Page 1: Corp. Profile Pdf 6 23 09

Construction Management Owner/Agent CM

Development Administration General Contracting

Design/Build Contracting

Bayport One 8025 Black Horse Pike, Suite 490

West Atlantic City, NJ 08232 Phone: 609.383.6700 / Fax: 609.383.6706

Bertino & Associates Corporate Profile

Page 2: Corp. Profile Pdf 6 23 09

Introduction

Exceeding Expectations!

INTRODUCTION

Bertino & Associates, Inc. formation is rooted in the foundation of more than 40 years of construction-industry experience. Under the leadership of Michael S. Bertino, President, the company concentrates on improving its clients’ busi-nesses through the management of construction programs for new facilities, renovations, fit-out programs and expansions. Broad in scope, the company’s services include development, construction management and owner/agent project management. Michael S. Bertino is the guiding force behind Bertino & Associates’ personnel. He is committed to affording clients with personal attention and instills this philosophy in each associate. A Registered Professional Engineer, Mr. Bertino has a strong history of orchestrating and completing the most challenging con-struction programs. For 10 years prior to forming Bertino & Associates, he was Principal in charge of Keating Building Corporation’s construction division where he administered more than $300 million in annual construction. As Senior Vice President of Mellon Stuart Company’s Eastern Region, he also ensured success for up to $350 million in annual construction during his 14 year tenure.

Client Focused Services Bertino & Associates is 100% client focused. Our services are flexible in na-ture and respond to specific client and project needs. Our corporate philoso-phy ‘Exceed Expectations’ is the driving force that ensures that we exceed cli-ent goals in each undertaking. Recognizing that every project is unique, we draw upon the technical expertise of our senior associates to formulate an innovative approach that makes projects happen and happen successfully! Perhaps the greatest benefit of Bertino & Associates’ services is the benefit of our early input from an experienced builder’s perspective of approach, plan-ning, concepts, designs, alternatives and proposed solutions, including estab-lishing “realistic” cost based upon our experience with similar projects. Our team is adept at translating architectural and engineering programs into build-ing reality. We instill quality in the total process to ensure completion on-time, and within or under budget. At Bertino & Associates, we know what works well, and we know what has been less than successful. We understand the value that “early teaming” yields to our clients, and the solutions that can be applied to make designs “constructible”. This expertise is brought to the “team planning table” early ensuring that clients receive the most value from start to completion without sacrificing quality and without entering into costly re-design.

Page 3: Corp. Profile Pdf 6 23 09

Introduction

Exceeding Expectations!

INTRODUCTION

PLANNING & PREDEVELOPMENT PHASE

�� Development Pre-Planning

�� Consultant Request for Proposal Preparation and Issuance

�� Consultant Interview & Selection

�� Consultant Contract Negotiations

�� Strategic & Financial Planning

�� Workload Projections

�� Regulatory Planning

PROGRAMMING PHASE

�� Project Program Development

�� Site Utilization/Evaluation

�� Logistics Planning

�� Scheme Estimating

�� Construction Evaluation

�� Scheduling/Phasing Evaluation

�� Professional Consultation

�� Cost & Financial Justification

PRECONSTRUCTION PHASE

�� Budget/Estimating Control

�� Construction Pre-Planning

�� Early-Start Construction Evaluation

�� Constructability Evaluation

�� Value Engineering

�� Life-Cycle Costing

�� Scheduling, Planning & Phasing

�� Cash Flow Projections

�� Competitive Bidding/Evaluation

�� Equipment Coordination/FF&E/

�� Purchasing & Coordination

�� Coordination of FF&E & Purchasing

CONSTRUCTION PHASE

�� Construction Oversight &

Administration

�� Early Start Construction

�� Cost Control

�� Contraction Coordination

�� Scheduling/Phasing

�� Quality Control

�� Coordination/FF&E Installations

�� Systems Start-Up Administration

�� Final Close-Out Administration

�� Warranty Administration

�� Occupancy Coordination

�� Dispute Resolution

�� Post-Construction Follow-Up

Outline Scope of Services

Bertino & Associates clients include Corporate, Native American, and Private and Public Agencies. Based upon their needs, we tailor our services to in-clude any combination or all the following:

Page 4: Corp. Profile Pdf 6 23 09

Introduction

Exceeding Expectations!

