Cubex Machine Roger

Embed Size (px)

Citation preview

2008V-30Blind Raising&Down ReamingWe are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com2008Blind Up ReamingPulling V-30Pushing V-30 DownWe are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com2008MACHINES ROGERADJUSTABLE SAFETY CANOPYThe Safety Canopy pictured hereallows maintenance to the V30 RaiseBore Head prior to the raise beingcompleted. This keeps the drill frombeing moved off of the asimuth setupof the Raise.The Canopy is easily attached to theStinger Stabilizers and adjusted toseal the hole such that loose cannotfall down the raise onto the operatorsor equipment.We are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com2008We are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com200830 inch raise hole through fractured groundWe are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com2008MACHINES ROGER V30 HEADPASSING THROUGH LEVELSThe V30 can be pulled successfullythrough adverse drilling conditions aspictured here on the leftThe V30 can also be pulled or pushedthrough rock boltsWe are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com2008We are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com2008Orion DHH with V-30 Cuttings DiverterWe are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com2008Orion ITH DrillBooster Compressor 700 cfm@ 350 psi driven by 75 hpElectric MotorFour (4) IndependentStingers Cylinders Four (4) Cylinder Water Cooled 100 hp DieselEngine 24 V starting systemWe are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com2008Slideover frame arrangement mast travels on chrome rods through high capacity bearingsOrion ITH DrillTrouble shooting gaugepanel for hydraulic, air & water systemsPLC control boxfor 24 v electric hydraulicsPDF created with pdfFactory trial version www.pdffactory.comCable Reel 75 mhigh voltage cableGrease injection system for I.T.H hammerWe are committed to a program of continuous improvement and reserve the right to change specifications without notice2008 V-30 CuttingsDiverter ClosedV-30 CuttingsDiverter OpenWe are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com2008Orion DHHUphole drilling in driftWe are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com2008Side viewWe are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com2008V-30Raise HeadBlind RaisingTram Position&Drill PositionUsing 6 HammersWe are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com2008Onboard rod handling to provide the operator with a fullyhydraulically sequenced rod carousel which reduces the operatorshandling of drill tubes, which in turn reduces operator fatigue andpossible safety issues due to lifting rods during a shift. The Aries orOrion drill can be fitted with our standard 16 rod carousel or 25 rodcarousel.We are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com2008Pipe ArmWe are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com2008Pipe TubWe are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com2008We are committed to a program of continuous improvement and reserve the right to change specifications without noticePDF created with pdfFactory trial version www.pdffactory.com