Conrail & GIS
Conrail presented both track investment opportunities and decisions as a maps from the beginning.
Conrail undertook a GPS project to map all mainlines as a basis for accurately monitoring rail wear and defect occurrences.
Conrail used dispatching data to accurately track tonnage by track.
Conrail began developing a GIS as a part of the rehabilitation planning process in 1977.
Database driven maintenance books replaced hand drawn graphicsIn the late ’70’s as a byproduct of intense investment analysis.
Conrail is a terminal and switching railroad.
Conrail is a wholly owned subsidiary of Norfolk Southern and CSX
Conrail operates in North Jersey, South Jersey / Southeastern Pennsylvania and Southeastern Michigan
Conrail is not the same railroad formed by congress in 1976.
The new organization is much smaller and has very different needs.
Yards and terminal areas are the majority of Conrails operations
No historic yardstick by which to measure or manage.
Conrail today is 8600 acres of land, ~1200 employees and ~route miles.
One foot aerials were used to register CAD based property maps.
Aerial View of Conrail property in Sterling, Michigan
E-8
A Property usage book was created by intersection of a land usage map
and Conrail polygons.
One time and recurring cost make application of the technology possible
◆Cost of GPS Unit - $500 ◆ Recurring monthly cost$40/month or $480 Annually
Trimble GPS Device
We used ARCMap to analyze feasability data.
Crew Report provides line supervision with information to evaluate workload, efficiency and customer service
CONRAIL CREW REPORTCrew: FD11 for 2009/03/27
Crew:M.GREENWELL Conductor On Duty Time : 06:30 AM
B.MCBAIN Engineer Off Duty Time : 11:08 AMS.BRENAMEN Engineer Trainee Total Time on Duty: 04:38
Locomotives:** CSX 6129 First Movement: 07:37 AM Origin Idle Time :01:07
Last Movement: 10:53 AM Destination Idle Time :00:15Total Time : 03:16 Origin/Dest Idle Time :01:22
Time Moving: 01:38 Total Miles Traveled :6.4Stopped: 01:38 Average Speed :3.9 MPH
Locomotive Speed (MPH) Distribution in Minutes0 : 122 62.2% 1- 4.9: 27 13.8% 5- 9.9: 47 24.0% 10-14.9: 0 0.0%
15-19.9: 0 0.0% 20-24.9: 0 0.0% 25-29.9: 0 0.0% 30+ : 0 0.0% Min Min
Moved Miles Speed Locomotive Stops Stop Location22 0.9 2.5 07:59 AM - 08:01 AM 2 Sterling Heights MI 9 0.5 3.3 08:10 AM - 09:46 AM 96 Sterling Heights MI
AEI Reads: Date/Time Cars EnginesWARREN 0327 0956 AM 3 1 WARREN 0327 1041 AM 20 4
Work Performed:Customer Reported Time Placed Pulled Total In Gate Out Gate Total Time
Min/CarCHRSTESTA 03/27 0945 AM 0 5 5 00:00 00:00 00:00 0.0 CHRSTESTA 03/27 1010 AM 6 0 6 00:00 00:00 00:00 0.0
