33
Delivering Quality Engineering Services ……… ISO 9001:2008 ::ISO 14001:2004::OHSAS 18001:2007 ZILLION INFRAPROJECTS PRIVATE LIMITED (Formerly known as DURHA CONSTRUCTIONS PVT. LTD) Delhi Office: 5th floor, Anushka Tower, Plot No. 2, Garg Trade Centre, Sector-11, Rohini, New Delhi – 110085 Tele Fax : +91 11 27574505 Mumbai office: Unit No. 6, Bldg No. 2, Sector 1, Millenium Business Park, Mahape, Navi Mumbai. 400710 PH- 91-022-41236303 Email : [email protected] Website : www.zillioninfraprojects.com

Company Profile ZIPL 21.10

Embed Size (px)

Citation preview

Page 1: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

ZILLION INFRAPROJECTS PRIVATE LIMITED (Formerly known as DURHA CONSTRUCTIONS PVT. LTD)

Delhi Office:

5th floor, Anushka Tower,

Plot No. 2, Garg Trade Centre,

Sector-11, Rohini, New Delhi – 110085

Tele Fax : +91 11 27574505

Mumbai office:

Unit No. 6, Bldg No. 2,

Sector 1, Millenium Business Park,

Mahape, Navi Mumbai. 400710

PH- 91-022-41236303

Email : [email protected] Website : www.zillioninfraprojects.com

Page 2: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

Company ProfileCompany ProfileCompany ProfileCompany Profile::::

We introduce our company as one managed by a group of dynamic professionals. We have about thirty five years of experience in construction of Industrial Projects ie. Power Plants , Cement & Fertilizer, Refineries & Petrochemical, Automobiles, Water & Sewerage System and other Infrastructure Projects . We undertake works such as:

A. Mechanical

� Machinery installation � Site fabrication and erection of structural steel � Piping fabrication and erection � Equipment fabrication and erection � Sand/grit blasting and painting, insulation and protective coating � Cross-country pipeline and terminal stations

B. Civil

� Construction of foundations, buildings , reservoirs etc � Water & Sewerage systems, drains & culverts. � All types of Infrastructure development

C. Electricals & Instrumentation

� Sub-station work � Electrical and Instrumentation installation

We have Successfully executed jobs of national importance within stipulated

parameters of cost, time and quality to the entire satisfaction of the consultants

and customers like E.I.L., Deisen, Mecon, PDIL, UHDE, D.C.L., T.C.L., Toyo,

Komutsu, amongst others. Our clientele include organizations like Nuclear Power

Corporation, BHEL, Hindustan Zinc Ltd., Maruti Udyog Ltd., NTPC, Reliance,

Essar, IPCL, IOCL, BPCL, Gail, Chambal Fertilizers, Tata Fertilizers, Hero

Honda, Shree Cements, Gujrat Ambuja Cements, State Electricity Boards, U.P.

State Bridge Corporation Ltd., Urban Improvement Trust-Udaipur etc. We are

associated with construction group like Larsen & Tubro Ltd., Dodsal, Bridge and

Roof, Mukand, Samsung , Indure Pvt. Limited , UP Jal Nigam amongst others.

Page 3: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

ISO Certified for Quality, Safety & Environment

Page 4: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

Page 5: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

Page 6: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

WORK FORCE

1.) Engineers:

Mechanical 100 Nos.

Civil 18 Nos.

QA/QC 32 Nos.

Electronic/Electrical/Instrumentation 12 Nos.

HSE 24 Nos.

2.) Supervisors:

Welding & QA/QC 50 Nos.

Fabrication 210 Nos.

Erection 120 Nos.

Civil Works 18 Nos.

Health, Safety & Environment1 20 Nos.

3.) Admn. / Acct. / Purchase/ Stores 80 Nos.

4.) Maintenance & Operation 85 Nos.

In addition, we have about 6000 Technicians i.e.; Welders, Fitters,

Grinders, Electricians, Gas Cutters etc. in the following ratio, working at our

various project sites:

Highly Skilled 15%

Jr. Technicians 30%

Semi Skilled 45%

Others 10%

Page 7: Company Profile ZIPL 21.10

De

liv

eri

ng

Qu

ali

ty E

ng

ine

eri

ng

Se

rvic

es…

……

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

ZILLION INFRPROJECTS PRIVATE LMITED

( Formerly Known as DURHA CONSTRUCTIONS PVT. LTD )

LIST OF ORDERS UNDER EXECUTION

S.�

o.

Des

crip

tio

n

�a

me

of

Cu

sto

mer

C

on

tra

ct V

alu

e R

s.

(Cro

re )

Per

cen

tag

e o

f w

ork

Co

mp

lete

d

1

Ere

cti

on

o

f B

oile

r ,

ES

P

an

d

P

ow

er

Cy

cle

P

ipin

g

of

2

x

2

50

MW

at

Pa

ric

ha

Jh

an

si

( U

P)

BH

EL

(P

SN

R)

/ U

PV

UN

L

3

8.0

0

97

%

2

Ere

cti

on

, o

f E

SP

p

ac

ka

ge

of

3 X

66

0 M

W f

or

UN

IT #

1,

2 &

3

AT

Ba

rh S

TP

P,

Pa

tna

(B

iha

r)

NT

PC

/BH

EL

(P

SN

R)

3

6.1

2

50

%

3

Fa

bri

ca

tio

n &

ere

cti

on

of

str

uc

tura

l s

tee

l w

ork

fo

r M

ill B

ay

, B

un

ke

r &

TG

Bu

ildin

g s

tru

ctu

re f

or

Ph

as

e I

I 2

x2

50

MW

TP

P

at

Ch

ha

bra

(R

aj)

R

RV

UN

L /

IN

DU

RE

3

0.0

0

50

%

4

Fa

bri

ca

tio

n

& E

rec

tio

n

of

co

mp

lete

p

lan

t S

trl,

M

ac

hin

ery

&

E

qu

ipm

en

ts w

ork

fo

r K

CP

Ce

me

nt

at

Ja

ge

yy

ap

et

(AP

)

L &

T L

td /

KC

P L

td.

