Page 1 of 60 DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. Adani Electricity Mumbai Limited Devidas Lane, Off SVP Road, Borivali (W), Mumbai - 400 103

DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

  • Upload
    others

  • View
    15

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 1 of 60

DISASTER MANAGEMENT PLAN -2019

ADANI ELECTRICITY MUMBAI LTD.

Adani Electricity Mumbai Limited Devidas Lane, Off SVP Road, Borivali (W), Mumbai - 400 103

Page 2: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 2 of 60

Contents

Section – A: Adani Electricty - Overview ............................................................................................... 3

1. Introduction ........................................................................................................................................ 4

2. Power Distribution Aspects ............................................................................................................. 4

3. Disaster Management aspects of T&D Distribution ................................................................... 4

4. Vulnerability analysis ...................................................................................................................... 10

5. Disaster Management Plan (DMP) ............................................................................................... 10

Section – B: Adani Electricty - Mumbai Transmission ...................................................................... 13

6. Mumbai Transmission Business .....................................................................................................14

7. Action Plan – Transmission System ..............................................................................................16

8. Roles & Responsibilities ..................................................................................................................18

9. Flowchart For Transmission DMP ................................................................................................ 24

10. Important Contact Numbers ..................................................................................................... 26

Section – C: Adani Electricty – Mumbai Distribution ....................................................................... 33

11. Adani Electricity Mumbai Distribution at a Glance ............................................................... 34

12. Adani Electricity – Distribution Disaster Preparedness ....................................................... 36

13. Distribution Business Disaster Response Plan .......................................................................41

14. Communication ............................................................................................................................ 42

15. Power Helpline ............................................................................................................................. 42

16. External Communication – Media, Public Information......................................................... 42

17. Internal Communication Plan .................................................................................................... 43

18. Complaint Handling Centres: .................................................................................................... 44

19. Disaster Management Portal..................................................................................................... 45

20. Disaster Management Portal Mobile App ............................................................................... 46

21. Annexure – 1 ................................................................................................................................. 47

22. Annexure – 2 ................................................................................................................................ 55

Page 3: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 3 of 60

Section – A: Adani Electricty - Overview

Page 4: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 4 of 60

1. Introduction

Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the

field of power distribution for over 9 decades, with a network that spans over 400 Sq. Kms catering to the electricity needs of over 3 million customers in Mumbai City with maximum

demand of 1884 MW.

Adani Electricity’s distribution network ensures that power reaches to end customers with

maximum efficiency and reliability. We stand by our core belief of ‘Power of Service’ to

consistently deliver reliable and quality services to all customers at competitive costs, with

international standards of customer care, thereby creating superior value for all stakeholders. We strive to set new benchmarks in standards of corporate performance and governance

through the pursuit of operational and financial excellence, responsible citizenship thus

aiding in nation’s growth.

2. Power Distribution Aspects

2.1 Transmission & Distribution

Adani Electricity’s distribution licence area includes the suburban area of Mumbai (about 75

per cent. of Greater Mumbai) and the Mira-Bhayander Municipal Corporation area in Thane District. The entire licensed area is urban with a mix of Residential, Commercial and Industrial consumers.

Adani Electricity’s power transmission system in Mumbai is part of the intra-state transmission system. At present, our transmission system comprises 8 EHV stations and

approximately 540 circuit kilometres of 220 kV lines. The power received at various EHV stations is supplied mainly through underground cables to our distribution receiving stations,

for onward distribution to consumers.

Power is then distributed primarily through underground cables with network length of

~22,300 circuit Kms and interconnected via ~6,650 substations (11kV level).

2.2 License

Adani Electricity holds a distribution licence (DL No. 1 of 2011), granted to under Section 14

and 15 of the Electricity Act, 2003 for a period of 25 years starting from 16th. August, 2011

and also holds Transmission licence (TL No. 1 of 2011) for a period of 25 years starting from 16th. August, 2011.

3. Disaster Management aspects of T&D Distribution

A disaster is a catastrophe, mishap, calamity or grave occurrence affecting any area, arising from natural or manmade causes, or by accident or negligence which results in substantial

loss of life or human suffering or damage to, and destruction of property, or damage to, or

degradation of, environment, and is of such a nature or magnitude as to be beyond the

normal coping capacity. Central Electricity Authority defines disaster as an event which brings sudden great misfortune bringing disruption to normal activities including to that of

Page 5: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 5 of 60

the power supply. As far as this document is concerned, disaster is synonymous with

emergency and crisis. A well advanced disaster management plan is necessary to ensure that a disaster has least impact.

The main features of a disaster are:

Unpredictability

Unfamiliarity

Threat

Speed

Urgency

Uncertainty

3.1 Types of Disasters:

Sr. No. Type Details

*Past Occurrence

History

Chances of Occurrence

1. Water and Climate Related

1. Floods Exists Probable 2. Cyclones No History Less Probable 3. Tornadoes & Hurricanes No History Less Probable 4. Hailstorm No History Less Probable 5. Cloud Burst Exists Probable 6. Snow Avalanches No History Less Probable 7. Heat & Cold Waves No History Less Probable 8. Thunder & Lightning No History Less Probable 9. Tsunami Exists Probable

2. Geologically Related

1. Earthquakes Exists Probable 2. Dam Bursts & Dam Failures No History Less Probable

3. Chemical, Industrial and Nuclear Related

1. Chemical and Industrial Disasters Exists Probable

2. Nuclear Disasters No History Less Probable

4. Accident Related

1. Major Building Collapse No History Probable 2. Serial Bomb Blasts Exists Probable

5. Fire 1. Urban fire (Less Probable) No History Less Probable 2. Forest Fire (Less Probable) No History Less Probable

6 Agitation

Local community or local mass movement, road and rail blockades, religious or communal conflict, Major law and order situation, long duration strikes

Exists Probable

7 Terrorism Terrorist attack, siege or hostage situation,

Exists Less Probable

8 Transport Major road, rail, water way traffic disruption

Exists Less Probable

(* Past occurrence History is considered in same area and the vicinity area)

Page 6: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 6 of 60

Details of probable disasters are as follows:

a. Water and Climate Related

Floods / Cloud Burst / Tsunami

Floods refer to huge amount of water reaching land in a short span of time, causing land surface to be submerged under water – at places where land surface is usually not covered with water.

Floods could occur due to natural causes, or human activities, or a combination of both. Floods are caused by discharge of huge volume of water in a short span of time, at a rate,

such that the water cannot be carried away from the scene of discharge.

Some of the possible reasons for such huge discharge of water could be:

- Very heavy rainfall in a short span of time. It should be noted that the amount of rainfall itself is not a sufficient cause, the duration within which the rainfall is receives

is equally important contributor.

- Breach in levy, dams, etc.

- Very high tidal waves (sometimes in the aftermath of a seismic activity, e.g. earthquakes) etc. – also called tsunamis.

Among the various kinds of disasters, flooding is unique in the sense that it has a very high degree of predictability, both in the short term, as well as long term. In most situations, flood

prone areas are quite known, in the sense that they have a history of flooding. Only in very

rare situations, a place might be flooded without having any past history of flooding. Even in

such cases, a careful study of the area could give an indication of possible flooding.

Indicators of Possible Flooding

Usually, any of the following situations should indicate the possibility of flooding:

- heavy rainfall in/around the vicinity, especially, if the specific location falls in the pathway of the water-discharge system from the area receiving heavy rainfall.

- if there is heavy rainfall/flow of water/accumulation of water, on the other side of a boundary, e.g. across a dam, across a levy, side of a river-embankment etc; because

these boundaries might get breached.

As can be seen, both the above situations can be predicted with reasonable degree of accuracy. These days, the meteorological predictions are accurate enough for upto 4-5 days. Hence, it is usually possible to know about the possibility of heavy rainfall about 4-5 days in advance.

Effect of Floods / Cloud Burst / Tsunami on Adani Electricity T&D Network:

i. Due to Floods / Cloud Burst / Tsunami Receiving sub-station buildings / Transmission line towers / distribution substations / network feeder pillars may be damaged which

Page 7: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 7 of 60

can result in disruption of supply. Mumbai has experienced flooding due to Cloud Burst in 2005.

ii. Also Floods / Cloud Burst / Tsunami may cause damage to equipments such as Transformers / Switchgears / Transmission Towers / cables / feeder pillars etc. resulting in disruption of supply.

b. Cyclones/ Hurricanes / Tornado:

These are winds of high-speed, many times accompanied by heavy rainfall. These cause

structural damage, snapped overhead wires, and, possibility of floods.

Because of damage to structure and overhead wires, utility services could be disrupted. Heavy rainfall could cause flooding also.

Many times, these could last for a few days. In such cases, any restoration and relief activities

cannot even start till these few days when the activities start subsiding.

The only thing good about these kinds of natural disasters is that they can be predicted to a

reasonable degree - thanks to the advancement of metrological sciences. In most cases, it is possible to get a warning of up to several days. Usually, it is possible to take at least some preventive measures - during these few days of warning. However, in spite of these warnings,

damage to property cannot be mitigated much, as, immovable structures cannot be

relocated.

Another important thing about these kinds of strong winds and rainfall is that they don’t

appear totally at will. There are well-defined geographical areas, which tend to see incidents

of typhoons and cyclones. This means that, people inhabiting these areas could take some fundamental care, while, building homes etc.

Effect of Cyclones / Hurricanes / Tornado on Adani Electricity T&D Network:

i. Due to Cyclones / Hurricanes / Tornado Substation buildings / Transmission line towers

may get damaged which can result in disruption of supply.

ii. Also Cyclones / Hurricanes / Tornado may cause damage to equipments such as

Transformers / Switchgears / Transmission Towers / other distribution equipment installed in field, etc. resulting in disruption of supply.

c. Geologically Related

Earthquakes

Earthquakes refer to shaking of earth. There is continuous activity going on below the surface of the earth. There are several large plates (size of continents) below the surface of the earth, which move (at a very slow speed). As a part of this movement, sometimes, they

collide against each other. And, after the collision, they might still continue to push each

other. As they continually keep pushing each other, there is a pressure building up – across

Page 8: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 8 of 60

these plates below the surface. And, then, at a certain time, one of the plates might slide over

another. This causes an earthquake.

Some earthquakes might be caused by activity above the surface. For example in a mountainous region, there might be a heavy landslide. Due to a huge mass of land falling, at the point of the fall, there could be a minor shaking of earth, due the impact of fall. However,

usually, such earthquakes are not very major.

Maharashtra and its adjoining regions are prone to earthquakes of moderate magnitude. Mumbai lies in the zone-III category. Earthquakes of mild capacity has hit in Maharashtra at

Koyna (1967- 6.5 Richter) and Latur (1993-6.4 Richter) in recent past. In addition to

buildings, transformers, underground cable network and other machines spread across whole supply area are in probable to get impacted during an earthquake. For seismic zone mapping

please refer to the map is provided below.

Seismic Zone Map of India

Effect of Earthquake on Adani Electricity T&D Network:

i. Due to Earthquake sub-station buildings / Transmission line towers / underground cable may be damaged which can result in disruption of supply. Mumbai has experienced

several earth quakes of intensities 3.5 to 4.6 Ritcher scale in the past, however there

has not been of any significant impact on our system.

Page 9: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 9 of 60

ii. Also Earthquake may cause damage to equipments such as Transformers / Switchgears

/ Transmission Towers / equipments installed in the field, etc. resulting in disruption of supply.

d. Chemical, Industrial and Nuclear Related

Chemical Leaks/Spill Over & Industrial Disaster:

As the world is making rapid advancements in the field of industrialization, there are huge

chemicals plants – dealing with all kinds of chemicals. Some of these chemical plants deal

with seemingly simple (non-hazardous) chemicals, while, some other chemicals could be

dealing with hazardous materials.

