1

CERTIFICATION OF ENROLLMENT - WA State LEAP ...leap.leg.wa.gov/leap/budget/lbns/1517Cap1115-PL.pdfCERTIFICATION OF ENROLLMENT SECOND ENGROSSED HOUSE BILL 1115 64th Legislature 2015

  • Upload
    vanlien

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

CERTIFICATION OF ENROLLMENTSECOND ENGROSSED HOUSE BILL 1115

64th Legislature2015 3rd Special Session

Passed by the House June 30, 2015 Yeas 96 Nays 2

Speaker of the House of Representatives

Passed by the Senate June 30, 2015 Yeas 44 Nays 1

President of the Senate

CERTIFICATE

I, Barbara Baker, Chief Clerk ofthe House of Representatives of theState of Washington, do herebycertify that the attached is SECONDENGROSSED HOUSE BILL 1115 as passedby House of Representatives and theSenate on the dates hereon setforth.

Chief Clerk

Approved FILED

Governor of the State of Washington

Secretary of State State of Washington

AN ACT Relating to the capital budget; making appropriations and1authorizing expenditures for capital improvements; amending RCW243.160.080, 27.34.330, 28A.525.166, 28B.20.725, 28B.15.310,328B.15.210, 28B.30.750, 28B.35.370, 28B.50.360, 43.19.501,443.155.050, 43.155.070, 43.160.080, 43.131.413, 43.131.414, and528B.20.744; amending 2013 2nd sp.s. c 19 ss 1073, 1074, 1077, 1078,61091, 1109, 1093, 1099, 1108, 1104, 1105, 2024, 2028, 3067, 3058,73101, 3190, 3212, 5007, 5020, 5015, 5025, 5055, 5108, 5110, and 70438(uncodified); amending 2013 3rd sp.s. c 1 s 3 (uncodified);9reenacting and amending RCW 70.105D.070; adding new sections to 2013102nd sp.s. c 19 (uncodified); creating new sections; repealing 2013112nd sp.s. c 19 ss 1090 and 7013 (uncodified); making appropriations;12providing an expiration date; and declaring an emergency.13

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:14

NEW SECTION. Sec. 1. (1) A capital budget is hereby adopted15and, subject to the provisions set forth in this act, the several16dollar amounts hereinafter specified, or so much thereof as shall be17sufficient to accomplish the purposes designated, are hereby18appropriated and authorized to be incurred for capital projects19during the period beginning with the effective date of this act and20ending June 30, 2017, out of the several funds specified in this act.21

SECOND ENGROSSED HOUSE BILL 1115

Passed Legislature - 2015 3rd Special SessionState of Washington 64th Legislature 2015 Regular SessionBy Representatives Dunshee, DeBolt, Gregerson, Morris, and Reykdal;by request of Governor InsleeRead first time 01/13/15. Referred to Committee on Capital Budget.

p. 1 2EHB 1115.PL

(2) The definitions in this subsection apply throughout this act1unless the context clearly requires otherwise.2

(a) "Fiscal year 2016" or "FY 2016" means the period beginning3July 1, 2015, and ending June 30, 2016.4

(b) "Fiscal year 2017" or "FY 2017" means the period beginning5July 1, 2016, and ending June 30, 2017.6

(c) "Lapse" or "revert" means the amount shall return to an7unappropriated status.8

(d) "Provided solely" means the specified amount may be spent9only for the specified purpose.10

(3) Unless otherwise specifically authorized in this act, any11portion of an amount provided solely for a specified purpose that is12not expended subject to the specified conditions and limitations to13fulfill the specified purpose shall lapse.14

(4) The amounts shown under the headings "Prior Biennia," "Future15Biennia," and "Total" in this act are for informational purposes only16and do not constitute legislative approval of these amounts. "Prior17biennia" typically refers to the immediate prior biennium for18reappropriations, but may refer to multiple biennia in the case of19specific projects. A "future biennia" amount is an estimate of what20may be appropriated for the project or program in the 2017-201921biennium and the following three biennia; an amount of zero does not22necessarily constitute legislative intent to not provide funding for23the project or program in the future.24

(5) "Reappropriations" in this act are appropriations and, unless25the context clearly provides otherwise, are subject to the relevant26conditions and limitations applicable to appropriations.27Reappropriations shall be limited to the unexpended balances28remaining on June 30, 2015, from the 2013-2015 biennial29appropriations for each project.30

PART 131GENERAL GOVERNMENT32

NEW SECTION. Sec. 1001. FOR THE HOUSE OF REPRESENTATIVES33House of Representatives Interim Task Force on Washington Waters34

(91000002)35(1) The house of representatives finds that low water supply in36

portions of eastern Washington, catastrophic flood damage, and storm37

p. 2 2EHB 1115.PL

water runoff polluting state waterways have reached crisis levels,1endangering the health and safety of our citizens and the2environment.3

(2) The house of representatives interim task force on Washington4waters is established to build upon the foundation of Senate Bill No.55628 that was introduced in the 2015 regular session and provided for6storm water, flood control, and water supply infrastructure in the7state. The objective of the task force is to prepare a report and8draft legislation for consideration in the 2016 legislative session9that:10

(a) Quantifies the level of funding needed through fiscal year112026 to address the three water priorities;12

(b) Develops and recommends state funding options that address13the three water priorities equally;14

(c) Develops and recommends local funding options that generate15revenues from municipal and agricultural beneficiaries;16

(d) Develops and recommends criteria and mechanisms for managing,17prioritizing and distributing the funding;18

(e) Analyzes and reports on the metrics and variables associated19with water market pricing, including the costs per acre-foot of water20supply developed and delivered for irrigation; and21

(f) Addresses other relevant issues as determined by the task22force.23

(3) The house of representatives interim task force on Washington24waters must consist of ten members:25

(a) Five members from the majority caucus appointed by the26speaker of the house, including the chair of the capital budget27committee; one member each from the appropriations, finance, and28transportation committees; and one member at large; and29

(b) Five members from the minority caucus appointed by the30minority leader, including the ranking minority member of the capital31budget committee; one member each from the appropriations, finance,32and transportation committees; and one member at large.33

(c) The chair and the ranking minority member of the capital34budget committee shall cochair the task force.35

(d) Appointments to the task force must be completed within36fifteen days of the effective date of this section.37

(4) Principal staff support for the task force must be provided38by the house of representatives office of program research. The task39force may:40

p. 3 2EHB 1115.PL

(a) Request the participation of the office of financial1management and other relevant executive branch agencies;2

(b) Enter into contracts with persons who have specific technical3expertise; and4

(c) Solicit information and perspectives from representatives of5public and private organizations.6

(5) Legislative members of the task force must be reimbursed for7travel expenses in accordance with RCW 44.04.120. Task force8expenditures are subject to approval by the house of representatives9executive rules committee, or its successor committee.10

(6) The task force must report its findings and recommendations11to appropriate legislative committees by November 15, 2015.12

(7) The task force expires on June 30, 2016.13(8) The appropriation in this section is provided solely for any14

technical research and analysis required to carry out the task force15objectives in subsection (2) of this section.16Appropriation:17

State Building Construction Account—State. . . . . . . . $75,00018Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $75,00021

NEW SECTION. Sec. 1002. FOR THE SECRETARY OF STATE22Library - Archives Building (30000033)23The appropriation in this section is subject to the following24

conditions and limitations:25(1) The appropriation is provided solely for a predesign to26

determine: (a) Necessary program space for the state library27currently located in Tumwater, and additional archive space; (b)28capital budget requirements, including the use of fees collected by29the secretary of state that will support a certificate of30participation for the financing of the construction of the facility,31and future operating costs; and (c) projected efficiencies of32electronic document storage in determining necessary space.33

(2) The study must consider the use of the general administration34building site as a possible location; and any benefits or35consequences may be identified at this site or other sites36considered; and lease options.37

p. 4 2EHB 1115.PL

(3) The office of financial management shall determine the1maximum use of the site and consider the consolidation of other state2agencies, including separately elected officials.3

(4) The building must be a high performance building as described4in section 7008 of this act and the construction must be procured5using a performance based method including design-build or design-6build-operate-maintain.7Appropriation:8

State Building Construction Account—State. . . . . . . . $400,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . $55,428,00011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $55,828,00012

NEW SECTION. Sec. 1003. FOR THE SECRETARY OF STATE13Minor Works (91000007)14

Appropriation:15State Building Construction Account—State. . . . . . . $1,007,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,007,00019

NEW SECTION. Sec. 1004. FOR THE DEPARTMENT OF COMMERCE20Local and Community Projects (20064008)21The reappropriation in this section is subject to the following22

conditions and limitations: The reappropriation is subject to the23provisions in section 131, chapter 488, Laws of 2005.24Reappropriation:25

State Building Construction Account—State. . . . . . . . $434,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $45,458,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $45,892,00029

NEW SECTION. Sec. 1005. FOR THE DEPARTMENT OF COMMERCE30Rural Washington Loan Fund (20064010)31

Reappropriation:32Rural Washington Loan Account—State. . . . . . . . . . $2,383,00033

p. 5 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . $1,744,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,127,0003

NEW SECTION. Sec. 1006. FOR THE DEPARTMENT OF COMMERCE4Rural Washington Loan Fund (20074008)5

Reappropriation:6Rural Washington Loan Account—State. . . . . . . . . . $1,822,0007Prior Biennia (Expenditures). . . . . . . . . . . . . . $205,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,027,00010

NEW SECTION. Sec. 1007. FOR THE DEPARTMENT OF COMMERCE11Housing Assistance, Weatherization, and Affordable Housing12

