COST EFFECTIVE MASS HOUSING TECHNOLOGY

MONOLITHIC CONCRETE HOUSING FORM WORK

Page 2: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

What are the Requirements of anEffective Housing System?

• Must be cost effective.

• Must be capable of a fast rate of construction.

• Must be adaptable to any structural design or architectural layout.

• Must produce high quality, durable and low maintenance structures.

• Must produce structures that are resistant to meteorological and/or seismic conditions.

Page 3: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

MONOLITHIC CONCRETE HOUSING FORM WORK TECHNOLOGY

• Hand-held reusable aluminum formwork system for forming cast-in-place concrete housing.

• The System also controls the scheduling of the other trades involved in the construction; – steel reinforcement, – mechanical and electrical,– concreting.

Page 4: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

MONOLITHIC CONCRETE HOUSING FORM WORK TECHNOLOGY

• Can be used for any type of housing from; low rise single or double storey housing, to walk-up apartments, to high rise towers.

• Can be used for any income level of housing from low income, to medium income, to luxury condominiums.

Page 5: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Features of the System

• Versatility

• Speed

• Quality

• Durability

• Cost

Page 6: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Versatility

• Architect is not required to change the building layout to suit the Mascon System.

• Capable of forming any type of structural design for any type of housing.

– Column & Beam Design

– Loadbearing Wall Design

Page 7: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Versatility

• The System is unique in that it forms all of the concrete in a building including; – walls– columns – beams– floor slabs– staircases– balconies– window hoods– storage lofts

• No need for bricks, blocks or plastering.

Page 8: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Speed

• Multi-Storey Housing - structures are completed at the rate of four days per floor - regardless of floor size.

• Single or Double Storey Housing - structures are completed at the rate of one house per day.

• To increase the speed of construction, several “sets” of formwork equipment can be provided.

Page 9: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Quality

• Precision in fabricating the Mascon formwork results in accurate and consistent forming of the concrete.

• The quality of the concrete finish is the same regardless of whether the System is used for low cost housing or luxury housing.

Page 10: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Durability of Housing Units

• All concrete (walls, slabs, staircases etc.) are poured monolithically, therefore, there are no construction joints and no problems of leaking joints.

• The result is a rigid reinforced “box” structure that is structurally very durable and very resistant to meteorological and seismic conditions.

Page 11: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Why is this System So Cost Effective?

• Highly reusable formwork.

• Forms all the concrete in a building.

• Unique construction cycling.

• Uses locally available materials - i.e. concrete and reinforcing steel.

• Requires unskilled labour only and no cranes.

• Loadbearing wall structural design.

Page 12: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Internal View of the Aluminum Formwork

Page 13: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK
Page 14: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Low Cost Walk-Up Apartments - India

Page 15: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Entire Four Storey Superstructure Completed in 16 Days

Page 16: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Each Double Storey House Completed at the Rate of One House per Day

Page 17: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK
Page 18: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK
Page 19: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK
Page 20: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK
Page 21: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK
Page 22: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK
Page 23: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK
Page 24: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK
Page 25: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK
Page 26: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK
Page 27: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Rigid & Strong formwork Panels Produce Smooth Off-form Concrete Finish

Page 28: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Square Openings Allow for Easy Fitting of Doors and Windows

Page 29: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Note - Surface Mounting of Electrical to Save on Costs

Page 30: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Electrical, However, is Usually Buried in Concrete with PVC Conduits

Page 31: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

PVC Electrical Conduits for Floor Slabs

Page 32: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Unique Method for Propping of Floor Slab Formwork

Page 33: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Undisturbed Prop Head

Soffit of Floor Slab After Removal of Floor Slab Panels

Page 34: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Forming of Soffit of Staircase

Page 35: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK
Page 36: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

For Low Cost Housing - No Internal Plastering Required - Only Paint

Page 37: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

For Medium to High Cost Housing - A Thin (3mm) Skim Coat of Plaster is Applied Before Painting

Page 38: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

For Low Cost Housing - No External Plastering Required - Only Paint

Page 39: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

No External Plastering Required - Only Spray Applied Finish

Page 40: COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

Mascon Aluminum Forms are HandheldNO Need for Cranes