Risks associated with chemicals and chemical industries include:

- Risks due to blast of certain equipments involved in large chemical plants, e.g. boiler etc.

- Risks due to leakage of chemicals wherever they are stored/transported/used in small quantities etc.

Effect of Chemical Leaks/Spill Over & Industrial Disaster on Adani Electricity T&D Network:

Due to Chemical Leaks/Spill Over & Industrial Disaster, probability of human casualty is very high.

e. Accident Related

Major Building Collapse

It is disaster which can be caused because of

- construction on marshy land,

- poor planning of building lay out,

- poor construction materials, or

- other natural calamities

Effect of major building collapse on Adani Electricity T&D Network:

As all the controlling equipments including relays, breakers etc, are within building premises,

collapse of building will cause damage the Property and human life.

f. Serial Bomb Blasts

Terrorism / Bomb Blast happens to be one of the deadliest form of crisis in terms of loss of life and damage to the property. Power generation stations and transmission lines, Load

Dispatch Centres (LDCs) form the prime target for such terrorist groups. The terrorist related

aspects could be dealt with by making use of advancement of technology in the areas of

surveillance and proper intelligence network.

Page 10: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 10 of 60

Effect of Serial Bomb Blasts on our system:

i. This can damage the equipments inside the Receiving sub-Stations thus disrupting the supply.

ii. Bomb Explosion may cause fire resulting in damage of extensive to the equipments & causing disruption of supply.

4. Vulnerability analysis

Following is the brief vulnerability analysis of AEML network with respect to various hazards.

Sr. No

Risks/Threats/Hazards/ Vulnerabilities/ Potential events

Probability

(H/M/L)

Impact

(H/M/L) Effect

1 Floods / Cloud Burst / Tsunami

High High Station Equipment, UG Network & Human Life

2 Cyclones / Hurricanes / Tornado

Low High All equipment & Human Life

3 Earthquakes Low High All equipment & Human Life

4 Chemical Leaks/Spill Over & Industrial Disaster

Low High Human Life

5 Major Building Collapse Low High Station equipment & Human Life

6 Serial Bomb Blasts Low High All equipment & Human Life

While it will be an ongoing task to identify different Environmental risk and OH&S hazards potential hazards, the impacts of these hazards & environmental risks on our T&D system and

the mitigation process have been emphasized in this plan.

5. Disaster Management Plan (DMP)

Natural disasters cannot be prevented and accidents can occur despite all efforts to prevent

them, but effective preparedness and actions taken during critical time can greatly lessen

the impact of such events. Response to disasters, in the absence of a well-defined plan, would be arbitrary leading to overemphasis of some actions and absence of other critical

actions. Hence, it is necessary to document a Disaster Management Plan (DMP) so that pre

planned procedures can be followed during the course of disasters.

The primary objective of DMP is to ensure the safety of life and protection of property and

the same time ensure minimum disruption of power. Other major objectives of the DMP can be summarized as follow.

- To identify major resources, manpower, material and equipments needed to make the plan operational.

- To make optimum use of combined resources.

Page 11: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 11 of 60

- To set up effective command and control structure for handling disasters.

- To improve the state of preparedness to meet any contingency.

- To reduce response time in organizing the assistance.

- To identify the training needs for personnel engaged in handling disaster.

- To promote Evacuation, rescue and relief,

- To reduce the frequency of occurrence of such disasters.

- To protect environmental damage.

- Assessing the severity or magnitude of effects of any disaster;

- And, to facilitate quick business recovery.

5.1 Components of Disaster Management

a) Risk Management

Consists of identifying threats, determining their probability of occurrence, estimating impact of threats to communities at risk, determining measures that can reduce risk, and

taking action to reduce threat.

The Risk Analysis and Vulnerability Assessment aims at identifying the disasters, their

probability, their effects and impact on business and people.

b) Response Plan

The Response Plan lays down preparedness checklists, operating procedure guidelines, list of monitoring facilities, reporting formats and other measures to mitigate the impact of

disasters. Also, it identifies functional areas such as relief, communication, transport, health

services, etc. and proposes assignments to various departments, including identifying lead &

supporting departments and the organizational structure to effectively deal with the disaster in a coordinated and the quickest possible manner.

c) Control of Events

Control is maintained through the following measures:

i. Anticipation of a disaster and the cause and effect relationship generated by each type of event;

ii. The mitigation strategy focuses on the long-term planning for disaster handling. It deals

with the issues of continued commitment to hazard identification, risk assessment and

long term measures to reduce the probability and impact of disasters. The mitigation strategy makes an argument for better resource management, safety codes, training programs, and innovative leadership.

This document deals with the various events that may lead to disasters, preventive

measures need to be adopted to avoid and lessen the impact of any disaster, ways and

Page 12: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 12 of 60

means to respond to a disaster, and hierarchical set up at various levels during a disaster

for effective and efficient dealing.

iii. Preparedness – by viewing anticipated scope of disaster, managers can plan adequate responses;

iv. Accurate information collection and assessment – once a disaster has occurred, the

manager needs reliable data upon which to base priorities and guide response; and

v. Balanced response – each type of disaster will require a different set of responses.

d) Equity of Assistance

All disaster responses should be provided in an equitable and fair manner.

e) Resource Management

Few disaster managers have adequate resources to meet all competing needs and demands

of a post disaster environment. Thus, resource management becomes a critical element of disaster response. The disaster manager must be familiar with the resources available.

f) Loss Management

Losses in a disaster include human, structural and economic losses. Loss management

addresses these through pre and post–disaster actions designed to keep losses to minimum. Effective loss management activities occur prior to a disaster and are focused on reducing society’s vulnerability to the disaster.

5.2 Objectives and Scope of Crisis & Disaster Management Plan

Disaster Management encompasses the activities that enable the various agencies to plan for, quickly respond to and to recover from unexpected events and situations. It is a tool to provide necessary guidelines for assistance to organizations for ensuring safety of people,

protection of environment, protection of installations and restoration. It has the following

objectives:

To improve state of preparedness to meet any contingency,

To reduce response time in organizing the assistance,

To identify major resources, man power, materials & equipments needed to make the plan operational, and,

Making optimum use of the combined resources. The activities in response to a crisis situation on disaster shall mainly include:

a) Exchange of information in terms of event description, its severity and action plan. b) Identification of resources need and their deployment viz, technical experts,

manpower, equipment, spare parts & other material.

c) Early restoration and to facilitate re-inspection as needed.

d) Field/Site surveys, damage assessment e) Post event investigation & analysis and strategy for the future.

Page 13: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 13 of 60

Section – B: Adani Electricty - Mumbai Transmission

Page 14: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 14 of 60

6. Mumbai Transmission Business

The power generated at DTPS is brought to Adani Electricity area of supply through two

double circuit 220 kV transmission lines emanating from it. Grid connection is established through tie lines with TPC’s Borivali & Saki Receiving Sub-Station, MSTCL’s Boisar, Borivali

and Trombay EHV Sub-Stations. Eight numbers of 220 kV EHV Sub-Stations are set up namely Versova, Ghodbunder, Aarey, Goregaon, Gorai, Borivali, Saki and Chembur. 100 MVA,

125 MVA transformers installed at these sub-Stations step down the voltage from 220 kV to 33 kV. The 33 kV feeders emanating from these sub-stations cater the demand of Adani

Electricity area of supply.

6.1 Adani Electricity 220kV Network

6.2 Transmission Line Brief Details

Route Details

DTPS to Ghodbunder - Conductor type AAAC 487.5 Sq.mm.

- DTPS-Ghodbunder-Versova line with OPGW

- Aarey to Tata Borivali with OPGW

DTPS to Versova

Ghodbunder to Versova

Versova to Aarey

Aarey to TPC’s Borivali

Ghodbunder to Gorai

Page 15: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 15 of 60

Route Details

Gorai to Versova

- Total 220 kV lines 481.85 circuit kM

Versova to Goregaon

Aarey to Goregaon

DTPS to MSETCL Viraj

MSETCL Viraj to MSETCL Boisar

Versova to MSETCL Boisar

AEML Borivali to TPC Borivali Single Core 1200sq.mm. cable

AEML Borivali to MSETCL Borivali Single Core 1200sq.mm. cable

Gorai to MSETCL Borivali Single Core 1200sq.mm. cable

Ghodbunder to MSETCL Boisar Single Core 1200sq.mm. cable along with one OFC and DTS cable per Circuit till Existing LILO tower of MSETCL

Ghodbunder to MSETCL Borivali

Aarey to Saki Single Core 1200sq.mm. cable along with one OFC and DTS cable per Circuit

Chembur to MSETCL Trombay

AEML Saki to TPC Saki

6.3 Salient details of 220 kV EHV Sub-Stations

Particulars Versova Ghod-bunder Aarey Saki Chembur

Gore-gaon Gorai Borivali

Installed Capacity

(MVA)

4x100

1x125

3x100

1x125

3x100

2x125 3x125 3x125 3x125 2x125 2x125

No. of 220 kV AIS Bays

12 09 10 - - - - 2

No of 220kV GIS

3 10 7 10 10 10 10 10

No. of 33 kV

Switchgears

68 58 80 42 42 42 26 27

Critical Feeders

Juhu, Ambivali, Saraswati

Road, Metro

Mira Bhainder

Airport, Seepz, Metro

Saki, Kurla, BKC

Chembur, Shivaji Nagar

Gore-gaon

Gorai, KIE

Borivali, Maga-thane.

Page 16: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 16 of 60

6.4 “Trans-Security” Security Control Room:

Security control room is situated at the 220/33kV Ghodbunder EHV Sub-station, for the one

point monitoring of all EHV Sub-stations, where the plasma displays are installed.

The modern type of PTZ cameras at different appropriate places are installed in the sub-

stations and these PTZ cameras can be controlled as per requirement by the controller at

220kV control room as well as security control room in order to enhance the security round the clock, to monitor unauthorized entry to keep watch on any illegal activity as well as to monitor activities in the switchyard.

Further the access control door at all 220/33 kV EHV sub-station to prevent unauthorized

entry in Control Room, Building, porta cabins are provided inside switchyard for effective

patrolling of switchyard area.

7. Action Plan – Transmission System

7.1 Preparedness to meet any contingency

a. Awareness to person by training and displaying posters / slogans etc.

b. DCC shall collect updated information / news from following agencies and communicate to departmental heads and other respective sections.

c. Warning Notification implies that a disaster is imminent; an advance action may be initiated for minimizing the damages / rescue operations. The warning notification,

indicating the magnitude of disaster should be communicated to other concerned in the region.

7.2 Warning Systems

Presently, Area Cyclone Warning Centre, Colaba, Mumbai, is responsible for issue of cyclone

warning bulletins for Arabian sea north of Latitude 5 deg N and east of Longitude 60 deg E excluding the area north of 20 deg N and west of 68 deg E. According to the two stage

warning scheme, ACWC, Mumbai, issues warnings for coastal districts of Goa and Maharashtra in 2 stages.

Whenever the coastal belt is expected to experience adverse weather (heavy rain/gales/tidal wave) in association with a cyclonic storm or depression likely intensify into a cyclonic storm ACWC, Mumbai, issues warnings for coastal districts of Goa and Maharashtra in two stages

under two stage warning scheme.

Cyclone alert (lst stage warning): It is issued 48 hrs in advance of expected commencement

of adverse weather over coastal areas

Cyclone warning (2nd stage warning): It is issued 24 hours in advance of expected commencement of adverse weather. Main mode of communication of cyclone warnings is by

telegram -000 weather immediate telegram, Telex, W/T (full-form), Telephone, Fax, Police wireless if other channels fail and satellite communication (disaster warning system).