Total 6 5 11
Daily Crew Mobility Report - South Jersey
SJ MILLVILLE FP14 01/27 05:00 10:41 2:16 1:14 0:47 4:17 21.2% 11.5% 7.3% 40.1% 6:24 59.9% 4429 2 2 7 4 11 19
SJ MILLVILLE 1 10:41 2:16 1:14 0:47 4:17 21.2% 11.5% 7.3% 40.1% 6:24 59.9% 2 2 7 11SJ MORRISVIL FP12 01/27 09:00 2:25 0:09 0:46 0:23 1:18 6.2% 31.7% 15.9% 53.8% 1:07 46.2% 2106 1 1 7 2 7 9SJ MORRISVIL FP23 01/27 15:00 7:58 0:31 2:53 0:11 3:35 6.5% 36.2% 2.3% 45.0% 4:23 55.0% 5280 3 3 16 1 11 53SJ MORRISVIL FP62 01/27 07:30 8:00 1:22 0:24 3:09 4:55 17.1% 5.0% 39.4% 61.5% 3:05 38.5% 5282 2 2 4 3 6 7
SJ MORRISVIL 3 6:08 0:41 1:21 1:14 3:16 11.1% 22.0% 20.2% 53.3% 2:52 46.7% 6 6 27 10SJ PAVONIA FC03 01/27 08:00 4:57 0:35 0:35 2:02 3:12 11.8% 11.8% 41.1% 64.6% 1:45 35.4% 8973 2 2 5 1 8 11SJ PAVONIA FC09 01/27 06:30 5:15 0:51 0:47 0:50 2:28 16.2% 14.9% 15.9% 47.0% 2:47 53.0% 5223 2 2 5 1 10 23SJ PAVONIA FC27 01/27 15:30 5:55 0:58 0:28 2:17 3:43 16.3% 7.9% 38.6% 62.8% 2:12 37.2% 1704 2 1 2 6 14 22SJ PAVONIA FC42 01/27 03:00 12:19 0:09 3:56 0:29 4:34 1.2% 31.9% 3.9% 37.1% 7:45 62.9% 1704 2 1 15 1 16 51SJ PAVONIA FC44 01/27 22:30 10:46 3:43 3:00 2:07 8:50 34.5% 27.9% 19.7% 82.0% 1:56 18.0% 2810 6 2 7 6 26 98
SJ PAVONIA 5 7:50 1:15 1:45 1:33 4:33 16.0% 22.4% 19.8% 58.1% 3:17 41.9% 14 8 34 16SJ PHIFRAJCT FP42 01/27 22:30 4:12 0:41 1:36 0:08 2:25 16.3% 38.1% 3.2% 57.5% 1:47 42.5% 1537 2 2 7 3 14 30SJ PHIFRAJCT FP60 01/27 15:00 6:42 2:00 1:16 0:11 3:27 29.9% 18.9% 2.7% 51.5% 3:15 48.5% 1127 3 2 7 7 11 15
SJ PHIFRAJCT 2 5:27 1:20 1:26 0:10 2:56 24.6% 26.3% 2.9% 53.8% 2:31 46.2% 5 4 14 13SJ SJTERMIN FP27 01/27 07:00 8:00 1:35 1:08 3:16 5:59 19.8% 14.2% 40.8% 74.8% 2:01 25.2% 3021 2 2 3 4 23 57
SJ SJTERMIN 1 8:00 1:35 1:08 3:16 5:59 19.8% 14.2% 40.8% 74.8% 2:01 25.2% 2 2 3 23
SJ Totals/Avgs 12 7:16 1:14 1:30 1:19 4:04 17.0% 20.7% 18.2% 55.9% 3:12 44.1% 29 22 85 13
SAA Totals/Avgs 33 7:20 1:06 2:18 1:01 4:26 15.1% 31.4% 13.9% 60.5% 2:54 39.5% 79 57 259 18
On Duty Crew GPS Units GPSRegion Yard Crew Starts Time Time Origin Enroute Destination Total Origin Enroute Destination Total Time % Unit Reported Unit(s) Stops Shortest Avg Longest
DT 6 5:16 0:52 0:51 1:14 2:57 16.3% 16.2% 23.4% 55.9% 2:20 44.1% 8 7 22 14NJ 15 8:12 1:06 3:31 0:42 5:19 13.4% 43.0% 8.5% 64.9% 2:53 35.1% 42 28 152 21SJ 12 7:16 1:14 1:30 1:19 4:04 17.0% 20.7% 18.2% 55.9% 3:12 44.1% 29 22 85 13
SAA 33 7:20 1:06 2:18 1:01 4:26 15.1% 31.4% 13.9% 60.5% 2:54 39.5% 79 57 259 18
SummaryIdle Time Idle Time Percentage Moving Enroute Stop Info
CONSOLIDATED RAIL CORPORATIONDaily Crew Mobility Report - South Jersey