(20074009)13Reappropriation:14

State Taxable Building Construction Account—15State. . . . . . . . . . . . . . . . . . . . . . . $1,405,00016

Washington Housing Trust Account—State. . . . . . . . . . $86,00017Subtotal Reappropriation. . . . . . . . . . . . . $1,491,00018

Prior Biennia (Expenditures). . . . . . . . . . . . $198,509,00019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $200,000,00021

NEW SECTION. Sec. 1008. FOR THE DEPARTMENT OF COMMERCE22Job Development Fund Grants (20074010)23The reappropriation in this section is subject to the following24

conditions and limitations: The reappropriation is subject to the25provisions of section 1032, chapter 520, Laws of 2007 and section261005, chapter 36, Laws of 2010 1st sp. sess.27Reappropriation:28

State Building Construction Account—State. . . . . . . $3,987,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $44,943,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $48,930,00032

NEW SECTION. Sec. 1009. FOR THE DEPARTMENT OF COMMERCE33p. 6 2EHB 1115.PL

Local and Community Projects (20084001)1The reappropriation in this section is subject to the following2

conditions and limitations: Except as directed otherwise prior to the3effective date of this section, the department shall not expend the4reappropriation in this section unless and until the nonstate share5of project costs have been either expended, or firmly committed, or6both, in an amount sufficient to complete the project or a distinct7phase of the project that is useable to the public for the purpose8intended by the legislature. This requirement does not apply to9projects where a share of the reappropriation is released for design10costs only.11Reappropriation:12

State Building Construction Account—State. . . . . . . . $113,00013Prior Biennia (Expenditures). . . . . . . . . . . . $127,577,00014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . $127,690,00016

NEW SECTION. Sec. 1010. FOR THE DEPARTMENT OF COMMERCE17Community Development Fund (20084850)18

Reappropriation:19State Building Construction Account—State. . . . . . . $1,213,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $19,703,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,916,00023

NEW SECTION. Sec. 1011. FOR THE DEPARTMENT OF COMMERCE24Housing Assistance, Weatherization, and Affordable Housing25

(30000013)26Reappropriation:27

Washington Housing Trust Account—State. . . . . . . . . $276,00028Prior Biennia (Expenditures). . . . . . . . . . . . $129,724,00029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . $130,000,00031

NEW SECTION. Sec. 1012. FOR THE DEPARTMENT OF COMMERCE322010 Local and Community Projects (30000082)33

p. 7 2EHB 1115.PL

The reappropriation in this section is subject to the following1conditions and limitations: The projects must comply with RCW243.63A.125 and other requirements for community projects administered3by the department.4Reappropriation:5

State Building Construction Account—State. . . . . . . $1,991,0006Prior Biennia (Expenditures). . . . . . . . . . . . . $11,431,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,422,0009

NEW SECTION. Sec. 1013. FOR THE DEPARTMENT OF COMMERCE10Drinking Water State Revolving Fund Loan Program (30000095)11

Reappropriation:12Drinking Water Assistance Account—State. . . . . . . . $6,451,00013Drinking Water Assistance Repayment Account—State. . $90,368,00014

Subtotal Reappropriation. . . . . . . . . . . . . $96,819,00015Prior Biennia (Expenditures). . . . . . . . . . . . . $10,863,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . $107,682,00018

NEW SECTION. Sec. 1014. FOR THE DEPARTMENT OF COMMERCE19Community Economic Revitalization Board (30000097)20

Reappropriation:21Public Facility Construction Loan Revolving Account—22

State. . . . . . . . . . . . . . . . . . . . . . . $2,104,00023Prior Biennia (Expenditures). . . . . . . . . . . . . $2,896,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00026

NEW SECTION. Sec. 1015. FOR THE DEPARTMENT OF COMMERCE27Housing Assistance, Weatherization, Affordable Housing Trust Fund28

(30000098)29The reappropriation in this section is subject to the following30

conditions and limitations: The reappropriation is subject to the31provisions of section 1026, chapter 49, Laws of 2011 1st sp. sess.32Reappropriation:33

p. 8 2EHB 1115.PL

State Taxable Building Construction Account—State. . . $6,907,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $43,093,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,0004

NEW SECTION. Sec. 1016. FOR THE DEPARTMENT OF COMMERCE5Public Works Assistance Account Program (30000103)6The reappropriation in this section is subject to the following7

conditions and limitations: The reappropriation is subject to the8provisions of section 1021, chapter 48, Laws of 2011 1st sp. sess.9Reappropriation:10

Public Works Assistance Account—State. . . . . . . . $90,734,00011Prior Biennia (Expenditures). . . . . . . . . . . . $233,851,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $324,585,00014

NEW SECTION. Sec. 1017. FOR THE DEPARTMENT OF COMMERCE15Building Communities Fund Grants (30000102)16The reappropriation in this section is subject to the following17

conditions and limitations:18(1) The reappropriation is subject to the provisions of section19

1027, chapter 49, Laws of 2011, 1st sp. sess.20(2) $573,000 of the reappropriation is provided solely for the21

University District food bank project.22(3) $815,000 of the reappropriation is provided solely for the23

Village Green foundation project.24Reappropriation:25

State Building Construction Account—State. . . . . . . $1,388,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $12,830,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,218,00029

NEW SECTION. Sec. 1018. FOR THE DEPARTMENT OF COMMERCE30Local and Community Projects (30000166)31The reappropriation in this section is subject to the following32

conditions and limitations: The reappropriation is subject to the33provisions of section 1002, chapter 2, Laws of 2012 2nd sp. sess.34

p. 9 2EHB 1115.PL

Reappropriation:1State Building Construction Account—State. . . . . . . $1,887,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $14,930,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,817,0005

NEW SECTION. Sec. 1019. FOR THE DEPARTMENT OF COMMERCE6Financing Energy/Water Efficiency (30000180)7

Reappropriation:8Public Works Assistance Account—State. . . . . . . . . $4,886,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . $114,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00012

NEW SECTION. Sec. 1020. FOR THE DEPARTMENT OF COMMERCE13Public Works Assistance Account Program 2013 Loan List (30000184)14The reappropriation in this section is subject to the following15

conditions and limitations: The reappropriation is subject to the16provisions of section 1016, chapter 2, Laws of 2012 2nd sp. sess.17Reappropriation:18

Public Works Assistance Account—State. . . . . . . . $82,786,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $82,786,00022

NEW SECTION. Sec. 1021. FOR THE DEPARTMENT OF COMMERCE23Building for the Arts Grants (30000186)24The reappropriation in this section is subject to the following25

conditions and limitations: The reappropriation is subject to the26provisions of section 1063, chapter 19, Laws of 2013 2nd sp. sess.27Reappropriation:28

State Building Construction Account—State. . . . . . . $3,301,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $6,903,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,204,00032

p. 10 2EHB 1115.PL

NEW SECTION. Sec. 1022. FOR THE DEPARTMENT OF COMMERCE1Drinking Water State Revolving Fund Loan Program (30000189)2The reappropriations in this section are subject to the following3

conditions and limitations: For projects involving repair,4replacement, or improvement of a clean water infrastructure facility5or other public works facility for which an investment grade6efficiency audit is obtainable, the public works board must require7as a contract condition that the project sponsor undertake an8investment grade efficiency audit. The project sponsor may finance9the costs of the audit as part of its drinking water state revolving10fund program loan.11Reappropriation:12

Drinking Water Assistance Account—State. . . . . . . . $4,000,00013Drinking Water Assistance Repayment Account—14

State. . . . . . . . . . . . . . . . . . . . . . $200,000,00015Subtotal Reappropriation. . . . . . . . . . . . $204,000,00016

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . $680,000,00018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $884,000,00019

NEW SECTION. Sec. 1023. FOR THE DEPARTMENT OF COMMERCE20Community Economic Revitalization Board (30000190)21The reappropriation in this section is subject to the following22

conditions and limitations: The reappropriation is subject to the23provisions of section 1070, chapter 19, Laws of 2013 2nd sp. sess.24Reappropriation:25

Public Facility Construction Loan Revolving Account—26State. . . . . . . . . . . . . . . . . . . . . . . $8,882,00027

Prior Biennia (Expenditures). . . . . . . . . . . . . . $118,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,000,00030

NEW SECTION. Sec. 1024. FOR THE DEPARTMENT OF COMMERCE31Weatherization (30000192)32The reappropriation in this section is subject to the following33

conditions and limitations: The reappropriation is subject to the34provisions of section 1076, chapter 19, Laws of 2013 2nd sp. sess.35

p. 11 2EHB 1115.PL

Reappropriation:1State Building Construction Account—State. . . . . . . $4,291,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $15,709,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,000,0005

NEW SECTION. Sec. 1025. FOR THE DEPARTMENT OF COMMERCE62013-2015 Energy Efficiency Grants (30000193)7The reappropriation in this section is subject to the following8

conditions and limitations: The reappropriation is subject to the9provisions of section 1075, chapter 19, Laws of 2013 2nd sp. sess.10Reappropriation:11

State Building Construction Account—State. . . . . . $21,714,00012Prior Biennia (Expenditures). . . . . . . . . . . . . $3,286,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00015

NEW SECTION. Sec. 1026. FOR THE DEPARTMENT OF COMMERCE16Renton Aerospace Training Center Construction (30000724)17The reappropriation in this section is subject to the following18

conditions and limitations: The reappropriation is subject to the19provisions of section 3, chapter 1, Laws of 2013 3rd sp. sess.20Reappropriation:21

State Building Construction Account—State. . . . . . $10,000,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00025

