Certified Federal Contracts ManagerNCMA

Federal Acquisition Regulation

FAR PARTS: 30-36

https://www.acquisition.gov/far/

Instructor: W. Ryan, ManagerProcurement and Grants Office (PGO)Office of Policy Oversight and Evaluation

CDC PGOFeb-April, 2010

Page 2: Certified Federal Contracts Manager NCMA

PGO

Contents

Cost Accounting Standards – Part 30

Contract Cost Principles and Procedures – Part 31

Contract Financing – Part 32

Page 3: Certified Federal Contracts Manager NCMA

NCMA

Contract Financing, p. 79

Page 4: Certified Federal Contracts Manager NCMA

PGO

Contract FinancingConsiderations: Order of Preference

1. Private financing, no government guarantee

Private financial institution may submit a loan guarantee to the Federal Reserve Bank

Seven Presidentially designated guaranteeing agencies

Dept. of Defense

Dept. of Energy

Dept. of Commerce

Dept. of Revenue

Dept. of Agriculture

General Services Admin.

National Aeronautics and Space

Administration

Page 5: Certified Federal Contracts Manager NCMA

PGO

Contract FinancingOrder of Preference Considerations, cont.

2. Progress payments based on incurred costs (see FAR 32)

3. Advanced Payments (least desirable of financing options)

Not measured by performance

Made in anticipation of performance

If granted, specific banking arrangements must be made and the Government is entitled to the interest accrued.

Page 6: Certified Federal Contracts Manager NCMA

FAR Part 30

The Cost Accounting Standards (CAS) Administration

Page 7: Certified Federal Contracts Manager NCMA

Cost Accounting BasicsOverhead -- General & Administrative Costs (G&A) – Cost of Money

– Allocable Costs – Allowable Costs – Home Office – Direct – Indirect – Cost Accounting Standards – GAAP – Standard Costing

GENERAL AND ADMINISTRATIVE COSTS (Upper management)

OVERHEADS (HEAT, LIGHT, RENT, DEPRECIATION, PROP TAX, ETC.)

Contract Contract Contract Contract Contract

Page 8: Certified Federal Contracts Manager NCMA

Cost Accounting Basics

Accountants struggle with the classification of values. One Professor at Pace U, perhaps the Foremost Accounting program in the world, has argued that Accounting belongs in the Faculty of Philosophy, not Business

Wherever Accounting belongs academically, when applied to Government contracts, accounting fictions can yield very real costs and profits.

Page 9: Certified Federal Contracts Manager NCMA

Cost Accounting Basics

Accounting Regulatory Bodies:• American Institute of Certified Public Accountants

The first law establishing the CPA designation was in New York on April 17, 1896

• Securities and Exchange Commission• Financial Accounting Standards Board -- AICPA, SEC,

INDUSTRY• Internal Revenue Service• Cost Accounting Standards Board (Only on

Government Contracts)• State and Foreign Regulatory Boards

Page 10: Certified Federal Contracts Manager NCMA

Cost Accounting Basics

Generally Accepted Accounting Principles (GAAP) derive from the AICPA Standards and FASB Rules

Securities and Exchange Commission:

The SEC has statutory authority to establish financial accounting and reporting standards for publicly held companies under the Securities Exchange Act of 1934. Throughout its history, however, the Commission’s policy has been to rely on the private sector for this function to the extent that the private sector demonstrates ability to fulfill the responsibility in the public interest.

Page 11: Certified Federal Contracts Manager NCMA

Cost Accounting Basics

Virtually all of the emphasis on Accounting derives from the regulation of public statements, so that investors and lenders can gain a true picture of the profitability of a company and its future prospects.

Cost Accounting was not neglected entirely, but was only of interest to the regulatory bodies in how it affected profitability and the valuation of assets. One segment of the CPA examination, a very difficult segment, deals with industrial cost accounting

Page 12: Certified Federal Contracts Manager NCMA

Cost Accounting Basics

Cost Accounting is of great interest to the US Government, since the negotiated price of contracts is often based on cost. In addition, the consideration for many contract modifications is based on costs, and there are many cost reimbursable contracts written.

Determining Costs could be an extremely complicated process, and the cost determination could have a direct affect on the price of the product or service.

Page 13: Certified Federal Contracts Manager NCMA

Cost Accounting Basics

During the 1960s, Admiral Hyman G. Rickover, father of the nuclear submarine program, recognized the fact that the lack of cost accounting standards prevented the Navy from negotiating on a consistent, fair basis with its contractors.

Due largely to his influence, the Cost Accounting Standards Board was established in 1970

Page 14: Certified Federal Contracts Manager NCMA

Cost Accounting BasicsThe original CASB was established in 1970 as an agency of Congress in accordance

with a provision of Public Law 91-379. It was authorized to (1) promulgate cost accounting standards designed to achieve uniformity and consistency in the cost accounting principles followed by defense contractors and subcontractors under Federal contracts in excess of $100,000 and (2) establish regulations to require defense contractors and subcontractors, as a condition of contracting, to disclose in writing their cost accounting practices, to follow the disclosed practices consistently and to complywith duly promulgated cost accounting standards.

b. The original CASB promulgated 19 standards and associated rules, regulations and interpretations. It went out of existence on September 30, 1980.

c. On November 17, 1988, President Reagan signed Public Law 100-679 which reestablished the CASB. The new CASB is located within the Office of Federal Procurement Policy (OFPP) which is under the Office of Management and Budget (OMB). The CASB consists of five members: the Administrator of OFPP who is the Chairman and one member each from DoD, GSA, industry and the private sector (generally expected to be from the accounting profession).

Page 15: Certified Federal Contracts Manager NCMA

Cost Accounting Basics

Simply:

If a contract is above a certain dollar value or the total value of smaller contracts exceed that value, companies become subject to CAS.

$50 million makes the company subject to full CAS

$7.5 million makes the company subject to modified CAS

A “CAS Covered Contract” is a contract arising from FAR part 15

Page 16: Certified Federal Contracts Manager NCMA

Cost Accounting Basics

Disclosure Statement (FORM CASB DS-2 (REV 10/94) )• A comprehensive description of cost accounting

methodology. • Rigorous Process• The Disclosure Statement must be approved by the

Cognizant Federal Agency Official (CFAO) – usually a Contracting Officer, sometimes an Administrative Contracting Officer .

• Any changes have to be negotiated based on cost impact, audited and agreed-to by the CFAO

Page 17: Certified Federal Contracts Manager NCMA

PGO

Cost Accounting Standards Administration 30.000  

30.000  Scope of part.

This part describes policies and procedures for applying the Cost Accounting Standards Board (CASB) rules and regulations (48 CFR Chapter 99 (FAR Appendix)) to negotiated contracts and subcontracts. This part does not apply to sealed bid contracts or to any contract with a small business concern (see 48 CFR 9903.201-1(b) (FAR Appendix) for these and other exemptions).

Page 18: Certified Federal Contracts Manager NCMA

PGO

30.001  Definitions.

“Affected CAS-covered contract or subcontract” means a contract or subcontract subject to Cost Accounting Standards (CAS) rules and regulations for which a contractor or subcontractor—

(1) Used one cost accounting practice to estimate costs and a changed cost accounting practice to accumulate and report costs under the contract or subcontract; or

(2) Used a noncompliant practice for purposes of estimating or accumulating and reporting costs under the contract or subcontract.

“Cognizant Federal agency official (CFAO)” means the contracting officer assigned by the cognizant Federal agency to administer the CAS.

Page 19: Certified Federal Contracts Manager NCMA

PGO

30.001  Definitions.

“Required change” means—

(1) A change in cost accounting practice that a contractor is required to make in order to comply with applicable Standards, modifications or interpretations thereto, that subsequently becomes applicable to an existing CAS-covered contract or subcontract due to the receipt of another CAS-covered contract or subcontract; or

(2) A prospective change to a disclosed or established cost accounting practice when the CFAO determines that the former practice was in compliance with applicable CAS and the change is necessary for the contractor to remain in compliance.

“Unilateral change” means a change in cost accounting practice from one compliant practice to another compliant practice that a contractor with a CAS-covered contract(s) or subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the Government will pay no aggregate increased costs.

Page 20: Certified Federal Contracts Manager NCMA

PGO

Subpart 30.1—General

30.101  Cost Accounting Standards.

(a) Public Law 100-679 (41 U.S.C. 422) requires certain contractors and subcontractors to comply with Cost Accounting Standards (CAS) and to disclose in writing and follow consistently their cost accounting practices.

(b) Contracts that refer to this Part 30 for the purpose of applying the policies, procedures, standards and regulations promulgated by the CASB pursuant to Public Law 100-679, shall be deemed to refer to the CAS, and any other regulations promulgated by the CASB (see 48 CFR Chapter 99), all of which are hereby incorporated in this Part 30.

Page 21: Certified Federal Contracts Manager NCMA

PGO

30.101  Cost Accounting Standards.

(c) The Appendix to the FAR loose-leaf edition contains—

(1) Cost Accounting Standards and Cost Accounting Standards Board Rules and Regulations Recodified by the Cost Accounting Standards Board at 48 CFR Chapter 99; and

(2) The following preambles:

(i) Part I—Preambles to the Cost Accounting Standards Published by the Cost Accounting Standards Board.

(ii) Part II—Preambles to the Related Rules and Regulations Published by the Cost Accounting Standards Board.

(iii) Part III—Preambles Published under the FAR System.

Page 22: Certified Federal Contracts Manager NCMA

PGO

30.101  Cost Accounting Standards, cont.

(d) The preambles are not regulatory but are intended to explain why the Standards and related Rules and Regulations were written, and to provide rationale for positions taken relative to issues raised in the public comments. The preambles are printed in chronological order to provide an administrative history.

Page 23: Certified Federal Contracts Manager NCMA

PGO

Cost Accounting Standards, cont.

A company may be subject to "full" CAS coverage (required to follow all 19 standards), "modified" CAS coverage (required to follow only Standards 401, 402, 405, and 406), or be exempt. A company under "full" coverage is not subject to a standard where it does not apply (e.g., a company which does not use standard costing does not have to comply with CAS 407).

"Full" coverage applies only when a company receives either one CAS-covered contract of US$50 million or more, or a number of smaller CAS-covered contracts totaling US$50 million. In addition to complying with all 19 standards (where applicable), the company must also file a CAS Disclosure Statement, which spells out the company's accounting practices (such as if certain costs are treated as direct contract charges or as part of overhead expense). There are two versions of the CAS Disclosure Statement: DS-1 applies to commercial companies while DS-2 applies to educational institutions.

"Modified" coverage applies when a company receives a single CAS-covered contract of US$7.5 million or more.

Page 24: Certified Federal Contracts Manager NCMA

PGO

Cost Accounting Standards, cont.

In some instances, a contract may be exempt from CAS standards:

Contracts awarded to small businesses are exempt from CAS, regardless of contract size

Any contract less than US$7.5 million is exempt, provided the company has not been awarded a contract greater than US$7.5 million, and also any contract less than US$650,000 is always exempt

Contracts for commercial items

Contracts awarded under sealed bid procedures, or where "adequate price competition" was available (the latter meaning where at least two companies had the ability to bid and perform on a contract, even if only one bid was later received)

Contracts where the price is set by law or regulation

Contracts awarded to foreign governments

Contracts where performance will be performed entirely outside the United States (including territories and possessions)

Page 25: Certified Federal Contracts Manager NCMA

PGO

Subpart 30.2—CAS Program Requirements30.201  Contract requirements.