2

2.0

0

Un

de

r C

om

mis

sio

nin

g

5

Ere

cti

on

, T

es

tin

g ,

Co

mm

iss

ion

ing

fo

r 4

x2

40

TP

H &

2x

11

0

TP

H H

RS

G G

GS

R P

roje

ct

at

Bh

ati

nd

a (

Pu

nja

b)

BH

EL

(P

SN

R)

1

2.9

5

95

%

6

Ere

cti

on

, T

es

tin

g

an

d

Co

mm

iss

ion

ing

o

f C

om

ple

te

Bo

iler

co

ns

isti

ng

o

f B

oile

r S

tru

ctu

res

,of

1

x

33

0T

PH

b

oile

r a

t R

as

htr

iya

Is

pa

t N

iga

m L

imit

ed

(R

INL

) –

Vis

ak

ha

pa

tna

m

BH

EL

(P

SS

R)

/

R

INL

Viz

ag

9

.95

8

0%

7

Fa

bri

ca

tio

n

&

Ere

cti

on

o

f S

tru

ctu

ral

Ste

el

wo

rk

for

AB

G

Ce

me

nt

Pla

nt

at

Ku

tch

-G

ujr

at

S

ha

pp

orj

i P

allo

nji

Co

. L

td.

1

5.6

5

75

%

8

Ere

cti

on

o

f B

oile

r ,

ES

P

an

d

P

ow

er

Cy

cle

P

ipin

g

of

1

x

2

50

MW

a

t N

ew

P

arl

i T

he

rma

l P

ow

er

Pro

jec

t m

ah

ara

str

a

Sta

te

Po

we

r G

en

era

tio

n

Co

mp

an

y

Lim

ite

d

at

Be

ed

,

Ma

ha

ras

htr

a

BH

EL

- P

SW

R

22

.51

2

5%

Page 8: Company Profile ZIPL 21.10

De

liv

eri

ng

Qu

ali

ty E

ng

ine

eri

ng

Se

rvic

es…

……

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

9

Ere

cti

on

, T

es

tin

g,

Co

mm

iss

ion

ing

etc

of

bo

iler

& a

ux

of

un

it #

2

& 3

fo

r 3

x2

50

un

its

at

Bo

ng

aig

ao

n T

PS

, S

ala

ka

ti,

As

sa

m

BH

EL

- P

SE

R

69

.51

2

5%

10

E

rec

tio

n,

Te

sti

ng

, C

om

mis

sio

nin

g e

tc o

f b

oile

r &

au

x o

f u

nit

#

for

2x

27

0

un

its

a

t G

VK

G

oin

dw

al

Th

erm

al

Po

we

r P

lan

t D

istr

ict

Ta

ran

tara

n,

Pu

nja

b

B

HE

L-

PS

NR

3

8.0

0

20

%

11

E

rec

tio

n,

Te

sti

ng

& C

om

mis

sio

nin

g o

f B

oile

r ,

Wo

rk u

nit

No

. 6

a f

or

An

pa

ra –

D T

he

rma

l P

ow

er

Pla

nt

of

2x

50

0 M

W U

nit

s

of

UP

RV

NL

at

AN

PA

RA

, S

on

eb

ha

dra

-U

P

BH

EL

- P

SN

R

55

.54

1

8%

12

E

rec

tio

n,

Te

sti

ng

, C

om

mis

sio

nin

g e

tc o

f b

oile

r &

au

x o

f u

nit

#

1&

3

fo

r 2

x2

50

u

nit

s

at

Na

bin

ag

ar

Th

erm

al

Po

we

r P

lan

t D

istr

ict

Au

ran

ga

ba

d B

iha

r

BH

EL

-P

SW

R

58

.11

2

%

13

Ere

cti

on

, T

es

tin

g,

Co

mm

iss

ion

ing

, H

an

dlin

g

ov

er

etc

o

f B

oile

r,

ES

P,

Ro

tati

ng

A

ux

.,

Pip

ing

, In

su

lati

on

, P

ain

tin

g

etc

a

lon

g

Str

uc

tura

l S

tee

l w

ork

s

of

Mill

&

B

un

ke

r B

ay

w

ork

s

, In

ter-

Co

nn

ec

tin

g p

latf

orm

s,

str

uc

ture

s e

tc f

or

Ph

as

e-1

,2x

27

0

MW

Un

it-1

&2

. A

INL

Ch

an

dw

a T

PP

Jh

ark

ha

nd

BH

EL

- P

SE

R

39

.82

1

5 %

14

R

& M

of

Bo

iler

& A

ux

, T

urb

ine

, T

g S

et

& A

ux

, M

isc

ella

ne

ou

s

Eq

uip

me

nt

Fo

r 1

x1

10

Mw

Un

it #

1 A

t M

uz

aff

arp

ur

Tp

s,K

bu

nl,

B

iha

r.

