1 Chicago to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015

Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

Embed Size (px)

Citation preview

Page 1: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

1

Chicago to St. Louis

High-Speed Rail

IDOT District 8 Crossings

July 29, 2015

Page 2: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

2

History: Chicago-St. Louis Corridor

» IDOT has actively developed the

Chicago to St. Louis corridor since

the mid 1980’s

» In 1992 – Federally designated a

High-Speed Rail (HSR) Corridor

» Previously completed National

Environmental Policy Act (NEPA)

Environmental Impact Statement (EIS)

with 2004 Record of Decision (ROD)

» Sizeable ridership at

intermediate stations

Page 3: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

3

Who’s Involved

Business

Community

General Public &

Interest Groups

Elected Officials

Transportation

Providers

City/County

Technical Staff

Regional

Agencies

Project Partners• Illinois Department of Transportation

(IDOT)

• Federal Railroad Administration (FRA)

• Union Pacific Railroad (UPRR)

• Amtrak

• Illinois Commerce Commission (ICC)

• Others

Support• Parsons Brinckerhoff - Program Manager

• IDOT Consultants (PTB Advertisements)

• UPRR Contractors/Consultants

Page 4: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

4

Illinois High-Speed Rail Program Components

» Upgrades for passenger speeds up to 110 mph

» Design and construction of 243 miles of main track including concrete ties, welded rail, and etc. between East St. Louis and Joliet

» Realignment of curves

» New second tracks and sidings

» Grade crossing warning devices

» Construction of grade crossings

» Train control signaling

» Turnouts, culverts, bridges, fencing, etc.

» Purchase of six new high-speed train sets

» Eight (8) new/renovated stations

Page 5: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

5

High-Speed Rail Program Schedule

Page 6: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

6

Note: This summary does not include Tier 1 and Tier 2 EIS’s,

Joliet Multimodal, or other individual projects.

Current Program Budget: $1.53 Billion

Page 7: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

7

» One hour travel time

reduction when complete

» Enhanced reliability

» New passenger cars and

locomotives

» New/rehabilitated stations

» Safety improvements

Chicago-St. Louis Corridor Benefits

Page 8: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

8

Program Activities

Page 9: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

9

Major Components

» 262 miles of track rehabilitation(complete)

» 16 new or improved sidings/DT(4 complete)

» 250 improved grade crossings(initial improvements made)

» 8 new or remodeled stations

» 6 new high-speed train sets

» Advanced signaling system (PTC)

Page 10: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

10

Public Involvement Accomplishments

» 40 Public Meetings/Hearings

» 35 Railroad Safety Presentations

» 91 Community Events/Civic Presentations

Page 11: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

11

» Crossing and approach

improvements

» New sidings and second track

» Upgrades to bridges

and culverts

» Drainage improvements

» Installation and upgrades to

signal and wayside equipment

» Installation of fencing

2015 Construction: Overall Program

Page 12: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

12

» New signal systems – Positive Train

Control (PTC)

» Crossing safety devices

» New signage and pavement markings

» ADA accessibility directive signage

» Pedestrian crossings

» Extensive liaison with IDOT Highways,

local agencies, ICC, FRA, and others

Grade Crossing Improvements

Page 13: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

13

Mainline Track Rehabilitation

Before After

Page 14: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

14

» Fencing typically will be placed

within one-foot of the Union

Pacific Railroad right-of-way:

o In urban areas

o In select rural areas

Right-of-Way and Pedestrian Fencing

Page 15: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

15

Positive Train Control (PTC)

» PTC will be installed

on the HSR corridor

» System testing will be

conducted this fall.

» Locals will be

notified in

advance of testing.

PTC is a safety system

that notifies the conductor of

vehicles on a crossing.