NEW SECTION. Sec. 1027. FOR THE DEPARTMENT OF COMMERCE26ARRA SEP Revolving Loans (30000725)27

Appropriation:28Energy Recovery Act Account—State. . . . . . . . . . . $2,500,00029Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . $10,000,00031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,500,00032

p. 12 2EHB 1115.PL

NEW SECTION. Sec. 1028. FOR THE DEPARTMENT OF COMMERCE1Clean Energy and Energy Freedom Program (30000726)2The appropriations in this section are subject to the following3

conditions and limitations:4(1) The appropriations are provided solely for projects that5

provide a benefit to the public through development, demonstration,6and deployment of clean energy technologies that save energy and7reduce energy costs, reduce harmful air emissions or otherwise8increase energy independence for the state.9

(2) In soliciting and evaluating proposals, awarding contracts,10and monitoring projects under this section, the department must:11

(a) Ensure that competitive bidding processes, rather than sole12source contracting processes, are used to select all projects;13

(b) Require that all expenditures be used for projects that14develop and acquire asset that have a useful life of at least15thirteen years; and16

(c) Conduct due diligence activities associated with the use of17public funds including, but not limited to, oversight of the project18selection process, project monitoring and ensuring that all19applications and contracts fully comply with all applicable laws20including disclosure and conflict of interest statutes.21

(3)(a) Pursuant to chapter 42.52 RCW, the ethics in public22service act, the department must require an applicant to identify in23application materials any state of Washington employees or former24state employees employed or on the firm's governing board during the25past twenty-four months. Application materials must identify the26individual by name, the agency previously or currently employed by,27job title or position held, and separation date. If it is determined28by the department that a conflict of interest exists, the applicant29may be disqualified from further consideration for award of a30contract.31

(b) If the department finds, after due notice and examination,32that there is a violation of chapter 42.52 RCW, or any similar33statute involving a contractor either in procuring or performing34under the contract, the department in its sole discretion may35terminate the contract by written notice. If the contract is36terminated, the department must be entitled to pursue the same37remedies against the contractor as it could pursue in the event of a38breach of the contract by the contractor.39

p. 13 2EHB 1115.PL

(4) The requirements in subsections (2) and (3) of this section1must be specified in funding agreements issued by the department.2

(5) The department may not obligate or expend any of the amounts3provided in this section on new projects that involve the Snohomish4county public utilities district or its subcontractors until the5executive ethics board responds to the department's June 17, 2015,6request for an advisory opinion on poststate employment.7

(6)(a) $10,000,000 of the state taxable building construction8account is provided solely to create a revolving loan fund to support9the widespread use of proven energy efficiency and renewable energy10technologies now inhibited by lack of access to capital.11

(b) The department shall provide grant funds to one or more12competitively selected nonprofit lenders that will provide matching13private capital and will administer the loan fund. The department14must select the loan fund administrator or administrators through a15competitive process, with scoring conducted by a group of qualified16experts, applying criteria specified by the department.17

(c) The department must establish guidelines that specify18applicant eligibility, the screening process, and evaluation and19selection criteria. The guidelines must be used by the nonprofit20lenders.21

(d) Loan applications must disclose all sources of public funds22invested in the project. The nonprofit lender must make loans23available to the following types of projects that include, but are24not limited to: Residential, commercial, industrial, and agricultural25energy retrofits, residential and community-scale solar26installations, anaerobic digesters to treat dairy and organic waste,27and combined heat and power projects using woody biomass as a fuel28source.29

(e) State funds may not exceed fifty percent of the estimated30cost of a project, and funding preference must be provided to31projects that offer a higher percentage of nonstate match funds.32

(7) $6,600,000 of the state taxable building construction account33is provided solely for credit enhancements of advanced solar and34renewable energy manufacturing within Washington state. The35department shall develop an application process to competitively36select projects.37

(8)(a) $13,000,000 of the state building construction account is38provided solely for grants to advance clean and renewable energy39technologies and advance transmission and distribution control system40

p. 14 2EHB 1115.PL

improvements for increased reliability, resiliency, and enabling1integration of distributed and renewable resources and technology by2public and private electrical utilities that serve retail customers3in the state. Eligible utilities may partner with other public and4private sector research organizations and businesses in applying for5funding.6

(b) The department shall develop a grant application process to7competitively select projects for grant awards, to include scoring8conducted by a group of qualified experts with application of9criteria specified by the department. In development of the10application criteria, the department shall, to the extent possible,11allow smaller utilities or consortia of small utilities to apply for12funding.13

(c) The department shall convene an advisory panel of electric14utility representatives to identify program objectives, near term15priorities and long term goals.16

(d) Applications for grants must disclose all sources of public17funds invested in a project.18

(e) Grant funds must be used for research, development, or19demonstration projects that integrate intermittent renewables through20energy storage, information technology or other smart grid21technologies, dispatch energy storage resources from utility control22rooms, use demand response, transactive control, or the thermal23properties and electric load of commercial buildings and district24energy systems to store energy, reduce transmission congestion or25otherwise improve system reliability and resiliency and enable26integration of distributed and renewable energy sources.27

(9)(a) $10,000,000 of the state building construction account is28provided solely for grants to match federal funds or other nonstate29funding sources used to research, develop, and demonstrate clean30energy technologies.31

(b) The department shall consult with the University of32Washington, Washington State University, the Pacific Northwest33national laboratory and other clean energy organizations to design34the program. The program shall offer matching funds for competitively35selected clean energy projects including, but not limited to:36Advancing energy storage and solar technologies, advancing bioenergy,37developing new lightweight materials, and advancing renewable energy38and energy efficiency technologies.39

p. 15 2EHB 1115.PL

(10) $400,000 of the state building construction account—state is1provided solely for capital funding of competitively selected wood2energy conversion projects at public facilities.3

(11) The department must report on number and results of projects4that receive grants or loans through the clean energy fund, including5the number of job hours created and the number of jobs maintained and6created, to the governor and the legislature, by November 1, 2016.7

(12) The department shall develop metrics that indicate the8performance of energy efficiency efforts and provide a report of the9metrics, including at a minimum the current energy used by the10building, the energy use after efficiencies are completed, and cost11of energy saved, to the house of representatives technology &12economic development committee and the senate energy, environment &13telecommunications committee. The report must include these metrics14from other states.15Appropriation:16

State Taxable Building Construction Account—State. . $17,000,00017State Building Construction Account—State. . . . . . $23,400,00018

Subtotal Appropriation. . . . . . . . . . . . . . $40,400,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . $240,000,00021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $280,400,00022

NEW SECTION. Sec. 1029. FOR THE DEPARTMENT OF COMMERCE23Building for the Arts Program (30000731)24The appropriation in this section is subject to the following25

conditions and limitations:26(1) The appropriation is subject to the provisions of RCW27

43.63A.750.28(2) Except as directed otherwise prior to the effective date of29

this section, the department may not expend the appropriation in this30section unless and until the nonstate share of project costs have31been either expended, or firmly committed, or both, in an amount32sufficient to complete the project or a distinct phase of the project33that is useable to the public for the purpose intended by the34legislature. This requirement does not apply to projects where a35share of the appropriation is released for design costs only.36

p. 16 2EHB 1115.PL

(3) The appropriation is provided solely for the following list1of projects:2Spokane children's theatre. . . . . . . . . . . . . . . . . . $18,0003KEXP's new home at Seattle center. . . . . . . . . . . . . $1,866,0004Admiral theatre renovation 2.0. . . . . . . . . . . . . . . $100,0005Kirkland arts center - capital improvements project. . . . . $48,0006Uniontown creativity center addition and site7

improvements. . . . . . . . . . . . . . . . . . . . . . $123,0008San Juan islands museum of art. . . . . . . . . . . . . . . $650,0009KidsQuest children's museum - good to grow capital10

campaign. . . . . . . . . . . . . . . . . . . . . . . $2,000,00011Cornish playhouse. . . . . . . . . . . . . . . . . . . . . . $232,00012ACT theatre eagles auditorium restoration and renovation. . $303,00013Music works northwest park 118 building renovation. . . . . . $64,00014New hands on children's museum. . . . . . . . . . . . . . . $393,00015TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . $5,797,00016Appropriation:17

State Building Construction Account—State. . . . . . . $5,797,00018Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019Future Biennia (Projected Costs). . . . . . . . . . . $21,600,00020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $27,397,00021

NEW SECTION. Sec. 1030. FOR THE DEPARTMENT OF COMMERCE22Youth Recreational Facilities Program (30000792)23The appropriation in this section is subject to the following24

conditions and limitations:25(1) The appropriation is subject to the provisions of RCW26

43.63A.135.27(2) Except as directed otherwise prior to the effective date of28

this section, the department may not expend the appropriation in this29section unless and until the nonstate share of project costs have30been either expended, or firmly committed, or both, in an amount31sufficient to complete the project or a distinct phase of the project32that is useable to the public for the purpose intended by the33legislature. This requirement does not apply to projects where a34share of the appropriation is released for design costs only.35

(3) The appropriation is provided solely for the following list36of projects:37

p. 17 2EHB 1115.PL

Youth activity wing at the Tom Taylor family YMCA. . . . . . $515,0001BGCB main club project. . . . . . . . . . . . . . . . . . $1,200,0002BGCB hidden valley fieldhouse project. . . . . . . . . . . $1,200,0003Sultan boys & girls club. . . . . . . . . . . . . . . . . . $340,0004Stanwood-Camano family YMCA. . . . . . . . . . . . . . . . $1,200,0005YMCA camp Terry environmental recreation center. . . . . . . $500,0006Mukilteo boys & girls club. . . . . . . . . . . . . . . . $1,200,0007Lummi youth wellness center renovation project. . . . . . $1,200,0008TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . $7,355,0009Appropriation:10

