82
District 10 2018 Outreach Joseph P. Dubovi, III., P. E. District Executive

District 10 2018 Outreach - penndot.gov Outreac… · Satterlee Bridge • Route 119 • Bridge Replacement or Rehabilitation • East Mahoning Twp. ... Brian N. Allen, P.E. Assistant

Embed Size (px)

Citation preview

District 10 2018 Outreach

Joseph P. Dubovi, III., P. E.District Executive

2018 Outreach Agenda

Resources

District Profile

Leslie S. Richards, Secretary of Transportation

Construction Projects

Projects in Design

County Maintenance

Innovation & Improvements

Upcoming Programs

District 10 Profile

INTERESTING TO KNOW:

PA has roughly as many state-maintained miles of highway as New

England, New York, & New Jersey combined (40,000).

PA has the 5th largest roadway system & the 3rd largest number of

bridges in the country.

Back to Agenda

Feature Armstrong Butler Clarion Indiana Jefferson Total

Population 66,486 186,847 38,513 86,364 44,073 422,283

-Townships 28 33 22 24 23 130

-Boroughs 16 23 12 14 11 76

-Cities 1 1 0 0 0 2

State Highway

(Linear Miles) 664 670 476 813 559 3,182

State Highway

(Lane Miles)1,382 1,496 1,006 1,728 1,173 6,785

Interstate Miles 0 29 28 0 24 81

National Highway

System Miles68 107 45 113 39 372

State Routes

ADT >2000103 230 84 112 83 612

State Routes

ADT <2000492 304 319 588 413 2116

Bridges (over 8' span) 372 355 208 430 265 1630

PennDOT Vision

PennDOT Mission

County Accreditation

PennDOT Connects

Road MaP

Diversity

Leslie S. Richards, Secretary of Transportation

Back to Agenda

TOPICS

PennDOT Vision

A better quality of life built on

transportation excellence.

Back to Agenda Back to Secretary’s Topics

PennDOT Mission

To provide a sustainable transportation system and quality services that are

embraced by our communities and add value to our customers.

Back to Agenda Back to Secretary’s Topics

• Truck Skills Rodeo

• Safety Stand Down Days

• Training Videos

• School Awareness

County Accreditation – Best Practices

Touch-A-Truck Event

Truck Skills Rodeo

Safety First

Back to Agenda Back to Secretary’s Topics

• Safety Innovation Presentations

• Rolling Roadblock Sign Setting

• Cone Setting Platform

• Seal Coat Signing Pilot

• Flashing Yellow Arrow

County Accreditation – Best Practices

I-80 Rolling Roadblock

Cone Setting Insert

Flashing Yellow Arrow

Safety First

Back to Agenda Back to Secretary’s Topics

County Accreditation – Best Practices

• Asset: People

– Forming effective partnerships

– Recruitment, training, retention

• Asset: Roads

– Sectional Cycle Maintenance

– 5-year Paving Plans

• Asset: Bridges

– Maintenance & preservation

– Rehabilitation or replacement of structurally-deficient (SD) bridges

• Asset: Equipment & Materials

– Equipment sharing between Counties and other Districts

– Efficient procurement & use of winter supplies

Asset Management

Back to Secretary’s TopicsBack to Agenda

Structurally Deficient Bridges

2008 2018

Statewide 6,034 3,114

District 10 580 283

PennDOT Connects

Back to Agenda Back to Secretary’s Topics

Road MaP

Road Maintenance and Preservation

ROAD MaP - Overview

• Funding & Allocation

– Act 89

– Decade of Investment

– Capital Projects

– Preservation & Reconstruction

• Innovation

– RAP

– Equipment Sharing

Back to Agenda Back to Secretary’s Topics

Road MaP

Maintenance

• RAP (Recycled Asphalt Paving)

– Environmentally Conscious

– Ideal for less-traveled roads

• Department Force vs. Outsourcing

• 18-year Sign Life Management

• Sectional Cycle Maintenance

– Increased from 4 to 5 years

• Equipment Sharing

Back to Agenda Back to Secretary’s Topics

Diversity

• Diversity

– All-inclusive Workforce

– Stimulates Innovation

– Sparks Creativity

– Strengthens the Organization

• Recruitment

– Identifying Target Audiences

– Incorporating Results-Driven Strategies

– Participating in Community Outreach

• Retention

– Inclusion Committees

– Training & Organizational Support

Back to Agenda Back to Secretary’s Topics

CONSTRUCTION

Paul F. Koza, Jr., P.E.

