos farmers for 3 days @1000/-
each.
1 Nos - 0.30
Total [Rs. in Lakh] 6 nos. - 2.40
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(EXPOSURE VISIT OUTSIDE THE STATE)
Total
no/Capaci
ty (cum)
Command
area/Irrigation
potential (in
hec)
Estimated
cost (Rs. in
Lakh)
Period of
implement
ation
1 Thadlaskein
Block Agriculture PMKSY Per drop
more crop
(Supplementary
water
Exposure visit outside the State (20 farmers for
10 days @ 1000/-each ) 1 Nos - 2.00
2018-19
2 Laskein Block Agriculture Exposure visit outside the State (20 farmers for
10 days @ 600/-each ) 1 Nos - 2.00
District Irrigation Plan
NABARD Consultancy Services 250
3
Amlarem Sub-
Division
Agri.Officer
Agriculture
management
activities) Exposure visit outside the State (20 farmers for
10 days @ 600/-each ) 1 Nos - 2.00
Total [Rs. in Lakh] 3 nos. - 6.00
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities (EXPOSURE VISIT WITHIN THE
STATE)
Total
no/Capacit
y (cum)
Command
area/Irrigation
potential (in
hec)
Estimated
cost (Rs. in
Lakh)
Period of
implemen
tation
1 Thadlaskein
Block Agriculture
PMKSY Per drop
more crop
(Supplementary
water
management
activities)
Exposure visit outside the State (20 farmers for 5
days @ 500/-each ) 1 Nos - 0.5
2018-19 2 Laskein Block Agriculture
Exposure visit outside the State (20 farmers for 5
days @ 500/-each ) 1 Nos - 0.5
3
Amlarem Sub-
Division
Agri.Officer
Agriculture Exposure visit outside the State (20 farmers for
5Days @ 500/-each ) 1 Nos - 0.5
Total [Rs. in Lakh] 3 nos. - 1.5
District Irrigation Plan
NABARD Consultancy Services 251
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(EXPOSURE VISIT WITHIN THE
DISTRICT)
Total
no/Capacit
y (cum)
Command
area/Irrigation
potential (in
hec)
Estimated
cost (Rs. in
Lakh)
Period of
implement
ation
1 Thadlaskein
Block Agriculture PMKSY Per drop
more crop
(Supplementary
water
management
activities)
Exposure visit within the District (20 farmers
for 1 days @ 300/-each ) 1 Nos - 0.06
2018-19 2 Laskein Block Agriculture Exposure visit within the District (20 farmers
for 1 days @ 300/-each ) 1 Nos - 0.06
3
Amlarem Sub-
Division
Agri.Officer
Agriculture Exposure visit within the District (20 farmers
for 1 days @ 300/-each ) 1 Nos - 0.06
Total [Rs. in Lakh] 3 nos. - 0.18
District Irrigation Plan
NABARD Consultancy Services 252
Strategic Action Plan for Irrigation under PMSKY for the Year 2019-2020
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(TRAINING PROGRAMME)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in hec)
Estimated
cost (Rs. in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY
Per drop more
crop
(Supplementary
water
management
activities)
Training programme at Demthring,
Pynthorlangtein and Madur under ADO
Sohmynting circle.(1 training per Village
@ 20000/- each)
3 nos.
-
0.60
2019-20
Training Programme at Namdong A,
Umjalasiaw and Khonsar under ADO
Namdong B. (1 training per Village @
20000/- each)
3 nos.
-
0. 60
Training programme at Mihmyntdu,
Pynthorwah and Khliehtyrshi under
ADO HQR.(1 training per Village @
20000/- each)
3 nos.
