    Design-Build QA/QC Plan Sample Selected pages (not a complete plan) 

    Part 1: Project-Specific Quality Plan

    Part 2: Company Quality Manual

    Part 3: Library of QA/QC Forms

    Part 4: Inspection Forms

    Contact:

    Ed Caldeira410-451-8006 

  • 8/18/2019 Design Build Qa Qc Plan

    2/23

    PROJECT-SPECIFIC DESIGN-BUILD Q UALITY PLAN 

    TABLE OF CONTENTS 

    Background Information .......................................................................................................................... 7 

    Project Name .............................................................................................................................................. 7 

    Project Number .......................................................................................................................................... 7 

    Project Location .......................................................................................................................................... 7 

    Project Description ..................................................................................................................................... 7 

    Project Scope .............................................................................................................................................. 7 

    A. [CompanyName] Quality Policy ........................................................................................................... 8 

    B. Key Elements of the Design-Build Quality Plan .................................................................................... 9 

    Project Quality Assurance/Quality Control Plan Overview ...................................................................... 12 

    C. Project Quality Coordination and Communication ............................................................................. 13 

    D. Project QC Personnel ......................................................................................................................... 17 

    Project QC Job Position Assignments ....................................................................................................... 17 

    Project QC Organization Chart ................................................................................................................. 18 

    E. Duties, Responsibilities, and Authority of QC Personnel .................................................................... 19 

    F. Personnel Qualifications and Technical Certifications ........................................................................ 26 

    G. Qualification of Third Party Inspection/Testing Companies and Subcontractors And Suppliers ......... 28 

    Inspection/Testing Laboratory Qualification Requirements .................................................................... 28 

    Qualification ............................................................................................................................................. 28 

    Purchase Order Approval ......................................................................................................................... 29 

    H. Quality Training ................................................................................................................................. 31 I. Design-Build Project Quality Specifications ......................................................................................... 34 

    Local Building Codes ................................................................................................................................. 34 

    J. Design Control .................................................................................................................................... 36 

    Design Plan ............................................................................................................................................... 36 

    Design Reviews ......................................................................................................................................... 36 

    K. Material Inspection Traceability and Quality Controls ....................................................................... 41 

    Identification of Lot Controlled Materials ................................................................................................ 41 

    Material Receiving and Inspection ........................................................................................................... 41 

    L. Design-Build Inspection and Test Plan ................................................................................................ 46 

    Control of Inspection, Measuring, and Test Equipment ........................................................................... 46 

    M. Design-Build Work Task Quality Inspections ..................................................................................... 49 

    Identification of Quality Inspected Design-Build Work Tasks................................................................... 49 

    Required Inspections For Each Design-Build Work Task .......................................................................... 50 

    Additional Inspection Requirements for Process Work Tasks .................................................................. 50 

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    3/23

    Special Process Inspections ...................................................................................................................... 51 

    Daily Quality Control Report ..................................................................................................................... 51 

    N. Control of Punch Items and Nonconformances .................................................................................. 55 

    Marking of Nonconformances and Observations ..................................................................................... 55 

    Control the Continuation of Work ............................................................................................................ 55 

    Recording of Nonconformances ............................................................................................................... 55 

    Quality Manager Disposition of Nonconformance Reports ..................................................................... 56 

    Corrective Actions .................................................................................................................................... 56 

    Nonconformance Preventive Actions ....................................................................................................... 57 

    O. Project Completion Inspections ......................................................................................................... 59 

    Punch-Out QC Inspection ......................................................................................................................... 59 

    Pre-Final Customer Inspection ................................................................................................................. 59 

    Final Acceptance Customer Inspection .................................................................................................... 60 

    P. Project Quality Records and Documents ............................................................................................ 63 

    Q. Quality Assurance Surveillance .......................................................................................................... 66 

    Project Quality Performance Surveillance ................................................................................................ 66 

    Project Quality Audits ............................................................................................................................... 66 

    Project Audit Plan ..................................................................................................................................... 67 

    Project Audit Requirements ..................................................................................................................... 67 

    R. Additional Quality Control Requirements .......................................................................................... 69 

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    4/23

    I. DESIGN-BUILD PROJECT Q UALITY SPECIFICATIONS Fulfilling customer contract expectations is a primary objective of the [CompanyName] Quality System. To

    ensure that customer expectations will be fulfilled, [CompanyName] clearly defines the requirements for

    each contract before it is approved.

    The Project Manager ensures that the information in customer contracts clearly defines customer

    expectations and that the necessary details are provided to set requirements for construction.

    [CompanyName] personnel, subcontractors and suppliers are accountable for compliance to standards-

    based written specifications.

