  • Volume : 3

    Issue : 7

    Q4 2012 / Q1 2013

    1

    Leading Concrete RevolutionLeading Concrete Revolution

    Projects in

    Progress2

    Notable Projects

    4

    IFWAPCA 2013

    6

    10

    Concrete Facts

    Do you know that Rock Valve

    is a patented technology of

    Schwing and it powers

    majority of concrete pumps

    manufactured by Schwing

    across the world.

    See page 5

    Product Focus

  • 2MDs Message

    Welcome back and wish you all a very happy and prosperous New Year 2013. May God's grace prevail for all good things to happen around.

    After a string of festivals in the last quarter of 2012, it was a series of customer interaction activities for Schwing Stetter India in the first

    quarter of 2013. Schwing Stetter India participated and sponsored many events in the first quarter of 2013, viz., being the principal

    sponsors of IFAWPCA the National Contractors' Association's convention in Kochi and being an active participant in the Cosmo Expo

    2013 Fair at Raipur and the FIB Seminar at Larsen & Toubro's ECC Division, Chennai in the month of January, 2013. Schwing Stetter India

    also participated in Bauma Conexpo's BC India Fair held at Mumbai and in the National Seminar on 'Constructions at Great Height

    in High Rise Buildings' conducted by the Institution of Engineers, Mumbai during February 2013.

    3

    Our equipment also created a record of sorts, which are detailed in this issue. Noteworthy of these are 1840 m of concrete produced by

    Lafarge in 55 hours and 83 m vertical pumping by a small Schwing pump SP1200 in Pune. I am sure with more and more co-operation and

    understanding among our technicians and the customers, we are poised to set many more records. Schwing Stetter India since inception,

    strongly believed in education and training of its employees, technicians, customers' operators & technicians, besides

    conducting specialised seminars by inviting specialists from its parent company in Germany on special concreting

    technology. In continuing with this education / training programs, we have taken up the task of providing

    leadership and managerial training program for our middle and senior level executives at IIM Lucknow. About 20

    employees would undergo training during this initiative. Such initiatives are with a view to prepare ourselves for

    the future challenges, as we strongly believe that India is a growing market.

    The Union Budget was announced and even though there are not many surprises, it appeared that the government

    and the finance ministry are determined to push infrastructure projects and thus, economic development. We hope

    to see many fresh contracts being awarded which will improve the sentiments of the stake holders.

    I wish you all a successful and bright future.

    GIFT City Project

    Projects in Progress

    All the best,

    A prestigious commercial project Gujarat International Finance Tech

    City (GIFT) is being constructed at Gandhi Nagar, Gujarat. It is the

    tallest commercial tower in Gujarat, standing 31 storey high. With

    built of 130 Mts, L&T ECC and IL&FS are using Schwing Stetter

    machineries to achieve this target. L&T approached SSI to plan the

    concreting method and high-rise pumping for achieving the

    maximum output in concrete placement. These two towers at GIFT

    city project are a mixture of both Commercial & Residential

    complexes.

    Concrete Pour

    L&T is using our separate placing

    boom SPB35 to achieve fast

    progress and maximum output.

    Schwing Stetter equipment has

    produced around 42300 m of

    concrete to complete the full

    structure. SP 1800 HDRL with SPB

    35X Concrete Pump produced

    45m/Hr. An average of 3300 m

    concrete is being produced every

    month for the past 13 months

    comprising of various grades of concrete. Concreting at this high-rise

    project was done smoothly at 202.5 meters vertical pipe line and total

    pipeline length was 262.5 meters with the joint efforts of Schwing

    Stetter service team and L&T team. Schwing Stetter with L&T team

    carried out water cleaning system to overcome the wastage of

    concrete in pipelines. With the help of this system an average of 205 3

    m of concrete was saved in the last three months of the project.

    Record Break3

    A SP 1800 Concrete pump ran continuously to pump 1000 m of

    concrete for each floor up to a height of 130 meter without any major 3

    problem on the pump performance. To pour this 1000 m concrete,

    the pump ran continuously for 48 to 52 Hours. The P&M team from

    L&T was extremely happy with the performance of Schwing Stetter

    equipments and also the technical inputs given by the Schwing

    Stetter team that helped them to achieve their target on time.

    Machine Model Quantity

    Batching Plant CP 30 1 no.

    Concrete Pump SP 1800 HDRL 1 no.

    Boom Placer SPB 35X 1 no.

    Transit Mixer AM6 SHC RH 8 nos.

    Vice Chairman & Managing Director - SSI

  • 3CT News

    Safety Award

    Schwing Stetter India recently participated in Cosmo Expo-2013 Build

    and Trade Fair show held between 10th and 14th January 2013 at

    Raipur, Chhattisgarh. The exhibition was inaugurated by

    Shri.Brijmohan Agrawal, Hon. Minister for Public Works, Education,

    Endowment, Culture, Legislative Affairs and Tourism. The event was

    organised by Rotary Club of Raipur Cosmopolitan and participated by

    the members of BAI and other civil contractors. Schwing Stetter India

    displayed its Rock Valve during the exhibition.