State Building Construction Account—State. . . . . . . $7,355,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . $32,000,00013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $39,355,00014

NEW SECTION. Sec. 1031. FOR THE DEPARTMENT OF COMMERCE15Building Communities Fund Program (30000803)16The appropriation in this section is subject to the following17

conditions and limitations:18(1) The appropriation is subject to the provisions of RCW19

43.63A.125.20(2) Except as directed otherwise prior to the effective date of21

this section, the department may not expend the appropriation in this22section unless and until the nonstate share of project costs have23been either expended, or firmly committed, or both, in an amount24sufficient to complete the project or a distinct phase of the project25that is useable to the public for the purpose intended by the26legislature. This requirement does not apply to projects where a27share of the appropriation is released for design costs only.28

(3) The appropriation is provided solely for the following list29of projects:30Rainier Beach urban farm and wetlands. . . . . . . . . . . . $307,00031Whatcom county emergency food hub. . . . . . . . . . . . . . $575,00032Hopelink Redmond integrated services center. . . . . . . . $2,400,00033Riverside drive building purchase. . . . . . . . . . . . . . $138,00034Centerforce. . . . . . . . . . . . . . . . . . . . . . . . . $98,00035Eritrean association community kitchen. . . . . . . . . . . . $58,00036Tonasket food bank building acquisition. . . . . . . . . . . $22,00037

p. 18 2EHB 1115.PL

Building for the future. . . . . . . . . . . . . . . . . . . $300,0001Entiat Valley community services resource center. . . . . . $100,0002Pike market neighborhood center. . . . . . . . . . . . . . . $500,0003Opportunity council renovation project. . . . . . . . . . . $170,0004FareStart facility expansion to the Pacific tower. . . . . . $438,0005Walla Walla community teen center. . . . . . . . . . . . . . $475,0006El Centro de la Raza community access & parking7

improvements. . . . . . . . . . . . . . . . . . . . . . $600,0008Good ground capital campaign. . . . . . . . . . . . . . . . $300,0009Renewed hope capital campaign. . . . . . . . . . . . . . . . $66,00010International community health services (ICHS). . . . . . $3,500,00011Casa latina: A home for opportunity. . . . . . . . . . . . . $150,00012Centerstone building renovation. . . . . . . . . . . . . . $1,500,00013PSRS office building conversion. . . . . . . . . . . . . . . $212,00014Prairie oaks. . . . . . . . . . . . . . . . . . . . . . . . $200,00015Leschi center renovation. . . . . . . . . . . . . . . . . $1,000,00016Everett family YMCA. . . . . . . . . . . . . . . . . . . . $2,000,00017Behavioral healthcare center for children, youth and18

families. . . . . . . . . . . . . . . . . . . . . . . $2,000,00019Phoenix rising. . . . . . . . . . . . . . . . . . . . . . . $250,00020Gordon family YMCA (Sumner, WA). . . . . . . . . . . . . . $2,000,00021Community grief support and recovery center. . . . . . . . $1,000,00022Auburn youth resources campus expansion. . . . . . . . . . . $500,00023TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . $20,859,00024Appropriation:25

State Building Construction Account—State. . . . . . $20,859,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . $120,000,00028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $140,859,00029

NEW SECTION. Sec. 1032. FOR THE DEPARTMENT OF COMMERCE30Housing Trust Fund Appropriation (30000833)31The appropriation in this section is subject to the following32

conditions and limitations:33(1) The appropriation in this section is provided solely for the34

department to award loans and grants on a competitive basis to35affordable housing projects statewide that will produce, at a36minimum, a total of 1,900 homes and 500 seasonal beds, in the37following categories and amounts:38

p. 19 2EHB 1115.PL

(a) For people with chronic mental illness, 281 homes;1(b) For homeless families with children, 529 homes;2(c) For people with disabilities, developmental disabilities,3

veterans, and others, 400 homes; of that number, a minimum of 80 must4be for veterans;5

(d) For homeless youth, 200 homes;6(e) For farmworkers, 176 homes and 500 seasonal beds;7(f) For seniors, 200 homes;8(g) For homeownership, 100 homes.9(2) If upon review of completed applications, the department10

determines there are not adequate suitable projects in a category,11the department may allocate funds to projects serving other low-12income and special needs populations, provided those projects are13located in an area with an identified need for the type of housing14proposed.15

(3) In evaluating projects for homes for homeless families with16children specified in subsection (1)(b) of this section, consistent17with Engrossed House Bill No. 1633, the department must give18preference for applications based on some or all of the criteria in19chapter 43.185.070(5), including projects involving collaborative20partnerships between local school districts and either public housing21authorities or nonprofit housing providers, that help children of22low-income families succeed in school.23

(4) $625,000 of the appropriation in this section is provided24solely for designing, engineering, constructing, installing, and25other costs and fees associated with connecting existing and future26farmworker housing in Skagit county to the city of Burlington sewer27system.28

(5)(a) $2,500,000 of the appropriation in this section is29provided solely as a grant to the Puget Sound regional council for a30revolving loan fund to support the development of affordable housing31opportunities related to equitable transit-oriented development in32accordance with Second Engrossed Substitute Senate Bill No. 598733(transportation revenue). This amount must be provided in the form of34a direct grant without a requirement that the grant be a35reimbursement for local expenditures.36

(b) Amounts provided in this section must be used to plan,37predesign, design, provide technical assistance and financial38services, and build low-income housing units in underserved39communities of concern. "Underserved communities of concern" are40

p. 20 2EHB 1115.PL

persons and families who: (i) Have incomes at or below thirty percent1of the median family income for the county or standard metropolitan2statistical area where the project is located; (ii) experience3chronic homelessness; and (iii) lack affordable housing. Underserved4communities of concern include veterans, immigrants, and refugee5communities.6

(c) Amounts provided in this section must be matched by local7government nonstate cash resources.8Appropriation:9

State Taxable Building Construction Account—State. . $75,000,00010Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011Future Biennia (Projected Costs). . . . . . . . . . $220,000,00012

TOTAL. . . . . . . . . . . . . . . . . . . . . . $295,000,00013

NEW SECTION. Sec. 1033. FOR THE DEPARTMENT OF COMMERCE14Ultra-Efficient Affordable Housing Demonstration (30000836)15The appropriation in this section is subject to the following16

conditions and limitations:17(1) The appropriation in this section is provided solely for18

loans or grants to low-income housing developers to design and19construct ultra-high energy efficient housing projects including20single and multifamily units;21

(2) By December 1, 2015, in consultation with professional22building, energy efficiency and housing finance organizations, the23office of financial management, and appropriate legislative staff,24the department shall develop a process that is designed to solicit,25evaluate, and fund ultra-high energy efficient housing projects as26part of the housing trust fund competitive program.27

(3) To receive funding, a project must demonstrate energy-saving28and renewable energy systems designed to reach net-zero energy use29after housing is fully occupied and must provide a life-cycle cost30analysis report to the department.31

(4) The department must consider, at a minimum and in any order,32the following factors in assigning a numerical ranking to a project:33

(a) Whether the proposed design has demonstrated that the project34will achieve net-zero energy use when fully occupied;35

(b) The life-cycle cost of the project;36

p. 21 2EHB 1115.PL

(c) That the project demonstrates a design, use of materials, and1construction process that can be replicated by the Washington2building industry;3

(d) The extent to which the project leverages nonstate funds;4(e) The extent to which the project is ready to proceed to5

construction;6(f) Whether the project promotes sustainable use of resources and7

environmental quality;8(g) Whether the project is being well-managed to fund maintenance9

and capital depreciation;10(h) Reduction of housing and utilities carbon footprint; and11(i) Other criteria that the department considers necessary to12

achieve the purpose of this program.13(5) The department must monitor and track the results of the14

housing projects that receive ultra-high energy efficiency funding15under this section. By December 1, 2018, the department must submit a16report to appropriate legislative committees documenting:17

(a) Project costs compared to the costs of traditional design and18construction;19

(b) Life-cycle costs;20(c) Use of sustainable resources;21(d) Energy savings and reduction of carbon footprint;22(e) Any lessons learned; and23(f) A data collection plan to monitor actual performance in order24

to validate projected savings.25Appropriation:26

Washington Housing Trust Account—State. . . . . . . . $2,500,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,500,00030

NEW SECTION. Sec. 1034. FOR THE DEPARTMENT OF COMMERCE312015-2017 Community Economic Revitalization Board Program32

(30000834)33Appropriation:34

Public Facility Construction Loan Revolving Account—35State. . . . . . . . . . . . . . . . . . . . . . $10,600,00036

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $037

p. 22 2EHB 1115.PL

Future Biennia (Projected Costs). . . . . . . . . . . $28,000,0001TOTAL. . . . . . . . . . . . . . . . . . . . . . $38,600,0002

NEW SECTION. Sec. 1035. FOR THE DEPARTMENT OF COMMERCE3Energy Efficiency and Solar Grants (30000835)4The appropriation in this section is subject to the following5

conditions and limitations:6(1)(a) $8,000,000 for fiscal year 2016 and $8,000,000 for fiscal7

year 2017 is provided solely for grants to be awarded in competitive8rounds to local agencies, public higher education institutions,9school districts, and state agencies for operational cost savings10improvements to facilities and related projects that result in energy11and operational cost savings.12

(b) At least ten percent of each competitive grant round must be13awarded to small cities or towns with a population of five thousand14or fewer residents.15

