Upload
dangnhan
View
261
Download
0
Embed Size (px)
Citation preview
CMTS and Docsis 3.0 update
Daniel Etman, Product Manager CMTS BU
This Roadmap is included for informational purposes only and is subject to change at Cisco’s sole discretion. The features
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID 1
will be offered on a when-and-if-available basis, and Cisco will have no liability for delay in delivery or failure to deliver any of
the features set forth in this document.
Cisco’s Commitment to the IndustryMarket Leadership
Leading CMTS vendor
First with EuroDocsis 3.0 ds bonding, IPv6 and Multicasting
Technology Leadership4 worldwide development centers
San Jose, Boxborough, Bangalore, Shanghaig g g
300 development engineers working on CMTS’s
Over 2000 development engineers company wide
working on CMTS related developmentworking on CMTS related development
Largest Product Portfolio in the Industry uBR10K
uBR7246VXRuBR7246VXR
uBR7225VXR
All have a roadmap to full EuroDocsis 3.0I P i
2
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
Investment ProtectionOnly vendor with Investment Protection track record.All in house development, no acquired technology forcing forklift
Over 6,600 ubr10K’s shipped
End-to-End Cisco DOCSIS 3.0 Solution<15K Subs/Hub
EPC3010Data Modem
Up to 48 QAM ChannelsRFGW-1 EQAM
8X4 DOCSIS 3.0
HFC EPC3212EMTA2 Phone Lines8X4 DOCSIS 3.0
uBR100012 CMTS
>15K Subs/Hub EPC3925
RFGW-10 EQAM> 480 QAM Channels
EPC3925Wireless Gateway2 Phone Lines8X4 DOCSIS
Phase 1 - 88 Phase 2 - 184 Phase 3 - I-CMTS Phase 4 - 3G60, 512
3
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
Downstream and 160 Upstream channels,
IPv6
Downstream and 160Upstream channels,dynamic multicast
MC2020, 304Downstream and 160Upstream channels
,Downstream and 480Upstream channels
Cisco uBR product FamilyRoadmap to Docsis 3.0
“This Roadmap is included for informational purposes only and is subject to change at Cisco’s sole discretion. The features will be offered on a when-and-if-available basis and Cisco will have no liability for delay inwhen and if available basis, and Cisco will have no liability for delay in
delivery or failure to deliver any of the features set forth in this document”
4
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
Cisco’s uBR product FamilyCisco s uBR product Family
Roadmap to Docsis 3.0
This Roadmap is included for informational purposes only and is subject to change at Cisco’s sole discretion. The features
5
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
will be offered on a when-and-if-available basis, and Cisco will have no liability for delay in delivery or failure to deliver any of
the features set forth in this document.
Cisco uBR10KI-CMTS & M-CMTS
“This Roadmap is included for informational purposes only and is subject to change at Cisco’s sole discretion. The features will be offered on a when-and-if-available basis and Cisco will have no liability for delay inwhen and if available basis, and Cisco will have no liability for delay in
delivery or failure to deliver any of the features set forth in this document”
6
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
uBR10KuBR10K
I-CMTS & M-CMTS
This Roadmap is included for informational purposes only and is subject to change at Cisco’s sole discretion. The features
7
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
will be offered on a when-and-if-available basis, and Cisco will have no liability for delay in delivery or failure to deliver any of
the features set forth in this document.