INTRODUCTION Planning for all things that make projects happen is a critical ingredient in our approach. In evaluating projects, we draw from our staff and associates’ expertise to provide a base of services that is all encompassing for a smooth planning, programming, preconstruction and construction process.

Leading the Team to Success Bertino & Associates, as Program Manager, puts the entire project team into active roles within a fully integrated planning, design and construction proc-ess. Combining hands-on experience with practical solutions, we achieve success. We understand approvals and compliance concerns, budget restric-tions, schedule parameters, FF&E purchasing, tenant fit-out and occupancy requirements. We also know that the qualifications of the personnel as-signed are critical to the successful execution of the work, and we know how to structure the project team to ensure that resources are maxi-mized to potential. Equally important, we know that a successful project is a project com-pleted without claims. Towards that end, we ensure that the early up-front planning is a total and comprehensive team effort. This approach goes a long way in minimizing change orders in construction, and also in ensuring that the documents are as complete and thorough as possi-ble to minimize the potential for conflicts. Aiding our staff in the administration of the work, we apply a variety of computer based applications using Suretrak and Primavera for scheduling; Expedition and Pro Log for documentation, tracking, project controls and communications; estimating software and spreadsheet applications for cost-ing and budgeting; AutoCAD for document review; as well as software for word processing, layout, data management and accounting. All of these components are incorporated into the extensive planning that we apply in our projects. From start through completion, Bertino & Associates’ goal is to achieve suc-cess and exceed expectations in teaming, quality, schedule, budget and total client satisfaction. And in this process, we foster long-term friendships and working relationships with our clients, architects, and the total project team!

With�an�eye�focused�

on�“most�value�for�

dollars�expended”�we�

apply�a�“total�team�

approach”�to�ensure�

that�all�components�

are�done�right…�

the�first�time

Page 5: Corp. Profile Pdf 6 23 09

Exceeding Expectations!

PROJECT

EXPERIENCE

Bertino & Associates

Enjoying many successful projects, our associates have been able to develop long term relationships throughout the construction industry with owners, de-velopers, architects, consultants, subcontractors, vendors and suppliers. Ber-tino & Associates’ staff have completed projects of varied sizes, scope and complexity. We have actively participated in master planning, development and design administration, new construction, renovations and expansions, interior fit-out, FF&E purchasing and coordination, and in infrastructure to sup-port these facilities such as central boiler, chiller plants and parking garages. Bertino & Associates’ ongoing and daily activity in the development and con-struction marketplace affords our team the advantages of a complete under-standing of how to guide projects through the extensive approvals and permit-ting process to avoid delays. We know Planning & Zoning Boards’ expecta-tions; we understand the local and State approval processes and require-ments; and we know how to expedite the Building Permit process. Working continuously with these agencies through our daily work, we know what to ex-pect and the timing required, and we apply this knowledge to “expedite” the process. Similarly, our construction management expertise and working rela-tionships with contractors and vendors that serve the construction industry, allow us to repeatedly deliver high-quality projects on time and within budget. Illustrating the depth of experience of the Bertino & Associates team, the fol-lowing projects are high lighted:

Page 6: Corp. Profile Pdf 6 23 09

Representative

OFFICE

Projects

The Mid-Town Office Bldg. Core & Shell Fit-Out / 60,000 s.f. Tenant Fit-Out / 50,000 s.f. Centurian Plaza 140,000 s.f. Class “A”Office Space with 520 car parking Hewlett Packard Company 360,000 s.f. Divisional Headquarters with Research, Development & Manufacturing Facilities CONRAIL Headquarters 752,000 s,.f. 28-Story Corporate Fit-Out IBM Corporation 1,200,000 s.f. Divisional Headquarters Campus Chase Manhattan Bank 200,000 s.f. Corporate Office & Computer Operations Center Commerce Square 650,000 s.f., 21-Stories Multi-Tenant Fit-Out Independence Blue Cross 800,000 s.f. 27-Story Base Building and Tenant Fit-Up Keystone Mercy Health Plan 100,000 s.f. Class “A” Office Fit-Out One First Avenue 4 Story Multi-Tenant Fit-Out 100 East Elm Street 4 Story Multi-Tenant Fit-Out Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart.

