pek. persiapanANALISA BIAYA KONSTRUKSIPEKERJAAN PERSIAPANPA6.1.1 m'Pagar Sementara dari kayu tinggi 2 meter6.1.1.Bahan-Kayu Laut/Dolken1.250BtgxRp19,250=Rp24,062.50-Semen Portland2.500KgxRp1,270=Rp3,175.00-Pasir Beton0.005M3xRp87,800=Rp439.00-Koral Beton0.009M3xRp170,900=Rp1,538.10-Kayu 5/70.038M3xRp3,107,500=Rp118,085.00-Paku Biasa 2" - 5"0.060KgxRp14,520=Rp871.20-Residu/colter0.400LtxRp6,530=Rp2,612.00Jumlah (1)=Rp150,782.806.1.2.Tenaga-Tukang kayu0.200OhxRp78,800=Rp15,760.00-Pekerja0.400OhxRp52,500=Rp21,000.00-Kepala tukang0.020OhxRp91,900=Rp1,838.00-Mandor0.020OhxRp65,600=Rp1,312.00Jumlah (2)=Rp39,910.00Jumlah (1) + (2)=Rp190,692.80PA6.2.1 m'Pagar sementara dari seng gelombang tinggi 2 meter6.2.1.Bahan-Kayu Laut/Dolken1.250BtgxRp19,250=Rp24,062.50-Semen Portland2.500KgxRp1,270=Rp3,175.00-Seng Gelombang1.200LbrxRp59,640=Rp71,568.00-Pasir beton0.005M3xRp87,800=Rp439.00-Koral beton0.009M3xRp170,900=Rp1,538.10-Kayu 5/70.012M3xRp3,107,500=Rp37,290.00-Paku biasa 2" - 5"0.060KgxRp14,520=Rp871.20-Meni besi0.450KgxRp25,410=Rp11,434.50Jumlah (1)=Rp150,378.306.2.2.Tenaga-Tukang kayu0.200OhxRp78,800=Rp15,760.00-Pekerja0.400OhxRp52,500=Rp21,000.00-Kepala tukang0.020OhxRp91,900=Rp1,838.00-Mandor0.020OhxRp65,600=Rp1,312.00Jumlah (2)=Rp39,910.00Jumlah (1) + (2)=Rp190,288.30PA6.31 M' Pagar sementara dari kawat duri tinggi 1,8 meter6.3.1.Bahan-Kayu Laut/Dolken1.000BtgxRp19,250=Rp19,250.00-Semen Portland2.000KgxRp1,270=Rp2,540.00-Kawat duri1.625KgxRp4,030=Rp6,548.75-Pasir beton0.005M3xRp87,800=Rp439.00-Koral beton0.009M3xRp170,900=Rp1,538.10-Paku biasa 2" - 5"0.060KgxRp14,520=Rp871.20Jumlah (1)=Rp31,187.056.3.2.Tenaga-Tukang kayu0.200OhxRp78,800=Rp15,760.00-Pekerja0.400OhxRp52,500=Rp21,000.00-Kepala tukang0.020OhxRp91,900=Rp1,838.00-Mandor0.020OhxRp65,600=Rp1,312.00Jumlah (2)=Rp39,910.00Jumlah (1) + (2)=Rp71,097.05PA6.4Pengukuran dan Pemasangan bouplank6.4.1.Bahan-Kayu 5/70.012M3xRp3,107,500=Rp37,290.00-Paku biasa 2" - 5"0.020KgxRp14,520=Rp290.40-Kayu papan 3/200.007M3xRp3,107,500=Rp21,752.50Jumlah (1)=Rp59,332.906.4.2.Tenaga-Tukang kayu0.100OhxRp78,800=Rp7,880.00-Pekerja0.100OhxRp52,500=Rp5,250.00-Kepala tukang0.010OhxRp91,900=Rp919.00-Mandor0.005OhxRp65,600=Rp328.00Jumlah (2)=Rp14,377.00Jumlah (1) + (2)=Rp73,709.90PA6.51 m2Pembuatan Kantor Sementara dengan Lantai Plesteran6.5.1.Bahan-Kayu Laut/Dolken1.250BtgxRp19,250=Rp24,062.50-Kayu0.180M3xRp37,400=Rp6,732.00-Batu Belah/Kali 15 - 20 cm0.850KgxRp125,900=Rp138,490.00-Besi Strip1.100KgxRp87,800=Rp3,073,000.00-Semen Portland35.000KgxRp1,270=Rp190.50-Pasir pasang0.150M3xRp150,200=Rp15,020.00-Pasir beton0.100M3xRp165,200=Rp24,780.00-Koral beton0.150M3xRp185,900=Rp5,577,000.00-Bata merah30.000BhxRp64,400=Rp16,100.00-Seng plat0.250LbrxRp4,180=Rp8,360.00-Jendela nako2.000BhxRp13,590=Rp1,087.20-Kaca polos0.080M2xRp145,200=Rp21,780.00-Kunci tanam0.150BhxRp170,900=Rp10,254.00-Plywood 4 mm0.060LbrxRp202,700=Rp0.00Jumlah (1)=Rp8,916,856.206.5.2.Tenaga-Tukang kayu2.000OhxRp78,800=Rp157,600.00-Tukang batu1.000OhxRp78,800=Rp78,800.00-Pekerja2.000OhxRp52,500=Rp105,000.00-Kepala tukang0.300OhxRp91,900=Rp27,570.00-Mandor0.050OhxRp65,600=Rp3,280.00Jumlah (2)=Rp372,250.00Jumlah (1) + (2)=Rp9,289,106.20PA6.6.1 M Pembuatan gudang semen dan alat - alat6.6.1.Bahan-Kayu Laut/Dolken1.700BtgxRp19,250=Rp32,725.00-Kayu0.210M3xRp37,400=Rp7,854.00-Paku biasa0.300KgxRp125,900=Rp37,770.00-Semen Portland10.500KgxRp1,270=Rp13,335.00-Pasir beton0.030M3xRp165,200=Rp4,956.00-Koral beton0.050M3xRp185,900=Rp9,295.00-Seng gelombang bjls 20 - 7"1.500LbrxRp59,640=Rp89,460.00Jumlah (1)=Rp195,395.006.2.2.Tenaga-Tukang kayu0.200OhxRp78,800=Rp15,760.00-Pekerja0.400OhxRp52,500=Rp21,000.00-Kepala tukang0.020OhxRp91,900=Rp1,838.00-Mandor0.020OhxRp65,600=Rp1,312.00Jumlah (2)=Rp39,910.00Jumlah (1) + (2)=Rp235,305.00PA6.71m Pembuatan rumah jaga / kontruksi kayu6.7.1Bahan-Kayu Laut/Dolken3.000BtgxRp19,250=Rp57,750.00-Kayu0.276MxRp37,400=Rp10,322.40-Paku biasa0.700KgxRp125,900=Rp88,130.00-Seng gelombang bjls 20 - 7"1.500LbrxRp59,640=Rp89,460.00Jumlah (1)=Rp245,662.406.7.2Tenaga-Tukang kayu1.500OhxRp78,800=Rp118,200.00-Pekerja1.000OhxRp52,500=Rp52,500.00-Kepala Tukang0.150OhxRp91,900=Rp13,785.00-Mandor0.050OhxRp65,600=Rp3,280.00Jumlah (2)=Rp187,765.00Jumlah (1) + (2)=Rp433,427.40PA6.81 m Membersihkan lapangan dan perataan6.8.1Tenaga-Pekerja0.100OhxRp52,500=Rp5,250.00-Mandor0.050OhxRp65,600=Rp3,280.00Jumlah=Rp8,530.00PA6.91 m Pembuatan bedeng buruh6.9.1Bahan-Kayu Laut/Dolken1.250BtgxRp19,250=Rp24,062.50-Kayu0.186MxRp37,400=Rp6,956.40-Paku biasa0.300KgxRp125,900=Rp37,770.00-Semen portland18.000KgxRp1,270=Rp22,860.00-Pasir beton0.030MxRp165,200=Rp4,956.00-Koral beton0.050MxRp185,900=Rp9,295.00-Seng gelombang bjls 20 - 7"1.500LbrxRp59,640=Rp89,460.00-Plywood 4mm1.350LbrxRp202,700=Rp273,645.00Jumlah (1)=Rp469,004.906.9.2Tenaga-Tukang kayu2.000OhxRp78,800=Rp157,600.00-Pekerja1.000OhxRp52,500=Rp52,500.00-Kepala tukang0.200OhxRp91,900=Rp18,380.00-Mandor0.050OhxRp65,600=Rp3,280.00Jumlah (2)=Rp231,760.00Jumlah (1) + (2)=Rp700,764.90PA6.10.1 m Pembuatan bak adukan ukuran ( 40 x 50 x 20 ) cm6.10.1.Bahan-Waterfroof0.036M3xRp52,300=Rp1,882.80-Paku biasa0.080KgxRp125,900=Rp10,072.00-Kaso 5/71.000BtgxRp1,270=Rp1,270.00Jumlah (1)=Rp13,224.806.10.2Tenaga-Tukang kayu0.300OhxRp78,800=Rp23,640.00-Mandor0.002OhxRp65,600=Rp98.40Jumlah (2)=Rp23,738.40Jumlah (1) + (2)=Rp36,963.20PA6.11.1 m Pembuatan Stegger dari bambu, ukuran ( 40 x 50 x 20 ) cm6.11.1Bahan-Bambu 6 - 8 / 600 cm1.000BtgxRp62,900=Rp62,900.00-Tali ijuk0.250KgxRp0=Rp0.00Jumlah (1)=Rp0.006.11.2Tenaga-Tukang kayu0.017OhxRp78,800=Rp1,339.60-Kepala tukang0.002OhxRp91,900=Rp183.80-Pekerja0.250OhxRp52,500=Rp13,125.00-Mandor0.013OhxRp65,600=Rp852.80Jumlah (2)=Rp15,501.20Jumlah (1) + (2)=Rp0.00PA6.121 m Pembuatan jalan sementara6. 12.1Bahan-Batu belah 15/200.150MxRp125,900=Rp18,885.00-Batu pecah 5/70.090MxRp150,200=Rp13,518.00-Pasir pasang0.010MxRp76,500=Rp765.00Jumlah (1)=Rp33,168.006.12.2Tenaga-Pekerja1.000OhxRp52,500=Rp52,500.00-Mandor0.050OhxRp65,600=Rp3,280.00Jumlah (2)=Rp55,780.00Jumlah (1) + (2)=Rp88,948.00PA6.131 m Bongkaran beton betulang6.13.1Tenaga-Pekerja6.667OhxRp52,500=Rp350,017.50-Mandor0.333OhxRp65,600=Rp21,844.80Jumlah=Rp371,862.30PA6.141m Bongkaran dinding tembok bata merah6.14.1Tenaga-Pekerja5.000OhxRp52,500=Rp262,500.00-Mandor0.250OhxRp65,600=Rp16,400.00Jumlah=Rp278,900.00PA6.151m Pasangan pagar kawat jaring galvanis, tinggi 1.00 m6.15.1Bahan-Kawat jaring galvanis/BRC0.434LbrxRp235,950=Rp102,402.30Jumlah (1)=Rp102,402.306.15.2.Tenaga-Pekerja0.042OhxRp52,500=Rp2,205.00-Kepala tukang0.004OhxRp91,900=Rp367.60-Tukang0.042OhxRp78,800=Rp3,309.60-Mandor0.002OhxRp65,600=Rp131.20Jumlah (2)=Rp6,013.40Jumlah (1) + (2)=Rp108,415.70PA6.161 m'Pasang pagar beton pracetak (5 x 50 x 213) cm6.16.1.Bahan-Panel beton pracetak0.986LbrxRp177,700=Rp175,212.20-Kolom beton pracetak0.525BtgxRp0=Rp0.00-Pasir beton0.074MxRp165,200=Rp12,224.80-Koral 2/30.146MxRp0=Rp0.00-Batu Bata biasa 5x10x20 cm45.000KgxRp1,270=Rp57,150.00Jumlah (1)=Rp244,587.006.16.2.Tenaga-Pekerja0.042OhxRp52,500=Rp2,205.00-Kepala tukang0.004OhxRp91,900=Rp367.60-Tukang0.042OhxRp78,800=Rp3,309.60-Mandor0.002OhxRp65,600=Rp131.20Jumlah (2)=Rp6,013.40Jumlah (1) + (2)=Rp250,600.40

pek. TanahANALISA BIAYA KONSTRUKSIPEKERJAAN TANAHPT6.1.1 mGalian tanah biasa sedalam 1 meter6.1.1.Tenaga-Pekerja0.400OhxRp.52,500=Rp.21,000.00-Mandor0.040OhxRp.65,600=Rp.2,624.00Jumlah (1)=Rp.23,624.00PT6.2.1 mGalian tanah biasa sedalam 2 meter6.2.1.Tenaga-Pekerja0.526OhxRp.52,500=Rp.27,615.00-Mandor0.0526OhxRp.65,600=Rp.3,450.56Jumlah (1)=Rp.31,065.56PT6.3.1 mGalian tanah biasa sedalam 3 meter6.3.1.Tenaga-Pekerja0.735OhxRp.52,500=Rp.38,587.50-Mandor0.0735OhxRp.65,600=Rp.4,821.60Jumlah (1)=Rp.43,409.10PT6.4.1 mGalian tanah keras sedalam 1 meter6.4.Tenaga-Pekerja0.625OhxRp.52,500=Rp.32,812.50-Mandor0.062OhxRp.65,600=Rp.4,067.20Jumlah=Rp.36,879.70PT6.5.1 mGalian tanah cadas sedalam 1 meter6.5.1.Tenaga-Pekerja1.250OhxRp.52,500=Rp.65,625.00-Mandor0.125OhxRp.65,600=Rp.8,200.00Jumlah=Rp.73,825.00PT6.6..1 mGalian tanah lumpur sedalam 1 meter6.6.1.Tenaga-Pekerja0.823OhxRp.52,500=Rp.43,207.50-Mandor0.083OhxRp.65,600=Rp.5,444.80Jumlah=Rp.48,652.30PT6.7.1 mPekerjaan stripping setinggi 1 meter6.7.1.Tenaga-Pekerja0.050OhxRp.52,500=Rp.2,625.00-Mandor0.005OhxRp.65,600=Rp.328.00Jumlah (1)=Rp.2,953.00PT6.8.1 mPembuangan tanah sejauh 150 meter6.8.1.Tenaga-Pekerja0.515OhxRp.52,500=Rp.27,037.50-Mandor0.0515OhxRp.65,600Rp.3,378.40Jumlah=Rp.30,415.90PT6.9.1 mUrugan kembali6.9.1.Tenaga-Pekerja0.192OhxRp.52,500=Rp.10,080.00-Mandor0.019OhxRp.65,600=Rp.1,246.40Jumlah=Rp.11,326.40PT6.10.1 mPemadatan tanah6.10.1.Tenaga-Pekerja0.500OhxRp.52,500=Rp.26,250.00-Mandor0.050OhxRp.65,600=Rp.3,280.00Jumlah=Rp.29,530.00PT6.11.1 mUrugan pasir6.11.1.Bahan-Pasir urug1.200MxRp.64,400=Rp.77,280.00Jumlah (1)=Rp.77,280.006.11.2.Tenaga-Pekerja0.300OhxRp.52,500=Rp.15,750.00-Mandor0.015OhxRp.65,600=Rp.984.00Jumlah (2)=Rp.16,734.00Jumlah (1) + (2)=Rp.94,014.00PT6.12.1 mLapisan pudel campuran 1 Kp : 3 Ps : 7 TL6.12.1.Bahan-Pasir urug0.330MxRp.64,400=Rp.21,252.00-Kapur padam0.109MxRp.1,840=Rp.200.56-Tanah liat0.763MxRp.62,900=Rp.47,992.70Jumlah (1)=Rp.69,445.266.12.2.Tenaga-Pekerja0.500OhxRp.52,500=Rp.26,250.00-Mandor0.050OhxRp.65,600=Rp.3,280.00Jumlah (2)=Rp.29,530.00Jumlah (1) + (2)=Rp.98,975.26PT6.13.1 mLapisan pudel campuran 1 Kp : 5 TL6.13.1.Bahan-Kapur padam0.200MxRp.1,840=Rp.368.00-Tanah liat1.000MxRp.62,900=Rp.62,900.00Jumlah (1)=Rp.63,268.006.13.2.Tenaga-Pekerja0.500OhxRp.52,500=Rp.26,250.00-Mandor0.050OhxRp.65,600=Rp.3,280.00Jumlah (2)=Rp.29,530.00Jumlah (1) + (2)=Rp.92,798.00PT6.16.1 mPembuatan jalan sementara, tebal 25 cm6.16.1.Bahan-Batu belah 10/150.275MxRp.140,900=Rp.38,747.50-Batu koral 5/70.030MxRp.170,900=Rp.5,127.00-Pasir pasang0.050MxRp.76,500=Rp.3,825.00Jumlah (1)=Rp.47,699.506.16.2.Tenaga-Pekerja0.500OhxRp.52,500=Rp.26,250.00-Mandor0.050OhxRp.65,600=Rp.3,280.00Jumlah (2)=Rp.29,530.00Jumlah (1) + (2)=Rp.77,229.50