    Exhibition in Raipur, Chhattisgarh

    FIB Seminar - 2013

    FIB (Federation Internationale Du Beton) Days 2012 was conducted

    at L&T ECC in Chennai between 10th & 11th January 2013. Schwing

    Stetter India was one of the sponsors for this event which discussed

    various topics on latest concreting trends. FIB was formed in 1998 by

    the amalgamation of CEB (Comite Euro International du Beton) & FIP

    (Federation Internationale de la Precontrainte). FIB conducts

    International Congresses every four years & International Seminars

    every year.

    Schwing Stetter bagged two first position awards from Inspectorate

    of Factories in two categories for the year 2008-2009 recently. One

    award was given for less number of accidents and another for

    accident free days (Most number of days between any two incidents).

    Both the Awards were presented by Mr. Seetha Chellapandiyan

    Minister of Labour during the event.

    Customer Meet

    Schwing Stetter India recently conducted its customer meet at

    Trivandrum, Kerela. The event featured Schwing Stetter equipment

    and highlighted on the various products and services offered by

    Schwing Stetter India. The event was an eye opener for all attendees,

    including local contractors, hirers and government officials.

    National Seminar

    National Seminar on Constructions at Great Height in High Rise

    Buildings was held on 8th and 9th February 2013 at The Institution

    of Engineers (India) in Mumbai. The event was organised by India

    Chapter of American Concrete Institute and Co-sponsored by

    American Concrete Institute, USA. Schwing Stetter India provided its

    expertise in high-rise concrete pumping for the presentation, in

    association with Ultratech Concrete during this seminar.

    We at Schwing Stetter India take utmost interest for our contribution

    in concrete mechanization by regular association with such events.

    The event had eminent speakers including Consultants & Scientists

    from all over the world, CSIR, IIT Madras & Senior Technocrats of

    major construction companies.

    New Achievement of

    SP 1200 Converted pump

    Schwing Stetter SP 1200 converted pump has 3

    done an achievement of 83 m vertical

    pumping at Castle Royal, Pune University,

    Pune. The customer M/s. S J Construction

    converted the old BP 350 concrete pump in to

    SP 1200 concrete pump.

    After this Rock Valve conversion, the customer

    initially carried out the load trial on 11th floor

    by pumping concrete 38 meter vertically. The

    second load trial was done successfully at 25th

    floor pumping concrete around 83 meter 3

    vertical, 56 meter horizontal and 30 m of

    concrete was pumped in he process.

    The customer is satisfied and happy with the

    pump performance and support provided by

    the resident service center team of Schwing

    Stetter.

    Rock Night Meet in Bangalore

    SSI recently conducted Rock Night meet in Bangalore for pump

    operators. During this event Schwing Stetter's team covered various

    topics on pump operation, safety and maintenance.

    Schwing Stetter India is ultimate solution of concreting. Schwing Stetter stands apart due to its customer support and quality products.

    Mr. Jignesh Malani, MD, M/S Malani Construction, Rajkot.

  • 4Ahuja Tower Project Salt Mount at

    Gandhinagar, Ahmedabad.

    Notable Projects

    Concreting at Tata Steel Plant-Duburi

    A high-rise residential project 'Ahuja Tower' is under construction at

    Prabhadevi, Mumbai, by L&T ECCD. It is one of the tallest residential

    towers in Mumbai, standing 55 storey high with multi level car

    parking. 42 storey with swimming pool and multi level car parking till

    the 12th floor has been completed so far in the project, which is under

    construction.

    Salt Mound building is a part of the prestigious Museum project in

    Gandhinagar, Ahmedabad. This special type of building is constructed

    like a pyramid; it is 42 meters tall, has 90 meters bottom diameter and

    six meters upper diameter.

    The project is being constructed by L&T and is expected to complete

    by March 2013. The total

    concrete required for this 3

    project is around 33000 m for

    wh i ch Schw ing S te t te r

    equipments like two CP 30

    Batching Plants, eight Transit

    Mixers and one S 36 Boom

    pump are used.

    Tata Steel is setting up a 6 million

    tonne per annum integrated steel

    plant at Kalinganagar Industrial

    Complex at Duburi, in partnership

    with the Government of Odisha.

    Schwing Stetter equipments are

    being used at this project by

    construction companies like Chitra Builders, Gayatri Projects,

    Southeast Constructions, S.J Developers, Supreme Concrete,

    Navyuga Constructions and Quartz Infra.

    3

    This massive project has produced total of 574820 m various grades

    of concrete using Schwing Stetter equipments. Schwing equipments

    like Boom Pumps, high capacity Concrete Pumps and Batching Plants

    have considerably eased the challenges encountered in this project.

    SP 1000 at MDI College, Murshidabad

    Subir Engineering Works of Durgapur is using SP 1000 concrete pump

    to construct six blocks of an

    Institutional Project at MDI

    College in Murshidabad,

    West Bengal. 1044 m of M

    25 grade of concrete is being

    pumped upto 90m horizontal

    and 9m vertical, without any

    difficulty.