    To achieve expectations reliably and consistently, specifications are clearly spelled out, not only for results

    but also for processes. Specifications apply to materials, work steps, qualified personnel and

    subcontractors and suppliers, safe work rules, and environmental work conditions.

    Standards ensure that materials, methods, and results are specified rather than left to discretionary

    practices.

    All [CompanyName] construction activities comply with generally accepted good workmanship practices

    and industry standards.

    COMPLIANCE WITH INDUSTRY STANDARDS 

    Regulatory Codes that may apply to this project include those listed below.

    Regulatory Codes and Industry Standards 

    Division DescriptionReference

    Standard No. Reference Standard Title 03 Construction and placement of

    forms, shoring and scaffolding

    ACI MCP-2 Manual of Concrete Practice Part 2

    03 Reinforcement fabrication shapes

    and dimensions

    ACI 318M Building Code Requirements for Structural Concrete and Commentary

    03 Reinforcement Placement ACI 318M Building Code Requirements for Structural Concrete and Commentary

    03 Reinforcement Splices ACI 318M Building Code Requirements for Structural Concrete and Commentary

    03 Reinforcement Splice Welds AWS D1.4 D1.4M Structural Welding Code - Reinforcing Steel

    03 Fiber Reinforcement mixing ASTM C 1116/C

    1116M

    Standard Specification for Fiber-Reinforced Concrete

    03 Installation details of stressing

    tendons and accessories.

    ACI SP-66 and

    ACI 318M ACI 318

    ACI Detailing Manual and Building Code Requirements for Structural

    Concrete and Commentary

    03 Cold weather requirements ASTM C 494/C

    494M

    Standard Specification for Chemical Admixtures for Concrete

    03 Hot weather requirements ACI 305R Specification for Hot Weather Concreting

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    5/23

    03 Prevention of plastic shrinkage

    cracking

    ACI 305R Specification for Hot Weather Concreting

    03 Finish formed surface tolerances ACI 117 Specifications for Tolerances for Concrete Construction and Materials and

    Commentary

    05 Definitions of welding terms AWS A3.0M/A3.0 Standard Welding Terms and Definitions

    05 Workmanship and techniques forwelded construction

    AWS D1.1/D1.1M Structural Welding Code – Steel

    05 Welding standards AWS B2.1/B2.1M Specification for Welding Procedure and Performance Qualification

    05 Framing and reinforcing openings

    through a steel deck

    SDI DDP Deck Damage and Penetrations

    05 Placement of concrete on a metal

    deck

    SDI 31 Design Manual for Composite Decks, Form Decks, and Roof Decks

    05 Minimum spacings and edge

    distances for screws

    AISI SG02-KIT North American Specification for the Design of Cold-Formed Steel

    Structural Members

    05 Installation of chimneys, vents, and

    smokestacks

    NFPA 211 Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances

    05 Install high-strength bolts RCSC's "Specification for Structural Joints Using ASTM A 325 or A 490 Bolts"

    05 Installation of bracing and

    permanent bracing and bridging

    CFSEI Field Installation Guide for Cold-Formed Steel Roof Trusses

    26 Splicing and general conductor

    installation

    NFPA 70 National Electrical Code

    26 Mounting height of wall-mounted

    outlet and switch boxes

    ICC/ANSI A117.1 Accessible and Usable Buildings and Facilities

    26 Install Control devices and protective

    devices

    NFPA 70 National Electrical Code

    26 Grounding and bonding NFPA 70 National Electrical Code

    26 Workmanship NFPA 70 National Electrical Code

    26 Telecommunications grounding TIA-569 Commercial Building Standard for Telecommunications Pathways and

    Spaces

    26 Telecommunications pathways TIA J-STD-607 Commercial Building Grounding (Earthing) and Bonding Requirements for

    Telecommunications

    26 Warning Sign placement NFPA 70E Standard for Electrical Safety in the Workplace

    26 Lightning Protection installation NFPA 780 Standard for the Installation of Lightning Protection Systems

    31 Bedding for buried piping AWWA C600 Installation of Ductile-Iron Water Mains and Their Appurtenances

    31 Welding lengths of pipe together for

    bore holes

    AWS D1.1/D1.1M Structural Welding Code - Steel

    31 Geotextile storing and handling ASTM D 4873 Identification, Storage, and Handling of Geosynthetic Rolls and Samples

    31 Shoring installation EM 385-1-1 Safety and Health Requirements Manual

    31 Precast prestressed concrete pile

    installation

    PCI JR-382 Recommended Practice for Design, Manufacture and Installation of

    Prestressed Concrete Piling

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    6/23

    J. DESIGN CONTROL Design controls are in place to assure the quality of designs for this project. A design plan is used to

    document the design control process. The Design Plan is included as an exhibit in this subsection.