pek. pondasiANALISA BIAYA KONSTRUKSIPEKERJAAN PONDASIPP6.1.1 MPasangan pondasi batu kali, 1 Pc : 1 Ps6.1.1.Bahan :-Batu belah 15/201.100MxRp.125,900.00=Rp.138,490.00-Semen porland392.000KgxRp.1,270.00=Rp.497,840.00-Pasir pasang0.314MxRp.76,500.00=Rp.24,021.00Jumlah (1)=Rp.660,351.006.1.2.Tenaga-Pekerja1.500OhxRp.52,500.00=Rp.78,750.00-Tukang batu0.600OhxRp.78,800.00=Rp.47,280.00-Kepala tukang0.060OhxRp.91,900.00=Rp.5,514.00-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.136,464.00Jumlah (1) + (2)=Rp.796,815.00PP6.2.1 MPasang pondasi batu kali 1 Pc : 2 Ps6.2.1.Bahan-Batu belah 15/20 cm1.100MxRp.125,900.00=Rp.138,490.00-Semen porland267.000KgxRp.1,270.00=Rp.339,090.00-Pasir Pasang0.427MxRp.76,500.00=Rp.32,665.50Jumlah (1)=Rp.510,245.506.2.2.Tenaga-Pekerja1.500OhxRp.52,500.00=Rp.78,750.00-Tukang batu0.600OhxRp.78,800.00=Rp.47,280.00-Kepala tukang0.060OhxRp.91,900.00=Rp.5,514.00-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.136,464.00Jumlah (1) +(2)=Rp.646,709.50PP6.3.1 MPasang pondasi batu kali, 1 Pc : 2,5 Ps6.3.1.Bahan-Batu belah 15/20 cm1.100MxRp.125,900.00=Rp.138,490.00-Semen porland392.000KgxRp.1,270.00=Rp.497,840.00-Pasir Pasang0.314MxRp.76,500.00=Rp.24,021.00Jumlah (1)=Rp.660,351.006.3.2.Tenaga-Pekerja1.500OhxRp.52,500.00=Rp.78,750.00-Tukang batu0.600OhxRp.78,800.00=Rp.47,280.00-Kepala tukang0.060OhxRp.91,900.00=Rp.5,514.00-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.136,464.00Jumlah (1) +(2)=Rp.796,815.00PP6.4.1 MPasang pondasi batu kali, 1 Pc : 3 Ps6.4.1.Bahan-Batu belah 15/20 cm1.100MxRp.125,900.00=Rp.138,490.00-Semen porland202.000KgxRp.1,270.00=Rp.256,540.00-Pasir Pasang0.485MxRp.76,500.00=Rp.37,102.50Jumlah (1)=Rp.432,132.506.4.2.Tenaga-Pekerja1.500OhxRp.52,500.00=Rp.78,750.00-Tukang batu0.600OhxRp.78,800.00=Rp.47,280.00-Kepala tukang0.060OhxRp.91,900.00=Rp.5,514.00-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.136,464.00Jumlah (1) +(2)=Rp.568,596.50PP6.5.1 MPasang pondasi batu kali, 1 Pc : 4 Ps.6.5.1.Bahan-Batu belah 15/20 cm1.100MxRp.125,900.00=Rp.138,490.00-Semen porland163.000KgxRp.1,270.00=Rp.207,010.00-Pasir Pasang0.520MxRp.76,500.00=Rp.39,780.00Jumlah (1)=Rp.385,280.006.5.2.Tenaga-Pekerja1.500OhxRp.52,500.00=Rp.78,750.00-Tukang batu0.600OhxRp.78,800.00=Rp.47,280.00-Kepala tukang0.060OhxRp.91,900.00=Rp.5,514.00-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.136,464.00Jumlah (1) +(2)=Rp.521,744.00PP6.6.1 MPasang pondasi batu kali, 1 Pc : 5 Ps6.6.1.Bahan-Batu belah 15/20 cm1.100MxRp.125,900.00=Rp.138,490.00-Semen porland136.000KgxRp.1,270.00=Rp.172,720.00-Pasir Pasang0.544MxRp.76,500.00=Rp.41,616.00Jumlah (1)=Rp.352,826.006.6.2.Tenaga-Pekerja1.500OhxRp.52,500.00=Rp.78,750.00-Tukang batu0.600OhxRp.78,800.00=Rp.47,280.00-Kepala tukang0.060OhxRp.91,900.00=Rp.5,514.00-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)136,464.00Jumlah (1) +(2)489,290.00PP6.7.1 MPasang pondasi batu kali, 1 Pc : 6 Ps6.7.1.Bahan-Batu belah 15/20 cm1.100MxRp.125,900.00=Rp.138,490.00-Semen porland117.000KgxRp.1,270.00=Rp.148,590.00-Pasir Pasang0.561MxRp.76,500.00=Rp.42,916.50Jumlah (1)=Rp.329,996.506.7.2.Tenaga-Pekerja1.500OhxRp.52,500.00=Rp.78,750.00-Tukang batu0.600OhxRp.78,800.00=Rp.47,280.00-Kepala tukang0.060OhxRp.91,900.00=Rp.5,514.00-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.136,464.00Jumlah (1) +(2)=Rp.466,460.50PP6.8.1 MPasang pondasi batu kali, Pc : 8 Ps6.8.1.Bahan-Batu belah 15/20 cm1.100MxRp.125,900.00=Rp.138,490.00-Semen porland91.000KgxRp.1,270.00=Rp.115,570.00-Pasir Pasang0.561MxRp.76,500.00=Rp.42,916.50Jumlah (1)=Rp.296,976.506.8.2.Tenaga-Pekerja1.500OhxRp.52,500.00=Rp.78,750.00-Tukang batu0.600OhxRp.78,800.00=Rp.47,280.00-Kepala tukang0.060OhxRp.91,900.00=Rp.5,514.00-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.136,464.00Jumlah (1) +(2)=Rp.433,440.50PP6.9.1 MPasang pondasi batu kali, 1 Kp : 1 Sm : 1 Ps6.9.1.Bahan-Batu belah 15/20 cm1.100MxRp.125,900.00=Rp.138,490.00-Kapur pasang0.229KgxRp.187,000.00=Rp.42,823.00-Batu Bata biasa 5x10x20 cm0.229MxRp.25,080.00=Rp.5,743.32-Pasir Pasang0.544MxRp.6,270.00=Rp.3,410.88Jumlah (1)=Rp.190,467.206.9.2.Tenaga-Pekerja1.500OhxRp.52,500.00=Rp.78,750.00-Tukang batu0.600OhxRp.78,800.00=Rp.47,280.00-Kepala tukang0.060OhxRp.91,900.00=Rp.5,514.00-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.136,464.00Jumlah (1) +(2)=Rp.326,931.20PP6.10.1 MPasang pondasi batu kali, 1 Kp : 1 SM : 2 Ps6.10.1.Bahan-Batu belah 15/20 cm1.100MxRp.125,900.00=Rp.138,490.00-Kapur pasang0.170KgxRp.187,000.00=Rp.31,790.00-Batu Bata biasa 5x10x20 cm0.170MxRp.25,080.00=Rp.4,263.60-Pasir Pasang0.340MxRp.6,270.00=Rp.2,131.80Jumlah (1)=Rp.176,675.406.10.2.Tenaga-Pekerja1.500OhxRp.52,500.00=Rp.78,750.00-Tukang batu0.600OhxRp.78,800.00=Rp.47,280.00-Kepala tukang0.060OhxRp.91,900.00=Rp.5,514.00-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.136,464.00Jumlah (1) +(2)=Rp.313,139.40PP6.11.1 MPasangan pondasi batu kali, 1 Pc : 1/4 Kp : 4 Ps6.11.1.Bahan-Batu belah 15/20 cm1.100MxRp.125,900.00=Rp.138,490.00-Kayu Profil 4"156.000KgxRp.25,080.00=Rp.3,912,480.00-Kapur pasang0.032MxRp.187,000.00=Rp.5,984.00-Pasir Pasang0.584MxRp.6,270.00=Rp.3,661.68Jumlah (1)=Rp.4,060,615.686.11.2.Tenaga-Pekerja1.500OhxRp.52,500.00=Rp.78,750.00-Tukang batu0.600OhxRp.78,800.00=Rp.47,280.00-Kepala tukang0.060OhxRp.91,900.00=Rp.5,514.00-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.136,464.00Jumlah (1) +(2)=Rp.4,197,079.68PP6.12.1 MPasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps6.12.1.Bahan-Batu belah 15/20 cm1.100MxRp.125,900.00=Rp.138,490.00-Kayu Profil 4"61.000KgxRp.25,080.00=Rp.1,529,880.00-Kapur pasang0.147MxRp.187,000.00=Rp.27,489.00-Pasir Pasang0.492MxRp.6,270.00=Rp.3,084.84Jumlah (1)=Rp.1,698,943.846.12.2.Tenaga-Pekerja1.500OhxRp.52,500.00=Rp.78,750.00-Tukang batu0.600OhxRp.78,800.00=Rp.47,280.00-Kepala tukang0.060OhxRp.91,900.00=Rp.5,514.00-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.136,464.00Jumlah (1) +(2)=Rp.1,835,407.84PP6.13.1 MPasang pondasi batu kali, 1/4 Pc : 1 Kp : 4 Ps6.13.1.Bahan-Batu belah 15/20 cm1.100MxRp.125,900.00=Rp.138,490.00-Kayu Profil 4"41.000KgxRp.25,080.00=Rp.1,028,280.00-Kapur pasang0.131MxRp.187,000.00=Rp.24,497.00-Pasir Pasang0.523MxRp.6,270.00=Rp.3,279.21Jumlah (1)=Rp.1,194,546.216.13.2.Tenaga-Pekerja1.500OhxRp.52,500.00=Rp.78,750.00-Tukang batu0.600OhxRp.78,800.00=Rp.47,280.00-Kepala tukang0.060OhxRp.91,900.00=Rp.5,514.00-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.136,464.00Jumlah (1) +(2)=Rp.1,331,010.21PP6.14.1 MPasang pondasi batu kosong6.14.1.Bahan-Batu belah 10/15 cm1.200MxRp.140,900.00=Rp.169,080.00-Pasir pasang0.300MxRp.76,500.00=Rp.22,950.00Jumlah (1)=Rp.192,030.006.14.2.Tenaga-Pekerja0.780OhxRp.52,500.00=Rp.40,950.00-Tukang batu0.390OhxRp.78,800.00=Rp.30,732.00-Kepala tukang0.039OhxRp.91,900.00=Rp.3,584.10-Mandor0.039OhxRp.65,600.00=Rp.2,558.40Jumlah (2)=Rp.77,824.50Jumlah (1) +(2)=Rp.269,854.50PP6.15.1 MPasang pondasi siklop 40 % batu kali6.15.1.Bahan-Besi beton75.000KgxRp.14,410.00=Rp.1,080,750.00-Semen portland202.000KgxRp.1,270.00=Rp.256,540.00-Pasir beton0.320KgxRp.87,800.00=Rp.28,096.00-Koral beton0.490MxRp.185,900.00=Rp.91,091.00-Kawat beton0.800KgxRp.16,830.00=Rp.13,464.00Jumlah (1)=Rp.1,469,941.006.15.2.Tenaga-Pekerja3.000OhxRp.52,500.00=Rp.157,500.00-Tukang batu0.850OhxRp.78,800.00=Rp.66,980.00-Kepala tukang0.085OhxRp.91,900.00=Rp.7,811.50-Mandor0.150OhxRp.65,600.00=Rp.9,840.00Jumlah (2)=Rp.242,131.50Jumlah (1) +(2)=Rp.1,712,072.50PP6.16.1 MPasang pondasi sumuran diameter 100 Cm6.16.1.Bahan-Batu belah 15/20 cm0.450MxRp.125,900.00=Rp.56,655.00-Semen portland280.000KgxRp.1,270.00=Rp.355,600.00-Pasir Pasang0.670MxRp.76,500.00=Rp.51,255.00Jumlah (1)=Rp.463,510.006.16.2.Tenaga-Pekerja2.380OhxRp.52,500.00=Rp.124,950.00-Tukang batu0.300OhxRp.78,800.00=Rp.23,640.00-Kepala tukang0.030OhxRp.91,900.00=Rp.2,757.00-Mandor0.080OhxRp.65,600.00=Rp.5,248.00Jumlah (2)=Rp.156,595.00Jumlah (1) +(2)=Rp.620,105.00PP6.17.1 MPembuatan tiang pancang (40 x 40) Cm, beton bertulang6.17.1.Bahan-Pasir urug darat0.019MxRp.64,400.00=Rp.1,223.60-Pasir beton0.094MxRp.87,800.00=Rp.8,253.20-Koral beton0.150MxRp.185,900.00=Rp.27,885.00-Semen porland60.500KgxRp.1,270.00=Rp.76,835.00-Besi beton45.000KgxRp.14,410.00=Rp.648,450.00-Kawat beton0.900KgxRp.16,830.00=Rp.15,147.00-Kayu kaso 5/70.032MxRp.3,107,500.00=Rp.99,440.00-Paku0.120KgxRp.14,520.00=Rp.1,742.40-Minyak bekisting0.090LtxRp.6,290.00=Rp.566.10-Plamur tembok0.240KgxRp.15,730.00=Rp.3,775.20Jumlah (1)=Rp.883,317.506.17.2.Tenaga-Pekerja1.000OhxRp.52,500.00=Rp.52,500.00-Tukang batu0.670OhxRp.78,800.00=Rp.52,796.00-Kepala tukang0.067OhxRp.91,900.00=Rp.6,157.30-Mandor0.050OhxRp.65,600.00=Rp.3,280.00Jumlah (2)=Rp.114,733.30Jumlah (1) +(2)=Rp.998,050.80PP6.18.1 MPembuatan tiang pancang (35 x 35) Cm, beton bertulang6.18.1.Bahan-Pasir urug darat0.016MxRp.64,400.00=Rp.1,030.40-Pasir beton0.080MxRp.87,800.00=Rp.7,024.00-Koral beton0.125MxRp.185,900.00=Rp.23,237.50-Semen porland49.000KgxRp.1,270.00=Rp.62,230.00-Besi beton34.500KgxRp.14,410.00=Rp.497,145.00-Kawat beton0.700KgxRp.16,830.00=Rp.11,781.00-Kayu kaso 5/70.027MxRp.3,107,500.00=Rp.83,902.50-Paku0.120KgxRp.14,520.00=Rp.1,742.40-Minyak bekisting0.090LtxRp.6,290.00=Rp.566.10-Plamur tembok0.200KgxRp.15,730.00=Rp.3,146.00Jumlah (1)=Rp.691,804.906.18.2.Tenaga-Pekerja0.800OhxRp.52,500.00=Rp.42,000.00-Tukang batu0.500OhxRp.78,800.00=Rp.39,400.00-Kepala tukang0.050OhxRp.91,900.00=Rp.4,595.00-Mandor0.040OhxRp.65,600.00=Rp.2,624.00Jumlah (2)=Rp.88,619.00Jumlah (1) +(2)=Rp.780,423.90

pek. dindingANALISA BIAYA KONSTRUKSIPEKERJAAN DINDINGPD6.1.1 MPasangan bata merah tebal 1 bata, 1 Pc : 1 Ps6.1.1.Bahan-Bata merah 5 x 10 x 20 cm140.000BhxRp.720=Rp100,800.00-Semen portland64.030KgxRp.1,270=Rp81,318.10-Pasir pasang0.059MxRp.76,500=Rp4,513.50Jumlah (1)=Rp186,631.606.1.2Tenaga-Pekerja0.650OhxRp.52,500=Rp34,125.00-Tukang batu0.200OhxRp.78,800=Rp15,760.00-Kepala tukang0.020OhxRp.91,900=Rp1,838.00-Mandor0.030OhxRp.65,600=Rp1,968.00Jumlah (2)=Rp53,691.00Jumlah (1) + (2)=Rp240,322.60PD6.21m Pasangan bata merah tebal 1 bata, 1Pc : 2 Ps6.2.1Bahan-Bata merah 5 x 10 x 20 cm140.000BhxRp.720=Rp100,800.00-Semen portland43.500KgxRp.1,270=Rp55,245.00-Pasir pasang0.080MxRp.76,500=Rp6,120.00Jumlah (1)=Rp162,165.006.2.2Tenaga-Pekerja0.650OhxRp.52,500=Rp34,125.00-Tukang batu0.200OhxRp.78,800=Rp15,760.00-Kepala tukang0.020OhxRp.91,900=Rp1,838.00-Mandor0.030OhxRp.65,600=Rp1,968.00Jumlah (2)=Rp53,691.00Jumlah (1) + (2)=Rp215,856.00PD6.31 m Pasangan bata merah tebal 1 bata, 1Pc : 3 Ps6.3.1Bahan-Bata merah 5 x 10 x 20 cm140.000BhxRp.720=Rp100,800.00-Semen portland32.950KgxRp.1,270=Rp41,846.50-Pasir pasang0.091MxRp.76,500=Rp6,961.50Jumlah (1)=Rp149,608.006.3.2Tenaga-Pekerja0.650OhxRp.52,500=Rp34,125.00-Tukang batu0.200OhxRp.78,800=Rp15,760.00-Kepala tukang0.020OhxRp.91,900=Rp1,838.00-Mandor0.030OhxRp.65,600=Rp1,968.00Jumlah (2)=Rp53,691.00Jumlah (1) + (2)=Rp203,299.00PD6.41 m Pasangan bata merah tebal 1 bata, 1Pc : 4 Ps6.4.1Bahan-Bata merah 5 x 10 x 20 cm140.000BhxRp.720=Rp100,800.00-Semen portland26.550KgxRp.1,270=Rp33,718.50-Pasir pasang0.093MxRp.76,500=Rp7,114.50Jumlah (1)=Rp141,633.006.4.2Tenaga-Pekerja0.650OhxRp.52,500=Rp34,125.00-Tukang batu0.200OhxRp.78,800=Rp15,760.00-Kepala tukang0.020OhxRp.91,900=Rp1,838.00-Mandor0.030OhxRp.65,600=Rp34,125.00Jumlah (2)=Rp51,723.00Jumlah (1) + (2)=Rp193,356.00PD6.51 m Pasangan bata merah tebal 1 bata, 1Pc : 5 Ps6.5.1Bahan-Bata merah 5 x 10 x 20 cm140.000BhxRp.720=Rp100,800.00-Semen portland22.200KgxRp.1,270=Rp28,194.00-Pasir pasang0.102MxRp.76,500=Rp7,803.00Jumlah (1)=Rp136,797.006.5.2Tenaga-Pekerja0.650OhxRp.52,500=Rp34,125.00-Tukang batu0.200OhxRp.78,800=Rp0.00-Kepala tukang0.020OhxRp.91,900=Rp0.00-Mandor0.030OhxRp.65,600=Rp1,968.00Jumlah (2)=Rp36,093.00Jumlah (1) + (2)=Rp172,890.00PD6.61 m Pasangan bata merah tebal 1 bata, 1Pc : 6 Ps6.6.1Bahan-Bata merah 5 x 10 x 20 cm140.000BhxRp.720=Rp100,800.00-Semen portland22.200KgxRp.1,270=Rp28,194.00-Pasir pasang0.102MxRp.76,500=Rp7,803.00Jumlah (1)=Rp136,797.006.6.2Tenaga-Pekerja0.650OhxRp.52,500=Rp34,125.00-Tukang batu0.200OhxRp.78,800=Rp15,760.00-Kepala tukang0.020OhxRp.91,900=Rp1,838.00-Mandor0.030OhxRp.65,600=Rp1,968.00Jumlah (2)=Rp53,691.00Jumlah (1) + (2)=Rp190,488.00PD6.71 m Pasangan bata merah tebal 1 bata, 1Pc : 3 Kp : 10 Ps6.7.1Bahan-Bata merah 5 x 10 x 20 cm140.000BhxRp.720=Rp100,800.00-Semen portland10.080KgxRp.1,270=Rp12,801.60-Pasir pasang0.0925MxRp.76,500=Rp7,076.25Jumlah (1)=Rp19,877.856.7.2Tenaga-Pekerja0.650OhxRp.52,500=Rp34,125.00-Tukang batu0.200OhxRp.78,800=Rp15,760.00-Kepala tukang0.020OhxRp.91,900=Rp1,838.00-Mandor0.030OhxRp.65,600=Rp1,968.00Jumlah (2)=Rp53,691.00Jumlah (1) + (2)=Rp73,568.85PD6.81 m Pasangan bata merah tebal 1/2 bata, 1Pc : 1 Ps6.8.1Bahan-Bata merah 5 x 10 x 20 cm70.000BhxRp.720=Rp50,400.00-Semen portland27.800KgxRp.1,270=Rp35,306.00-Pasir pasang0.028MxRp.76,500=Rp2,142.00Jumlah (1)=Rp87,848.006.8.2Tenaga-Pekerja0.320OhxRp.52,500=Rp16,800.00-Tukang batu0.100OhxRp.78,800=Rp7,880.00-Kepala tukang0.010OhxRp.91,900=Rp919.00-Mandor0.015OhxRp.65,600=Rp984.00Jumlah (2)=Rp26,583.00Jumlah (1) + (2)=Rp114,431.00PD6.91 m Pasangan bata merah tebal 1/2 bata, 1Pc : 2 Ps6.9.1Bahan-Bata merah 5 x 10 x 20 cm70.000BhxRp.720=Rp50,400.00-Semen portland18.950KgxRp.1,270=Rp24,066.50-Pasir pasang0.038MxRp.76,500=Rp2,907.00Jumlah (1)=Rp77,373.506.9.2Tenaga-Pekerja0.320OhxRp.52,500=Rp16,800.00-Tukang batu0.100OhxRp.78,800=Rp7,880.00-Kepala tukang0.010OhxRp.91,900=Rp919.00-Mandor0.015OhxRp.65,600=Rp984.00Jumlah (2)=Rp26,583.00Jumlah (1) + (2)=Rp103,956.50PD6.101 m Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Ps6.10.1Bahan-Bata merah 5 x 10 x 20 cm70.000BhxRp.720=Rp50,400.00-Semen portland14.370KgxRp.1,270=Rp18,249.90-Pasir pasang0.040MxRp.76,500=Rp3,060.00Jumlah (1)=Rp71,709.906.10.2Tenaga-Pekerja0.320OhxRp.52,500=Rp16,800.00-Tukang batu0.100OhxRp.78,800=Rp7,880.00-Kepala tukang0.010OhxRp.91,900=Rp919.00-Mandor0.015OhxRp.65,600=Rp984.00Jumlah (2)=Rp26,583.00Jumlah (1) + (2)=Rp98,292.90PD6.111 m Pasangan bata merah tebal 1/2 bata, 1Pc : 4 Ps6.11.1Bahan-Bata merah 5 x 10 x 20 cm70.000BhxRp.720=Rp50,400.00-Semen portland11.500KgxRp.1,270=Rp14,605.00-Pasir pasang0.043MxRp.76,500=Rp3,289.50Jumlah (1)=Rp68,294.506.11.2Tenaga-Pekerja0.320OhxRp.52,500=Rp16,800.00-Tukang batu0.100OhxRp.78,800=Rp7,880.00-Kepala tukang0.010OhxRp.91,900=Rp919.00-Mandor0.015OhxRp.65,600=Rp984.00Jumlah (2)=Rp26,583.00Jumlah (1) + (2)=Rp94,877.50PD6.121 m Pasangan bata merah tebal 1/2 bata, 1Pc : 5 Ps6.12.1Bahan-Bata merah 5 x 11 x 22 cm70.000BhxRp.720=Rp50,400.00-Semen portland9.680KgxRp.1,270=Rp12,293.60-Pasir pasang0.045MxRp.76,500=Rp3,442.50Jumlah (1)=Rp66,136.106.12.2Tenaga-Pekerja0.320OhxRp.52,500=Rp16,800.00-Tukang batu0.100OhxRp.78,800=Rp7,880.00-Kepala tukang0.010OhxRp.91,900=Rp919.00-Mandor0.015OhxRp.65,600=Rp984.00Jumlah (2)=Rp26,583.00Jumlah (1) + (2)=Rp92,719.10PD6.131 m Pasangan bata merah tebal 1/2 bata, 1Pc : 6 Ps6.13.1Bahan-Bata merah 5 x 11 x 22 cm70.000BhxRp.720=Rp50,400.00-Semen portland8.320KgxRp.1,270=Rp10,566.40-Pasir pasang0.049MxRp.76,500=Rp3,748.50Jumlah (1)=Rp64,714.906.13.2Tenaga-Pekerja0.320OhxRp.52,500=Rp16,800.00-Tukang batu0.100OhxRp.78,800=Rp7,880.00-Kepala tukang0.010OhxRp.91,900=Rp919.00-Mandor0.015OhxRp.65,600=Rp984.00Jumlah (2)=Rp26,583.00Jumlah (1) + (2)=Rp91,297.90PD6.141 m Pasangan bata merah tebal 1/2 bata, 1Pc : 8 Ps6.14.1Bahan-Bata merah 5 x 11 x 22 cm70.000BhxRp.720=Rp50,400.00-Semen portland6.500KgxRp.1,270=Rp8,255.00-Pasir pasang0.050MxRp.76,500=Rp3,825.00Jumlah (1)=Rp62,480.006.14.2Tenaga-Pekerja0.320OhxRp.52,500=Rp16,800.00-Tukang batu0.100OhxRp.78,800=Rp7,880.00-Kepala tukang0.010OhxRp.91,900=Rp919.00-Mandor0.015OhxRp.65,600=Rp984.00Jumlah (2)=Rp26,583.00Jumlah (1) + (2)=Rp89,063.00PD6.151 m Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Kp : 10 Ps6.15.1Bahan-Bata merah 5 x 11 x 22 cm70.000BhxRp.720=Rp50,400.00-Semen portland4.500KgxRp.1,270=Rp5,715.00-Pasir pasang0.050MxRp.76,500=Rp3,825.00-Kapur pasang0.015MxRp.0=Rp0.00Jumlah (1)=Rp59,940.006.15.2Tenaga-Pekerja0.320OhxRp.52,500=Rp16,800.00-Tukang batu0.100OhxRp.78,800=Rp7,880.00-Kepala tukang0.010OhxRp.91,900=Rp919.00-Mandor0.015OhxRp.65,600=Rp984.00Jumlah (2)=Rp26,583.00Jumlah (1) + (2)=Rp86,523.00PD6.161 m Pasangan bata merah tebal 1/2 bata, 1Kp : 1 Sm : 1 Ps6.16.1Bahan-Bata merah 5 x 11 x 22 cm70.000BhxRp.720=Rp50,400.00-Kawat Duri0.018MxRp.4,030=Rp72.54-Pasir pasang0.018MxRp.76,500=Rp1,377.00-Kapur padam0.018MxRp.68,290=Rp1,229.22Jumlah (1)=Rp53,078.766.16.2Tenaga-Pekerja0.320OhxRp.52,500=Rp16,800.00-Tukang batu0.100OhxRp.78,800=Rp7,880.00-Kepala tukang0.010OhxRp.91,900=Rp919.00-Mandor0.015OhxRp.65,600=Rp984.00Jumlah (2)=Rp26,583.00Jumlah (1) + (2)=Rp79,661.76PD6.171 m Pasangan bata merah tebal 1/2 bata, 1Kp : 1 Sm : 2 Ps6.17.1Bahan-Bata merah 5 x 11 x 22 cm70.000BhxRp.720=Rp50,400.00-Kawat Duri0.014KgxRp.1,270=Rp17.78-Pasir pasang0.028MxRp.76,500=Rp2,142.00-Kapur padam0.014MxRp.68,290=Rp956.06Jumlah (1)=Rp53,515.846.17.2Tenaga-Pekerja0.320OhxRp.52,500=Rp16,800.00-Tukang batu0.100OhxRp.78,800=Rp7,880.00-Kepala tukang0.010OhxRp.91,900=Rp919.00-Mandor0.015OhxRp.65,600=Rp984.00Jumlah (2)=Rp26,583.00Jumlah (1) + (2)=Rp80,098.84PD6.181 m Pasangan dinding holowblock (HB.20)6.18.1Bahan-Hollow block (HB.20)12.500BhxRp.17,070=Rp213,375.00-Semen portland13.500KgxRp.1,270=Rp17,145.00-Pasir pasang0.048MxRp.76,500=Rp3,672.00-Besi beton polos1.950MxRp.168,250=Rp328,087.50Jumlah (1)=Rp562,279.506.18.2Tenaga-Pekerja0.320OhxRp.52,500=Rp16,800.00-Tukang batu0.150OhxRp.78,800=Rp11,820.00-Kepala tukang0.015OhxRp.91,900=Rp1,378.50-Mandor0.017OhxRp.65,600=Rp1,115.20Jumlah (2)=Rp31,113.70Jumlah (1) + (2)=Rp593,393.20PD6.191 m Pasangan dinding holowblock (HB.15)6.19.1Bahan-Hollow block (HB.15)12.500BhxRp.8,540=Rp106,750.00-Semen portland10.450KgxRp.1,270=Rp13,271.50-Pasir pasang0.038MxRp.76,500=Rp2,907.00-Besi beton polos1.950MxRp.168,250=Rp328,087.50Jumlah (1)=Rp451,016.006.19.2Tenaga-Pekerja0.320OhxRp.52,500=Rp16,800.00-Tukang batu0.120OhxRp.78,800=Rp9,456.00-Kepala tukang0.012OhxRp.91,900=Rp1,102.80-Mandor0.015OhxRp.65,600=Rp984.00Jumlah (2)=Rp28,342.80Jumlah (1) + (2)=Rp479,358.80PD6.201 m Pasangan dinding holowblock (HB.10)6.20.1Bahan-Hollow block (HB.10)12.500BhxRp.17,330=Rp216,625.00-Semen portland7.500KgxRp.1,270=Rp9,525.00-Pasir pasang0.027MxRp.76,500=Rp2,065.50-Besi beton polos1.950MxRp.168,250=Rp328,087.50Jumlah (1)=Rp556,303.006.20.2Tenaga-Pekerja0.320OhxRp.52,500=Rp16,800.00-Tukang batu0.100OhxRp.78,800=Rp7,880.00-Kepala tukang0.010OhxRp.91,900=Rp919.00-Mandor0.015OhxRp.65,600=Rp984.00Jumlah (2)=Rp26,583.00Jumlah (1) + (2)=Rp582,886.00PD6.211 m Pasangan dinding conblock (CB.20)6.21.1Bahan-Concrete block (CB 20)12.500BhxRp.2,920=Rp36,500.00-Semen portland14.050KgxRp.1,270=Rp17,843.50-Pasir beton0.004MxRp.87,800=Rp351.20-Pasir pasang0.042MxRp.76,500=Rp3,213.00-Besi beton polos3.870BhxRp.14,410=Rp55,766.70-Paku biasa 2" - 5"0.006KgxRp.14,520=Rp87.12-Kayu sembarang0.001MxRp.3,107,500=Rp3,107.50-Kawat beton0.030MxRp.16,830=Rp504.90-Koral beton0.005MxRp.185,900=Rp929.50Jumlah (1)=Rp118,303.426.21.2Tenaga-Pekerja0.370OhxRp.52,500=Rp19,425.00-Tukang batu0.157OhxRp.78,800=Rp12,371.60-Tukang besi0.007OhxRp.78,800=Rp551.60-Kepala tukang0.0164OhxRp.91,900=Rp1,507.16-Mandor0.0185OhxRp.65,600=Rp1,213.60Jumlah (2)=Rp35,068.96Jumlah (1) + (2)=Rp153,372.38PD6.221 m Pasangan dinding Conblock (CB.15)6.22.1Bahan-Concrete block (CB 15)12.500BhxRp.1,600=Rp20,000.00-Semen portland10.460KgxRp.1,270=Rp13,284.20-Pasir beton0.003MxRp.87,800=Rp263.40-Pasir pasang0.032MxRp.76,500=Rp2,448.00-Besi beton polos 8 mm2.870BhxRp.14,410=Rp41,356.70-Paku biasa 2" - 5"0.004KgxRp.14,520=Rp58.08-Kayu sembarang0.001MxRp.3,107,500=Rp3,107.50-Kawat beton0.020MxRp.16,830=Rp336.60-Koral beton0.004MxRp.185,900=Rp743.60Jumlah (1)=Rp81,598.086.22.2Tenaga-Pekerja0.340OhxRp.52,500=Rp17,850.00-Tukang batu0.130OhxRp.78,800=Rp10,244.00-Tukang besi0.007OhxRp.78,800=Rp551.60-Kepala tukang0.0137OhxRp.91,900=Rp1,259.03-Mandor0.017OhxRp.65,600=Rp1,115.20Jumlah (2)=Rp31,019.83Jumlah (1) + (2)=Rp112,617.91PD6.231 m Pasangan dinding Conblock (CB.10)6.23.1Bahan-Concrete block (CB 10)12.500BhxRp.740=Rp9,250.00-Semen portland7.200KgxRp.1,270=Rp9,144.00-Pasir beton0.002MxRp.87,800=Rp175.60-Pasir pasang0.021MxRp.76,500=Rp1,606.50-Besi beton polos2.540BhxRp.14,410=Rp36,601.40-Paku biasa 2" - 5"0.003KgxRp.14,520=Rp43.56-Kayu sembarang0.001MxRp.3,107,500=Rp3,107.50-Kawat beton0.015MxRp.16,830=Rp252.45-Koral beton0.003MxRp.185,900=Rp557.70Jumlah (1)=Rp60,738.716.23.2Tenaga-Pekerja0.340OhxRp.52,500=Rp17,850.00-Tukang batu0.107OhxRp.78,800=Rp8,431.60-Tukang besi0.007OhxRp.78,800=Rp551.60-Kepala tukang0.0114OhxRp.91,900=Rp1,047.66-Mandor0.017OhxRp.65,600=Rp1,115.20Jumlah (2)=Rp28,996.06Jumlah (1) + (2)=Rp89,734.77PD6.241 m Pasang dinding lantai6.24.1Bahan-Bondbeam 40 x 20 x 20 cm2.500BhxRp.30,250=Rp75,625.00-Semen portland5.100KgxRp.1,270=Rp6,477.00-Pasir beton0.080MxRp.87,800=Rp7,024.00-Besi beton polos1.500KgxRp.14,410=Rp21,615.00-Koral beton0.150MxRp.185,900=Rp27,885.00Jumlah (1)=Rp138,626.006.24.2Tenaga-Pekerja0.100OhxRp.52,500=Rp5,250.00-Tukang batu0.030OhxRp.78,800=Rp2,364.00-Tukang besi0.030OhxRp.78,800=Rp2,364.00-Kepala tukang0.006OhxRp.91,900=Rp551.40-Mandor0.005OhxRp.65,600=Rp328.00Jumlah (2)=Rp10,857.40Jumlah (1) + (2)=Rp149,483.40PD6.251 m Pasang dinding roster / terawang6.25.1Bahan-Roster/terawang36.000BhxRp.3,030=Rp109,080.00-Semen portland12.800KgxRp.1,270=Rp16,256.00-Pasir pasang0.035MxRp.76,500=Rp2,677.50Jumlah (1)=Rp128,013.506.25.2Tenaga-Pekerja0.300OhxRp.52,500=Rp15,750.00-Tukang batu0.100OhxRp.78,800=Rp7,880.00-Kepala tukang0.010OhxRp.91,900=Rp919.00-Mandor0.015OhxRp.65,600=Rp984.00Jumlah (2)=Rp25,533.00Jumlah (1) + (2)=Rp153,546.50PD6.261 m Pasang bata berongga ukuran ( 5 x 10 x 20 ) cm6.26.1Bahan-Batu berongga80.000BhxRp.610=Rp48,800.00-Semen portland23.650KgxRp.1,270=Rp30,035.50-Pasir pasang0.570MxRp.76,500=Rp43,605.00Jumlah (1)=Rp122,440.506.26.2Tenaga-Pekerja0.320OhxRp.52,500=Rp16,800.00-Tukang batu0.150OhxRp.78,800=Rp11,820.00-Kepala tukang0.015OhxRp.91,900=Rp1,378.50-Mandor0.015OhxRp.65,600=Rp984.00Jumlah (2)=Rp30,982.50Jumlah (1) + (2)=Rp153,423.00PD6.271 m Pasang dinding anyaman bambu, rangka kayu6.27.1Bahan-Bilik bambu1.500MxRp.16,340=Rp24,510.00-Kayu 5/70.014MxRp.5,225,000=Rp73,150.00-Paku0.012KgxRp.14,520=Rp174.24-List kayu 2/40.003MxRp.5,225,000=Rp15,675.00Jumlah (1)=Rp113,509.246.27.2Tenaga-Pekerja0.100OhxRp.52,500=Rp5,250.00-Tukang batu0.050OhxRp.78,800=Rp3,940.00-Kepala tukang0.005OhxRp.91,900=Rp459.50-Mandor0.002OhxRp.65,600=Rp131.20Jumlah (2)=Rp9,780.70Jumlah (1) + (2)=Rp123,289.94