    SSI's equipment have made a major contribution for this project. L&T

    ECCD has Schwing Stetter equipments like BP 1800 Pump and

    SP 2800 HD, to pump high grade concrete to the present height of

    180 mtr.

    L&T has placed approx. 50,346 3

    m , M40, M50 & M60 grade

    concrete for this project with

    the support f rom RMC

    compan ies l i ke Ashoka

    Buildcon, Lafarge RMC and

    Ultratech RMC for supplying

    concrete. L&T approached Schwing Stetter India to plan the correct

    method and systems for pumping the concreting at this project

    successfully, which includes concrete pipelines laying, clamping

    system and pipeline cleaning system.

    Machine Model Quantity

    Batching Plant CP 30, M 1, M 1.25 6 nos.

    Concrete Pump SP 1200, BP 350 7 nos.

    Boom Placer S 36X 7 nos.

    3

    Transit Mixer 6 & 7 m 56 nos.

  • 5BC INDIA 2013

    Leading the Concrete Revolution in India

    Schwing Stetter India together with its partner Xuzhou Construction Machinery Group (XCMG) participated in BC India 2013, the international trade

    fair show, which was held at Bandra Kurla Complex in Mumbai from 5th to 8th February - 2013. Commanding a prominent position in the show with

    the largest stall, Schwing Stetter India exhibited 17 products amongst which six new products were also unveiled during this event. The exhibition

    area of Schwing's stall provided a good insight to their total product offerings.

    The products on display included SP 1600 concrete pump a new

    range designed to fill the gap between SP 1400 and SP 1800 concrete

    pumps. SP 3600 heavy duty concrete pump was also displayed which

    comes in aesthetic aerodynamic design for higher volume output, to

    increase the speed of construction. Schwing Stetter India also 3

    exhibited 7m Transit Mixer with optional accessories like ad mixer

    dosing system, gate for hopper, hydraulic oil pressure gauge, and

    water dosing system to name a few.

    Among Batching Plants Schwing Stetter India showcased their

    compact batching plant CP 30 with planetary mixer and inline silo with

    skid and conveyor. In the category of Mobile Batching Plant Schwing

    Stetter displayed M 1-C version which is compact and mobile and

    doesn't require any foundation. Schwing Stetter India also displayed

    the HN 1 with planetary mixer, twin discharge and inclined belt

    conveyor version under the horizontal batching plant category.

    Besides, the Rock Valve Technology, High Pressure Cleaning System,

    Sound Proof Canopy and Recycle Plant were also showcased during

    the exhibition.

    Schwing Stetter India always had a close interaction with their

    customers to know and analyse the customers' needs and difficulties

    in the concreting area. The exhibition provided a close interactive

    opportunity for Schwing Stetter India to address and resolve the

    difficulties that customer faces in concreting. They were a major

    attraction at Schwing Stetter India's new launches and most visitors

    who came to Schwing Stall were really pleased with the products and

    interested to learn more about their technological advancement in

    concreting. Schwing Stetter India has utilised the event to reinforce

    their commitment to the Indian market and also to underscore the

    fact that they are 'Total Solution Provider' offering first class leading

    products and services to customers throughout the ownership

    lifecycle.

    Overall, it was a very successful presence for Schwing Stetter India at

    BC India 2013. Schwing Stetter's huge presence at the exhibition

    clearly conveyed to thousands of its customers that they are the most

    leading concrete equipment manufacturers. With the ability to follow

    up on their promises and commitments in the

    market, Schwing Stetter India stands ahead of

    their competitors in the industry.

  • 6IFWAPCA 2013

    The 40th International Federation of Asian and Western Pacific

    Contractors' Associations (IFAWPCA), Convention, an international

    event was staged in Kochi, India between 6th and 9th January 2013.

    Schwing Stetter India was the principal sponsor of the event, which

    provided tremendous opportunity for the construction industry

    including builders and contractors from 16 countries..

    The 40th IFAWPCA Convention was held after a long spell of 22 years

    in India at Gokulam Park Convention Centre, Kochi providing a unique

    platform for the construction industry by bring together 1000+

    delegates from 16 member countries. In connection with IFAWPCA

    convension, an outdoor and indoor exhibition was also arranged to

    bring together products & services of various brands of the industry.

    The theme of the 40th IFAWPCA Convention was harnessing

    emerging technologies to ensure 'Responsible Infrastructure' in an

    inclusive, socially responsible and eco-friendly manner, be it public

    transport systems, buildings or housing complexes. During the event

    Schwing Stetter India showcased India's largest concreting boom

    pump, along with 6 other revolutionary products.

    The convention was organised by the Builders Association of India

    (BAI) and Schwing Stetter India shared its expertise in mechanisation

    of concreting and also presented its various products and services

    during this event. The convention was meant to encourage the

    collaboration among neighbouring contractors and builders for better

    trading environment in construction industry.