-
0.60
Training programme at Kdohkule,
Kpermynsnieh, Pdeiniadaw, Moorathud,
Umlangshor, Wahiajer, Nongbah and
Ialong under ADO Thadlaskein. (1
training per Village @ 20000/- each)
8 nos. - 1.60
2 Laskein Block Agriculture
Training at Iongulang, Raliang, Mulieh,
Nongkynrih, Shangpung Pohshnong,
Moobando, Umsalang, Mynskiah,
Thadialong, Samatan, Niawkmai,
Mynksan, Mukhap and Thadsning under
ADO Laskein Block. (1 training per
Village @ 20000/- each)
14 nos. - 2.80
3
Amlarem Sub-
Division
Agri.Officer
Agriculture
Training at Pasaddwar, Pdengkarong,
Satpatar , Samanong, Amlarem,
Madantyrpait, Thangbuli, Umladkhur,
Riahjalong, Amlympiang,
Kudengthymmai, Lamin and wahusdiah,
13 nos. - 2.60
District Irrigation Plan
NABARD Consultancy Services 253
Sl
no
Name of the
Block
Sub/Sub
District
Connected
Ministry/Dept. Components
Activities
(AWARENESS PROGRAMME)
Total
no./Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs. in
Lakh)
Period of
implementati
on
1. Thadlaskein
Block Agriculture
PMKSY
Per drop more
crop
(Supplementa
ry water
management
activities)
Awareness programme at Muphlang, Iongnoh and
Chyrmang under ADO Sohmynting circle. (1 no. per
village @ 20,000/-)
3 nos.
-
0.60
2019-20
Awareness programme at Moorap, Nongthymme, and
Mookjat under ADO Namdongcircle. (1 no. per village
@ 20,000/-)
3 nos.
-
0.60
Awareness programme at Mihmyntdu, Lumpyrtuh and
Moopyllaitsyiar under ADO HQR. (1 no. per village @
20,000/-)
3 nos.
-
0.60
Awareness programme at Laru, Ionglwit, Mynkrem, and
Takhniang under ADO Thadlaskein. (1 no. per village @
20,000/-)
4 nos. - 0.80
2. Laskein
Block Agriculture
Awareness programme at Priang, Iawthymme,
Umdiengling, Thadialong, Sookhlieh, Tum Tum,
Myntangtihwieh, Madanrwai, Mynskiah, Khliehumbuit,
Nongryngkoh, Psiar, Saphai, and Iongkynshur Under
ADO Laskein Block. (1 no. per village @ 20,000/-).
14 nos - 2.80
3.
Amlarem Sub
Division
Agril Officer
Agriculture
Awareness programme at Shnongpdeng, Syndai
Mission, Amjalong, Amsohtai, Pamtadong, Nongbareh,
Darrang, Amkoi, Kudengrim, Amtra, Kharkhana,
Sankhad, and Lakroh. (1 no. per village @ 20,000/-).
13 nos. - 2.60
Total [Rs. in Lakh] 40 nos. - 8.00
under SDAO Amlarem1 training per -
Village @ 20000/- each)
Total [Rs. in Lakh] 44 nos. - 8.80 lakh
District Irrigation Plan
NABARD Consultancy Services 254
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(TRAINING PROGRAMME OUTSIDE THE
STATE)
Total
no/Capac
ity (cum)
Command
area/Irrigati
on potential
(in hec)
Estimated
cost (Rs.
in Lakh)
Period of
impleme
ntation
1 Thadlaskein
Block Agriculture
PMKSY Per drop
more crop
(Supplementary water
management activities)
Training programme at NERIWALM,TEZPUR (10
farmers for 5 days @ 1000/-each ) 1 Nos - 0.50
2019-20
Training Programme at Jorhat Agril.University,
Assam for 10 nos farmers for 3 days @1000/- each. 1 Nos - 0.30
2 Laskein Block Agriculture
Training programme at NERIWALM,TEZPUR (10
farmers for 5 days @ 1000/-each ) 1 Nos - 0.50
Training Programme at Jorhat Agril.University,
Assam for 10 nos farmers for 3 days @1000/- each. 1 Nos - 0.30
3
Amlarem Sub-
Division
Agri.Officer
Agriculture
Training programme at NERIWALM,TEZPUR (10
farmers for 5 days @ 1000/-each ) 1 Nos - 0.50
Training Programme at Jorhat Agril.University,
Assam for 10 nos farmers for 3 days @1000/- each. 1 Nos - 0.30
Total [Rs. in Lakh] 6 nos. - 2.40
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept Components
Activities
(EXPOSURE VISIT OUTSIDE THE STATE)
Total
no/Capac
ity (cum)
Command
area/Irrigati
on
potential(in
hec)
Estimated
cost (Rs.