Title 48 CFR 9903.201-1 (FAR Appendix) describes the rules for determining whether a proposed contract or subcontract is exempt from CAS. Negotiated contracts not exempt in accordance with 48 CFR 9903.201-1(b) shall be subject to CAS. A CAS-covered contract may be subject to either full or modified coverage. The rules for determining whether full or modified coverage applies are in 48 CFR 9903.201-2 (FAR Appendix).

30.201-3  Solicitation provisions. (a) The contracting officer shall insert the provision at 52.230-1, Cost Accounting

Standards Notices and Certification, in solicitations for proposed contracts subject to CAS as specified in 48 CFR 9903.201 (FAR Appendix).

(b) If an award to an educational institution is contemplated prior to July 1, 1997, the contracting officer shall insert the basic provision set forth at 52.230-1 with its Alternate I, unless the contract is to be performed by a Federally Funded Research and Development Center (FFRDC) (see 48 CFR 9903.201-2(c)(5) (FAR Appendix)), or the provision at 48 CFR 9903.201-2(c)(6) (FAR Appendix) applies.

(c) Insert the provision at FAR 52.230-7, Proposal Disclosure—Cost Accounting Practice Changes, in solicitations for contracts subject to CAS as specified in 48 CFR 9903.201 (FAR Appendix).

Page 26: Certified Federal Contracts Manager NCMA

PGO

CAS Program Requirements 30.201-5  Waiver.

The head of the agency—

(1) May waive the applicability of CAS for a particular contract or subcontract under the conditions listed in paragraph (b) of this subsection; and

(2) Must not delegate this waiver authority to any official in the agency below the senior contract policymaking level.

Page 27: Certified Federal Contracts Manager NCMA

PGO

CAS Program Requirements 30.201-5  Waiver, cont.

(b) The head of the agency may grant a waiver when one of the following conditions exists:

(1) The contract or subcontract value is less than $15,000,000, and the head of the agency determines, in writing, that the segment of the contractor or subcontractor that will perform the contract or subcontract—

(i) Is primarily engaged in the sale of commercial items; and

(ii) Has no contracts or subcontracts that are subject to CAS.

Page 28: Certified Federal Contracts Manager NCMA

PGO

CAS Program Requirements 30.201-5  Waiver, cont.

(2) The head of the agency determines that exceptional circumstances exist whereby a waiver of CAS is necessary to meet the needs of the agency. Exceptional circumstances exist only when the benefits to be derived from waiving the CAS outweigh the risk associated with the waiver. The determination that exceptional circumstances exist must—

(i) Be set forth in writing; and

(ii) Include a statement of the specific circumstances that justify granting the waiver.

Page 29: Certified Federal Contracts Manager NCMA

PGO

30.202-6  Responsibilities.

(a) The contracting officer is responsible for determining when a proposed contract may require CAS coverage and for including the appropriate notice in the solicitation. The contracting officer must then ensure that the offeror has made the required solicitation certifications and that required Disclosure Statements are submitted. (Also see 48 CFR 9903.201-3 and 9903.202 (FAR Appendix).)

(b) The contracting officer shall not award a CAS-covered contract until the Cognizant Federal Agency Official (CFAO) has made a written determination that a required Disclosure Statement is adequate unless, in order to protect the Government's interest, the agency head, on a nondelegable basis, authorizes award without obtaining submission of the required Disclosure Statement (see 48 CFR 9903.202-2). In this event, the contractor shall submit the required Disclosure Statement and the CFAO shall make a determination of adequacy as soon as possible after the award.

Page 30: Certified Federal Contracts Manager NCMA

PGO

30.202-6  Responsibilities, cont.

(c) The cognizant auditor is responsible for conducting reviews of Disclosure Statements for adequacy and compliance.

(d) The CFAO is responsible for issuing determinations of adequacy and compliance of the Disclosure Statement.

30.202-8  Subcontractor Disclosure Statements. (a) When the Government requires determinations of adequacy of

subcontractor disclosure statements, the CFAO for the subcontractor shall provide this determination to the CFAO for the contractor or next higher-tier subcontractor. The higher-tier CFAO shall not change the determination of the lower-tier CFAO.

(b) Any determination that it is impractical to secure a subcontractor’s Disclosure Statement must be made in accordance with 48 CFR 9903.202-2 (FAR Appendix).

Page 31: Certified Federal Contracts Manager NCMA

PGO

Cost Accounting Standards

30.3 CAS Rules and Regulations [Reserved]

30.4 Cost Accounting Standards [Reserved]

30.5 Cost Accounting Standards for Educational Institutions [Reserved]

Page 32: Certified Federal Contracts Manager NCMA

PGO

Cost Accounting Standards

Standard Title

401 Consistency in Estimating, Accumulating and Reporting Costs

402 Consistency in Allocating Costs Incurred for the Same Purpose

403 Allocation of Home Office Expenses to Segments

404 Capitalization of Tangible Assets

405 Accounting for Unallowable Costs

406 Cost Accounting Period

407 Use of Standard Costs for Direct Material and Direct Labor

408 Accounting for Costs of Compensated Personal Absence

409 Depreciation of Tangible Capital Assets

410 Allocation of Business Unit General and Administrative Expenses to Final Cost Objectives

411 Accounting for Acquisition Costs of Material

412 Composition and Measurement of Pension Costs

Page 33: Certified Federal Contracts Manager NCMA

PGO

Cost Accounting Standards

413 Adjustment and Allocation of Pension Cost

414 Cost of Money as an Element of the Cost of Facilities Capital

415 Accounting for the Cost of Deferred Compensation

416 Accounting for Insurance Cost

417 Cost of Money as an Element of the Cost of Capital Assets Under Construction

418 Allocation of Direct and Indirect Costs

419 unused

420 Accounting for Independent Research and Development Costs and Bid and Proposal Costs (IR&D and B&P)

Page 34: Certified Federal Contracts Manager NCMA

PGO

Subpart 30.6—CAS Administration 30.601  Responsibility.

(a) The CFAO shall perform CAS administration for all contracts and subcontracts in a business unit, even when the contracting officer retains other administration functions. The CFAO shall make all CAS-related required determinations and findings (see Subpart 1.7) for all CAS-covered contracts and subcontracts, including—

(1) Whether a change in cost accounting practice or noncompliance has occurred; and

(2) If a change in cost accounting practice or noncompliance has occurred, how any resulting cost impacts are resolved.

Page 35: Certified Federal Contracts Manager NCMA

PGO

30.601  Responsibility.

(b) Within 30 days after the award of any new contract subject to CAS, the contracting officer making the award shall request the CFAO to perform administration for CAS matters (see Subpart 42.2). For subcontract awards, the contractor awarding the subcontract must follow the procedures at 52.230-6(l), (m), and (n).

(c) In performing CAS administration, the CFAO shall request and consider the advice of the auditor as appropriate (see 1.602-2).

Page 36: Certified Federal Contracts Manager NCMA

PGO

30.602  Materiality.

(a) In determining materiality, the CFAO shall use the criteria in 48 CFR 9903.305 (FAR Appendix).

(b) A CFAO determination of materiality—

(c) When the CFAO determines the cost impact is immaterial, the CFAO shall— (1) Make no contract adjustments and conclude the cost impact process; (2) Document the rationale for the determination; and

Page 37: Certified Federal Contracts Manager NCMA

PGO

30.602  Materiality.

(3) In the case of noncompliance issues, inform the contractor that—

(i) The noncompliance should be corrected; and

(ii) If the noncompliance is not corrected, the Government reserves the right to make appropriate contract adjustments should the cost impact become material in the future.

(d) For required, unilateral, and desirable changes, and CAS noncompliances, when the amount involved is material, the CFAO shall follow the applicable provisions in 30.603, 30.604, 30.605, and 30.606.

Page 38: Certified Federal Contracts Manager NCMA

PGO

30.606  Resolving cost impacts.

(a) General.

(1) The CFAO shall coordinate with the affected contracting officers before negotiating and resolving the cost impact when the estimated cost impact on any of their contracts is at least $100,000. However, the CFAO has the sole authority for negotiating and resolving the cost impact.

(2) The CFAO may resolve a cost impact attributed to a change in cost accounting practice or a noncompliance by adjusting a single contract, several but not all contracts, all contracts, or any other suitable method.

(3) In resolving the cost impact, the CFAO—

(i) Shall not combine the cost impacts . . .

(4) For desirable changes, the CFAO should consider the estimated cost impact of associated management actions on contract costs in resolving the cost impact.

Page 39: Certified Federal Contracts Manager NCMA

PGO

30.606  Resolving cost impacts.

(b) Negotiations. The CFAO shall—

(1) Negotiate and resolve the cost impact on behalf of all Government agencies; and

(2) At the conclusion of negotiations, prepare a negotiation memorandum and send copies to the auditor and affected contracting officers.

Page 40: Certified Federal Contracts Manager NCMA

PGO

30.607  Subcontract administration.

When a negotiated CAS price adjustment or a determination of noncompliance is required at the subcontract level, the CFAO for the subcontractor shall furnish a copy of the negotiation memorandum or the determination to the CFAO for the contractor of the next higher-tier subcontractor. The CFAO of the contractor or the next higher-tier subcontractor shall not change the determination of the CFAO for the lower-tier subcontractor. If the subcontractor refuses to submit a GDM or DCI proposal, remedies are made at the prime contractor level.

Page 41: Certified Federal Contracts Manager NCMA

Part 31—Contract Cost Principles and Procedures

31.000  Scope of part.

This part contains cost principles and procedures for—

(a) The pricing of contracts, subcontracts, and modifications to contracts and subcontracts whenever cost analysis is performed (see 15.404-1(c)); and

(b) The determination, negotiation, or allowance of costs when required by a contract clause.

Page 42: Certified Federal Contracts Manager NCMA

PGO

31.101  Objectives.

In recognition of differing organizational characteristics, the cost principles and procedures in the succeeding subparts are grouped basically by organizational type; e.g., commercial concerns and educational institutions.

• The overall objective is to provide that, to the extent practicable, all

organizations of similar types doing similar work will follow the same cost principles and procedures. To achieve this uniformity, individual deviations concerning cost principles require advance approval of the agency head or designee.

• Class deviations for the civilian agencies require advance approval of the Civilian Agency Acquisition Council. . .

• Class deviations for the Department of Defense require advance approval of the Director of Defense Procurement, Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics.

Page 43: Certified Federal Contracts Manager NCMA

PGO

31.102  Fixed-price contracts.

The applicable subparts of Part 31 shall be used in the pricing of fixed-price contracts, subcontracts, and modifications to contracts and subcontracts whenever

(a) cost analysis is performed, or

(b) a fixed-price contract clause requires the determination or negotiation of costs. However, application of cost principles to fixed-price contracts and subcontracts shall not be construed as a requirement to negotiate agreements on individual elements of cost in arriving at agreement on the total price.