    Mr. Shashi TharoorHon'ble Minister of State for HR Development

    Mr. Hubert MerklDirector Sales & Marketing - Schwing GmbH

    Mr. Anand SundaresanVice Chairman & Managing Director - SSI

    Mr. V.G Sakthi KumarWhole-time Director - Operations - SSI

    Colossal Pour at Lafarge Concrete Kolkata

    New record in M S Glass Industries Ltd project at

    Kolkata by Lafarge using Schwing Setter equipment

    On 18th December 2012, at M/s. M S Glass Industries Ltd, Bigati at

    Kolkata, Lafarge A&C India's RMX Dankuni Plant completed the 3

    concreting of 1840 m in 55 hours. The event commenced on the 16th

    of December 2012, the customer was equipped with Schwing Stetter

    Concrete Machinery. Schwing Stetter M1 Batching Plant along with

    the 13 Transit Mixers and two BP 1800

    Concrete Pumps were brought into play

    to meet this requirement. Hence the concreting team of Lafarge

    which was in charge of concreting the Raft Foundation at site set a 3

    new record in Kolkata by pouring 1840 m of concrete in 55 hours. The

    customer is very delighted at the speed at which the work was done

    and the efficiency of the equipment. They are also satisfied with the

    support and training provided by Schwing Stetter India. The job was 3

    completed at a speed of 33.45 m per hour.

    This was one of the largest pours in Kolkata and involved production

    of M30 grade of concrete. The M 1 Batching Plant and BP 1800

    Concrete Pumps are year 2007 make. Despite the age of the

    equipments the customer had full confidence on Schwing Stetter

    products and undertook the mission to complete the project. There

    were absolutely no breakdown of any equipment during this

    aggressive pouring.

  • 7Customer Speaks

    Interview with Mr. Haribhai & Mr. Natubhai

    Innovative Ready Mix Concrete, Ahmedabad.

    Interview with Mr. Pankaj Garg,

    Managing director, Garg RMC, Gurgaon

    About Innovative RMC

    Our site based concrete

    company was started in the year

    2004. We are now one of the

    leading RMC Suppliers in

    Ahmedabad. I am happy and

    proud to talk about our

    company. We had started this

    RMC business in 2004 with a site

    mix local batching plant.

    In 2006 we purchased one CP 30

    Batching Plant, six Transit Mixers and two BP 350D Concrete Pumps

    from Schwing Stetter India. Due to the machine performance and

    profit, we were able to start-up one more RMC setup at Santej in 2008

    with one M1 Batching Plant, eight Transit Mixers, one SP 1400

    Concrete Pump and one BP 350D Concrete Pump.

    Our company is well reputed and ranked in Ahmedabad's RMC

    business because of our ability to complete the projects on time with

    utmost quality and good service. This was possible only because of

    Schwing Stetter equipments. We are happy with the continuous

    development of our business. We got many projects with different

    clients.

    About some of our landmark projects:

    YMCA Club at S.G. Highway, Ahmedabad

    Sapath Five at S.G. Highway, Ahmedabad

    Safal Parivesh at Bopal, Ahmedabad

    Heritage Skyz at Prahlad nagar, Ahmedabad

    Iscon Mall at S.G.Highway, Ahmedabad

    Acropolis Mall at S.G.Highway Ahmedabad

    SUMEL Business Park

    Schwing Stetter India Equipment Used

    Currently we are using two M1 Batching Plant, one CP 30 Batching

    Plant, 24 Transit Mixers, two SP 1400 Concrete pumps, one SP 1200

    Concrete pump and three BP 350D Concrete Pumps.

    Why Schwing Stetter India?

    We are pleased to say that Schwing Stetter India is one of oldest &

    most valuable suppliers of concreting equipment serving our needs in

    supplying materials at the right time. Complemented by prompt

    service with highly technical engineers, there are many reasons to

    select Schwing Stetter equipment because of their German

    technology, quality, and performance. We are also happy with their

    sales because of their good relationship and after sales support as

    they are quick and are highly skilled technically. We regularly

    purchase all our major equipment such as Batching Plant, Concrete

    Pumps, Transit Mixers, and Spare Parts from SSI. They have also

    recognized all our suggestions and our feedbacks are well taken.

    We have suggested them to manufacture other good products like

    Loaders, Chassis etc.

    About Garg RMC

    We have the oldest Batching Plant

    (CP 30) in Faridabad, which now has 3

    produced over one lakh m of concrete

    and always stood strong to deliver more.

    Recently we have also procured M1

    Batching Plant and added another fleet

    of Transit Mixers and Concrete Pump to

    expand our business horizons.

    About some of its landmark Projects

    Being the oldest RMC in Faridabad, we have been incorporated in

    various projects be it commercial or residential or PWD works. We

    adhere to strong quality norms and this has made us a fore runner in

    providing RMC of all needs to customers. We produce an average of 3 3

    5000 m from CP 30 Batching Plant and over 8000 m of concrete from

    M1 Batching Plant.

    Schwing Stetter India Equipment used

    Currently we are having twenty five Transit Mixers, three stationary

    concrete pumps, one SP 1400, one SP 1200 and one BP 350 and two

    Batching Plants one CP 30 and one M1. We will be very shortly 3

    procuring five numbers of 7 m Transit Mixers and SP1400 stationary

    concrete pump.