2006 – MC520 Line Card
TCC
MC520
UPL
INK
120%
el
Cost per Downstream
U
Density
80%
100%
trea
m C
hann
e
ps p
er R
U) DS : 40
US : 160DOCSIS : 1.x, 2.0
Density
40%
60%
st p
er D
owns
t
Den
sity
(Mbp
,
RF PerformanceRF DensityHA
8
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
0%
20%Co HA
IPv6 MC520
2007 – 2 x ED3.0 DS SPA
DTCC
MC520
UPL
INK
2 SP
A
120%
el
Cost per DownstreamDensity
U 2
DS : 40→76US : 160DOCSIS : 1.x, 2.0, 3.0 BRONZEI CMTS & M CMTS
80%
100%
trea
m C
hann
e
ps p
er R
U)
Density
I-CMTS & M-CMTS
>2x DS CapacityD1.x/2.0 Load BalancingD3 0 B d d S i
40%
60%
st p
er D
owns
t
Den
sity
(Mbp
9
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
D3.0 Bonded ServicesNO RF Re-Cabling – Lo OPEX
0%
20%Co
2008 – 6 x ED3.0 DS SPA
DTCC
MC520
3.0
SP
APL
INK
SPA
6 D
2 U
P
120%
el
Cost per DownstreamDensity
DS : 40→76→148US : 160DOCSIS : 1.x, 2.0, 3.0 BRONZEE roDOCSIS EHP compatible
80%
100%
trea
m C
hann
e
ps p
er R
U)
Density
EuroDOCSIS EHP compatibleI-CMTS & M-CMTS
>4x DS CapacityS l d Hi h A il bilit
40%
60%
ost p
er D
owns
Den
sity
(Mbp
10
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
Scale and High AvailabilityD1.x/2.0 LB and D3.0 BondingNO RF Re-Cabling – Lo OPEX0%
20%Co
2009 – MC2020V Line Card
DTCC
MC2020
3.0
SP
APL
INK
SPA
6
D2
UP
120%
el
Cost per DownstreamD it
DS : 40→160US : 160EuroDOCSIS : 1.x, 2.0, 3.0 FULLI CMTS
80%
100%
trea
m C
hann
e
ps p
er R
U)
Density
I-CMTS
>7x DS CapacityLarge Scale, HA & USCBD1 /2 0 LB d D3 0 B di
40%
60%
st p
er D
owns
t
Den
sity
(Mbp
11
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
D1.x/2.0 LB and D3.0 BondingNO RF Re-Cabling – Lo OPEX
0%
20%Co
2009 – MC2020V Line Card
DTCC
MC2020
3.0
SP
APL
INK
SPA
6
D2
UP
120%
el
Cost per DownstreamD it
DS : 40→76 →148→268US : 160EuroDOCSIS : 1.x, 2.0, 3.0 FULLI CMTS & M CMTS
80%
100%
trea
m C
hann
e
ps p
er R
U)
Density
I-CMTS & M-CMTS
>7x DS CapacityVery large Scale, HA & USCBD1 /2 0 LB d D3 0 B di
40%
60%
st p
er D
owns
t
Den
sity
(Mbp
12
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
D1.x/2.0 LB and D3.0 BondingNO RF Re-Cabling – Lo OPEX
0%
20%Co
Integrated CMTS - Downstream QAMs part of CMTS Core
Modular versus Integrated CMTS Integrated CMTS - Downstream QAMs part of CMTS Core -Benefits
-Simple, self contained
-Restrictions-Data only
-Fixed configurations limited by chassis and line-card configuration-Fixed configurations limited by chassis and line-card configuration
-Onwards cost curve inflexibility
Modular CMTS – Downstream QAMs external to CMTS Core-Benefits
-Allows Converged Data + Video services on M-CMTS EQAM
-Scalability beyond chassis restrictions-Scalability beyond chassis restrictions
-Operators can pick ‘best of breed’ M-MCTS EQAM
-M-CMTS EQAM competition as a cost driver
13
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
-Restrictions-Requires DTI server
-Considerations needed for HA EQAM redundancy
Cisco uBR10K MC2020 Linecard• Full DOCSIS 3.0 support
Downstream Bonding Upstream BondingIPv6MulticastAES (in Hardware)
• Upgrade for MC520 LCspgSame RF CablingRetains 520 configVery low operational impacty p p
• Full HA supportCan act as fail-over card for
520 and 2020 line-cards• Utilizing RFGW-1D phy
No change in RF behaviour• Utilizing us phy of the 520H- Beta cards currently in customer labs
14
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
No change in RF behavioury
- Orderability open NOW!!- FCS scheduled for December 8
MC2020 Features
