D-R Compressor Cell
RIT Senior Design Team P13458Week 4 Status Report
Agenda
• Review of activities thus far• Short term goals• Questions / Requests
Project Summary• Overall goal of project:
– Transform their fixed material position assembly process for their gas application reciprocating compressors into a flowing cell layout
• Motivations:– Prepare for a projected increase in demand for their newly released MOS
compressor– Create a safer environment for the operators (no overhead cranes)– Increase their on-time delivery rating
• Specific Task:– Create the material handling system that will allow the assembly to travel
through this cell and will support the lean manufacturing initiatives this project is pursuing
Note: A consultant has created a conceptual design of the process flow through this cell.
Customer NeedsNo. Priority
Multiplier Description
1 3 Safety & Ergonomics: Minimize work-related injury
2 1 Cost: Minimize purchase & installation costs
3 2 Transportability: Ease of motion to start, sustain movement, and stop
4 1 Current Capability: Compatibility with current facilities
5 3 Scale: Minimize impact of installation to facilities
6 2 Guidance: Ability to remain inline
7 3 Flexibility: Capacity for systems integration
8 2 Maintenance: Minimize operational cost, frequency of repairs, repair costs
9 2 Returnability: Ability to return empty fixture to beginning of the line
Concept Selection – Moving
Safety
Cost
Transportability
Current Capability
Scale
Guidance
Flexibility
Maintenance
Returnability
Feasbility Score
Multiplier 3 1 2 1 3 2 3 2 2Fluid Skid -2 -3 3 -3 -3 3 -3 0 -3 -24Air Skid -1 0 3 2 3 -3 3 0 2 21Conveyor 2 -2 3 -2 -1 3 -2 -3 3 5Cart 2 3 -1 3 3 -2 3 3 2 34Rail System 3 0 2 -1 -2 3 1 3 -3 15Crane -3 -3 3 -3 -2 2 3 0 3 4Mag Lev -2 -3 3 -2 -2 3 1 -3 -3 14
-30
-20
-10
0
10
20
30
40
Fluid Skid
Air Skid
Conveyors
Carts
Rail System
Crane
Mag Lev
Concept Selection – Propulsion
Chain Driv
e
Powered Cart
s
Winch
(es)
Car W
ash St
yle
Powered Rail
Trolle
y
Powered Dolly
Compressed
Air Motor
Unpowered Dolly
Movemen
t by H
and
Air Power
(Hove
rCraft
)
Tread
Drive
0
5
1015
20
25
3035
4045
Safety
Cost
Transportability
Current Capability
Scale
Guidance
Flexibility
Maintenance
Returnability
Speed
Feasbility Score
Multiplier 3 1 2 1 3 2 3 2 2 2Chain Drive -2 2 2 3 -2 3 -3 2 -1 2 0Powered Carts 2 -3 2 3 2 -2 2 -2 3 2 24Winch(es) 2 2 2 3 -1 2 3 0 -2 2 25Car Wash Style 2 -2 2 3 -3 3 -2 1 -3 2 2Powered Rail Trolley 2 -3 2 3 2 3 1 -1 -3 2 21Powered Dolly -1 3 2 3 3 2 3 2 3 1 41Compressed Air Motor 2 -2 2 3 2 -2 2 -2 3 2 25Unpowered Dolly -3 3 -3 3 3 2 3 2 3 -3 17Movement by Hand -3 3 -3 3 3 2 3 2 3 -3 17Air Power (HoverCraft) 2 3 -2 3 3 -2 2 2 2 -3 21Tread Drive 2 -3 2 3 2 -2 2 -2 3 2 24
Concept Selection – Loading
Pneumati
c Actu
ation
Electr
ic Actu
ation
Hydrau
lic Actu
ation
Crane
Forkl
ift
Powered Sc
rew
Ramp Conve
yor
Scisso
r Lift
-30
-20
-10
0
10
20
30
Safety
Cost
Transportability
Current Capability
Scale
Guidance
Flexibility
Maintenance
Returnability
Feasability Score
Multiplier 3 1 2 1 3 2 3 2 2Pneumatic Actuation 3 -1 1 3 2 0 -1 2 0 20Electric Actuation 3 -3 1 1 2 0 -1 1 0 14Hydraulic Actuation 3 -3 1 -3 -3 0 -1 1 0 -5Crane -2 -2 3 2 -2 0 3 1 0 5Forklift -2 1 1 2 3 0 -1 2 0 9Powered Screw 3 2 2 3 2 0 -1 -1 0 19Ramp Conveyor -3 -3 2 -1 -3 0 -1 -2 0 -25Scissor Lift 3 -1 1 3 2 0 -1 2 0 20
Goals for next 2 weeks
• D-R Approval for customer needs, functional decomposition
• Specifications definition from D-R• Develop solutions based on feedback from D-R • Risk Management• Schedule Systems Design Review• Create Systems Design Review Presentation
Requests
• Data on Cylinder weights for all families• Data Cylinder dimensions for all families
• Is there an expectation for future line expansion?
Project Requests
Requests:• Review customer needs & provide feedback• Review functional decomposition & provide
feedback• Specifications and constraints definition to
meet customer needs– Ideas: time to move, size envelope for system
within layout, no overhead crane, no monuments
Next Steps
• Systems Design Review– Tentatively Scheduled Friday, January 18th