City of Palm Coast-Flagler County Transportation Impact FeesCity Council-Flagler County Commission Workshop
Presentation Outline• Background
• History of Impact Fee Districts
• Amount of Transportation Impact Fees
• Options for Projects• - Transportation Projects in City CIP• - Northeast Palm Coast Transportation Corridors
• Discussion & Next Steps
BackgroundWhy does County have City Transportation Impact Fees?
• Before Incorporation • Flagler County collects impact fee for entire county
• After Incorporation • City – County Interlocal Agreement September 29, 2000• City collects transportation impact fees as part of the building
permit process beginning on October 2, 2000• September 21, 2004 - City Adopts Transportation Impact Fee
Ordinance
Transportation Impact FeesHistory of Transportation Impact Fee Districts
• Prior to Interlocal Agreement (“Old” Impact Fee Districts)
• Flagler County collects impact
fees countywide
• Two impact fee districts
• All County lands east of FEC railroad and all county lands west of FEC railroad
Transportation Impact FeesHistory of Transportation Impact Fee Districts
• After City of Palm Coast Incorporation (“New” Impact Fee Districts)
• Three impact fee districts:
• District 1 – all lands within corporate limits of City of Palm Coast• District 2 – all lands east of FEC-RR except within City of Palm
Coast• District 3 – all lands west of FEC-RR except within City of Palm
Coast
Transportation Impact Fees
• “Old” Transportation Impact Fee Districts• All areas of the County east of FEC railroad (including Palm Coast)
• $3.36 million (on 10/01/09) (encumbered & unencumbered)• $2.4 million (as of 10/01/11) (encumbered & unencumbered)
• “New” Transportation Impact Fee districts (Per ILA)• City of Palm Coast district (incorporated area of Palm Coast)
• $4.2 million (on 10/01/09) (encumbered & unencumbered)• $4.2 million (as of 10/01/11) (encumbered & unencumbered)
• All areas east of FEC railroad (excluding incorporated areas of Palm Coast)• $507,000 (on 10/01/09) (encumbered & unencumbered)• $480,000 (as of 10/01/11) (encumbered & unencumbered)
Transportation Impact FeesSummary of Available Transportation Impact Fees
• Transportation Impact fee balance collected under ILA
• $4.2 million • From Palm Coast Impact Fee District
• Available for Flagler County Projects east of FEC railroad• $2.88 million• $2.4 million from “Old” Impact Fee District (All Flagler County
including Palm Coast east of FEC Railroad)• $480,000 from “New” Impact Fee District
Transportation Impact FeesProject Options
Option 1 – Projects on City’s Capital Improvements Plan (CIP)
• City Projects in CIP and ILA
Option 2 – Northeast Palm Coast Corridor Projects
• City and County Projects
Option 1 City CIP Projects
Project Name Project Limits Phase Cost(millions)
N. Pine Lakes Parkway Palm Coast Pkwy to Belle Terre Pkwy Construction (Funded) $2.2*
Royal Palms Pkwy. Phase II Belle Terre To Rymfire Dr. Design (Funded) $0.200*
Acquisition of Land for Old Kings Rd., Matanzas Woods Interchange, Palm Harbor Parkway projects
Lands to be used potentially for additional right-of-way, floodplain compensation, wetland mitigation, stormwater ponds
$1.6
Palm Harbor Parkway (Ext.) South of Forest Grove Dr. to Old Kings Rd.
Construction & CEI $2.7
Royal Palms Pkwy. Phase II Belle Terre To Rymfire Dr. Construction & CEI $1.1
Old Kings Rd. (Widening) Palm Coast Pkwy. To Forest Grove Dr. Construction & CEI $15.0
Old Kings Rd. (Extension) Forest Grove Dr. to Old Kings Rd. Right of Way $ 1.0
Construction & CEI $9.9
TOTAL $33.7
*Funded in 2012 City CIP Budget.Note: All Transportation projects are consistent with the City/County ILA.