The final price accepted by the parties reflects agreement only on the total price. Further, notwithstanding the mandatory use of cost principles, the objective will continue to be to negotiate prices that are fair and reasonable, cost and other factors considered.

Page 44: Certified Federal Contracts Manager NCMA

PGO

31.103  Contracts with commercial organizations.

This category includes all contracts and contract modifications for

• supplies,

• services, or

• experimental,

• developmental, or research work negotiated with organizations other than educational institutions (see 31.104),

• construction and architect-engineer contracts (see 31.105),

State and local governments (see 31.107) and nonprofit organizations (see 31.108) on the basis of cost.

Page 45: Certified Federal Contracts Manager NCMA

PGO

31.103  Contracts with commercial organizations.

b) In addition, the contracting officer shall incorporate the cost principles and procedures in Subpart 31.2 and agency supplements by reference in contracts with commercial

organizations as the basis for—

(1) Determining reimbursable costs . . .

(2) Negotiating indirect cost rates (see Subpart 42.7);

(3) Proposing, negotiating, or determining costs under terminated contracts (see 49.103 and 49.113);

(4) Price revision of fixed-price incentive contracts (see 16.204 and 16.403);

(5) Price redetermination of price redetermination contracts (see 16.205 and 16.206); and

(6) Pricing changes and other contract modifications.

Page 46: Certified Federal Contracts Manager NCMA

PGO

Unallowable Costs

Specific Costs Not Allowable.— (1) The following costs are not allowable under a covered contract:

(A) Costs of entertainment, including amusement, diversion, and social activities and any costs directly associated with such costs (such as tickets to shows or sports events, meals, lodging, rentals, transportation, and gratuities).

(B) Costs incurred to influence (directly or indirectly) legislative action on any matter pending before Congress, a State legislature, or a legislative body of a political subdivision of a State.

(C) Costs incurred in defense of any civil or criminal fraud proceeding or similar proceeding (including filing of any false certification) brought by the United States where the contractor is found liable or has pleaded nolo contendere to a charge of fraud or similar proceeding (including filing of a false certification).

Page 47: Certified Federal Contracts Manager NCMA

PGO

Unallowable Costs

(D) Payments of fines and penalties resulting from violations of, or failure to comply with, Federal, State, local, or foreign laws and regulations, except when incurred as a result of compliance with specific terms and conditions of the contract or specific written instructions from the contracting officer authorizing in advance such payments in accordance with applicable provisions of the Federal Acquisition Regulation.

(E) Costs of membership in any social, dining, or country club or organization.

(F) Costs of alcoholic beverages.

(G) Contributions or donations, regardless of the recipient.

(H) Costs of advertising designed to promote the contractor or its products.

(I) Costs of promotional items and memorabilia, including models, gifts, and souvenirs.

(J) Costs for travel by commercial aircraft which exceed the amount of the standard commercial fare.

Page 48: Certified Federal Contracts Manager NCMA

PGO

Unallowable Costs

(K) Costs incurred in making any payment (commonly known as a “golden parachute payment”) which is— (i) in an amount in excess of the normal severance pay paid by the contractor to an employee upon termination of employment; and

(ii) is paid to the employee contingent upon, and following, a change in management control over, or ownership of, the contractor or a substantial portion of the contractor’s assets.

(L) Costs of commercial insurance that protects against the costs of the contractor for correction of the contractor’s own defects in materials or workmanship.

(M) Costs of severance pay paid by the contractor to foreign nationals employed by the contractor under a service contract performed outside the United States, to the extent that the amount of severance pay paid in any case exceeds the amount paid in the industry involved under the customary or prevailing practice for firms in that industry providing similar services in the United States, as determined under the Federal Acquisition Regulation.

Page 49: Certified Federal Contracts Manager NCMA

PGO

Unallowable Costs

(N) Costs of severance pay paid by the contractor to a foreign national employed by the contractor under a service contract performed in a foreign country if the termination of the employment of the foreign national is the result of the closing of, or the curtailment of activities at, a United States military facility in that country at the request of the government of that country.

(O) Costs incurred by a contractor in connection with any criminal, civil, or administrative proceeding commenced by the United States or a State, to the extent provided in subsection (k).

(P) Costs of compensation of senior executives of contractors for a fiscal year, regardless of the contract funding source, to the extent that such compensation exceeds the benchmark compensation amount determined applicable for the fiscal year by the Administrator for Federal Procurement Policy under section 39 of the Office of Federal Procurement Policy Act (41 U.S.C. 435).

Page 50: Certified Federal Contracts Manager NCMA

PGO

31.104  Contracts with educational institutions.

This category includes all contracts and contract modifications for research and development, training, and other work performed by educational institutions.

(a) The contracting officer shall incorporate the cost principles and procedures in Subpart 31.3 by reference in cost-reimbursement contracts with educational institutions as the basis for—

(1) Determining reimbursable costs under the contracts and cost-reimbursement subcontracts thereunder performed by educational institutions;

(2) Negotiating indirect cost rates; and

(3) Settling costs of cost-reimbursement terminated contracts (see Subpart 49.3 and 49.109-7).

Page 51: Certified Federal Contracts Manager NCMA

PGO

31.104  Contracts with educational institutions.

(b) The cost principles in this subpart are to be used as a guide in evaluating costs in connection with negotiating fixed-price contracts and termination settlements.

OMB CIRCULAR A-21, ENTITLED "PRINCIPLES FOR DETERMINING COSTS APPLICABLE TO GRANTS, CONTRACTS AND OTHER AGREEMENTS WITH EDUCATIONAL INSTITUTIONS", SETS FORTH THE GOVERNING RULES FOR DETERMINING THE VARIOUS COSTS THAT CAN BE CHARGED TO GRANTS AND CONTRACTS, AND FOR ESTABLISHING WHETHER THOSE COSTS MAY BE CHARGED DIRECTLY, OR CHARGED THROUGH THE APPLICATION OF THE INSTITUTION'S FACILITIES AND ADMINISTRATION (INDIRECT COST) RATE. INCORPORATED IN THE CIRCULAR SPECIFICALLY, AND BY REFERENCE AS WELL, ARE FOUR COST ACCOUNTING STANDARDS (CAS) WHICH UNIVERSITIES ARE REQUIRED TO COMPLY WITH.

Page 52: Certified Federal Contracts Manager NCMA

PGO

Unallowable Costs Ed. Institutions1. Advertising and public relations costs

2. Alcoholic beverages3. Alumni/ae activities4. Bad debts5. Civil defense costs6. Commencement and convocation costs7. Communication costs8. Compensation for personal services9. Contingency provisions10. Deans of faculty and graduate schools11. Defense and prosecution of criminal and civil proceedings, claims, appeals and      patent infringement12. Depreciation and use allowances13. Donations and contributions14. Employee morale, health, and welfare costs and credits15. Entertainment costs16. Equipment and other capital expenditures17. Executive lobbying costs

Page 53: Certified Federal Contracts Manager NCMA

PGO

Unallowable Costs Ed. Institutions

18. Fines and penalties19. Goods or services for personal use20. Housing and personal living expenses21. Insurance and indemnification22. Interest, fund raising, and investment management costs23. Labor relations costs24. Lobbying25. Losses on other sponsored agreements or contracts26. Maintenance and repair costs27. Material costs28. Memberships, subscriptions and professional activity costs29. Patent costs30. Plant security costs31. Preagreement costs32. Professional services costs33. Profits and losses on disposition of plant equipment or other capital assets

Page 54: Certified Federal Contracts Manager NCMA

PGO

Unallowable Costs Ed. Institutions

34. Proposal costs35. Rearrangement and alteration costs36. Reconversion costs37. Recruiting costs38. Rental cost of buildings and equipment39. Royalties and other costs for use of patents40. Sabbatical leave costs41. Scholarships and student aid costs 42. Selling and marketing43. Severance pay44. Specialized service facilities45. Student activity costs46. Taxes47. Transportation costs48. Travel costs49. Termination costs applicable to sponsored agreements50. Trustees

Page 55: Certified Federal Contracts Manager NCMA

NCMA

Architect, Engineering, and Construction Service

P. 59

Page 56: Certified Federal Contracts Manager NCMA

PGO

Architect, Engineering, and Construction Services Specialized Language

Design – “Defining a construction requirement, including the functional relationships to be use: Producing the technical specifications and drawings; and preparing the construction cost estimate.”

Design-bid-build – “The traditional construction delivery method where design and construction are sequential and contracted for separately with two contracts and two contractors.”

Design-build – “Combining the design and construction requirements in a single contract with one contractor.”

Two-phase design-build – “A selection procedure that selects a number of offerors based on qualifications in the first phase to submit detailed proposals for evaluation and award in the second phase.”

Page 57: Certified Federal Contracts Manager NCMA

PGO

7.2.1 Architect, Engineering Services

• Professional services of an architectural or engineering nature, as defined by applicable state law, which the state law requires to be performed by a registered architect or engineer;

• Professional architectural or engineering services associated with the design or construction of real property;

• Other professional architectural or engineering services related to studies, investigations, surveying, mapping, soils engineering, construction phase conceptual design, and similar tasks that require performance by registered architect, engineer, and their employees; and

• Professional surveying and mapping services, when the mapping services are associated with the construction or alteration of real property.

Page 58: Certified Federal Contracts Manager NCMA

PGO

7.2.2 Construction Services

• Presolicitation notice. A presolicitation notice contains sufficient detail to identify the nature, volume, location and schedule for the requirement. The notices are usually issued well in advance of the invitation to bid in order to stimulate the interest of the greatest number of prospective bidders.

• Invitation for bids. The invitation should allow sufficient time for bidders to perform the many tasks and issues associated with the bid process, including site inspection, collection of required subcontracting bids, examination of plans and specifications, and preparation of the required estimates.

• Prebid Conferences. Prebid conferences often are held to ensure that all prospective bidders have a clear and complete understanding of all aspects of the requirement.

Page 59: Certified Federal Contracts Manager NCMA

PGO

7.2.2 Construction Services

• Notice of Award (NOA)

• Preconstruction Orientation. A preconstruction conference often is held with the successful offeror, before the construction effort begins, to again ensure that there is complete understanding of all issues related to the effort.

Page 60: Certified Federal Contracts Manager NCMA

FAR 31, cont.

31.105  Construction and architect-engineer contracts.

Page 61: Certified Federal Contracts Manager NCMA

PGO

31.105  Construction and architect-engineer contracts.

(a) This category includes all contracts and contract modifications negotiated on the basis of cost with organizations other than educational institutions (see 31.104), State and local governments (see 31.107), and nonprofit organizations except those exempted under OMB Circular A-122 (see 31.108) for construction management or construction, alteration or repair of buildings, bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to construction projects. It does not include contracts for vessels, aircraft, or other kinds of personal property.

(b) Except as otherwise provided in (d) of this section, the cost principles and procedures in Subpart 31.2 shall be used in the pricing of contracts and contract modifications in this category if cost analysis is performed as required by 15.404-1(c).