CORPORATE OFFICE

Exceeding Expectations!

Page 7: Corp. Profile Pdf 6 23 09

Millennium Assisted Living 160 Units of Assisted Living Elderly Housing McClay Street Low-Income Housing Phases I and II 650 Units Low-Income Family Housing Renovo Borough Housing 65 Units Low-Income Family Housing Frostburg Heights Apartments 5-Story, Apartment Complex Villa Saint Catherine 116-Bed Skilled Nursing Facility & Secular Retirement Community Bahia Vista 146 Unit Hotel & Condominium University Center at Easton Avenue—Rutgers 630 Student Apartments 960-Car Parking Garage Deptford Park II 102 Apartment Units of Senior Housing with 15,500 sf Administrative Center Tre Sorelle 24 Luxury Condominiums Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart.

Exceeding Expectations!

HOUSING

Representative

Projects

Page 8: Corp. Profile Pdf 6 23 09

Standy Electric Generating Facility A 16 MW at 4160V de signed for future expansion. Unique design for noise, emis-sions, special structures, & rapid start. Bally’s Park Place Overbuild $22 Million Pop-Lloyd Avenue-Overbuild joining Claridge & Bally’s Casinos. Bally’s Park Place 500-Car Parking Garage & Transportation Depot Air Hub Distribution Center 1,000,000 s.f./212 Acre Site Regional Air Hub, Vehicle Main-tenance, Pkg. Distribution Facilities and Roadways AstraZeneca U.S. Business Center 2,050 Car Parking Garage Hahnemann Hospital Park-ing Garage 13-Story Parking Garage 830 Cars Central Boiler/Chiller Plant City of Philadelphia 6,000 Ton Gas-Fired Central Boiler/Chiller Plant Steam Generation Plant Building 7 Powerhouse Expansion Merck-West Point Campus Keystone Health Systems 923-Car Parking Garage Envirotest Systems, Inc. Multi-State Program for Construction of 186 Emissions Testing Centers Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart.

Representative

Projects

Exceeding

Expectations!

INFRASTRUCTURE

Page 9: Corp. Profile Pdf 6 23 09

Strawberry Square Harrisburg, PA 1,000,000 s.f. Mixed-Use State Office, Retail And Parking City Government Center New Brunswick, NJ 150,000 s.f. Expansion and Public Safety Bldg. Renovations Criminal Justice Center Philadelphia, PA 582,000 s.f. New Judicial Center with 64 Courtrooms Municipal Services Building Philadelphia, PA 486,000 s.f., 20-Story Base Build-ing Renovs. w/Interior Fit-Out State of Ohio VEIP 22 New Emissions Testing Station, 9 Renovations and 2 Technical Training Centers Maximum Security Prison 2,000 Bed Maximum Security Correctional Complex Lackawanna County Prison Scranton, PA 596 Beds, 164,000 s.f. Expansion and Renovations State of Pennsylvania VEIP 82 New Emission Testing Facilities throughout the state of PA Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart.

Exceeding Expectations!

PUBLIC

Representative

Projects

Page 10: Corp. Profile Pdf 6 23 09

University Center at Easton Rutgers University 630 Student Apartments 960 car parking garage Sandby Generator Facility Temple University 16 mega watt/4160 volt facility Capagle of supplying electric To total campus Student Dormitory Lycoming College 120 student dormitory Food Service Building Penn State University New Creamery, Research and Classroom Forest Resources Building Penn State University New Research and Classroom Building Multipurpose Health Science Center Temple University New Research and Classroom Building Fine Auto Center Rutgers University Center for Performing Arts, Audio and Visual Student Housing University of Rhode Island 800 Student dormitory complex Consisting of 4 student suites Payne Whitney Gymnasium Renovation Yale University Athletic Renovations and install-ation of squash courts Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart.

Exceeding Expectations!