    The first control point will be of the review of design inputs. The Design Manager will assure that all

    necessary information is available to perform the required design work. The Design Manager will also

    assure that expectations for design outputs are well defined.

    Intermediate reviews will be carried out as indicated on the design control plan. The last review is the

    design output review.

    A record of all reviews will be recorded on the Design Review form. A Design Review form exhibit is

    included in this subsection.

    The President has appointed [DesignManagerName] as the Design Manager. [DesignManagerName] will

    control the design process with specific quality responsibilities, duties, and the authority to carry them

    out. A record of the Design Manager’s appointment appears in this plan.

    DESIGN PLAN 

    The Design Manager prepares a project-specific plan that includes:

    •  A listing of key project personnel, specific design responsibilities, and authority

    •  Appointment and the qualification of key design personnel to perform assigned design

    responsibilities

    •  Who will verify and approve the design input specifications before design work begins

    •  A listing of company and customer stakeholders, reviews they will participate in, and how their

    input will be used to amended design requirements. The project organization chart Includes

    interfaces between various groups and personnel for producing and reviewing the design.

    • 

    Design output specifications, including required drawings, and engineering calculations•  Identification of who will perform design output verification activities and the criteria they will

    use.

    •  The sequence of design work tasks and schedule

    The Design Manager reviews the design process project plan with the customer and other interested

    parties. The customer approves the plan after any discrepancies are resolved and the plan is agreed upon.

    Design work may begin only after the customer approves the plan.

    DESIGN REVIEWS 

    DESIGN INPUT REQUIREMENTS REVIEW 

    The Design Manager ensures that the information in design inputs clearly defines customer expectations

    and that the necessary details are provided to set requirements for design.

    The Design Manager obtains design specifications from the customer and conducts a customer design

    input review to ensure that:

    •  Customer design input requirements and specifications are complete

    •  Design process review milestones are specified when necessary

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    7/23

    [CompanyName]Project Design Process Plan

    Version August 14, 2012

    Project ID Project Name Preparer Date

    [ProjectNumber] [ProjectName]

    Design Appointments 

    Design Manager

    Designer(s)

    Design QC Reviewer

    Design Review Milestones 

    Ref# Work Task

    Output required for

    review Scheduled date/milestone Review participants

    Design Input Review

    Work in Process

    Review:

    Work in Process

    Review:

    Final Design Review:

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    8/23

    Q UALITY MANUAL 

    TABLE OF CONTENTS 

    1. Quality System Management and Responsibilities ............................................................................... 6 

    1.1. Overview .............................................................................................................................................. 6 

    1.2. [CompanyName] Quality Policy ........................................................................................................... 6 

    1.3. Quality Duties, Responsibilities, and Authority ................................................................................... 6 

    1.4. Quality System Performance Measures .............................................................................................. 9 

    1.5. Customer Satisfaction Performance Measures ................................................................................... 9 

    1.6. Exceptions ............................................................................................................................................ 9 

    2. Project Quality Assurance/Quality Control Plan ................................................................................. 10 

    2.1. Overview ............................................................................................................................................ 10 

    2.2. [CompanyName] Project License and Qualification Requirements .................................................. 10 2.3. Project Personnel and Qualifications ................................................................................................ 10 

    2.4. Project Quality Assurance/Quality Control Plan ................................................................................ 11 

    2.5. Identification of Quality Controlled Work Tasks................................................................................ 12 

    2.6. Project Quality Inspection and Test Plan ........................................................................................... 12 

    2.7. Project Quality Communications Plan ............................................................................................... 12 

    2.8. Project Quality Training Plan ............................................................................................................. 12 

    2.9. Customer Training On Operation And Maintenance ......................................................................... 12 

    2.10. Project Records and Documentation Plan ....................................................................................... 12 

    2.11. Project Audit Plan ............................................................................................................................ 13 

    3. Contract Specifications ....................................................................................................................... 14 

    3.1. Overview ............................................................................................................................................ 14 

    3.2. Contract Technical Specifications ...................................................................................................... 14 

    3.3. Contract Drawings ............................................................................................................................. 14 

    3.4. Contract Submittals ........................................................................................................................... 14 

    3.5. Customer Submittal Approval ........................................................................................................... 16 

    3.6. Contract Warranty ............................................................................................................................. 16 

    3.7. Contract Review and Approval .......................................................................................................... 17 

    4. Design Control.................................................................................................................................... 18 

    4.1. Overview ............................................................................................................................................ 18 

    4.2. Design Input Review .......................................................................................................................... 18 4.3. Project Design Quality Assurance/Quality Control Plan .................................................................... 18 

    4.4. Design Progress Reviews ................................................................................................................... 19 

    4.5. Design Output Verification and Approval .......................................................................................... 19 

    5. Project-Specific Quality Standards ..................................................................................................... 20 