1. Full DOCSIS 3.0 complianceDS bonding/US bondingLegacy DOCSIS 1.x and 2.0 modem supportMulticast, IPv6 and other DOCSIS 3.0 specsS-CDMA and logical channelsAES encryptionQualification planned 2nd Half CY2010
2 Line rate performance on US and DS on all channels (Annex A/B)2. Line rate performance on US and DS on all channels (Annex A/B)3. MC2020 as Protect for MC520 and MC20204. Full Feature parity with MC520H5. Support with both PRE-2 and PRE-46. Interoperable with the EuroDOCSIS 3.0 M-CMTS DS SPA7. SW licensing available
15
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
g
2010 – MC3G60 Line Card
60
DTCC
MC
3G
6
x 10
GE
LIN
K S
PA
120%
el
Cost per DownstreamDensity
2 U
P
DS : 40→76 →148→268→432US : 160→480EURODOCSIS : 1.x, 2.0, 3.0 FULLM CMTS
80%
100%
trea
m C
hann
e
ps p
er R
U)
Density
M-CMTS
>12x DS Capacity3x US Capacity
40%
60%
st p
er D
owns
t
Den
sity
(Mbp
16
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
Massive Scale0%
20%Co
Cisco uBR10K MC3G60 Linecard• Full DOCSIS 3.0 & M-CMTS Support
• >12x DS capacity in same uBR10K i t ll d h i
3G60
installed chassis
• 40 88 184 304 576 DS
• ~20Gbps DOCSIS connectivity
MC • 5 to 6 times the DS capacity of
competitive CMTS platforms
• 3x US capacity (160 480 US)y ( )
• Full HA
• Software licensing to enable selectable DS & US counts
• 1G24, 2G48, 3G24, 3G60, etc…
• Special V-DOC configurations to minimize cost-per-Video DS
17
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
minimize cost per Video DS
• Scalability for triple play services- FCS planned for Q4 2010
uBR10K Supported Hardware Configurations
SPA Carrier Type WAN SPA Type PRE-2 PRE-4S S G2 SPA SIP HHGE Yes No
4 SPA SIP-600 HHGE Yes No4 SPA SIP-600 5x1GE Yes* Yes4 SPA SIP-600 1x10GE No Yes
Supported configurations (with maximum configuration per option):
PRE-2
1. PRE-2 + 1x SIP-600 + 4xHHGE with 2x D3.0 SPA on SIP-6002. PRE-2 + 1x SIP-600 + 4xHHGE with 4x D3.0 SPA on SIP-6003. PRE-2 + 2x SIP-600 with one 5x1GE + 2x D3.0 SPA per SIP-600
(*with 2 GE ports activated only)
PRE-4
18
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
1. PRE-4 + 2xSIP-600 with one 5x1GE + 3x D3.0 SPA per SIP-6002. PRE-4 + 2xSIP-600 with one 1x10GE + 3x D3.0 SPA per SIP-600
Cisco uBR10012 Investment ProtectionI-CMTS / M-CMTS Flexibility
Chassis SolutionTotal
SlotsTotal
DownstreamTotal
UpstreamuBR10012 w/ 5/20 8 – 5x20 Modules 40 160ModulesuBR10012 w/ Modular DS
8 – 5x20 Modules
2 – 24 Port DS Card
88/76 160
2 – 24 Port DS CarduBR10012 w/ Modular DS Q4cy08
8 – 5x20 Modules
6 – 24 Port DS Card
184/148 160
uBR10012 I-CMTS w/ 20/20 Modules
8 – 20/20 Modules 160 160
uBR10012 w/ 3G60 8 – 3G60 Modules 576/432 480
19
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
Modules
Cisco uBR7200VXRI-CMTS
“This Roadmap is included for informational purposes only and is subject to change at Cisco’s sole discretion. The features will be offered on a when-and-if-available basis and Cisco will have no liability for delay inwhen and if available basis, and Cisco will have no liability for delay in
delivery or failure to deliver any of the features set forth in this document”
20
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
uBR7200VXRuBR7200VXR
I-CMTS
This Roadmap is included for informational purposes only and is subject to change at Cisco’s sole discretion. The features
21
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
will be offered on a when-and-if-available basis, and Cisco will have no liability for delay in delivery or failure to deliver any of
the features set forth in this document.
