We deliver what we promise. 8168420786 Compressor Stations Compressor Station Building Automatic Control Compressor Station Building Automatic Control This major pipeline operator wanted to retain the compression capacity of three manually operated engines located in a separate building from the newer, automated 8engine facility. The challenge was to maintain safety in the old building’s hazardous natural gas environment (CLASS 1 Division 1 and Division 2 Group D) while avoiding unnecessary Emergency Shutdown (ESD). New Frontier Technologies (NFT) is designing a costeffective, limited automation solution which will directly address the problem. The addition of automatic engine load valve control will let an operator (or the system acting automatically) shut down/blow down an individual engine when a leak is detected, isolating the problem before an ESD is triggered. Gas Control will be able to initiate unit shut down if necessary. The new system will also support semiautomated engine startup from a local PLC panel to quickly bring an engine back on line when the problem is cleared. The operator will still manually set engine speed and loading. The customer is modifying the safety system to support Limited Local Area Shutdown (LASD) of the old building. If the building percent lower explosive limit (%LEL) setpoint is exceeded, the LASD is triggered. The station stays on line and continues to operate with the main engines. Only if the High %LEL condition persists for a predetermined time is a full ESD performed. The NFT team is basing the automation architecture on a CTI PLC and a Parker CTC HMI, a combination familiar to the company’s personnel. To meet space constraints and lower project cost they designed the system to control all three engines from the single PLC. Scope of Work Automation design PLC programming HMI screen development Flame and gas panel modification Communications coordination with Gas Control PLC Enclosure Supply Electrical wiring & installation supervision CONTACT INFORMATION New Frontier Technologies 1501 Burlington Street North Kansas City, Missouri 64116 Phone: 8168420786 Fax: 8168420789 [email protected] BROCHURE Our new brochure provides an overview of the services we offer and our areas of expertise. Download a digital copy by clicking on the brochure icon. FACILITIES Pipelines Compressor Stations Pumping Stations Loadout Terminals Tank Farms Gas Storage Metering / Regulatiing HOME ABOUT US SERVICES EXPERTISE NEWS CONTACT

Compressor Station Building Automatic Control _ New Frontier Technologies ------ LASD vs ESD

Embed Size (px)

DESCRIPTION

It is a good resource on compressor stations

Citation preview

Page 1: Compressor Station Building Automatic Control _ New Frontier Technologies ------ LASD vs ESD

We deliver what we promise. 816­842­0786

Compressor Stations

Compressor Station Building Automatic Control

Compressor Station Building Automatic Control

This major pipeline operator wanted to retain the compression capacity of three manually operated engines located in a separate building from the newer,automated 8­engine facility. The challenge was to maintain safety in the old building’s hazardous natural gas environment (CLASS 1 Division 1 and Division2 Group D) while avoiding unnecessary Emergency Shutdown (ESD).

New Frontier Technologies (NFT) is designing a cost­effective, limited automation solution which will directly address the problem. The addition of automaticengine load valve control will let an operator (or the system acting automatically) shut down/blow down an individual engine when a leak is detected, isolatingthe problem before an ESD is triggered. Gas Control will be able to initiate unit shut down if necessary.

The new system will also support semi­automated engine start­up from alocal PLC panel to quickly bring an engine back on line when the problem iscleared. The operator will still manually set engine speed and loading.

The customer is modifying the safety system to support Limited Local AreaShutdown (LASD) of the old building. If the building percent lower explosivelimit (%LEL) setpoint is exceeded, the LASD is triggered.  The station stayson line and continues to operate with the main engines.  Only if the High%LEL condition persists for a predetermined time is a full ESD performed.

The NFT team is basing the automation architecture on a CTI PLC and aParker CTC HMI, a combination familiar to the company’s personnel.

To meet space constraints and lower project cost they designed the systemto control all three engines from the single PLC.

Scope of Work

Automation design

PLC programming

HMI screen development

Flame and gas panel modification

Communications coordination with Gas Control

PLC Enclosure Supply

Electrical wiring & installation supervision

CONTACT INFORMATION

New Frontier Technologies1501 Burlington StreetNorth Kansas City, Missouri 64116Phone: 816­842­0786Fax: 816­842­[email protected]

BROCHURE

Our new brochure providesan overview of the serviceswe offer and our areas ofexpertise. Download a digitalcopy by clicking on thebrochure icon.

FACILITIES

PipelinesCompressor StationsPumping StationsLoadout TerminalsTank FarmsGas StorageMetering / Regulatiing

HOME ABOUT US SERVICES EXPERTISE NEWS CONTACT

Page 2: Compressor Station Building Automatic Control _ New Frontier Technologies ------ LASD vs ESD

Site and Content Copyright 2012, New Frontier Technologies, All Rights Reserved