pek.plesteranANALISA BIAYA KONSTRUKSIPEKERJAAN PLESTERANPPL6.1.1 M Plesteran 1 Pc : 1 Ps, tebal 15 mm6.1.1.Bahan-Semen portland12.920KgxRp.1,270=Rp.16,408.40-Pasir pasang0.013MxRp.76,500=Rp.994.50Jumlah (1)=Rp.17,402.906.1.2.Tenaga-Pekerja0.200OhxRp.52,500=Rp.10,500.00-Tukang batu0.150OhxRp.78,800=Rp.11,820.00-Kepala tukang0.015OhxRp.91,900=Rp.1,378.50-Mandor0.010OhxRp.65,600=Rp.656.00Jumlah (2)=Rp.24,354.50Jumlah (1) + (2)=Rp.41,757.40PPL6.2.1 M Plesteran 1 Pc : 2 Ps, tebal 15 mm6.2.1.Bahan-Semen portland8.520KgxRp.1,270=Rp.10,820.40-Pasir pasang0.017MxRp.76,500=Rp.1,300.50Jumlah (1)=Rp.12,120.906.2.2.Tenaga-Pekerja0.200OhxRp.52,500=Rp.10,500.00-Tukang batu0.150OhxRp.78,800=Rp.11,820.00-Kepala tukang0.015OhxRp.91,900=Rp.1,378.50-Mandor0.010OhxRp.65,600=Rp.656.00Jumlah (2)=Rp.24,354.50Jumlah (1) + (2)=Rp.36,475.40PPL6.3.1 M Plesteran 1 Pc : 3 Ps, tebal 15 mm6.3.1.Bahan-Semen portland6.480KgxRp.1,270=Rp.8,229.60-Pasir pasang0.019MxRp.76,500=Rp.1,453.50Jumlah (1)=Rp.9,683.106.3.2.Tenaga-Pekerja0.200OhxRp.52,500=Rp.10,500.00-Tukang batu0.150OhxRp.78,800=Rp.11,820.00-Kepala tukang0.015OhxRp.91,900=Rp.1,378.50-Mandor0.010OhxRp.65,600=Rp.656.00Jumlah (2)=Rp.24,354.50Jumlah (1) + (2)=Rp.34,037.60PPL6.4.1 M Plesteran 1 Pc : 4 Ps, tebal 15 mm6.4.1.Bahan-Semen portland5.200KgxRp.1,270=Rp.6,604.00-Pasir pasang0.020MxRp.76,500=Rp.1,530.00Jumlah (1)=Rp.8,134.006.4.2.Tenaga-Pekerja0.200OhxRp.52,500=Rp.10,500.00-Tukang batu0.150OhxRp.78,800=Rp.11,820.00-Kepala tukang0.015OhxRp.91,900=Rp.1,378.50-Mandor0.010OhxRp.65,600=Rp.656.00Jumlah (2)=Rp.24,354.50Jumlah (1) + (2)=Rp.32,488.50PPL6.5.1 M Plesteran 1 Pc : 5 Ps, tebal 15 mm6.5.1.Bahan-Semen portland4.320KgxRp.1,270=Rp.5,486.40-Pasir pasang0.022MxRp.76,500=Rp.1,683.00Jumlah (1)=Rp.7,169.406.5.2.Tenaga-Pekerja0.200OhxRp.52,500=Rp.10,500.00-Tukang batu0.150OhxRp.78,800=Rp.11,820.00-Kepala tukang0.015OhxRp.91,900=Rp.1,378.50-Mandor0.010OhxRp.65,600=Rp.656.00Jumlah (2)=Rp.24,354.50Jumlah (1) + (2)=Rp.31,523.90PPL6.6.1 M Plesteran 1 Pc : 6 Ps, tebal 15 mm6.6.1.Bahan-Semen portland3.680KgxRp.1,270=Rp.4,673.60-Pasir pasang0.023MxRp.76,500=Rp.1,759.50Jumlah (1)=Rp.6,433.106.6.2.Tenaga-Pekerja0.200OhxRp.52,500=Rp.10,500.00-Tukang batu0.150OhxRp.78,800=Rp.11,820.00-Kepala tukang0.015OhxRp.91,900=Rp.1,378.50-Mandor0.010OhxRp.65,600=Rp.656.00Jumlah (2)=Rp.24,354.50Jumlah (1) + (2)=Rp.30,787.60PPL6.7.1 M Plesteran 1 Pc : 8 Ps, tebal 15 mm6.7.1.Bahan-Semen portland2.880KgxRp.1,270=Rp.3,657.60-Pasir pasang0.024MxRp.76,500=Rp.1,836.00Jumlah (1)=Rp.5,493.606.7.2.Tenaga-Pekerja0.200OhxRp.52,500=Rp.10,500.00-Tukang batu0.150OhxRp.78,800=Rp.11,820.00-Kepala tukang0.015OhxRp.91,900=Rp.1,378.50-Mandor0.010OhxRp.65,600=Rp.656.00Jumlah (2)=Rp.24,354.50Jumlah (1) + (2)=Rp.29,848.10PPL6.8.1 M Plesteran 1 Pc : 0,5 Kp : 3 Ps, tebal 15 mm6.8.1.Bahan-Semen portland5.760KgxRp.1,270=Rp.7,315.20-Kapur padam0.003MxRp.8,470=Rp.25.41-Pasir pasang0.013MxRp.76,500=Rp.994.50Jumlah (1)=Rp.8,335.116.8.2.Tenaga-Pekerja0.200OhxRp.52,500=Rp.10,500.00-Tukang batu0.150OhxRp.78,800=Rp.11,820.00-Kepala tukang0.015OhxRp.91,900=Rp.1,378.50-Mandor0.010OhxRp.65,600=Rp.656.00Jumlah (2)=Rp.24,354.50Jumlah (1) + (2)=Rp.32,689.61PPL6.9.1 M Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm6.9.1.Bahan-Semen portland1.840KgxRp.1,270=Rp.2,336.80-Kapur padam0.006MxRp.8,470=Rp.50.82-Pasir pasang0.014MxRp.76,500=Rp.1,071.00Jumlah (1)=Rp.3,458.626.9.2.Tenaga-Pekerja0.200OhxRp.52,500=Rp.10,500.00-Tukang batu0.150OhxRp.78,800=Rp.11,820.00-Kepala tukang0.015OhxRp.91,900=Rp.1,378.50-Mandor0.010OhxRp.65,600=Rp.656.00Jumlah (2)=Rp.24,354.50Jumlah (1) + (2)=Rp.27,813.12PPL6.12.1 M Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 15 mm6.12.1.Bahan-Bingkai Naco Niki Hitam0.007KgxRp.1,270=Rp.8.89-Kapur padam0.007MxRp.8,470=Rp.59.29-Pasir pasang0.015MxRp.76,500=Rp.1,147.50Jumlah (1)=Rp.1,215.686.12.2.Tenaga-Pekerja0.200OhxRp.52,500=Rp.10,500.00-Tukang batu0.150OhxRp.78,800=Rp.11,820.00-Kepala tukang0.015OhxRp.91,900=Rp.1,378.50-Mandor0.010OhxRp.65,600=Rp.656.00Jumlah (2)=Rp.24,354.50Jumlah (1) + (2)=Rp.25,570.18PPL6.13.1 M Plesteran 1 Pc : 2 Ps, tebal 20 mm6.13.1.Bahan-Semen Portland14.280KgxRp.1,270=Rp.18,135.60-Pasir pasang0.023MxRp.76,500=Rp.1,759.50Jumlah (1)=Rp.19,895.106.13.2.Tenaga-Pekerja0.250OhxRp.52,500=Rp.13,125.00-Tukang batu0.200OhxRp.78,800=Rp.15,760.00-Kepala tukang0.020OhxRp.91,900=Rp.1,838.00-Mandor0.0125OhxRp.65,600=Rp.820.00Jumlah (2)=Rp.31,543.00Jumlah (1) + (2)=Rp.51,438.10PPL6.14.1 M Plesteran 1 Pc : 3 Ps, tebal 20 mm6.14.1.Bahan-Semen Portland10.800KgxRp.1,270=Rp.13,716.00-Pasir pasang0.026MxRp.76,500=Rp.1,989.00Jumlah (1)=Rp.15,705.006.14.2.Tenaga-Pekerja0.250OhxRp.52,500=Rp.13,125.00-Tukang batu0.200OhxRp.78,800=Rp.15,760.00-Kepala tukang0.020OhxRp.91,900=Rp.1,838.00-Mandor0.0125OhxRp.65,600=Rp.820.00Jumlah (2)=Rp.31,543.00Jumlah (1) + (2)=Rp.47,248.00PPL6.15.1 M Plesteran 1 Pc : 4 Ps, tebal 20 mm6.15.1.Bahan-Semen Portland8.680KgxRp.1,270=Rp.11,023.60-Pasir pasang0.028MxRp.76,500=Rp.2,142.00Jumlah (1)=Rp.13,165.606.15.2.Tenaga-Pekerja0.250OhxRp.52,500=Rp.13,125.00-Tukang batu0.200OhxRp.78,800=Rp.15,760.00-Kepala tukang0.020OhxRp.91,900=Rp.1,838.00-Mandor0.0125OhxRp.65,600=Rp.820.00Jumlah (2)=Rp.31,543.00Jumlah (1) + (2)=Rp.44,708.60PPL6.16.1 M Plesteran 1 Pc : 5 Ps, tebal 20 mm6.16.1.Bahan-Semen Portland7.290KgxRp.1,270=Rp.9,258.30-Pasir pasang0.028MxRp.76,500=Rp.2,142.00Jumlah (1)=Rp.11,400.306.16.2.Tenaga-Pekerja0.250OhxRp.52,500=Rp.13,125.00-Tukang batu0.200OhxRp.78,800=Rp.15,760.00-Kepala tukang0.020OhxRp.91,900=Rp.1,838.00-Mandor0.0125OhxRp.65,600=Rp.820.00Jumlah (2)=Rp.31,543.00Jumlah (1) + (2)=Rp.42,943.30PPL6.17.1 M Plesteran 1 Pc : 6 Ps, tebal 20 mm6.17.1.Bahan-Semen Portland6.240KgxRp.1,270=Rp.7,924.80-Pasir pasang0.030MxRp.76,500=Rp.2,295.00Jumlah (1)=Rp.10,219.806.17.2.Tenaga-Pekerja0.250OhxRp.52,500=Rp.13,125.00-Tukang batu0.200OhxRp.78,800=Rp.15,760.00-Kepala tukang0.020OhxRp.91,900=Rp.1,838.00-Mandor0.0125OhxRp.65,600=Rp.820.00Jumlah (2)=Rp.31,543.00Jumlah (1) + (2)=Rp.41,762.80PPL6.18.1 M Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 20 mm6.18.1.Bahan-Bingkai Naco Niki Hitam0.009MxRp.1,270=Rp.11.43-Kapur padam0.009MxRp.8,470=Rp.76.23-Pasir pasang0.018MxRp.76,500=Rp.1,377.00Jumlah (1)=Rp.1,464.666.18.2.Tenaga-Pekerja0.250OhxRp.52,500=Rp.13,125.00-Tukang batu0.200OhxRp.78,800=Rp.15,760.00-Kepala tukang0.020OhxRp.91,900=Rp.1,838.00-Mandor0.0125OhxRp.65,600=Rp.820.00Jumlah (2)=Rp.31,543.00Jumlah (1) + (2)=Rp.33,007.66PPL6.19.1 M Plesteran 1 Pc : 2 Ps, tebal 25 mm6.19.1.Bahan-Semen Portland15.500KgxRp.1,270=Rp.19,685.00-Pasir pasang0.013MxRp.76,500=Rp.994.50Jumlah (1)=Rp.20,679.506.19.2.Tenaga-Pekerja0.300OhxRp.52,500=Rp.15,750.00-Tukang batu0.200OhxRp.78,800=Rp.15,760.00-Kepala tukang0.020OhxRp.91,900=Rp.1,838.00-Mandor0.013OhxRp.65,600=Rp.820.00Jumlah (2)=Rp.34,168.00Jumlah (1) + (2)=Rp.54,847.50PPL6.20.1 M Plesteran 1 Pc : 3 Ps, tebal 25 mm6.20.1.Bahan-Semen Portland11.750KgxRp.1,270=Rp.14,922.50-Pasir pasang0.035MxRp.76,500=Rp.2,677.50Jumlah (1)=Rp.17,600.006.20.2.Tenaga-Pekerja0.300OhxRp.52,500=Rp.15,750.00-Tukang batu0.200OhxRp.78,800=Rp.15,760.00-Kepala tukang0.020OhxRp.91,900=Rp.1,838.00-Mandor0.013OhxRp.65,600=Rp.852.80Jumlah (2)=Rp.34,200.80Jumlah (1) + (2)=Rp.51,800.80PPL6.21.1 M Plesteran 1 Pc : 4 Ps, tebal 25 mm6.21.1.Bahan-Semen Portland9.480KgxRp.1,270=Rp.12,039.60-Pasir pasang0.038MxRp.76,500=Rp.2,907.00Jumlah (1)=Rp.14,946.606.21.2.Tenaga-Pekerja0.300OhxRp.52,500=Rp.15,750.00-Tukang batu0.200OhxRp.78,800=Rp.15,760.00-Kepala tukang0.020OhxRp.91,900=Rp.1,838.00-Mandor0.013OhxRp.65,600=Rp.852.80Jumlah (2)=Rp.34,200.80Jumlah (1) + (2)=Rp.49,147.40PPL6.22.1 M Plesteran 1 Pc : 5 Ps, tebal 25 mm6.22.1.Bahan-Semen Portland7.940KgxRp.1,270=Rp.10,083.80-Pasir pasang0.039MxRp.76,500=Rp.2,983.50Jumlah (1)=Rp.13,067.306.22.2.Tenaga-Pekerja0.300OhxRp.52,500=Rp.15,750.00-Tukang batu0.200OhxRp.78,800=Rp.15,760.00-Kepala tukang0.020OhxRp.91,900=Rp.1,838.00-Mandor0.013OhxRp.65,600=Rp.852.80Jumlah (2)=Rp.34,200.80Jumlah (1) + (2)=Rp.47,268.10PPL6.23.1 M Plesteran 1 Pc : 2 Ps, tebal 30 mm6.23.1.Bahan-Semen Portland18.650KgxRp.1,270=Rp.23,685.50-Pasir pasang0.035MxRp.76,500=Rp.2,677.50Jumlah (1)=Rp.26,363.006.23.2.Tenaga-Pekerja0.320OhxRp.52,500=Rp.16,800.00-Tukang batu0.250OhxRp.78,800=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900=Rp.2,297.50-Mandor0.015OhxRp.65,600=Rp.984.00Jumlah (2)=Rp.39,781.50Jumlah (1) + (2)=Rp.66,144.50PPL6.24.1 M Plesteran 1 Pc : 3 Ps, tebal 30 mm6.24.1.Bahan-Semen Portland14.150KgxRp.1,270=Rp.17,970.50-Pasir pasang0.039MxRp.76,500=Rp.2,983.50Jumlah (1)=Rp.20,954.006.24.2.Tenaga-Pekerja0.320OhxRp.52,500=Rp.16,800.00-Tukang batu0.250OhxRp.78,800=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900=Rp.2,297.50-Mandor0.015OhxRp.65,600=Rp.984.00Jumlah (2)=Rp.39,781.50Jumlah (1) + (2)=Rp.60,735.50PPL6.25.1 M Plesteran 1 Pc : 4 Ps, tebal 30 mm6.25.1.Bahan-Semen Portland11.380KgxRp.1,270=Rp.14,452.60387-Pasir pasang0.042MxRp.76,500=Rp.3,213.00331Jumlah (1)=Rp.17,665.60566.25.2.Tenaga-Pekerja0.320OhxRp.52,500=Rp.16,800.00-Tukang batu0.250OhxRp.78,800=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900=Rp.2,297.50-Mandor0.015OhxRp.65,600=Rp.984.00Jumlah (2)=Rp.39,781.50Jumlah (1) + (2)=Rp.57,447.10PPL6.26.1 M Plesteran 1 Pc : 4 Ps, tebal 30 mm6.26.1.Bahan-Semen Portland8.190KgxRp.1,270=Rp.10,401.30-Pasir pasang0.045MxRp.76,500=Rp.3,442.50Jumlah (1)=Rp.13,843.806.26.2.Tenaga-Pekerja0.320OhxRp.52,500=Rp.16,800.00-Tukang batu0.250OhxRp.78,800=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900=Rp.2,297.50-Mandor0.015OhxRp.65,600=Rp.984.00Jumlah (2)=Rp.39,781.50Jumlah (1) + (2)=Rp.53,625.30PPL6.27.1 M Berapen 1 Pc : 3 Ps, tebal 30 mm6.27.1.Bahan-Semen Portland7.070KgxRp.1,270=Rp.8,978.90-Pasir pasang0.021MxRp.76,500=Rp.1,606.50Jumlah (1)=Rp.10,585.406.27.2.Tenaga-Pekerja0.150OhxRp.52,500=Rp.7,875.00-Tukang batu0.070OhxRp.78,800=Rp.5,516.00-Kepala tukang0.007OhxRp.91,900=Rp.643.30-Mandor0.008OhxRp.65,600=Rp.524.80Jumlah (2)=Rp.14,559.10Jumlah (1) + (2)=Rp.25,144.50PPL6.28.1 M Berapen 1 Pc : 5 Ps, tebal 30 mm6.28.1.Bahan-Semen Portland5.670KgxRp.1,270=Rp.7,200.90-Pasir pasang0.023MxRp.76,500=Rp.1,759.50Jumlah (1)=Rp.8,960.406.28.2.Tenaga-Pekerja0.150OhxRp.52,500=Rp.7,875.00-Tukang batu0.070OhxRp.78,800=Rp.5,516.00-Kepala tukang0.007OhxRp.91,900=Rp.643.30-Mandor0.008OhxRp.65,600=Rp.524.80Jumlah (2)=Rp.14,559.10Jumlah (1) + (2)=Rp.23,519.50PPL6.29.1 M Plesteran Beton 1 Pc : 2 Ps, tebal 15 mm6.29.1.Bahan-Semen Portland9.300KgxRp.1,270=Rp.11,811.00-Pasir pasang0.018MxRp.76,500=Rp.1,377.00Jumlah (1)=Rp.13,188.006.29.2.Tenaga-Pekerja0.260OhxRp.52,500=Rp.13,650.00-Tukang batu0.200OhxRp.78,800=Rp.15,760.00-Kepala tukang0.020OhxRp.91,900=Rp.1,838.00-Mandor0.013OhxRp.65,600=Rp.852.80Jumlah (2)=Rp.32,100.80Jumlah (1) + (2)=Rp.45,288.80PPL6.30.1 M Plesteran Beton 1 Pc : 3 Ps, tebal 15 mm6.30.1.Bahan-Semen Portland7.070KgxRp.1,270=Rp.8,978.90-Pasir pasang0.021MxRp.76,500=Rp.1,606.50Jumlah (1)=Rp.10,585.406.30.2.Tenaga-Pekerja0.260OhxRp.52,500=Rp.13,650.00-Tukang batu0.200OhxRp.78,800=Rp.15,760.00-Kepala tukang0.020OhxRp.91,900=Rp.1,838.00-Mandor0.013OhxRp.65,600=Rp.852.80Jumlah (2)=Rp.32,100.80Jumlah (1) + (2)=Rp.42,686.20PPL6.31.1 M Plesteran Skoning 1 Pc : 2 Ps6.31.1.Bahan-Semen Portland0.500KgxRp.1,270=Rp.635.00-Pasir pasang0.002MxRp.76,500=Rp.153.00Jumlah (1)=Rp.788.006.31.2.Tenaga-Pekerja0.057OhxRp.52,500=Rp.2,992.50-Tukang batu0.038OhxRp.78,800=Rp.2,994.40-Kepala tukang0.038OhxRp.91,900=Rp.3,492.20-Mandor0.002OhxRp.65,600=Rp.131.20Jumlah (2)=Rp.9,610.30Jumlah (1) + (2)=Rp.10,398.30PPL6.32.1 M Plesteran Granito, 1 Pc warna : 2 Granito, tebal 10 mm6.32.1.Bahan-PC warna0.144KgxRp.=Rp.0.00-Batu granito15.000KgxRp.=Rp.0.00Jumlah (1)=Rp.0.006.32.2.Tenaga-Pekerja0.050OhxRp.52,500=Rp.2,625.00-Tukang batu0.020OhxRp.78,800=Rp.1,576.00-Kepala tukang0.002OhxRp.91,900=Rp.183.80-Mandor0.005OhxRp.65,600=Rp.328.00Jumlah (2)=Rp.4,712.80Jumlah (1) + (2)=Rp.4,712.80PPL6.33.1 M Plesteran Teraso, 1 Pc warna : 2 Batu Teraso, tebal 10 mm6.33.1.Bahan-PC warna0.440KgxRp.=Rp.0.00-Batu teraso11.500KgxRp.=Rp.0.00Jumlah (1)=Rp.0.006.33.2.Tenaga-Pekerja0.450OhxRp.52,500=Rp.23,625.00-Tukang batu0.200OhxRp.78,800=Rp.15,760.00-Kepala tukang0.020OhxRp.91,900=Rp.1,838.00-Mandor0.025OhxRp.65,600=Rp.1,640.00Jumlah (2)=Rp.42,863.00Jumlah (1) + (2)=Rp.42,863.00PPL6.34.1 M Plesteran Ciprat, 1 Pc : 2 Ps, tebal 10 mm6.34.1.Bahan-Semen portland4.320KgxRp.1,270=Rp.5,486.40-Pasir pasang0.016MxRp.76,500=Rp.1,224.00Jumlah (1)=Rp.6,710.406.34.2.Tenaga-Pekerja0.250OhxRp.52,500=Rp.13,125.00-Tukang batu0.100OhxRp.78,800=Rp.7,880.00-Kepala tukang0.010OhxRp.91,900=Rp.919.00-Mandor0.015OhxRp.65,600=Rp.984.00Jumlah (2)=Rp.22,908.00Jumlah (1) + (2)=Rp.29,618.40PPL6.35.1 M Plesteran Siar adukan, 1 Pc : 2 Ps6.35.1.Bahan-Semen portland4.320KgxRp.1,270=Rp.5,486.40-Pasir pasang0.016MxRp.76,500=Rp.1,224.00Jumlah (1)=Rp.6,710.406.35.2.Tenaga-Pekerja0.150OhxRp.52,500=Rp.7,875.00-Tukang batu0.070OhxRp.78,800=Rp.5,516.00-Kepala tukang0.007OhxRp.91,900=Rp.643.30-Mandor0.008OhxRp.65,600=Rp.524.80Jumlah (2)=Rp.14,559.10Jumlah (1) + (2)=Rp.21,269.50PPL6.36.1 M Plesteran waterfroof bata cote 3 lapis6.36.1.Bahan-Semen portland0.500KgxRp.1,270=Rp.635.00-Kosen Pintu / Jendela Aluminium Putih2.900KgxRp.66,550=Rp.192,995.00-Pasir pasang0.006MxRp.76,500=Rp.459.00Jumlah (1)=Rp.194,089.006.36.2.Tenaga-Pekerja0.300OhxRp.52,500=Rp.15,750.00-Tukang batu0.200OhxRp.78,800=Rp.15,760.00-Kepala tukang0.020OhxRp.91,900=Rp.1,838.00-Mandor0.015OhxRp.65,600=Rp.984.00Jumlah (2)=Rp.34,332.00Jumlah (1) + (2)=Rp.228,421.00