Page 17: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 17 of 60

Disaster Agencies Earthquakes IMD, MERI, BARC Floods Meteorological Department, Irrigation

Department Cyclones IMD Epidemics Public Health Department Road Accidents Police Industrial and Chemical Accidents Industry, MARG, Police, DISH, BARC, AERB Fires Fire Brigade, Police

7.3 Advance Preparedness

For effective preparedness to face the disasters and to avoid last minute arrangements in panic conditions, the following aspects may be covered as an organizational practice:

- Well-documented emergency plans.

- Data on availability of resources and buffer stocks of restoration materials.

- Identification of key personnel: with their skills and experience on the disaster management.

- Allocation of budget for emergencies.

- “Delegation of Power” at various levels for disaster conditions.

- Mutual assistance agreements signed by all power utilities for sharing men, and

- material resources on demand.

Safety and security department arranges for mock-drill on following scenarios

Sr. No. MOCKDRILL Frequency 1 Fire & Emergency Evacuation Quarterly 2 Electrocution Quarterly 3 Earthquakes / Major Building Collapse Quarterly 4 Industrial Disaster Quarterly 5 Serial Bomb Blasts Quarterly 6 Snake Bite Quarterly 7 Fall from height Quarterly

7.4 Accident / Incident Recovery Plan

Once the emergency situation is over, the effort for the team is to bring back the facility to the normal situation.

Assessment committee will assess for the loss / damage and redevelopment committee will be responsible for restoration of facility.

The following major concerns always keep people worry about their facility:

Page 18: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 18 of 60

o Accident psychological factors

o Environmental factors

The debris is cleaned properly to minimize further environmental damages. The management can take help for this from the outside personnel who are expert in this area. The waste

water in no case is allowed to go out of the premises untreated.

The psychological trauma associated with the accidents can be taken out by the

management through thoughtful investigation of the accident and thereafter taking the actions to eliminate the cause of the accident,

The emergency management plan is well recorded and reviewed for the adequacy for future

to reduce the response time taken. This enhances the speedy mitigation of such emergencies.

7.5 Post Disaster Response and Recovery Stage

a. Accurate information collection and assessment – once a disaster has occurred, the

manager needs reliable data upon which to base priorities and guide response; and

b. Balanced response – each type of disaster will require a different set of responses

Following features need to be kept in mind for efficient recovery system:

i. Clear hierarchy of command system.

ii. Mobilization of damage assessment teams.

iii. Mobilization of teams for establishment of base camps / infrastructure.

iv. Officer for communication with the outside environment / press etc.

v. Predefined staff for co-ordination with other agencies on restoration front.

vi. Management of funds and resources at the disaster front.

8. Roles & Responsibilities

8.1 Responsibilities:

The DM Cell is responsible for implementation of Disaster management Plan and act as the

coordinating, controlling and monitoring body.

The DM Cell shall,

a. Examine the vulnerability of different parts within organization for different forms of disasters and specify measures to be taken for their prevention or mitigation.

b. Lay down, review and update guidelines for preparation of disaster management

plans.

c. Monitor the implementation of the guidelines laid down for integrating of measures

for prevention of disasters and mitigation by the departments

Page 19: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 19 of 60

d. Evaluate preparedness at all functional levels to respond to any threatening disaster

situation or disaster and give directions, where necessary, for enhancing such preparedness;

e. Coordinate response / rescue team in the event of any threatening disaster Situation.

f. Give directions to all concerned section, regarding actions to be taken in response to

any threatening disaster situation.

g. Advise, assist and coordinate the activities of the Departments engaged in disaster management.

h. Provide information to the concerned government Authority relating to different

aspects of disaster management.

i. ensure that communication systems are in order and the disaster management drills

are carried out periodically;

j. Assessing the severity or magnitude of effects of any disaster;

k. And, to facilitate quick business recovery.

8.2 Organization Structure of Disaster Management Cell:

Every year in month of January, COO will review / revalidate DM Cell.

A. COO:

COO (Mumbai Transmission) shall be the Chairperson of Disaster Management Cell.

B. Human Resources:

To ensure availability & distribution of resources prior to disaster, He/She shall

Support Incident Controller in implementation of Disaster Management Plan

C. Incident Controller:

Head (O&M) / Head Projects should be In-charge of the Disaster Management cell, and will be main coordinating authority in case of disaster. His responsibilities shall be -

Page 20: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 20 of 60

1. To maintain prior agreed inventory of emergency equipment in the Emergency Control Centre.

2. To keep Shift schedule for all the areas readily available

3. To direct all actions taken on the actual on-site condition.

4. To direct the ‘Key Personnel’ at the work spot for carrying out specific task.

5. To provide updates and information to COO.

6. To assess the impact of disaster

7. To coordinate with redevelopment committee.

8. Request for help from Government / Private Authorities like MCGM, MBMC Fire brigade, Ambulance, Police, NGO’s etc.

Key personnel have been identified in the table below for handling disasters at each EHV Stations. Their contact details are provided in subsequently in this plan.

In absence of Head O&M / Head Project, Zonal-in-charge acts as incident controller.

D. Key Personnel (KP)

A list of key personnel and their phone numbers shall be available at all the times at the

concerned places. Above all shall decide the actions needed to evacuate personnel at the

affected area, carry out emergency works, and arrange supplies of equipments, personnel, etc and liaison with outside authorities. Following shall be Key Personnel (KP) at corporate level

during disaster / emergency. Their roles are -

Admin coordinator:

He/She shall provide all the logistic support required for implementation of Disaster Management Plan to Incident Controller

Safety coordinator:

He/She shall -

- Update the On-site Disaster Management Plan regularly.

- List of compatibility of chemicals and the appropriate fire extinguishing media/ safety equipment be kept readily available.

- Carry out mock drills

- Arrange for Training on periodic basis.

- Monitor list of all FIRE extinguisher & updating their refilling.

- Ensure availability of competent first-aiders

Page 21: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 21 of 60

Security officer:

He/she shall -

- Maintaining the inventory of spill containment equipment

- Periodically check and ensure proper working of battery operated radios and cellular mobile phones so as to ensure operability at the time of emergency.

- Co-ordinate with fire brigade, Police officials, ATS, Bombs disposal squad as and when required.

On-Site In-Charge:

They shall -

- Prepare plan for evacuation in advance and ensure the availability of the same with office personnel.

- To ensure all the equipments / tools / first aid kit are available and maintained at assigned locations.

- Keep a list of all FIRE extinguisher & updating their refilling.

- Ensure Availability of local rescue team.

Emergency Response Teams:

There are local Emergency Response Teams which is available at all locations. In case of

disaster, these teams will be in action immediately, and DCC will coordinate with other teams for mobilising them in affected area.

Emergency Response Teams shall consist of Cordon Team, First-Aid Team, Fire Fighting Team, Restoration Team, Spill Clean Team,

Responsibilities of Emergency Response Teams are as follows:

- Identifying the location of disaster victims trapped or isolated;

- To save life of the disaster victims by bringing them to a safe location;

- Providing them with medical attention;

- To ensure the survival of the maximum possible number of victims;

- To facilitate search & rescue by the experts;

- To Work out the Search and Rescue plan with the local people;

- Involving various teams in appropriate steps;

- Involving the local people from the community who are well versed with the

- local area and can be instrumental in searching;

- Relocation of the victim to the safer areas through community mapping;

Page 22: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 22 of 60

- To provide shelter and other relief material;

- To control panic, rumours, confusion;

- Providing moral support to the victim;

- Providing food, drinking, water, first-aid and psychosocial care to the Victims at the affected places and also to the stranded people who are in Life threatening situation

awaiting rescue;

- Providing post evacuation relief through emergency supplies and services;

- Approach damaged buildings and facilities, if required, from the least dangerous side or access;

- Shut off / switch off all piped service mains (water/gas) and electricity lines in collapsed buildings;

Medical Coordinator:

He/She shall -

- Coordinate for equipped ambulance and other medical facilities

- Assess the casualty and coordinate with Hospitals in nearby area.

Assessment Committee:

Assessment committee shall consists of representatives from HR , Admin, Finance, Planning, Engineering, Safety, Security, with representative from affected department, chaired by Head O&M / Head Projects.

First Information Report of the committee shall be submitted to COO within 48 hours & Final Analysis Report shall be submitted within 7 days

Redevelopment Committee:

COO will appoint redevelopment committee. This committee shall:

- Coordinate with assessment committee

- Plan for redevelopment

- Execute for redevelopment work.

8.3 Disaster Control Centre (Emergency Control Room):

Provision is made to establish a Disaster Control Centre (DCC) from which disaster mitigation

operations are directed and co-ordinated. This centre is activated as soon as on-site disaster is declared.

The DCC is equipped to allow unhampered communication with the teams involved in

bringing the accident under control, and with the external response organizations and other nearby facility personnel. The Occupational health Room provides the shelter for the persons

who have come across the emergency.

Page 23: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 23 of 60

Only a limited and prearranged number of people are admitted to the DCC, when in use. This

eliminates unnecessary interference and reduces confusion.

Location

In case of emergency at 220 kV EHV sub-Stations, Disaster Control Center (DCC) will be set

up according to following table at two different locations.

Location DCC Back Up DCC

Aarey Ghodbunder

Resources

The Central Control Room shall have the following resources to effectively handle disasters.

1. Contact list and number of fire stations, medical centers, security, police and district

administration & authorities.

2. First aid procedure

3. Disaster Management Manuals, blown up area maps, district phone directories.

4. Contact list of AEML Key Personnel.

5. Complete detail of the system and guiding document for Bulk Supply Failure

6. In addition to above, comprehensive communication facilities, as listed below, are to be available at Emergency Control Center to handle disasters.

7. The DCC is also equipped with Site plans, facility description, various drawings and maps of the facility describing the electrical fittings, availability of the fire fighting equipments,

floor wise plan of evacuation etc.

The DCC consists of all the facilities like telephone, communication wireless handsets,

mobiles, backed up with emergency lighting etc

Facilities at Disaster Control Centre Sr. No. Description Quantity

1 Telephone 2 2 Personal Computer 2 3 Printer 1 4 Lan Connectivity 2 5 Lotus Notes ( Web Mail ) 2 6 Cell phone Chargers 2 7 Cell phone 1 8 Battery operated radio 1