EDUCATIONAL

Representative

Projects

Page 11: Corp. Profile Pdf 6 23 09

Allied Domecq 20-Site, Retail Turn-Key Devel- opment and Build Program Deptford Crossing Center 200,000 s.f. Strip Retail Center/4 Anchors International Retail Center 75,000 s.f. Concourse B/C Airport Retail Center Tropicana Hotel & Casino 3 new restaurants Asian and baccarat gaming lounges Isle of Capri Casinos 5 Faradday’s Signature Restaur-ants Sun International Asian Gourmet Restaurant New Bistro Restaurant 24 hour delicatessen The Chelsea Hotel Chelsea Prime Steakhouse Teplistsky’s Restaurant Foxwoods Resort & Casino 4 Retail Fit-Out locations David Burke Steakhouse/Burke In Box Restaurants Bar/Lounge Fit-Out Turning Stone Resort & Casino Wild Flowers Restaurant Radizzio Brazilian Steak House Festival Harvest Buffet Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart.

Exceeding Expectations!

RESTAURANT / RETAIL

Representative

Projects

Page 12: Corp. Profile Pdf 6 23 09

Tropicana Casino & Hotel 21-Story, 600 Rm. Hotel High-Roller Super Suites Baccarat Gaming Lounge Asian Gaming Lounge Simulcast Gaming Three New Restaurants Bally’s Wild Wild West Casino 210,000 sf Casino w/ 3,600 Gam-ing Positions Sun International 600,000 s.f. Resorts Casino Renovations 500-Rm Hotel Modernization Asian Gourmet Restaurant New Bistro Restaurant 24-Hour Delicatessen The Chelsea Hotel 317 Room Boutique Hotel And Spa Caesar’s Transportation Center 3,500 Car Transportation Center w/Connection Bridge Isle of Capri Casinos Riverboat Casino, Tunica 320 Rm Suites Hotel, Bossier Inn at the Isle Hotel, Biloxi 100 Rm Suites Hotel, Vicksburg 250 Rm Inn Hotel, Lake Charles Five Farraddays Signature Restaurants Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart.

Exceeding Expectations!

HOSPITALITY

Representative

Projects

Page 13: Corp. Profile Pdf 6 23 09

Turning Stone Resort Casino 287 Room 19 Story Hotel 98 Room Luxury Suite Hotel 5,000 seat Event Center Winter Garden Power Plant Bally’s Park Place Casino & Hotel 808-Room Guest Hotel Bus Transportation Ctr. Bally’s Claridge Connector 500-Car Garage Foxwoods Resort Casino 818 Room Hotel 4,000 Seat Theater 50,000 s.f. Ballroom 25,000 s.f. Meeting Room 50,000 s.f. Casino 2,900 Parking Garage Magic City Casino 2,500 Slot & Poker Parlor Miami, Florida Monticello Raceway Casino Renovation of Racetrack and 1,800 Position Slot Machines The D.C. Capital Hilton Hotel 1,200 Room Luxury Hotel Renovation Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart.

Exceeding Expectations!

HOSPITALITY

Representative

Projects

Page 14: Corp. Profile Pdf 6 23 09

Scope of Services

Exceeding Expectations!

