Upload
zaid-abbas
View
262
Download
2
Embed Size (px)
Citation preview
Page - 1
EDUCATION
B.Sc Al Mustansiriya University, Civil Engineering
Graduation Date: July 2011
WORKS EXPERIENCE
.Dissertation,
The First Job
Name of Company: Dewan Architecture Consulting Engineers
Location: ARMY CANAL LINING PROJECT IN BAGDAD CITY
Contractor: Arab Contractors Co.
Company: Baghdad Municipality.
Third Party: Dewan Architecture Consulting Engineers
Period: 1 of July 2011 to 31 of December 2011
Position: Civil Engineer
The project consists Building(WC and cafeteria) , Cannel lining 21 Km(Earthworks, lining by
concrete) , Curbs(interlock, Sand, Curbstone)
My duties were:
Site inspection for all Civil work activities
Prepare Daily, Weekly and Monthly reports
Cooperate with Company to solve problems related to the project
Read and implement the approved drawing accurately
ZAID ABBAS RAZZAQ
Nationality: Iraqi
Residence: Baghdad
Birth of Day:22/06/1989
Phone:07718743963
07817023518
E-MAIL:[email protected]
Page - 2
The Second Job Name of Company: Pan East Construction Co.,
Location: LOGISTIC SUPPORT BASE (LSB), ZUBAIR OILFIELD
DEVELOPMENT PROJECT FROM ENI OIL
Contractor: Pan East Co.
Company: ENI Co.
Period: 1 of January 2012 to 31 of October 2012
Position: QA/QC Civil Engineer
The project consists 93 building (Concrete works, Asphalt Road, Steel structures,
Earthworks, Finishing).
My duties were:
Prepares and submit to company all inspection and test plan (ITP) and
implement all civil works according to project specification.
Submit application for inspection(AFI) before 24 hour to Company for
inspection
Make daily site inspection for all surveillance and wittiness point as per ITP
and found the Violations and take the necessary corrective action and
preventive measures
Submitted AFI´S inspection schedule to company
Accurate in reading construction drawing and specification
The Third Job Name of Company: 77 Constrictions Turkish Co.
Location: CPF and Well Pads at West Qurrna 2 project
Contractor: 77 Constructions Co.
Company: Lukoil Company
Period: 1 of November 2012 to 31 of May 2014
Position: Site Manager
The project consists CPF and Well pads (Concrete works, Asphalt Road, Steel
structures, Earthworks, Finishing, Piles Works-Cast in the place piles, fence
fabrications. Concrete Pre-cast works).
My duties were:
Prepare and Submit the time schedule to Company according to approved
drawing and apply the plans to complete the project with high Quality and
minimal cost
Calculate the required quantity of materials (Rebar, Cement, aggregate,
Concrete.etc)and inform the owner for splaying the materials
Control the movement of equipment, machinery and manpower at the site
Give the necessary instructions to surveyors according to work requirements
Prepare the bar bending schedule according to drawing
Prepare manpower, and machinery timesheet
Implement the works activity as per drawing and specification
Cooperate with quality teams and Company representatives to solve all site
work issues
Page - 3
The Fourth Job
Name of Company: (CPP) China pipeline petroleum Co.
Location: EPC Well Pads and Oil Gathering System at the West Qurna (Phase 2) Contract
Area
Contractor: China pipeline petroleum Co.
Company: Lukoil Company
Period: 1 of Jun 2014 until now
Position: QA/QC Civil Engineer and Document controller (DCC)
The project consists Well pads and pipe line (Concrete works, Asphalt Road, Steel
structures, Earthworks, Finishing, Piles Works-pre-cast piles, fence fabrications.
Concrete Pre-cast works, Blocks Masonry, Wall Plastering, finishing, Drainage pipes).
My duties were:
I have prepared all Civil works Inspection and test plan ITP according to
project specification (ITP for (Concrete Works, Earth works, Piles
fabrication, piles driving, T-WALL Fabrication, T-WALL installation , Fence
fabrication , Fence installation, HDPE Drainage pipe works, Block Masonry,
Plastering and Painting)) and all ITP´S have been accepted by Company
Submit application for inspection(AFI) before 24 hour to Company for
inspection
Comply with company instruction, observations
Make daily site inspection for all surveillance and witness point as per ITP
and found the Violations and take the necessary corrective action and
preventive measures
Submit all required Quality Technical Query (TQ) to Company
Submit AFI Daily Schedule to Company
Witness and Review all constriction tests(Concrete compressive test,
Compaction test, materials physical and chemical test (Soil. Subbase, base
course, aggregates, cement, sand, water), Pile load test ,Pile PDA Test ,
Asphalt core test, Asphalt Job mix formula, Concrete Core test ,Concrete
Schmidt test. Concrete mix design, etc)
Prepare, Review and submit all Civil Quality Dossiers to Company for
approval
Prepare Quality Minutes of Meeting(MOM)
Page - 4
PROFESSIONAL TRAINING
English language Training
Computer Program Training
Safety Training
COMPUTER SKILLS
Microsoft office, Auto Cad, MS Project
LANGUAGES SKILLS
Language Reading Speaking Writing
Arabic Mother Tongue Mother Tongue Mother Tongue
English Excellent Excellent Excellent
Turkish Fair Fair Fair
Page - 5
CERTIFICATES
Page - 6
Page - 7
Page - 8
Page - 9
Page - 10
Page - 11
Page - 12
Page - 13
Page - 14
Page - 15
Page - 16
Page - 17
BADGES
Page - 18