Page 24: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 24 of 60

List Of Additional Equipment At EHV Sub-Stations

Sr. No. Resources ARY Zone VSV Zone GBR Zone TFM

1 Dewatering Pumps 6 6 4 -

2 DG Sets 3 3 2 -

3 Fire extinguishers 5 5 5 -

4 First Aid Box 3 3 2 3

5 Torches 6 6 4 6

6 Emergency Lights 6 6 4 -

7 Gloves 6 6 4 5

8 Life jackets 6 6 4 22

9 Battery operated radio 3 3 2 3

10 Fire suit 10 10 10 -

11 PPE’s As applicable

As applicable

As applicable

-

12 Public Address System 3 3 2 -

13 Inflatable Boats - - - 2

9. Flowchart For Transmission DMP

Page 25: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 25 of 60

Page 26: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 26 of 60

10. Important Contact Numbers

10.1 Key personnel have been identified in the table below for handling disasters at each receiving stations.

Sr. No. Department Details Designation Name Contact

Number

1 COO-Mumbai Transmission Business Sr. Exec. VP Sh.A.K. Sharma 9699992095

2 Head- Engineering & Safety VP Sh. Shekar Huprikar 9323550673 3 Head- Security VP Sh. Vinayak Supekar 7303487887

4 In-Charge Security (Transmission) GM Sh.Vivek S. Pathak 7498246694

5 Head- O&M EHV Substation & Testing VP Sh.Vikas Sonar 9323552929

6 In-Charge O&M EHV Substation Addl.VP Sh. Dilip Devasthale 9324180932

7 In-Charge Transmission Line Maintance DGM Sh.Satish Shinde 9322131364

8 In-Charge Cable projects AVP Sh. Sanjeev Bagde 9322607634

9 Head- Projects (Substation & Feeder) VP Sh.Mahesh

Ambardekar 9323842316

10 In-Charge Substation projects Addl.VP Sh. Rajesh Vadangekar 9323951396

11 In-Charge DPG AVP Sh.Sajid Khan 9323702030

Disaster Control Centre

Back up Disaster Control Centre

Area Covered All EHV Sub-stations in MTB

All EHV Sub-stations in MTB

Location As mentioned in details of EHV

substation

As mentioned in details of EHV substation

Person Responsible

Disaster Control Center Head Bhaskar Chaudhary 9322664109

S. B. Gapat 9321486569

Dy. Disaster Control Center Head Shekhar Mahajan 9323848126

Sanjay Satamkar 9321923437

Person Responsible in Absence of the Person Above

Disaster Control Center Head Vinod Chatur 9321063485

Balkrishna Gosavi 9321923438

Dy. Disaster Control Center Head Rugved Deshpande 7498288408

Denny Thomas 7498629384

Page 27: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 27 of 60

Sr. No. Department Details Designation Name Contact

Number 12 In-Charge Engineering Addl.VP Sh. Ashish Waknis 9323729357 13 Planning& regulatory,PMG, DPG Addl.VP Sh.Rakesh Raj 9323552940

14 In-charge Testing Section DGM Sh.Mohan Waingankar 9324216664

15 Head-HR VP Sh. Prabhakar Malve 9322130457 16 In-Charge Aarey Zone AVP Sh. B.S.Chaudhari 9322664109

17 In-Charge Versova Zone AVP Sh. Mahesh Dange 9320328593

18 In-Charge Ghodbunder Zone GM Sh. S. B. Gapat 9321486569 10.2 For Bomb Threat

1. Bomb Squad (BDDS) Mumbai 0222080501 2. BDDS, Thane 02225392767 3. Sh.Sudhir Marathe Security Officer 9323808880 4. Sh. Vinayak Supekar VP (Security) 7303487887 5. Fire Fire Brigade 101 6. Police Police Control 100 7. Sh.A.K.Sharma Sr. Exec. VP (Transmission) 9699992095 8. Sh.Vikas Soanr VP (Head O&M) 9323552929 9. Sh. Shekar Huprikar VP (Head Safety) 9323550673 10. Sh. Vivek Pathak GM(Security) 7498246694

10.3 For Terrorist Attack

1. Sh.Sudhir Marathe Security Officer 9323808880 2. Sh. Vinayak Supekar VP (Security) 7303487887 3. Fire Fire Brigade 101 4. Police Police Control 100 5. Sh. A.K. Sharma Sr. Exec. VP (Transmission)9699992095 6. Sh.Vikas Soanr VP (Head O&M) 9323552929 7. Sh. Shekar Huprikar VP (Head Safety) 9323550673 8. Sh. Vivek Pathak GM(Security) 7498246694 9. ATS, DCP Mumbai 02223077778 11. DCP, Protection Mumbai 022 2652767

10.4 List of Hospitals for Transmission Feeders

Mumbai Section of Transmission Line:

Cluster No. Locations Area Hospital Name Contact No.

1 SS 174 - SS 204

Virar Sanjivani Hospital Dattamandir rd. Virar

95250-2505029 95250-2502284 LS 171 - LS 201

2 SS 205 - SS 214

Nallasopara Alliance Hospital Tulinj rd. Nallasopara (E)

95250-2442663 95250-2442664 95250-2439999 LS 202 - SS 211

3 SS 215 - SS 228

Vasai Riddhi Hospital Vasant Nagari Nallasopara link

0250-6429114 / 2461134 / 2460199 LS 212 - LS 226

Page 28: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 28 of 60

Cluster No. Locations Area Hospital Name Contact No.

rd. Vasai (E) 90522823 / 9322091381 /

9890079688 / 9322090625

4 SS 229 - SS 264

Naigoan Purushottam Hospital Juchandra Naigaon (E) 0250-3206827

LS 227 - LS 261

5 SS 265 - SS 297

Mira - Bhayander

Bhaktivedant Shrusti Mira rd (E)

022-29452435 / 29452400 LS 262 - LS 285

6 SS 298 - SS 316

7

SS 298 - SS 334

Malad ( W )

Dr. Bet Hospital & Polyclinic Neptune building, Mith chowki, Marve rd. Malad (W)

022-28820435 / 28823910 LS 313 - LS 332

8 SS 335 - SS 338

Versova Cooper Hospital Vile Parle (W) 022 26207254 LS 333 - LS 337

VAB 1 - VAB 11

9 LS 286 - LS 312

Borivali ( E ) Karuna Hospital Jeevan Bhima nagar, Borivali (W)

022 28934698 VAB 71 - VAB 77

10 VAB 54 - VAB 61 Malad ( E ) Sanjeevani Hospital Ishwar Bhavan , Rani Sati maarg, Malad (E)

022 28822929

11 VAB 62 - VAB 70 Kandivali ( E )

Aditi hospital & Polyclinic Nirav building 90 ft rd Kandivali (E)

12 VAB 12 - VAB 21 Goregoan (W) 101, ONYX 1st floor S V Road Goregaon West 022 26794797

13 VAB 22 - VAB 31 VAB 39 - VAB 53 Goregoan (E)

Dr. Kamats Hospital B-3/4, Ground Flr, Satellite Classic, Caves Rd, Jogeshwari East,

022 28265677

14 VAB 31 - VAB 38 Aarey

Vidya Hospital Kanyapada Filmcity Shop #21 Goregaon Road Goregaon East

022-28492201

Dahanu Section of Transmission Line:

Cluster No. Locations Area Hospital Name Contact No.

1 LS 2 - LS 51

Dahanu

Dr. R. Wadekar Wadekar Hospital, Above Chandrika Hotel, Dahanu Station Road, Dahanu.

02525-222957 02525-222067

SS 1 - SS 55

Page 29: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 29 of 60

Cluster No. Locations Area Hospital Name Contact No.

2

LS 52 - LS 92

Boisar

Dr. Jaiprakash Tarapur General Hospital, A unit of TIMA Hopital, P-126, Khaira Phatak, Saravali, Boisar, Dist. Thane - 401 501.

9260709968 02525-278444 SS 55 - SS 94

BTL 1 - BTL 27

3 LS 92X - LS 170 SS 94X - SS 173

Palghar

Dr. Anand R. Kapse, Mobile: Dr. Navin Pawaskar, Mobile: Rural Homoeopathic Hospital Palghar – Boisar Road, Opp. S.T. Workshop, Palghar – 401 404

09371721780 0937171940

02525-256932 / 33

10.5 Police Station

Aarey / Versova EHV Zones

Sr. No. Station Exchange

No. Exchange

No. Tel .No. Sr. PI No. Name of Sr. P I / PI

1. Andheri 28211414 28221562 28221447 26842677 Bhilare

2. D.N.Nagar 26460404 26287607 26232117 26282876 V. D. Bhoite

3. Jogeshwari - East 28211414 28360505 28221672 28210763 Kotak

4. Meghwadi 28211414 28221651 28210860 28210837 Chowdhari Y.K. 5. MIDC 28211414 28368352 28394205 Gadre A.V. 6. Oshiwara 26460404 26323862 26323861 26322753 D. K. Rupwate 7. Sahar 28211414 28221748 28221711 28326775 Mane M.B. 8. Versova 26460404 9773177477 26304812 Sharad K. Borase

9. Aarey Colony 9821597841 26858484 Laxman Tondpe

Ghodbunder EHV Zone

Sr. No

Address Names of Sr officers Contact Nos (Police Stn)

1 MIRA RD PS KANAKIYA(BEVERLY) PARK,BHAYANDER(E), DIST. THANE

Sr PI-NITIN MURADE. DySP-NM INGLE SP- ARCHAN TYAGI DIG- RATHOD

28126767 25343027-SP 28126495-DySP PSI Ranmale-9324636802

2 KASHIMIRA PS Jn Of WEXP HIGHWAY & MIRA

SrPI-RAJAN GHULE

28457301 PSI Shaikh

Page 30: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 30 of 60

Sr. No

Address Names of Sr officers Contact Nos (Police Stn)

BHAYANDER ROAD,KASHI MIRA, DIST.THANE

3 BHAYNDER(W)PS STATION ROAD,BHAYANDER(W) DIST THANE

Sr PI-ASHOK VASTRAD.

28192257

4. CHARKOP PS RESERVE LAND(SVY#152/3/4/)SECTOR 2 CHARKOP ,KANDIVALI(W), MUMBAI-67 ZONE11

SrPI – ARUN PANDITRAO CHAVAN ACP-RJ SHINDE DCP –MN RANADE

28676581 28676583 28682211(SrPI) 28670069(FAX) API Budawale SI Shinde

5. MHB PS YOGI NAGAR,POLICE OFFICERS QUARTERS, BORIVALI (w),MUMBAI-92 ZONE 12

SrPI-VIJAY BHAGVE(ActingPI) ACP – RAMESH TAYADE DCP- SHIVAJI BODKE

28981679 28675257 28020711 API Ugale N -9821210154 PI Vijay Bagve- API Darade-9892645078

6. KASTURBA MARG PS Jn of MAIN KASTURBA RD & CROSS RD #1,BORIVALI (E),MUMBAI -66 ZONE12

SrPI- PRAHLAD R SURYAVANSHI. ACP- BHAGWAN LAHANE. DCP – SHIVAJI BODKE

28059007-SrPI 28066158 28877624-ACP 28020711 PI Shinde(admn)- PSI savants-

7. DAHISAR PS Nr RAJSHRI Jn.SV ROAD,DAHISAR (E) MUMBAI-68 ZONE12

Sr PI- RR THAKUR ACP-RC TAYADE DCP- S BODKE

28285014-SrPI 28281069-ACP 28284024 28282040 28968383-Check Naka API Phooldas Bhoiye PI Baboolal Patel PSI Kedar

National Diaster Management

Sr. No. ADDRESS CONTACT NO. Fax No. 1 Ministry of home affairs

National Disaster management division, Lok nayak bhawan, new delhi Mha control room

011-23092923 011-23093750

011-23093054 011-23092763 011-23092885

011-23093897 2 Meteorological Department 018001801717 Maharashtra Flood, Drought, Tsunami

Control Room 022-22027990 022-22026712

3 SLDC ( Kalwa)

022-27601765 022-27601769

022-27601766 4 BCC Transmission 022-30094742 /

43

Page 31: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 31 of 60

10.6 EHV Substation-wise Hospitals and Fire Services contact numbers

Aarey EHV Zone

Sr. No. Name of the Hospitals Contact

1 Sanjivan Hospital (022) 28216145

2 Nanavati Hospital (022)23735555 / (022)23739400

3 JJ Hospital (022)23739400 4 Sion Hospital (022)26182255 5 Dr. Shekar subru (Nearest Doctor) 9821141949 6 Day & night Ambulance service 102 / (022) 28732823 7 Fire Brigade, Marol 101/ (022) 28210940/41

8 Holy Spirit Hospital Mahakali Road, Andheri (East)

28248500/1/2/3, 242478888, 28248505

Verosva EHV Zone

Sr. No. Name of the Hospitals Contact

1 BSES MG Hospitals (022)56970707 2 Kokilaben Dhirubhai Ambani Hospital (022)30919191 3 Ambulance service 102 / (022)26243675 4 Ambulance service 26253599 / 26255264 5 Fire Brigade, Andheri 101/ (022) 26205301

Ghodbunder EHV Zone

Sr. No. Name of the Hospitals Contact

1 Bagwati Hospital (022)28932461/62 2 Nanavati Hospital (022)26182255 3 Karuna Hospital (022)28959827 4 Bakti Hospital (022)28459888 5 St Anns (022)28458663 6 Ambulance service (Mr. Datta) 9324242609 / 14 7 Ambulance service (Mr. Chaumal) 9870035135 / 9820332108 8 Fire Brigade, Bhayander 101/ (022) 28195041 / 28197637

Other Contact Numbers

Designation Phone Number Other contact no

(mobile) Office Residential

Director, Meteorology Department

2151606 / 04310405

Fax :2160824

Director, MERI 0253-512764 511628

Director, BARC 5564716 5511910

3633356

Page 32: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 32 of 60

NGOs at State Level

Designation Phone Number Other contact no (mobile)

Office Residential

Indian Red Cross 0222266 1524 Fax:022-2670738

Divya Joyti Jagrati 011-27020666, 27024555

Ratna Nidhi Charitable Trust

022- 226 150 6435 /

23898930

CARE India, (Maharashtra), Mumbai

8368484

CASA 3089896 3085872

Fax:3085400

CARITAS 040-3744395 Fax:040-293290

Sr. No.