2003 – MC28U Line Card
TCC
120%
el
Cost per DownstreamDensity
80%
100%
trea
m C
hann
e
ps p
er R
U) DS : 8
US : 32DOCSIS : 1.x, 2.0
Density
40%
60%
st p
er D
owns
t
Den
sity
(Mbp
,
RF PerformanceRF DensityTi t M k t
22
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
0%
20%Co Time to Market
Feature Rich
2010 – MC88V Line Card
TCC
120%
el
Cost per DownstreamDensity
80%
100%
trea
m C
hann
e
ps p
er R
U) DS : 32
US : 32DOCSIS : 1.x, 2.0, 3.0
Density
40%
60%
st p
er D
owns
t
Den
sity
(Mbp
, ,
4 x Downstream CapacityD1.x/2.0 LB and D3.0 BondingNO RF R C bli L OPEX
23
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
0%
20%Co NO RF Re-Cabling – Lo OPEX
Including US Bonding
2010 – MC88V Line Card
MC88
120%
el
Cost per DownstreamDensity
80%
100%
trea
m C
hann
e
ps p
er R
U) DS : 16
US : 16DOCSIS : 1.x, 2.0, 3.0
Density
40%
60%
st p
er D
owns
t
Den
sity
(Mbp
, ,
4 x Downstream CapacityD1.x/2.0 LB and D3.0 BondingNO RF R C bli L OPEX
24
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
0%
20%Co NO RF Re-Cabling – Lo OPEX
Including US Bonding
Cisco uBR7200VXR MC8x8 Linecard• Full DOCSIS 3.0 support
Downstream Bonding Upstream BondingIPv6MulticastAES (in Hardware)
• Upgrade for MC2x8U LCspgSame RF CablingRetains 28U configVery low operational impacty p p
• Utilizing RFGW-1D phyNo change in RF behaviour
• Utilizing us phy of the 520Hg p yNo change in RF behaviour
Beta cards currently in customer labs
25
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
- Beta cards currently in customer labs- FCS scheduled for Feb/March
Cisco IOS Feature overview12.2(33)SCC - Bighorn
“This Roadmap is included for informational purposes only and is subject to change at Cisco’s sole discretion. The features will be offered on a when-and-if-available basis and Cisco will have no liability for delay inwhen and if available basis, and Cisco will have no liability for delay in
delivery or failure to deliver any of the features set forth in this document”
26
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
Bighorn ReleaseBighorn Release12.2(33)SCC
27
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
Features Targeting Bighorn Release (ECed)
Feature uBR10K * uBR-VXR
SW support for MC20x20 Y N/App
US Bonding on MC5x20H (including US Dynamic BW Sharing) Y N/A
QoS: US Class-Based Fairness Y Y
QoS: Configurable DOCSIS priority weights for US and DS Y Partial – US Only
Logical channels Y N/A
Admission Control Enhancements (Service Flow - VDOC, D3.0) Y Y
AToM support for L2VPN (Phase I) Y Y
IPv6: Dual Stack CPE & APM (Application Performance Management) Y YIPv6: Dual Stack CPE & APM (Application Performance Management) Y Y
Full D3.0 Feature Set Y N/A
DEPI Control Plane Y N/A
28
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
Primary GiGE Support for WB SPA Y N/A
Featurettes Targeting Bighorn Release (ECed)( )
Feature uBR10K * uBR-VXR
LB: Utilization-based Dynamic LB with Dynamic BW Sharing (DBS) Y N/ALB: Utilization based Dynamic LB with Dynamic BW Sharing (DBS) Y N/A
Multiple Mod profiles* Y NSPA DS Channel Utilization Reporting Y N/AEmbedded Event Manager (V2.3) Y Y
PCMM I04 ECNs for HSD and voice Y Y
ToS MQC Support for MC DS Y NA
CLI show full run to show all settings - defaults and non-defaults Y Y
CISL - IOS Software Licensing Y N/A
S-CDMA (20x20 only) Y N/A
Support for user configurable GigE output-rate Y Yg g
D3.0: CMTS CRL and OCSP Project Y N/A
D3.0 Downstream Peak Traffic Rate TLV support for ERBA Y N/A
HOT ICE CLI Y Y
29
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
HOT ICE CLI Y Y
* Only available on MC520H
Featurettes Targeting Bighorn Release (ECed)( )
Feature uBR10K * uBR-VXR
Full D3.0 Multicasting support Y N/Ag ppFull D3.0 OSS IPDR support Y N/AFull D3.0 OSS SNMP/SP support Y N/AM-CMTS debugability: Enhance show cr10k-rp and show pxf cmd for a given MD Y N/Agiven MDMAC-Provisioned Device Downstream Classification Y Y
30
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
* Only available on MC520H
Cable Roadmap Overview
This Roadmap is included for informational purposes only and is subject to change at Cisco’s sole discretion. The features
31
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
will be offered on a when-and-if-available basis, and Cisco will have no liability for delay in delivery or failure to deliver any of
the features set forth in this document.