Option 2: Northeast Palm Coast Corridor
Matanzas Woods Interchange
Matanzas High School
Option 2: Northeast Palm Coast Corridor
Intersection of Forest Grove and Palm Harbor Parkway
Option 2: Northeast Palm Coast Corridor
Heading West on Forest Grove Dr. from Old Kings Rd.
Heading West on Forest Grove Dr. from Palm Harbor Dr. to Old Kings Rd.
Option 2: Northeast Palm Coast Corridor
Looking North on Old Kings Rd. from Forest Grove Dr.
Matanzas High School
Option 2:Northeast Palm Coast Corridor
Matanzas High SchoolMatanzas
Woods Interchange
Land Acquisition
Old
Kin
gs R
oad
Exte
nsio
n
Palm Harbor Parkway Extension
Option 2: Northeast Palm Coast Corridor
Purpose of Land Acquisition• Comprehensively address environmental needs of
transportation projects in the Corridor
• Needs include:• Environmental Mitigation (wetland impacts, T&E?)• Stormwater Management & Treatment (Ponds)• Floodplain Compensation• Right-of-Way
• Coordinated response for environmental needs• Savings in overall costs for projects
Options Northeast Palm Coast Corridor Projects
Project Name/Project Limits Phase YearFunding Source
(millions)Total Cost (millions)
Funding Need
FDOT City/Local (millions)NORTHEAST PALM COAST CORRIDOR PROJECTS
Palm Harbor Parkway ExtensionSouth of Forest Grove Dr. to Old Kings Road
ROW 2011/12 $0.23 $0.48 $0.25 Design & CEI 2011/12 $0.07 $0.07 $0.00 Construction
& CEI $2.65 $2.65 (For Descriptive Purposes Only - No FDOT funding to be requested) TOTAL $0.00 $0.30 $3.20 $2.90
Old Kings Rd. (Extension) PD&E 2010/12 $0.15 $0.02 $0.17 $0.00 Forest Grove Dr. to Old Kings Rd Design 2012/13 $1.35 $1.35 $0.00
Specific to this Project ROW $0.50 $0.50
Construction
& CEI $8.70 $8.70 TOTAL $1.50 $0.02 $10.72 $9.20
*Adjusted Total if Land Acquisition above does not occur $12.02 Matanzas Woods Parkway/I-95 Interchange Design 2011/12 $0.70 $0.70 $0.00 Phase One - Interchange Ramps Construction
& CEI 2014/15 $5.90 $8.10 $2.20 *Construction Costs based on Summary Report from PD&E TOTAL $5.90 $0.70 $8.80 $2.20 Land Acquisition for right-of-way, floodplain compensation, wetland mitigation, & stormwater ponds) $1.60 $1.60
Options Northeast Palm Coast Corridor Projects
Project Name/Project Limits Phase YearFunding Source
(millions)Total Cost (millions)
Funding Need
FDOT City/Local (millions)NORTHEAST PALM COAST CORRIDOR PROJECTS ROW $0.23 $2.58 $2.35
PD&E $0.15 $0.02 $0.17 $0.00 Design $1.35 $0.77 $2.12 $0.00
Construction &
CEI $5.90 $0.00 $19.45 $13.55
TOTAL $7.40 $1.02 $24.32 $15.9 Funding - City Impact Fee with County $3.50 Funding - Palm Coast Park CDD - IJR Commitment $0.25 Funding - Whiteview/I-95 Overpass Transfer (Funded for 2014/15) $0.58 Funding - F.C. Impact Fees (All F. C. East of Railroad - Old District) $2.40
Revised TOTAL $9.17
Summary of Options
Option 1 – Projects on City’s Capital Improvements Plan (CIP)
• City Projects in CIP and ILA
Option 2 – Northeast Palm Coast Corridor Projects
• City and County Projects
Transportation Impact Fees