    Follow us on

    https://twitter.com/schwingindia

    https://www.facebook.com/schwingstetterindia

    Why Schwing Stetter India?

    Being an RMC player, it's very essential for us to have least down time

    of any equipment to get the best out of our investment. With all these

    years of experience in RMC, I'm sure that no other player can offer the

    standards that Schwing Stetter can offer. Their quality in equipment

    and after sale service support has been impeccable. I'm looking

    forward to a continued and strong relationship with SSI.

    We have been using M1 batching plant and Im extremely happy with the equipment and the support Scwhing Stetter India has given us

    Mr. Shailender Mishra, GM, T&M, Sriram RMC, Gurgaon.

  • 8Project Abroad

    Going the Distance Niagara Tunnel Project

    An entire fleet of eleven Schwing stationary pumps with various

    configurations along with extensive fleet of Schwing boom pumps,

    under the guidance of Pumpcrete, conveniently located in Niagara

    Falls, are working around the clock on Niagara tunnel project. The

    project will divert 35 percent of the Niagara River at night and a new

    massive diversion tunnel will add additional hydroelectric power to an

    existing generating station with enough electricity for 160,000 more

    homes.

    Pumpcrete has an extensive tunnel lining resume. The difference

    with this tunnel is its immense diameter, explains Dave Moriarity,

    Pumpcrete manager. This one you could erect a five story building

    inside the tunnel.

    Shotcreting was part of the excavation contract to stabilize the bore

    hole perimeter but additional shotcrete was required to fill voids in

    loose soil conditions. The company utilised three Schwing SP 500 split

    units to apply the shotcrete to a thickness of 13 cm through hand-

    held hoses and shotcrete robots attached to the TBM (Tunnel Boring

    Machine). The wet shotcrete was applied over reinforcing mats

    anchored into the tunnel walls.

    A shotcrete arm provided extra reach to fill voids that occurred when

    soil conditions were not ideal. A Schwing SP 1000 was used to feed

    the arm and to provide additional velocity to the shotcrete. Strabag

    subcontracted batch plant operations and trucks supplied the pre-

    mixed shotcrete to the electrically powered pumps. More than

    120,000 cubic meter of shotcrete was applied

    over the five years of tunneling.

    Following behind the shotcreting operation is the form and pour for

    the tunnel invert the bottom one-third of the tunnel lining.

    Pumpcrete utilised two Schwing SP 2000 stationary pumps that are

    fed by agitator trailers hauled in by trucks. The tunnel lining concrete

    is a pumpable mix according to Moriarity, explaining that the mix

    designs are proprietary.

    Output to the two form systems that leapfrogged their way through 3

    the bore hole was between 40 and 50 m per hour. The form systems

    travel about 50 meters in front of the electric powered trailer pumps. 3

    Each pour advances the invert 12.5 meters and consumes 120 m of

    concrete. Water is used to clean out the pipeline systems with a

    diversion valve on the pump's discharge that sends wash water and

    residual concrete into trailers to be disposed off outside the tunnel.

    The loads must be spread evenly throughout the tunnel's

    circumference. Therefore, all voids need to be grouted in order to

    keep the thickness of the inner lining within specified tolerances of 30

    centimeters. Because of the internal water pressure of up to 15 bar

    (2,175 psi), the lining must be fitted accurately into the surrounding

    rock.

    Pumpcretes close location to the project allows them to draw on

    their extensive fleet of Schwing boom pumps

    Waterproofing Manager Stefan Mackinger explains why elaborate

    waterproofing is mandatory for the success of this tunnel, The

    tunnel designer specified a single-layer waterproofing membrane for

    non-swelling rock and a double-layer membrane for the Queenston

    Formation, an area that contains argillite, which swells in contact with

    water and would ruin the concrete lining.

    To complete the remaining two-thirds of the concrete tunnel,

    Pumpcrete chose a Schwing electric SP 5000 split unit that was 3

    positioned under an 8 m Maxon Maxcrete agitating surge hopper to

    travel into the bore hole. A Schwing SP 8000 outside the tunnel fed

    the surge hopper.

    Because of traffic through the tunnel, the SP 8000 pumped through a

    five-inch line for as long as possible.

    We were amazed that Schwing was able to push the mix as far as 1.7

    kilometers, explained Pumpcrete owner, Ken Williams, Jr., That's

    more than a mile and probably some sort of record. The crews

    eventually resorted to feeding the pump with trucks and trailers.

    3

    By the end of the project more than 300,000 m will be pumped with

    the Schwing units. Pumpcrete's contribution to the project is

    immeasurable. A partner in concrete placement means use of good

    equipment, experience and reliable operators and parts support

    especially in tunneling. Pumpcrete has supplied all of these

    components. according to Bernhard Mitis, Strabag's manager for the

    concrete portion of the project.

    Schwing SP 5000 is positioned under a remixer

    that receives concrete from agitator trailers.

    Arch form for the tunnel lining is fed by a Schwing SP 5000- positioned

    up to 50 meters behind the form system.

