22
Collaboration and Innovation in a Post-Tensioned Waffle Slab. Neeta City Shopping Centre Shaun Sullivan Structural Systems (Northern) Pty Ltd

Collaboration and Innoviation in Post-tensioned Waffle Slab

Embed Size (px)

DESCRIPTION

Losas nervadas postensadas

Citation preview

  • Collaboration and Innovation in a Post-Tensioned Waffle Slab.

    Neeta City Shopping Centre

    Shaun Sullivan

    Structural Systems (Northern) Pty Ltd

  • Introduction

    Collaborative Effort between Contractor, Consultant & Specialist

    Contractor

    A Solution to your Weighty Problem A Post Tensioned Waffle Slab

    Structural Systems (Northern) Pty Ltd

  • Project Overview Extension and refurbishment of the Neeta City Shopping Center,

    Fairfield

    Existing 1st Floor car-park converted to a new Big W Store.

    Approx 5800m2

    New Floor 300 to 400mm above the existing car-park floor.

    Floor Live Load increased from 3kPa to 5KPa / 10kPa

    Structural Systems (Northern) Pty Ltd

  • Project Constraints Operating Woolworths supermarket in floor below +

    carpark over

    No space beneath could be used for construction

    No significant construction noise during business hours.

    Weight of new floor less than slab capacity.

    Relatively long spans & falls in carpark

    Structural Systems (Northern) Pty Ltd

  • External UpstandRemained

    Kerbs & Planter Upstand Removed

    Structural Systems (Northern) Pty Ltd

  • Existing Risers

    Stormwater pipes through slab

    Structural Systems (Northern) Pty Ltd

  • Conforming RC Scheme New waffle slab composite with existing PT floor

    Locate existing tendons

    Dowels @ 250cts & scabblingexisting concrete

    Styrene void formers

    Reinf. Mat typ + extra bars at columns

    Ribs @ 1600max cts Existing Tendons

    PLANStructural Systems (Northern) Pty Ltd

  • Construction Noise Approx 30,000 Dowels & 8000m of 200wide scabbling

    Scabbling and drilling outside business hours. Costly and timely!

    Day NightNight

    Woolworths Trading Hours

    LocalResidents

    LocalResidents

    Limited time to perform noisy work!

    Structural Systems (Northern) Pty Ltd

  • Alternative PT Scheme Post-tensioned waffle slab

    Isolated from the existing floor surface.

    Connection to Existing Columns by Dowels

    Temporary IJ to existing columns to allow movement.

    Structural Systems (Northern) Pty Ltd

  • Typical Scheme Details 200 wide ribs @ 1500 cts Joint locations reflect existing slab 90mm thick RC slab between ribs Pour strips for stressing access Bond breaker to existing slab

    Structural Systems (Northern) Pty Ltd

  • Structural Systems (Northern) Pty Ltd

  • Structural Systems (Northern) Pty Ltd

  • Structural Systems (Northern) Pty Ltd

  • Core Connections Bars epoxied into core

    Sleeved for movement

    10mm isolation to existing slab

    Structural Systems (Northern) Pty Ltd

  • Why Isolate? Typical Slab Columns deflect to accommodate PT force

    As slab is poured directly on existing, columns cannot deflect - post-tensioned force lost

    Structural Systems (Northern) Pty Ltd

  • Column Connections Column Reinf. Located

    Oversized holes cores

    Tapered isolation gap (preformed metal mesh)

    Grouted at 56 days

    Structural Systems (Northern) Pty Ltd

  • Column Connections

    Structural Systems (Northern) Pty Ltd

  • Back of House Hanging Load Wider ribs (extra DL) required

    in 10KPa area

    Unable to prop from below

    Load hung from carpark slab over

    Reidbar threaded reinforcement & plates

    Woolworths

    Carpark

    New Slab

    Existing Slab

    Structural Systems (Northern) Pty Ltd

  • Back of House Hanging Load

    Structural Systems (Northern) Pty Ltd

  • Hanging Support Very long span in 10Kpa area Unable to span with available

    depth Room underneath slab not

    available Blade column introduced

    Structural Systems (Northern) Pty Ltd

  • Curved Beam Irregular column grid Extra concrete and DL

    required to span Composite section used

    similar to RC scheme

    Structural Systems (Northern) Pty Ltd

  • Summary

    Minimal disturbances to existing tenancies Savings in construction time. Challenges solved through collaboration of

    interested parties

    Thankyou

    PT solution eliminated significant amount of construction noise.

    Structural Systems (Northern) Pty Ltd