22
Data Center Infrastructure Management (DCIM) Product Offer Allan Braish Schneider-electric Snior DCIM Software Consultant Dennis Strieter President, LDP Associates, Inc. APC Elite Data Center Consultant

Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

  • Upload
    others

  • View
    13

  • Download
    6

Embed Size (px)

Citation preview

Page 1: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

Data Center Infrastructure Management (DCIM)

Product Offer

Allan Braish Schneider-electric Snior DCIM Software Consultant

Dennis StrieterPresident, LDP Associates, Inc.

APC Elite Data Center Consultant

Page 2: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

2

A new level of business intelligence for your Data Center Infrastructure

Management (DCIM).

Ability today to integrate management platforms

A vision for tomorrow for simplified, integrated management

Remove silos & create energy awareness across the entire data center

StruxureWare Data Center Operation

PLANNINGImprove IT room allocation of

power & cooling

ANALYSISLeverage historical data to

improve future performance in

the data center

OPERATIONSRapid impact analysis in the

event of failure in the data

center

I need to know what

happens before a

failure occurs

IT Manager

Part of StruxureWare for Data Centers

Page 3: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

What is the Actual Utilization or

capacity of My Data Center(s)?

Capacity Management

Page 4: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

StruxureWare for Data Centers

DEMO

Page 5: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

We Want to Deploy Additional IT

equipment , Where in My Data

Center can this be Done?

Capacity Management

Page 6: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

StruxureWare for Data Centers

DEMO

Page 7: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

I want to know My data Center(s)

PUE and cost of energy ?

Energy Efficiency Dashboard

Page 8: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

StruxureWare for Data Centers

DEMO

Page 9: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

What are the Unique Features of

Schneider-electric DCIM

StruxureWare for Data Centers

Page 10: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

Schneider Electric Global Foot Print

billion € sales in 2011

% of sales in new economies

people in 100+ countries

of sales devoted to R&D

Energ

y pro

duction

& tra

nsm

issio

n

Making energy:•Safe

•Reliable

•Efficient

•Productive

•Green

The global specialist in

Energy management

Energ

y usage

A Recognised

Sustainable commitment

Covering

of world final energy

consumption

Page 11: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

“Do you have any

underutilized, idle or

unused servers in your

data center?”

IT Optimization

Page 12: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

12

Page 13: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

Powered by Intel® Data Center

Manager (Intel DCM)

IT Power Control

Page 14: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

Rack Provisioningand Capacity Planning

Page 15: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

TRADITIONAL METHOD:

Staticprovisioning

RACK PROVISION:4,000 watt available power

CAPACITY PLAN:Provision serverswithin 4,000 watts envelope

Rack Provisioning/Capacity Planning

Page 16: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

Rack Provisioning/Capacity Planning

650 watt power

supply rating

400 W

650 watt

Safe bet (derated): 400 watts per server based on lab measurements forexpected configuration

TRADITIONAL METHOD:

Staticprovisioning

Page 17: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

Rack Provisioning/Capacity Planning

650 watt power

supply rating

400 W

650 watt

Safe bet (derated): 400 watts per server based on lab measurements forexpected configuration

4,000 watts

÷ 400 watts/server

TRADITIONAL METHOD:

Staticprovisioning

Page 18: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

400 W

650 watt

INTEL INNOVATION:

Real-timemonitoring

Page 19: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

INTEL INNOVATION:

Real-timemonitoring

Actual measurements

show power/server never

exceeds 250 watts

Summary Details Policies

Data Center Management Console

250 W650 watt

Strandedcapacity

Page 20: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

Optional: Enforce4,000 watts cap per rack for rare cases wheredemand exceeds 4 watts

Summary Details Policies

Data Center Management Console

Use 250 watts

as aggressive

power/server

4,000 watts

÷ 250 watts/server

250 W650 watt

INTEL INNOVATION:

Real-timemonitoring

Page 21: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

Payoff – Increase rack density by: 60%

TRADITIONAL METHOD:

Staticprovisioning

INTEL INNOVATION:

Real-timemonitoring

Page 22: Data Center Infrastructure Management (DCIM) · 2 A new level of business intelligence for your Data Center Infrastructure Management (DCIM). Ability today to integrate management

22

@struxureware_dc

apc.com/software

dcimsupport.apc.com

blog.schneider-electric.com/datacenter

Thank you for your attention

Find us on…