    5.1. Overview ............................................................................................................................................ 20 

    5.2. Regulatory Codes ............................................................................................................................... 20 

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    9/23

    5.3. Industry Quality Standards ................................................................................................................ 20 

    5.4. Material and Equipment Specifications ............................................................................................. 20 

    5.5. Work Process Specifications .............................................................................................................. 21 

    5.6. Controlled Material Identification and Traceability .......................................................................... 21 

    5.7. Measuring Device Control and Calibration ........................................................................................ 22 

    5.8. [CompanyName] Quality Standards .................................................................................................. 22 5.9. Application of Multiple Sources of Specifications ............................................................................. 22 

    6. Project Purchasing ............................................................................................................................. 23 

    6.1. Overview ............................................................................................................................................ 23 

    6.2. Qualification of Outside Organizations and Company Departments ................................................ 23 

    6.3. Quality Responsibilities of Key Subcontractor And Supplier Personnel ............................................ 24 

    6.4. Requirements for Subcontractor QC Plan ......................................................................................... 25 

    6.5. Subcontractor And Supplier Quality Policy ........................................................................................ 25 

    6.6. Project Subcontractor And Supplier List ............................................................................................ 26 

    6.7. Purchase Order Requirements .......................................................................................................... 26 

    6.8. Project Purchase Order Approvals..................................................................................................... 26 7. Process Controls ................................................................................................................................. 28 

    7.1. Overview ............................................................................................................................................ 28 

    7.2. Project Startup and Quality Control Coordination Meeting .............................................................. 28 

    7.3. Preparatory Project Quality Assurance/Quality Control Plan Planning ............................................. 28 

    7.4. Weekly Quality Planning and Coordination Meetings ....................................................................... 29 

    7.5. Process Control Standards ................................................................................................................. 29 

    7.6. Daily Quality Control Report .............................................................................................................. 30 

    7.7. Monthly Quality Control Report ........................................................................................................ 31 

    8. Inspections and Tests ......................................................................................................................... 32 

    8.1. Overview ............................................................................................................................................ 32 

    8.2. Required Work Task Quality Inspections and Tests........................................................................... 32 

    8.3. Material Inspections and Tests .......................................................................................................... 32 

    8.4. Additional Inspection Requirements for Process Tasks ..................................................................... 33 

    8.5. Inspection of Special Processes ......................................................................................................... 34 

    8.6. Independent Measurement and Tests .............................................................................................. 34 

    8.7. Commissioning Functional Acceptance Tests .................................................................................... 34 

    8.8. Hold Points for Customer Inspection................................................................................................. 34 

    8.9. Quality Inspection and Test Specifications ........................................................................................ 34 

    8.10. Inspection And Test Acceptance Criteria ......................................................................................... 34 

    8.11. Inspection and Test Status............................................................................................................... 35 

    8.12. Independent Quality Assurance Inspections ................................................................................... 35 

    8.13. Inspection and Test Records ............................................................................................................ 35 

    8.14. Project Completion and Closeout Inspection .................................................................................. 36 

    9. Nonconformances and Corrective Actions ......................................................................................... 38 

    9.1. Overview ............................................................................................................................................ 38 

    9.2. Nonconformances ............................................................................................................................. 38 

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    10/23

    9.3. Corrective Actions ............................................................................................................................. 39 

    10. Preventive Actions ........................................................................................................................... 40 

    10.1. Overview .......................................................................................................................................... 40 

    10.2. Identify Preventive Actions for Improvement ................................................................................. 40 

    10.3. Train Preventive Actions for Improvement ..................................................................................... 40 

    11. Quality System Audits ...................................................................................................................... 42 

    11.1. Overview .......................................................................................................................................... 42 

    11.2. Project Quality System Audit ........................................................................................................... 42 

    11.3. Company-wide Quality System Audit .............................................................................................. 42 

    12. Record and Document Controls ........................................................................................................ 43 

    12.1. Overview .......................................................................................................................................... 43 

    12.2. Quality System Documents ............................................................................................................. 43 

    12.3. Document Controls .......................................................................................................................... 43 

    12.4. Record Controls ............................................................................................................................... 44 

    13. Appendix .......................................................................................................................................... 46 

    13.1. Definitions of Terms ........................................................................................................................ 46 

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    11/23

    7. PROCESS CONTROLS HOW WORK IS CARRIED OUT

    7.1. OVERVIEW

    The construction process plan defines how project work is to be done and approved for the overall

    project. The construction process plan is communicated to all key personnel, subcontractors and suppliers

    in a startup meeting. As the project proceeds, work task plans provide additional details of how each

    individual work task is carried out. Work tasks planning meetings are used to communicate expectations

    of the work task plan to key personnel responsible for carrying out the work task.

