District 8 New Funding Project Selection Jon Huseby | District Engineer | ATP 8 Presentation | October 4, 2017 District 8 | mndot.gov

District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

District 8 New Funding Project Selection

Jon Huseby | District Engineer | ATP 8 Presentation | October 4, 2017

District 8 | mndot.gov

Page 2: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

FY 2018 – 2021 Approach to 2017 New Funding

10/4/2017 2

Page 3: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

Distribution of 17 New Funding

D1 D2 D3 D4 D6 D7 D8 Metro Statewide Project Delivery Total

Dollar $115 M $53 M $86 M $56 M $90 M $93 M $50 M $406 M $12 M $39 M $1 B

Percent 11.5% 5.3% 8.6% 5.6% 9% 9.3% 5% 40.6% 1.2% 3.9% 100%

10/4/2017 3

17 New Funding Distribution Process• Combined target distribution approach based on:

• The 4-year average distribution of DRMP funds• DRMP distribution with 50% weighted for Metro District• Distribution of State and Federal funds to Districts per STIP funding

guidance• The 4-year average of DRMP, SPP and ADA funds• DRMP, SPP and ADA distribution with 50% weighted for Metro District

Page 4: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

Overarching Priorities for New Funding

• Consistency with MnSHIP

• Consistency with NexTen

• Assess Risks Identified in Current Program

10/4/2017 4

Page 5: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

Priorities for New Funding

FY 2018 - 2021

• Alignment with NexTen

• Deliverability

• Improved performance outcomes

• Alignment with budget and funding

• Geographic distribution for total program – alignment with DRMP distribution formula

• Work type distribution

FY 2022 and Beyond

• District risk priorities

• Expansion/Capacity/Equity based on developed criteria:

• Greater Minnesota mobility

• Corridors of Commerce

• TED

10/4/2017 5

Page 6: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

Project Selection Criteria for New Funding

1. Long-term pavement preservation projects

2. Additional bridge repairs and replacements to continue to meet performance targets.

3. Initial investments in major urban corridor projects like I-94 from St Paul to Minneapolis, and Twin Ports Interchange in Duluth, to reduce the impact on future programs.

4. Other priority investment areas that were funded below the MnSHIP levels

5. Areas identified by Districts as risks within their existing program

10/4/2017 6

Page 7: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

MnDOT Project Selection Process for Regular Program

• Mn Go

• Other Statewide Plans

• MnSHIP

• Funding Targets

• Performance Measures

• Asset Condition

• Prediction Models

• Public Engagement

• Program and Construction Coordination

• Project Delivery

• Coordination with Local Agencies

10/4/2017 7

Page 8: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

Timeline for New Funding Project Selection

• FY 18 projects already approved at July TPIC meeting

• Review FY 19-21 projects with ATPs and stakeholders

• Review FY 22 projects with normal ATP process

• Inclusion of 17NEW projects in 2019 – 2022 STIP in April 2018

10/4/2017 8

Page 9: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

Project Selection Criteria for Corridors of Commerce Projects

10/4/2017 9

• The criteria used to score Corridors of Commerce projects was defined in legislation as:

1. Return on Investment

2. Measureable Impacts on Commerce & Economic Competitiveness

3. Efficiency in the Movement of Freight Including:

• Measures of AADT & HCAADT

• Measures of congestion or travel time reliability

4. Improvements to Traffic Safety

5. Connections to Regional Trade Centers, Local Highways & Other Transportation Modes

6. Addresses Multiple System Policy Objectives & Principles

7. Support and Consensus for Project by Surrounding Community

8. Regional Balance

Page 10: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

Timeline for Corridors of Commerce Projects

• Summer 2017: MnDOT reviewing scoring criteria

• October – November 2017: ATP input meetings

*We will likely be scheduling an additional meeting for this outreach

• December 2017 – January 2018: Corridors of Commerce Project Recommendations

• February 2018: Project Selection

*Timeline is subject to change

10/4/2017 10

Page 11: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

Thank you!