Page 62: Certified Federal Contracts Manager NCMA

PGO

31.105  Construction and architect-engineer contracts.

(c) In addition, the contracting officer shall incorporate the cost principles and procedures in Subpart 31.2 (as modified by (d) of this section by reference in contracts in this category as the basis for—

(1) Determining reimbursable costs under cost-reimbursement contracts, including cost-reimbursement subcontracts thereunder;

(2) Negotiating indirect cost rates;

(3) Proposing, negotiating, or determining costs under terminated contracts;

(4) Price revision of fixed-price incentive contracts; and

(5) Pricing changes and other contract modifications.

Page 63: Certified Federal Contracts Manager NCMA

PGO

31.105  Construction and architect-engineer contracts.

(d) Except as otherwise provided in this paragraph (d), the allowability of costs for construction and architect-engineer contracts shall be determined in accordance with Subpart 31.2.

(1) Because of widely varying factors such as the nature, size, duration, and location of the construction project, advance agreements as set forth in 31.109, for such items as home office overhead, partners’ compensation, employment of consultants, and equipment usage costs, are particularly important in construction and architect-engineer contracts.

When appropriate, they serve to express the parties’ understanding and avoid possible subsequent disputes or disallowances.

Page 64: Certified Federal Contracts Manager NCMA

PGO

31.105  Construction and architect-engineer contracts.

(d)(2) “Construction equipment,” as used in this section, means equipment (including marine equipment) in sound workable condition, either owned or controlled by the contractor or the subcontractor at any tier, or obtained from a commercial rental source, and furnished for use under Government contracts.

(i) Allowable ownership and operating costs shall be determined as follows:

(A) Actual cost data shall be used when such data can be determined for both ownership and operations costs for each piece of equipment, or groups of similar serial or series equipment, from the contractor’s accounting records.

(B) Predetermined schedules of construction equipment use rates (e.g., the Construction Equipment Ownership and Operating Expense Schedule, published by the U.S. Army Corps of Engineers, industry . . .

Page 65: Certified Federal Contracts Manager NCMA

PGO

(d)(2)(i) Allowable ownership and operating costs shall be determined as follows:

(C) When a schedule of predetermined use rates for construction equipment is used to determine direct costs, all costs of equipment that are included in the cost allowances provided by the schedule shall be identified and eliminated from the contractor’s other direct and indirect costs charged to the contract.

If the contractor’s accounting system provides for site or home office overhead allocations, all costs which are included in the equipment allowances may need to be included in any cost input base before computing the contractor’s overhead rate.

In periods of suspension of work pursuant to a contract clause, the allowance for equipment ownership shall not exceed an amount for standby cost as determined by the schedule or contract provision.

Page 66: Certified Federal Contracts Manager NCMA

PGO

31.105  Construction and architect-engineer contracts.

(d)(3) Costs incurred at the job site incident to performing the work, such as the cost of superintendence, timekeeping and clerical work, engineering, utility costs, supplies, material handling, restoration and cleanup, etc., are allowable as direct or indirect costs, provided the accounting practice used is in accordance with the contractor’s established and consistently followed cost accounting practices for all work.

(d)(4) Rental and any other costs, less any applicable credits incurred in acquiring the temporary use of land, structures, and facilities are allowable. Costs, less any applicable credits, incurred in constructing or fabricating structures and facilities of a temporary nature are allowable.

Page 67: Certified Federal Contracts Manager NCMA

PGO

31.107  Contracts with State, local, and federally recognized Indian tribal governments.

(a) Subpart 31.6 provides principles and standards for determining costs applicable to contracts with State, local, and federally recognized Indian tribal governments. . . . They apply to all programs that involve contracts with State, local, and federally recognized Indian tribal governments, except contracts with—

(1) Publicly financed educational institutions subject to Subpart 31.3; or

(2) Publicly owned hospitals and other providers of medical care subject to requirements promulgated by the sponsoring Government agencies.

(b) The Office of Management and Budget will approve any other exceptions in particular cases when adequate justification is presented

Page 68: Certified Federal Contracts Manager NCMA

PGO

Subpart 31.6—Contracts with State, Local, and Federally Recognized Indian Tribal Governments

31.603  Requirements.

(a) Contracts that refer to this Subpart 31.6 for determining allowable costs under contracts with State, local and Indian tribal governments shall be deemed to refer to, and shall have the allowability of costs determined by the contracting officer in accordance with, the revision of OMB Circular A-87 which is in effect on the date of the contract.

(b) Agencies are not expected to place additional restrictions on individual items of cost. However, under 10 U.S.C. 2324(e) and 41 U.S.C. 256(e), the following costs are unallowable:

Page 69: Certified Federal Contracts Manager NCMA

PGO

Subpart 31.6—Contracts with State, Local, and Federally Recognized Indian Tribal Governments

31.603(b)  Unallowable

(1) Costs of entertainment, including amusement, diversion, and social activities, and any costs directly associated with such costs (such as tickets to shows or sports events, meals, lodging, rentals, transportation, and gratuities).

(2) Costs incurred to influence (directly or indirectly) legislative action on any matter pending before Congress, a State legislature, or a legislative body of a political subdivision of a State.

(3) Costs incurred in defense of any civil or criminal fraud proceeding or similar proceeding (including filing of any false certification) brought by the United States where the contractor is found liable or has pleaded nolo contendere to a charge of fraud or similar proceeding (including filing of a false certification).

Page 70: Certified Federal Contracts Manager NCMA

PGO

Subpart 31.6—Contracts with State, Local, and Federally Recognized Indian Tribal Governments

31.603(b)  Requirements.

(4) Payments of fines and penalties resulting from violations of, or failure to comply with, Federal, state, local, or foreign laws and regulations, except when incurred as a result of compliance with specific terms and conditions of the contract or specific written instructions from the contracting officer authorizing in advance such payments in accordance with applicable regulations in the FAR or an executive agency supplement to the FAR.

(5) Costs of any membership in any social, dining, or country club or organization.

(6) Costs of alcoholic beverages.

(7) Contributions or donations, regardless of the recipient.

(8) Costs of advertising designed to promote the contractor or its products.

Page 71: Certified Federal Contracts Manager NCMA

PGO

Subpart 31.6—Contracts with State, Local, and Federally Recognized Indian Tribal Governments

31.603(b)  Requirements.

(9) Costs of promotional items and memorabilia, including models, gifts, and souvenirs.

(10) Costs for travel by commercial aircraft which exceed the amount of the standard commercial fare.

(11) Costs incurred in making any payment (commonly known as a “golden parachute payment”) which is

(12) Costs of commercial insurance that protects against the costs of the contractor for correction of the contractor’s own defects in materials or workmanship.

(13) Costs of severance pay paid by the contractor to foreign nationals employed by the contractor under a service contract performed outside the United States, to the extent that the amount of the severance pay paid in any case exceeds the amount paid in the industry involved under the customary or prevailing practice. . .

Page 72: Certified Federal Contracts Manager NCMA

PGO

Subpart 31.6—Contracts with State, Local, and Federally Recognized Indian Tribal Governments

31.603(b)  Requirements.

(14) Costs of severance pay paid by the contractor to a foreign national employed by the contractor under a service contract performed in a foreign country if the termination of the employment of the foreign national is the result of the closing of, or curtailment of activities at, a United States facility in that country at the request of the government of that country.

(15) Costs incurred by a contractor in connection with any criminal, civil, or administrative proceedings commenced by the United States or a State, to the extent provided in 10 U.S.C. 2324(k) or 41 U.S.C. 256(k).

Page 73: Certified Federal Contracts Manager NCMA

PGO

31.109  Advance agreements.

(a) The extent of allowability of the costs covered in this part applies broadly to many accounting systems in varying contract situations. Thus, the reasonableness, the allocability and the allowability under the specific cost principles at Subparts 31.2, 31.3, 31.6, and 31.7 of certain costs may be difficult to determine. To avoid possible subsequent disallowance or dispute based on unreasonableness, unallocability or unallowability under the specific cost principles at Subparts 31.2, 31.3, 31.6, and 31.7, contracting officers and contractors should seek advance agreement on the treatment of special or unusual costs and on statistical sampling methodologies at 31.201-6(c). However, an advance agreement is not an absolute requirement and the absence of an advance agreement on any cost will not, in itself, affect the reasonableness, allocability or the allowability under the specific cost principles at Subparts 31.2, 31.3, 31.6, and 31.7 of that cost.

Page 74: Certified Federal Contracts Manager NCMA

PGO

31.109  Advance agreements.

(b) Advance agreements may be negotiated either before or during a contract but should be negotiated before incurrence of the costs involved. The agreements must be in writing, executed by both contracting parties, and incorporated into applicable current and future contracts. An advance agreement shall contain a statement of its applicability and duration.

(c) The contracting officer is not authorized by this 31.109 to agree to a treatment of costs inconsistent with this part. For example, an advance agreement may not provide that, notwithstanding 31.205-20, interest is allowable.

(d) Advance agreements may be negotiated with a particular contractor for a single contract, a group of contracts, or all the contracts of a contracting office, an agency, or several agencies.

Page 75: Certified Federal Contracts Manager NCMA

PGO

31.109  Advance agreements.

(e) The cognizant administrative contracting officer (ACO), or other contracting officer established in Part 42, shall negotiate advance agreements except that an advance agreement affecting only one contract, or class of contracts from a single contracting office, shall be negotiated by a contracting officer in the contracting office, or an ACO when delegated by the contracting officer. When the negotiation authority is delegated, the ACO shall coordinate the proposed agreement with the contracting officer before executing the advance agreement.

(f) Before negotiating an advance agreement, the Government negotiator shall— (1) Determine if other contracting offices inside the agency or in other agencies have a significant unliquidated dollar balance in contracts with the same contractor; (2) Inform any such office or agency of the matters under consideration for negotiation; and (3) As appropriate, invite the office or agency and the responsible audit agency to participate in prenegotiation discussions and/or in the subsequent negotiations.

Page 76: Certified Federal Contracts Manager NCMA

PGO

31.109  Advance agreements.

(g) Upon completion of the negotiation, the sponsor shall prepare and distribute to other interested agencies and offices, including the audit agency, copies of the executed agreement and a memorandum providing the information specified in 15.406-3, as applicable.

Page 77: Certified Federal Contracts Manager NCMA

PGO

31.109  Advance agreements.

h) Examples for which advance agreements may be particularly important are—

(1) Compensation for personal services, including but not limited to allowances for off-site pay, incentive pay, location allowances, hardship pay, cost of living differential, and termination of defined benefit pension plans;

(2) Use charges for fully depreciated assets;

(3) Deferred maintenance costs;

(4) Precontract costs;

Page 78: Certified Federal Contracts Manager NCMA

PGO

31.109  Advance agreements.

(5) Independent research and development and bid and proposal costs;

(6) Royalties and other costs for use of patents;

(7) Selling and distribution costs;

(8) Travel and relocation costs, as related to special or mass personnel movements, as related to travel via contractor-owned, -leased, or -chartered aircraft; or as related to maximum per diem rates;

(9) Costs of idle facilities and idle capacity;

(10) Severance pay to employees on support service contracts;

Page 79: Certified Federal Contracts Manager NCMA

PGO

31.109  Advance agreements.

(11) Plant reconversion;

(12) Professional services (e.g., legal, accounting, and engineering);

(13) General and administrative costs (e.g., corporate, division, or branch allocations) attributable to the general management, supervision, and conduct of the contractor’s business as a whole. These costs are particularly significant in construction, job-site, architect-engineer, facilities, and Government-owned contractor operated (GOCO) plant contracts (see 31.203(h));

(14) Costs of construction plant and equipment (see 31.105(d));

(15) Costs of public relations and advertising;

(16) Training and education costs (see 31.205-44(h)); and

(17) Statistical sampling methods (see 31.201-6(c)(4).