(c) In each competitive round, the higher the leverage ratio of16nonstate funding sources to state grant and the higher the energy17savings, the higher the project ranking.18

(d) For school district applicants, priority consideration must19be given to school districts that demonstrate improved health and20safety through (i) reduced exposure to polychlorinated biphenyl; or21(ii) replacing outdated heating systems that use oil or propane as22fuel sources as identified by the Washington State University23extension energy program; (iii) prior grant award: Priority24consideration must be given to applicants that did not receive grant25awards from appropriations provided in section 5023, chapter 19, Laws26of 2013 2nd sp. sess.27

(2) $5,775,000 is provided solely for grants to be awarded in28competitive rounds to local agencies, public higher education29institutions, school districts, and state agencies for projects that30involve the purchase and installation of solar energy systems,31including solar modules and inverters, with a preference for32Washington-manufactured products.33

(3) $3,000,000 is provided solely for energy efficiency34improvements to minor works and stand-alone projects at state-owned35facilities that repair or replace existing building systems including36but not limited to HVAC, lighting, insulation, windows, and other37mechanical systems. Eligibility for this funding is dependent on an38

p. 23 2EHB 1115.PL

analysis using the office of financial management's life-cycle cost1tool that compares project design alternatives for initial and long-2term cost-effectiveness. Assuming a reasonable return on investment,3the cost to improve the project's energy efficiency compared to the4original project request will be added to the project appropriation5after construction bids are received. The department of commerce6shall coordinate with the office of financial management to develop a7process for project submittal, review, approval criteria, tracking8project budget adjustments, and performance measures.9

(4) $225,000 is provided solely for resource conservation10managers in the department of enterprise services to coordinate with11state agencies and school districts to assess and adjust existing12building systems and operations to optimize the efficiency in use of13energy and other resources in state-owned facilities. The department14of commerce will oversee an interagency agreement with the department15of enterprise services to fund the resource conservation managers.16

(5) The department shall develop metrics that indicate the17performance of energy efficiency efforts and provide a report of the18metrics, including at a minimum the current energy used by the19building, the energy use after efficiencies are completed, and cost20of energy saved, to the house of representatives technology &21economic development committee and the senate energy, environment &22telecommunications committee. The report must include these metrics23from other states.24Appropriation:25

State Building Construction Account—State. . . . . . $25,000,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . $120,000,00028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $145,000,00029

NEW SECTION. Sec. 1036. FOR THE DEPARTMENT OF COMMERCE30Community Behavioral Health Bed - Acute & Residential (92000344)31The appropriation in this section is subject to the following32

conditions and limitations:33(1) The appropriation in this section is provided solely for the34

department of commerce, in collaboration with the department of35social and health services, to issue grants to hospitals or other36entities to establish new community hospital inpatient psychiatric37beds, free-standing evaluation and treatment facilities, enhanced38

p. 24 2EHB 1115.PL

services facilities, triage facilities, or crisis stabilization1facilities with sixteen or fewer beds for the purpose of providing2short-term detention services through the publicly funded mental3health system. Funds may be used for construction and equipment costs4associated with establishment of the community hospital inpatient5psychiatric beds, free-standing evaluation and treatment facilities,6enhanced services facilities, triage facilities, or crisis7stabilization facilities. These funds may not be used for operating8costs associated with the treatment of patients using these services.9The department shall establish criteria for the issuance of grants10and priority must be given to those proposals to establish new11community hospital inpatient psychiatric beds or free-standing12evaluation and treatment facilities. The criteria must include:13

(a) Evidence that the application was developed in collaboration14with one or more regional support networks, as defined in RCW1571.24.025;16

(b) Evidence that the applicant has assessed and would meet gaps17in geographical access to short-term detention services under chapter1871.05 RCW in their region;19

(c) A commitment by applicants to serve persons who are publicly20funded and persons detained under the involuntary treatment act under21chapter 71.05 RCW;22

(d) A commitment by the applicant to maintain the beds or23facility for at least a ten-year period;24

(e) The date upon which structural modifications or construction25would begin and the anticipated date of completion of the project;26

(f) A detailed estimate of the costs associated with opening the27beds;28

(g) The applicant's commitment to work with local courts and29prosecutors to ensure that prosecutors and courts in the area served30by the hospital or facility will be available to conduct involuntary31commitment hearings and proceedings under chapter 71.05 RCW; and32

(h) A lack of local resources, including nonmedicaid operating33reserves, and regional fund balances that are not contractually34encumbered.35

(2) To accommodate the emergent need for inpatient psychiatric36services, the department of health and the department of commerce, in37collaboration with the department of social and health services shall38establish a concurrent and expedited process for the purpose of grant39applicants meeting any applicable regulatory requirements necessary40

p. 25 2EHB 1115.PL

to operate inpatient psychiatric beds, free-standing evaluation and1treatment facilities, enhanced services facilities, triage2facilities, or crisis stabilization facilities.3

(3) The following list is subject to the criteria in subsection4(1) of this section:5Cascade mental health. . . . . . . . . . . . . . . . . . . $3,000,0006Woodmont recovery center. . . . . . . . . . . . . . . . . $5,000,0007Parkside conversion to behavioral health beds. . . . . . . $3,000,0008Navos behavioral health center for children, youth &9

families. . . . . . . . . . . . . . . . . . . . . . . $2,000,00010Central Washington comprehensive mental health. . . . . . $2,000,00011Swedish Ballard psychiatric unit. . . . . . . . . . . . . $3,000,00012Substance abuse & mental health facilities. . . . . . . . $2,000,00013Fairfax behavioral health - Providence health &14

services facility. . . . . . . . . . . . . . . . . . . . . $1,00015Daybreak Youth Services. . . . . . . . . . . . . . . . . . $1,500,00016

(4) Multicare-Franciscan joint venture. . . . . . . . $5,000,00017Appropriation:18

State Building Construction Account—State. . . . . . $32,000,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,000,00022

NEW SECTION. Sec. 1037. FOR THE DEPARTMENT OF COMMERCE23Weatherization Matchmaker Program (30000838)24The appropriation in this section is subject to the following25

conditions and limitations: The department shall develop metrics that26indicate the performance of energy efficiency efforts and provide a27report of the metrics, including at a minimum the current energy used28by the building, the energy use after efficiencies are completed, and29cost of energy saved, to the house of representatives technology &30economic development committee and the senate energy, environment &31telecommunications committee. The report must include these metrics32from other states.33Appropriation:34

State Building Construction Account—State. . . . . . $15,000,00035Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $036Future Biennia (Projected Costs). . . . . . . . . . . $60,000,00037

p. 26 2EHB 1115.PL

TOTAL. . . . . . . . . . . . . . . . . . . . . . $75,000,0001

NEW SECTION. Sec. 1038. FOR THE DEPARTMENT OF COMMERCE22015-2017 Drinking Water State Revolving Fund Loan Program3

(30000840)4The appropriation in this section is subject to the following5

conditions and limitations:6(1) $4,000,000 of the drinking water assistance account for7

fiscal year 2016 and $4,000,000 of the drinking water assistance8account for fiscal year 2017 is provided as state match for federal9safe drinking water funds.10

(2) For projects involving repair, replacement, or improvement of11a clean water infrastructure facility or other public works facility12for which an investment grade efficiency audit is obtainable, the13public works board must require as a contract condition that the14project sponsor undertake an investment grade efficiency audit. The15project sponsor may finance the costs of the audit as part of its16drinking water state revolving fund program loan.17

(3) The agency must encourage local government use of federally18funded drinking water infrastructure programs operated by the United19States department of agriculture - rural development.20Appropriation:21

Drinking Water Assistance Account—State. . . . . . . $135,000,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . $480,000,00024

TOTAL. . . . . . . . . . . . . . . . . . . . . . $615,000,00025

NEW SECTION. Sec. 1039. FOR THE DEPARTMENT OF COMMERCE26Community Energy Efficiency Program (30000845)27The appropriation in this section is subject to the following28

conditions and limitations: The department shall develop metrics that29indicate the performance of energy efficiency efforts and provide a30report of the metrics, including at a minimum the current energy used31by the building, the energy use after efficiencies are completed, and32cost of energy saved, to the house of representatives technology &33economic development committee and the senate energy, environment &34telecommunications committee. The report must include these metrics35from other states.36

p. 27 2EHB 1115.PL

Appropriation:1State Building Construction Account—State. . . . . . . $5,000,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . $40,000,0004

TOTAL. . . . . . . . . . . . . . . . . . . . . . $45,000,0005

NEW SECTION. Sec. 1040. FOR THE DEPARTMENT OF COMMERCE6Local and Community Projects 2016 (92000369)7The appropriation in this section is subject to the following8

conditions and limitations:9(1) Except as directed otherwise prior to the effective date of10

this section, the department may not expend the appropriation in this11section unless and until the nonstate share of project costs have12been either expended, or firmly committed, or both, in an amount13sufficient to complete the project or a distinct phase of the project14that is useable to the public for the purpose intended by the15legislature. This requirement does not apply to projects where a16share of the appropriation is released for design costs only.17

(2) Prior to receiving funds, project recipients must demonstrate18that the project site is under control for a minimum of ten years,19either through ownership or a long-term lease. This requirement does20not apply to appropriations for preconstruction activities or21appropriations whose sole purpose is to purchase real property that22does not include a construction or renovation component.23

(3) Projects funded in this section may be required to comply24with Washington's high performance building standards as required by25chapter 39.35D RCW.26

(4) Project funds are available on a reimbursement basis only,27and shall not be advanced under any circumstances.28

(5) Projects funded in this section must be held by the recipient29for a minimum of ten years and used for the same purpose or purposes30intended by the legislature as required in RCW 43.63A.125(6).31