Page 16: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

16

Stations

Page 17: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

17

» New or renovated facilities

» Increased passenger safety, comfort and convenience

» Lighting, site and parking improvements

» New ADA compliant boarding platforms

Station Improvements

Page 18: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

18

Station Interaction with Grade Crossings

& Fencing

» No boarding in streets

» Platforms not to be used as path to grade crossing

» Back of platform fencing & diversions channel passenger flow

Page 19: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

19

Station Improvements

» Joliet

o Received a discretionary grant to construct a multi-modal facility

and to make safety improvements

o Construction is ongoing

» Dwight

o Site south of the current location

on Village property

o Categorical exclusion complete

o Plans in the design phase

o Construction to begin Summer 2015

» Pontiac

o Proposed site southwest of the existing station on City property

o Environmental documentation complete

o Plans in the design phase

o Construction to begin Fall 2015

Page 20: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

20

Station Improvements

» Normal

o New multi-modal facility opened in July 2012

o Funded with a Transportation Investments

Generating Economic Recovery (TIGER) grant

o Second platform and passenger grade

separation to be built using High-Speed Rail

(HSR) funding

o Improvements in the design phase

» Lincoln

o Categorical exclusion complete

o Plans for upgrades in the conceptual

design phase

o Rehabilitation to begin Summer 2015

Page 21: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

21

Station Improvements

» Springfield

o Plans for upgrades in the design phase

» Carlinville

o Proposed site near the current facility

o Plans in the design phase

» Alton

o Environmental Assessment (EA) completed

o Selected to receive TIGER grant funding

o Will integrate a new IDOT HSR station

and a multi-modal facility

(in conceptual design phase)

Page 22: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

22

Equipment Procurement

Page 23: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

23

Locomotives

New high horsepower

diesel locomotives

>

Page 24: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

24

Passenger Cars

» Coach Cars and

Café/Business Cars

Page 25: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

25

Accessibility Improvements

Page 26: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

26

Grade Crossing

Improvements

Page 27: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

27

Purpose and Need for the Proposed Improvements

» Improvements for at-grade crossings

would provide new safety crossing

protection devices needed to

accommodate increase in train speed

» Additional intersection design

improvements, such as realignment of

adjacent roadways and cross streets,

are required to meet geometric and

safety requirements

Page 28: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

28

Project Location Map

Page 29: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

29

Environmental Documentation

» Crossings evaluated as part of the

environmental documentation estimated

completion in December 2015 include the following:

o Terpening Road –

Piasa Township

o David Lane –

Piasa Township

o Alby Street –

Village of Godfrey

Page 30: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

30

Piasa Township

» Terpening Road & David Lane

o Roadway work at and adjacent

to the railroad tracks

o Installation of safety crossing

protection features

o Additional roadway

improvements

Page 31: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

31

Village of Godfrey

» Alby Street

o Roadway work at and adjacent

to the railroad tracks

o Installation of safety

crossing protection features

o Additional roadway

improvements

Page 32: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

32

Roadway Improvements

» New roadway work adjacent to tracks

» Improvement of roadway approaches

to the railroad crossing

» New medians and sidewalks

» Culverts and drainage ditch improvements

» Curb and/or shoulder work to tie into

existing roadway

» New pavement markings and signage

Page 33: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

33

Fencing

» Fencing will be installed along the railroad corridor at

Terpening Road, David Lane, and Alby Street

o On both sides of the railroad corridor

o Located within the Union Pacific

Railroad Right-of-Way

o Coordinated with the local communities

• Improve pedestrian safety by encouraging

pedestrians to cross at designated grade crossings

• Will discourage trespassing

Page 34: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

34

Safety Information

Page 35: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

35

Page 36: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

36

Page 37: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

37

Page 38: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

38

Page 39: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

39

Page 40: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

40

Page 41: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

41

Page 42: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

42

Page 43: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

43

Page 44: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

44

Page 45: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

45

Page 46: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

46

Page 47: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

47

Page 48: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

48

Page 49: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

49

Page 50: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

50

Page 51: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

51

Page 52: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

52

Public Involvement

Page 53: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

53

» Visit www.idothsr.org and www.illinoisrail.org

o Program activities (e.g. crossing closures)

o Program Schedules

o Comment on Illinois Rail Programs

o Sign up for e-mail notifications

www.facebook.com/illinoishighspeedrail

1-855-IDOT-HSR (436-8477)

Page 54: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

54

» Visit the Doing Business

section:

o IL High-Speed Rail

• Find details about the

bidding process and

current business

opportunities

• Find related links for

detailed procedures

Business Opportunities

Page 55: Chicago to St. Louis High-Speed Rail IDOT District 8 … to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015. 2 History: Chicago-St. Louis Corridor ... o David Lane

55

Questions?