in Lakh)
Period of
implemen
tation
1 Thadlaskein
Block Agriculture
PMKSY Per drop more
crop (Supplementary
water management
activities)
Exposure visit outside the State (20 farmers for 10
days @ 1000/-each) 1 Nos - 2.00
2019-20 2 Laskein Block Agriculture
Exposure visit outside the State (20 farmers for 10
days @ 600/-each) 1 Nos - 2.00
3
Amlarem
Sub-Division
Agri.Officer
Agriculture Exposure visit outside the State (20 farmers for 10
days @ 600/-each) 1 Nos - 2.00
Total [Rs. in Lakh] 3 nos. - 6.00
District Irrigation Plan
NABARD Consultancy Services 255
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(EXPOSURE VISIT WITHIN THE
STATE)
Total
no/Capac
ity (cum)
Command
area/Irrigation
potential (in hec)
Estimated
cost (Rs. in
Lakh)
Period of
implemen
tation
1 Thadlaskein
Block Agriculture
PMKSY Per drop more
crop (Supplementary
water management
activities)
Exposure visit outside the State (20
farmers for 5 days @ 500/-each) 1 Nos - 0.50
2019-20 2 Laskein Block Agriculture Exposure visit outside the State (20
farmers for 5 days @ 500/-each) 1 Nos - 0.50
3
Amlarem Sub-
Division
Agri.Officer
Agriculture Exposure visit outside the State (20
farmers for 5Days @ 500/-each) 1 Nos - 0.50
Total [Rs. in Lakh] 3 nos. - 1.50
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(EXPOSURE VISIT WITHIN THE
DISTRICT)
Total
no/Capac
ity (cum)
Command
area/Irrigation
potential (in
hec)
Estimated
cost (Rs. in
Lakh)
Period of
implement
ation
1 Thadlaskein
Block Agriculture
PMKSY Per drop more
crop (Supplementary
water management
activities)
Exposure visit within the District (20
farmers for 1 days @ 300/-each) 1 Nos - 0.06
2019-20 2 Laskein Block Agriculture Exposure visit within the District (20
farmers for 1 days @ 300/-each) 1 Nos - 0.06
3
Amlarem Sub-
Division
Agri.Officer
Agriculture Exposure visit within the District (20
farmers for 1 days @ 300/-each) 1 Nos - 0.06
Total [Rs. in Lakh] 3 nos. - 0.18
District Irrigation Plan
NABARD Consultancy Services 256
Strategic Action Plan for Irrigation under PMSKY for the Year 2020-2021
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(TRAINING PROGRAMME)
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs. in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY
Per drop more
crop
(Supplementary
water
management
activities)
Training programme at Moobakhon,
Mynsngat, Nongdhar, Iongshitait,
Nongkhyllep, Lakaroi, Umshangiar, Tamu,
Saitsama, Khanduli, Sanaro,
Pdieniawmusiang, Saphohwaiong,
Madansynrang, Laru, Moorapuchai,
Takhniang and Kremlabit under ADO
Thadlaskein. (1 training per Village @ 20000/-
each)
18 nos. - 3.60
2020-21
2 Laskein Block Agriculture
Training at Saba, Iongkynshur, Mukroh,
Saphai, Iawthymme, Priang, Pdeinlapatein,
Myntangtihwieh, Umdiengling, Thangthring,
Iongkasaro, Psiar, Sahsniang, Shangpung
Moosyiem, Shangpung Khliemuchut,
Lummooriap, Sookhlieh and Khadkasla ADO