Po

we

rme

ch

/B

HE

L

PS

WR

6

.57

20

%

15

Ha

nd

ling

at

sit

e s

tore

s/

sto

rag

e y

ard

, t

ran

sp

ort

ati

on

, t

o s

ite

of

wo

rk

ere

cti

on

,

tes

tin

g

a

nd

c

om

mis

sio

nin

g

of

HR

SG

,

Uti

lity

Bo

iler

an

d i

ts a

ux

ilia

rie

s ,

Ro

tati

ng

Ma

ch

ine

, i

ns

ula

tio

n

inc

lud

ing

Su

pp

ly a

nd

Ap

plic

ati

on

of

Fin

al

Pa

inti

ng

fo

r B

loc

k –

A(

HR

SG

-2

&

Uti

lity

B

oile

r -2

a

t IO

CL

P

ara

dip

R

efi

ne

ry

Pro

jec

t 3

66

M

W

Co

-Ge

ne

rati

on

C

PP

P

ac

ka

ge

Pa

rad

ip

,

Ori

ss

a

.

BH

EL

PS

SR

- C

he

nn

ai

27

.45

6

%

Page 9: Company Profile ZIPL 21.10

De

liv

eri

ng

Qu

ali

ty E

ng

ine

eri

ng

Se

rvic

es…

……

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

16

E

qu

ipm

en

t e

rec

tio

n

an

d

pip

ing

w

ork

s

of

alu

min

a

refi

ne

ry

pro

jec

t o

f u

tka

l A

lum

ina

In

tern

ati

on

al

Ltd

., R

ay

ag

ad

a O

ris

sa

B

rid

ge

& R

oo

f C

o.

Ind

ia

Ltd

. 7

4.8

7

5 %

17

Str

uc

tura

l, F

ab

ric

ati

on

& E

rec

tio

n W

ork

Of

Ma

in P

lan

t C

W &

Off

sit

e c

ivil

Wo

rk P

ac

ka

ge

fo

r 3

X2

50

MW

B

on

ga

iga

on

TP

P

As

sa

m

SP

ML

1

3.6

0

5 %

18

Ere

cti

on

, t

es

tin

g ,

co

mm

iss

ion

ing

, t

ria

l ru

n ,

ha

nd

ing

ov

er

of

bo

iler

&

its

a

ux

ilia

rie

s

an

d

Str

uc

tura

l s

tee

l w

ork

s

of

Mill

Bu

nk

er

Bu

ildin

g

, T

ran

sfe

r p

oin

ts

, C

on

ve

yo

r G

alle

rie

s

co

nn

ec

tio

ng

pla

tfo

rm i

nc

lud

ing

th

e i

nte

rco

nn

ec

tio

ns

be

twe

en

the

b

un

ke

r b

uild

ing

s

of

Un

it-1

&

U

nit

-2,

wit

h

Co

lum

ns

a

nd

str

uc

ture

s

for

inte

rco

nn

ec

tin

g

ga

lleri

es

e

tc.

of

1x

27

0

MW

Un

it-2

, P

ha

se

-II

at

AN

IL,

4x

27

0

MW

C

ha

nd

wa

T

PP

,D

ist-

La

teh

ar,

Jh

ark

ha

nd

B

HE

L-P

SE

R

44

.40

2

%

19

Me

ch

an

ica

l E

qu

ipm

en

t E

rec

tio

n,

Pip

ing

& P

ain

tin

g W

ork

s O

f

VG

O-H

DT

U

nit

s

of

Pa

rad

ip

Re

fin

ery

P

roje

ct

of

M/s

IO

CL

,

Pa

rad

ip O

ris

sa

Bri

dg

e &

Ro

of

Co

. In

dia

L

td.

45

.90

2

0 %

20

Ere

cti

on

, T

es

tin

g,

Co

mm

iss

ion

ing

, H

an

din

g

ov

er

etc

o

f

Ste

am

Tu

rbin

e &

Au

xili

ari

es

, G

en

era

tor

& A

ux

ilia

rie

s,

Pu

mp

s,

Pip

ing

, M

isc

E

qu

ipm

en

ts,

Ins

ula

tio

n,

Pa

inti

ng

in

clu

din

g

Un

loa

din

g &

Pla

ce

me

nt

of

Ge

ne

rato

r S

tato

r o

n F

ou

nd

ati

on

of

TG

&

A

ux

ilia

rie

s

for

1

x

27

0

MW

(U

NIT

#

2

) C

ha

nd

wa

Pro

jec

t, L

ate

ha

r, J

ha

rkh

an

d.

Po

we

rme

ch

/B

HE

L P

SE

R

4.8

7

20

%

Page 10: Company Profile ZIPL 21.10

De

liv

eri

ng

Qu

ali

ty E

ng

ine

eri

ng

Se

rvic

es…

……

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

21

S

tru

ctu

ral

Fa

bri

ca

tio

n &

ere

cti

on

wo

rk f

or

Mill

& B

un

ke

r B

ay

for

5x

27

0 M

W I

nd

ia B

ulls

at

Na

sh

ik

GD

CL

/In

dia

bu

lls -

De

lhi

75

6

%

22

Pa

ck

ag

e-a

_

Ere

cti

on

, te

sti

ng

, c

om

mis

sio

nin

g,

tria

l ru

n,

ha

nd

ing

ov

er

etc

of

bo

iler,

ro

tati

ng

ma

ch

ine

s a

nd

du

ct,

es

p,

cri

tic

al

pip

ing

, m

isc

p

ipin

g,

bo

iler

inte

gra

l p

ipin

g,

ins

ula

tio

n

an

d f

ina

l p

ain

tin

g e

tc o

f u

_ 1

fo

r 2

x1

95

mw

un

its

fo

r k

bu

nl,

mu

za

ffa

rpu

r p

roje

ct,

b

iha

r a

nd

_

ii_

pa

ck

ag

e-b

_

ere

cti

on

,

tes

tin

g,

co

mm

iss

ion

ing

, tr

ial

run

, h

an

din

g o

ve

r e

tc o

f b

oile

r,

rota

tin

g m

ac

hin

es

an

d d

uc

t, e

sp

, c

riti

ca

l p

ipin

g,

mis

c p

ipin

g,

bo

iler

inte

gra

l p

ipin

g,

ins

ula

tio

n a

nd

fin

al

pa

inti

ng

etc

of

u _

2

for

2x

19

5 m

w u

nit

s f

or

kb

un

l, m

uz

aff

arp

ur

pro

jec

t, b

iha

r.