pek.kayuANALISA BIAYA KONSTRUKSIPEKERJAAN KAYUPK6.1.1 M Pasang kusen pintu dan jendela kayu jati :6.1.1.Bahan-Kayu jati, balok1.100MxRp.23,925,000.00=Rp.26,317,500.00Jumlah (1)=Rp.26,317,500.006.1.2.Tenaga-Pekerja6.000OhxRp.52,500.00=Rp.315,000.00-Tukang kayu20.000OhxRp.78,800.00=Rp.1,576,000.00-Kepala tukang2.000OhxRp.91,900.00=Rp.183,800.00-Mandor0.300OhxRp.65,600.00=Rp.19,680.00Jumlah (2)=Rp.2,094,480.00Jumlah (1) +(2)=Rp.28,411,980.00PK6.2.1 M Pasang kusen pintu dan jendela kayu damar laut :6.2.1.Bahan-Kayu meranti, balok1.200MxRp.9,075,000.00=Rp.10,890,000.00Jumlah (1)=Rp.10,890,000.006.2.2.Tenaga-Pekerja6.000OhxRp.52,500.00=Rp.315,000.00-Tukang kayu18.000OhxRp.78,800.00=Rp.1,418,400.00-Kepala tukang2.000OhxRp.91,900.00=Rp.183,800.00-Mandor0.300OhxRp.65,600.00=Rp.19,680.00Jumlah (2)=Rp.1,936,880.00Jumlah (1) +(2)=Rp.12,826,880.00PK6.3.1 M Pasang kusen pintu dan jendela kayu meranti :6.3.1.Bahan-Kayu kapur, balok1.200MxRp.6,490,000.00=Rp.7,788,000.00Jumlah (1)=Rp.7,788,000.006.3.2.Tenaga-Pekerja6.000OhxRp.52,500.00=Rp.315,000.00-Tukang kayu18.000OhxRp.78,800.00=Rp.1,418,400.00-Kepala tukang2.000OhxRp.91,900.00=Rp.183,800.00-Mandor0.300OhxRp.65,600.00=Rp.19,680.00Jumlah (2)=Rp.1,936,880.00Jumlah (1) +(2)=Rp.9,724,880.00PK6.4.1 M Pasang kusen pintu dan jendela kayu damar laut :6.4.1.Bahan-Kayu damar laut, balok1.200MxRp.9,350,000.00=Rp.11,220,000.00Jumlah (1)=Rp.11,220,000.006.4.2.Tenaga-Pekerja6.000OhxRp.52,500.00=Rp.315,000.00-Tukang kayu18.000OhxRp.78,800.00=Rp.1,418,400.00-Kepala tukang2.000OhxRp.91,900.00=Rp.183,800.00-Mandor0.300OhxRp.65,600.00=Rp.19,680.00Jumlah (2)=Rp.1,936,880.00Jumlah (1) +(2)=Rp.13,156,880.00PK6.5.1 M Pasang pintu klamp kayu meranti batu6.5.1.Bahan-Kayu meranti batu, papan0.036MxRp.9,375,000.00=Rp.337,500.00-Paku biasa 2" - 5"0.050KgxRp.14,520.00=Rp.726.00Jumlah (1)=Rp.338,226.006.5.2.Tenaga-Pekerja0.350OhxRp.52,500.00=Rp.18,375.00-Tukang kayu1.050OhxRp.78,800.00=Rp.82,740.00-Kepala tukang0.105OhxRp.91,900.00=Rp.9,649.50-Mandor0.018OhxRp.65,600.00=Rp.1,180.80Jumlah (2)=Rp.111,945.30Jumlah (1) +(2)=Rp.450,171.30PK6.6.1 M Pasang pintu klamp kayu jati6.6.1.Bahan-Kayu jati, papan0.036MxRp.24,104,440.00=Rp.867,759.84-Paku biasa 2" - 5"0.050KgxRp.14,520.00=Rp.726.00Jumlah (1)=Rp.868,485.846.6.2.Tenaga-Pekerja0.350OhxRp.52,500.00=Rp.18,375.00-Tukang kayu1.050OhxRp.78,800.00=Rp.82,740.00-Kepala tukang0.105OhxRp.91,900.00=Rp.9,649.50-Mandor0.018OhxRp.65,600.00=Rp.1,180.80Jumlah (2)=Rp.111,945.30Jumlah (1) +(2)=Rp.980,431.14PK6.7.1 M Pasang pintu panel kayu jati :6.7.1.Bahan-Kayu jati, papan0.036MxRp.24,104,440.00=Rp.867,759.84Jumlah (1)867,759.846.7.2.Tenaga-Pekerja1.000OhxRp.52,500.00=Rp.52,500.00-Tukang kayu2.500OhxRp.78,800.00=Rp.197,000.00-Kepala tukang0.250OhxRp.91,900.00=Rp.22,975.00-Mandor0.050OhxRp.65,600.00=Rp.3,280.00Jumlah (2)=Rp.275,755.00Jumlah (1) +(2)=Rp.1,143,514.84PK6.8.1 M Pasang pintu panel kayu meranti batu6.8.1.Bahan-Kayu meranti batu, papan0.040MxRp.9,375,000.00=Rp.375,000.00Jumlah (1)=Rp.375,000.006.8.2.Tenaga-Pekerja1.000OhxRp.52,500.00=Rp.52,500.00-Tukang kayu2.500OhxRp.78,800.00=Rp.197,000.00-Kepala tukang0.250OhxRp.91,900.00=Rp.22,975.00-Mandor0.050OhxRp.65,600.00=Rp.3,280.00Jumlah (2)=Rp.275,755.00Jumlah (1) +(2)=Rp.650,755.00PK6.9.1 M Pasang pintu dan jendela kaca panel kayu jati :6.9.1.Bahan-Kayu jati, papan0.035MxRp.24,104,440.00=Rp.843,655.40-Kaca polos 5 mm0.800MxRp.145,200.00=Rp.116,160.00Jumlah (1)=Rp.959,815.406.9.2.Tenaga-Pekerja0.800OhxRp.52,500.00=Rp.42,000.00-Tukang kayu2.000OhxRp.78,800.00=Rp.157,600.00-Kepala tukang0.200OhxRp.91,900.00=Rp.18,380.00-Mandor0.040OhxRp.65,600.00=Rp.2,624.00Jumlah (2)=Rp.220,604.00Jumlah (1) +(2)=Rp.1,180,419.40PK6.10.1 M Pasang pintu dan jendela kaca panel kayu meranti batu :6.10.1.Bahan-Kayu meranti batu, papan0.035MxRp.9,375,000.00=Rp.328,125.00-Kaca polos 5 mm0.800MxRp.145,200.00=Rp.116,160.00Jumlah (1)=Rp.444,285.006.10.2.Tenaga-Pekerja0.800OhxRp.52,500.00=Rp.42,000.00-Tukang kayu2.000OhxRp.78,800.00=Rp.157,600.00-Kepala tukang0.200OhxRp.91,900.00=Rp.18,380.00-Mandor0.040OhxRp.65,600.00=Rp.2,624.00Jumlah (2)=Rp.220,604.00Jumlah (1) +(2)=Rp.664,889.00PK6.11.1 M Pasang pintu dan jendela kaca panel kayu meranti :6.11.1.Bahan-Kayu meranti, papan0.035MxRp.5,475,000.00=Rp.191,625.00-Kaca polos 5 mm0.800MxRp.145,200.00=Rp.116,160.00Jumlah (1)=Rp.307,785.006.11.2.Tenaga-Pekerja0.800OhxRp.52,500.00=Rp.42,000.00-Tukang kayu2.000OhxRp.78,800.00=Rp.157,600.00-Kepala tukang0.200OhxRp.91,900.00=Rp.18,380.00-Mandor0.040OhxRp.65,600.00=Rp.2,624.00Jumlah (2)=Rp.220,604.00Jumlah (1) +(2)=Rp.528,389.00PK6.12.1 M Pasang pintu dan jendela jalusi kayu jati :6.12.1.Bahan-Kayu jati, papan0.064MxRp.24,104,440.00=Rp.1,542,684.16Jumlah (1)=Rp.1,542,684.166.12.2.Tenaga-Pekerja1.000OhxRp.52,500.00=Rp.52,500.00-Tukang kayu3.000OhxRp.78,800.00=Rp.236,400.00-Kepala tukang0.300OhxRp.91,900.00=Rp.27,570.00-Mandor0.300OhxRp.65,600.00=Rp.19,680.00Jumlah (2)=Rp.336,150.00Jumlah (1) +(2)=Rp.1,878,834.16PK6.13.1 M Pasang pintu dan jendela jalusi kayu meranti batu :6.13.1.Bahan-Kayu meranti batu, papan0.064MxRp.9,375,000.00=Rp.600,000.00Jumlah (1)=Rp.600,000.006.13.2.Tenaga-Pekerja1.000OhxRp.52,500.00=Rp.52,500.00-Tukang kayu3.000OhxRp.78,800.00=Rp.236,400.00-Kepala tukang0.300OhxRp.91,900.00=Rp.27,570.00-Mandor0.500OhxRp.65,600.00=Rp.32,800.00Jumlah (2)=Rp.349,270.00Jumlah (1) +(2)=Rp.949,270.00PK6.14.1 M Pasang pintu plywood rangka, rangka kayu jati :6.14.1.Bahan-Kayu jati, papan0.0196MxRp.24,104,440.00=Rp.472,447.02-Paku biasa " - 1"0.030KgxRp.16,940.00=Rp.508.20-Lem kayu0.300LtxRp.37,400.00=Rp.11,220.00-Playwood 4' x 3' x 4 mm1.000LbrxRp.51,920.00=Rp.51,920.00Jumlah (1)=Rp.536,095.226.14.2.Tenaga-Pekerja0.600OhxRp.52,500.00=Rp.31,500.00-Tukang kayu2.000OhxRp.78,800.00=Rp.157,600.00-Kepala tukang0.200OhxRp.91,900.00=Rp.18,380.00-Mandor0.030OhxRp.65,600.00=Rp.1,968.00Jumlah (2)=Rp.209,448.00Jumlah (1) +(2)=Rp.745,543.22PK6.15.1 M Pasang pintu plywood rangka, rangka kayu meranti batu :6.15.1.Bahan-Kayu meranti batu, papan0.0196MxRp.9,375,000.00=Rp.183,750.00-Paku biasa " - 1"0.030KgxRp.16,940.00=Rp.508.20-Lem kayu0.300LtxRp.37,400.00=Rp.11,220.00-Playwood 4' x 3' x 4 mm1.000LbrxRp.51,920.00=Rp.51,920.00Jumlah (1)=Rp.247,398.206.15.2.Tenaga-Pekerja0.600OhxRp.52,500.00=Rp.31,500.00-Tukang kayu2.000OhxRp.78,800.00=Rp.157,600.00-Kepala tukang0.200OhxRp.91,900.00=Rp.18,380.00-Mandor0.030OhxRp.65,600.00=Rp.1,968.00Jumlah (2)=Rp.209,448.00Jumlah (1) +(2)=Rp.456,846.20PK6.16.1 M Pasang jalusi mati kusen kayu jati :6.16.1.Bahan-Kayu jati, papan0.060MxRp.24,104,440.00=Rp.1,446,266.40-Paku biasa " - 1"0.150KgxRp.16,940.00=Rp.2,541.00Jumlah (1)=Rp.1,448,807.406.16.2.Tenaga-Pekerja0.500OhxRp.52,500.00=Rp.26,250.00-Tukang kayu2.000OhxRp.78,800.00=Rp.157,600.00-Kepala tukang0.200OhxRp.91,900.00=Rp.18,380.00-Mandor0.025OhxRp.65,600.00=Rp.1,640.00Jumlah (2)=Rp.203,870.00Jumlah (1) +(2)=Rp.1,652,677.40PK6.17.1 M Pasang jalusi mati kusen kayu damar laut :6.17.1.Bahan-Kayu damar laut, papan0.060MxRp.9,650,000.00=Rp.579,000.00-Paku biasa " - 1"0.150KgxRp.16,940.00=Rp.2,541.00Jumlah (1)=Rp.581,541.006.17.2.Tenaga-Pekerja0.500OhxRp.52,500.00=Rp.26,250.00-Tukang kayu2.000OhxRp.78,800.00=Rp.157,600.00-Kepala tukang0.200OhxRp.91,900.00=Rp.18,380.00-Mandor0.025OhxRp.65,600.00=Rp.1,640.00Jumlah (2)=Rp.203,870.00Jumlah (1) +(2)=Rp.785,411.00PK6.18.1 M Pasang pintu plywood rangka, rangka kayu meranti :6.18.1.Bahan-Kayu meranti, papan0.0196MxRp.5,475,000.00=Rp.107,310.00-Paku biasa " - 1"0.030KgxRp.16,940.00=Rp.508.20-Lem kayu0.300LtxRp.37,400.00=Rp.11,220.00-Playwood 4' x 3' x 4 mm1.000LbrxRp.51,920.00=Rp.51,920.00Jumlah (1)=Rp.63,140.006.18.2.Tenaga-Pekerja0.600OhxRp.52,500.00=Rp.31,500.00-Tukang kayu2.000OhxRp.78,800.00=Rp.157,600.00-Kepala tukang0.200OhxRp.91,900.00=Rp.18,380.00-Mandor0.030OhxRp.65,600.00=Rp.1,968.00Jumlah (2)=Rp.209,448.00Jumlah (1) +(2)=Rp.272,588.00PK6.19.1 M Pasang pintu teakwood rangka, rangka kayu jati :6.19.1.Bahan-Kayu jati, papan0.0196MxRp.24,104,440.00=Rp.472,447.02-Paku biasa " - 1"0.300KgxRp.16,940.00=Rp.5,082.00-Lem kayu0.300LtxRp.37,400.00=Rp.11,220.00-Teakwood 4' x 8' x 4 mm1.000LbrxRp.54,450.00=Rp.54,450.00Jumlah (1)=Rp.543,199.026.19.2.Tenaga-Pekerja0.600OhxRp.52,500.00=Rp.31,500.00-Tukang kayu2.000OhxRp.78,800.00=Rp.157,600.00-Kepala tukang0.200OhxRp.91,900.00=Rp.18,380.00-Mandor0.030OhxRp.65,600.00=Rp.1,968.00Jumlah (2)=Rp.209,448.00Jumlah (1) +(2)=Rp.752,647.02PK6.20.1 M Pasang pintu teakwood rangka, rangka kayu meranti batu :6.20.1.Bahan-Kayu meranti batu, papan0.0196MxRp.9,375,000.00=Rp.183,750.00-Paku biasa " - 1"0.300KgxRp.16,940.00=Rp.5,082.00-Lem kayu0.300LtxRp.37,400.00=Rp.11,220.00-Teakwood 4' x 8' x 4 mm1.000LbrxRp.54,450.00=Rp.54,450.00Jumlah (1)=Rp.254,502.006.20.2.Tenaga-Pekerja0.600OhxRp.52,500.00=Rp.31,500.00-Tukang kayu2.000OhxRp.78,800.00=Rp.157,600.00-Kepala tukang0.200OhxRp.91,900.00=Rp.18,380.00-Mandor0.030OhxRp.65,600.00=Rp.1,968.00Jumlah (2)=Rp.209,448.00Jumlah (1) +(2)=Rp.463,950.00PK6.21.1 M Pasang pintu plywood & formika, rangka kayu jati :6.21.1.Bahan-Kayu jati, papan0.0196MxRp.24,104,440.00=Rp.472,447.02-Paku biasa " - 1"0.300KgxRp.16,940.00=Rp.5,082.00-Lem kayu0.800LtxRp.37,400.00=Rp.29,920.00-Plywood 4' x 8' x 4 mm1.000LbrxRp.51,920.00=Rp.51,920.00-Formica 4' x 8'1.000LbrxRp.74,250.00=Rp.74,250.00Jumlah (1)=Rp.633,619.026.21.2.Tenaga-Pekerja0.800OhxRp.52,500.00=Rp.42,000.00-Tukang kayu2.500OhxRp.78,800.00=Rp.197,000.00-Kepala tukang0.250OhxRp.91,900.00=Rp.22,975.00-Mandor0.040OhxRp.65,600.00=Rp.2,624.00Jumlah (2)=Rp.264,599.00Jumlah (1) +(2)=Rp.898,218.02PK6.22.1 M Pasang pintu plywood & formika, rangka kayu meranti batu :6.22.1.Bahan-Kayu meranti batu, papan0.0196MxRp.9,375,000.00=Rp.183,750.00-Paku biasa " - 1"0.300KgxRp.16,940.00=Rp.5,082.00-Lem kayu0.800LtxRp.37,400.00=Rp.29,920.00-Plywood 4' x 8' x 4 mm1.000LbrxRp.51,920.00=Rp.51,920.00-Formica 4' x 8'1.000LbrxRp.74,250.00=Rp.74,250.00Jumlah (1)=Rp.344,922.006.22.2.Tenaga-Pekerja0.800OhxRp.52,500.00=Rp.42,000.00-Tukang kayu2.500OhxRp.78,800.00=Rp.197,000.00-Kepala tukang0.250OhxRp.91,900.00=Rp.22,975.00-Mandor0.040OhxRp.65,600.00=Rp.2,624.00Jumlah (2)=Rp.264,599.00Jumlah (1) +(2)=Rp.609,521.00PK6.23.1 M Pasang pintu plywood & formika, rangka kayu jati :6.23.1.Bahan-Kayu jati, papan0.0196MxRp.24,104,440.00=Rp.472,447.02-Paku biasa " - 