1/27/2007
Daily Locomotive Utilization Report - Detroit
SAA UnitUtilized
Time%
Utilized
Non-Utilized
Time% Non-Utilized
% Utilized
% Non-Utilized
% Utilized
% Non-Utilized
% Utilized
% Non-Utilized
Detroit NS 1448 0:00 0% 24:00 100% 0% 100% 0% 100% 0% 100%NS 5273 1:01 4% 22:59 96% 13% 88% 0% 100% 0% 100%NS 5219 1:10 5% 22:50 95% 14% 86% 0% 100% 0% 100%NS 5267 1:08 5% 22:52 95% 14% 86% 0% 100% 0% 100%NS 5275 1:08 5% 22:52 95% 14% 86% 0% 100% 0% 100%NS 5294 1:05 5% 22:55 95% 13% 87% 0% 100% 0% 100%NS 5241 5:05 21% 18:55 79% 14% 86% 50% 50% 0% 100%NS 3009 5:35 23% 18:25 77% 14% 86% 27% 73% 29% 71%NS 5272 5:24 23% 18:36 78% 14% 86% 53% 47% 0% 100%NS 5242 6:05 25% 17:55 75% 13% 88% 63% 37% 0% 100%CSX 6350 10:22 43% 13:38 57% 14% 86% 45% 55% 71% 29%
Totals 11 38:03 14% 225:57 86% 10:51 77:09 19:03 68:57 7:59 79:51 Averages 3:28 14% 20:32 86% 12% 88% 22% 78% 9% 91%
System Totals 82 459:08 23% 1508:52 77% 125:21 530:39 166:48 489:12 165:40 489:01System Averages 5:36 23% 18:24 77% 19% 81% 25% 75% 25% 75%
Detroit 14.0%North Jersey 28.0%South Jersey 21.0%All SAA 23.0%
CONSOLIDATED RAIL CORPORATIONLocomotive Utilization Report
01/27/07 22:30 to 01/28/07 22:30All Tricks "C" Trick "A" Trick "B" Trick
Percentage of Utilization to Total Availability
22:30 - 06:29 06:30 - 14:29 14:30 - 22:29
Daily Fuel Conservation Report
Region Init NumberTotal
OpportunityShutdown
TimeFuel
SavedMoney Saved
Opportunity Lost
Fuel Burned
Money Lost Taken Missed Total APU
Detroit NS 5273 23.59 0.00 0.00 $0.00 23.59 107.93 $191.03 0 1 1CSX 6350 16.12 0.00 0.00 $0.00 16.12 72.90 $129.03 0 3 3NS 1448 24.00 24.00 108.00 $191.16 0.00 0.00 $0.00 1 0 1
11 242.03 24.00 108.00 $191.16 218.03 180.83 $320.06 1 4 522.00 2.11 36.00 $63.72 19.49 60.28 $106.69 0.3 1.3 1.7
North Jersey CSX 2735 23.59 0.00 0.00 $0.00 23.59 107.93 $191.03 0 1 1 YCSX 4415 24.00 24.00 108.00 $191.16 0.00 0.00 $0.00 1 0 1 YCSX 8817 24.00 24.00 108.00 $191.16 0.00 0.00 $0.00 1 0 1 Y
37 710.10 48.00 216.00 $382.32 662.10 107.93 $191.03 2 1 319.12 1.18 72.00 $127.44 17.54 35.98 $63.68 0.7 0.3 1.0
South JerseyCSX 2814 23.59 0.00 0.00 $0.00 23.59 107.93 $191.03 0 1 1 YNS 5222 23.49 3.40 16.50 $29.21 20.09 90.68 $160.49 1 3 4CSX 2798 22.05 3.46 16.95 $30.00 18.19 82.43 $145.89 1 2 3 YNS 5291 23.57 3.49 17.18 $30.40 20.08 90.60 $160.36 1 2 3 YCSX 8973 20.38 9.11 41.33 $73.15 11.27 51.53 $91.20 1 1 2
34 702.18 20.26 91.96 $162.76 681.52 423.17 $748.97 4 9 1320.39 0.36 18.39 $32.55 20.03 84.63 $149.79 0.8 1.8 2.6
Count/Totals 82 1,654.31 92.26 415.96 $736.24 1,562.05 711.93 $1,260.06 7 14 21Averages 20.11 1.08 5.07 $8.98 19.03 8.68 $15.37 0.1 0.2 0.3
