15
CIBSE |Digital Engineering| CIBSE |Digital Engineering|

CIBSE |Digital Engineering| - REHVA · CIBSE |Digital Engineering| PAS1192 -5 “An attack on US retailer Target, in which millions of customers' credit card information was stolen,

Embed Size (px)

Citation preview

CIBSE |Digital Engineering|CIBSE |Digital Engineering|

CIBSE |Digital Engineering|CIBSE |Digital Engineering|

REHVABIM Developments and Challenges in HVAC4th April 2017

CIBSE |Digital Engineering|CIBSE |Digital Engineering|

Presenter

Carl Collins – Consultant to CIBSE

CIBSE |Digital Engineering|CIBSE |Digital Engineering|

Developments

CIBSE |Digital Engineering|CIBSE |Digital Engineering|

PAS1192-5

“An attack on US retailer Target, in which millions of customers' credit card information was stolen, was traced back to the heating and ventilation system.”BBC News

CIBSE |Digital Engineering|CIBSE |Digital Engineering|

ISO 19650

Internationalising the “BIM Level 2” concepts.

CIBSE |Digital Engineering|CIBSE |Digital Engineering|

BIMHawk

Standardising the way we describe things.

https://www.bimhawk.co.uk/

CIBSE |Digital Engineering|CIBSE |Digital Engineering|

BIMHawk

CIBSE |Digital Engineering|CIBSE |Digital Engineering|

UK BIM Alliance

CIBSE |Digital Engineering|CIBSE |Digital Engineering|

Challenges

CIBSE |Digital Engineering|CIBSE |Digital Engineering|

Engagement and Perception

Estimated 8% market penetration in UK to “expert level”.“It’s just 3D CAD”“I can’t afford it”“It doesn’t affect me”“I’m not learning new software…”

CIBSE |Digital Engineering|CIBSE |Digital Engineering|

Data Overload

Everyone asks for “their slice of the data pie”This creates parallel data requirementsEach data requirement involves effort by someoneEffort = Cost

CIBSE |Digital Engineering|CIBSE |Digital Engineering|

Silo Mentality

Collaboration is not a natural place to be in Construction.Lack of collaboration causes more issues than anything else.

CIBSE |Digital Engineering|CIBSE |Digital Engineering|

Translating Thought into Action

Taking the first step is always the most challenging.Fear of failure causes inaction.Inaction allows the competition to accelerate away.

CIBSE |Digital Engineering|CIBSE |Digital Engineering|