Page 80: Certified Federal Contracts Manager NCMA

PGO

31.110  Indirect cost rate certification and penalties on unallowable costs.

(a) Certain contracts require certification of the indirect cost rates proposed for final payment purposes. See 42.703-2 for administrative procedures regarding the certification provisions and the related contract clause prescription.

(b) If unallowable costs are included in final indirect cost settlement proposals, penalties may be assessed. See 42.709 for administrative procedures regarding the penalty assessment provisions and the related contract clause prescription.

Page 81: Certified Federal Contracts Manager NCMA

Subpart 31.2—

Contracts with Commercial Organizations

Page 82: Certified Federal Contracts Manager NCMA

PGO

Subpart 31.2—Contracts with Commercial Organizations

31.201-1  Composition of total cost.

(a) The total cost, including standard costs properly adjusted for applicable variances, of a contract is the sum of the direct and indirect costs allocable to the contract, incurred or to be incurred, plus any allocable cost of money pursuant to 31.205-10, less any allocable credits. In ascertaining what constitutes a cost, any generally accepted method of determining or estimating costs that is equitable and is consistently applied may be used.

(b) While the total cost of a contract includes all costs properly allocable to the contract, the allowable costs to the Government are limited to those allocable costs which are allowable pursuant to Part 31 and applicable agency supplements.

Page 83: Certified Federal Contracts Manager NCMA

PGO

Subpart 31.2—Contracts with Commercial Organizations

31.201-2  Determining allowability.

(a) A cost is allowable only when the cost complies with all of the following requirements:

(1) Reasonableness.

(2) Allocability.

(3) Standards promulgated by the CAS Board, if applicable, otherwise, generally accepted accounting principles and practices appropriate to the circumstances.

(4) Terms of the contract.

(5) Any limitations set forth in this subpart.

Page 84: Certified Federal Contracts Manager NCMA

PGO

Subpart 31.2—Contracts with Commercial Organizations

(b) Certain cost principles in this subpart incorporate the measurement, assignment, and allocability rules of selected CAS and limit the allowability of costs to the amounts determined using the criteria in those selected standards. Only those CAS or portions of standards specifically made applicable by the cost principles in this subpart are mandatory unless the contract is CAS-covered (see Part 30).

Business units that are not otherwise subject to these standards under a CAS clause are subject to the selected standards only for the purpose of determining allowability of costs on Government contracts. Including the selected standards in the cost principles does not subject the business unit to any other CAS rules and regulations. The applicability of the CAS rules and regulations is determined by the CAS clause, if any, in the contract and the requirements of the standards themselves.

Page 85: Certified Federal Contracts Manager NCMA

PGO

Subpart 31.2—Contracts with Commercial Organizations

(c) When contractor accounting practices are inconsistent with this Subpart 31.2, costs resulting from such inconsistent practices in excess of the amount that would have resulted from using practices consistent with this subpart are unallowable.

(d) A contractor is responsible for accounting for costs appropriately and for maintaining records, including supporting documentation, adequate to demonstrate that costs claimed have been incurred, are allocable to the contract, and comply with applicable cost principles in this subpart and agency supplements. The contracting officer may disallow all or part of a claimed cost that is inadequately supported

Page 86: Certified Federal Contracts Manager NCMA

PGO

31.201-3  Determining reasonableness.

(a) A cost is reasonable if, in its nature and amount, it does not exceed that which would be incurred by a prudent person in the conduct of competitive business. Reasonableness of specific costs must be examined with particular care in connection with firms or their separate divisions that may not be subject to effective competitive restraints.

No presumption of reasonableness shall be attached to the incurrence of costs by a contractor. If an initial review of the facts results in a challenge of a specific cost by the contracting officer or the contracting officer’s representative, the burden of proof shall be upon the contractor to establish that such cost is reasonable.

Page 87: Certified Federal Contracts Manager NCMA

PGO

31.201-3  Determining reasonableness.

(b) What is reasonable depends upon a variety of considerations and circumstances, including—

(1) Whether it is the type of cost generally recognized as ordinary and necessary for the conduct of the contractor’s business or the contract performance;

(2) Generally accepted sound business practices, arm’s-length bargaining, and Federal and State laws and regulations;

(3) The contractor’s responsibilities to the Government, other customers, the owners of the business, employees, and the public at large; and

(4) Any significant deviations from the contractor’s established practices.

Page 88: Certified Federal Contracts Manager NCMA

PGO

31.201-4  Determining allocability.

A cost is allocable if it is assignable or chargeable to one or more cost objectives on the basis of relative benefits received or other equitable relationship. Subject to the foregoing, a cost is allocable to a Government contract if it—

(a) Is incurred specifically for the contract;

(b) Benefits both the contract and other work, and can be distributed to them in reasonable proportion to the benefits received; or

(c) Is necessary to the overall operation of the business, although a direct relationship to any particular cost objective cannot be shown.

Page 89: Certified Federal Contracts Manager NCMA

PGO

31.201-5  Credits.

The applicable portion of any income, rebate, allowance, or other credit relating to any allowable cost and received by or accruing to the contractor shall be credited to the Government either as a cost reduction or by cash refund. See 31.205-6(j)(3) for rules governing refund or credit to the Government associated with pension adjustments and asset reversions.

Page 90: Certified Federal Contracts Manager NCMA

PGO

31.201-7  Construction and architect-engineer contracts.

Specific principles and procedures for evaluating and determining costs in connection with contracts and subcontracts for construction, and architect-engineer contracts related to construction projects, are in 31.105. The applicability of these principles and procedures is set forth in 31.000 and 31.100.

Page 91: Certified Federal Contracts Manager NCMA

PGO

31.202  Direct costs.

(a) No final cost objective shall have allocated to it as a direct cost any cost, if other costs incurred for the same purpose in like circumstances have been included in any indirect cost pool to be allocated to that or any other final cost objective. Direct costs of the contract shall be charged directly to the contract. All costs specifically identified with other final cost objectives of the contractor are direct costs of those cost objectives and are not to be charged to the contract directly or indirectly.

(b) For reasons of practicality, the contractor may treat any direct cost of a minor dollar amount as an indirect cost if the accounting treatment—

(1) Is consistently applied to all final cost objectives; and

(2) Produces substantially the same results as treating the cost as a direct cost.

Page 92: Certified Federal Contracts Manager NCMA

PGO

31.203  Indirect costs

(a) For contracts subject to full CAS coverage, allocation of indirect costs shall be based on the applicable provisions. For all other contracts, the applicable CAS provisions in paragraphs (b) through (h) of this section apply.

(b) After direct costs have been determined and charged directly to the contract or other work, indirect costs are those remaining to be allocated to intermediate or two or more final cost objectives. No final cost objective shall have allocated to it as an indirect cost any cost, if other costs incurred for the same purpose, in like circumstances, have been included as a direct cost of that or any other final cost objective.

(c) The contractor shall accumulate indirect costs by logical cost groupings with due consideration of the reasons for incurring such costs. . .

Page 93: Certified Federal Contracts Manager NCMA

PGO

31.203  Indirect costs

(d) Once an appropriate base for allocating indirect costs has been accepted, the contractor shall not fragment the base by removing individual elements. All items properly includable in an indirect cost base shall bear a pro rata share of indirect costs irrespective of their acceptance as Government contract costs.

For example, when a cost input base is used for the allocation of G&A costs, the contractor shall include in the base all items that would properly be part of the cost input base, whether allowable or unallowable, and these items shall bear their pro rata share of G&A costs.

(e) The method of allocating indirect costs may require revision when there is a significant change in the nature of the business, the extent of subcontracting, fixed-asset improvement programs, inventories, the volume of sales and production, manufacturing processes, the contractor’s products, or other relevant circumstances.

Page 94: Certified Federal Contracts Manager NCMA

PGO

31.203  Indirect costs

(f) Separate cost groupings for costs allocable to offsite locations may be necessary to permit equitable distribution of costs on the basis of the benefits accruing to the several cost objectives.

(g) A base period for allocating indirect costs is the cost accounting period during which such costs are incurred and accumulated for allocation to work performed in that period.

(1) For contracts subject to full or modified CAS coverage, the contractor shall follow the criteria and guidance in 48 CFR 9904.406 for selecting the cost accounting periods to be used in allocating indirect costs.

(2) For contracts other than those subject to paragraph (g)(1) of this section, the base period for allocating indirect costs shall be the contractor’s fiscal year used for financial reporting purposes in accordance with generally accepted accounting principles. The fiscal year will normally be 12 months, but a different period may be appropriate (e.g., when a change in fiscal year occurs due to a business combination or other circumstances).

Page 95: Certified Federal Contracts Manager NCMA

PGO

31.203  Indirect costs

(h) Special care should be exercised in applying the principles of paragraphs (c), (d), and (e) of this section when Government-owned contractor-operated (GOCO) plants are involved. The distribution of corporate, division or branch office G&A expenses to such plants operating with little or no dependence on corporate administrative activities may require more precise cost groupings, detailed accounts screening, and carefully developed distribution bases.

(i) Indirect costs that meet the definition of “excessive pass-through charge” in 52.215-23, are unallowable.

Page 96: Certified Federal Contracts Manager NCMA

PGO

31.204  Application of principles and procedures.

(a) Costs are allowable to the extent they are reasonable, allocable, and determined to be allowable under 31.201, 31.202, 31.203, and 31.205. These criteria apply to all of the selected items that follow, even if particular guidance is provided for certain items for emphasis or clarity.

(b)(1) For the following subcontract types, costs incurred as reimbursements or payments to a subcontractor are allowable to the extent the reimbursements or payments are for costs incurred by the subcontractor that are consistent with this part:

(i) Cost-reimbursement.

(ii) Fixed-price incentive.

(iii) Price redeterminable (i.e., fixed-price contracts with prospective price redetermination and fixed-ceiling-price contracts with retroactive price redetermination).

(2) The requirements of paragraph (b)(1) of this section apply to any tier above the first firm-fixed-price subcontract or fixed-price subcontract with economic price adjustment provisions.

Page 97: Certified Federal Contracts Manager NCMA

PGO

31.204  Application of principles and procedures.

(c) Costs incurred as payments under firm-fixed-price subcontracts or fixed-price subcontracts with economic price adjustment provisions or modifications thereto, for which subcontract cost analysis was performed are allowable if the price was negotiated in accordance with 31.102.

Page 98: Certified Federal Contracts Manager NCMA

PGO

31.204  Application of principles and procedures.

(d) Section 31.205 does not cover every element of cost. Failure to include any item of cost does not imply that it is either allowable or unallowable.

The determination of allowability shall be based on the principles and standards in this subpart and the treatment of similar or related selected items.

