PROGRAM : PENDIDIKAN TINGGI KEGIATAN : REHABILITASI GEDUNG PTN/PTS PEKERJAAN : REHABILI TASI GEDUNG STIP BUNGA BANGSA PALANGKA RAYA LOKASI : PALANGKA RAYA TAHUN ANGGARAN : 2014 NO SATUAN HARGA 1 3 4 A HARGA UPAH TENAGA KERJA 1 Mandor Org/Hari 177,100.00  2 Tukang Gali Tanah Org/Hari 113,900.00  3 Kepala Tukang (Batu,Kayu,Besi, Cat) Org/Hari 164,500.00  4 Tukang Gali Tanah (Batu,Kayu,Besi, Cat) Org/Hari 113,900.00  5 Pekerja 94,900.00  B HARGA BAHA N BANGUNAN 1 Baut Baja/Angker Bh 21,500.00  2 Atap Genteng Metal Color Lbr 48,600.00  3 Batu Bata Bh 900.00  4 Batu Belah M3 373,500.00  5 Bak Fiberglass 70x70 Bh 291,000.00  6 Batu Alam M2 250,000.00  7Bubungan Atap Gentang Metal Color Bh 28,500.00  8 Balok Kayu Ulin M3 8,855,000.00  9 Balok Kayu Benuas M3 5,060,000.00  10 Balok Kayu Lanan M3 2,767,200.00  11 Besi Beton Polos Kg 15,800.00  12 Cat Kayu Dasar Kg 33,900.00  13 Cat Kayu Mengkilat Kg 59,200.00  14 Cat Tembok (Matek/Setara) 5Kg Kg 95,500.00  15 Cat Manie Kg 35,400.00  16 Closed Jongkok Bh 213,500.00  17 Engsel Lokal 4" (Pintu) Bh 22,300.00  18 Engsel Lokal 3" (Jendela) Bh 21,800.00  19 Floor Drain Bh 35,000.00  20 Grendel Bh 3,200.00  21 Kaca Cermin Washtafel Set 1,500,000.00  22 Kait Angin Bh 26,800.00  23 Handle/Tarikan Pintu Jendela Lokal Bh 3,200.00  24 Kaca bening Ukuran 5mm M2 150,500.00  25 Kawat Beton/Bindrat Kg 23,000.00  26 Kayu Dolken/Galam Dia.10-12Cm, P.4m Btg 15,000.00  27 Kerikil Sungai M3 452,600.00  28 Kunci Tanam Bh 228,300.00  29 Keramik 30x30cm M2 66,700.00  30 Keramik 20x20cm M2 72,600.00  31 Kran Air Bh 19,000.00  32 Lampu Armature+Panel (2 lampu) Bh 750,000.00  33 Lampu SL40 Watt Bh 50,000.00  34 Lem Albon Kg 15,000.00  35 List profil Gypsum M 35,000.00  36Minyak Diesel Solar (Tidak Bersubsidi) Ltr 13,900.00  37 Paku Anti Karat Kg 33,500.00  38 Paku Kayu Kg 22,000.00  39 Paku Plywood/Teakwood Kg 26,100.00  40 Paku Ulin Kg 25,600.00  URAIAN 2 DAFTAR HARGA SATUAN UPAH DAN BAHAN

Daftar Harga Satuan Dan Upah

Embed Size (px)

DESCRIPTION

Daftar Harga Satuan Dan Upah Bahan

Citation preview

Sheet1DAFTAR HARGA SATUAN UPAH DAN BAHANPROGRAM: PENDIDIKAN TINGGIKEGIATAN: REHABILITASI GEDUNG PTN/PTSPEKERJAAN: REHABILITASI GEDUNG STIP BUNGA BANGSA PALANGKA RAYALOKASI: PALANGKA RAYATAHUN ANGGARAN: 2014NOURAIANSATUANHARGA1234AHARGA UPAH TENAGA KERJA1MandorOrg/Hari177,100.002Tukang Gali TanahOrg/Hari113,900.003Kepala Tukang (Batu,Kayu,Besi, Cat)Org/Hari164,500.004Tukang Gali Tanah (Batu,Kayu,Besi, Cat)Org/Hari113,900.005Pekerja94,900.00BHARGA BAHAN BANGUNAN1Baut Baja/AngkerBh21,500.002Atap Genteng Metal ColorLbr48,600.003Batu BataBh900.004Batu BelahM3373,500.005Bak Fiberglass 70x70Bh291,000.006Batu AlamM2250,000.007Bubungan Atap Gentang Metal ColorBh28,500.008Balok Kayu UlinM38,855,000.009Balok Kayu BenuasM35,060,000.0010Balok Kayu LananM32,767,200.0011Besi Beton PolosKg15,800.0012Cat Kayu DasarKg33,900.0013Cat Kayu MengkilatKg59,200.0014Cat Tembok (Matek/Setara) 5KgKg95,500.0015Cat ManieKg35,400.0016Closed JongkokBh213,500.0017Engsel Lokal 4" (Pintu)Bh22,300.0018Engsel Lokal 3" (Jendela)Bh21,800.0019Floor DrainBh35,000.0020GrendelBh3,200.0021Kaca Cermin WashtafelSet1,500,000.0022Kait AnginBh26,800.0023Handle/Tarikan Pintu Jendela LokalBh3,200.0024Kaca bening Ukuran 5mmM2150,500.0025Kawat Beton/BindratKg23,000.0026Kayu Dolken/Galam Dia.10-12Cm, P.4mBtg15,000.0027Kerikil SungaiM3452,600.0028Kunci TanamBh228,300.0029Keramik 30x30cmM266,700.0030Keramik 20x20cmM272,600.0031Kran AirBh19,000.0032Lampu Armature+Panel (2 lampu)Bh750,000.0033Lampu SL40 WattBh50,000.0034Lem AlbonKg15,000.0035List profil GypsumM35,000.0036Minyak Diesel Solar (Tidak Bersubsidi)Ltr13,900.0037Paku Anti KaratKg33,500.0038Paku KayuKg22,000.0039Paku Plywood/TeakwoodKg26,100.0040Paku UlinKg25,600.0041Papan BakestingM31,644,500.0042Papan Kayu UlinM312,548,800.0043Pasir PasangM3118,300.0044Pasir UrugM387,600.0045Pipa PVC 4"Btg293,700.0046Pipa PVC 2"Btg100,200.0047Pipa PVC 3/4"Btg29,100.0048Plamur Tembok 5KgKg63,400.0049Plamur KayuKg31,600.0050Plywood 3mmLbr63,500.0051Rangka Atap Baja RinganM2250,000.0052Seal TapeBh10,000.0053Septictank + Rembesan Kap. 6M3Unit9,255,500.0054Schakelar (Standar)Bh38,000.0055Semen PCKg1,725.0056Semen Putih (Isi 40Kg/Zak)Zak117,000.0057Semen WarnaKg19,800.0058Stop Kontak + Instalasi (Konst. Beton)Ttk102,300.0059Skring Kast Lokal 1 (satu) GroupBh44,300.0060Tanah Uruh BiasaM387,600.0061Titik Lampu + Instalasi (Konst. Beton)Ttk379,500.0062WashtafelBh850,000.00

Sheet2

Sheet3