Roadmap OverviewHardware and Software
“This Roadmap is included for informational purposes only and is subject to change at Cisco’s sole discretion. The features will be offered on a when-and-if-available basis and Cisco will have no liability for delay inwhen and if available basis, and Cisco will have no liability for delay in
delivery or failure to deliver any of the features set forth in this document”
32
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
Cable Train Feature Release Timeline
Bighorn 12 2(33)SCCBighorn 12 2(33)SCC
Congo 12.2(33)SCD
Congo 12.2(33)SCD
MonetMonet
Amazon12.2(33)SCBAmazon12.2(33)SCB
Danube 12.2(33)SCEDanube 12.2(33)SCE
12.2(33)SCC12.2(33)SCC
Elkhorn 12.2(33)SCFElkhorn 12.2(33)SCF
Rembrandt 12.3(23)BCRembrandt 12.3(23)BC
Monet12.2(33)SCAMonet12.2(33)SCA
Q4 CY08Q4 CY08Q4 CY07Q4 CY07Q1 CY08Q1 CY08
Q4 CY09Q4 CY09 2H CY102H CY10Q1 CY10Q1 CY10 1HCY111HCY11
33
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
Commit in processCommit in processAvailableAvailable ScheduledScheduled
CMTS & QAM Roadmap – August 2009This Roadmap is included for informational purposes only and is subject to change at Cisco’s sole discretion. The features
will be offered on a when-and-if-available basis and Cisco will have no liability for delay in delivery or failure to deliver any of
7K8x8
uBR7225DOCSIS 3.0 Bronze
DOCSIS 3.0 Full
will be offered on a when-and-if-available basis, and Cisco will have no liability for delay in delivery or failure to deliver any of the features set forth in this document.
NPE-G210KPRE-4
8x8
MC520H
DS 3.0SW on WB
SPA
WidebandSPA
3G 6020 20SIP 600
RF Gateway RFGW-1
XDQA 24
3Gx6020x205x20V0x20V
SIP-600
DOCSIS 3.0 US Bondingvia Software
Software
Monet (S)• Dali parity• IPv6/Multicast• NPE-G2• uBR7225• SII Ph2
Dali (BC)• WB SPA (10K)
XDQA-24WB/VOD/SDV
QAM
Bighorn (S)• 20x20
• 3 0 USB on
Amazon (S)• Rembrandt
Congo (S)• 8x8 (VXR)
RFGW-10
Danube (S
via Software
34
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID 2007 2008
SII Ph2
Rembrandt (BC)• 3.0 DS onWB SPA
( )• 10K HA• CPD
2009
• 3.0 USB on MC520H
• Logical Chan• DEPI control
• EEM
parity• Spumoni• PRE-4• ISSU
( )• 8x8 (7225) • 3Gx60
2010
uBR series EuroDocsis 3.0 Migration Summary
1. EfficientAll uBR10K components purchased are re-used for EuroDocsis 3.0. p puBR7246VXR deployments can be upgrade to EuroDocsis3.0 via a
simple line-card change
2 Incremental2. IncrementalAllows customers to incrementally add downstream capacity without
affecting other services or currently deployed assets
3. Cost EffectiveMinimal equipment investment to add DS channel bonding or
additional DOCSIS 2 0 DS capacityadditional DOCSIS 2.0 DS capacityNo up front loading of capacity, pay as you growInvestment Protection, no chassis forklifts
35
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID
Registrujte se za Cisco Networkers 25 28 j 2010 B l25-28. januar 2010. Barselona28-31. mart 2010. Bahrein
36
© 2008 Cisco Systems, Inc. All rights reserved. Cisco ConfidentialPresentation_ID