When more than one subsection in 31.205 is relevant to a contractor cost, the cost shall be apportioned among the applicable subsections, and the determination of allowability of each portion shall be based on the guidance contained in the applicable subsection.

When a cost, to which more than one subsection in 31.205 is relevant, cannot be apportioned, the determination of allowability shall be based on the guidance contained in the subsection that most specifically deals with, or best captures the essential nature of, the cost at issue.

Page 99: Certified Federal Contracts Manager NCMA

PGO

31.205-4  Bonding costs.

(a) Bonding costs arise when the Government requires assurance against financial loss to itself or others by reason of the act or default of the contractor. They arise also in instances where the contractor requires similar assurance. Included are such bonds as bid, performance, payment, advance payment, infringement, and fidelity bonds.

(b) Costs of bonding required pursuant to the terms of the contract are allowable.

(c) Costs of bonding required by the contractor in the general conduct of its business are allowable to the extent that such bonding is in accordance with sound business practice and the rates and premiums are reasonable under the circumstances.

Page 100: Certified Federal Contracts Manager NCMA

PGO

31.205-6  Compensation for personal services.

(a) General. Compensation for personal services is allowable subject to the following general criteria and additional requirements contained in other parts of this cost principle:

(1) Compensation for personal services must be for work performed by the employee in the current year and must not represent a retroactive adjustment of prior years’ salaries or wages (but see paragraphs (g), (h), (j), (k), (m), and (o) of this subsection).

(2) The total compensation for individual employees or job classes of employees must be reasonable for the work performed; however, specific restrictions on individual compensation elements apply when prescribed.

(3) The compensation must be based upon and conform to the terms and conditions of the contractor’s established compensation plan or practice followed so consistently as to imply, in effect, an agreement to make the payment.

Page 101: Certified Federal Contracts Manager NCMA

PGO

31.205-6  Compensation for personal services.

(4) No presumption of allowability will exist where the contractor introduces major revisions of existing compensation plans or new plans and the contractor has not provided the cognizant ACO, either before implementation or within a reasonable period after it, an opportunity to review the allowability of the changes.

(5) Costs that are unallowable under other paragraphs of this Subpart 31.2 are not allowable under this subsection 31.205-6 solely on the basis that they constitute compensation for personal services.

Page 102: Certified Federal Contracts Manager NCMA

PGO

31.205-6  Compensation for personal services.

(6)(i) Compensation costs for certain individuals give rise to the need for special consideration. Such individuals include:

(A) Owners of closely held corporations, members of limited liability companies, partners, sole proprietors, or members of their immediate families; and

(B) Persons who are contractually committed to acquire a substantial financial interest in the contractor’s enterprise.

(ii) For these individuals, compensation must—

(A) Be reasonable for the personal services rendered; and

(B) Not be a distribution of profits (which is not an allowable contract cost).

(iii) For owners of closely held companies, compensation in excess of the costs that are deductible as compensation under the Internal Revenue Code (26 U.S.C.) and regulations under it is unallowable.

Page 103: Certified Federal Contracts Manager NCMA

PGO

31.205-6  Compensation for personal services.

(b) Reasonableness—

(1) Compensation pursuant to labor-management agreements.

(2) Compensation not covered by labor-management agreements.

Page 104: Certified Federal Contracts Manager NCMA

PGO

31.205-7  Contingencies.

(a) “Contingency,” as used in this subpart, means a possible future event or condition arising from presently known or unknown causes, the outcome of which is indeterminable at the present time.

(b) Costs for contingencies are generally unallowable for historical costing purposes because such costing deals with costs incurred and recorded on the contractor’s books. However, in some cases, as for example, terminations, a contingency factor may be recognized when it is applicable to a past period to give recognition to minor unsettled factors in the interest of expediting settlement.

Page 105: Certified Federal Contracts Manager NCMA

PGO

31.205-7  Contingencies.

(c) In connection with estimates of future costs, contingencies fall into two categories:

(1) Those that may arise from presently known and existing conditions,

(2) Those that may arise from presently known or unknown conditions, the effect of which cannot be measured so precisely as to provide equitable results to the contractor and to the Government; e.g., results of pending litigation.

Page 106: Certified Federal Contracts Manager NCMA

PGO

31.205-19  Insurance and indemnification.

(a) Insurance by purchase or by self-insuring includes—

(1) Coverage the contractor is required to carry or to have approved, under the terms of the contract; and

(2) Any other coverage the contractor maintains in connection with the general conduct of its business.

(b) For purposes of applying the provisions of this subsection, the Government considers insurance provided by captive insurers (insurers owned by or under control of the contractor) as self-insurance, and charges for it shall comply with the provisions applicable to self-insurance costs in this subsection. However, if the captive insurer also sells insurance to the general public in substantial quantities and it can be demonstrated that the charge to the contractor is based on competitive market forces, the Government will consider the insurance as purchased insurance.

Page 107: Certified Federal Contracts Manager NCMA

PGO

31.205-19  Insurance and indemnification.

(c) Whether or not the contract is subject to CAS, self-insurance charges are allowable subject to paragraph (e) of this subsection and the following limitations:

(d) Purchased insurance costs are allowable, subject to paragraph (e) of this subsection and the following limitations:

(e) Self-insurance and purchased insurance costs are subject to the cost limitations in the following paragraphs:

Page 108: Certified Federal Contracts Manager NCMA

PGO

31.205-33  Professional and consultant service costs. (c) Costs of professional and consultant services performed

under any of the following circumstances are unallowable:

(1) Services to improperly obtain, distribute, or use information or data protected by law or regulation (e.g., 52.215-1(e), Restriction on Disclosure and Use of Data).

(2) Services that are intended to improperly influence the contents of solicitations, the evaluation of proposals or quotations, or the selection of sources for contract award, whether award is by the Government, or by a prime contractor or subcontractor.

(3) Any other services obtained, performed, or otherwise resulting in violation of any statute or regulation prohibiting improper business practices or conflicts of interest.

(4) Services performed which are not consistent with the purpose and scope of the services contracted for or otherwise agreed to.

Page 109: Certified Federal Contracts Manager NCMA

PGO

31.205-33 (d) In determining the allowability of costs (including retainer fees) in a particular case, no single factor or any special combination of factors is necessarily determinative. However, the contracting officer shall

consider the following factors, among others:

(1) The nature and scope of the service rendered in relation to the service required.

(2) The necessity of contracting for the service, considering the contractor’s capability in the particular area.

(3) The past pattern of acquiring such services and their costs, particularly in the years prior to the award of Government contracts.

(4) The impact of Government contracts on the contractor’s business.

Page 110: Certified Federal Contracts Manager NCMA

PGO

31.205-33 (d) In determining the allowability of costs (including retainer fees) in a particular case, no single factor or any special combination of factors is necessarily determinative. However, the contracting officer shall

consider the following factors, among others:

(5) Whether the proportion of Government work to the contractor’s total business is such as to influence the contractor in favor of incurring the cost, particularly when the services rendered are not of a continuing nature and have little relationship to work under Government contracts.

(6) Whether the service can be performed more economically by employment rather than by contracting.

(7) The qualifications of the individual or concern rendering the service and the customary fee charged, especially on non-Government contracts.

(8) Adequacy of the contractual agreement for the service (e.g., description of the service, estimate of time required, rate of compensation, termination provisions).

Page 111: Certified Federal Contracts Manager NCMA

PGO

31.205-35  Relocation costs.

(c) The following types of costs are unallowable:

(1) Loss on the sale of a home.

(2) Costs incident to acquiring a home in the new location as follows:

(3) Continuing mortgage principal payments on a residence being sold.

(4) Costs incident to furnishing equity or nonequity loans to employees or making arrangements with lenders for employees to obtain lower-than-market rate mortgage loans.

Page 112: Certified Federal Contracts Manager NCMA

PGO

31.205-41  Taxes. (a) The following types of costs are allowable:

(1) Federal, State, and local taxes (see Part 29), . . . Fines and penalties are not considered taxes.

(2) Taxes otherwise allowable under paragraph (a)(1) of this section, but upon which a claim of illegality or erroneous assessment exists; provided the contractor, before paying such taxes—

(3) Pursuant to paragraph (a)(2) of this section, the reasonable costs of any action taken by the contractor at the direction or with the concurrence of the contracting officer. Interest or penalties incurred by the contractor for non-payment of any tax at the direction of the contracting officer or by reason of the failure of the contracting officer to ensure timely direction after a prompt request.

(4) The Environmental Tax found at section 59A of the Internal Revenue Code, also called the “Superfund Tax.”

Page 113: Certified Federal Contracts Manager NCMA

PGO

31.205-41  Taxes. (b) The following types of costs are not allowable:

(1) Federal income and excess profits taxes.

(2) Taxes in connection with financing, refinancing, refunding operations, or reorganizations (see 31.205-20 and 31.205-27).

(3) Taxes from which exemptions are available to the contractor directly, or available to the contractor based on an exemption afforded the Government, except when the contracting officer determines that the administrative burden incident to obtaining the exemption outweighs the corresponding benefits accruing to the Government. . .When partial exemption from a tax is attributable to Government contract activity,

(4) Special assessments on land that represent capital improvements

Page 114: Certified Federal Contracts Manager NCMA

PGO

31.205-41  Taxes. (b) The following types of costs are not allowable:

(5) Taxes (including excises) on real or personal property, or on the value, use, possession or sale thereof, which is used solely in connection with work other than on Government contracts (see paragraph (c) of this section).

(6) Any excise tax in subtitle D, Chapter 43 of the Internal Revenue Code of 1986, as amended. That chapter includes excise taxes imposed in connection with qualified pension plans, welfare plans, deferred compensation plans, or other similar types of plans.

(7) Income tax accruals designed to account for the tax effects of differences between taxable income and pretax income as reflected by the books of account and financial statements.

Page 115: Certified Federal Contracts Manager NCMA

PGO

31.205-41  Taxes.

(c) Taxes on property (see paragraph (b)(5) of this section) used solely in connection with either non-Government or Government work should be considered directly applicable to the respective category of work unless the amounts involved are insignificant or comparable results would otherwise be obtained; . . The cost of taxes incurred on property used in both Government and non-Government work shall be apportioned to all such work based upon the use of such property on the respective final cost objectives.

(d) Any taxes, interest, or penalties that were allowed as contract costs and are refunded to the contractor shall be credited or paid to the Government in the manner it directs. If a contractor or subcontractor obtains a foreign tax credit that reduces its U.S. Federal income tax because of the payment of any tax or duty allowed as contract costs, and if those costs were reimbursed by a foreign government, the amount of the reduction shall be paid to the Treasurer of the United States at the time the Federal income tax return is filed. . .

Page 116: Certified Federal Contracts Manager NCMA

PGO

31.205-48  Research and development costs.

“Research and development,” as used in this subsection, means the type of technical effort described in 31.205-18 but sponsored by a grant or required in the performance of a contract. When costs are incurred in excess of either the price of a contract or amount of a grant for research and development effort, the excess is unallowable under any other Government contract.

31.205-49  Goodwill.