SCOPE OF SERVICES

OVERVIEW

Bertino & Associates specializes in providing Program and Development Management Services, as well as Construction Management Services and general construction. These services have been formulated to represent and protect the Owner’s interests from inception to final completion. Our interest lies in providing the highest level of professional services that ensure that the project is planned, designed, coordinated and constructed to meet the project’s objectives for program, quality, budget and operation. Bertino & Associates’ staff of senior professionals is, in fact, an extension of an Owner’s project staff. Each member of our staff is highly experienced in the development and construction of major sized projects, especially projects in the Hospitality and Gaming Industry. We are able to provide the manage-ment leadership, technical expertise, and relentless protection of the Owner’s interests throughout all phases of the project. Bertino & Associates will prepare trade subcontractor bid packages for solici-tation of bid proposals. These packages are based on the specific require-ments of the project. Upon receipt of responsible proposals, Bertino & Asso-ciates will renew the proposals, and as necessary, interview individual trade contractor to clarify scope, inclusions and exclusions. During the Planning Phase, our experience with similar projects will enhance the Design Team and Owner in the establishment of program and budget, phase development strategy, timeframe scheduling and operational planning and quality assistance in the development of a financing package and strat-egy. Budget and Schedule Control will continue throughout the Design and Pre-construction Phase. During this phase, we will develop and implement a con-tracting strategy that utilizes pre-qualified contractors, while taking full ad-vantage of the competitive marketplace. Through our staff’s 40 plus years experience in the construction industry, bidding documents will be prepared with an eye towards minimizing changes and potential claims. Prior to bidding, all contract documents and drawings will be reviewed for constructability and completeness. Incorporated within the documents will be a master schedule for timely start and completion of each phase of the project. Throughout the Construction Phase, our onsite professional staff will monitor and manage the construction contractors and consultants. In this process we will review and approve Applications for Payment, Change Orders, Project Schedules, and required Submittals. Our staff will conduct weekly Owner/Contractor/Architect meetings with a focus on coordination and prob-lem resolution.

Page 15: Corp. Profile Pdf 6 23 09

Scope of Services

Exceeding Expectations!

SCOPE OF SERVICES

During the construction phase, in concert with the Owner’s Facilities Manage-ment Group, we will develop and implement a training and operational pro-gram to ensure that the facility will be properly operated once placed into ser-vice. As the project approaches completion, our onsite staff will provide complete closeout services including the management of punch list completion, and assembly and turnover of all closeout documents.

�� Consultant Selection/Contracting: Assist the Owner and Development

Team in identifying the special consultants that may be required. Pre-pare documents for the consultant/contracting solicitation process, as-sist in the evaluation of proposals and negotiations, and assist in the preparation of the contract agreement(s).

�� Project Budgets/Proforma: Assist the Owner in the formulation of an

overall project budget and Proforma. Develop a tracking and reporting system designed to monitor and report on the total project budget throughout the duration of the project. Provide cash flow projections of anticipated expenditures.

�� Program Development: Provide technical assistance to the Owner and the Design Team in the formulation of the overall Program. Provide com-parisons of the program to comparable facilities. As appropriate, make recommendations for program changes. Coordinate meetings between the Design Team and operations/maintenance staff for the purpose of program review and coordination of team input.

�� Design Concepts/Site Planning: Provide technical assistance to the

Owner and Design Team for the review of design concepts and overall site planning. Compare design concepts to the program requirements. As appropriate, provide recommendations for ensuring the best utiliza-tion of the site for current and future development; development of a cost-effective design; ensuring that quality expectations are met; and that the anticipated construction schedule can be achieved. Prepare cost comparisons of each design concept.

�� Agency Approvals: Assist the Owner and the Design Team in obtaining all

necessary agency approvals. Monitor and report on the progress of each approval process.

�� Master Project Schedule: Prepare an overall Master Project Schedule

that incorporates all major activities required during Planning, Precon-struction and Construction. Update the Master Project Schedule on a regular basis.

�� Job Progress Meetings: On a regular basis, schedule, coordinate and

attend Progress Meetings between the Owner, the Development Team and the Design Team.

PLANNING PHASE SERVICES

Page 16: Corp. Profile Pdf 6 23 09

Scope of Services

Exceeding Expectations!

SCOPE OF SERVICES

�� Financial Assistance: Provide to the Financing Team any required budg-ets, cash flow projections, schedules, and phases that may be necessary for completion of a financial package.

�� Other Technical Assistance: Provide or secure any other technical assis-

tance the Owner may require to ensure the formulation of a Master Pro-ject that will meet the anticipated expectations and provide the required financial return.

�� Reporting:: Provide the Owner monthly progress reports incorporating all

aspects of the Planning Phase. • Design Consultant Selection/Contracting: Assist the Owner and the De-

sign Team in the solicitation and selection process, as well as negotiation and contracting of required special consultants. Assist in the preparation of contract agreements for each consultant.

�� Project Budget:: Continue the tracking and reporting of the overall project

budget, and incorporate all contracted costs into the reporting of the Pro-ject Budget. Provide cash flow projections of anticipated expenditures. If any portion of the budget is not met, make recommendations for actions required to be implemented for budget adherence.