M/s

BH

EL

-PS

ER

2

7.7

1

0.5

%

CIVIL WORK

23

L

ay

ing

of

Tru

nk

/L

ate

ral/

Bra

nc

h S

ew

er

an

d S

ew

ag

e p

um

pin

g

sta

tio

n a

nd

its

alli

ed

wo

rks

in

se

we

rag

e D

istr

ict

– I

II P

art

II

at

Lu

ck

no

w

UP

Ja

l N

iga

m -

Lu

ck

no

w

17

4.5

5

2%

24

C

on

str

uc

tio

n

of

Co

nv

en

tio

na

l u

nd

erg

rou

nd

m

ult

ilev

el

ca

r p

ark

ing

at

Ha

uz

ran

i in

so

uth

zo

ne

M

un

icip

al

Co

rpo

rati

on

of

De

lhi

2

9.5

1

1%

25

Co

ns

tru

cti

on

of

Te

mp

ora

ry F

en

cin

g w

ith

CG

I s

he

et,

Ce

me

nt

Go

-do

wn

, G

ue

st

Ho

us

e,

Up

-Gra

da

tio

n

of

Fie

ld

Ho

ste

l ,

Pe

rma

ne

nt

Bo

un

da

ry

Wa

ll,

Ap

pro

ac

h

Ro

ad

, F

illin

g

an

d

co

mp

ac

tio

n o

f e

nti

re p

lot

are

a e

tc f

or

2 x

25

0 M

W

Ba

rau

ni

Th

erm

al

Po

we

r S

tati

on

(E

xte

ns

ion

pro

jec

t),

Ph

as

e-I

I, B

IHA

R

an

d C

ivil

wo

rks

fo

r B

oile

r A

ux

ilia

rie

s F

ou

nd

ati

on

fo

r R

& M

job

of

2 x

11

0 M

W

Ba

rau

ni

Th

erm

al

Po

we

r S

tati

on

, P

ha

se

-I,

BIH

AR

.

BH

EL

-PS

ER

7

9.3

1

3 %

*

EN

D *

Page 11: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

CROSS COUNTRY PIPELINE

S.No Customer Plant/Site Description of work Year

1. HZL DARIBA (Raj.) 6”x 6 Km. water pipe line 1981

2. IOCL Virangram (Guj.) 24” x 4 lines x 3 Km. crude oil 1983

3. GAIL HBJ - Jhansi 24”x 50 Kms. Gas Pipe line 1986

4. HZL AGUCHA (Raj.) 8”x 8 Km.water pipe line 1991

5. GAIL Thal Pen (M.H.) 12” x 20 Kms Gas Pipe Line 1994

6. M.R.P.L. Manglore One 36”, One 20”, Two 18” & 12”

Product Lines and 16” Effluent

Disposal Pipe Line x each 4.5

Kms.

1995

7. GAIL Mehsana(Guj.) 4” x 8.5 Kms Gas Pipe line 1995

8. Reliance Hazira(Guj.) 20” x 3 Kms Product line 1996

9. GAIL Ankleshwar(Guj.) 4” x 13.5 Kms Gas Pipelines 1996

10. Oil India Jodhpur 4” & 3” x Carbon steel/stainless

steel Gas flow lines at different

Gas Wells

2000

11. IOCL Merrut-Sonipath 10”x 77 Km. diesel pipe line from

Sonipat to Meerut

2000

12. HZL AGUCHA (Raj.) 16”x7.5 Km. water pipe line. 2004

13. L &T Hyderbad Fabrication & Erection of Aviation

Fuel Hydrant system for

Hyderabad Int. Airport

2006

Page 12: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

REFINERIES AND PETROCHEMICALS

S. No. Customer Plant / Site Description of work Year

1. ONGC Uran(M.H.) Fab & Erec. Of piping 1979

2. Reliance Patalganga(M.H.) Fab &Erec. Of piping 1979

3. C.T.T.L. Trombay (M.H.) Fab &Erec. Of piping 1979

4. I.P.C.L. Baroda(Gujarat) Fab &Erec. Of piping & equipments 1983

5. ONGC Uran(MH) Fab &Erec. Of piping 1984

6. Reliance Patalganga(M.H.) Fab &Erec. Of piping 1985

7. Bharat

Petroleum

Mahul(M.H.) Fab &Erec. Of piping & strc.,

Furnace &stack

1988

8. Reliance Hazira(Gujarat) Fab & Erec of str. & piping

& equipment for furnace, cracker,

Meg, VCM .

1994

9. A.T.V. Chatta(U.P.) Fab & erec of piping 1994

10. MRPL Manglore

(Karnataka)

Fab &erec. Of heaters and

supporting structures

1994

11. IPCL Dahej(Gujarat.) Piping and equipments Inst. 1998

12. Reliance Jamnagar(Gujarat) Heaters,Piping and equip. 1999

13. MRPL Manglore

(Karnataka)

Piping and Equip. for cdu/vdu, 1999

14. GAIL Pata(U.P.) LPG storage facility 1999

15. IOCL Mathura (U.P.) Effluent collecting System 2000

16. IOCL Baroda (Gujrat) Shut down 2004

17. IOTL Panipat Fabrication & Erection of Off Site

Piping at IOCL Panipat

2005

Page 13: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

18. REAL (RIL) Jamnagar

(Gujarat)

Fabrication & Erection of Off Site,

Plant & Tank Form Piping &

Equipment.

