Cumulative effects assessment. Cumulative effects assessment. Approach Scoping: focus on VECs and VSECs where potential for cumulative effects existed - regardless of whether the effect was significant identified past, present and potential future projects - PowerPoint PPT Presentation
Citation preview
Cumulative effects assessment
Cumulative effects assessment
• Approach– Scoping:
• focus on VECs and VSECs where potential for cumulative effects existed - regardless of whether the effect was significant
– identified past, present and potential future projects
– identified residual effects for other projects
– identified the “zone of influence” for effects
– confirmed potential cumulative effects
• scope did not include a study of the cumulative effects of accidents and malfunctions
Cumulative effects assessment
Cumulative effects assessment
• Approach
Cumulative effects assessment
Cumulative effects assessment
• Approach– Effects Analysis
• determined the potential for induced effects
• set 25 years for temporal extent
• spatial extent varied with effect
Cumulative effects assessment
Cumulative effects assessment
• Types of cumulative effects
Cumulative effects assessment• Types of cumulative effects
Cumulative effects assessment
• Approach
Cumulative effects assessment
• Approach– Mitigation:
• appropriate mitigation identified, as required
– Significance
• compare effects against known or derived thresholds and land use plan expectations
– Follow-up
• program designed as needed
Cumulative effects assessment
• Potential cumulative effectsCategory Discipline Key Components
Terrestrial Mammals
Dolphin and Union caribou
Grizzly bear
Wolverine
Raptors (Peregrine falcon)
Biophysical Environment (VECs)
Marine Mammals
Beluga Whale
Narwhal
Bowhead whale
Ringed seal
Bearded seal
Harp seal
Walrus
Polar bear
Socio-economic
Employment and Labour Force
Business and Contracting
Training and Education
Drug and Alcohol Abuse
Harvesting Activities Human Environment (VSECs)
Archaeology
Archaeological Resources
Cumulative effects assessment
• Potential for other projects to use infrastructure
– Analysis
• 1 in 1000 exploration projects result in a mine
• 2% chance that the construction of a road will spawn the development of a mine in the north within a 300 km radius
– Result
• maximum 5% chance that a mine will result because of Zinifex infrastructure i.e., 1 or 2 mines
Cumulative effects assessment
• Results– no significant adverse cumulative effects
identified
– identified cumulative effects can be managed through project-specific mitigation and adjusted through monitoring