Goodwill, an unidentifiable intangible asset, originates under the purchase method of accounting for a business combination when the price paid by the acquiring company exceeds the sum of the identifiable individual assets acquired less liabilities assumed, based upon their fair values. The excess is commonly referred to as goodwill. Goodwill may arise from the acquisition of a company as a whole or a portion thereof. Any costs for amortization, expensing, write-off, or write-down of goodwill (however represented) are unallowable.

Page 117: Certified Federal Contracts Manager NCMA

PGO

Subpart 31.6—Contracts with State, Local, and Federally Recognized Indian Tribal Governments

31.602  General.

Office of Management and Budget (OMB) Circular No. A-87, Cost Principles for State and Local Governments, Revised, sets forth the principles for determining the allowable costs of contracts and subcontracts with State, local, and federally recognized Indian tribal governments. These principles are for cost determination and are not intended to identify the circumstances or dictate the extent of Federal and State or local participation in financing a particular contract.

Page 118: Certified Federal Contracts Manager NCMA

PGO

Subpart 31.7—Contracts with Nonprofit Organizations

31.702  General.

Office of Management and Budget (OMB) Circular No. A-122, Cost Principles for Nonprofit Organizations, sets forth principles for determining the costs applicable to work performed by nonprofit organizations under contracts (also applies to grants and other agreements) with the Government.

Page 119: Certified Federal Contracts Manager NCMA

Part 32

Contract Financing

Page 120: Certified Federal Contracts Manager NCMA

PGO

32.002  Applicability of subparts.

(a) The following sections and subparts of this part are applicable to all purchases subject to Part 32:

(1) Sections 32.000 through 32.005.

(2) Subpart 32.3, Loan Guarantees for Defense Production.

(3) Subpart 32.6, Contract Debts.

(4) Subpart 32.7, Contract Funding.

(5) Subpart 32.8, Assignment of Claims.

(6) Subpart 32.9, Prompt Payment.

(7) Subpart 32.11, Electronic Funds Transfer.

Page 121: Certified Federal Contracts Manager NCMA

PGO

32.002  Applicability of subparts.

(a) The following sections and subparts of this part are applicable to all purchases subject to Part 32:

(b) Subpart 32.2, Commercial Item Purchase Financing, is applicable only to purchases of commercial items under authority of Part 12.

(c) The following subparts of this part are applicable to all purchases made under any authority other than Part 12:

(1) Subpart 32.1, Non-Commercial Item Purchase Financing.

(2) Subpart 32.4, Advance Payments For Non-Commercial Items.

(3) Subpart 32.5, Progress Payments Based on Costs.

(4) Subpart 32.10, Performance-Based Payments.

Page 122: Certified Federal Contracts Manager NCMA

PGO

32.005  Consideration for contract financing.

(a) Requirement. When a contract financing clause is included at the inception of a contract, there shall be no separate consideration for the contract financing clause. The value of the contract financing to the contractor is expected to be reflected in either

(1) a bid or negotiated price that will be lower than such price would have been in the absence of the contract financing, or

(2) contract terms and conditions, other than price, that are more beneficial to the Government than they would have been in the absence of the contract financing. Adequate new consideration is required for changes to, or the addition of, contract financing after award.

Page 123: Certified Federal Contracts Manager NCMA

PGO

32.005  Consideration for contract financing.

(b) Amount of new consideration. The contractor may provide new consideration by monetary or nonmonetary means, provided the value is adequate. The fair and reasonable consideration should approximate the amount by which the price would have been less had the contract financing terms been contained in the initial contract. In the absence of definite information on this point, the contracting officer should apply the following criteria in evaluating whether the proposed new consideration is adequate:

(1) The value to the contractor of the anticipated amount and duration of the contract financing at the imputed financial costs of the equivalent working capital.

(2) The estimated profit rate to be earned through contract performance.

Page 124: Certified Federal Contracts Manager NCMA

PGO

32.005  Consideration for contract financing.

(c) Interest. Except as provided in Subpart 32.4, Advance Payments for Non-Commercial Items, the contract shall not provide for any other type of specific charges, such as interest, for contract financing.

Page 125: Certified Federal Contracts Manager NCMA

PGO

32.104  Providing contract financing.

(a) Prudent contract financing can be a useful working tool in Government acquisition by expediting the performance of essential contracts. Contracting officers must consider the criteria in this part in determining whether to include contract financing in solicitations and contracts. Resolve reasonable doubts by including contract financing in the solicitation.

(b) If the contractor is a small business concern, the contracting officer must give special attention to meeting the contractor’s contract financing need. However, a contractor’s receipt of a certificate of competency from the Small Business Administration has no bearing on the contractor’s need for or entitlement to contract financing.

Page 126: Certified Federal Contracts Manager NCMA

PGO

32.104  Providing contract financing.

(c) Subject to specific agency regulations and paragraph (d) of this section, the contracting officer—

(d) Unless otherwise authorized by agency procedures, the contracting officer may provide contract financing in the form of performance-based payments (see Subpart 32.10) or customary progress payments (see Subpart 32.5) if the following conditions are met:

Page 127: Certified Federal Contracts Manager NCMA

PGO

32.108  Financial consultation.

Each contracting office should have available and use the services of contract financing personnel competent to evaluate credit and financial problems. In resolving any questions concerning—

(a) The financial capability of an offeror or contractor to perform a contract, or

(b) What form of contract financing is appropriate in a given case, the contracting officer should consult the appropriate contract financing office.

Page 128: Certified Federal Contracts Manager NCMA

PGO

32.110  Payment of subcontractors under cost-reimbursement prime contracts.

. . . the contracting officer should accept the financing payments as reimbursable costs of the prime contract only under the following conditions:

(a) The payments are made under the criteria in Subpart 32.5 for customary progress payments based on costs, 32.202-1 for commercial item purchase financing, or 32.1003 for performance-based payments, as applicable.

(b) . . . the payments do not exceed the progress payment rate in 32.501-1, unless unusual progress payments to the subcontractor have been approved in accordance with 32.501-2.

(c) . . . the subcontractor complies with the liquidation principles of 32.503-8, 32.503-9, and 32.503-10.

(d) If performance-based payments are made, the subcontractor complies with the liquidation principles of 32.1004(d).

(e) The subcontract contains financing payments terms as prescribed in this part.

Page 129: Certified Federal Contracts Manager NCMA

Subpart 32.2

Commercial Item Purchase Financing

Page 130: Certified Federal Contracts Manager NCMA

PGO

32.202-1  Policy.

(a) Use of financing in contracts. It is the responsibility of the contractor to provide all resources needed for performance of the contract. Thus, for purchases of commercial items, financing of the contract is normally the contractor’s responsibility.

(b) Authorization

(c) Difference from non-commercial financing. Government financing of commercial purchases under this subpart is expected to be different from that used for non-commercial purchases under Subpart 32.1 and its related subparts.

(d) Unusual contract financing. Any contract financing arrangement not in accord with the requirements of agency regulations or this part is unusual contract financing and requires advance approval in accordance with agency procedures.

Page 131: Certified Federal Contracts Manager NCMA

PGO

32.202-1  Policy, cont.

(e) Best interest of the Government. The statutes cited in 32.201 do not allow contract financing by the Government unless it is in the best interest of the United States. Agencies may establish standards to determine whether contract financing is in the best interest of the Government. These standards may be for certain types of procurements, certain types of items, or certain dollar levels of procurements.

Page 132: Certified Federal Contracts Manager NCMA

PGO

32.207  Administration and payment of commercial financing payments.

(a) Responsibility. The contracting officer responsible for administration of the contract shall be responsible for review and approval of contract financing requests.

(b) Approval of financing requests. Unless otherwise provided in agency regulations, or by agreement with the appropriate payment official—

(1) The contracting officer shall be responsible for receiving, approving, and transmitting all contract financing requests to the appropriate payment office; and

(2) Each approval shall specify the amount to be paid, necessary contractual information, and the account(s) (see 32.206(d)) to be charged for the payment.

(c) Management of security. After contract award, the contracting officer responsible for approving requests for financing payments shall be responsible for determining that the security continues to be adequate. If the contractor’s financial condition is the Government’s security, this contracting officer is also responsible for monitoring the contractor’s financial condition.

Page 133: Certified Federal Contracts Manager NCMA

PGO

32.410  Findings, determination, and authorization.

(a) Each determination concerning advance payments shall be supported by written findings (see 32.402(c)(1)(iii)).

(b) The following is an example of the format and text of findings, determination, and authorization with alternative words, phrases, and paragraphs to be selected to conform to the circumstances involved:

Page 134: Certified Federal Contracts Manager NCMA

Subpart 32.5

Progress Payments Based on Costs

Page 135: Certified Federal Contracts Manager NCMA

PGO

Subpart 32.5—Progress Payments Based on Costs

32.500  Scope of subpart. This subpart prescribes policies, procedures, forms, solicitation provisions, and contract clauses for providing contract financing through progress payments based on costs. This subpart does not apply to—

(a) Payments under cost-reimbursement contracts, but see 32.110 for progress payments made to subcontractors under cost-reimbursement prime contracts; or

(b) Contracts for construction or for shipbuilding or ship conversion, alteration, or repair, when the contracts provide for progress payments based on a percentage or stage of completion.

Page 136: Certified Federal Contracts Manager NCMA

PGO

32.502-2  Contract finance office clearance.

The contracting officer shall obtain the approval of the contract finance office or other offices designated under agency procedures before taking any of the following actions:

(a) Providing a progress payment rate higher than the customary rate (see 32.501-1).

(b) Deviating from the progress payments terms prescribed in this part.

(c) Providing progress payments to a contractor—

(1) Whose financial condition is in doubt;

(2) Who has had an advance payment request or loan guarantee denied for financial reasons (or approved but withdrawn or lapsed) within the previous 12 months; or

(3) Who is named in the consolidated list of contractors indebted to the United States (known commonly as the “Hold-up List”).

Page 137: Certified Federal Contracts Manager NCMA

PGO

32.503-8  Liquidation rates—ordinary method.

The Government recoups progress payments through the deduction of liquidations from payments that would otherwise be due to the contractor for completed contract items. To determine the amount of the liquidation, the contracting officer applies a liquidation rate to the contract price of contract items delivered and accepted. The ordinary method is that the liquidation rate is the same as the progress payment rate. At the beginning of a contract, the contracting officer must use this method.

Page 138: Certified Federal Contracts Manager NCMA

PGO

32.503-16  Risk of loss.

(a) Under the Progress Payments clause, and except for normal spoilage, the contractor bears the risk for loss, theft, destruction, or damage to property affected by the clause, even though title is vested in the Government, unless the Government has expressly assumed this risk. . .

(b) If a loss occurs in connection with property for which the contractor bears the risk, the contractor is obligated to repay to the Government the amount of unliquidated progress payments based on costs allocable to the property.

(c) The contractor is not obligated to pay for the loss of property for which the Government has assumed the risk of loss. . .

Page 139: Certified Federal Contracts Manager NCMA

PGO

Subpart 32.6—Contract Debts 32.602  Responsibilities.

(a) The contracting officer has primary responsibility for identifying and demanding payment of contract debts except those resulting from errors made by the payment office. The contracting officer shall not collect contract debts or otherwise agree to liquidate contract debts (e.g., offset the amount of the debt against existing unpaid bills due the contractor, or allow contractors to retain contract debts to cover amounts that may become payable in future periods).