2006

19 RIL Hazira (Gujarat) Fabrication & Erection of Off Site,

Plant & AS IBR Piping &

Equipments.

2006

20 Reliance Jamnagar U/G Piping with Related Civil Work

at Reliance Jamnagar Complex

2006

21 B & R Company (I) Ltd

BORL -Bina (MP) Mechanical Works for Above Ground Piping of Offsite for Bharat Oman Refinery Limited at Bina MP

2010

22 Samsung Eng. Co. Limited -

Opal Dahej (Gujarat)

Fabrication & Erection of UG Piping & its Allied Civil work at Opal Dahej ( Gujarat )

2010

23 B & R Company (I) Ltd

BORL-DCU Bina (MP)

Fabrication & Erection of UG & AG Piping , Equipment & allied civil works at Bharat Oman Refinery Limited at DCU Bina MP

2011

Page 14: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

COMPLETED JOBS FOR POWER PLANTS

S. No.

Customer Plant/ Site Description of site Year

1 TATA Trombay(MH) Erection of Structures for 500 MW

Thermal Station 1980

2 Reliance Patalganga(MH) 2 MW Captive Power Plant comp.

installation 1986

3 Reliance Patalganga(MH) Installation of DG sets and piping 1985

4

N.T.P.C. Antah(Rajasthan) 60 MM, fabrication & erection of structural of combined cycle, power Station.

1986

5 N.T.P.C. Vindhyachal(MP) Erection of inter connected piping for 210

MW power project. 1988

6 TATA Babrala(UP) 32 MW piping for captive boiler unit & heat

recovery boiler. 1993

7 USHA Ispat Reddi(MH) Complete erection of captive boiler 1993

8 Bindal Agro Shahjahanpur

(UP) 32 MW complete erection of gas turbine & heat recovery boiler unit.

1994

9 MRPL Mangalore Erection supervision contract 1995

10 Him Ambuja Cement Ltd.

Darlaghat (HP) Installation of two Nos. of 6 MW DG sets & auxiliary equipments.

1996

11 Him Ambuja Cement Ltd.

Darlaghat (HP) Installation of two Nos. of 6 MW DG sets & auxiliary equipments.

1997

12

Wartsila NSD India Ltd.

Gajraula Hauling, erection & commissioning of DG sets & related auxiliaries 2x12 V 32 LN DG sets.

1998

13

Wartsila NSD India Ltd.

Indore(MP) Hauling, erection & commissioning of DG sets & related auxiliaries 1x12 V 32

1998

14

Wartsila NSD India Ltd.

Indore(MP) Hauling, erection & commissioning of DG sets & related auxiliaries 1x 12V 32

1998

15

Wartsila NSD India Ltd.

Kothapur Fabrication & erection of tanks and chimney, erection of DG sets & auxiliaries

1998

16

Wartsila NSD India Ltd.

Eurotex India Ltd.

Fabrication & erection of tanks and chimney, erection of DG sets & auxiliaries

1998

Page 15: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

17 BHEL Mathura (UP) Erection, testing, commissioning of 1x 120

tph boiler. 1999

18 BHEL Pata Erection, testing, commissioning of 1x 120

tph boiler. 1999

19

EID-Pery Ltd. Cuddalore Boiler dismantling & Re-Erection, fabrication & erection of equipments structure and piping

1999

20 Ambuja Eastern Cement Ltd.

Raipur Erection and commissioning of ten 10 MW DG Set.

2000

21

Pragati Power Plant

Delhi Fabrication and Erection of About 4500 MT Structural Steel & 1600 MT of Cooling Water System

2003

22

BARC Tarapur Atomic Power Project

Piping, Equipment Erection related to Primary Heat Transport System at Tarapur Atomic Power Project .

2006

23 I. P. Power Station

Delhi Retrofit of ESP for 5X60 MW Power Station

2006

24 BHEL Chanderia (Raj) 80 MW Erection , testing , commissioning

of Boiler 2009

25 BHEL Zawarmines

( Raj.) 80 MW Erection , testing , commissioning of Boiler

2009

26 NBCC/BHEL Chandrapura

(Jharkhand) Fabrication & Erection of Structural Steel for 2 X 250 MW Thermal Power Plant at DVC Chandrapura (Jharkhand)

2009

27 REL/UEEPL Rosa Shahjan

Pur (UP) Fabrication & Erection of Structuiral Steel for Unit -2 x 300 MW Rosa Thermal Power Plant Shahjan Pur (UP)

2010

Page 16: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

AUTOMOBILE INDUSTRIES

S. No.

Customer Plant Description of site Year

1 Maruti Gurgaon Installation of 2000 ton Tri axis Press (Komutsu)

1985

2 Maruti Gurgaon Installation of 1800 ton Tandem press (Komutsu)

1986

3 Machino Plast Gurgaon Installation of injection molding machine

1987

4 Machino Plast Gurgaon Installation of injection molding machine

1988

5 Maruti Gurgaon Installation of weld shop machines

1989

6 Maruti Gurgaon Installation of 400 ton Blanking line & Die Spotting Presses

1990

7 Maruti Gurgaon Installation of 3500MT Transfer Press (Komutsu)

1993

8 Maruti Gurgaon Shifting of Tool Room machines to New Tool Room

1993

9 Maruti Gurgaon Installation of machines of machine shop

1993

10 Maruti Gurgaon Installation of machines of Wed shop

1993

11 Maruti Gurgaon Installation of machines of machine shop

1994

12 Maruti Gurgaon Installation of 2400 MT transfer press (Komutsu)

1994

13 Caparo Maruti Gurgaon Installation of 800 Ton Tandem Press(Fagor - Spain)

1995

14 Hero Honda Motors Gurgaon Installation of 800 Ton Tandem Press (Aida - Japan) & 250 Ton press from ISGEC

1996

15 Daewoo Motors Gr. Noida Installation of 1)1800 Ton Tandem Press (Hitachi - Japan)

1996

2)2400 Ton Transfer Press (Hitachi - Japan)