1"0.300KgxRp.16,940.00=Rp.5,082.00-Lem kayu0.800LtxRp.37,400.00=Rp.29,920.00-Teakwood 4' x 8' x 4 mm1.000LbrxRp.54,450.00=Rp.54,450.00-Formica 4' x 8'1.000LbrxRp.74,250.00=Rp.74,250.00Jumlah (1)=Rp.636,149.026.23.2.Tenaga-Pekerja0.800OhxRp.52,500.00=Rp.42,000.00-Tukang kayu2.500OhxRp.78,800.00=Rp.197,000.00-Kepala tukang0.250OhxRp.91,900.00=Rp.22,975.00-Mandor0.040OhxRp.65,600.00=Rp.2,624.00Jumlah (2)=Rp.264,599.00Jumlah (1) +(2)=Rp.900,748.02PK6.24.1 M Pasang pintu plywood & formika, rangka kayu damar laut (divermis) :6.24.1.Bahan-Kayu meranti batu, papan0.0196MxRp.9,375,000.00=Rp.183,750.00-Paku biasa " - 1"0.300KgxRp.16,940.00=Rp.5,082.00-Lem kayu0.800LtxRp.37,400.00=Rp.29,920.00-Teakwood 4' x 8' x 4 mm0.500LbrxRp.54,450.00=Rp.27,225.00-Vernis0.500LtxRp.48,280.00=Rp.24,140.00-Formica 4' x 8'0.500LbrxRp.74,250.00=Rp.37,125.00Jumlah (1)=Rp.307,242.006.24.2.Tenaga-Pekerja0.800OhxRp.52,500.00=Rp.42,000.00-Tukang kayu2.500OhxRp.78,800.00=Rp.197,000.00-Kepala tukang0.250OhxRp.91,900.00=Rp.22,975.00-Mandor0.040OhxRp.65,600.00=Rp.2,624.00Jumlah (2)=Rp.264,599.00Jumlah (1) +(2)=Rp.571,841.00PK6.29.1 M Pasang konstruksi kuda-kuda kayu damar laut :6.29.1.Bahan-Kayu damar laut, balok1.1000MxRp.9,350,000.00=Rp.10,285,000.00-Besi strip15.000KgxRp.11,880.00=Rp.178,200.00-Paku biasa 2" - 5"0.800KgxRp.16,940.00=Rp.13,552.00Jumlah (1)=Rp.10,476,752.006.29.2.Tenaga-Pekerja4.000OhxRp.52,500.00=Rp.210,000.00-Tukang kayu12.000OhxRp.78,800.00=Rp.945,600.00-Kepala tukang1.200OhxRp.91,900.00=Rp.110,280.00-Mandor0.200OhxRp.65,600.00=Rp.13,120.00Jumlah (2)=Rp.1,279,000.00Jumlah (1) +(2)=Rp.11,755,752.00PK6.30.1 M Pasang konstruksi kuda-kuda kayu meranti :6.30.1.Bahan-Kayu meranti, balok1.1000MxRp.5,225,000.00=Rp.5,747,500.00-Besi strip15.000KgxRp.11,880.00=Rp.178,200.00-Paku biasa 2" - 5"0.800KgxRp.16,940.00=Rp.13,552.00Jumlah (1)=Rp.5,939,252.006.30.2.Tenaga-Pekerja4.000OhxRp.52,500.00=Rp.210,000.00-Tukang kayu12.000OhxRp.78,800.00=Rp.945,600.00-Kepala tukang1.200OhxRp.91,900.00=Rp.110,280.00-Mandor0.200OhxRp.65,600.00=Rp.13,120.00Jumlah (2)=Rp.1,279,000.00Jumlah (1) +(2)=Rp.7,218,252.00PK6.31.1 M Pasang kaso + reng genteng kodok kayu meranti :6.31.1.Bahan-Kayu meranti, balok0.012MxRp.5,225,000.00=Rp.62,700.00-Paku biasa 2" - 5"0.150KgxRp.16,940.00=Rp.2,541.00Jumlah (1)=Rp.65,241.006.31.2.Tenaga-Pekerja0.100OhxRp.52,500.00=Rp.5,250.00-Tukang kayu0.100OhxRp.78,800.00=Rp.7,880.00-Kepala tukang0.010OhxRp.91,900.00=Rp.919.00-Mandor0.005OhxRp.65,600.00=Rp.328.00Jumlah (2)=Rp.14,377.00Jumlah (1) +(2)=Rp.79,618.00PK6.32.1 M Pasang kaso + reng genteng kodok kayu damar laut :6.32.1.Bahan-Kayu damar laut, balok0.012MxRp.9,350,000.00=Rp.112,200.00-Paku biasa 2" - 5"0.150KgxRp.16,940.00=Rp.2,541.00Jumlah (1)=Rp.114,741.006.32.2.Tenaga-Pekerja0.100OhxRp.52,500.00=Rp.5,250.00-Tukang kayu0.100OhxRp.78,800.00=Rp.7,880.00-Kepala tukang0.010OhxRp.91,900.00=Rp.919.00-Mandor0.005OhxRp.65,600.00=Rp.328.00Jumlah (2)=Rp.14,377.00Jumlah (1) +(2)=Rp.129,118.00PK6.33.1 M Pasang kaso + reng genteng monier kayu jati :6.33.1.Bahan-Kayu jati, balok0.014MxRp.23,925,000.00=Rp.334,950.00-Paku biasa 2" - 5"0.150KgxRp.16,940.00=Rp.2,541.00Jumlah (1)=Rp.337,491.006.33.2.Tenaga-Pekerja0.100OhxRp.52,500.00=Rp.5,250.00-Tukang kayu0.100OhxRp.78,800.00=Rp.7,880.00-Kepala tukang0.010OhxRp.91,900.00=Rp.919.00-Mandor0.005OhxRp.65,600.00=Rp.328.00Jumlah (2)=Rp.14,377.00Jumlah (1) +(2)=Rp.351,868.00PK6.34.1 M Pasang kaso + reng genteng monier kayu damar laut :6.34.1.Bahan-Kayu damar laut, balok0.014MxRp.9,350,000.00=Rp.130,900.00-Paku biasa 2" - 5"0.150KgxRp.16,940.00=Rp.2,541.00Jumlah (1)=Rp.133,441.006.34.2.Tenaga-Pekerja0.100OhxRp.52,500.00=Rp.5,250.00-Tukang kayu0.100OhxRp.78,800.00=Rp.7,880.00-Kepala tukang0.010OhxRp.91,900.00=Rp.919.00-Mandor0.005OhxRp.65,600.00=Rp.328.00Jumlah (2)=Rp.14,377.00Jumlah (1) +(2)=Rp.147,818.00PK6.35.1 M Pasang kaso + reng genteng beton kayu damar laut :6.35.1.Bahan-Kayu damar laut, balok0.014MxRp.9,350,000.00=Rp.130,900.00-Paku biasa 2" - 5"0.150KgxRp.16,940.00=Rp.2,541.00Jumlah (1)=Rp.133,441.006.35.2.Tenaga-Pekerja0.100OhxRp.52,500.00=Rp.5,250.00-Tukang kayu0.100OhxRp.78,800.00=Rp.7,880.00-Kepala tukang0.010OhxRp.91,900.00=Rp.919.00-Mandor0.005OhxRp.65,600.00=Rp.328.00Jumlah (2)=Rp.14,377.00Jumlah (1) +(2)=Rp.147,818.00PK6.36.1 M Pasang kaso + reng atap sirap kayu damar laut :6.36.1.Bahan-Kayu damar laut, balok0.165MxRp.9,350,000.00=Rp.1,542,750.00-Paku biasa 2" - 5"0.200KgxRp.16,940.00=Rp.3,388.00Jumlah (1)=Rp.1,546,138.006.36.2.Tenaga-Pekerja0.120OhxRp.52,500.00=Rp.6,300.00-Tukang kayu0.120OhxRp.78,800.00=Rp.9,456.00-Kepala tukang0.012OhxRp.91,900.00=Rp.1,102.80-Mandor0.006OhxRp.65,600.00=Rp.393.60Jumlah (2)=Rp.17,252.40Jumlah (1) +(2)=Rp.1,563,390.40PK6.37.1 M Pasang kaso + reng atap sirap kayu meranti :6.37.1.Bahan-Kayu meranti, balok0.165MxRp.5,225,000.00=Rp.862,125.00-Paku biasa 2" - 5"0.200KgxRp.16,940.00=Rp.3,388.00Jumlah (1)=Rp.865,513.006.37.2.Tenaga-Pekerja0.120OhxRp.52,500.00=Rp.6,300.00-Tukang kayu0.120OhxRp.78,800.00=Rp.9,456.00-Kepala tukang0.012OhxRp.91,900.00=Rp.1,102.80-Mandor0.006OhxRp.65,600.00=Rp.393.60Jumlah (2)=Rp.17,252.40Jumlah (1) +(2)=Rp.882,765.40PK6.38.1 M Pasang rangka langit-langit (1.00 x 1.00) m, kayu jati :6.38.1.Bahan-Kayu jati, balok0.012MxRp.23,925,000.00=Rp.287,100.00-Paku biasa 2" - 5"0.100KgxRp.16,940.00=Rp.1,694.00Jumlah (1)=Rp.288,794.006.38.2.Tenaga-Pekerja0.150OhxRp.52,500.00=Rp.7,875.00-Tukang kayu0.250OhxRp.78,800.00=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900.00=Rp.2,297.50-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.34,792.50Jumlah (1) +(2)=Rp.323,586.50PK6.38. A1 M Pasang rangka langit-langit (1.00 x 1.00) m, damar laut :6.38.1.Bahan-Kayu damar laut, balok0.012MxRp.9,350,000.00=Rp.112,200.00-Paku biasa 2" - 5"0.100KgxRp.16,940.00=Rp.1,694.00Jumlah (1)=Rp.113,894.006.38.2.Tenaga-Pekerja0.150OhxRp.52,500.00=Rp.7,875.00-Tukang kayu0.250OhxRp.78,800.00=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900.00=Rp.2,297.50-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.34,792.50Jumlah (1) +(2)=Rp.148,686.50PK6.38. B1 M Pasang rangka langit-langit (1.00 x 1.00) m, Kayu meranti :6.38.1.Bahan-Kayu meranti, balok0.012MxRp.5,225,000.00=Rp.62,700.00-Paku biasa 2" - 5"0.100KgxRp.16,940.00=Rp.1,694.00Jumlah (1)=Rp.64,394.006.38.2.Tenaga-Pekerja0.150OhxRp.52,500.00=Rp.7,875.00-Tukang kayu0.250OhxRp.78,800.00=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900.00=Rp.2,297.50-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.34,792.50Jumlah (1) +(2)=Rp.99,186.50PK6.44.1 M Pasang rangka langit-langit (30 x 30) cm, kayu jati :6.44.1.Bahan-Kayu jati, balok0.027MxRp.23,925,000.00=Rp.645,975.00-Paku biasa 2" - 5"0.200KgxRp.16,940.00=Rp.3,388.00Jumlah (1)=Rp.649,363.006.44.2.Tenaga-Pekerja0.250OhxRp.52,500.00=Rp.13,125.00-Tukang kayu0.350OhxRp.78,800.00=Rp.27,580.00-Kepala tukang0.035OhxRp.91,900.00=Rp.3,216.50-Mandor0.0125OhxRp.65,600.00=Rp.820.00Jumlah (2)=Rp.44,741.50Jumlah (1) +(2)=Rp.694,104.50PK6.45.1 M Pasang rangka langit-langit (30 x 30) cm, kayu damar laut :6.45.1.Bahan-Kayu damar laut, balok0.027MxRp.9,350,000.00=Rp.252,450.00-Paku biasa 2" - 5"0.200KgxRp.16,940.00=Rp.3,388.00Jumlah (1)=Rp.255,838.006.45.2.Tenaga-Pekerja0.250OhxRp.52,500.00=Rp.13,125.00-Tukang kayu0.350OhxRp.78,800.00=Rp.27,580.00-Kepala tukang0.035OhxRp.91,900.00=Rp.3,216.50-Mandor0.0125OhxRp.65,600.00=Rp.820.00Jumlah (2)=Rp.44,741.50Jumlah (1) +(2)=Rp.300,579.50PK6.46.1 M Pasang rangka langit-langit (30 x 30) cm, kayu meranti :6.46.1.Bahan-Kayu meranti, balok0.027MxRp.5,225,000.00=Rp.141,075.00-Paku biasa 2" - 5"0.200KgxRp.16,940.00=Rp.3,388.00Jumlah (1)=Rp.144,463.006.46.2.Tenaga-Pekerja0.250OhxRp.52,500.00=Rp.13,125.00-Tukang kayu0.350OhxRp.78,800.00=Rp.27,580.00-Kepala tukang0.035OhxRp.91,900.00=Rp.3,216.50-Mandor0.0125OhxRp.65,600.00=Rp.820.00Jumlah (2)=Rp.44,741.50Jumlah (1) +(2)=Rp.189,204.50PK6.47.1 M Pasang lisplang ukuran (3 x 20) cm, kayu meranti :6.47.1.Bahan-Kayu meranti, papan0.0072MxRp.5,475,000.00=Rp.39,420.00-Paku biasa 2" - 5"0.050KgxRp.16,940.00=Rp.847.00Jumlah (1)=Rp.40,267.006.47.2.Tenaga-Pekerja0.100OhxRp.52,500.00=Rp.5,250.00-Tukang kayu0.200OhxRp.78,800.00=Rp.15,760.00-Kepala tukang0.025OhxRp.91,900.00=Rp.2,297.50-Mandor0.005OhxRp.65,600.00=Rp.328.00Jumlah (2)=Rp.23,635.50Jumlah (1) +(2)=Rp.63,902.50PK6.48.1 M Pasang lisplang ukuran (3 x 20) cm, kayu meranti batu :6.48.1.Bahan-Meranti batu, papan0.0072MxRp.9,375,000.00=Rp.67,500.00-Paku biasa 2" - 5"0.050KgxRp.16,940.00=Rp.847.00Jumlah (1)=Rp.68,347.006.48.2.Tenaga-Pekerja0.100OhxRp.52,500.00=Rp.5,250.00-Tukang kayu0.200OhxRp.78,800.00=Rp.15,760.00-Kepala tukang0.020OhxRp.91,900.00=Rp.1,838.00-Mandor0.005OhxRp.65,600.00=Rp.328.00Jumlah (2)=Rp.23,176.00Jumlah (1) +(2)=Rp.91,523.00PK6.49.1 M Pasang lisplang ukuran (3 x 30) cm, kayu jati :6.49.1.Bahan-Kayu jati, papan0.0110MxRp.24,104,440.00=Rp.265,148.84-Paku biasa 2" - 5"0.050KgxRp.16,940.00=Rp.847.00Jumlah (1)=Rp.265,995.846.49.2.Tenaga-Pekerja0.110OhxRp.52,500.00=Rp.5,775.00-Tukang kayu0.220OhxRp.78,800.00=Rp.17,336.00-Kepala tukang0.022OhxRp.91,900.00=Rp.2,021.80-Mandor0.005OhxRp.65,600.00=Rp.328.00Jumlah (2)=Rp.25,460.80Jumlah (1) +(2)=Rp.291,456.64PK6.50.1 M Pasang lisplang ukuran (3 x 30) cm, kayu meranti batu :6.50.1.Bahan-Meranti batu, papan0.011MxRp.9,375,000.00=Rp.103,125.00-Paku biasa 2" - 5"0.050KgxRp.16,940.00=Rp.847.00Jumlah (1)=Rp.103,972.006.50.2.Tenaga-Pekerja0.110OhxRp.52,500.00=Rp.5,775.00-Tukang kayu0.220OhxRp.78,800.00=Rp.17,336.00-Kepala tukang0.022OhxRp.91,900.00=Rp.2,021.80-Mandor0.005OhxRp.65,600.00=Rp.328.00Jumlah (2)=Rp.25,460.80Jumlah (1) +(2)=Rp.129,432.80PK6.51.1 M Pasang lisplang ukuran 2 x (3 x 20) cm, kayu meranti batu :6.51.1.Bahan-Meranti batu, papan0.0145MxRp.9,375,000.00=Rp.135,937.50-Paku biasa 2" - 5"0.060KgxRp.16,940.00=Rp.1,016.40Jumlah (1)=Rp.136,953.906.51.2.Tenaga-Pekerja0.150OhxRp.52,500.00=Rp.7,875.00-Tukang kayu0.250OhxRp.78,800.00=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900.00=Rp.2,297.50-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.34,792.50Jumlah (1) +(2)=Rp.171,746.40PK6.52.1 M Pasang lisplang ukuran 2 x (2 x 20) cm, kayu meranti batu :6.52.1.Bahan-Meranti batu, papan0.0086MxRp.9,375,000.00=Rp.80,625.00-Paku biasa 2" - 5"0.060KgxRp.16,940.00=Rp.1,016.40Jumlah (1)=Rp.81,641.406.52.2.Tenaga-Pekerja0.100OhxRp.52,500.00=Rp.5,250.00-Tukang kayu0.100OhxRp.78,800.00=Rp.7,880.00-Kepala tukang0.010OhxRp.91,900.00=Rp.919.00-Mandor0.050OhxRp.65,600.00=Rp.3,280.00Jumlah (2)=Rp.17,329.00Jumlah (1) +(2)=Rp.98,970.40PK6.53.1 M Pasang lisplang ukuran 2 x (2 x 20) cm, kayu meranti :6.53.1.Bahan-Kayu meranti,papan0.0086MxRp.5,475,000.00=Rp.47,085.00-Paku biasa 2" - 5"0.060KgxRp.16,940.00=Rp.1,016.40Jumlah (1)=Rp.48,101.406.53.2.Tenaga-Pekerja0.100OhxRp.52,500.00=Rp.5,250.00-Tukang kayu0.100OhxRp.78,800.00=Rp.7,880.00-Kepala tukang0.010OhxRp.91,900.00=Rp.919.00-Mandor0.050OhxRp.65,600.00=Rp.3,280.00Jumlah (2)=Rp.17,329.00Jumlah (1) +(2)=Rp.65,430.40PK6.54.1 M Pasang rangka dinding pemisah, kayu damar laut :6.54.1.Bahan-Kayu damar laut, balok0.0195MxRp.9,350,000.00=Rp.182,325.00-Meranti batu, papan0.007MxRp.9,375,000.00=Rp.65,625.00-Paku biasa 2" - 5"0.100KgxRp.16,940.00=Rp.1,694.00Jumlah (1)=Rp.249,644.006.54.2.Tenaga-Pekerja0.150OhxRp.52,500.00=Rp.7,875.00-Tukang