12
Industrial & Engineering Technology October 12, 2011 4:00-6:00 p.m. ISC - Room 1301

Curriculum Action Team

  • Upload
    gilon

  • View
    44

  • Download
    0

Embed Size (px)

DESCRIPTION

Industrial & Engineering Technology. Curriculum Action Team. October 12, 2011 4:00-6:00 p.m. ISC - Room 1301. Agenda. “Visualizing Our Vision” Curriculum Priorities Reports & Updates. Pretty Good. Visualizing Our Vision. - PowerPoint PPT Presentation

Citation preview

Page 1: Curriculum Action Team

Industrial & Engineering Technology

October 12, 20114:00-6:00 p.m.ISC - Room 1301

Page 2: Curriculum Action Team

“Visualizing Our Vision”Curriculum PrioritiesReports & Updates

Page 3: Curriculum Action Team

PrettPretty y

GoodGood

Page 4: Curriculum Action Team

If there were no obstacles at all, what would I love to see happen to the Technology & Engineering Program in Parkway?

What would I love to see my students doing? What would it look like? What would it sound like?

What is my ideal scenario?What do I want this program to be remembered or known for? How do I want people to describe our program and our student’s work?

What must happen in our program to achieve the mission of the Parkway School District?

Page 5: Curriculum Action Team

VisualiVisualize Your ze Your VisionVision

Page 6: Curriculum Action Team

Stage 2: Assessment Evidence

Science, Technology, Engineering and

Mathematics

Architecture and

Construction

Manufacturing Transportation, Distribution and Logistics

• PLTW Introduction to Engineering Design

• PLTW Principles of Engineering

• PLTW Digital Electronics• PLTW Civil Engineering

and Architecture• PLTW Computer

Integrated Manufacturing• PLTW Biotechnical

Engineering• Robotics Technology • Design and Technology 1,

2

• Construction Technology

• Advanced Construction Technology

• Drafting• Civil

Engineering and Architecture

• Computer Integrated Manufacturing

• Robotics Technology

• Power, Energy and Transportation 1

• Power, Energy, and Transportation 2

Stage 3: Learning Plan

Stage 1: Identify Desired Results

Page 7: Curriculum Action Team

What Do We Need to Stop Doing?

What Do We Need to Start Doing?

Page 8: Curriculum Action Team

Determine CTE program/pathway transfer goals and determine which goals belong within each CTE course.

Update Stage 1 curriculum to include explicitly stated transfer goals.

Align curriculum to Parkway M/V. Create/revise assessments to align

with Stage 1.

Page 9: Curriculum Action Team

__________________ is a priority course in Technology & Engineering because _________________________.

Page 10: Curriculum Action Team

PLTW PLTW Re-Re-

CertificatiCertificationon

Page 11: Curriculum Action Team

November 2, 2011 Curriculum Action Team Meeting Focus: Priority Non-PLTW Courses as

identified at October 12 meeting.November 4, 2011

Curriculum Action Team Work Continues…

Page 12: Curriculum Action Team

• PLTW Re-Certification and Self Assessments• Energy & the Environment• Recruitment and Retention Plan• Boeing Women in Engineering Conference• 2012 PLTW EOC Exam Competencies and Protocols• PLTW EOC's online TOTALLY for POE and CIM - both A and C with 1 hour time limits for all testing unless IEP/504 plans are submitted in a timely fashion to PLTW.• VEX components and programming with the PIC controller vs. version 3.0• How ROBOTC affects the VEX PIC Controller