3)3500 Ton Transfer Press (Hitachi - Japan)

Page 17: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

4)1000 Ton Try Out Press (Hitachi - Japan)

5)Blanking Line

6)Die Spotting Press (Hitachi - Japan)

7) Machine Shop (Totaling-10000 MT Machines.)

8) D.G.Set (2 M.W.)

9)Aluminum Die Casting Shop

16 Ford Motors Chennai Installation of 2300 MT Tandem Line(Schuler- Brazil)

1997

17 Sona Sonic Gurgaon Installation of Presses (Enotomo - Japan)

1997

18 Maruti Gurgaon Installation of machines of Machine Shop

1997

19 Morri-Roku Noida Installation of Injection Molding Machine

1997

20 Maruti Gurgaon Installation of 1998

1) 2400 MT Transfer Press (komutsu)

2) 4000 MT Transfer Press

3) 600 MT Sheering Press

21 Maruti Gurgaon Installation of Presses of Machine Shop

1999

22 HMT Katni / Ambajan

Installation of Presses for DEFENCE

2000

23 Toyota Banglore Installation of Presses for Press Shop

2000

24 Mahendra & Mahendra Nasik Installation of 2400 MT Press Line (Hitachi)

2001

25 Nagata India Gurgaon Installation of Press 2002

26 Toyota Bangalore Installation of Presses for press Shop

2004

27 Toyota Tisso Bangalore Installation of Injection Molding Machine

2004

28 Mark Auto Gurgaon Installation of Press Machine & associated Civil Foundation Work

2005

29 Nagata India Ltd Gurgaon Installation of Press Machine & associated Civil Foundation Work

2005

30 Maruti Manesar Supply of Material, Main Press 2006

31 Maruti Manesar Fabrication items for 4000 ton tendem press line

2006

Page 18: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

32 Maruti Manesar Design, Manufacturing, Supply and Installation of Pip Cover, Hoist Crane, exhaust fans and lighting for Cylinder Block line Centralized coolant system pit.

2006

33 Maruti Manesar Erection & Commissioning of 200 T Die Spotting Press

2006

34 Maruti Manesar Supply of Power Cable and Flexible Conduit Tube with Fittings

2006

35 Maruti Manesar Installation of 9” Pitch Conveyor 2006

36 Maruti Gurgaon Commissioning of 2 Nos. CNC Milling Machine

2006

37 Maruti Manesar Installation of Doha Carburising Furnace Installation

2007

38 Toyota Isusha India Pvt Limited

New Delhi Equipment Installation for Maruti Udyog Limited.

2007

39 Honda Trading Corporation India Pvt. Ltd Gurgaon Harayana

Bhiwadi Installation Tendem Line Press machine at Tapukhera Plant Bhiwadi

2008

Page 19: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

CEMENT INDUSTRIES

S. No.

Customer Plant/ Site Description of Scope Year

1 Him Ambuja Dariaghat(H.P.) Erection of machinery, equipments and structures of preheaters, kilns, raw mill, coal mill, long belt conveyor

1994

2 Gujrat Ambuja Cements

Kodinar(Gujarat) Fabrication of preheater stock file, ESP, polycon equipments & Str. & Erection of ESP & polycon structural, Machin & equip

1995

3 Laxmi cements Sorihi( Rajasthan) Erection of preheater, cooler, ESP & kiln, Str. & equipments

1995

4 Sanghi Cements

Naliya(bhuj) Fabrication of preheater bag house structural & equipments.

1995

5 Raj cements Beawar (rajasthan) Fabrication of Str. & equipments of stack, conveyor, cement mill, raw mill erection of struc. Machineries & equipment of crusher house stacker, reclaimer cem. Mill & belt conveyor, stack, raw mill

1996

6 ACC cements Kymore(M.P.) Fabrication of preheater str. & equipments.

1996

7 Ultra Cement Limited

Tadpatri (A.P.) Fabrication & Erection of Structural Steel Work For L&T Ltd.

2007

8 Lafarge India Pvt. Ltd. (Kolkata )

Mejia (West Bengal) Mechanical Work of 1 MTPA Clinker Grinding Unit including Cement Mill and Chutes & Ducts Piping etc.

2009

9 Dalmia Cement (Bharat ) Ltd. New Delhi

Kadappa (A.P.) Mechanical Fabrication & Erection of Chutes & Ducts Structure Steel Erection of Plant & Machinery for Cement Plant Including Cement Mill, KILN (App.15000 MT

2009

Page 20: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

STEEL PLANTS

S.No. Customer Plant Description of Work Year 1 Nippon Derno Kaimeshwar

(MH)

Erection of continuous color

coating line and other

1987

2 Essar Steel Hazira (Guj) Erection of structures &

equipments of conveyors

1989

3 Usha Ispat Ltd. Redid (MH) Fabrication and erection of blast

furnace stoves & piping

1992

4 Sesa Goa Goa Fabrication and erection of blast

furnace stoves & piping

1993

5 Essar phase-II Hazira (Guj) Fabrication and erection of arc

furnace piping

1994

6 Malvika Steels

Ltd.