    7.2. PROJECT STARTUP AND Q UALITY CONTROL COORDINATION MEETING 

    Prior to the commencement of work, the Project Manager holds a meeting to discuss and coordinate how

    project work will be performed and controlled. Key personnel from [CompanyName], subcontractors andsuppliers meet to review expectations for project quality results as well as quality assurance and quality

    control policies and procedures including:

    •  Key requirements of the project

    •  The Project Quality Assurance/Quality Control Plan

    •  Required quality inspections and tests

    •  The project submittal schedule

    •  Quality policies and heightened awareness of critical quality requirements

    •  Project organization chart and job responsibilities

    •  Methods of communication and contact information

    •  Location of project documents and records

    7.3. PREPARATORY PROJECT Q UALITY ASSURANCE/Q UALITY CONTROL PLAN PLANNING 

    7.3.1. WORK TASK REQUIREMENTS REVIEW 

    In preparation for the start of an upcoming work task, the Superintendent reviews an integrated and

    coordinated set of documents that collectively define quality requirements for the work task including:

    •  Objectives and acceptance criteria of the work task

    •  Quality standards that apply to the work task

    •  Work instructions, process steps, and product installation instructions that apply to the work task

    •  Shop drawings

    •  Submittals

    • 

    Tools and equipment necessary to perform the work•  License, certification, or other qualification requirements of personnel assigned to work

    •  Required records of the process and resulting product

    •  The subcontractor contracted to perform the work, if applicable

    •  Customer contract requirements

    •  Required quality inspections and tests

    •  Method for clearly marking nonconformances to prevent inadvertent use

    •  Location of quality system records and documents

    •  Personnel training

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    12/23

    7.3.2. PREPARATORY SITE INSPECTION 

    The Superintendent also performs a quality inspection of the work area and:

    •  Assesses completion of required prior work

    •  Verifies field measurements

    •  Assures availability and receiving quality inspection status of required materials

    • 

    Identifies any nonconformances to the requirements for the work task to begin

    •  Identifies potential problems

    7.3.3. WORK TASK PREPARATORY Q UALITY PLANNING MEETINGS 

    Prior to the start of a work task, the Superintendent conducts a meeting with key company, subcontractor

    personnel responsible for carrying out, supervising, or inspecting the work, and interested customer

    representatives.

    During the meeting, the Superintendent communicates the work task quality requirements and reinforces

    heightened awareness for critical requirements. Topics for a work task quality plan meeting include:

    •  Work tasks quality requirements as identified in section 7.3.1

    • 

    Findings of the work task preparatory quality inspection in section 7.3.2•  Conflicts that need resolution

    •  Required quality documents and a verification of availability to personnel carrying out,

    supervising, or inspecting the work task

    •  Record keeping requirements and the availability of necessary forms

    •  Review methods and sequences of installation

    •  Special details and conditions

    •  Standards of workmanship

    •  Heightened awareness of critical quality requirements

    •  Quality risks

    •  Work tasks quality inspection form

    7.4. 

    WEEKLY Q UALITY PLANNING AND COORDINATION MEETINGS 

    The Superintendent conducts a meeting with key company, subcontractor and supplier personnel

    responsible for carrying out, supervising, or inspecting the work, and interested customer representatives.

    The meeting is held on a nominal weekly schedule. During the meeting, the Superintendent facilitates

    coordination among the participants, communication among the participants, and reinforces heightened

    awareness for critical requirements.

    The Superintendent maintains a record of the meeting event on the Daily Quality Control Report.

    7.5. PROCESS CONTROL STANDARDS 

    7.5.1. 

    JOB-READY START WORK STANDARDS 

    Work on a work task starts only when conditions do not adversely impact quality, comply with

    government regulations, contract technical specifications, industry standards, or product installation

    instructions.

    The Quality Manager identifies supplemental start-work requirements that apply to a specific project

    when they are necessary to assure quality results.

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    13/23

    LIBRARY OF INCLUDED QA/QC PLAN FORMS 

    MILITARY FORMS: 

      Preparatory Phase Checklist 

      Initial Phase Checklist Form 

      Contractor Production Report 

      Contractor Quality Control Report 

      Testing Plan and Log 

    STANDARD FORMS: 

     

    Point 

    Of  

    Contact 

    List 

    Form 

      Project Quality Communications Plan Form 

     

    Quality 

    Manager 

    Appointment 

    Letter 

    Form 

     

    Project 

    Manager 

    Appointment 

    Letter 

    Form 

     

    Superintendent 

    Appointment 

    Letter 

    Form 

      Project Personnel Resumes Form 

     

    Training 

    Plan 

    Form 

     

    Training 

    Log 

    Form 

      Project Design Process Plan Form 

      Design Review Form 

     