�� Design Review & Coordination Meetings: On a regular basis, schedule,

coordinate and attend Design Review and Coordination Meetings. Provide technical assistance to the Design Team and the Owner regarding con-structability, cost-effective design, value engineering, systems selections and phasing/scheduling issues. Conduct a full review at completion of the schematic and design development stages and at issuance of each bid package.

�� Contractor Selection: In consultation with the Design Team, prepare a

solicitation package for construction services with an either stipulated Guaranteed Maximum Price (GMP) or a Lump Sum. The solicitation proc-ess will include the prequalification of invited Contractors and Subcontrac-tors, and issuance of a design package for preparation of bids, which bid packages will include front end documents and scope of work, design documents, outline technical and quality performance specifications, a matrix of Owner/Contractor FF&E responsibilities, necessary allowances, and construction schedule completion requirements. Upon receipt of pro-posals, Bertino & Associates will conduct Contractor interviews for clarifi-cation, evaluation and determination of the completeness of submissions. Following interviews, if necessary, addenda may be issued for re-pricing and submission of revised proposals. Bertino & Associates in consultation with the Owner and Design Team will negotiate the final contract.

�� Contractor Coordination: Upon selection, the Contractor and/or Trade

Contractors will join the preconstruction team to provide input into the de-sign for constructability, coordination of bid packages, design adherence to the agreed upon GMP (or Lump Sum) basis of design, and value engi-neering input.

DESIGN & PRECONSTRUCTION PHASE SERVICES

Page 17: Corp. Profile Pdf 6 23 09

Scope of Services

Exceeding Expectations!

SCOPE OF SERVICES

�� Subcontractor Bidding: If the Contractor and Subcontractors provides a

GMP based upon incomplete design documents (i.e., an early-start ap-proach), Bertino & Associates will oversee the subcontractor bidding phase to ensure that the process is conducted in the best interest of the Owner and the project. Bertino & Associates will review bidders’ lists, participate in the review of bids received including post-bid interviews, and evaluate the Contractor’s recommendations for subcontractor awards.

�� Owner Furnished Furniture, Fixtures & Equipment (FF&E): In consulta-

tion with the appropriate consultants, including an FF&E Purchasing Agent as may be required, Bertino & Associates will assist in the prepara-tion of bidder solicitation packages and contracting for all Owner-furnished FF&E for the project. The Purchasing Agent’s solicitation proc-ess will include a prequalification of bidders, issuance of bid packages, receipt and evaluation of bids, post-bid interviews and negotiations, and preparation of contracts and purchase orders. Upon award, coordinate deliveries and installations with the work of the Contractor. Bertino & Associates will review and approve all awards and invoices. Bertino & Associates has the in-house capabilities of providing Purchasing Agent Services.

�� Invoice Review & Approval: Bertino & Associates will review and ap-

prove all consultant and contractor invoices for payment that will be sub-mitted to the Owner for payment. During the Preconstruction Phase, Ber-tino & Associates will establish cash flow projections for all work to be performed.

�� Preconstruction & Construction CPM Schedule: Review and monitor

the schedules prepared by the Contractor or individual subcontractors. Whenever activities deviate from the required schedule dates and dura-tions, recommend appropriate action to be taken to get activities back on schedule. Coordinate all Owner action and activities to ensure that the Owner required decisions or actions are made in a timely manner to avoid delaying the project.

�� Reporting: Provide to the Owner a monthly progress report incorporating

all aspects of the Design and Preconstruction Phase.

�� Construction Oversight: Establish a Field Management Office and pro-vide on-site staff to monitor, report and deliver technical assistance to the Owner on all aspects of the construction process including manage-ment of subcontractors and associated field staff.

�� Budget Control: Establish a construction budget reporting system that

incorporates a detailed schedule of values of the construction contract, subcontract awards and invoices, purchase orders by the Contractor, general conditions, consultant costs, soft costs and other related project costs. Report to the Owner on a regular basis regarding the status of the project budget and make recommendations where necessary to ensure that the overall project budget is maintained.