Detroit 9.9%North Jersey 6.8%South Jersey 2.9%All SAA 5.6%
CONSOLIDATED RAIL CORPORATIONFuel Conservation Report
1/28/2007Opportunities
Count/TotalsAverages
Count/TotalsAverages
Newark temperature at 05:38 AM: 26Camden temperature at 05:38 AM: 29
Count/TotalsAverages
Percentage of Shutdown to Total OpportunityDetroit temperature at 05:38 AM: 12
Users wanted the actual time the customer was served so we changed to a Lat-Lon Unit.
CONRAIL CREW REPORTCrew: FD11 for 2009/03/27
Crew:S.BRENAMEN Engineer Trainee On Duty Time : 06:30 AM
B.MCBAIN Engineer Off Duty Time : 11:08 AMM.GREENWELL Conductor Total Time on Duty: 04:38
Locomotives:** CSX 6129 First Movement: 07:36 AM Origin Idle Time :01:06
Last Movement: 10:53 AM Destination Idle Time :00:15Total Time : 03:17 Origin/Dest Idle Time :01:21
Time Moving: 01:18 Total Miles Traveled :8.5Stopped: 01:59 Average Speed :6.5 MPH
Locomotive Speed (MPH) Distribution in Minutes0 : 122 61.9% 1- 4.9: 27 13.7% 5- 9.9: 48 24.4% 10-14.9: 0 0.0%
15-19.9: 0 0.0% 20-24.9: 0 0.0% 25-29.9: 0 0.0% 30+ : 0 0.0% Stops of 5 minutes or more
Min MinMoved Miles Speed Locomotive Stops Stop Location
3 0.2 4.0 08:10 AM - 09:51 AM 101 Sterling Heights AEI Reads: Date/Time Cars Engines
WARREN 0327 0956 AM 3 1 WARREN 0327 1041 AM 20 4
Work Performed:Conductor
Customer Reported Time Placed Pulled TotalCHRSTESTA 03/27 0945 AM 0 5 5 CHRSTESTA 03/27 1010 AM 6 0 6
Total 6 5 11 GPS GPS GPS
Customer In Gate Out Gate Total TimeCHRSTESTA 03/27 09:59 03/27 10:34 00:36
Customer Placed Pulled Total Total Time Min/CarCHRSTESTA 6 5 11 00:36 3.3
Generator Field Event Counts: 23Fuel at Start: 3503 Fuel at End: 3607 Fuel Consumed: -104
Lat-Lon has given us a manageable geofence event
Sometimes the customer geography requires multiple fences.
Conrail has realized the folling benefits from GPS technology :
◆ Customer Service has utilized the GPS technology to respond to customer requests for shipment information.
◆ Improvements in Asset utilization have been made and continue with more extensive analysis of GPS and Crew information regarding locomotives and crew consolidations.
◆ Increases in efficiency have been recognized with Train crew overtime reductions.
◆ GPS-based data collection allows management to monitor locomotive shutdown compliance which reduces fuel usage.
3
Next steps.
Continue to develop the customer service model
Locomotive maintenance and fuel management
Highway equipment management
GPS equipped radios to monitor training and execution
Did the crew establish three step protection
Accident investigation