Jon Huseby

[email protected]

320-231-5497

10/4/2017 11

Page 12: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

District 8 New Funding Project Selection (Continued)

Susann Karnowski | Assistant District Engineer | ATP 8 Presentation | October 4, 2017

District 8 | mndot.gov

Page 13: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

Project Selection Criteria for New Funding

1. Long-term pavement preservation projects

2. Additional bridge repairs and replacements to continue to meet performance targets.

3. Initial investments in major urban corridor projects like I-94 from St Paul to Minneapolis, and Twin Ports Interchange in Duluth, to reduce the impact on future programs.

4. Other priority investment areas that were funded below the MnSHIP levels

5. Areas identified by Districts as risks within their existing program

10/4/2017 13

Page 14: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

New Funding Project Selection Process

• Central Office Guidance

• Districts submitted projects to Central Office for review & prioritization

• CO scored them according to prioritization criteria

• Gather ATP input

• Make changes to projects, if needed

• Include in 2019 – 2022 STIP

10/4/2017 14

Page 15: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

2018 District 8 Tier 1 Proposed Projects with New Funding

10/4/2017 15

Fiscal

YearAction Hwy Project Description Project Cost

2018 Added 277 Turnback (cash transfer) from MN 40 to MN 7 $9,600,000

2018Advance &

Increase ScopeDistrictwide

Bridge painting for bridges 5526, 34006,

42003, 43006 & 87008$1,560,000

2018 Added Districtwide Culvert lining $600,000

Total New Funding in 2018 $11,760,000

Projects Submitted by D8 and Selected for FY 2018

Page 16: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

2019 - 2021 District 8 Tier 1 Proposed Projects with New Funding

10/4/2017 16

Fiscal

YearAction Hwy Project Description

Project

Cost

2019 Advanced 68Replace bridge 5432 over Lazarus Creek, 3.6 miles west of

Canby; replace 24” CMP$1,440,000

2020 Advanced 753” CIR and 2” overlay plus ADA in Bellingham from Twp 127

(north of Hwy 212) to MN 7 (22.2 miles) except in Madison$8,655,000

2021Advance &

Increase Scope212

Unbonded concrete overlay from 2.3 miles east of MN 23 to

Renville (10.9 miles), plus reconstruction in Sacred Heart$26,100,000

Total New Funding in 2019 - 2021 $36,195,000

Projects Submitted by D8 and Selected for Proposal into the STIP for 2019 - 2021

Page 17: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

District 8 Tier 2 Projects with New Funding

10/4/2017 17

Hwy Action Project Description

271Possible flex from 2022 to as

early as 2019

Reclaim and overlay Hwy 271 from MN 19 to Hendricks and

thin mill and overlay north of Hendricks to the South Dakota

state line

4Possible flex from 2026 to as

early as 2020

Reclaim and bituminous overlay on Hwy 4 from Northern Cross

Ave. (Cosmos) to .5 miles north of Township 243

19Possible flex from 2024 to as

early as 2019

Rehab bridge #5133 on Hwy 19 over the Redwood River in

Redwood Falls

Projects Submitted by D8 and Selected as Tier 2 for Possible Advancement in the STIP

Page 18: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

District 8 New Funding Projects Submitted but Not Selected

10/4/2017 18

Hwy Action Project Description

23Move ahead from

2020 to 2019

Mill and concrete overlay of Hwy 23 from Cottonwood to

Granite Falls, plus replace bridges 91419, 91420 & 91459,

panels on 87007, ADA and turn lanes

TBDAdd; undetermined

yearUndetermined shoulder widening project

40 Advance Replace bridge # 6706 on Hwy 40 east of Madison

71 AdvanceReplace bridge # 5543 on Hwy 71 over the Cottonwood River,

approximately 3 miles south of US 14

Projects Submitted by D8 but Not Selected for New Funding

Page 19: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

Summary of D8 New Funding

10/4/2017 19

Description DollarsFY 2018 Project Commitments $11,760,000

FY 2019 – 2021 Project Commitments $36,195,000

Preliminary Engineering for Tier 2

Projects$984,000

TBD $1,061,000

Total New Funding in D8 $50,000,000

Page 20: District 8 New Funding Project Selection Funding Presentation.pdfNew Funding Project Selection Process •Central Office Guidance •Districts submitted projects to Central Office

Thank you!

Susann Karnowski

[email protected]

320-214-6370

10/4/2017 20