© 2012 Chevron Chevron Subsea Projects Peter Blake Subsea Manager Energy Technology Company Subsea UK Lunch and Learn 29/05/2012

Chevron Subsea Projects lunch and learn.pdf · © 2012 Chevron Chevron Global Subsea Presence 3 Production/ MCPs Exploration Opportunities NOJV

Embed Size (px)

Citation preview

© 2010 Chevron © 2012 Chevron © 2012 Chevron

Chevron Subsea Projects

Peter Blake

Subsea Manager

Energy Technology Company

Subsea UK

Lunch and Learn

29/05/2012

© 2012 Chevron

Chevron’s Global Subsea Portfolio

2

20+ Major Capital Projects in queue

2015 Production > 800MBOED

© 2012 Chevron

Chevron Global Subsea Presence

3

Production/ MCPs

Exploration

Opportunities

NOJV

© 2012 Chevron

Chevron Global Subsea Projects

4

© 2012 Chevron

Chevron Global Subsea Projects Technology plays a vital role

5

Project 15 KSI

Instrumented

pipeline

protection

(HIPPS)

Multiphase

Flowmeters

Subsea

Sampling

Chem. Inj

Distribution

Intelligent

Well

Completion

Subsea

BoostingPower

Direct Elec

Heating

Project A

Project B Y

Project C

Project D Y Y Y

Project E Y Y

Project F Y Y Y Y Y Y

Project G

Project H Y Y Y

Project J Y Y Y Y Y

Project K Y Y Y

Project L Y Y

Project M Y Y Y Y Y

© 2012 Chevron

Gorgon Foundation Project

6 6

Runs through a three-train (15

million tonne per annum) LNG

and Domestic Gas facility on

Barrow Island.

It is the largest LNG plant ever

to be fed by a subsea system.

The Greater Gorgon Area

represents Australia's largest

known gas resource, estimated

to contain 40 trillion cubic feet

of gas – equivalent to 25% of

the country's total known gas

resources.

© 2012 Chevron 7

Gorgon Foundation Project

Gorgon

• 3 drill centres

• 8 wells

• 250 metre depth

• 70 km tie-back to plant

• 34” carbon steel pipeline

• High CO2 content (15%)

Jansz

• 2 drill centres

• 10 wells

• 1350 metre depth

• 147 km tie-back to plant

• 30/34” CS pipeline

© 2012 Chevron

Gorgon Foundation Project

Typical Arrangement of Subsea Equipment

8

© 2012 Chevron

Jack & St Malo

Wilcox Trend

9

Location – GoM WR 718

Water Depth – ~7000’

Semi-submersible Host FPU centrally

located between Jack and St. Malo

Shared process facilities initially sized

for 170,000 BOPD and 42.5 MMCFD

3 Subsea drill centres

Mobile Offshore Drilling Unit drilling

and completion operations

Dual 10" production flowlines from

each field to the Host

Oil and gas export pipelines operated

by third parties

Provisions for third party tie-backs

Provisions for future development

© 2012 Chevron

Jack & St Malo Project

10

Design SITP/Temp:

13,000psi

Tie-back Distance: 12 miles

for both fields

Three drill centers

Three single phase pumps

Well MPFMs on manifold

Subsea sampling on

manifold

CIMV future expansion

Artificial Lift Method: Seabed

pumping

1 – Oil Export SCR

1 – Gas Export SCR

© 2012 Chevron

Jack & St Malo Project

Typical Arrangement of Subsea Equipment

11

© 2012 Chevron

Jack & St Malo Project

Framo SPP Pump Station with Retrievable Modules

12

1

2

4 3

1) Pump Module

2) Transformer Module

3) SCM

4) Recycle Line Choke

© 2012 Chevron

Alder

13

Reservoir

Upper Jurassic Sandstone

14,700 ft tvdss

HPHT gas condensate

Location – UKCS Block 15

Water Depth – 150 metres

Tie-back Dist. – 28 Km

Design SITP – 694 bar

Design Temp – 135 C

Host - Britannia BLP

15

22

16

15 16

R

R

R

R

R

R

RR

R

R

R

III

III

VII

IV

II

X

IV

XX

III

XX

III

VII

XX

II

SA

X

IV

XXI

III

SA

VI

IV

IV

XX

XXI

II

IV

II

XXI

VII

III

III

IV

IV

XI

III

II

III

XX

VII

X

II

III

XIII

VII

Con-Ph.

Conoco-Phillips

Ta

lism

an

Conoco-Phillips

Apache

Con-Ph.

Shell

Chevron-Texaco

Chevron-Texaco

Conoco-Phillips

Conoco-Phillips

Apache

Conoco-Phillips

PGS

OilExco

Talisman

BP

ChevTex

Kerr-

McGee

Eni

BP

OilExco

Kerr-McGee

Premier

ChevTex

Con-Ph.

Kerr-McGee

BP

Eni

Chevron-Texaco

Kerr-McGee

Conoco-Phillips

Shell

VeritasExxonMobil

Conoco-Phillips

Exxo

nM

ob

il

BP

Con-Ph.

ChevronTexaco

PGS

Eni

Kerr-McGee

ChevronTexaco

Talisman

Statoil

Con-Ph.