kayu0.450OhxRp.78,800.00=Rp.35,460.00-Kepala tukang0.045OhxRp.91,900.00=Rp.4,135.50-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.52,390.50Jumlah (1) +(2)=Rp.302,034.50PK6.55.1 M Pasang rangka dinding pemisah, kayu meranti :6.55.1.Bahan-Kayu meranti, balok0.0195MxRp.5,225,000.00=Rp.101,887.50-Kayu meranti, papan0.007MxRp.5,475,000.00=Rp.38,325.00-Paku biasa 2" - 5"0.100KgxRp.16,940.00=Rp.1,694.00Jumlah (1)=Rp.141,906.506.55.2.Tenaga-Pekerja0.150OhxRp.52,500.00=Rp.7,875.00-Tukang kayu0.450OhxRp.78,800.00=Rp.35,460.00-Kepala tukang0.045OhxRp.91,900.00=Rp.4,135.50-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.52,390.50Jumlah (1) +(2)=Rp.194,297.00PK6.56.1 M Pasang dinding pemisah teakwood rangka, rangka kayu damar laut :6.56.1.Bahan-Kayu damar laut, balok0.0195MxRp.9,350,000.00=Rp.182,325.00-Teakwood 4' x 8'1.000MxRp.54,450.00=Rp.54,450.00-Paku biasa 2" - 5"0.100KgxRp.16,940.00=Rp.1,694.00Jumlah (1)=Rp.238,469.006.56.2.Tenaga-Pekerja0.150OhxRp.52,500.00=Rp.7,875.00-Tukang kayu0.450OhxRp.78,800.00=Rp.35,460.00-Kepala tukang0.045OhxRp.91,900.00=Rp.4,135.50-Mandor0.075OhxRp.65,600.00=Rp.4,920.00Jumlah (2)=Rp.52,390.50Jumlah (1) +(2)=Rp.290,859.50PK6.57.1 M Pasang dinding pemisah double plywood, rangka kayu damar laut :6.57.1.Bahan-Kayu damar laut, balok0.0195MxRp.9,350,000.00=Rp.182,325.00-Paku biasa 2" - 5"0.100KgxRp.16,940.00=Rp.1,694.00-Lem kayu0.560LtxRp.37,400.00=Rp.20,944.00-Plywood 4' x 8' x 4 mm1.000LbrxRp.51,920.00=Rp.51,920.00Jumlah (1)=Rp.256,883.006.57.2.Tenaga-Pekerja0.200OhxRp.52,500.00=Rp.10,500.00-Tukang kayu0.600OhxRp.78,800.00=Rp.47,280.00-Kepala tukang0.060OhxRp.91,900.00=Rp.5,514.00-Mandor0.010OhxRp.65,600.00=Rp.656.00Jumlah (2)=Rp.63,950.00Jumlah (1) +(2)=Rp.320,833.00PK6.58.1 M Pasang dinding lambrizering dari papan meranti :6.58.1.Bahan-Kayu meranti, papan0.0120MxRp.5,475,000.00=Rp.65,700.00-Paku biasa 2" - 5"0.100KgxRp.16,940.00=Rp.1,694.00-Paku skrup 3,5"0.150LbrxRp.21,180.00=Rp.3,177.00Jumlah (1)=Rp.70,571.006.58.2.Tenaga-Pekerja0.600OhxRp.52,500.00=Rp.31,500.00-Tukang kayu1.800OhxRp.78,800.00=Rp.141,840.00-Kepala tukang0.180OhxRp.91,900.00=Rp.16,542.00-Mandor0.030OhxRp.65,600.00=Rp.1,968.00Jumlah (2)=Rp.191,850.00Jumlah (1) +(2)=Rp.262,421.00PK6.59.1 M Pasang plywood tebal 4 mm, untuk dinding :6.59.1.Bahan-Plywood 4' x 8' x 4 mm0.4000LbrxRp.51,920.00=Rp.20,768.00-Paku biasa 2" - 5"0.050KgxRp.16,940.00=Rp.847.00Jumlah (1)=Rp.21,615.006.59.2.Tenaga-Pekerja0.025OhxRp.52,500.00=Rp.1,312.50-Tukang kayu0.075OhxRp.78,800.00=Rp.5,910.00-Kepala tukang0.0075OhxRp.91,900.00=Rp.689.25-Mandor0.0013OhxRp.65,600.00=Rp.85.28Jumlah (2)=Rp.7,997.03Jumlah (1) +(2)=Rp.29,612.03PK6.60.1 M' Pasang list plafond kayu profil :6.60.1.Bahan-Kayu profil 2"1.050M'xRp.12,540.00=Rp.13,167.00Jumlah (1)=Rp.13,167.006.60.2.Tenaga-Pekerja0.021OhxRp.52,500.00=Rp.1,102.50-Tukang kayu0.021OhxRp.78,800.00=Rp.1,654.80-Kepala tukang0.002OhxRp.91,900.00=Rp.183.80-Mandor0.001OhxRp.65,600.00=Rp.65.60Jumlah (2)=Rp.3,006.70Jumlah (1) +(2)=Rp.16,173.70

pek.betonANALISA BIAYA KONSTRUKSIPEKERJAAN BETONPB6.1.1 M Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr6.1.1Bahan-Semen portland218.000KgxRp.1,270=Rp.276,860.00-Pasir beton0.520MxRp.87,800=Rp.45,656.00-Koral beton 5/70.870MxRp.170,900=Rp.148,683.00Jumlah (1)=Rp.471,199.006.1.2.Tenaga-Pekerja1.650OhxRp.52,500=Rp.86,625.00-Tukang batu0.250OhxRp.78,800=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900=Rp.2,297.50-Mandor0.080OhxRp.65,600=Rp.5,248.00Jumlah (2)=Rp.113,870.50Jumlah (1) + (2)=Rp.585,069.50PB6.2.1 M Membuat beton tumbuk, 1 Pc : 3 Ps : 6 Kr6.2.1Bahan-Semen portland197.000KgxRp.1,270=Rp.250,190.00-Pasir beton0.470MxRp.87,800=Rp.41,266.00-Koral beton 5/70.940MxRp.170,900=Rp.160,646.00Jumlah (1)=Rp.452,102.006.2.2.Tenaga-Pekerja1.650OhxRp.52,500=Rp.86,625.00-Tukang batu0.250OhxRp.78,800=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900=Rp.2,297.50-Mandor0.080OhxRp.65,600=Rp.5,248.00Jumlah (2)=Rp.113,870.50Jumlah (1) + (2)=Rp.565,972.50PB6.3.1 M Membuat beton tumbuk, 1 Pc : 4 Ps : 6 Kr6.3.1Bahan-Semen portland173.000KgxRp.1,270=Rp.219,710.00-Pasir beton0.570MxRp.87,800=Rp.50,046.00-Koral beton 5/70.870MxRp.170,900=Rp.148,683.00Jumlah (1)=Rp.418,439.006.3.2.Tenaga-Pekerja1.650OhxRp.52,500=Rp.86,625.00-Tukang batu0.250OhxRp.78,800=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900=Rp.2,297.50-Mandor0.080OhxRp.65,600=Rp.5,248.00Jumlah (2)=Rp.113,870.50Jumlah (1) + (2)=Rp.532,309.50PB6.4.1 M Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr, Tebal 5 Cm6.4.1Bahan-Semen portland10.000KgxRp.1,270=Rp.12,700.00-Pasir beton0.026MxRp.87,800=Rp.2,282.80-Koral beton 5/70.044MxRp.170,900=Rp.7,519.60Jumlah (1)=Rp.22,502.406.4.2.Tenaga-Pekerja0.165OhxRp.52,500=Rp.8,662.50-Tukang batu0.025OhxRp.78,800=Rp.1,970.00-Kepala tukang0.002OhxRp.91,900=Rp.183.80-Mandor0.006OhxRp.65,600=Rp.393.60Jumlah (2)=Rp.11,209.90Jumlah (1) + (2)=Rp.33,712.30PB6.5.1 M Membuat beton 1 Pc : 2 Ps : 3 Kr6.5.1. Bahan-Semen portland232.000KgxRp.1,270=Rp.294,640.00-Pasir beton0.520MxRp.87,800=Rp.45,656.00-Koral beton 5/70.780MxRp.170,900=Rp.133,302.00Jumlah (1)=Rp.473,598.006.5.2.Tenaga-Pekerja1.650OhxRp.52,500=Rp.86,625.00-Tukang batu0.250OhxRp.78,800=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900=Rp.2,297.50-Mandor0.080OhxRp.65,600=Rp.5,248.00Jumlah (2)=Rp.113,870.50Jumlah (1) + (2)=Rp.587,468.50PB6.6.1 M Membuat beton 1 Pc : 2 Ps : 4 Kr6.6.1. Bahan-Semen portland280.000KgxRp.1,270=Rp.355,600.00-Pasir beton0.450MxRp.87,800=Rp.39,510.00-Koral beton 3/50.900MxRp.185,900=Rp.167,310.00Jumlah (1)=Rp.562,420.006.6.2.Tenaga-Pekerja1.650OhxRp.52,500=Rp.86,625.00-Tukang batu0.250OhxRp.78,800=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900=Rp.2,297.50-Mandor0.080OhxRp.65,600=Rp.5,248.00Jumlah (2)=Rp.113,870.50Jumlah (1) + (2)=Rp.676,290.50PB6.7.1 M Membuat beton 1 Pc : 2 Ps : 2,5 Kr6.7.1. Bahan-Semen portland352.000KgxRp.1,270=Rp.447,040.00-Pasir beton0.560MxRp.87,800=Rp.49,168.00-Koral beton 3/50.700MxRp.185,900=Rp.130,130.00Jumlah (1)=Rp.626,338.006.7.2.Tenaga-Pekerja1.650OhxRp.52,500=Rp.86,625.00-Tukang batu0.250OhxRp.78,800=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900=Rp.2,297.50-Mandor0.080OhxRp.65,600=Rp.5,248.00Jumlah (2)=Rp.113,870.50Jumlah (1) + (2)=Rp.740,208.50PB6.8.1 M Membuat beton 1 Pc : 1,5 Ps : 3 Kr6.8.1. Bahan-Semen portland357.000KgxRp.1,270=Rp.453,390.00-Pasir beton0.420MxRp.87,800=Rp.36,876.00-Koral beton 3/50.540MxRp.185,900=Rp.100,386.00Jumlah (1)=Rp.590,652.006.8.2.Tenaga-Pekerja1.650OhxRp.52,500=Rp.86,625.00-Tukang batu0.250OhxRp.78,800=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900=Rp.2,297.50-Mandor0.080OhxRp.65,600=Rp.5,248.00Jumlah (2)=Rp.113,870.50Jumlah (1) + (2)=Rp.704,522.50PB6.9.1 M Membuat beton 1 Pc : 1,5 Ps : 2,5 Kr6.9.1. Bahan-Semen portland386.000KgxRp.1,270=Rp.490,220.00-Pasir beton0.470MxRp.87,800=Rp.41,266.00-Koral beton 3/50.780MxRp.185,900=Rp.145,002.00Jumlah (1)=Rp.676,488.006.9.2.Tenaga-Pekerja1.650OhxRp.52,500=Rp.86,625.00-Tukang batu0.250OhxRp.78,800=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900=Rp.2,297.50-Mandor0.080OhxRp.65,600=Rp.5,248.00Jumlah (2)=Rp.113,870.50Jumlah (1) + (2)=Rp.790,358.50PB6.10.1 M Membuat beton 1 Pc : 1 Ps : 2 Kr6.10.1. Bahan-Semen portland479.000KgxRp.1,270=Rp.608,330.00-Pasir beton0.370MxRp.87,800=Rp.32,486.00-Koral beton 3/50.740MxRp.185,900=Rp.137,566.00Jumlah (1)=Rp.778,382.006.10.2.Tenaga-Pekerja1.650OhxRp.52,500=Rp.86,625.00-Tukang batu0.250OhxRp.78,800=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900=Rp.2,297.50-Mandor0.080OhxRp.65,600=Rp.5,248.00Jumlah (2)=Rp.113,870.50Jumlah (1) + (2)=Rp.892,252.50PB6.11.1 M Membuat tiang pancang prestressed beton6.11.1. Bahan-Semen portland440.000KgxRp.1,270=Rp.558,800.00-Pasir beton0.500MxRp.87,800=Rp.43,900.00-Koral beton/batu pecah 2/30.800MxRp.177,700=Rp.142,160.00-Rapidrant2.460GlnxRp.=Rp.0.00Jumlah (1)=Rp.744,860.006.11.2.Tenaga-Pekerja1.650OhxRp.52,500=Rp.86,625.00-Tukang batu0.250OhxRp.78,800=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900=Rp.2,297.50-Mandor0.080OhxRp.65,600=Rp.5,248.00Jumlah (2)=Rp.113,870.50Jumlah (1) + (2)=Rp.858,730.50PB6.12.1 M Membuat beton dengan puzzdith - 100 XR6.12.1. Bahan-Semen portland336.000KgxRp.1,270=Rp.426,720.00-Pasir beton0.540MxRp.87,800=Rp.47,412.00-Koral beton0.810MxRp.185,900=Rp.150,579.00-Puzzdith - 100 XR1.000LtrxRp.=Rp.0.00Jumlah (1)=Rp.624,711.006.12.2.Tenaga-Pekerja1.650OhxRp.52,500=Rp.86,625.00-Tukang batu0.250OhxRp.78,800=Rp.19,700.00-Kepala tukang0.025OhxRp.91,900=Rp.2,297.50-Mandor0.080OhxRp.65,600=Rp.5,248.00Jumlah (2)=Rp.113,870.50Jumlah (1) + (2)=Rp.738,581.50PB6.13.1 M Membuat beton 1 Pc : 2 Ps : 3 Kr6.13.1. Bahan-Semen portland336.000KgxRp.1,270=Rp.426,720.00-Pasir beton0.540MxRp.87,800=Rp.47,412.00-Koral beton/batu pecah 2/30.810MxRp.177,700=Rp.143,937.00Jumlah (1)=Rp.618,069.006.13.2.Tenaga-Pekerja2.000OhxRp.52,500=Rp.105,000.00-Tukang batu0.350OhxRp.78,800=Rp.27,580.00-Kepala tukang0.035OhxRp.91,900=Rp.3,216.50-Mandor1.000OhxRp.65,600=Rp.65,600.00Jumlah (2)=Rp.201,396.50Jumlah (1) + (2)=Rp.819,465.50PB6.14.1 M Membuat beton 1 Pc : 2 Ps : 4 Kr6.14.1. Bahan-Semen portland291.000KgxRp.1,270=Rp.369,570.00-Pasir beton0.470MxRp.87,800=Rp.41,266.00-Koral beton/batu pecah 2/30.930MxRp.177,700=Rp.165,261.00Jumlah (1)=Rp.576,097.006.14.2.Tenaga-Pekerja2.000OhxRp.52,500=Rp.105,000.00-Tukang batu0.350OhxRp.78,800=Rp.27,580.00-Kepala tukang0.035OhxRp.91,900=Rp.3,216.50-Mandor1.000OhxRp.65,600=Rp.65,600.00Jumlah (2)=Rp.201,396.50Jumlah (1) + (2)=Rp.777,493.50PB6.15.1 M Membuat beton 1 Pc : 1,5 Ps : 3 Kr6.15.1. Bahan-Semen portland367.000KgxRp.1,270=Rp.466,090.00-Pasir beton0.440MxRp.87,800=Rp.38,632.00-Koral beton 2/30.880MxRp.177,700=Rp.156,376.00Jumlah (1)=Rp.661,098.006.15.2.Tenaga-Pekerja2.000OhxRp.52,500=Rp.105,000.00-Tukang batu0.350OhxRp.78,800=Rp.27,580.00-Kepala tukang0.035OhxRp.91,900=Rp.3,216.50-Mandor1.000OhxRp.65,600=Rp.65,600.00Jumlah (2)=Rp.201,396.50Jumlah (1) + (2)=Rp.862,494.50PB6.16.1 M Membuat beton 1 Pc : 1,5 Ps : 2,5 Kr6.16.1. Bahan-Semen portland400.000KgxRp.1,270=Rp.508,000.00-Pasir beton0.480MxRp.87,800=Rp.42,144.00-Koral beton 2/30.880MxRp.177,700=Rp.156,376.00Jumlah (1)=Rp.706,520.006.16.2.Tenaga-Pekerja2.000OhxRp.52,500=Rp.105,000.00-Tukang batu0.350OhxRp.78,800=Rp.27,580.00-Kepala tukang0.035OhxRp.91,900=Rp.3,216.50-Mandor1.000OhxRp.65,600=Rp.65,600.00Jumlah (2)=Rp.201,396.50Jumlah (1) + (2)=Rp.907,916.50PB6.17.1 M Membuat beton 1 Pc : 1 Ps : 1 Kr696.17.1. Bahan15-Semen portland615.000KgxRp.1,270=Rp.781,050.0054-Pasir beton0.520MxRp.87,800=Rp.45,656.00-Koral beton 2/30.520MxRp.177,700=Rp.92,404.00Jumlah (1)=Rp.919,110.006.17.2.Tenaga-Pekerja2.000OhxRp.52,500=Rp.105,000.00-Tukang batu0.350OhxRp.78,800=Rp.27,580.00-Kepala tukang0.035OhxRp.91,900=Rp.3,216.50-Mandor1.000OhxRp.65,600=Rp.65,600.00Jumlah (2)=Rp.201,396.50Jumlah (1) + (2)=Rp.1,120,506.50PB6.18.1 M Membuat beton kedap air dengan strorox - 1006.18.1. Bahan-Semen portland400.000KgxRp.1,270=Rp.508,000.00-Pasir beton0.480MxRp.87,800=Rp.42,144.00-Koral beton 2/30.800MxRp.177,700=Rp.142,160.00-Strorox - 1001.200MxRp.