Assistant District Engineer for Construction

724-357-2812

Back to Agenda

Outreach 2018 – Indiana County

Back to Agenda

Grove Chapel Climbing Lane

• ECMS #25472

• SR 119

• Rayne Twp.

• Relocation/New Construction

• Cost: $16,094,110

• Ligonier Construction

• Let: 4/21/16

• Fall 2018 Completion

Back to Agenda

Brush Valley Bridge #3

• ECMS #83206

• SR 56

• Brush Valley Twp.

• Bridge Replacement & New Alignment

• C.H. & D. Enterprises Inc.

• Cost: $1,893,036

• Let: 8/25/16

• Fall 2018 Completion

Back to Agenda

Plumville Bridge #1

• ECMS #83210

• SR 85

• Plumville Boro

• Bridge Replacement

• Plum Contracting, Inc.

• Cost: $1,996,347

• Let: 10/20/16

• Spring 2018 Completion

Back to Agenda

US 119 Three Bridges

• ECMS #101483

• SR 119

• Center Twp.

• Bridge Replacement, 2 Removals and Tide Road connection to Route 119

• Swank Construction Company, LLC

• Cost: $15,232,664

• Let: 5/4/17

• Summer 2019 Completion

Back to Agenda

T-460 Aultman Bridge #3

• ECMS #25419

• SR 7203 T-460

• Black Lick Twp.

• Bridge Replacement

• Gregori Construction Inc.

• Cost: $614,416

• Let: 6/22/17

• Detour

Back to Agenda

Upper Juneau Bridge

• ECMS #25790

• SR 1045

• Canoe Twp.

• Bridge Replacement

• Francis J. Palo, Inc.

• Cost: $1,253,668

• Let: 7/13/17

• Detour

Back to Agenda

Newport Road Bridge No.3

• ECMS #83384

• SR 3009

• Black Lick Twp.

• Bridge Rehabilitation

• Clearwater Construction, Inc.

• Cost: $2,176,000

• Let: 7/13/17

• Detour

Back to Agenda

Onberg Bridge and Ruffner Church Bridge

• ECMS #25546 / 92666

• SR 1005

• Rayne Twp.

• Bridge and Pipe Replacement

• Francis J. Palo, Inc.

• Cost: $1,571,005

• Let: 10/5/17

• Detour

Back to Agenda

PA 286 over North Branch of Two Lick

• ECMS #83301

• SR 286

• Banks, Green & Montgomery Twps.

• Bridge Replacement

• Allison Park Contractors, Inc.

• Cost: $2,500,000

• Let: 10/19/17

• Detour

Back to Agenda

Pollock Bridge

• ECMS #95847

• SR 119

• Rayne Twp.

• Bridge Replacement

• Gregori Construction Inc.

• Cost: $964,469

• Let: 12/7/17

• Temporary Road for 20 days

Back to Agenda

Penn Run – North Harmony to PA 403

• ECMS #100102

• SR 422

• Pine Twp.

• Resurfacing / Overlay

• Cost: $2.5 to $5.0M

• Let: 3/15/18

Back to Agenda

SR 4005 Wayne Ave. Resurfacing

• ECMS #110019

• SR 4005

• Indiana Borough

• Resurfacing / Overlay

• Cost: $0.5 to $1.0M

• Let: 3/15/18

• Detour

• Night Work

Back to Agenda

Home Bridge #3

• ECMS #95848

• SR 119

• Rayne Twp.