  • 9Product Focus

    Belt Conveyor(Installation, Operation & Maintenance)

    INSTALLATION

    OPERATION

    1. Please ensure that the installation is done with necessary

    precautions. Measure the belt without creasing, folding or

    straining.

    2. Care should be taken while splicing or vulcanising to ensure that

    the joint is made correctly & no horizontal bends are developed

    in the belt while making joint out of square.

    3. Belt should be clean and free from oil and grease.

    4. Belt and Conveyor Supports should be in proper alignment.

    5. Power transmission machinery should be checked for proper

    alignment on assembly.

    1. Before starting Conveyor, ensure that the Conveyor structure is

    firm enough to prevent vibration.

    2. Before starting the Conveyor, care to be taken to see that there is

    no coal lumps, chips and wood or pieces of iron etc., on the

    carrying and return belt.

    3. After confirming no load operation, feed material on the

    Conveyor Belt, uniformly and carefully.

    4. Quantity of material feed should be controlled. If the material is

    fed in excess, the motor of the Conveyor will get overloaded. In

    addition, the material on the belt is bound to spill.

    5. At the loading point, skirt boards are used to centralize material,

    falling off the belt. The skirts should have proper contact with the

    belt.

    6. Proper belt tension should be maintained by the take-up,

    a) To ensure that minimum tension in the belt is sufficient to

    prevent undue sag between idlers. b) To transmit load.

    7. When the Conveyor has to be stopped, please ensure that there

    is no material left on the belt.

    Maintenance

    The general good maintenance practice is as follows:

    1. Check clearances periodically.

    2. Emphasize visibility in loading and unloading sections and in

    control locations.

    3. Confine the operation of conveyors to authorised employees

    only.

    4. Confine repair functions to trained maintenance employees only.

    5. Repair damaged belts immediately.

    6. Do not permit riding or stepping on conveyor.

    7. Instruct employees using conveyors on the methods of loading

    and unloading them and the clearances required for safe

    operation.

    8. In general do not load mechanical equipment beyond its rated

    capacity.

    9. Lubricate through piping where possible. Lubricate conveyor

    with oil of proper grade on a regular schedule with definite

    responsibility assigned to particular individuals for doing the

    work and making signed reports.

    10. Use lock-outs in fuse boxes during maintenance operation and

    have push buttons or cord lines for emergency stops.

    11. Insist on high quality heavy electrical equipments and strict

    adherence to electrical codes.

    12. Check the oil level of gearbox every week and fill it if required.

    13. Initial oil shall be replaced after two months or 1400 running

    hours, whichever is earlier.

    14. Greasing has to be done for all bearing block every month.

    15. Check all nuts and bolts of Head Pulley, Gearbox Motors

    regularly.

    16. Don't stop Belt Conveyor until all material is unloaded.

    The most preferred concreting equipment

    by tunnelling contractors

    The most preferred concreting equipment

    by tunnelling contractors

  • 10

    Schwing Service Center

    Evolution of service center

    In business, the market is changing so rapidly that many of the

    products and services that successfully met customer demands and

    needs a few years ago, are obsolete today. Only few companies with

    proactive powerful leadership monitored the environmental change

    and succeeded even during the difficult times and Schwing Stetter

    India is one of few such market leaders.

    We are one among the few companies who have extended our

    various value added customer services across the country directly to

    stay close to our customer to support their product. Keeping the

    growing trend of Schwing Stetter equipment and non availability of

    skilled man power in the industry, Schwing Stetter India has incepted

    its state of the art service centers in different states and many are to

    follow.

    Why service center

    Services offered

    As Schwing Stetter India understands, effective outsourcing is one of

    the most proven and reliable solution to meet the requirement of the

    market without increasing the working capital. When the OEM offers

    the solution in the form of service center it is obvious that customers

    would grab the opportunity with both the hands.

    Periodic maintenance

    Rectification of defects from Minor to Major

    Rewiring of Electrical system and Rebuilding of Hydraulics

    Repainting of equipment

    Mounting of Transit Mixer & Boom Placer

    Conversion of flat gate valve to rock valve and vice versa

    Conversion of diesel driven to electric driven and vice versa

    Sale of refurbished equipment

    Repair of sub assemblies like Hydraulic pump, motor, gearbox

    etc.,

    Helps to handle the insurance claims with timely and precise

    estimates during / after an accident.

    Understanding the need

    Retrofitment

    Standby

    Specialised Repairs

    Conversion: Flat gate valve technology was introduced when the site

    requirements for concrete mix was predominant. These pumps were

    not able to meet the concrete requirements in high rise constructions.

    To overcome these issues, Schwing Stetter India has come up with its

    unique option of converting the flat gate valve into rock valve, for its

    customer to meet the requirements. The conversion from flat gate to

    rock valve came as second lease of life for those who opted to convert

    their pumps. We have received accolades from many benefitted

    customer.

    Many customers are benefited

    from the retro fitment solutions

    provided by Schwing Stetter

    India's service center. This made

    most of the customer to prefer

    Schwing Stetter equipment.

    As the projects are critically time bound, there is no margin for error

    for the pump to be under break down even for short duration. On the

    other hand if new pump is kept standby, cost rockets sky high.