Laskein Block. (1 training per Village @
20000/- each)
18 nos. - 3.60
3
Amlarem Sub-
Division
Agri.Officer
Agriculture
Training at Kharkhana, Sankhad, Hawaisutnga
and Amsohrhong under SDAO Amlarem (1
training per Village@ 20000/- each) 4 nos. - 0.80
Total [Rs. in Lakh] 40 nos. - 8.00
District Irrigation Plan
NABARD Consultancy Services 257
Sl
no
Name of the
Block
Sub/Sub
District
Connected
ministry/Dept. Components
Activities
(AWARENESS PROGRAMME)
Total
no/Capacity
(cum)
Command
area (in ha)
Estimated
cost (Rs. in
Lakh)
Period of
implementation
1 Thadlaskein
Block
Agriculture
PMKSY Per drop
more crop
(Supplementary
water management
activities)
Awareness programme at Maskut, ATS,
Mookynniang, Moodymmai, Ladmukhla,
Ummulong, Nongmulieh, Moolyngkein,
Kdiap, Mooker, Lumkya, Mukhla, Lumtrep,
Mupliang, Wahrymbai, Mookhoniung,
Nongjngi and Nongrimbambtong under
ADO Thadlaskein. (1 no. per village @
20,000/-)
18 nos. - 3.60
2 Laskein Block
Awareness programme at Latanai,
Madankynsaw, Lummuphan, Iongulang,
Madanrwan, Niawkmai, Muchai, Biar,
Shangpung Mission, Umsalang, Latymphu,
Thadsning, Thadmuthlong A, Phramer,
Barato, Mynska, Khliehrangnah and
Chutwakhusarhen under ADO Laskein
Block. (1 no per village @ 20,000/-).
18 nos. - 3.60 2020-21
3
Amlarem Sub
Division
Agril Officer
Awareness programme at Wahlyngdoh,
Kongwan, Tarangblang and Iongushen
under SDAO Amlarem (1 no per village @
20,000/).
4 nos. - 0.80
Total [Rs. in Lakh] 40 nos. - 8.00
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(TRAINING PROGRAMME OUTSIDE
THE STATE)
Total
no/Capacity
(cum)
Command
area/Irrigat
ion
potential
(in hec)
Estimated
cost (Rs.
in Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per drop
more crop
(Supplementary
Training programme at
NERIWALM,TEZPUR (10 farmers for 5
days @ 1000/-each)
1 Nos - 0.50 2020-21
District Irrigation Plan
NABARD Consultancy Services 258
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities (EXPOSURE VISIT OUTSIDE
THE STATE)
Total
no/Capacity
(cum)
Command
area/Irrigat
ion
potential
(in hec)
Estimated
cost (Rs. in
Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture PMKSY Per drop
more crop
(Supplementary
water
management
activities)
Exposure visit outside the State (20 farmers
for 10 days @ 1000/-each) 1 Nos - 2.00
2020-21 2 Laskein Block Agriculture
Exposure visit outside the State (20 farmers
for 10 days @ 600/-each) 1 Nos - 2.00
3
Amlarem Sub-
Division
Agri.Officer
Agriculture Exposure visit outside the State (20 farmers
for 10 days @ 600/-each) 1 Nos - 2.00
Total [Rs. in Lakh] 3 nos. - 6.00
water management
activities)
Training Programme at Jorhat
Agril.University, Assam for 10 nos farmers
for 3 days @1000/- each.
1 Nos - 0.30
2 Laskein Block Agriculture
Training programme at
NERIWALM,TEZPUR (10 farmers for 5
days @ 1000/-each)
1 Nos - 0.50
Training Programme at Jorhat
Agril.University, Assam for 10 nos farmers
for 3 days @1000/- each.