• Bridge Replacement

• Cost: $0.5 to $1.0M

• Let: 6/7/18

• Phased Construction

– Maintaining Two Way Traffic throughout Project

Back to Agenda

Five Points Road Bridge

• ECMS #74303

• SR 4001

• Armstrong Twp.

• Bridge Replacement

• Cost: $1.0 to $2.5M

• Let: 6/21/18

• Detour

Back to Agenda

Gas Center Thin Overlay

• ECMS #105378

• SR 22

• East Wheatfield Twp.

• Resurfacing / Overlay

• Cost: $1.0 to $2.5M

• Let: 4/26/19

Back to Agenda

2018 District Wide Contracts

• 2018 RPM: ECMS #110105

– Cost: $300,000

– Let: 4/12/18

• 2018 Small Paint: ECMS #110106

– Cost: $300,000

– Let: 6/7/18

• Guiderail Contracts:• Armstrong: ECMS #110870, Cost $200,000

• Butler: ECMS #110871, Cost $250,000

• Clarion: ECMS #110872, Cost $225,000

• Indiana: ECMS #110873, Cost $250,000

• Jefferson: ECMS #110874, Cost $225,000

– Let: 6/7/18

Back to Agenda

Plenary Walsh Keystone Partners – P3 Bridges

– Clarksburg Bridge SR 286 Young Twp.

• JV 386

• Temp Signal

– Willet Run Bridge SR 954

• JV 388

• Detour

– http://parapidbridges.com

Back to Agenda

DESIGN

James. R. Andrews, P.E.

Assistant District Engineer for Design

724-357-2805

Back to Agenda

2018 Indiana County Outreach

Back to Agenda

Dixonville #1 & Barr Slope Bridges

• Routes 403 and 1012

• Bridge Replacements

• Green Twp.

• Over Dixon Run

• Phased Construction

• Construction in 2019

• Estimate: $2.5M - $5M

Back to Agenda

McKee Run Bridges Group

• Routes 110 & 4005

• Bridge Replacements

• White Twp.

• Over McKee Run

• Phased Construction

− Shick Drive, Muller, Grove

• Detour

− Frances (2 weeks)

• Construction in 2019

• Estimate: $2.5M - $5M

Back to Agenda

North Branch Plum Creek Bridge

• Route 4035

• Bridge Replacement

• Plumville Borough

• Over North Branch of Plum Creek

• Detour

• Construction in 2019

• Estimate: $1M - $2.5M

Back to Agenda

Oakland Avenue Resurfacing

• Route 286

• Resurfacing

• Indiana Borough & White Twp.

• Construction in 2019

• Estimate: $1M - $2.5M

Back to Agenda

Trade City South PM

• Route 210

• Resurfacing

• North, South & East Mahoning Twps.

• Construction in 2019

• Estimate: $2.5M - $5M

Back to Agenda

Shelocta West Resurfacing

• Route 422 – Resurfacing

− Elderton Borough & Plumcreek Twp., Armstrong County

− Armstrong Twp., Indiana County

• Construction in 2019

• Estimate: $2.5M - $5M

Back to Agenda

Armagh Bypass PM

• Route 22 - Resurfacing

• East Wheatfield Twp.

• Construction in 2019

• Estimate: $2.5M - $5M

Back to Agenda

Route 422 Cunningham Culvert

• Route 422

• Two Bridge Replacements

• Armstrong Twp.

• Over Curry Run & Tributary to Curry Run

• Maintain Two Lanes of Traffic

• Construction not funded

• Estimate: $5M - $7.5M

Back to Agenda

Philadelphia Street Bridges Group

• Route 286 & 4032

• Bridge Replacements

• Indiana Borough

• Over Whites Run & Marsh Run

• Construction in 2020

• Estimate: $2.5M - $5M

Back to Agenda

SR 4005 Mack Park & SR 4030 Carter Avenue Bridges

• Routes 4005 & 4030

• Bridge Replacements

• White Twp., Indiana Borough

• Over Marsh Run

• Construction in 2020

• Estimate: $2.5M - $5M

Back to Agenda

Smicksburg #3 Bridge

• Route 4026

• Bridge Rehabilitation

• West Mahoning Twp.