(6) Projects funded in this section, including those that are32owned and operated by nonprofit organizations, are generally required33to pay state prevailing wages.34

(7) $2,209,000 of the appropriation in this section is provided35solely for the Fairchild air force base protection and community36empowerment project, including the purchase of twenty acres of land37for development of affordable housing and the county's purchase of38

p. 28 2EHB 1115.PL

mobile home parks in order to reduce the use of the accident1potential zone for residential purposes. If the county subsequently2rezones, develops, and leases the mobile home park property for3commercial or industrial uses contrary to the allowed uses in the4accident potential zone, the county must repay to the state the5amount spent on the purchase of mobile home parks in its entirety6within ten years.7

(8) $850,000 of the appropriation in this section is provided8solely for the White River restoration project. Design solutions for9flooding reductions in the lower White River must include a10floodplain habitat design that both reduces flood risks and restores11salmon habitat by reconnecting the river with its floodplain and a12sustainable riparian corridor. Project designs and plans must also13identify lands for acquisition needed for floodplain reconnection14where pending or existing development eliminates the potential for15riparian and aquatic habitat restoration. The city shall work16cooperatively with the Muckleshoot Indian Tribe and the Puyallup17Tribe of Indians, and develop a plan collaboratively to achieve both18flood reduction and habitat restoration.19

(9) Up to $150,000 of the appropriation in this section for the20veterans helping veterans: Emergency transition shelter project may21be spent on preconstruction or pre-acquisition activities, including,22but not limited to, building inspections, design of necessary23renovations, cost estimation, and other activities necessary to24identify and select a facility appropriate for the program. The25remainder of the appropriation must be used for eventual acquisition26and renovations of a facility.27

(10) $2,500,000 of the appropriation in this section is provided28solely for the mercy housing and health care center at Sand Point.29During the 2015-2017 fiscal biennium, the center may not house any30community health care training organization that has been31investigated by and has paid settlement fees to the attorney32general's office for alleged medicaid fraud.33

(11) The Lake Chelan land use plan must be developed without34adverse impacts on agricultural operations.35

(12) The appropriation is provided solely for the following list36of projects:37

38 Algona senior center $500,000

39 All-accessible destination playground $750,000

p. 29 2EHB 1115.PL

1 Appleway trail $1,000,000

2 Basin 3 sewer rehabilitation $1,500,000

3 Bellevue downtown park inspiration playground and sensory garden $1,000,000

4 Bender fields parking lot and restrooms $1,000,000

5 Blackhills community soccer complex safety projects $750,000

6 Bremerton children's dental clinic $396,000

7 Brewster reservoir replacement $1,250,000

8 Brookville gardens $1,200,000

9 Camas-Washougal Babe Ruth youth baseball improve Louis Bloch park $10,000

10 Cancer immunotherapy facility-Seattle children's research inst. $7,000,000

11 Caribou trail apartments $100,000

12 Carnegie library imprv for the rapid recidivism reduction program $1,000,000

13 Cavelero park - regional park facility/skateboard park $500,000

14 CDM caregiving services: Clark county aging resource center $1,200,000

15 Centerville school heating upgrades $46,000

16 Chambers Creek regional park pier extension and moorage $1,750,000

17 City of LaCenter parks & rec community center $1,500,000

18 City of Lynden pipeline $2,000,000

19 City of Lynden-Riverview road construction $850,000

20 City of Lynden-safe rtes to school and Kaemingk trail gap elim. $300,000

21 City of Mt. Vernon downtown flood protect project & riverfront trail $1,500,000

22 City of Olympia - Percival Landing renovation $950,000

23 City of Pateros water system $1,838,000

24 City of Stanwood police station/city hall relocation $300,000

25 Classroom door barricade - nightlock $45,000

26 Confluence area parks upgrade and restoration $1,000,000

27 Corbin senior center elevator $300,000

28 Covington community park $5,000,000

29 Cross Kirkland corridor trail connection 52nd St. $1,069,000

30 Dawson place child advocacy center building completion project $161,000

31 Dekalb street pier $500,000

32 DNR/City of Castle Rock exchange $80,000

p. 30 2EHB 1115.PL

1 Dr. Sun Yat Sen memorial statue $10,000

2 Drug abuse and prevention center - Castle Rock $96,000

3 DuPont historical museum renovation $46,000

4 East Tacoma community center $1,000,000

5 Edmonds center for the arts: Gym climate control & roof repairs $250,000

6 Edmonds senior & community center $1,250,000

7 Emergency generator for kidney resource center $226,000

8 Enumclaw expo center $350,000

9 Fairchild air force base protection & comm empowerment project $2,209,000

10 Federal Way PAC center $2,000,000

11 Filipino community of Seattle village (innovative learning center) $1,200,000

12 Franklin Pierce early learning center $2,000,000

13 Gateway center project $1,000,000

14 Gilda club repairs $800,000

15 Granite Falls boys & girls club $1,000,000

16 Gratzer park ball fields $200,000

17 Grays Harbor navigation improvement project $2,500,000

18 Green river gorge open space buffer, Kummer connection $750,000

19 Guy Cole center revitalization $450,000

20 Historic renovation Maryhill museum $1,000,000

21 Hopelink at Ronald commons $750,000

22 Irvine slough storm water separation $500,000

23 Kahlotus highway sewer force main $2,625,000

24 Kennewick boys and girls club $500,000

25 Kent east hill YMCA $500,000

26 Key Pen civics center $50,000

27 KiBe high school parking $125,000

28 Kitsap humane society - shelter renovation $90,000

29 Lacey boys & girls club $29,000

30 Lake Chelan land use plan $75,000

31 LeMay car museum ADA access improvements $500,000

32 Lyman city park renovation $167,000

p. 31 2EHB 1115.PL

1 Lyon creek flood reduction project $400,000

2 Main street revitalization project $1,300,000

3 Marine terminal rail investments $1,000,000

4 Martin Luther King Jr. family outreach center expansion project $85,000

5 Mason county Belfair wastewater system rate relief $1,500,000

6 McAllister museum $660,000

7 Mercer arena energy savings & sustainability funding $450,000

8 Mercy housing and health center at Sand Point $2,500,000

9 Meridian center for health $2,500,000

10 Minor Road water reservoir replacement $1,500,000

11 Mountains to Sound Greenway Tiger Mountain access improvements $300,000

12 13Mt. Spokane guest services building & preservation/maintenance of existing

facilities

$520,000

14 Mukilteo boys & girls club $1,000,000

15 Mukilteo tank farm clean-up $250,000

16 New Shoreline medical-dental clinic $1,500,000

17 Nordic heritage museum $2,000,000

18 North Kitsap fishline foodbank $625,000

19 Northwest native canoe center project $250,000

20 Oak Harbor clean water facility $2,500,000

21 Okanogan emergency communications $400,000

22 Onalaska community tennis and sports courts $80,000

23 Opera house ADA elevator $357,000

24 Orcas Island library expansion $1,400,000

25 Pacific community center $250,000

26 PCAF's building for the future $350,000

27 Pe Ell second street $197,000

28 Perry technical school $1,000,000

29 Pike Place Market front project $800,000

30 Police station security/hardening $38,000

31 Port of Centralia - Centralia station $500,000

32 Port of Sunnyside demolish the carnation building $450,000

33 PROVAIL TBI residential facility $450,000

p. 32 2EHB 1115.PL

1 Quincy water reuse $1,500,000

2 Redmond downtown park $3,000,000

3 Redondo boardwalk repairs $1,500,000

4 Renovate senior center $400,000

5 Rochester boys & girls club $38,000

6 Rockford wastewater treatment $1,200,000

7 Roslyn renaissance-NW improve company bldg renovation project $900,000

8 Sammamish rowing association boathouse $500,000

9 SE 240th St. watermain system improvement project $700,000

10 SE Seattle financial & economic opportunity center $1,500,000

11 SeaTac international marketplace & transit-oriented community $1,250,000

12 Seattle theatre group $131,000

13 Snohomish veterans memorial rebuild $10,000

14 Snoqualmie riverfront project $1,520,000

15 South 228th street inter-urban trail connector $500,000

16 Splash pad/foundation: Centralia outdoor pool restoration project $200,000

17 Spokane women's club $300,000

18 Springbrook park neighborhood connection project $300,000

19 SR 532 flood berm and bike/ped path $85,000

20 St. Vincent food bank & community services construction project $400,000

21 Stan & Joan cross park $750,000

22 Steilacoom Sentinel Way repairs $450,000

23 Stilly Valley youth project Arlington B&G club $2,242,000

24 Sunset neighborhood park $1,750,000

25 Support, advocacy & resource center for victims of violence $750,000

26 The gathering house job training café $14,000

27 The Salvation Army Clark County: Corps community center $1,200,000

28 Thurston county food bank $500,000

29 Tulalip water pipeline, (final of 8 segments) $2,000,000

30 Twin Bridges museum rehab Lyle Wa $64,000

31 Twisp civic building $500,000

32 Vancouver, Columbia waterfront project $2,500,000

p. 33 2EHB 1115.PL

1 Vantage point senior apartments $2,000,000

2 Veterans center $500,000

3 Veterans helping veterans: Emergency transition shelter $600,000

4 Waitsburg Main Street bridge replacement $1,700,000

5 Washington green schools $105,000

6 Washougal roof repair $350,000

7 Water meter and system improvement program $500,000

8 Water reservoir and transmission main $500,000

9 Wayne golf course land preservation $500,000

10 White River restoration project $850,000

11 Willapa behavioral health safety improvement project $75,000

12 WSU LID frontage - local and economic benefits $500,000

13 Yakima children's museum center $50,000

14 Yakima SunDome $2,000,000

15 Yelm community center $500,000

16 Yelm senior center $80,000

17 Youth wellness campus gymnasium renovation $1,000,000

18

19 Total $130,169,000

Appropriation:20State Building Construction Account—State. . . . . . $130,169,00021Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . $130,169,00024

