 Cosmaceuticals Surrey, BC Area: 5,200 m² Project Cost: CDN $2.3M Responsibilities:  Functional/Space Programming  Functional GLP/GMP Layouts  Conceptual Design Cosmaceutical Research’s new facility was designed to manufacture GMP semi-solids and liquids. PharmEng provided equipment planning and GMP compliance expertise to ensure that this plant will meet GMP requirements. Cosmaceutical Research Lab moved into the new state-of- the-art facility in May 2007 with a significant increase in capacity and quality control measures.

Cos Mace Utica Ls

  • Upload
    jocelyn

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Cos Mace Utica Ls

8/18/2019 Cos Mace Utica Ls

http://slidepdf.com/reader/full/cos-mace-utica-ls 1/1

CosmaceuticalsSurrey, BC

Area: 5,200 m²

Project Cost: CDN

$2.3M

Responsibilities:

  Functional/Space

Programming

  Functional

GLP/GMP Layouts  Conceptual Design

Cosmaceutical

Research’s new facility

was designed to

manufacture GMPsemi-solids and liquids.

PharmEng provided

equipment planning and

GMP compliance

expertise to ensure that

this plant will meet GMP

requirements.

Cosmaceutical

Research Lab movedinto the new state-of-

the-art facility in May

2007 with a significant

increase in capacity and

quality control