• Over Little Mahoning Creek

• Detour

• Construction in 2020

• Estimate: $2.5M - $5M

Back to Agenda

SR 1004 over US 119

• Route 1004

• Bridge Replacement

• White Twp.

• Construction in 2020

• Estimate:$5 to $10M

Back to Agenda

PA 286: US 422 Interchange East

• Route 286 - Highway Capacity - Lane Additions

• Intersection Improvements w/ Bike/Ped Facilities

• SR 422 Interchange to Rustic Lodge Road

• White Twp.

• Construction in 2020

• Estimate: $15M - $20M

Back to Agenda

Park Road Slide

• Route 3025 Seg 0040

• Roadway Slide Repair

• Young Twp.

• Construction in 2020

• Estimate: $100,000 - $500,000

Back to Agenda

Lockvale Bridge

• Route 1053

• Bridge Replacement

• Banks Twp.

• Over S. Branch Of Bear Run

• Construction in 2021

• Estimate: $1M - $2.5M

Back to Agenda

SR 4422 Claypoole Heights Bridge

• Route 4422

• Bridge Replacement

• White Twp.

• Over tributary to McCarthy Run

• Construction in 2022

• Estimate: $1M - $2.5M

Back to Agenda

SR 954 Windows Bridge

• Route 954

• Bridge Replacement

• West Mahoning Twp.

• Over tributary to Little Mahoning Creek

• Construction in 2022

• Estimate: $1M - $2.5M

Back to Agenda

SR 3007 Marshall Run Bridge #1

• Route 3007

• Bridge Replacement

• Conemaugh Twp.

• Over Marshall Run

• Construction in 2022

• Estimate: $1M - $2.5M

Back to Agenda

SR 403 Marion Center Bridge #1

• Route 403

• Bridge Replacement

• Marion Center Borough

• Over a tributary to Pine Run

• Construction in 2022

• Estimate: $1M - $2.5M

Back to Agenda

SR 1002 Ramsey Run Bridge #1

• Route 1002

• Bridge Replacement

• White Twp.

• Over Ramsey Run

• Construction in 2022

• Estimate: $1M - $2.5M

Back to Agenda

SR 3016 over Two Lick Creek

• Route 3016

• Bridge Replacement

• Homer City Borough

• Over Two Lick Creek

• Construction in 2022

• Estimate: $1M to $2.5M

Back to Agenda

SR 286 over Trib. to Cherry Run

• Route 286

• Bridge Replacement

• White Twp.

• Over a tributary to Cherry Run

• Construction not funded

• Estimate: $1M - $2.5M

Back to Agenda

PA 553 – PA 403 to Cambria County

• Route 553

• Resurfacing

• Cherryhill Twp.

• Construction not funded

• Estimate: $2.5M - $5M

Back to Agenda

Grange Hall Bridge

• Route 2013

• Bridge Replacement

• East Wheatfield Twp.

• Over Tributary to Conemaugh River

• Detour

• Construction not funded

• Estimate: $500K to $1M

Back to Agenda

Satterlee Bridge

• Route 119

• Bridge Replacement or Rehabilitation

• East Mahoning Twp.

• Over Little Mahoning Creek

• Construction not funded

• Estimate: $2.5M - $5M

Back to Agenda

Green Valley Bridge #1

• SR 3031

• Bridge Replacement

• Young Twp.

• Over Blacklegs Creek

• Detour

• Construction not funded

• Estimate: $500,000 - $1M

Back to Agenda

Indiana County Outreach

Route 422 Projects in Armstrong County

Back to Agenda

Margaret Road Intersection

• Route 422 - New Alignment

• Plumcreek Township

• Construction not funded

• Estimate: $25M - $30M

Back to Agenda

MAINTENANCE

Brian N. Allen, P.E.