Jagdishpur

(UP)

Fabrication and erection of blast

furnace stoves & piping

1993

7 Nippon Derno Pen(MH) Fabrication & erection of ducting

& piping

1994

Page 21: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

S.No Customer Site Description of Work Year

1 N.F.L. Panipat (Haryana) Fabrication and erection of Str. &

piping for Ammonia & Furnace

1976

2 N.F.L. Bhatinda (Punjab) Fabrication and erection of Str. &

piping in compressor house and

furnace

1978

3 Neyveli Legnite

Corp.

Neyveli (TN) Fabrication and erection of Str. &

piping

1978

4 IFFCO Phulpur (UP) Fabrication and erection of Str. &

piping for Naptha Unloading, sub

stations, Off-site etc.

1978

5 G.N.F.C. Bharuch (Guj) Cooling water system 1979

6 R.C.F. Trombay (MH) Furnace piping 1980

7 Kribhco Fertilizer Hazira (Guj) Urea & Ammonia inter connection

& off site

1983

8 IFFCO Fertilizer Aonala(UP) Fabrication and erection of Str. &

piping for furnace, urea plant, off

site, fire protection system

1986

9 Chambal

Fertilizers Ltd.

Gadepan (Raj.) Fabrication and erection of Str. &

piping for furnace & fire fighting

system

1992

10 Tata Fertilizers

Ltd.

Babrala (UP) Fabrication and erection of Str.,

piping, equipment for raw water

system, ammonia off sites, D.M.

water, captive power plant

1993

11 Bindal Fertilizers

Ltd.

Shahjahanpur(UP) Fabrication and erection of Str. &

piping, equipment for urea

ammonia, singas compressor

house and gas turbine.

1994

FERTILIZER PLANTS

Page 22: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

12 Chambal

Fertilizers Ltd.

Gadepan (Raj.) Piping for Ammonia 1999

Page 23: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

ROAD WORKS

S.No Customer Plant / Site Description of work Year

1 NHAI - BSC.RBM.PATI NH 8

(Haryana -

Rajasthan)

Construction of

Embankment ,sub grade

& GSB of Gurgaon -

Kotputli

1999

2 NHAI-U.PSBC Ltd. NH 24

Moradabad

(UP)

Construction of

Embankment, sub

grade & G.S.B. for By-

Pass

2000

3 PWD - UPSBC Ltd.. Dhaula Kuan

(Delhi)

Excavation of Soil &

Rock for Flyover

2001

4 NHAI - CDS (Russia)/

Mukand

NH 2

(Kanpur -

Allahabad)

(U.P.)

Construction of

embankment, sub grade

& G.S.B.

2001

5 Indore Development

Board

Indore (M.P.) Widening & Repairing of

Indore city road.

2001

Page 24: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

FOUNDATION AND PLINTH WORK (Through our associated company)

S.No Customer Size (Length x

Dia)

Nos. Year

1 Sunil Solvex (Etawah, UP) 12 mtrs x 450 mm 750 1994

2 L & T Ltd. (Mohali, Punjab) 8 mtrs x 375mm 575 1995

3 Anant spinning mills (Mandi Deep,

MP)

8 mtrs x 300mm 800 1995

4 Nippon Denro – Pen 2000 Cum - 1995

5 HP Constructions (Adampur, Punjab) 8 mtrs x 400 mm 400 1996

6 Phonex India (Noida, UP) 6 mtrs x 375 mm 315 1996

7 Sikand Construction (Rudurpur, UP) 6.5 mtrs x 375 mm 380 1997

8 Febritech Associates (Kashipur, UP) 8 mtrs x 250/400mm 300 1998

9 Shri Ram Honda Power Equip. 6.5 mtrs x 350 mm 54 1999

10 UEM India (Nilothi, New Delhi) 11 mtrs x 450/550mm 1290 2000

11 Delhi Jal Board 11 mtrs x 450 mm 700 2000

12 MCD 11 mtrs x 450 mm 700 2000

13 Suresh Sapra and Constructions 10 mtrs x 400 mm 375 2001

14 PWD (Sirsa, Haryana) 8 mtrs x 500 mm 150 2001

15 Police Housing Corpn. (Hisar,

Haryana)

3.5 mtrs x 400 mm 225 2002

16 PWD (Sirsa, Haryana) 6 mtrs x 400 mm 225 2003

17 BSNL (Lucknow, UP) 15 mtrs x 400 mm 250 2003

18 CPWD (Barmer-Jodhpur, Rajasthan) 5 mtrs x 300 mm 350 2003

19 Northern Railway (New Delhi) 18 mtrs x 1000 mm 250 2003

Page 25: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

20 BHEL – I.P. Station (New Delhi) 2000 Cum - 2004

21 Mark Auto – Gurgaon 1300 Cum - 2005

22 Nagata India – Gurgaon 200 Cum - 2005

Page 26: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

RESERVOIRS , DAMS AND OTHER STRUCTURES

S.No. CUSTOMER SITE DESCRIPTION YEAR

1 NIPPON DENRO PEN Water Treatment Plant 1995

2 HZL AGUCHA

MINES (Raj.)

50,000 cum capacity RCC

Reservoir of 98.00 mtr. Dia. X 7.5

mtr. Height on EPC basis

2004

3 HZL AGUCHA

MINES

(Raj.)

30,000 cum capacity Earthen

Reservoir of 133.85 mtr. X 83.50

mtr. X 3.85 mtr.

2004

4 HZL AGUCHA

MINES

(Raj.)