    Schwing Stetter India plays a major role by providing limited warranty

    for refurbished concrete pump to help the customer. These pumps

    are also exported to the countries like Srilanka and Singapore.

    Many specialised machines prior to execution at major projects get

    serviced at Schwing Stetter India service center. To mention few,

    BP 4000, BP 3500 for Parbati dam project executed by Gammon

    India, KVM 42 boom pumps for Petron.

    Customer Testimony

    We express our sincere thanks for the

    co-operation SSI have extended during

    the execution of conversion of our

    concrete pump. We are happy that the

    concrete pump after conversion to

    SP1200 is giving very good performance.

    Since Feb-2012, it is working at a site

    near Nandura (Vidarbha Maharashtra)

    Disha Engineers, Mumbai

    First of all we are proud to be first

    customer of the flat gate valve to rock

    valve conversion in Gujarat. We are using

    this converted pump in RMC line for the

    last six months and we are extremely

    happy with its performance. A total of 3

    12500 m of concrete is being poured

    after the conversion.

    MCC Concrete, Vadodara

    First of all we are proud to be customer of

    flat gate valve to rock valve conversion.

    We are using three no.s converted pump

    in RMC line and Project line for the last

    two months and we are extremely happy

    with its performance. Total concrete 3

    poured after conversion is 2000 m Appx, 3

    maximum volume of 300 m in a single

    pour.

    Prashant Logistics, Baroda

  • Star Batcher

    11

    Tech

    Most induction motors are started directly on line, but when very

    large motors are started that way, they cause a disturbance of voltage

    on the supply lines due to large starting current surges. To limit the

    starting current surge, large induction motors are started at reduced

    voltage and then have full supply voltage reconnected when they run

    up to near rotated speed. Two methods are used for reduction of

    starting voltage which is star delta starting and auto transformer

    starting.

    This is the reduced voltage starting method. Voltage reduction during

    star-delta starting is achieved by physically reconfiguring the motor

    windings as illustrated in the figure below. During starting the motor

    windings are connected in star configuration and this reduces the

    voltage across each winding 3. This also reduces the torque by a

    factor of three. After a period of time the winding is reconfigured as

    delta and the motor runs normally.

    Working Principle of Star-Delta Starter:

    Star-Delta Starter

    Star-Delta starters are probably the most common reduced voltage

    starters. They are used in an attempt to reduce the start current

    applied to the motor during start as a means of reducing the

    disturbances and interference on the electrical supply.

    Traditionally in many supply regions, there has been a requirement to

    fit a reduced voltage starter on all motors greater than 5HP (4KW).

    The Star-Delta (or Wye-Delta) starter is one of the lowest cost

    electromechanical reduced voltage starters that can be applied.

    Application of Star-Delta Starter:

    Advantages of Star-Delta starter:

    In SCHWING Stetter Batching Plants we use Star-Delta Starter in

    most of the Pan Mixers and Twin Shaft Mixers.

    The Star-Delta method is usually only applied to low to medium

    voltage and light starting torque motors.

    Features of star-delta starting

    For low- to high-power three-phase motors.

    Reduced starting current

    Six connection cables

    Reduced starting torque

    Current peak on changeover from star to delta

    Mechanical load on changeover from star to delta

    The operation of the star-delta method is simple and rugged. It is

    relatively cheap compared to other reduced voltage methods.

    Good Torque/Current Performance.

    During the start it draws twice the current of the full load.

    The Star-Delta starter is manufactured from three contactors, a timer

    and a thermal overload. The contactors are smaller than the single

    contactor used in a Direct on Line starter as they are controlling

    winding currents only. The currents through the winding are 1/ 3

    (58%) of the current in the line.

    There are two contactors that are close during run, often referred to

    as the main contractor and the delta contactor. These are AC3 rated at

    58% of the current rating of the motor. The third contactor is the star

    contactor and that only carries star current while the motor is

    connected in star. The current in star is one third of the current in

    delta, so this contactor can be AC3 rated at one third (33%) of the

    motor rating.

    Now Concrete

    Anytime... Anywhere...

    Now Concrete

    Anytime... Anywhere...

    SSI Make CP30 has achieved mile stone in concreting by producing 77484 m3 in 12 months. CP30 is the best plant in its category I have seen.

    Mr. Dinesh Patel, Partner, M/s Patel Enterprises, Raipur.

    NIMO designed to meet requirements of

    concrete transportation in tunnels.

    NIMO designed to meet requirements of

    concrete transportation in tunnels.

  • ISO 9001:2008 :: OHSAS 18001: 2007 :: ISO 14001:2004

    F 71 - 72, SIPCOT Industrial Park, Irungattukottai, Sriperumpudur Taluk, Kancheepuram District,Tamil Nadu - 602105.