=Rp.0.00Jumlah (1)=Rp.692,304.006.18.2.Tenaga-Pekerja2.000OhxRp.52,500=Rp.105,000.00-Tukang batu0.350OhxRp.78,800=Rp.27,580.00-Kepala tukang0.035OhxRp.91,900=Rp.3,216.50-Mandor1.000OhxRp.65,600=Rp.65,600.00Jumlah (2)=Rp.201,396.50Jumlah (1) + (2)=Rp.893,700.50PB6.19.1 M' Memasang PVC Waterstop lebar 150 mm6.19.1. Bahan-Waterstop lebar 150 mm1.050M'xRp.=Rp.0.00Jumlah (1)=Rp.0.006.19.2.Tenaga-Pekerja0.050OhxRp.52,500=Rp.2,625.00-Tukang batu0.030OhxRp.78,800=Rp.2,364.00-Kepala tukang0.003OhxRp.91,900=Rp.275.70-Mandor0.002OhxRp.65,600=Rp.131.20Jumlah (2)=Rp.5,395.90Jumlah (1) + (2)=Rp.5,395.90PB6.20.1 M' Memasang PVC Waterstop lebar 200 mm6.20.1. Bahan-Waterstop lebar 200 mm1.050M'xRp.=Rp.0.00Jumlah (1)=Rp.0.006.20.2.Tenaga-Pekerja0.050OhxRp.52,500=Rp.2,625.00-Tukang batu0.035OhxRp.78,800=Rp.2,758.00-Kepala tukang0.0035OhxRp.91,900=Rp.321.65-Mandor0.002OhxRp.65,600=Rp.131.20Jumlah (2)=Rp.5,835.85Jumlah (1) + (2)=Rp.5,835.85PB6.21.1 M' Memasang PVC Waterstop lebar 230 mm6.21.1. Bahan-Waterstop lebar 230 mm1.050M'xRp.=Rp.0.00Jumlah (1)=Rp.0.006.21.2.Tenaga-Pekerja0.550OhxRp.52,500=Rp.28,875.00-Tukang batu0.035OhxRp.78,800=Rp.2,758.00-Mandor0.002OhxRp.65,600=Rp.131.20Jumlah (2)=Rp.31,764.20Jumlah (1) + (2)=Rp.31,764.20PB6.22.1 M' Memasang PVC Waterstop lebar 250 mm6.22.1. Bahan-Waterstop lebar 250 mm1.050M'xRp.=Rp.0.00Jumlah (1)=Rp.0.006.22.2.Tenaga-Pekerja0.550OhxRp.52,500=Rp.28,875.00-Tukang batu0.035OhxRp.78,800=Rp.2,758.00-Mandor0.003OhxRp.65,600=Rp.196.80Jumlah (2)=Rp.31,829.80Jumlah (1) + (2)=Rp.31,829.80PB6.23.1 M' Memasang PVC Waterstop lebar 300 mm6.23.1. Bahan-Waterstop lebar 300 mm1.050M'xRp.=Rp.0.00Jumlah (1)=Rp.0.006.23.2.Tenaga-Pekerja0.300OhxRp.52,500=Rp.15,750.00-Tukang batu0.260OhxRp.78,800=Rp.20,488.00-Kepala tukang0.026OhxRp.91,900=Rp.2,389.40-Mandor0.005OhxRp.65,600=Rp.328.00Jumlah (2)=Rp.38,955.40Jumlah (1) + (2)=Rp.38,955.40PB6.251 Kg Pembesian dengan Besi polos6.25.1BahanBesi beton polos1.050KgxRp.14,410=Rp.15,130.50Kawat beton0.015KgxRp.16,830=Rp.252.45Jumlah (1)=Rp.15,382.956.25.2TenagaPekerja0.007OhxRp.52,500=Rp.367.50Tukang besi0.007OhxRp.78,800=Rp.551.60Kepala tukang0.007OhxRp.91,900=Rp.643.30Mandor0.003OhxRp.65,600=Rp.196.80Jumlah (2)=Rp.1,759.20Jumlah (1) + (2)=Rp.17,142.15PB6.261 M Kabel Presstressed polos / strands6.26.1BahanBesi Presstressed polos1.050KgxRp.14,410=Rp.15,130.50Kawat beton0.010KgxRp.16,830=Rp.168.30Jumlah (1)=Rp.15,298.806.26.2TenagaPekerja0.005OhxRp.52,500=Rp.262.50Tukang besi0.005OhxRp.78,800=Rp.394.00Kepala tukang0.005OhxRp.91,900=Rp.459.50Mandor0.003OhxRp.65,600=Rp.196.80Jumlah (2)=Rp.1,312.80Jumlah (1) + (2)=Rp.16,611.60PB6.281 M Pasang bekisting untuk pondasi6.28.1BahanKayu sembarang0.040MxRp.3,107,500=Rp.124,300.00Paku biasa 2" - 5"0.300KgxRp.14,520=Rp.4,356.00Minyak bekisting0.100LtrxRp.6,290=Rp.629.00Jumlah (1)=Rp.129,285.006.28.2TenagaPekerja0.300OhxRp.52,500=Rp.15,750.00Tukang besi0.260OhxRp.78,800=Rp.20,488.00Kepala tukang0.026OhxRp.91,900=Rp.2,389.40Mandor0.005OhxRp.65,600=Rp.328.00Jumlah (2)=Rp.38,955.40Jumlah (1) + (2)=Rp.168,240.40PB6.29.1 M Pasang bekisting untuk sloof6.29.1. Bahan-Kayu sembarang0.045MxRp.3,107,500=Rp.139,837.50-Paku biasa 2' - 5"0.300KgxRp.14,520=Rp.4,356.00-Minyak bekisting0.100LtxRp.6,290=Rp.629.00Jumlah (1)=Rp.144,822.506.29.2.Tenaga-Pekerja0.300OhxRp.52,500=Rp.15,750.00-Tukang batu0.260OhxRp.78,800=Rp.20,488.00-Kepala tukang0.026OhxRp.91,900=Rp.2,389.40-Mandor0.005OhxRp.65,600=Rp.328.00Jumlah (2)=Rp.38,955.40Jumlah (1) + (2)=Rp.183,777.90PB6.30.1 M Pasang bekisting untuk kolom6.30.1. Bahan-Kayu sembarang0.040MxRp.3,107,500=Rp.124,300.00-Paku biasa 2' - 5"0.400KgxRp.14,520=Rp.5,808.00-Minyak bekisting0.200LtxRp.6,290=Rp.1,258.00-Balok kayu sembarang0.015MxRp.3,107,500=Rp.46,612.50-Plywood tebal 9 mm0.350LbrxRp.116,820=Rp.40,887.00-Kayu dolken/Laut 3"-4"/4 m2.000BtgxRp.19,250=Rp.38,500.00Jumlah (1)=Rp.257,365.506.30.2.Tenaga-Pekerja0.300OhxRp.52,500=Rp.15,750.00-Tukang batu0.330OhxRp.78,800=Rp.26,004.00-Kepala tukang0.033OhxRp.91,900=Rp.3,032.70-Mandor0.006OhxRp.65,600=Rp.393.60Jumlah (2)=Rp.45,180.30Jumlah (1) + (2)=Rp.302,545.80PB6.31.1 M Pasang bekisting untuk balok6.31.1. Bahan-Kayu sembarang0.040MxRp.3,107,500=Rp.124,300.00-Paku biasa 2' - 5"0.400KgxRp.14,520=Rp.5,808.00-Minyak bekisting0.200LtxRp.6,290=Rp.1,258.00-Balok kayu sembarang0.018MxRp.3,107,500=Rp.55,935.00-Plywood tebal 9 mm0.350LbrxRp.116,820=Rp.40,887.00-Kayu dolken/Laut 3"-4"/4 m2.000BtgxRp.19,250=Rp.38,500.00Jumlah (1)=Rp.266,688.006.31.2.Tenaga-Pekerja0.320OhxRp.52,500=Rp.16,800.00-Tukang batu0.330OhxRp.78,800=Rp.26,004.00-Kepala tukang0.033OhxRp.91,900=Rp.3,032.70-Mandor0.006OhxRp.65,600=Rp.393.60Jumlah (2)=Rp.46,230.30Jumlah (1) + (2)=Rp.312,918.30PB6.32.1 M Pasang bekisting untuk lantai6.32.1. Bahan-Kayu sembarang0.040MxRp.3,107,500=Rp.124,300.00-Paku biasa 2' - 5"0.400KgxRp.14,520=Rp.5,808.00-Minyak bekisting0.200LtxRp.6,290=Rp.1,258.00-Balok kayu sembarang0.015MxRp.3,107,500=Rp.46,612.50-Plywood tebal 9 mm0.350LbrxRp.116,820=Rp.40,887.00-Kayu dolken/Laut 3"-4"/4 m6.000BtgxRp.19,250=Rp.115,500.00Jumlah (1)=Rp.334,365.506.32.2.Tenaga-Pekerja0.320OhxRp.52,500=Rp.16,800.00-Tukang batu0.330OhxRp.78,800=Rp.26,004.00-Kepala tukang0.033OhxRp.91,900=Rp.3,032.70-Mandor0.006OhxRp.65,600=Rp.393.60Jumlah (2)=Rp.46,230.30Jumlah (1) + (2)=Rp.380,595.80PB6.33.1 M Pasang bekisting untuk dinding6.33.1. Bahan-Kayu sembarang0.030MxRp.3,107,500=Rp.93,225.00-Paku biasa 2' - 5"0.400KgxRp.14,520=Rp.5,808.00-Minyak bekisting0.200LtxRp.6,290=Rp.1,258.00-Balok kayu sembarang0.020MxRp.3,107,500=Rp.62,150.00-Plywood tebal 9 mm0.350LbrxRp.116,820=Rp.40,887.00-Kayu dolken/Laut 3"-4"/4 m3.000BtgxRp.19,250=Rp.57,750.00-Formtie/penjaga jarak bekisting/spacer4.000BtgxRp.5,000=Rp.20,000.00Jumlah (1)=Rp.281,078.006.33.2.Tenaga-Pekerja0.320OhxRp.52,500=Rp.16,800.00-Tukang batu0.330OhxRp.78,800=Rp.26,004.00-Kepala tukang0.033OhxRp.91,900=Rp.3,032.70-Mandor0.006OhxRp.65,600=Rp.393.60Jumlah (2)=Rp.46,230.30Jumlah (1) + (2)=Rp.327,308.30PB6.34.1 M Pasang bekisting untuk tangga6.34.1. Bahan-Kayu sembarang0.030MxRp.3,107,500=Rp.93,225.00-Paku biasa 2' - 5"0.400KgxRp.14,520=Rp.5,808.00-Minyak bekisting0.150LtxRp.6,290=Rp.943.50-Balok kayu sembarang0.015MxRp.3,107,500=Rp.46,612.50-Plywood tebal 9 mm0.350LbrxRp.116,820=Rp.40,887.00-Kayu dolken/Laut 3"-4"/4 m2.000BtgxRp.19,250=Rp.38,500.00Jumlah (1)=Rp.225,976.006.34.2.Tenaga-Pekerja0.320OhxRp.52,500=Rp.16,800.00-Tukang batu0.330OhxRp.78,800=Rp.26,004.00-Kepala tukang0.033OhxRp.91,900=Rp.3,032.70-Mandor0.006OhxRp.65,600=Rp.393.60Jumlah (2)=Rp.46,230.30Jumlah (1) + (2)=Rp.272,206.30PB6.35.1 M Pasang beton dengan mutu K 2256.35.1. Bahan-Semen portland388.000KgxRp.1,270=Rp.492,760.00-Pasir beton0.650MxRp.87,800=Rp.57,070.00-Batu pecah0.650MxRp.190,200=Rp.123,630.00Jumlah (1)=Rp.673,460.006.35.2.Tenaga-Pekerja6.000OhxRp.52,500=Rp.315,000.00-Tukang batu1.000OhxRp.78,800=Rp.78,800.00-Kepala tukang0.100OhxRp.91,900=Rp.9,190.00-Mandor0.300OhxRp.65,600=Rp.19,680.00Jumlah (2)=Rp.422,670.00Jumlah (1) + (2)=Rp.1,096,130.00PB6.36.1 M Pasang beton dengan mutu K 2756.36.1. Bahan-Semen portland400.000KgxRp.1,270=Rp.508,000.00-Pasir beton0.400MxRp.87,800=Rp.35,120.00-Koral beton0.820MxRp.190,200=Rp.155,964.00Jumlah (1)=Rp.699,084.006.36.2.Tenaga-Pekerja6.000OhxRp.52,500=Rp.315,000.00-Tukang batu1.000OhxRp.78,800=Rp.78,800.00-Kepala tukang0.100OhxRp.91,900=Rp.9,190.00-Mandor0.300OhxRp.65,600=Rp.19,680.00Jumlah (2)=Rp.422,670.00Jumlah (1) + (2)=Rp.1,121,754.00PB6.37.1 M Pasang jembatan cor6.37.1. Bahan-Kayu sembarang0.0264MxRp.3,107,500=Rp.82,038.00-Paku biasa 2" - 5 "0.600KgxRp.14,520=Rp.8,712.00-Kayu dolken/Laut 3"-4"/4 m0.500BtgxRp.19,250=Rp.9,625.00Jumlah (1)=Rp.100,375.006.37.2.Tenaga-Pekerja0.150OhxRp.52,500=Rp.7,875.00-Tukang batu0.050OhxRp.78,800=Rp.3,940.00-Kepala tukang0.005OhxRp.91,900=Rp.459.50-Mandor0.007OhxRp.65,600=Rp.459.20Jumlah (2)=Rp.12,733.70Jumlah (1) + (2)=Rp.113,108.70PB6.38.1 M Membuat pondasi beton bertulang (150 kg besi + bekisting)6.38.1. Bahan-Kayu sembarang0.2000MxRp.3,107,500=Rp.621,500.00-Paku biasa 2" - 5 "1.500KgxRp.14,520=Rp.21,780.00-Minyak bekisting0.400LtxRp.6,290=Rp.2,516.00-Besi beton polos150.000KgxRp.14,410=Rp.2,161,500.00-Kawat beton2.250KgxRp.16,830=Rp.37,867.50-Semen portland323.000KgxRp.1,270=Rp.410,210.00-Pasir beton0.520MxRp.87,800=Rp.45,656.00-Koral beton0.780MxRp.190,200=Rp.148,356.00Jumlah (1)=Rp.3,449,385.506.38.2.Tenaga-Pekerja3.900OhxRp.52,500=Rp.204,750.00-Tukang batu0.350OhxRp.78,800=Rp.27,580.00-Tukang kayu1.040OhxRp.78,800=Rp.81,952.00-Tukang besi1.050OhxRp.78,800=Rp.82,740.00-Kepala tukang0.245OhxRp.91,900=Rp.22,515.50-Mandor0.165OhxRp.65,600=Rp.10,824.00Jumlah (2)=Rp.430,361.50Jumlah (1) + (2)=Rp.3,879,747.00PB6.39.1 M Membuat sloof beton bertulang (200 kg besi + bekisting)6.39.1. Bahan-Kayu sembarang0.2700MxRp.3,107,500=Rp.839,025.00-Paku biasa 2" - 5 "2.000KgxRp.14,520=Rp.29,040.00-Minyak bekisting0.600LtxRp.6,290=Rp.3,774.00-Besi beton polos200.000KgxRp.14,410=Rp.2,882,000.00-Kawat beton3.000KgxRp.16,830=Rp.50,490.00-Semen portland323.000KgxRp.1,270=Rp.410,210.00-Pasir beton0.520MxRp.87,800=Rp.45,656.00-Koral beton0.780MxRp.190,200=Rp.148,356.00Jumlah (1)=Rp.4,408,551.006.39.2.Tenaga-Pekerja4.850OhxRp.52,500=Rp.254,625.00-Tukang batu0.350OhxRp.78,800=Rp.27,580.00-Tukang kayu1.560OhxRp.78,800=Rp.122,928.00-Tukang besi1.400OhxRp.78,800=Rp.110,320.00-Kepala tukang0.331OhxRp.91,900=Rp.30,418.90-Mandor0.170OhxRp.65,600=Rp.11,152.00Jumlah (2)=Rp.557,023.90Jumlah (1) + (2)=Rp.4,965,574.90PB6.40.1 M Membuat kolom beton bertulang (300 kg besi + bekisting)6.40.1. Bahan-Kayu sembarang0.4000MxRp.3,107,500=Rp.1,243,000.00-Paku biasa 2" - 5 "4.000KgxRp.14,520=Rp.58,080.00-Minyak bekisting2.000LtxRp.6,290=Rp.12,580.00-Besi beton polos300.000KgxRp.14,410=Rp.4,323,000.00-Kawat beton4.500KgxRp.16,830=Rp.75,735.00-Semen portland323.000KgxRp.1,270=Rp.410,210.00-Pasir beton0.520MxRp.87,800=Rp.45,656.00-Koral beton0.780MxRp.190,200=Rp.148,356.00-Kayu sembarang balok0.150MxRp.3,107,500=Rp.466,125.00-Plywood 9 mm3.500LbrxRp.116,820=Rp.408,870.00-Kayu dolken/Laut 3"-4"/4 m20.000BtgxRp.19,250=Rp.385,000.00Jumlah (1)=Rp.7,576,612.006.40.2.Tenaga-Pekerja7.300OhxRp.52,500=Rp.383,250.00-Tukang batu0.350OhxRp.78,800=Rp.27,580.00-Tukang kayu3.300OhxRp.78,800=Rp.260,040.00-Tukang besi2.100OhxRp.78,800=Rp.165,480.00-Kepala tukang0.570OhxRp.91,900=Rp.52,383.00-Mandor0.250OhxRp.65,600=Rp.16,400.00Jumlah (2)=Rp.905,133.00Jumlah (1) + (2)=Rp.8,481,745.00PB6.41.1 M Membuat balok beton bertulang (200 kg besi + bekisting)6.41.1. Bahan-Kayu sembarang0.3200MxRp.3,107,500=Rp.994,400.00-Paku biasa 2" - 5 "3.200KgxRp.14,520=Rp.46,464.00-Minyak bekisting1.600LtxRp.6,290=Rp.10,064.00-Besi beton polos200.000KgxRp.14,410=Rp.2,882,000.00-Kawat beton3.000KgxRp.16,830=Rp.50,490.00-Semen portland323.000KgxRp.1,270=Rp.410,210.00-Pasir beton0.520MxRp.87,800=Rp.45,656.00-Koral beton0.780MxRp.190,200=Rp.148,356.00-Kayu sembarang balok0.140MxRp.3,107,500=Rp.435,050.00-Plywood 9 mm2.800LbrxRp.116,820=Rp.327,096.00-Kayu dolken/Laut 3"-4"/4 m16.000BtgxRp.19,250=Rp.308,000.00Jumlah (1)=Rp.5,657,786.006.41.2.Tenaga-Pekerja5.960OhxRp.52,500=Rp.312,900.00-Tukang batu0.350OhxRp.78,800=Rp.27,580.00-Tukang kayu2.800OhxRp.78,800=Rp.220,640.00-Tukang besi1.400OhxRp.78,800=Rp.110,320.00-Kepala tukang0.455OhxRp.91,900=Rp.41,814.50-Mandor0.208OhxRp.65,600=Rp.13,644.80Jumlah (2)=Rp.726,899.30Jumlah (1) + (2)=Rp.6,384,685.30PB6.42.1 M Membuat balok beton bertulang (150 kg besi + beki