DM Group member Name Mob. No.

1 COO Sh. A.K.Sharma. 9699992095 2 Incident

Controller Head O&M Sh. Vikas Sonar 9323552929 Head Project Construction

Sh. Mahesh Ambardekar

9323842316

3 HR, Head Sh. Prabhakar Malve 9322130457 4 Zone In Charge Aarey Zone Sh.Bhaskar Chaudhari 9322664109

Ghodbunder Zone

Sh. S. B. Gapat 9321486569

Versova Zone Sh. Mahesh Dange 9320328593 Project Coordinator

All sites Sh. Rajesh Vadangekar 9323951396

In-Charge TFM Sh. Sandeep Godbole 9323702020 Cable Project Sh. Sanjeev Bagde 9322607634

5 Safety Coordinator Sh. Shekhar Huprikar Sh. Kuvarsing Rajput

9323550673 9320981523

6 Medical Coordinator Dr. Naresh Jamhani 9324232140 7 Security Coordinator Sh. Vivek Pathak 7498246694

Page 33: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 33 of 60

Section – C: Adani Electricty – Mumbai Distribution

Page 34: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 34 of 60

11. Adani Electricity Mumbai Distribution at a Glance

Adani Electricity distribution network is spread over 400 Sq. Kms catering to the electricity

needs of over 2.9 million customers today. The area in Suburban Mumbai served by AEML is from Bandra to Bhayander on the western side, and Sion to Mankhurd on the eastern Side.

The geographical map is given below:

Map Showing Operational Area of Adani Electricity

The Adani Group is a globally integrated infrastructure player with business spanning across

key industry verticals of resources, logistics, energy and agro. The Adani Group's growth and vision has always been in sync with the idea of Nation Building. "Thinking Big. Doing Better"

Page 35: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 35 of 60

is a natural philosophy that is embodied in everyone at Adani Group and we sincerely believe

that we are doing our part in nation building and touching the lives of millions of people positively.

Adani Electricity Mumbai Limited (Adani Electricity) is a 100% subsidiary of Adani Transmission Ltd and is an integrated Generation, Transmission and Distribution utility

powering Mumbai suburbs and area around it.

As an organization, Adani Electricity believes in ‘The Power of Service’. It is born with the ‘will to make a difference’. Adani Electricity changes the things for the better to fulfil power

dreams of our consumers.

From an operational point of view, Adani Electricity’s supply area is divided into five (5)

divisions viz.

South Division – Bandra to Vile Parle South Central Division – Andheri, MIDC, Marol, SEEPZ and Jogeshwari Central Division – Goregaon to Kandivali North Division – Borivali to Bhayander East Division – Chunabhatti to Vikhroli and Mankhurd

Operational Statistics and Characteristics of our Distribution Network in Mumbai are as

follows:-

Network Element As on 31/03/2019

No. of receiving stations 89

No of power transformers 211

No of distribution substations 6601

No of distribution transformers 6758

HT Cable Length (Kms) 4806

No. of consumers (in Lakhs) 30.37

Adani Electricity strives to provide quality power to the consumers. Adani Electricity has

adopted several new technologies with its state of art SCADA (Supervisory Control and Data

Acquisition) system as its backbone. Adani Electricity, being the leader in adopting new technologies has gone further high tech by installation of secondary SCADA, GIS

(Geographical Information System), CMS (Complain Management System), WMS (Work Management System), NMS (Network Management System) etc. to ensure uninterrupted

power supply to its 3 million consumers.

At System Control Centre, Adani Electricity monitors and control entire distribution network

which is an open ring system. The distribution network has NOPs (Normally Open points) from where the supply to other part of the network can be restored in case of any abnormality in the network. With the kind of topology of 11 kV network, Adani Electricity is

Page 36: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 36 of 60

successful in maintaining the reliability and quality of power that is being supplied to the

consumers.

Adani Electricity has state of the art Control System called the Supervisory Control and Data Acquisition (SCADA) for 33/22/11 kV Receiving Stations and Distribution Management System (DMS) at strategic 11/0.433 kV substations. The SCADA system is a real-time operating

system. It closely monitors the distribution system and its behavior. The SCADA operation

team takes prompt actions that are necessary to reduce the down time of the network. All our 33-22/11kV Receiving Stations as well a few strategically located 11/0.433kV consumer substations are integrated with our Master Control Center at Aarey. The List of 33-22/11kV

Receiving Stations along with their addresses are tabulated in Annexure-1.

12. Adani Electricity – Distribution Disaster Preparedness

Adani Electricity management has drawn up an elaborate Disaster Management Plan to

minimize the damage & disruption of power supply during any probable natural disaster and

has also put in place a well defined response, recovery and restoration plan with its associated infrastructure. This Plan also includes our preparedness for disaster on the supply side, which includes generation and transmission network.

Following are the various steps taken by Adani Electricity Mumbai Limited as part of the Disaster Management plan.

12.1 Creation of dedicated Disaster Management Teams:

Disaster Management Teams consisting of senior & experienced personnel drawn from

various functions have been formed at Central Control Centre level as well as at five different Divisional levels. Regular review meetings of various teams are held to assess the level of

preparedness in respect of Material, Manpower & Transport.

Apart from the Apex DM Team stationed at Central Control Centre at AEMI, Aarey, these five

Divisional DM teams function from respective Divisional Offices located across Mumbai

Suburban Areas. These Control Centres are equipped with communication gadgets including

wireless communication equipment like Radio Frequency Walkie-Talkie Sets, Hot lines, etc. Apart from these, Mobile Phones are provided to each executive, for ease & continuance of communication in case of failure of the normal communication system. Hotline connectivity

is available between our SCADA Control Room and MCGM’s Primary Disaster Control Room at

their Head Quarters opposite Mumbai CST and their back up Control Room at Parel. We are also in the process of working out the application of satellite phones.

12.2 Disaster Management Manual:

A comprehensive Disaster Management Manual specific to our business has been prepared

for reference and guidance to all employees connected with Mumbai Business. This updated reference Manual covers information of DM Cell, round the clock accountability of available

quick response teams, response trigger mechanisms and resource management at pre-

Page 37: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 37 of 60

defined locations. The updated Manual is available on the Company’s Intranet Portal and all

employees can access and view the same.

12.3 Training of Teams:

Organization has identified 32 teams for quick response during and effective recovery post

disaster. These teams comprise trained and experienced personnel who understand our

electrical system and are available on-call 24x7.

12.4 Pre-disaster preparedness:

A total of 32 Quick Response Teams are identified for quick response during & post disaster.

The role of each team has been defined and necessary briefing/training is conducted as

when needed, including mock drills.

The disaster trigger mechanism is defined and methodology of alerting and activating all

teams within the shortest possible time has been worked out.

12.5 Infrastructure:

a. Additional Spares and Capex Materials

i. Essential spare parts, tools and other equipment are specifically reserved to tackle

problems foreseen in the event of a catastrophic disaster and are stocked at ten

locations spread over the area of supply. These materials are at the disposal of divisional teams. Each of these store locations has 90 nos. of different types of identified equipment, including major CAPEX equipment like Distribution

Transformers, HT/LT Switchgears, HT/LT Cables, their accessories etc. apart from

other electrical utility spares.

ii. Stocking of 21 Nos. of Distribution transformers, 15 Nos. of RMUs / 11 kV Switch

Gears, more than 80 KM Cables, more than 50 feeder pillars & 130 mini pillars.*

iii. Adequate LT / HT jointing kits and LT/HT HRC fuses are kept as reserve stocks

iv. 89 Nos. of de-watering pumps of 3 HP rating for evacuation of flood water are

also kept in working conditions at strategic locations.

b. Transportation, Emergency DG Set and other Resources

i. 225 nos. of vehicles comprising trucks, pickup/delivery vans and testing vans equipped with emergency repair kits, tools and safety gear & PPE are made available during the monsoon period. These have been placed at all Divisional

offices and Depots.

ii. 6nos. of Truck mounted DG Sets of rating of 600 kVA along with 2nos. of DG sets

of 200 kVA rating, maintained in working condition are stationed at strategic

locations.

iii. In addition to the above we hire DG Sets of various capacities on ‘24x7 standby

basis’ and ‘As and When’ basis.

Page 38: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 38 of 60

iv. 24nos. of portable D.G. Sets of 2.2 kVA capacity are also maintained in working

condition.

v. 24nos. of state of the art LT / HT Cable Fault Testing Vans and 2nos. of Equipment Testing Vans are available round the clock.

vi. We hire fiber boats along with skilled operators. These fiber boats along with their

operators are available 24x7 during monsoon period. One fiber boat along with its operator is available at our Mira Receiving Station and another fiber boat along with its operator is available at Tilak Nagar Office, East Division.

vii. Procurement of 5nos. Of Heavy Duty Inflatable Rescue Boats is in process. These

boats will be kept at strategic locations near areas that suffered deluge during

previous monsoons.

c. Medical Support, Additional Crews, Security Guards and Communication Support

i. Our Medical Teams provide first-aid training as well as awareness about monsoon related diseases to our employees including contract labour. Necessary medicine is also distributed to all field level employees and contract labour as and when

required.

ii. We have hired the services of Indian Red Cross Society, Mumbai, to conduct

training on Disaster Management for our identified teams.

iii. Additional skilled employees from other functions are also absorbed in O&M based

on their necessity and availability.

iv. Need based deployment of additional security guards is done at all complaint

attending/handling centres in all divisions.

v. 75nos. of Radio Frequency Walkie-Talkie (Handset & Base Set) are made available at all Divisions as well as Control Center.

12.6 Central and Divisional Control Centres:

As per the Disaster Management Act, 2005, a Central Disaster Control Centre is equipped

with necessary communication facilities such as dedicated teams to man these centres on a 24 X 7 basis especially during Monsoon from 1st June to 30th September. In addition 5

Divisional Control Centres are also set up with similar arrangements. These arrangements will

continue to operate if the monsoon period extends beyond September.

The contact details of control centre are appended vide Annexure – 2

12.7 Distribution Substations in Low-lying Areas :

Distribution substations in low lying areas have been identified and a disaster recovery plan

for their speedy restoration is in place. Adequate resources have been reserved to meet any

contingencies in case of disruption of supply to these substations in low lying areas.