NEW SECTION. Sec. 1041. FOR THE DEPARTMENT OF COMMERCE25Youth Recreational Facilities Grants (30000185)26The reappropriation in this section is subject to the following27

conditions and limitations: The reappropriation is subject to the28provisions of section 1062, chapter 19, Laws of 2013 2nd sp. sess.29provided that the "New Life Community Development Agency" project may30be combined with the "New Life CDA" project in project number3130000188.32Reappropriation:33

p. 34 2EHB 1115.PL

State Building Construction Account—State. . . . . . . $2,568,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $1,563,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,131,0004

NEW SECTION. Sec. 1042. FOR THE DEPARTMENT OF COMMERCE5Building Communities Fund Grants (30000188)6The reappropriation in this section is subject to the following7

conditions and limitations: The reappropriation is subject to the8provisions of section 1072, chapter 19, Laws of 2013 2nd sp. sess.9provided that the "New Life CDA" project may be combined with the10"New Life Community Development Agency" project in project number1130000185.12Reappropriation:13

State Building Construction Account—State. . . . . . . $2,692,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $2,587,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,279,00017

NEW SECTION. Sec. 1043. FOR THE DEPARTMENT OF COMMERCE18Energy Efficiency Grants for Local Governments (91000241)19The reappropriation in this section is subject to the following20

conditions and limitations: The reappropriation is subject to the21provisions of section 301, chapter 1, Laws of 2012 2nd sp. sess.22Reappropriation:23

State Building Construction Account—State. . . . . . . $1,732,00024Prior Biennia (Expenditures). . . . . . . . . . . . . $16,268,00025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,000,00027

NEW SECTION. Sec. 1044. FOR THE DEPARTMENT OF COMMERCE28Energy Efficiency Grants for Higher Education (91000242)29The reappropriation in this section is subject to the following30

conditions and limitations: The reappropriation is subject to the31provisions of section 307, chapter 1, Laws of 2012 2nd sp. sess.32Reappropriation:33

State Building Construction Account—State. . . . . . . $5,077,00034p. 35 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . $14,923,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,000,0003

NEW SECTION. Sec. 1045. FOR THE DEPARTMENT OF COMMERCE4Public Works Pre-Construction Loan Program (91000319)5

Reappropriation:6Public Works Assistance Account—State. . . . . . . . . . $767,0007Prior Biennia (Expenditures). . . . . . . . . . . . . $2,233,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00010

NEW SECTION. Sec. 1046. FOR THE DEPARTMENT OF COMMERCE11Housing for Families with Children (91000409)12The reappropriation in this section is subject to the following13

conditions and limitations: The reappropriation is subject to the14provisions of section 310, chapter 1, Laws of 2012 2nd sp. sess.15Reappropriation:16

State Taxable Building Construction Account—State. . . $2,472,00017Prior Biennia (Expenditures). . . . . . . . . . . . . $5,778,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,250,00020

NEW SECTION. Sec. 1047. FOR THE DEPARTMENT OF COMMERCE21Housing for Seniors and People with Physical Disabilities22

(91000411)23The reappropriation in this section is subject to the following24

conditions and limitations: The reappropriation is subject to the25provisions of section 311, chapter 1, Laws of 2012 2nd sp. sess.26Reappropriation:27

State Taxable Building Construction Account—State. . . $4,350,00028Prior Biennia (Expenditures). . . . . . . . . . . . . $5,316,00029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,666,00031

NEW SECTION. Sec. 1048. FOR THE DEPARTMENT OF COMMERCE32

p. 36 2EHB 1115.PL

Housing for People with Chronic Mental Illness (91000412)1The reappropriation in this section is subject to the following2

conditions and limitations: The reappropriation is subject to the3provisions of section 1010, chapter 2, Laws of 2012 2nd sp. sess.4Reappropriation:5

State Taxable Building Construction Account—State. . . . $190,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . $935,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,125,0009

NEW SECTION. Sec. 1049. FOR THE DEPARTMENT OF COMMERCE10Housing for the Homeless (91000413)11The reappropriation in this section is subject to the following12

conditions and limitations: The reappropriation is subject to the13provisions of section 1011, chapter 2, Laws of 2012 2nd sp. sess.14Reappropriation:15

State Taxable Building Construction Account—State. . . $5,996,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $22,948,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,944,00019

NEW SECTION. Sec. 1050. FOR THE DEPARTMENT OF COMMERCE20Housing for Farmworkers (91000414)21The reappropriation in this section is subject to the following22

conditions and limitations: The reappropriation is subject to the23provisions of section 1012, chapter 2, Laws of 2012 2nd sp. sess.24Reappropriation:25

State Taxable Building Construction Account—State. . . $5,160,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $1,055,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,215,00029

NEW SECTION. Sec. 1051. FOR THE DEPARTMENT OF COMMERCE30Housing for People At Risk of Homelessness (91000415)31

p. 37 2EHB 1115.PL

The reappropriation in this section is subject to the following1conditions and limitations: The reappropriation is subject to the2provisions of section 312, chapter 1, Laws of 2012 2nd sp. sess.3Reappropriation:4

State Taxable Building Construction Account—State. . . . $959,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $1,541,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,500,0008

NEW SECTION. Sec. 1052. FOR THE DEPARTMENT OF COMMERCE9Housing for Low-Income Households (91000416)10The reappropriation in this section is subject to the following11

conditions and limitations: The reappropriation is subject to the12provisions of section 1013, chapter 2, Laws of 2012 2nd sp. sess.13Reappropriation:14

State Taxable Building Construction Account—State. . . $2,689,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . $293,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,982,00018

NEW SECTION. Sec. 1053. FOR THE DEPARTMENT OF COMMERCE192012 Local and Community Projects (91000417)20The reappropriation in this section is subject to the following21

conditions and limitations: The reappropriation is subject to the22provisions of section 302, chapter 1, Laws of 2012 2nd sp. sess.23Reappropriation:24

State Building Construction Account—State. . . . . . . $1,889,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $7,734,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,623,00028

NEW SECTION. Sec. 1054. FOR THE DEPARTMENT OF COMMERCE29Local and Community Projects 2012 (91000437)30The reappropriation in this section is subject to the following31

conditions and limitations: The reappropriation is subject to the32provisions of section 1003, chapter 2, Laws of 2012 2nd sp. sess.33

p. 38 2EHB 1115.PL

Reappropriation:1State Taxable Building Construction Account—State. . . $1,800,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $1,035,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,835,0005

NEW SECTION. Sec. 1055. FOR THE DEPARTMENT OF COMMERCE6Pacific Medical Center (91000445)7

Reappropriation:8State Taxable Building Construction Account—State. . . $2,405,0009State Building Construction Account—State. . . . . . . $9,818,00010

Subtotal Reappropriation. . . . . . . . . . . . . $12,223,00011Appropriation:12

State Taxable Building Construction Account—State. . . $6,000,00013Prior Biennia (Expenditures). . . . . . . . . . . . . $7,777,00014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . $26,000,00016

NEW SECTION. Sec. 1056. FOR THE DEPARTMENT OF COMMERCE17Sand Point Building 9 (91000446)18The reappropriation in this section is subject to the following19

conditions and limitations: The reappropriation is subject to the20provisions of section 1068, chapter 19, Laws of 2013 2nd sp. sess.21Reappropriation:22

State Taxable Building Construction Account—State. . . $9,802,00023Prior Biennia (Expenditures). . . . . . . . . . . . . $4,198,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,000,00026

NEW SECTION. Sec. 1057. FOR THE DEPARTMENT OF COMMERCE27Mental Health Beds (91000447)28The reappropriation in this section is subject to the following29

conditions and limitations: The reappropriation is subject to the30provisions of section 1071, chapter 19, Laws of 2013 2nd sp. sess.31Reappropriation:32

State Building Construction Account—State. . . . . . . $3,644,00033

p. 39 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . $1,356,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0003

NEW SECTION. Sec. 1058. FOR THE DEPARTMENT OF COMMERCE4Housing for Homeless Veterans (91000455)5The reappropriation in this section is subject to the following6

conditions and limitations: The reappropriation is subject to the7provisions of section 1065, chapter 19, Laws of 2013 2nd sp. sess.8Reappropriation:9

State Taxable Building Construction Account—State. . . $9,001,00010Prior Biennia (Expenditures). . . . . . . . . . . . . . $366,00011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,367,00013

NEW SECTION. Sec. 1059. FOR THE DEPARTMENT OF COMMERCE14Housing for Farmworkers (91000457)15The reappropriation in this section is subject to the following16

conditions and limitations: The reappropriation is subject to the17provisions of section 1066, chapter 19, Laws of 2013 2nd sp. sess.18Reappropriation:19

State Taxable Building Construction Account—State. . $19,723,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $7,327,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $27,050,00023

NEW SECTION. Sec. 1060. FOR THE DEPARTMENT OF COMMERCE24Housing for People with Developmental Disabilities (91000458)25The reappropriation in this section is subject to the following26

conditions and limitations: The reappropriation is subject to the27provisions of section 1067, chapter 19, Laws of 2013 2nd sp. sess.28Reappropriation:29