Veritas

Conoco-Phillips

22

4

16

b

a

a

b

d

c

23

b

30

21

a

1

20

d

a

28

12

18

29a

19

b

c

a

5

c

17b

24

a

29

c

27

a

8

e

N

24

b

a

b

b

b

c

b

d

6

a

(N)

b

b

26

c

4

a

S

3

e

9

2

a

(S)

b b

b

a

a

a

a

25

d

b

a

a

a

ARMADACOMPLEX

STIRLING

MOIRA

FORTIES

BLENHEIM

BRITANNIA

CYRUS

HAWKINS

DRAKE

THELMA

MAUREEN

EVEREST

(Abandoned)

BLADONGUNGNE

BEAULY

BLAIR

(Decommissioned)

GLAMIS

(Decomm.)

FLEMING

BRIMMOND

ANDREW

BALMORAL

SEYMOUR

MACCULLOCH

CALEDONIA

ALBA

(Abandoned)

15/12-10S

CALLANISH

Farragon

Macallan

16/18-1

16/22-2

Mabel

16/28-8

Alpha Brenda

15/25b-3

Bosun

Ptarmigan

Alder

16/22-5

J-Prospect

22/1a-4

15/20b-11

22/2b-2

Chestnut

22/8a-2

Kidd

Blair West

30"

Bra

e-F

ort

ies

o

il

14" Everest-Fortiescondensate

10"c

ond.

N

oil

20"g

as

EWT

UnityD

8" And

rew-

CATS g

as

24

" B

ruce

-Fo

rtie

s

oil p

ipe

lin

e

26" Britannia-St.Fergus gas

2

4"

oil

Bru

ce-F

ort

ies

30" Mille

r-St.F

ergus

gas pipelin

e

6"o

il

A

24" S

cott-F

ortie

s oil

10"oil

14

"

B

C

PDQ

8

4

3

2

1

2

10

2

1

18

27

5

16

6

13

19

9

4,4a

5

5

7

4

2

3

1

8

8z

23a

5

5

6

2 2

6

17

8,8re

12

4

4

2

3

1

1

5

3

11

2

7

10z

6

7,7Z

9

3,3a

15,15Z

117

2,2a

1

1

3

4

19

1

5

11,13,13z

26

3

11

1

6

14

5

1z

17z

5

3

6

8

12

5

1

4

13

10

25,25z2

1a

11,11x,y,z

22

11

18

7

7

1,16

1

18

7

4, 4z

2

4,4a,22

6

8,11

4

9

1,1a

17

8

4

2

4

5

34,4a

2

4

2

1

1

2, 2a

5

2

1

1

13

11

31

25

11

29

14a

18

17

20

4

13

14

30

13

10

3

9

4

15

1

5

3,3z

15

10, 10z

3

6

6

19

6,6a

10

20a

3

2

5

3

2

6

10

2

8

7z

1

10

6

3

2

4

23

9

6

2

2

3

9

6

9

3

12

8

4

3

3

9

3

9

6,9,10S

21

4

3

4

3

21z

7,7z

1

3

7,7a

1

16

2

6

7

4

7

28

10

8

6

3

2

11

24

A12Z

12

12z

7

1

7

7

328,9

5

2,2a

1

5

1

5

4

21

15

0°45'E

0°45'E

1°0'E

1°0'E

1°15'E

1°15'E

1°30'E

1°30'E

1°45'E

1°45'E

57

°45

'N

57

°45

'N

58

°0'N

58

°0'N

58

°15

'N

58

°15

'N

0 105Km

© 2012 Chevron

Alder

Subsea Overview

14

© 2012 Chevron

Alder

Subsea System

15

Subsea tie-back to Britannia Bridge Link Platform (BLP).

Subsea manifold containing:

− Two fully populated wellbays

− Subsea HIPPS

− Manifold mounted split Cooling loop

− Well and HIPPS SCMs

− Umbilical termination and distribution

− Chemical injection points (various)

Subsea structures “Fishing Friendly” / designed for required snag loads.

© 2012 Chevron

Alder

Subsea Manifold

Manifold piping and cooling spool

design

– Cooling loop made out of two “coils” -

for flexibility - self-draining

– HIPPS valves

– Production Valves

– Manifold piping orientated to meet

area subsea architecture

requirements, predominant current

direction, etc

– Interface with temporary Subsea Pig

launcher.

© 2012 Chevron

Alder

Subsea Trees

HPHT: 15ksi, 350°F requirement.

Pressure Rating driven by Chemical

injection requirement. (Methanol bull

heading)

“Enhanced Vertical Design”

Separate protective structure

Tree mounted Flow Module (Choke)

© 2012 Chevron

Rosebank

18

Rosebank

© 2012 Chevron

Rosebank

19

Location

150km NW of Shetland

Islands

Water Depth – 1,100M

Tie-back Dist. – 6 Km

Design SITP – 3600 psi

Design Temp – 200 f

• Layout

Shipshape FPSO

4/6 well subsea clusters

Flexible risers

Gas export pipeline

© 2012 Chevron

Rosebank

Arrangement

20

© 2010 Chevron © 2012 Chevron © 2012 Chevron

Chevron Subsea Projects