    Phone : 044 2715 6780 / 781, 47108100 / 33555588 Fax : 044 27156539 Visit us at www.schwingstetterindia.com

    Batching Plants Concrete Pumps Transit Mixers Concrete Recycling Plants Belt Conveyors Separate Placing Booms Shotcrete Pumps I I I I I I

    MUMBAI NEW DELHI

    HYDERABAD BANGALORE

    KOLKATA COCHIN AHMEDABAD

    PUNE CHANDIGARH

    BHUBANESWAR GUWAHATI RAIPUR

    022 25624863 / 64, 30718300 / 33555588 011 3092 8500 / 33555588

    040 6615 1783 / 33555588 080 4243 8400 / 33555588

    033 3322 3300 / 33555588 0484 4055984 / 3355558 079 40244200 / 33555588

    020 26055651 / 2 / 33555588 0172 3957500 / 3355558

    0674 2463999 / 3355558 0361 2234738 0771 2562325

    I

    I

    I I

    I

    I I Many more to come...

    March 2013

    Dear Customers,

    Greetings!!

    We at Schwing Stetter India believe the customer satisfaction is the most important factor in measuring our success. While satisfied customers

    express happiness on the products performance, after-sales support and overall experience of our partnership, we accord our highest priority for

    the safety of people who actually operate and maintain our equipments.

    We have opened our Training Centre in Hyderabad which has the capacity of training 20 operators in a batch. This center will focus on

    operation and safety.

    Walk the Talk. I am pleased to share with you Schwing Stetter India has been awarded two Safety Awards from the State Government on the

    following Categories:-

    First: Less Number of Incidents and the Second: Accident Free Days (Most number of days between any two incidents).

    Enhancing our number of touch points, we have added our Vizag Service Centre for the customers in coastal Andhra Pradesh and neighbouring

    districts of Orissa who can take full advantage of service centre.

    Focusing on our responsibility as pioneer of concreting machinery manufacturing, we have launched pre-cast plants in various capacities and new

    range of pump SP1600 during BC India 2013 in Mumbai. The all 6 new products received very good review from our customers across the

    segments.

    We have also increased our service offerings with the increased activity in reconditioning of old Concrete Pumps and Truck Mixers and helping

    customers to exchange old with the new machines.

    Demonstrating the ease of operation, Larsen & Toubro made a new National Record of Fastest Erection and

    Commissioning of CP30 Plant with Compartment Batcher in L&T Cognizant IT Park, Cochin Project,

    Kerala in 17 Hrs.

    I once again would like to thank you for all the support and look forward to welcome you in Bauma 2013 in Munich.

    Happy reading!!!

    With best regards,

    V.G. Sakthi Kumar,

    Whole-time Director - Operations - SSI

    [email protected]

    Published by Schwing Stetter India in Chennai. All Correspondence to be sent to [email protected]

    Designed and Printed by A.L. Senthil Kumar :: For private circulation only, not for sale.

    For any feedback regarding this newsletter, email at [email protected]

    Schwing Stetter India introduces SP 1600 pumps a

    new range designed to fill the gap between SP 1400

    and SP 1800 concrete pumps, ideal for highly

    reliable uses. The SP1600 pumps are meant to cater

    the concrete requirement with the productivity of 52 3

    m of concrete per hour. These pumps are highly

    reliable and work under low operating and

    maintenance cost. The state-of-the-art RL Rock

    valve technology and compact design of SP 1600

    makes it high fuel efficient. For further details about

    the product contact us on below given details.

    CONCRETE YOUR WAY...Schwing SP 1600 pumps are highly

    reliable and cost effective,

    which comes with

    Rock valve technology

    and low-fuel consumption.

    Separate pumping hour meter for better fuel

    usage and monitoring.

    Integrated control block.

    Ideally suits for pumping any type of concrete.

    State-of-the-art RL Rock Valve is ideally

    suited to withstand rugged site conditions.

    LAUNCH

    Dear Customers,

    Greetings!!

    In this issue, we have discussed SCHWING Stetter's contribution for Bridge Construction Projects across India. We are proud that our equipment

    played vital role aiding Customers to build landmark bridges across the mighty Brahmaputra, Ganga and other rivers in different parts of the

    Country.

    We are pleased to share with you a report on Construction of a Castle in 13th Century Medieval Style, where our Boom Pumps and Trailer

    Pumps were extensively used abroad.

    This issue briefly covers topics related to Wall Thickness and Wear of Pipelines.

    Our machines continue to set records in different segments viz., at Lafarge where 1014 cubic meters of concrete was poured within 24 hours using

    our M1 Batching Plant.

    We have also brought out an On the Spot Report on our contributions to Modak Sagar Tunnel Project and we are glad to inform that more such

    reports will follow in the months to come.

    Through this issue of Concreting Times, we would like to invite all the members of Builders Association of India to visit the 40th IFAWPCA

    Convention scheduled to be held in Kochi from 6th to 9th January 2013, where SCHWING Stetter India is the principal sponsor.

    With the monsoon season coming to an end, we see increased interest and activity amongst our customers and hope that this trend grows further

    and helps the Industry to come out of the current slow phase.

    I take this opportunity to thank all our Customers who took advantage of the special offers and schemes offered by our Service Centers during the

    Monsoon.

    Happy reading!!!

    With best regards,

    , COO

    [email protected]

    V.G. Sakthi Kumar