    Controlled 

    Materials 

    Form 

     

    Metals 

    Material 

    Receiving 

    Inspection 

    Report 

    Form 

      Material Inspection and Receiving Report Form 

     

    Quality 

    Inspection 

    and 

    Test 

    Plan 

    Form 

     

    Test 

    Equipment 

    Calibration 

    Plan 

    and 

    Log 

    Form 

      Quality Controlled Work Task List Form 

      Daily Production Report Form 

     

    Work 

    Task 

    Inspection 

    Form 

     

    Punch 

    List 

    Form 

      Project License and Qualifications Form 

      Project Organization Chart Form 

      Project Personnel Qualification Form 

      Personnel Certifications and Licenses Form 

      Subcontractor And Supplier Quality Communications Plan Form 

     

    Project 

    Quality 

    Training 

    Plan 

    Form 

      Project Quality Records Plan Form 

      Project Submittals Schedule and Log Form 

      Project Submittal Form 

      Change Order Form 

      Project Design Process Plan Form 

      Project Regulatory Building Codes Form 

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    14/23

     

    Laboratory 

    Qualification 

    Form 

      Subcontractor And Supplier Qualification Form 

      Subcontractor And Supplier Certifications and Licenses Form 

     

    Subcontractor 

    And 

    Supplier 

    Quality 

    Control 

    Policy 

    Requirements 

    Form 

     

    Project 

    Startup 

    Meeting 

    Form 

     

    Work 

    Task 

    Quality 

    Assurance/Quality 

    Control 

    Plan 

    Form 

      Work Task Quality Control Planning Meeting Form 

     

    Monthly 

    Quality 

    Control 

    Report 

    Form 

     

    Inspection 

    and 

    Test 

    Report 

    Form 

      Project Completion Inspection Form 

      Nonconformance Report Form 

      Nonconformance Report Control Log Form 

      Corrective Action Report Form 

      Training Record Form 

      Jobsite Quality Review Planning and Log Sheet Form 

      Quality System Audit Form 

     

    System 

    Document 

    Control 

    Form 

      Project Records Control Form 

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    15/23

    [CompanyName]Nonconformance Report

    Nonconformance Report

    Control ID Project ID Project Name

    [ProjectNumber] [ProjectName]

    Preparer Signature/ Submit Date Quality Manager Signature / Disposition Date

    Description of the requirement or

    specification

    Description of the nonconformance,

    location, affected area, and marking

    Disposition

    Replace Repair Rework Use As-is

    Approval of disposition required by customer representative? Yes No

    Customer approval signature /date: ___________________________________

    Corrective Actions

    Corrective actions completed Name/Date:_________________________

    Customer acceptance of corrective actions required? Yes No

    Name/Date:_________________________

    Preventive Actions

    Preventive actions completed Name/Date:_________________________

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    16/23

    Inspection Forms

    Available by Division Sections 

    CONCRETE

      Cast Decks and Underlayment

      Concrete Finishing

      Concrete Forming

      Concrete Reinforcing

      Grouting

      Precast Concrete

      Structural Concrete

    MASONRY

      Concrete Form Masonry Units

      Concrete Unit Masonry

      Exterior Stone Cladding

      Maintenance of Masonry

      Manufactured Brick Masonry

    METALS

      Metal Decking

      Metal Railings

      Metal Stairs

      Structural Steel Framing

    WOOD/PLASTICS/AND COMPOSITES

      Architectural Wood Casework

      Exterior Finish Carpentry  Interior Finish Carpentry

      Sheathing

      Wood Decking

      Wood Framing

    THERMAL AND MOISTURE PROTECTION

      Applied Fireproofing

      Blanket Insulation

      Board Insulation

      Dampproofing and Waterproofing

      Exterior Insulation and Finish Systems

      Firestopping

      Flashing and Sheet Metal

      Joint Protection

      Membrane Roofing

      Thermal and Moisture Protection-Roof

    Accessories

      Thermal and Moisture Protection-Roof

    and Deck Insulation

      Thermal and Moisture Protection-Roof

    Panels 07.41.00

      Roof Tiles

      Roofing and Siding Panels

      Sheet Metal Roofing

      Shingles and Shakes

      Siding

      Wall Panels

      Weather Barriers

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    17/23

    Concrete-Concrete Finishing 03.35.00 Sep2011

    Project: Phase: Contract#: Organization:

    9101Field Operations

    Crew:

    Compliance Verification

     o Compliance with initial job-readyrequirements

     o Compliance with material inspection and tests

     o Compliance with work in process first articleinspection requirements

     o Compliance with work in process inspectionrequirements

     o Compliance with Task completion inspectionrequirements

     o Compliance with inspection and test plan

     o Compliance with safety policies and procedures

    Reported Nonconformances and incomplete items:

      FTQ 2TQ   Heightened Awareness Checkpoints 

    o o Concrete Finishing Schedule reviewed withENGINEER/ARCHITECT prior to Concrete Placement 1030

     o o No damage to coated reinforcing exposed during patchingactivities 1031

     o o Adequate water is present to wet finishing equipment andprevent smearing of the finish 1032

     o o Color admixture evenly distributed throughout concrete mix(no streaking or color variations) 1033

     o o Surface Grooves orientated to direct water off of the slab 1034

     o o Adequate form release agent has been applied to concretestamps 1035

     o o Finished surfaces are free of pin holes// spalling// and othersurface irregularities 1036

     o o

    Finishing is smooth and ready to receive surface treatment(carpet// tile// etc.) 1037

     o o Concrete sealer applied to surfaces free of dust and standingwater 1038

     o o Site runoff is directed away from placed concrete untilproperly finished and cured 1039

    FTQ Scores and Completion Sign-off

    Field Mgmt.-Superintendent Inspection 91.45.01

    Quality 5 4 3 2 1  Notes:

    On-Time 5 4 3 2 1  Notes:

    Safety 5 4 3 2 1  Notes:

    Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________ Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.

    Field Mgmt.-QA Inspection 91.45.02

    Quality 5 4 3 2 1  Notes:

    Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________ Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.

    Quality ScoreOn-Time ScoreSafety Score

    5 = 100% NO problems5 = On Time5 = 100% NO problems

    4 = 1 minor problems4 = Late4 = 1 minor problem

    3 = Hotspot or 2-3 minor 3 = Late by 1 day3 = Hotspot or 2-3 minor 

    2 = 6+ or major problems2 = Late by 2 days2= 4+ or major problem

    1 = Excessive problems1 = Late more than 2 days1= Injury

    Copyright 2011 First Time Quality

  • 8/18/2019 Design Build Qa Qc Plan

    18/23

    OPENINGS

      Door Hardware

      Doors and Frames

      Glazing 08.80.00

      Louvers and Vents

      Unit Skylights

      Windows

    FINISHES

      Access Flooring

      Acoustic Treatment

      Acoustical Ceilings

      Backing Boards and Underlayments  Carpeting

      Masonry Flooring

      Painting and Coating

      Plaster and Gypsum Board

      Resilient Flooring

      Stone Facing

      Terrazzo Flooring

      Textured Ceilings

      Tiling

      Wall Coverings

      Wood Flooring

    FIRE SUPPRESSION

      Suppression Water-Service Piping

      Fire Pumps

     Fire-Suppression Sprinkler Systems

      Fire-Suppression Standpipes

      Fire-Suppression Water Storage

    PLUMBING

      Electric Domestic Water Heaters

      Facility Potable-Water Storage Tanks

      Facility Sanitary Sewerage

      Facility Storm Drainage

      Facility Water Distribution

      Fuel-Fired Domestic Water Heaters

      Plumbing Fixtures

      Plumbing Insulation

    HVAC

      Air Outlets and Inlets

      Air Terminal Units  Breechings//Chimneys// and Stacks

      Central Cooling Equipment

      Commissioning ofHVAC

      Cooling Towers

      Facility Fuel-Oil Piping

      Facility Fuel-Storage Tanks

      Facility Natural-Gas Piping

      Furnaces

      Heating Boilers

      HVAC Air Cleaning Devices

      HVAC Ducts and Casings

      HVAC Fans

      HVAC Insulation

      HVAC Piping and Pumps

      HVAC Water Treatment

      Indoor Central-Station Air-Handling

    Units

      Instrumentation and Control for HVAC

      Refrigerant Piping

      Testing// Adjusting// and Balancing for

    HVAC

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    19/23

    Heating// Ventilating// and Air Conditioning (HVAC)-Air Terminal Units23.36.00

    Feb2012

    Project: Phase: Contract#: Vendor:

    9101Field Operations

    Crew:

    Compliance Verification

     o Compliance with initial job-readyrequirements

     o Compliance with material inspection and tests

     o Compliance with work in process first articleinspection requirements

     o Compliance with work in process inspectionrequirements

     o Compliance with Task completion inspectionrequirements

     o Compliance with inspection and test plan

     o Compliance with safety policies and procedures

    Reported Nonconformances and incomplete items:

      FTQ 2TQ   Heightened Awareness Checkpoints 

    o o Air Terminal Units rigidly mounted 1532

     o o Air Terminal Units plumb and level 1533

     o o Units supported structure// not duct work 1534

     o o Access panels shall be clear of ducts// supports// structuralmembers// and other obstructions 1535

     o o Units located to provide straight run of inlet duct 1536

     o o Supply air flow rate is steady in Constant-Air-Volume Units1537

     o o Supply air temperature is steady in Variable-Air-Volume Units1538

     o o Heating coils operational 1539

     o o Air Terminal Units operate over entire temperature range 1540

     o o Operation and Maintenance Manuals supplied to Owner 1541

    FTQ Scores and Completion Sign-off

    Field Mgmt.-Superintendent Inspection 91.45.01

    Quality 5 4 3 2 1  Notes:

    On-Time 5 4 3 2 1  Notes:

    Safety 5 4 3 2 1  Notes:

    Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________ Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.