Page 39: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 39 of 60

12.8 Safe Loading of Lines, Equipment and Network Redundancy:

Installed capacities of all our Power Transformer (PT) are 1.5 times the Peak Load Demand

and Distribution Transformers (DT) capacities are 2.0 times the Peak Load Demand. All DT S/S are provided with energy audit metering and as a continuous planning process, these are upgraded as and when new loads are added.

All our substations are interconnected by Ring Main Unit (RMU) type switchgear thereby ensuring redundancy of supply in case of any fault in the network with minimal interruptions.

12.9 Pre-Monsoon maintenance checks:

All our network and equipment are subjected to additional physical verifications. Preventive

maintenance audits are carried out prior to monsoons to ensure prevention of moisture ingress in any form. This includes cleaning, drying and sealing of bus-bars and switchgear,

water seepage checks at substation ceilings, receiving stations etc. All accessories in outdoor type HT installations and cable terminations etc; in pole-mounted type sub-station

are cleant and sealed to prevent moisture ingress.

12.10 Identified essential consumers:

Our supply network is an open ring system i.e. every distribution substation is fed by a

duplicate source of supply thereby providing enough redundancy in HV/LV network to minimize interruption of supply by providing power through alternate source of supply. Also,

our Operation Squad personnel are available round the clock at strategic locations for faster restoration of supply in case of emergency.

In case of major failure due to man-made or natural disaster, priority will be to safeguard the distribution system to prevent shock, fire and loss of human life. We have also identified

essential consumers including –

MCGM Installations : All hydraulic and sewage pumping stations Hospitals : All Government, MCGM and Large Private

hospitals Defence : Military and Civil Establishments Establishments

Government Installations : All India Radio, MSEB installations, Wireless stations, MTNL Exchanges, Mobile satellite

communication towers etc.

Mobile Towers : All mobile companies.

12.11 Supply – Side Disaster Management Process

A. Risk / Threat / Potential Event :

i. Failure of Generation

ii. Generation Tripping due to technical reason

Page 40: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 40 of 60

iii. Manmade Disaster or Natural Disaster in Local Area of Generator.

B. Probability: Low

C. Action Plan to match Demand and supply

i. Dedicated control desks monitor the demand & supply position on a continual basis.

ii. Any tripping or failure of Generation will be reported by Generator / MSLDC / through mail or website.

iii. Primarily as per existing Balancing & Settlement Code, MSETCL is responsible for state level demand and supply matching.

iv. MSETCL will arrange power as per MOD irrespective of the contract, except in case of short fall.

v. In case of technical constraints or emergencies demand and supply is matched irrespective of contracts and post facto settlement between utilities takes place.

vi. All actions are taken as per ‘Scheduling and Dispatch Code’ as approved by the

Hon. MERC.

vii. Even though the primary responsibility for load generation balance is with MSETCL, following steps need to be taken by AEML ABT Team.

viii. In case of Tripping of DTPS, power to be arranged from MSETCL through our existing standby arrangement.

ix. If any other generation source fails, same day or day ahead power to be arranged through Power Exchange, Trader or Bilateral Contracts.

D. Risk / Threat / Potential Event :

All emergency related transmission systems have been addressed by our transmission division along with response and recovery plans. All documents pertaining to

transmission emergencies and disaster management are available on our intranet.

Page 41: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 41 of 60

13. Distribution Business Disaster Response Plan

Flowchart of the Disaster Response Plan is as shown below:

* Site Crew, News Channels, Customer Complaints Etc.

Disaster Management Cell of Govt. of Maharashtra,

MCGM Control Center

Metrological Department

Disaster Management Planning Team of AEML

Central Control Room

Divisional Control Room

Deployment of Teams

Additional Manpower Deployment

Depending on Feedback

Feedback

Feedback

Carry out work & Restore Supply

Assess the Material requirement

Carry out work & Restore Supply

Assess the Material requirement

Other Sources*

Page 42: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 42 of 60

14. Communication

Communication before, during and after a disaster dictates the success of Prevention and

Relief efforts. It is one of the important aspects of any Disaster Management Plan.

15. Power Helpline

24X7 Toll-free helpline 19122 (Toll Free).

This has been established to handle all customer complaints, queries and other information

needs. Call centre has been staffed with multilingual, professionally trained agents who offer services in English, Hindi, Marathi and Gujarati. In the likelihood of a situation leading to

disaster, there is an arrangement of an option for shifting / taking additional provisions at our

Call Centres.

Apart from 19122(Toll Free) Customers can lodge their ‘No supply Complaint’ at 18 Complaint

Handling Centres serving their area.

During monsoon period, in case of emergencies like Fire and Shock Complaints, customers

can also call our 24x7 Central Disaster Control Room on 30099111 / 30097225 from June to

September.

Missed Call – 18005329998 – Consumers to call from their registered mobile number to register their complaint or know the status of power restoration.

SMS - Send Power<9 digit account no.> to 7065313030 e.g. If your account no. is

XXXXXXXXX, then send Power XXXXXXXXX, to 7065313030.

WhatsApp – Send #nopower<9 digit account no.> to 9022813030 e.g. if your account no. is

XXXXXXXXXX then send #nopower XXXXXXXXXX to 9022813080.

16. External Communication – Media, Public Information

a. The flowchart of Disaster Response communication plan is as shown below:

Central Control Room

Regulatory Group

(Coordination)

MERC /

Government

Corporate Communication

(Video Coverage

Message

Media News Papers

TV News Cable Operators

Governments Police

Municipal Authorities

O&M

Divisions

Page 43: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 43 of 60

b. Information regarding switching off large areas affected by deluge will be

communicated to:-

i. MCGM DMU on their hotlines at HO or their backup at Parel,

ii. Police Control Room on 100 or 22625020 or 22621855 and

iii. Fire Brigade on 101 or 23076111 or 23083240.

17. Internal Communication Plan

Internal Communication flow among organization’s staff plays a key role in mitigating disaster. For effective communication, all employees including site staff has been provided

mobile phones. Also, wireless handsets are given to field crews for faster communication. To communicate during emergency, contact number directory is made available on intranet

which is accessible 24 hours at control centre. Information required for operational purpose is available on intranet.

The flowchart of internal communication plan during disaster is as shown below:

Central Disaster Control Room

Master System Control Center (MCC)

Divisional Disaster Control Room

Zonal System Control Centres (ZCC)

South Division

South Central Division

Central Division

North Division

East Division

South Division

South Central Division

Central Division

North Division

East Division

Page 44: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 44 of 60

18. Complaint Handling Centres: Apart from 19122(Toll Free) Customers can lodge their ‘No supply Complaint’ at the following

Complaint Handling Centres serving their area.

Sr. No. Location Area Telephone Numbers

1 BOMBILWADI Ice Factory Lane, Off Hill Road, Nr. Bank Of India,

Bandra West. 30098924

2 MMRDA MMRDA Receiving Station, Nr. Asian Heart Institute, Bandra East. 30097159

3 JUHU* Nr. Cooper Hospital, Gulmohar Road, Opp.

Homeopathy Hospital, Vileparle West. 8291102997

4 ANDHERI* Nr. Bus Depot, S. V. Road, Andheri West. 30098935

5 AMBIVALI Laxmi Industrial Estate, Veera Desai Rd; Andheri

West. 30098940

6 MIDC E-7, MIDC, MIDC Central Road, Opp. MIDC Police

Station, Andheri East. 30097157

7 GOREGAON

West* Nr. Champion, Opp. Sahara Studio, S.V Road,

Goregaon West. 30098917

8 DINDOSHI* Western Express highway, Opp. Patel Aluminum, Dindoshi, Goregaon East. 30097566

9 POISAR Nr. Mahindra and Mahindra, Kandivali East. 9321405073

10 KIE

(CHARKOP) Ganesh Nagar, Hindustan Naka, Charkop, Kandivali

West. 30098925

11 SHIMPOLI* Jn. Of S. V. Road and Shimpoli Road, Borivali West. 30098026

12 BORIVALI Nr. Tata Power House, Opp. Magathane Bus Depot,

Western Express Highway, Borivali East.

30098918

13 BHAYANDER Pavanputra, Nr. Bhayander Pump,

Bhayander East. 30098936

14 SAKI A. K. Road, Opp. Kumaria Residency, Saki Naka,

Andheri East. 30098921

15 KURLA Opp. Wadia Estate, Bail Bazaar, Kurla West. 30098916

16 VIKHROLI Junction of Link Road & LBS Marg,

Nr. Shreyas Cinema, Vikhroli East. 30098923

17 TILAK NAGAR Road No. 3, Near Sahakar Cinema, Tilak Nagar,

Chembur East. 30097153

18 CHEMBUR Near Katchi & Anchor Polytechnic, Sion Trombay

Road, Chembur (W). 30097154

* Complaint Centres Unmanned in the Night Shift.

Page 45: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 45 of 60

19. Disaster Management Portal

Adani Electricity has a disaster management portal on our GIS platform that is accessible to all employees. The purpose of this portal is to have minimal or zero consumers affected during a deluge situation. Information related to deluge can therefore be accessed on a

single platform. This helps to interlink and correlate the data captured from other systems

and derive actionable points in restoring supply in an optimal way.

Page 46: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 46 of 60

20. Disaster Management Portal Mobile App

A mobile app has been developed so that field staff can also have access to and share live

information from site.

Actions taken on site during disaster like Division/Unit wise assets affected due to water logging, water level, Reason for switching “OFF”, action taken to recover affected assets, expected restoration time & intimation to “ Pump Operator” can be fed in.

This App is also useful for identification & allocation of de-watering pumps, mapping

waterlogged area on GIS & allocation & communication of the affected asset to the asset owner.

Page 47: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 47 of 60

21. Annexure – 1 a) Details of EHV Sub-stations in Mumbai Transmission Business

Sr. Nos. Location Area

Telephone Numbers

1 Aarey EHV Sub-station

220 kV Aarey EHV Sub-station, Off Jogeshwari Vikhroli Link Road, Opp. SEEPZ North Gate No.3, Unit No. 19, Aarey Colony, Goregaon East, Mumbai - 400063.

30097271

2 Chembur EHV Sub-station

220 kV Chembur EHV Sub-station, Bhd. Borla Receiving Station, S.T. Rd. Nr. Deonar Depot, Mumbai - 400088.

30097285

3 Saki EHV Sub-station

220 kV Saki EHV Sub-station, Andheri Kurla Road, Nr. Indian Oil Petrol Pump, Saki Naka Junction, Andheri East, Mumbai - 400072.

30097276

4 Versova EHV Sub-station

220 kV Versova EHV Sub-station, Behind Lokhandwala Complex, Near Joggers Park, Andheri West, Mumbai – 400053.

30097275

5 Goregaon EHV Sub-station

220 kV Goregaon EHV, Sub-station, Opp. Sahara India, S.V. Road, Adani Electricity Mumbai Ltd, Mumbai – 400062.

30097372

6 Gorai EHV Sub-station

220 KV Gorai EHV Sub-station, L.T. Road, Near MCGM Dumping Ground, Borivali (West), Mumbai – 400092.

30097269

7 Ghodbunder EHV Sub-station

220 kV Ghodbunder EHV Sub-station, Ghodbunder Village, Near Raj Bucket Factory, Mira Bhayandar Area, Thane – 401107.

30097273

8 AEML Borivali EHV Sub-station

220kV GIS Borivali Sub-station, Near Jn. of Dattapada Rd. & Western Express Highway, Borivali East, Mumbai - 400066.

30097283

Page 48: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 48 of 60

b) Details of 33/22 kV Receiving Station in Mumbai Distribution Business

Sr. No Zone R/S Address Contact

Number/s Location of Phone

1 CZ 33KV AAREY (MAHANANDA)

Near Mahanand Dairy, Near Western Express Highway, Goregaon East, Mumbai-63.

