Construction Site – current Google Maps View. Construction Site today. 4. FAIR @ Darmstadt. Construction in Modules. Nuclear Structure & Astrophysics (Rare-isotope beams). Hadron Physics (Stored and cooled 14 GeV/c anti-protons). SIS18. p-Linac. SIS100 /300. UNILAC. - PowerPoint PPT Presentation

Citation preview

Titel Untertitel

4Construction Site todayConstruction Site current Google Maps View1Short Status of FAIR for NuPECC /KPFAIR @ DarmstadtShort Status of FAIR for NuPECC /KPDense Bulk Plasmas (Ion-beam bunch compression& petawatt-laser)Materials Science & Radiation Biology (Ion & antiproton beams)Accelerator Physics

UNILACSIS18SIS100/300p-LinacHESRCR &RESRNESRCryringRare-IsotopeProduction TargetAnti-ProtonProduction Target100 mQCD-Phase Diagram(HI beams 2 to 45 GeV/u)Hadron Physics (Stored and cooled14 GeV/c anti-protons)Nuclear Structure & Astrophysics(Rare-isotope beams)Fundamental Symmetries& Ultra-High EM Fields(Antiprotons & highly stripped ions)Module 3:High-energy p(p-linac, p, CR,HESR)Module 2:Super-FRSModule 1:Experimental areasModule 0:SIS100 and connection to existing accelerators2Construction in Modules

PANDA

NuSTARSuper-FRS

FAIR ExperimentsShort Status of FAIR for NuPECC /KPAPPA3in all 4 scientific core activities

CBM15.03.143Planning Activities

4Short Status of FAIR for NuPECC /KP

Civil EngineeringNewBeamline: 3.2 km thereofSyncrotron: 1.1 kmExisting: SIS 18600.000 cbm > 1 Mio tons of concrete 35.000 tons of steel5Short Status of FAIR for NuPECC /KPstatus of piling works6

piling to date: well ahead of schedule

goal: finished before Q III/2014

Klaus Peters - Exotics at PANDA6Short Status of FAIR for NuPECC /KP