    Field Mgmt.-QA Inspection 91.45.02

    Quality 5 4 3 2 1  Notes:

    Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________ Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.

    Quality ScoreOn-Time ScoreSafety Score

    5 = 100% NO problems5 = On Time5 = 100% NO problems

    4 = 1 minor problems4 = Late4 = 1 minor problem

    3 = Hotspot or 2-3 minor 3 = Late by 1 day3 = Hotspot or 2-3 minor 

    2 = 6+ or major problems2 = Late by 2 days2= 4+ or major problem

    1 = Excessive problems1 = Late more than 2 days1= Injury

    Copyright 2011 First Time Quality

  • 8/18/2019 Design Build Qa Qc Plan

    20/23

    ELECTRICAL

      Conduit for Electrical Systems

      Electrical and Cathodic Protection

      Enclosed Bus Assemblies

      Exterior Lighting

      Grounding and Bonding for Electrical

    Systems

      Identification for Electrical Systems

      Interior Lighting

      Low-Voltage Circuit Protective Devices

      Low-Voltage Controllers

      Low-Voltage Electrical Power

    Conductors and Cables (

  • 8/18/2019 Design Build Qa Qc Plan

    21/23

    Electrical-Grounding and Bonding for Electrical Systems 26.05.26 Feb2012

    Project: Phase: Contract#: Vendor:

    9101Field Operations

    Crew:

    Compliance Verification

     o Compliance with initial job-readyrequirements

     o Compliance with material inspection and tests

     o Compliance with work in process first article

    inspection requirements o Compliance with work in process inspection

    requirements

     o Compliance with Task completion inspectionrequirements

     o Compliance with inspection and test plan

     o Compliance with safety policies and procedures

    Reported Nonconformances and incomplete items:

      FTQ 2TQ   Heightened Awareness Checkpoints 

    o o Connections tight and free of corrosion// paint// and othernon-conductive materials 1633

     o o Anti-oxidant paste applied to connection junctions 1634

     o o Shielding grounded across splices and connections 1635

     o o Ground cabling entering/exiting buildings are sealed andwaterproofed 1636

     o o Metal conduits// boxes// panels// etc. bonded to GroundingSystem 1637

     o o Ground rods not located in rock or stone fill 1638

     o o Wiring secured to prevent movement and chafe 1639

     o o Multi-strand wire or strap connectors utilized on movableconnections 1640

     o o Ground system tested for continuity 1641

    FTQ Scores and Completion Sign-off

    Field Mgmt.-Superintendent Inspection 91.45.01

    Quality 5 4 3 2 1  Notes:

    On-Time 5 4 3 2 1  Notes:

    Safety 5 4 3 2 1  Notes:

    Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________ Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.

    Field Mgmt.-QA Inspection 91.45.02

    Quality 5 4 3 2 1  Notes:

    Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________ Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.

    Quality ScoreOn-Time ScoreSafety Score

    5 = 100% NO problems5 = On Time5 = 100% NO problems

    4 = 1 minor problems4 = Late4 = 1 minor problem

    3 = Hotspot or 2-3 minor 3 = Late by 1 day3 = Hotspot or 2-3 minor 

    2 = 6+ or major problems2 = Late by 2 days2= 4+ or major problem

    1 = Excessive problems1 = Late more than 2 days1= Injury

    Copyright 2011 First Time Quality

  • 8/18/2019 Design Build Qa Qc Plan

    22/23

    UTILITIES

      Culverts

      Public Water Utility Distribution Piping

      Sanitary Utility Sewerage Force Mains

      Sanitary Utility Sewerage Piping

      Storm Drainage Structures

      Storm Utility Water Drains

      Subdrainage

      Water Utility Distribution Equipment

    Questions? Call Ed Caldeira 410-451-8006

  • 8/18/2019 Design Build Qa Qc Plan

    23/23

     

    For More Information, contact: Ed Caldeira • Caldeira Quality, LLC • First Time Quality℠

    410 451 8006 • www firsttimequality com • EdC@FirstTimeQuality com

    For More Information:

    Contact: Ed Caldeira 

    410‐451‐8006 

    www.firsttimequality.com 

    [email protected] 

    Questions? Call Ed Caldeira 410-451-8006