7506778328 Security

2 CZ CAMA

Cama Industrial Estate Near Nirlon, Western Express Highway, Goregaon East, Mumbai-63.

7506779271 Security

3 CZ CHINCHAVLI Jn. of Chinchavali Road & S. V. Road, S.V. Road, Malad West Mumbai-64.

8291725918 Security

4 CZ CHINCHBUNDER Jn. Of Linking Road & Chinchbunder Road, Malad West, Mumbai-64.

8291729396 Security

5 CZ DINDOSHI

Opp. Patel Aluminium Compound, Western Express Highway, Malad East, Mumbai-97.

9321405074 30094804 30094805

&

8291726185

Shift Engineer

& Security

6 CZ ERANGAL Mudh-Marve Roadd, Erangal Village, Malad West, Mumbai-64.

8291748896 Security

7 CZ GANESH NAGAR MHADA

Near Building No.57, Shivajiraje Sankul, New Mhada Colony, Kandivili West, Mumbai-67.

8291726722 Security

8 CZ GOKULDHAM Vasantrao Hoshing Marg, Orchid Tower, Gokuldham, Goregaon East.

8291748955 Security

9 CZ GOREGAON S.V.Road, Near Siddharth Nagar, Goregan West, Mumbai-62.

9321405076 30098917

8291784269

Shift Engineer

10 CZ KANDIVLI Near Jn. of Station Rd & S.V. Rd, Opp. Telephone Exchange, Kandivli West, Mumbai-67.

8291716781

Security

11 CZ KANDIVLI INDUSTRIAL ESTATE

Behind Petrol Pump, Kandivli-Malad Link Rd, Charkop, Mumbai-67.

9321405075 30098925

8291694289

Shift Engineer

12 CZ LOKHANDWALA Opp. Highland Tower, Lokhandwala Complex, Kandivli East, Mumbai-101.

8291732182 Security

13 CZ MALAD Nr. N.L. High School, S.V. Road, Malad East, Mumbai-64. Security

Page 49: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 49 of 60

Sr. No Zone R/S Address Contact

Number/s Location of Phone

14 CZ MIND SPACE In compound of In-Orbit Mall, Link Rd, Malad West, Mumbai

8291746573 Security

15 CZ NIRLON Nirlon Complex, Near MTNL, Western Express Highway, Goregaon East.

8291753835 Security

16 CZ OMKAR

Omkar Alta-Monte Project, Near W E Highway Near Times of India, Malad East, Mumbai-97.

8291694409 Security

17 CZ PALM COURT Back side of Palm Court Complex, Near D-Mart, Link Rd, Malad West.

8291730237 Security

18 CZ POISAR Samata Nagar, Near Telephone Exchange, Kandivli East, Mumbai-101.

9321405073 8291745833 8291753814

& 7506776720

Shift Engineer

& Security

19 CZ RAHEJA IT PARK

Off Goregaon-Mulund Link Rd, OFF Raheja IT Park, Nr. Nagari Niwara Parishad, Goregaon East, Mumbai.

8291753741 Security

20 CZ RNA ROYAL PARK

RNA Royal Park Complex, Before Hindustan Naka, Kandivali West.

Unmanned -

21 CZ TIMES

Times of India Suburban Press, Near Raheja Complex, Near Western Express Highway, Malad East, Mumbai-97.

Unmanned -

22 EZ ACROPOLIS

Raheja Augustus Bldg; Raheja Acropolis Complex, Ahead of Telecom Factory, Off Sion-Trombay Road, Deonar Village, Govandi, Mumbai.

8291641259 Security

23 EZ ANIK

Ahead of Aashish Cinema, Near Port Trust Railway Crossing, Mahul, Chembur, Mumbai-71.

8291628429 Security

24 EZ CHANDIVALI SRA

SRA scheme Plot No.A, Sangharsh Nagar, Chandivali, Vikhroli West, Mumbai-72.

8291636826 Security

25 EZ CHEMBUR Adjacent to Shah & Anchor Engg. College, Sion-Trombay Road, Chembur, Mumbai-88.

8291620594 Security

26 EZ CHHEDA NAGAR

Opp. Subramanium Temple, Near Eastern Express Highway, Chheda Nagar, Chembur East, Mumbai-87

7506771534 Security

27 EZ CHUNABHATTI RCF Complex, Near Eastern Express Highway,

8291572749 Security

Page 50: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 50 of 60

Sr. No Zone R/S Address Contact

Number/s Location of Phone

Chunabhatti, Mumbai.

28 EZ HCC

Inside the compd. of Hindustan Const. Company, LBS Road, Vikhroli West, Mumbai.

8291630596 Security

29 EZ HINGWALA LANE

Hingwala Lane, Nr. Ghatkopar Station, Ghatkopar East, Mumbai.

8291622514 Security

30 EZ HIRANANDANI Near Suvarna Temple, Adj. to MCGM Pump House, Powai, Vikhroli, Mumbai.

7506773509 Security

31 EZ KALPATARU LBS

Kalpataru Aura Residential Complex, Opp. R-City Mall, LBS Marg, Ghatkopa West, Mumbai-86.

8291641932 Security

32 EZ KOHINOOR

Premier Padmini Compd; Kohinoor City, Vidyavihar Stn. Road, Mumbai.

7506772937 Security

33 EZ KURLA Opp. MCGM School, Bail Bazaar, Kurla West, Mumbai.

7506137195 Security

34 EZ MAHUL SRA

Eversmile Complex, S RA Scheme, Mahul Village Road, Bhd. Building, Chembur, Mumbai-74

8291636406 Security

35 EZ MHADA MANKHURD

Adjacent to BMC Garden, Next to Bldg. No. 4A, Maharashtra Nagar, Mankhurd East, Mumbai-88.

7506413859 Security

36 EZ MHADA SAHAKAR NAGAR

Mhada Sahakar Nagar Receiving Station, Kamgar Nagar, Shell Colony Road, Near MHADA Prathamesh Society and Sai Baba Mandir, Opp. To Tilaknagar Railway Station. Kurla East, Mumbai - 24.

8291641276 Security

37 EZ NAHAR SHAKTI Nahar Amrut Shakti Complex, Chandivali, Mumbai-72.

8291633439 Security

38 EZ NATWAR PAREKH

Natwar Parekh Compd; Ghatkopar Mankhurd Link Road, Chembur East, Bhd. Shivaji Nagar Police Station, Mumbai-43.

8291622520 Security

39 EZ RUNWAL Adjacent To R-Mall, Gandhi Nagar Jn. LBS Road, Vikhroli West, Mumbai.

8291646289 Security

40 EZ SAKI Near Saki-Naka Jn; Saki, Andheri East, Mumbai.

8291630172 Security

Page 51: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 51 of 60

Sr. No Zone R/S Address Contact

Number/s Location of Phone

41 EZ SHIVAJI NAGAR Opp. Deonar Dumping Ground, Deonar, Govandi, Mumbai.

8291624727 Security

42 EZ SIDHARTH NAGAR

Near Anand Mangal Hospital, Swastik Park, Chembur, Mumbai.

8291630626 Security

43 EZ SWAN MILL Swan Mill Compound, Behind Peninsula Bldg; LBS Marg, Kurla West.

7506643728 Security

44 EZ TAGORE NAGAR Near MCGM Pumping Station, Hariyali village, Tagore Nagar, Vikhroli East, Mumbai.

8291632384 Security

45 EZ TILAK NAGAR AEML East Division Office, Nr. Sahakar Cinema, Chembur, Mumbai-89.

9323510146 30097153

Shift engineer

46 EZ TORINO

Hiranandani Garden, South Avenue Road, Opp. Supreme City, Near Chitra Studio, Powai, Mumbai-76.

8291747790 Security

47 EZ VIHAR Ansa Industrial Estate, Saki-Vihar Rd; Andheri East, Mumbai.

7506774183 Security

48 EZ VIKHROLI

Near Jn. of Link Rd & LBS Marg, Shreyas Cinema, Nityanand Nagar, Ghatkopar, Mumbai-86.

8391605279 30098923

Shift engineer

49 NZ BHAYANDAR Pavanputra Bldg; Nr. Bhayandar Pump, Bhayandar East, Thane.

9323510156 30098036 30098037 30098936

Shift Engineer

50 NZ BHAYNDER WEST

Near Bhayandar Cemetary, Janardan Rakvi Marg, Near Patodia complex, Bhayndar (W), Thane.

Security

51 NZ BORIVALI

Adjacent to Tata Power House, Nr. Magathane Bus Depot, Borivali East, Mumbai-66.

9323510149 30094605 30094607

7506427096

Shift Engineer

52 NZ DAHISAR Nr. Shailendra High School, Shailendra nagar, Dahisar East, Mumbai-68.

8879867165 LT Dept Person

53 NZ DEVIDAS LANE Devidas lane, Nr. MTNL, Telephone Exchange, Off SVP Road, Dahisar West.

8291475938 Security

54 NZ GHODBUNDER AEML 220kV Ghodbundar R/Stn; Near Raj Bucket Factory, Ghodbunder, Thane.

8080935898

30093001 , 30093023

Control Room

Transmission

55 NZ GORAI Opp. Gorai Dumping Ground, Gorai , Borivali West, Mumbai-92.

7498899248 30097269 30097239

Control Room

Transmission &

Page 52: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 52 of 60

Sr. No Zone R/S Address Contact

Number/s Location of Phone Security

56 NZ KANAKIA CCI

Revali Complex, Western Express Highway, Nr. Metro Mall, Borivali East, Mumbai-66.

8879214516 Security

57 NZ MIRA Mira MIDC, Nr. Pesticide Company, Mira Road, Thane.

7506641172 Security

58 NZ RAVI MAHADA New Mhada Complex, Shanti Garden, Mira Road East, Thane – 401107.

8879195820 Security

59 NZ SADGURU

Sadguru Complex, Nr. Cinemax Theatre, Next to Mira Road Police Station, Mira Road East, Thane- 401107.

8879721779 Security

60 NZ SHANTISTAR Shanti Star Complex, Sector-1, Mira Road East, Thane-67.

7506641905 Security

61 NZ SHIMPOLI Near Jn. of Shimpoli Road & S.V. Road, Borivali West, Mumbai-92.

9323510151 30098925

7498965170

Shift Engineer

62 SCZ AAREY 220 KV

220 kV Aarey EHV Sub-Station, Off Jogeshwari Vikhroli Link Road, Opp. SEEPZ North Gate No.3, Unit No. 19, Aarey Colony, Goregaon East, Mumbai - 400063.

9323553068, 30097271, 30094466

Control Room

Transmission

63 SCZ AMBIVALI Laxmi Industrial Estate, Andheri West, Mumbai-58.

932140510230096445 30096443 30098940 30096441

Shift Engineer

& Security

64 SCZ ANDHERI Opp. BSES-MCGM Hospital, Andheri West, Mumbai -58.

9323510144, 30096477, 30096445, 30096443 30098940

Shift engineer

65 SCZ CHAKALA Near German Remedies, Andheri-Kurla Road, Andheri East, Mumbai-93.

8291687414 Security

66 SCZ HUL

Hindustan Unilever Ltd. Premises, B.D. Sawant Marg, Chakala, Andheri East, Mumbai-99.

7506769582 Security

Page 53: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 53 of 60

Sr. No Zone R/S Address Contact

Number/s Location of Phone

67 SCZ J B NAGAR

Rabindranath Tagore Road, Chakala, Off Sahar Road, Nr. Bombay Cambridge School Andheri East, Mumbai- 99.

