Construction Mark Scheme L/O: To gain confidence in your understanding of the construction mark scheme & To be able to peer assess your peers coursework by assessing each of the assessment objectives and assigning an overall level/mark/grade

Construction mark scheme

Embed Size (px)

Citation preview

Page 1: Construction mark scheme

Construction Mark Scheme

L/O: 

To gain confidence in your understanding of the construction mark scheme

 & 

To be able to peer assess your peers coursework by assessing each of the assessment objectives and 

assigning an overall level/mark/grade

Page 2: Construction mark scheme

Purpose of lesson

• Why do you think it’s important to have this lesson?

• Why is peer assessment important?

Page 3: Construction mark scheme

Purpose of lesson

• 1) to become more confident in mark scheme

• 2) respond to audience feedback

Page 4: Construction mark scheme

You will need…..

• Black/blue pen• Green pen

• Folder on desk

Page 5: Construction mark scheme

Construction is assessing your

F_____________     &      E___________

Page 6: Construction mark scheme

Construction is assessing your

Filming     &      Editing

The construction mark scheme has ASSESSMENT OBJECTIVES, which are all the technical features you are being marked on.

Page 7: Construction mark scheme

Rate your confidence in construction mark scheme

1 2 3 4 5 6 7 8 9 10

Low High

Page 8: Construction mark scheme

Quiz – page 1

All must fill in the blanks

Each of you have different papers:

1) Choose from word bank

2)  Letter to give hint

3) No hints/clues

3-4 mins

Page 9: Construction mark scheme

Quiz – page 1

SELF ASSESS IN GREEN PEN

Page 10: Construction mark scheme

Quiz – page 2Find the corresponding  definition to the assessment objective

Write the matching letter 

7-8 mins

Page 11: Construction mark scheme

Quiz – page 2

SELF ASSESS IN GREEN PEN

Page 12: Construction mark scheme

Quiz – page 3

Write the marks for each level

Write grade equivalent

Use the percentages to help you

1-2 mins

Page 13: Construction mark scheme

Quiz – page 3

SELF ASSESS IN GREEN PEN

Page 14: Construction mark scheme

Rate your confidence in construction mark scheme

1 2 3 4 5 6 7 8 9 10

Low High

Has your confidence improved?

Page 15: Construction mark scheme

The Task….

Peer assess each other’s videos

Page 16: Construction mark scheme

Peer Assessment Form

Mark each assessment objective with a sublevel

Choose 1 level

Give each person a -level-mark-%-subgrade

WWW comments

Targets how to improve

Page 17: Construction mark scheme

Learning Objectives

RED AMBER GREENAble to peer assess your peers coursework by setting levels for each assessment objective and overall level/mark/grade

Also, be able to comment on successful features (WWW) in line with the assessment objectives

Also, be able to set appropriate targets  (EBI) of how the group could improve in line with the assessment objectives

To gain confidence in your understanding of the construction mark scheme

&

To be able to peer assess your peers coursework by assessing each of the assessment objectives 

and assigning an overall level/mark/grade

Page 18: Construction mark scheme

Before you assess…….

• Remember Tuesday’s lesson

• Remember what Level 1, 2, 3, 4 looks like!

Page 19: Construction mark scheme

Who is marking who?

Group 1 Group 2 Group 3

Assessing….

Group 2

Assessing….

Group 3

Assessing….

Group 1

Complete as group but you’ve got your OWN targets.

You don’t have to agree on sublevels/marks etc.

20 mins

Page 20: Construction mark scheme

Plenary

____ I did not meet any of my targets and therefore made very little progress _____ I met some of my targets and therefore some progress _____ I met most of my targets and therefore made great progress _____ I exceeded my targets and therefore made outstanding progress

10 mins

Page 21: Construction mark scheme

Rate your confidence in construction mark scheme

1 2 3 4 5 6 7 8 9 10

Low High

Page 22: Construction mark scheme

Progress Made?

Targets not met

No progress

Some targets

Some progress

Met targets

Great progress

Exceeded targets

Outstanding progress

Page 23: Construction mark scheme

Group MarksGroup 1 Group 2 Group 3

-  2B  Producing an effective opening sequence --  1/2   using titles appropriately-  1/2   using sound with images-  1/2  editing appropriately -  2B   shooting material appropriate -  2C   controlled use of the camera,-  2B   attention to framing,-  2C    variety of shot distance-  1/2    close attention to mise-en-scene;-  1/2   using editing so that meaning is apparent to the viewer-  2B   use of shot transitions-  2C   use of other effects.

-  2B  Producing an effective opening sequence --  1/2   using titles appropriately-  2C   using sound with images-  2B  editing appropriately -  2B   shooting material appropriate -  2/3   controlled use of the camera,-  2A   attention to framing,-  2A    variety of shot distance-  2B    close attention to mise-en-scene;-  2B   using editing so that meaning is apparent to the viewer-  2C   use of shot transitions-  2C   use of other effects.

-  2A  Producing an effective opening sequence --  2A   using titles appropriately-  2B   using sound with images-  2A  editing appropriately -  2/3   shooting material appropriate -  2/3   controlled use of the camera,-  2A   attention to framing,-  2A    variety of shot distance-  2/3   close attention to mise-en-scene;-  2A   using editing so that meaning is apparent to the viewer-  2B   use of shot transitions-  2B   use of other effects.

Level:    2C

Mark:    24 /60

Grade:    E3

Level:    2C/2B

Mark:    27 /60

Grade:    E2   

Level:    2B/2A

Mark:    32 /60

Grade:    D3   

Page 24: Construction mark scheme

Accurate marking?

Not even close Nearly there… Pretty Close! Spot on!