CONSTRUCTION PHASE SERVICES

Page 18: Corp. Profile Pdf 6 23 09

Scope of Services

Exceeding Expectations!

SCOPE OF SERVICES

�� Quality Control: Establish a project Quality Control Testing and Inspec-

tion Program utilizing Independent Testing and Inspection Agencies. Included will be a daily reporting and notification of inspections and tests, a deficiency correction and follow up procedure and preconstruc-tion conferences and mock-ups.

�� Change Order Procedures & Control: Bertino & Associates will estab-

lish a change order procedure which will be administered on the project for review and processing all change orders. We will make recommen-dations to the Owner for appropriate actions to be taken, and ensure that change orders are in keeping with the terms and conditions of the construction contracts. All change orders will be incorporated into the tracking and project budget reporting systems.

�� Job Progress Meetings: On a weekly basis, schedule, coordinate and

attend Progress Meetings between the Contractor and the Design Team.

�� Construction Schedule Reporting: Monitor the CPM construction

schedule prepared by the Contractor. Conduct regularly scheduled re-views and update sessions. Make recommendations whenever activity schedule dates are not being met and regularly report schedule pro-gress to the Owner. Whenever critical activities fail to meet the re-quired schedule dates, conduct schedule recovery sessions with the Contractor. Document all progress and issue appropriate notices to the Contractor when critical dates are not being met.

�� Construction Invoice Review: Review and make recommendations for

approval and payment of all construction invoices from the Contractors, Vendors and Consultants. Field verifies percentages complete and en-sure all required invoices are substantiated with proper back-up docu-mentation. Provide a cash flow projection for monthly requisitions along with a summary total Project Cost Report.

�� Owner-Furnished Furniture, Fixtures & Equipment (FF&E): Establish a

tracking procedure for the administration of the ordering, delivery, stor-age and installation of all Owner-furnished FF&E. Coordinate receipt of all Owner-furnished/Contractor-installed FF&E with the Contractor to ensure timely delivery, proper receipt, storage and installation. Coordi-nate the Owner’s direct-vendors with the Contractor. Verify receipt of all materials and work completed.

�� Claims Prevention & Resolution: Establish a claims prevention and

resolution procedure for the resolution of disputes on a continuing ba-sis. As part of this process, instill a partnering approach by the project team for the review of bid documents for completeness; prequalifica-tion of bidders; review of required bonds and insurance; and timely is-suance, response, discussion and reporting of any unresolved disputes with recommendations for actions to be taken.

Page 19: Corp. Profile Pdf 6 23 09

Scope of Services

Exceeding Expectations!

SCOPE OF SERVICES

When a claim is submitted, Bertino & Associates will thoroughly investi-

gate the merits of the claim, solicit input from the appropriate Consult-ants or other parties, and report to the Owner with appropriate action to be taken. When authorized by the Owner, conduct settlement negotia-tions and final resolution. If a claim cannot be settled, the Owner will initiate the claims resolution procedures of the contract with Bertino & Associates' full cooperation and support of such claims resolution ac-tions.

�� Start-Up & Testing: In conjunction with the Contractor and the Owner’s

facility operations and maintenance staff, Bertino & Associates will schedule, monitor and report on all start-up and testing of equipment and systems. Where independent testing is required, schedule, monitor and report such testing as performed by testing agencies and consult-ants.

�� Punch list & Close-Out Documentation: When the project or a portion

of the project has been substantially completed, schedule punch list visits by the Design Consultants. Upon receipt of punch list, establish a procedure and schedule for completion by the contractor. Monitor and verify completion of each punch list item.

As part of the closeout documentation process, schedule all operation and maintenance training sessions, and coordinate the receipt of all as-built drawings, operations manuals, shop drawing files, warranties and final releases of liens and invoices.

Assist the Owner operations/maintenance staff in establishing a library of all maintenance documentation. Where appropriate, assist the Owner in the solicitation and negotiation of outside maintenance contracts.

• Reporting: Provide the Owner a monthly progress report incorporating

all aspects of the Construction Phase. At the completion of the project, Bertino & Associates will turn over all files and construction documents for the Owner’s archives