7506632889 Security

68 SCZ MAROL Vasant Oasis Compd; Off. Military Road, Marol, Andheri East, Mumbai-59.

7506645337 Security

69 SCZ MEGHAWADI Near MHB Colony, Janata Colony, Jogeshwari East, Mumbai-60.

7506716253 Security

70 SCZ MIDC Opp. MIDC Police station, MIDC, Andheri East, Mumbai-93.

9321405101 30094302 30094346 30094195 30094305 30094004

8291718632

Shift Engineer

& Security

71 SCZ SAHAR PLAZA Sahar Plaza Commercial Complex, Andheri-Kurla Road, Andheri East.

8291703368 Security

72 SCZ SWAMI SAMARTH NAGAR

Near Swami Samarth Nagar, Behind Infinity Mall, Off Linking Road, Andheri West, Mumbai – 53.

8291718632 Security

73 SCZ SEEPZ Nr. Intergold Jewellery, Inside SEEPZ Compd; Andheri East, Mumbai-96.

8291718937 Security

74 SCZ VERSOVA

AEML 220kV R/Stn; Nr. MCGM Pumping Station, Lokhandwala Complex, Andheri West, Mumbai-61.

808093585 30096501 30097275

Control Room

Transmission

75 SZ 24 TH ROAD 24Th Road, Nr. Patwardhwan Municipal Udyan, Bandra West, Mumbai-50.

Unmanned -

76 SZ BANDRA Opp. Shoppers Stop, Link Road, Bandra West, Mumbai-50.

8291725829 -

77 SZ BANDRA TERMINUS

Nr. Bandra Terminus Station, Khar East, Mumbai.

8291599295 Security

78 SZ BOMBILWADI Ice Factory Lane, Off Hill Road, Bandra West, Mumbai-50.

9321405078

Shift Engineer

& Security

79 SZ GODREJ BKC Near BKC-1 bldg; Bhd. ICICI Bank, Bandra-Kurla Complex, Bandra East, Mumbai-51.

7506772986 Security

80 SZ JUHU Behind Cooper Hospital, N.S. Road.No1, Juhu, Mumbai-49.

8291102997 7506772519

Shift Engineer

Page 54: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 54 of 60

Sr. No Zone R/S Address Contact

Number/s Location of Phone

81 SZ JUHU NORTH Nr. Juhu Bus Depot, Opp. Church, Vileparle West, Mumbai-49.

7506774768 Security

82 SZ KALANAGAR

Nr. RBI Officers Qtrs; Bhd. MMRDA Office, Bandra-Kurla Complex, Bandra East, Mumbai-51.

7506774053 Security

83 SZ KALINA Opp. Two-Star Hotel, Kalina Kurla Road, Kalina, Santacruz East, Mumbai-55.

8291653493 Security

84 SZ KHAR Dhurandhar Marg, Khar Danda Road, Opp. Jain Arcade, Khar West, Mumbai-400052

Unmanned -

85 SZ MAKERS

Makers Phase 2, E-Block, BKC Road, near MMRDA office, behind Family Court, Bandra East, Mumbai 400051

Unmanned -

86 SZ MMRDA

Adani Electricity South Division Office, Opp. Asian Heart Hospital, Bandra-Kurla Complex, Mumbai-51.

30096076 Security

87 SZ PALI St. Andrews Road, Near Pali Market, Bandra West, Mumbai-50.

7506773106 Security

88

RIL G Block BKC Road, Behind Bharat Diamond Bourse, Bandra (E) Mumbai-400051

Unmanned -

89 SZ SAMBHAJI NAGAR

HDIL Kaidonia, Opp. Vijay Nagar, Near Andheri Station, Sahar Road, Andheri East, Mumbai.

8291646957 Security

90 SZ SANTACRUZ Near Adani Electricity Stores compd; Santacruz East, Mumbai-55.

8291607417 Security

91 SZ SARASWATI ROAD

Saraswati Lane, Nr. Poddar School, Santacruz West, Mumbai.

8291615950 Security

92 SZ VILEPARLE Opp. Sahara Star Hotel, Western Express Highway, Vileparle East, Mumbai-57.

8291601730 Security

Page 55: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 55 of 60

22. Annexure – 2

A. Mumbai Distribution Business: Contact Details of our Key Personnel & Disaster Control Rooms

1. CENTRAL DISASTER CONTROL CENTRE

Telephone Numbers : a. 022-3009 9111 b. 022-3009 7225

Location : Adani Electricity Management Institute, 2nd. Floor, Disaster Mgmt. Cell, Unit 19, Aarey Colony, Aarey Road, JVLR, Opp. SEEPZ North Gate No.3, Goregaon (E), Mumbai 400 063.

Key Personnel: Name Division Land Line Mobile

Sadanand Sarpotdar O & M 30098360 9323552996

Subhash Chavan O & M 30094281 9322218723

Ajaykumar P Sethi O & M 30765429 9323552852

2. Divisional Control Centre

a) South Divisional Control Centre

Area covered : Bandra East & West to Vile Parle East & West

Location : MMRDA R/S, Opp. Asian heart Hospital, B K Complex, Bandra (E), Mumbai- 400051.

Shift in Charge : Tel nos. 022 30096080 / 022 30096006 / 022 30097158

Key Personnel:

Name Division Land Line Mobile

Dinesh Parab O & M 30096090 9321044338

Sandeep Narale Business 30096660 9322218694

Pramod Tayade O & M 30096024 9323552864

Page 56: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 56 of 60

b) South-Central Divisional Control Centre

Area covered : Andheri East & West to Jogeshwari East & West.

Location : MIDC R/S, E-4, MIDC, Andheri (E), Mumbai- 400093.

Shift in Charge : Tel nos. 022 30094193 / 022 30094192

Key Personnel:

Name Division Land Line Mobile Ravindra Kedar O & M 30095530 9323552822

B. B. Sarker Commercial 30094330 9323552849

Prakash Sawant O & M 30094340 9324216630

c) Central Divisional Control Centre

Area covered : Goregaon East & West to Kandivali East &West.

Location : Dindoshi Office, off W.E. Highway, Goregaon (E), Mumbai – 400097.

Shift in Charge : Tel nos. 022 30094916 / 022 30094911 / 022 30097569

Key Personnel:-

Name Division Land Line Mobile Kamlesh Pandey O & M 30094920 9323552941

Kerman Karkaria Business 30094900 9324904592

Manoj Chauhan O & M 30094918 9323552830

d) North Divisional Control Centre

Area covered : Borivali East & West to Bhayander East & West.

Location : S.V. Road and Shankar Lane Junction, Kandivli (W), Mumbai-400067.

Shift in Charge : Tel no. 022 30097596

Key Personnel:

Name Division Land Line Mobile Dayanand Samant O & M 30094540 9323815292

Sampada P. Jaint Commercial 30094500 9322218677

Page 57: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 57 of 60

Name Division Land Line Mobile

Vignesh Gawade O & M 30094533 9323815292

Umesh Huddar O & M 30091600 9323791483

e) East Divisional Control Centre

Area covered : Chunabhatti to Vikhroli and Mankhurd.

Location : Tilak Nagar R/S, Road No.3, Chembur, Mumbai-400089.

Shift in Charge : Tel nos. 30097226

Key Personnel :

Name Division Mobile

Mahesh Andhari O & M 9323549996

Nitin Kate Business 9323549946

Shrinivas Desai O & M 9321044367

Shirish Ranade O & M 9323808906

f) SCADA Master Control Center (MCC) / Complaint Management Cell (CMC)

Area covered : Mumbai Distribution Business

Location : Adani Electricity Management Institute, 1st. Floor, Disaster Mgmt. Cell, Unit 19, Aarey Colony, Aarey Road, JVLR, Opp. SEEPZ North Gate No.3, Goregaon (E), Mumbai 400 063.

Shift in Charge :Tel nos. 9321486590 /022 30098930 (MCC) – HT Abnormalities

Shift in Charge :Tel nos. 9324216667 (CMC) – LT Abnormalities

Key Personnel : MCC / CMC

Name Responsibility Land Line Mobile

Sandeep Parekh Head Operations --- 9323553117

Shrikant Yeole Head System Control

(MCC/BCC/ZCC) --- 9323552945

Mahesh Rajole Head (CMC) --- 9322343984

Page 58: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 58 of 60

g) Contact Details of Key Corporate Personnel –Mumbai Distribution Sr. No. Name Contact No. Department Address

1 Kapil Sharma 30098770 COO - MDB

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

2 Suraj Phalak 30098420 Head-Network Management

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

3 Vijay Dsouza 30098430 Head Maintenance

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

4 Sadanand Sarpotdar 30098360 Head - DMP

Adani Electricity Management Institute (AEMI), 2nd floor, Opp SEEPZ Gate No.3 , Jogeshwari Vikhroli Link Road , Unit 19, Aarey Road, Goregaon (E) , Mumbai -400063

5 Sunil Borse 30094359 Head - Safety

Adani Electricity Management Institute (AEMI), 2nd floor, Opp SEEPZ Gate No.3 , Jogeshwari Vikhroli Link Road , Unit 19, Aarey Road, Goregaon (E) , Mumbai -400063

6 R.R. Nakhare 30098760 Head

Commercial Management

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

7 S. M. Bhan 30098180 Head Key

Consumers Group

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

8 Anil Bendale 30098580 Head Divisional

Commercial Management

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

9 Ashish P. Khedkar

30098570

Head Government

Communication and Central

Enforcement

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

10 Taranath A. Kalyanpur 30098160 Head Business

Development

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai -

Page 59: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 59 of 60

Sr. No. Name Contact No. Department Address

400 103

11 Kishor Patil 30098780 Head-Regulatory

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

12 Manoj Sharma 30098850 Head-HR (Corporate)

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

13 Vinayak Dhonde 30098880 Head-HR (MDB)

Adani Electricity Ltd., Near Magathane Bus Depot, TATA Power Lane, Borivali (East), Mumbai - 400 066

14 Shrikumar Nair 30098810 Head-Admin (Corporate)

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

15 Vaibhav Tandon 30098764

Corporate Communications

(Corporate)

Adani Electricity Limited, Centre, Prabhat Colony, Santacruz (East) Mumbai - 400 055

16 Vijayendra R. Bhaavsar 30098805

Corporate Communications

(MDB)

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

17 Anshuman D. Sharma 30098551 Customer Care

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

18 Jayant D. Nerkar 30096020

Head - Receiving

Station Construction

Adani Electricity Ltd., MMRDA, Opp. Asian Heart Hospital, Bandra (E), Mumbai – 400 051

19 Sandeep Parekh 30098350

Head- Operations &

Planning

SCADA Control Centre, 1st Floor REMI, Opp SEEPZ Gate no 3, Jogeshwari Vikhroli Link Road, Goregaon (E) , Mumbai – 400 065

20 Bhushan Chaudhary 30098380 Head-CES

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

21 Ganesh E. Patil 30097163 Head-RSM

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

Page 60: DISASTER MANAGEMENT PLAN -2019 ADANI ELECTRICITY MUMBAI LTD. · Adani Electricity Mumbai Limited (Adani Electricity), a part of Adani Group, has been in the field of power distribution

Page 60 of 60

Sr. No. Name Contact No. Department Address

22 Chempak Kumar 30098351 Head-PM Cell

Adani Electricity Ltd ; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

23 Dr. Naresh Jhamnani 30091733 Head-Medical

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

24 Vikram Mallik 30096775 Head-Security

Adani Electricity Ltd., E-7(iii), MIDC, Opp MIDC Police station Andheri (E), Mumbai-400093Complex, Bandra (E), Mumbai-400051

25 Meghshyam Kulkarni 9323551410 MMG

Adani Electricity Ltd; Devidas Lane, Off. S.V.P Road, Nr. Devidas Lane Telephone Exchange, Borivali (W), Mumbai - 400 103

--------------------------------------