1 Nos - 0.30
3
Amlarem Sub-
Division
Agri.Officer
Agriculture
Training programme at
NERIWALM,TEZPUR (10 farmers for 5
days @ 1000/-each)
1 Nos - 0.50
Training Programme at Jorhat
Agril.University, Assam for 10 nos farmers
for 3 days @1000/- each.
1 Nos - 0.30
Total [Rs. in Lakh] 6 nos. - 2.40
District Irrigation Plan
NABARD Consultancy Services 259
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(EXPOSURE VISIT WITHIN THE
STATE)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in
hec)
Estimated cost
(Rs. in Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture PMKSY Per
drop more crop
(Supplementary
water
management
activities)
Exposure visit outside the State (20
farmers for 5 days @ 500/-each ) 1 Nos - 0.5 2020-21
2 Laskein Block Agriculture Exposure visit outside the State (20
farmers for 5 days @ 500/-each ) 1 Nos - 0.5 2020-21
3
Amlarem Sub-
Division
Agri.Officer
Agriculture Exposure visit outside the State (20
farmers for 5Days @ 500/-each ) 1 Nos - 0.5 2020-21
Total [Rs. in Lakh] 3 nos. - 1.5
Sl
no
Name of the
Block Sub/Sub
District
Connected
ministry/Dept Components
Activities
(EXPOSURE VISIT WITHIN THE
DISTRICT)
Total
no/Capacity
(cum)
Command
area/Irrigation
potential (in
hec)
Estimated cost
(Rs. in Lakh)
Period of
implementation
1 Thadlaskein
Block Agriculture
PMKSY Per
drop more crop
(Supplementary
water
management
activities)
Exposure visit within the District (20
farmers for 1 days @ 300/-each ) 1 Nos - 0.06
2020-21 2 Laskein Block Agriculture Exposure visit within the District (20
farmers for 1 days @ 300/-each ) 1 Nos - 0.06
3
Amlarem Sub-
Division
Agri.Officer
Agriculture Exposure visit within the District (20
farmers for 1 days @ 300/-each ) 1 Nos - 0.06
Total [Rs. in Lakh] 3 nos. - 0.18
District Irrigation Plan
NABARD Consultancy Services 260
Maps
District Irrigation Plan
NABARD Consultancy Services 261
Map 2: Agro-Climatic Zones Map of West Jaintia Hills
District Irrigation Plan
NABARD Consultancy Services 262
Map 3: Contour Map
District Irrigation Plan
NABARD Consultancy Services 263
Map 4: Drainage Map
District Irrigation Plan
NABARD Consultancy Services 264
Map 5: Forest Map
District Irrigation Plan
NABARD Consultancy Services 265
Map 6: Land Resources Map
District Irrigation Plan
NABARD Consultancy Services 266
Map 7: Land Use 10K Map
District Irrigation Plan
NABARD Consultancy Services 267
Map 8: Land Use Map
District Irrigation Plan
NABARD Consultancy Services 268
Map 9: Slope (%Rise) Map
District Irrigation Plan
NABARD Consultancy Services 269
Map 10: Soil Map
District Irrigation Plan
NABARD Consultancy Services 270
Map 11: Watershed Map
District Irrigation Plan
NABARD Consultancy Services 271
Map 12: Sub-Watershed Prioritization Map
District Irrigation Plan
NABARD Consultancy Services 272
Map 13: Wetland Map
District Irrigation Plan
NABARD Consultancy Services 273
Map 14: Wasteland Map
District Irrigation Plan
NABARD Consultancy Services 274
Map 15: Land Degradation Map
Notes…
District Irrigation Plan
NABARD Consultancy Services 276
NABARD CONSULTANCY SERVICES PVT. LTD.
Corporate Office : 24, Rajendra Place, NABARD Building, New Delhi – 110125
Reg. Office : Plot No. C24, G Taluka, 3rd Floor, NABARD Building
Bandra Kurla Complex, Bandra East, Mumbai-400051