CP243 Interlocking Project The CP243 Interlocking Project will construct a new four-track interlocking, a powered switch and signal system that allows trains to move from one track to another. The new interlocking is approximately 3,200 feet long, located approximately 1.5 miles east of the Walk Bridge on the New Haven Line (NHL) between East Norwalk and Westport. The project includes: Six new switches Track replacement and realignment New catenary structures Overhead catenary system modificaons Communicaons and signal systems Drainage improvements Ancipated Start Date Fall 2017 Construcon Duraon 3.5 Years Esmated Construcon Cost $210 Million What Does CP243 Mean? ‘CP’ means control point ‘2’ refers to the New Haven Commuter Line ‘43’ is the nearest mile post on the rail line, marked from Grand Central Terminal WALK BRIDGE PROGRAM | 2017 A railroad switch is a set of tracks that create a juncon, that when moved allows for trains to change from one track to another.

CP243 Interlocking Project 8 4 cp243 fact... · 2017. 8. 20. · CP243 Interlocking Project The CP243 Interlocking Project will construct a new four-track interlocking, a powered

  • Upload
    others

  • View
    22

  • Download
    1

Embed Size (px)

Citation preview

Page 1: CP243 Interlocking Project 8 4 cp243 fact... · 2017. 8. 20. · CP243 Interlocking Project The CP243 Interlocking Project will construct a new four-track interlocking, a powered

CP243 Interlocking Project

The CP243 Interlocking Project will construct a new four-track interlocking, a powered switch and signal system that allows trains to move from one track to another. The new interlocking is approximately 3,200 feet long, located approximately 1.5 miles east of the Walk Bridge on the New Haven Line (NHL) between East Norwalk and Westport.

The project includes:

• Six new switches

• Track replacement and realignment

• New catenary structures

• Overhead catenary system modifications

• Communications and signal systems

• Drainage improvements

Anticipated Start DateFall 2017

Construction Duration3.5 Years

Estimated Construction Cost$210 Million

What Does CP243 Mean?

‘CP’ means control point‘2’ refers to the New Haven

Commuter Line‘43’ is the nearest mile post on the rail line, marked from Grand Central Terminal

WALK BRIDGE PROGRAM | 2017

A railroad switch is a set of tracks that create a junction, that when moved allows for trains to change from one track to another.

Page 2: CP243 Interlocking Project 8 4 cp243 fact... · 2017. 8. 20. · CP243 Interlocking Project The CP243 Interlocking Project will construct a new four-track interlocking, a powered

Catenary and Signal

Submarine cables and tie-ins

Map LegendTrack Realignment

New Tracks, Track Base and Catenary

Potential Mitigation Measures

• Maximize daytime work

• Ongoing noise monitoring

• Low impact equipment

• Suppression of equipment noise

• Limit equipment idling time

Noise and Vibrations

The Walk Bridge Program understands that noise and vibrations which will occur as part of the CP243 Interlocking Project and may be of concern to the Norwalk community. The project will maximize daytime work to the extent possible. Night work is required because most track outages are available at night. To best minimize noise and vibrations, a construction coordination plan is being developed that will identify ‘sensitive receptors,’ establish baseline noise and vibration levels, implement

monitoring and mitigation techniques. The plan is a living document which will be developed in coordination with stakeholders. As the project progresses, unforseen nuisance noise will be evaluated and mitigated to the extent possible.

Contact UsFor more information on the Walk Bridge Program, Please visit: www.walkbridgect.com