CFS near term & Required ADI input 6-12 month activities, required ADI information
10. AUG 2014 CFS-ADI Joint Meeting 1
KEK Linear Collider Project OfficeMasanobu Miyahara
10. Apr 2014
■ Status of Facility Planning Progress
■ Near Term Activities (6-12 Month)
■ Pre-Construction Schedule
■ Summary
10. AUG 2014 CFS-ADI Joint Meeting 2
Pre-Project Scope of Work 6-12 Month activities
Topographical Survey
Environmental Impact AssessmentGeological Survey
Basic Planning
1 annual 2 annual 3 annual 4 annual 5 annual
Estimation
Basic Design Detailed Design
Contract
Con
stru
ctio
n P
hase
Predesign Phase Design Phase Contract
Phase
LCC ReviewBasic Plan
ReportBasic Design
DocumentDetailed Design
Document
Con
tract
D
ocu
mentLCC Review
Investigation in the Design Phase
8. AUG 2014 CFS-ADI Joint Meeting 3
Pre Construction ScheduleLong term & Medium term
LCC Review
Pre Construction Work Scope
Underground Facilities
Work ML AH DR BDS DH
Facility Arrangement B/C B/C C C B/C
Basic Shape, Dimension B/C B/C B/C C B/C
Civil/Architectural Design C C C C/D C
Electronic Design C C C C/D C
Mechanical Design C C C C/D C
10. AUG 2014 CFS-ADI Joint Meeting 4
Surface Facilities
AY CS CC
D C D
D C D
D C D
D C D
D C D
Current Status: Facility Planning Progress
Requirement Technical Study
A Clear Completed
B Clear Under study
C Unclear(50%) Partially executed
D Unclear Not yet started
Legend: Progress degreeTechnical Study
AH Access Hall
AY Access Yard
CS Central Substation
CC Central Campus
Legend: Facility
Preliminary Basic Planning
• Expected Output• Basic arrangement plan (1:10,000 topographical map)
‒ Evaluation of geological condition (active fault, earthquake, ,)‒ Determination of DH Location (including elevation)‒ Layout of the Beam Line route and elevation
• Access way to Detector Hall (HT and VS)• Review the cross-section for the main part (include BDS)
• Investigation• Topographical survey (already done)
‒ Topographical mapping 1:10,000 (result by aviation laser survey)
• Geological investigation‒ Borehole investigation with logging test (near IR point /100 ~
150m )‒ Geophysical exploration (500 ~ 1000m)
10. AUG 2014 CFS-ADI Joint Meeting 5
Required ADI Information
• Expected Input (for facility arrangement)• Determination of DH Location
‒ IR point (including elevation)‒ Layout of the Beam Line route and elevation
• Access way to DH (Vertical or Horizontal or,)
• Expected Input (for Cross section)• Decision of the Cross-section for the main part
‒ BDS Beam Line Layout & Cross-section‒ Shield Wall thickness in ML-tunnel (Sanami-san reported)
• Cryogenics Equipment layout‒ Arrangement of He-Tank & Cold box‒ Anti-vibration measure of the Compressor
• Install Method to MLT (include AH Cross-section)‒ Cryomodules & RF, Cold box
10. AUG 2014 CFS-ADI Joint Meeting 6
Near Term Activities : 1
1 Decision of Facility arrangement
■ Determination: IR Point
10. AUG 2014 CFS-ADI Joint Meeting 7
• Revision the DH Configuration (TDR)• Access Facility to DH (VS & HT)• Underground Facilities Layout and configuration
■ Determination: Surface Facility Layout
• Surface Facilities planning (Assembly hall)• Kick off some kind of Investigation (Topographical survey, Environmental Assessment)• Consultation with regional society
In Basic planning stage
2 Decision of Facility arrangement
■ Determination: Beam line level (elevation)
■ Determination: BL Route and Length
10. AUG 2014 CFS-ADI Joint Meeting 8
In Basic planning stage
• Revision the Access Point (AH & AT portal)• Access Facility to ML (AT length & location• Consistency with surface environment
• Vibration Impact Evaluation (Artificial, Separation from Riverbed)• Access Facility to ML (AT length & location• Groundwater treatment (Natural Drainage system)
Near Term Activities : 2
3 Decision of the basic facilities plan
■ Specific study of Power equipment (Central power receiving facility)
10. AUG 2014 CFS-ADI Joint Meeting 9
In Basic planning term
• Location of the Central Power Station• Power voltage, power receiving system • Consultation of Power receiving line• Negotiation with local power company• Planning the emergency power system
Near Term Activities : 3
■ Specific study of Cooling water system, Air-conditioning system, and
4 Decision of the basic facilities plan
10. AUG 2014 CFS-ADI Joint Meeting 10
In Basic planning term
• Finalize the Heat load capacity • Cooling water system (cooling tower, chiller )• Exhaust, Smoke facilities in the emergency• Facility planning in BDS & Detector Hall
Near Term Activities : 4
■ Measurement of regular vibration
5 Geological Survey for Facilities Designs
■ Geological Survey for Underground Facility Design
Vp=4.5km/sec 以上
■ Investigation step by step for Development Design■ Bedrock strength confirmation for execution plans■ Weak layer distribution
Ele
vati
on
Microtremor measurement in Japan
P WaveLongitudinal Section in KITAKAMI Site
■ Artificial vibration (Traffic, etc )■ Effects of waves and earthquake
10. AUG 2014 CFS-ADI Joint Meeting 11
Medium Activities
Summary
10. AUG 2014 CFS-ADI Joint Meeting 12
1. The specific engineering design depending on the Kitakami site conditions has started by unification of the site.
2. We need some reviews about Asian TDR configuration in the preliminary planning stage.
3. Important issue in the near term is the determination of IR point(DH) and Beam Line layout(BDS).
4. Surely doing a technological design at the basic planning phase enables shortening at the design period.5. Minimum geological survey is required to concrete the basic plan toward the design phase.6. We can push forward preparations for site acquisition and the environmental assessment by early determination of the every access point.
10. AUG 2014 CFS-ADI Joint Meeting 13
Back Up
Planning
1 annual 2 annual 3 annual 4 annual 5 annual
Additional Survey
Basic Survey Detailed Survey
Bidding
Topographic Document
Geological Document
Assessment Statement
Preliminarysurvey
Environmental Impact Assessment SurveyPreliminary
Survey
Basic DesignDetailed Design
Contract
Con
stru
ctio
n P
hase
Predesign phase Design phase Contract
phase
Geological Survey
Environmental Impact Assessment
Topographical Survey
Basic survey(1)
Review ReviewReview
Basic survey(2)
8. AUG 2014 CFS-ADI Joint Meeting 14
Pre Construction ScheduleLong term & Medium term
<Survey for land Acquisition>