Assistant District Engineer for Maintenance

724-357-2809

Back to Agenda

2018 Indiana County Maintenance

• John Serian County Maintenance Manager

• Ron Gresko Asst. County Manager

• Ed Kaylor Asst. County Manager

• George McFeaters Asst. County Manager

• Tim Clevenger Equipment Manager

• Glenda Palmer Roadway Programs Coordinator & Adopt-A-Highway Coordinator

2550 Oakland AvenueIndiana, PA 15701

724-357-2817

Back to Agenda

Indiana County Winter

2017-2018 Indiana County Winter Budget (personnel & operations) $4,013,000

Salt (5-year average in tons) 16,552

Anti-Skid (5-year average in tons) 16,966

Brine (5-year average in gallons) 200,341

Back to Agenda

Sectional Cycle Maintenance

• Section 1 – North east section of the County activities will include pipe flushing and tail ditching

• Section 2 – South east section of the County activities will include tow paving and the seal coat program

• Section 3 – South west section of the County activities will include pipe replacement and tail ditching

• Section 4 – North west section of the County activities will shoulder cutting and shoulder stabilization

Back to Agenda

Pipe Replacement

2018 Planned: 2,000 feet

2017 Completed: 1,700 feet

Back to Agenda

Pipe Flushing

2018 Planned: 20,000 feet

2017 Completed: 19,230 feet

Back to Agenda

Ditch Cleaning

2018 Planned: 32,000 feet

2017 Completed: 30,165 feet

Back to Agenda

Tow Patching

2018 Planned: 12,000 tons

2017 Completed: 12, 550 tons

Back to Agenda

Manual Patching / Edge Box Patching

2018 Planned Manual Patching: 1,200 tons2017 Completed Manual Patching: 800 tons

2018 Planned Edge Box Patching: 4,000 tons2017 Completed Edge Box Patching: 4,770 tons

Back to Agenda

Sweeping / Debris Removal

2018 Planned Sweeping: 2,500 hours

2017 Completed Sweeping: 3,100 hours

Back to Agenda

Mowing and Brushing

2018 Planned Mowing: 1,200 acres

2017 Completed Brushing: 7,685 hours

2018 Planned Brushing: 7,500 hours

2017 Completed Mowing: 1,180 acres

Back to Agenda

Shoulder Cutting

2018 Planned: 145 miles

2017 Completed: 261 miles

Back to Agenda

Seal Coat

2018 Planned: 550,000 gallons

2017 Completed: 680,200 gallons

Back to Agenda

Crack Sealing

Planned 2018: 60 miles

Completed 2017: 40 miles

Back to Agenda

Innovation & Improvements

BUTLER VO-TECH, JUDGE’S PICK

Keystone Area (Clarion) Facebook Fan Favorite

Back to Agenda

Innovation & Improvement

ALL ABOUT

SAFETY• Slower Speeds• 90% Reduction in Fatal

Crashes• 75% Reduction in Injury

Crashes• 30-40% Reduction in

Pedestrian Crashes• 10% Reduction in

Bicycle Crashes

CAPACITY• Reduces Delays• 30% Increase in Vehicle

Accommodation

• Increased Traffic Flow

• Click HERE for Roundabout Video

Back to Agenda

Upcoming Programs

• Rural Commercial Routes Program

– Low volume route improvements

– Pavement treatments

• Recycled asphalt

• Flexible base

• Warm mix asphalt with higher recycled asphalt percentage

• Municipal Bridge Improvement Program

– Component of Road MaP

– Bundling for cost savings

– Partnering with local government agencies

Back to Agenda

Resources – Customer Care Center

www.penndot.gov

Back to Agenda

Resources - Alerts

• Incidents

• Construction

• Winter road conditions

• Weather forecasts

• Weather alerts

• Plow truck locations

• Zoom to your region

Back to Agenda

Resources – Customer Surveys

www.penndot.govRegional Offices, D10

Customer Service Surveys

Winter Survey – live during the winter

storm season.

Construction Survey – live between mid-

November and the end of December.

Back to Agenda