Construction of Tailing Dam 2005

Page 27: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

SHIP BUILDING , AIRPORT AND OFFSHORE PLATFORMS

S.No. Customer Plant /

Site

Description of Site Year

1 SESA GOA SHIP

BUILDING DIVISION

GOA Construction of Barge 1993/94

2 SESA GOA SHIP

BUILDING DIVISION

GOA Repairing of Ships 1993/94

3 S.B.C. INDIAN NAVY Vizag Construction of Vessel 2000

4 ONGC - L&T Limited Hazira Construction of Off shore

Platform

2004/05

5 L&T Limited Hyderabad Fabrication & Erection of

structural steel for Hyd.

International Airport

2006/2007

6 L & T Delhi GMR Delhi Structural Steel works for

Fixed Link &PTB at DIAL -

Delhi

2009

Page 28: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

MINING AND CRUSHING

S.No. Customer Plant / Site Description of Work Year

1 Mukand Limited Kabrai / NH-2

Near Kanpur

Mining and Crushing of

Boulders

2001

2 Somdutt Builders Kabrai / NH-2

Near Kanpur

Mining and Crushing of

Boulders

2001

3 Delhi Metro (IMCC)

Behrampur

(Gurgaon)

Mining and Crushing of

Boulders

2002/03

4

L&T Limited Dankari Orissa

/ NH-5

Mining and Crushing of

Boulders

2002 / 04

Page 29: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

S. No.

Job Description

Customer

Year of Completion

1. Laying and jointing of RCC

Sewer line and associated civil

works for Bhoj Wet Land Project

at Bhopal, M.P. through M/s

L&T Ltd.

Bhoj Wet Land Sept. 2000

2.

Supplying, laying and jointing of

Sewerage system for Urban

Improvement Trust – Udaipur

Urban Improvement Trust May. 2004

SEWERAGE WORK

Page 30: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

Page 31: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

LIST OF OUR PLANTS & MACHINERIES

S. �o. Particulars Capacity Qty

(In �os.)

Remarks

Heavy P&M

A. MECHANICAL

1. Gantry Crane Up to 180 MT 6

2.

3.

Crawler Cranes Telescopic/Hydraulic Cranes

Up to 75 MT Up to 250 MT Up to 80 Up to 150

14 6 5 6

4. Mobile Cranes / Hydra

15/12 MT 74

5. Power Generators Up to 35/20/625KVA

15

6. Air Compressors 600 CFM 7

7. Forklift 3T 4

8. Winches Electrical 10/5/3 MT 90

9. Plate Bending Machine 25 MM PL 8

10. Power Press 20 T 1

11. Welding Machines (MG Set / Rectifiers) 400 Amp 3242

12. a) MIG – Welding Machine b) SAW – Welding Machine c) Plasma Cutting Machine

600 Amp 400 Amp Up to 50 m

51 4 3

13.

14.

15.

16.

Pipe Bending Machines Pug Cutting M/C Chain Blocks

Tractor Trolley /Trailor

Up to 300 NB 2 T/3T/5T/10T Up to 20 Ton

18

280

1500 18

B.

CIVIL

Page 32: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

1.

Tower Crane

175M X 60MX10

Ton

1

2.

3.

Excavators- Tata Hitachi I Komatsu/Poclain (With Rock Breakers) Back Hoe/wheel Lauds

Up to 1.2 m3 0.5/0.6 m3

9 4

4.

Dumpers

6/10 Wheel

40

5. Batching Plant 60/20/10 Cum/Hr 3

6.

Piling Rigs with accessories for DMC method Up to 1250 mm. 6

7. Piling Rigs with accessories for Earth Augur method

Up to 1250 mm. 20

C. OTHERS

1. Pressurizing Pumps Up to 400 Kg/Cm2

12

2. Jeeps/Pick-up 8/13 Seaters 30

3. Concrete Drill Machines 40 mm 12

4. Magnetic Drilling Machines/ All Cut Drilling 40 mm 120

5.

6.

7.

8.

Radial Drill Machine Grinding Machine Portable Sand Blasting Unit Precision Auto Level/Dumpy Level Precision Auto Level/ Dumpy Level

60 mm AG-9/AG-7 GQ-6,GQ-4

12

2500 6

20

12.

13

14

Theodolite - Digital / Manual Master Level Torque Wrench M/c

14

120

75

15. Total Station 2

16. Electrical Measuring Instruments Meagar Tons Testing

32

17. Temp. Recorders Stress Relieving Panels 6 Point 25

Page 33: Company Profile ZIPL 21.10

Delivering Quality Engineering Services………

IISSOO 99000011::22000088 ::::IISSOO 1144000011::22000044::::OOHHSSAASS 1188000011::22000077

18. Pressure Recorders 100 Kg/Cm2 2

19. Holiday Detectors With Rings 6

20. Gas cutting Sets (Manual) 2200

21. U/G Pipe I Cable Locator 2

22. Hydraulic Mechanical Jacks Up to 200 Tons 49

23. Thread Cutting Machines 10

24. Concrete Mixer Machines 14/10 CFT 8

25. Filling I De-watering Pumps (Kirloskar / Crompton)

19

26. Pipes Beveling Machines 4

27. Welding Trolley for Tanks 10

28. Jack-up system for Tanks-a) Jack b) Hydraulic Unit

12 T 02T

130 2

29. Cube Testing Machine 100 Ton 5

30. Cube Moulds 150mm X 150mm 250

31. Concrete Cutter HILTI/BOSCH Make

2

32

33

34

Portable Office (Containers)

Box Oven Carry Oven

Up to 3000C

Up to 3000C

32

90

2550