(b) The payment office has primary responsibility for—

(1) Collecting contract debts identified by contracting officers;

(2) Identifying and collecting duplicate and erroneous payments; and

(3) Authorizing the liquidation of contract debts in accordance with agency procedures.

Page 140: Certified Federal Contracts Manager NCMA

Subpart 32.7

Contract Funding

Page 141: Certified Federal Contracts Manager NCMA

PGO

32.702  Policy.

No officer or employee of the Government may create or authorize an obligation in excess of the funds available, or in advance of appropriations (Anti-Deficiency Act, 31 U.S.C. 1341), unless otherwise authorized by law. Before executing any contract, the contracting officer shall—

(a) Obtain written assurance from responsible fiscal authority that adequate funds are available or

(b) Expressly condition the contract upon availability of funds in accordance with 32.703-2.

Page 142: Certified Federal Contracts Manager NCMA

PGO

32.703  Contract funding requirements.

32.703-1  General.

(a) If the contract is fully funded, funds are obligated to cover the price or target price of a fixed-price contract or the estimated cost and any fee of a cost-reimbursement contract.

(b) If the contract is incrementally funded, funds are obligated to cover the amount allotted and any corresponding increment of fee.

Page 143: Certified Federal Contracts Manager NCMA

PGO

32.703-2  Contracts conditioned upon availability of funds.

(a) Fiscal year contracts. The contracting officer may initiate a contract action properly chargeable to funds of the new fiscal year before these funds are available, provided that the contract includes the clause at 52.232-18, Availability of Funds (see 32.705-1(a)). This authority may be used only for operation and maintenance and continuing services (e.g., rentals, utilities, and supply items not financed by stock funds)—

(1) Necessary for normal operations; and

(2) For which Congress previously had consistently appropriated funds, unless specific statutory authority exists permitting applicability to other requirements.

Page 144: Certified Federal Contracts Manager NCMA

PGO

32.703-2  Contracts conditioned upon availability of funds.

(b) Indefinite-quantity or requirements contracts. A one-year indefinite-quantity or requirements contract for services that is funded by annual appropriations may extend beyond the fiscal year in which it begins; provided, that—

(1) Any specified minimum quantities are certain to be ordered in the initial fiscal year (see 37.106) and

(2) The contract includes the clause at 52.232-19, Availability of Funds for the Next Fiscal Year (see 32.705-1(b)).

(c) Acceptance of supplies or services. The Government shall not accept supplies or services under a contract conditioned upon the availability of funds until the contracting officer has given the contractor notice, to be confirmed in writing, that funds are available.

Page 145: Certified Federal Contracts Manager NCMA

PGO

32.703-3  Contracts crossing fiscal years.

(a) A contract that is funded by annual appropriations may not cross fiscal years, except in accordance with statutory authorization (e.g., 41 U.S.C. 11a, 31 U.S.C. 1308, 42 U.S.C. 2459a, 42 U.S.C. 3515, and paragraph (b) of this subsection), or when the contract calls for an end product that cannot feasibly be subdivided for separate performance in each fiscal year (e.g., contracts for expert or consultant services).

(b) The head of an executive agency, except NASA, may enter into a contract, exercise an option, or place an order under a contract for severable services for a period that begins in one fiscal year and ends in the next fiscal year if the period of the contract awarded, option exercised, or order placed does not exceed one year (10 U.S.C. 2410a and 41 U.S.C. 253l). Funds made available for a fiscal year may be obligated for the total amount of an action entered into under this authority.

Page 146: Certified Federal Contracts Manager NCMA

PGO

32.803  Policies.

(a) Any assignment of claims that has been made under the Act to any type of financing institution listed in 32.802(b) may thereafter be further assigned and reassigned to any such institution if the conditions in 32.802(d) and (e) continue to be met.

(b) A contract may prohibit the assignment of claims if the agency determines the prohibition to be in the Government’s interest.

(c) Under a requirements or indefinite quantity type contract that authorizes ordering and payment by multiple Government activities, amounts due for individual orders for $1,000 or more may be assigned.

Page 147: Certified Federal Contracts Manager NCMA

PGO

32.803  Policies.

(d) Any contract of a designated agency (see FAR 32.801), except a contract under which full payment has been made, may include a no-setoff commitment only when a determination of need is made by the head of the agency

(e) When an assigned contract does not include a no-setoff commitment, the Government may apply against payments to the assignee any liability of the contractor to the Government arising independently of the assigned contract if the liability existed at the time notice of the assignment was received even though that liability had not yet matured so as to be due and payable.

Page 148: Certified Federal Contracts Manager NCMA

PGO

Subpart 32.9—Prompt Payment

(a) General. Agency procedures must ensure that, when specifying due dates, contracting officers give full consideration to the time reasonably required by Government officials to fulfill their administrative responsibilities under the contract.

(b) Payment due dates. Except as prescribed in paragraphs (c) through (f) of this section, or as authorized in 32.908(a)(2) or (c)(2), the due date for making an invoice payment is as follows:

(1) The later of the following two events:

(i) The 30th day after the designated billing office receives a proper invoice from the contractor (except as provided in paragraph (b)(3) of this section).

(ii) The 30th day after Government acceptance of supplies delivered or services performed.

Page 149: Certified Federal Contracts Manager NCMA

PGO

Subpart 32.9—Prompt Payment, cont.

(2) If the contract does not require submission of an invoice for payment (e.g., periodic lease payments), the contracting officer must specify the due date in the contract.

(3) If the designated billing office fails to annotate the invoice with the actual date of receipt at the time of receipt, the invoice payment due date is the 30th day after the date of the contractor's invoice, provided the designated billing office receives a proper invoice and there is no disagreement over quantity, quality, or contractor compliance with contract requirements.

Page 150: Certified Federal Contracts Manager NCMA

PGO

Subpart 32.9—Prompt Payment, cont. (d) Construction contracts.

(1) The due date for making payments on construction contracts is as follows: (i) The due date for making progress payments based on contracting

officer approval of the estimated amount and value of work or services performed, including payments for reaching milestones in any project, is 14 days after the designated billing office receives a proper payment request.

(ii) The due date for payment of any amounts retained by the contracting officer in accordance with the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts, will be as specified in the contract or . . The contracting officer must base the release of retained amounts on the contracting officer’s determination that satisfactory progress has been made.

(iii) The due date for final payments based on completion and acceptance of all work (including any retained amounts), and payments for partial deliveries that have been accepted by the Government (e.g., each separate building, public work, or other division of the contract for which the price is stated separately in the contract) is as follows:

Page 151: Certified Federal Contracts Manager NCMA

PGO

Subpart 32.9—Prompt Payment, cont.

(e) Cost-reimbursement contracts for services. For purposes of computing late payment interest penalties that may apply, the due date for making interim payments on cost-reimbursement contracts for services is 30 days after the date of receipt of a proper invoice.

(f) Food and specified items.

(g) Multiple payment due dates. Contracting officers may encourage, but not require, contractors to submit separate invoices for products with different payment due dates under the same contract or order. When an invoice contains items with different payment due dates (i.e., a mixed invoice), the payment office will, subject to agency policy—

(1) Pay the entire invoice on the earliest due date; or

(2) Split invoice payments, making payments by the applicable due dates.

Page 152: Certified Federal Contracts Manager NCMA

Subpart 32.10

Performance-Based Payments

Page 153: Certified Federal Contracts Manager NCMA

PGO

Performance-Based Payments

32.1001  Policy.

(a) Performance-based payments are the preferred Government financing method when the contracting officer finds them practical, and the contractor agrees to their use.

(b) Performance-based payments are contract financing payments that are not payment for accepted items.

(c) Performance-based payments are fully recoverable, in the same manner as progress payments, in the event of default.

(d) Performance-based payments are contract financing payments and, therefore, are not subject to the interest-penalty provisions of prompt payment . . .

Page 154: Certified Federal Contracts Manager NCMA

PGO

Performance-Based Payments

32.1001  Policy.

(e) Performance-based payments shall not be used for—

(1) Payments under cost-reimbursement line items;

(2) Contracts for architect-engineer services or construction, or for shipbuilding or ship conversion, alteration, or repair, when the contracts provide for progress payments based upon a percentage or stage of completion; or

(3) Contracts awarded through sealed bid procedures

Page 155: Certified Federal Contracts Manager NCMA

PGO

Performance-Based Payments 32.1004  Procedures.

Performance-based payments may be made either on a whole contract or on a deliverable item basis, unless otherwise prescribed by agency regulations. Financing payments to be made on a whole contract basis are applicable to the entire contract, and not to specific deliverable items. Financing payments to be made on a deliverable item basis are applicable to a specific individual deliverable item. (A deliverable item for these purposes is a separate item with a distinct unit price. Thus, a contract line item for 10 airplanes, with a unit price of $1,000,000 each, has 10 deliverable items-the separate planes. A contract line item for 1 lot of 10 airplanes, with a lot price of $10,000,000, has only one deliverable item-the lot.)

Page 156: Certified Federal Contracts Manager NCMA

PGO

Performance-Based Payments 32.1004  Procedures.

(a) Establishing performance bases.

(1) The basis for performance-based payments may be either specifically described events (e.g., milestones) or some measurable criterion of performance. Each event or performance criterion that will trigger a finance payment shall be an integral and necessary part of contract performance and shall be identified in the contract, along with a description of what constitutes successful performance of the event or attainment of the performance criterion.

(2) Events or criteria may be either severable or cumulative. The successful completion of a severable event or criterion is independent of the accomplishment of any other event or criterion. Conversely, the successful accomplishment of a cumulative event or criterion is dependent upon the previous accomplishment of another event. A contract may provide for more than one series of severable and/or cumulative performance events or criteria performed in parallel.

Page 157: Certified Federal Contracts Manager NCMA

PGO

32.1004(a)(2)  Procedures.

(i) The contract shall not permit payment for a cumulative event or criterion until the dependent event or criterion has been successfully completed.

(ii) The contract shall specifically identify severable events or criteria.

(iii) The contract shall specifically identify cumulative events or criteria and identify which events or criteria are preconditions for the successful achievement of each event or criterion.

(iv) Because performance-based payments are contract financing, events or criteria shall not serve as a vehicle to reward the contractor for completion of performance levels over and above what is required for successful completion of the contract.

(v) If payment of performance-based finance amounts is on a deliverable item basis, each event or performance criterion shall be part of the performance necessary for that deliverable item and shall be identified to a specific contract line item or subline item.

Page 158: Certified Federal Contracts Manager NCMA

PGO

32.1007  Administration and payment of performance-based payments.

(a) Responsibility. The contracting officer responsible for administering performance-based payments (see 42.302(a)(12)) for the contract shall review and approve all performance-based payments for that contract.

(b) Approval of financing requests. Unless otherwise provided in agency regulations, or by agreement with the appropriate payment official—

(1) The contracting officer shall be responsible for receiving, approving, and transmitting all performance-based payment requests to the appropriate payment office; and

(2) Each approval shall specify the amount to be paid, necessary contractual information, and the appropriation account(s) (see 32.1004(c)) to be charged for the payment.

Page 159: Certified Federal Contracts Manager NCMA

PGO

END PART I