State Taxable Building Construction Account—State. . . $6,392,00030Prior Biennia (Expenditures). . . . . . . . . . . . . $2,627,00031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,019,00033

p. 40 2EHB 1115.PL

NEW SECTION. Sec. 1061. FOR THE DEPARTMENT OF COMMERCE1Housing for People with Chronic Mental Illness (91000459)2

Reappropriation:3State Taxable Building Construction Account—State. . . $5,735,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . $329,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,064,0007

NEW SECTION. Sec. 1062. FOR THE DEPARTMENT OF COMMERCE8Public Works Assistance Account Project Backfill (91000581)9

Reappropriation:10State Building Construction Account—State. . . . . . . $3,263,00011Prior Biennia (Expenditures). . . . . . . . . . . . $154,737,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $158,000,00014

NEW SECTION. Sec. 1063. FOR THE DEPARTMENT OF COMMERCE15Clean Energy and Energy Freedom Program (91000582)16The reappropriations in this section are subject to the following17

conditions and limitations: The reappropriations are subject to the18provisions of section 1074, chapter 19, Laws of 2013 2nd sp. sess.19Reappropriation:20

Energy Recovery Act Account—State. . . . . . . . . . . $4,000,00021State Taxable Building Construction Account—State. . . $8,924,00022State Building Construction Account—State. . . . . . $19,069,00023

Subtotal Reappropriation. . . . . . . . . . . . . $31,993,00024Prior Biennia (Expenditures). . . . . . . . . . . . . $8,007,00025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,00027

NEW SECTION. Sec. 1064. FOR THE DEPARTMENT OF COMMERCE28Innovation Partnership Zones - Facilities and Infrastructure29

(92000089)30The reappropriation in this section is subject to the following31

conditions and limitations: The reappropriation is subject to the32provisions of section 309, chapter 1, Laws of 2012 2nd sp. sess.33

p. 41 2EHB 1115.PL

Reappropriation:1State Building Construction Account—State. . . . . . . $3,725,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $9,795,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,520,0005

NEW SECTION. Sec. 1065. FOR THE DEPARTMENT OF COMMERCE6Community Economic Revitalization Board Administered Economic7

Development, Innovation, and Export Grants (92000096)8The reappropriations in this section are subject to the following9

conditions and limitations: The reappropriations are subject to the10provisions of section 304, chapter 1, Laws of 2012 2nd sp. sess.11Reappropriation:12

State Building Construction Account—State. . . . . . . $4,267,00013Public Works Assistance Account—State. . . . . . . . $14,595,00014

Subtotal Reappropriation. . . . . . . . . . . . . $18,862,00015Prior Biennia (Expenditures). . . . . . . . . . . . . $13,736,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,598,00018

NEW SECTION. Sec. 1066. FOR THE DEPARTMENT OF COMMERCE19Main Street Improvement Grants (92000098)20The reappropriations in this section are subject to the following21

conditions and limitations: The reappropriations are subject to the22provisions of section 305, chapter 1, Laws of 2012 2nd sp. sess.23Reappropriation:24

Public Works Assistance Account—State. . . . . . . . . . $355,00025State Building Construction Account—State. . . . . . . $3,115,00026

Subtotal Reappropriation. . . . . . . . . . . . . $3,470,00027Prior Biennia (Expenditures). . . . . . . . . . . . . $11,380,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,850,00030

NEW SECTION. Sec. 1067. FOR THE DEPARTMENT OF COMMERCE31Brownfield Redevelopment Grants (92000100)32

p. 42 2EHB 1115.PL

The reappropriation in this section is subject to the following1conditions and limitations: The reappropriation in this section is2provided solely for redevelopment of the Bellingham waterfront.3Reappropriation:4

Local Toxics Control Account—State. . . . . . . . . . $1,194,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . $306,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,0008

NEW SECTION. Sec. 1068. FOR THE DEPARTMENT OF COMMERCE9Port and Export Related Infrastructure (92000102)10The reappropriation in this section is subject to the following11

conditions and limitations: The reappropriation is subject to the12provisions of section 306, chapter 1, Laws of 2012 2nd sp. sess.13Reappropriation:14

State Building Construction Account—State. . . . . . $13,603,00015Prior Biennia (Expenditures). . . . . . . . . . . . . $19,547,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . $33,150,00018

NEW SECTION. Sec. 1069. FOR THE DEPARTMENT OF COMMERCE19Projects for Jobs and Economic Development (92000151)20The reappropriations in this section are subject to the following21

conditions and limitations: The reappropriations are subject to the22provisions of section 1077, chapter 19, Laws of 2013 2nd sp. sess.23Reappropriation:24

Public Facility Construction Loan Revolving25Account—State. . . . . . . . . . . . . . . . . . . $7,100,00026

State Building Construction Account—State. . . . . . $22,256,00027Subtotal Reappropriation. . . . . . . . . . . . . $29,356,00028

Prior Biennia (Expenditures). . . . . . . . . . . . . $7,753,00029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . $37,109,00031

NEW SECTION. Sec. 1070. FOR THE DEPARTMENT OF COMMERCE32Projects that Strengthen Youth and Families (92000227)33

p. 43 2EHB 1115.PL

The reappropriation in this section is subject to the following1conditions and limitations: The reappropriation is subject to the2provisions of section 1079, chapter 19, Laws of 2013 2nd sp. sess.3Reappropriation:4

State Building Construction Account—State. . . . . . $12,695,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $6,982,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,677,0008

NEW SECTION. Sec. 1071. FOR THE DEPARTMENT OF COMMERCE9Projects that Strengthen Communities and Quality of Life10

(92000230)11The reappropriations in this section are subject to the following12

conditions and limitations: The reappropriations are subject to the13provisions of section 1078, chapter 19, Laws of 2013 2nd sp.s. and14section 6006 of this act.15Reappropriation:16

Environmental Legacy Stewardship Account—State. . . . . $395,00017State Building Construction Account—State. . . . . . $22,372,00018

Subtotal Reappropriation. . . . . . . . . . . . . $22,767,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $9,361,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,128,00022

NEW SECTION. Sec. 1072. FOR THE OFFICE OF FINANCIAL MANAGEMENT23Appropriations to Public Works Assistance Account for Previously24

Authorized Loans (92000011)25The appropriation in this section is subject to the following26

conditions and limitations: The appropriation in this section is27provided solely for expenditure into the public works assistance28account—state. The office of financial management shall consult with29the state treasurer's office to determine the timing of the30expenditures into the public works assistance account to return it to31a positive balance and accommodate authorized expenditures and32transfers from the account.33Appropriation:34

State Taxable Building Construction Account—State. . $11,000,00035p. 44 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,000,0003

NEW SECTION. Sec. 1073. FOR THE OFFICE OF FINANCIAL MANAGEMENT4Cowlitz River Dredging (20082856)5

Reappropriation:6State Building Construction Account—State. . . . . . . . $246,0007Prior Biennia (Expenditures). . . . . . . . . . . . . $1,254,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,00010

NEW SECTION. Sec. 1074. FOR THE OFFICE OF FINANCIAL MANAGEMENT11Catastrophic Flood Relief (20084850)12The appropriation in this section is subject to the following13

conditions and limitations:14(1) Up to $26,800,000 of the appropriation is for advancing the15

long-term strategy for the Chehalis Basin projects to reduce flood16damage and restore aquatic species including a programmatic17environmental impact statement, data collection, engineering design18of future construction projects, feasibility analysis, and engagement19of state agencies, tribes, and other parties.20

(2) Up to $23,200,000 of the appropriation is for construction of21local priority flood protection and habitat restoration projects.22

(3) Up to one percent of the appropriation provided in this23section may be used by the recreation and conservation office to24administer contracts associated with the subprojects funded through25this section. Contract administration includes, but is not limited26to: Drafting and amending contracts, reviewing and approving27invoices, tracking expenditures, and performing field inspections to28assess project status when conducting similar assessments related to29other agency contracts in the same geographic area.30Reappropriation:31

State Building Construction Account—State. . . . . . $12,484,00032Appropriation:33

State Building Construction Account—State. . . . . . $50,000,00034Prior Biennia (Expenditures). . . . . . . . . . . . . $25,203,00035

p. 45 2EHB 1115.PL

Future Biennia (Projected Costs). . . . . . . . . . $120,000,0001TOTAL. . . . . . . . . . . . . . . . . . . . . . $207,687,0002

NEW SECTION. Sec. 1075. FOR THE OFFICE OF FINANCIAL MANAGEMENT3Office of Financial Management Capital Budget Staff (30000045)4

Appropriation:5State Building Construction Account—State. . . . . . . $1,000,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . $4,000,0008

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0009

NEW SECTION. Sec. 1076. FOR THE OFFICE OF FINANCIAL MANAGEMENT10Oversight of State Facilities (30000046)11The appropriations in this section are subject to the following12

conditions and limitations:13(1) The office of financial management, with assistance from the14

department of enterprise services and other state agencies as needed,15shall conduct space studies and make recommendations to the16legislature on the state's space standards including alternative17workplace strategies. State agencies shall provide space use data in18a format prescribed by the office of financial management to support19this effort. The office of financial management shall report the20results and recommendations to the legislative fiscal committees by21July 1, 2016.22

(2) The office of financial management, with assistance from the23department of enterprise services and other state agencies as needed,24shall update the lease space requirements to reflect high performance25building standards and any other components that may improve the26conditions of leased space.27Appropriation:28

State Building Construction Account—State. . . . . . . $1,040,00029Thurston County Capital Facilities Account—State. . . $1,120,00030

Subtotal Appropriation. . . . . . . . . . . . . . $2,160,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,160,00034

NEW SECTION. Sec. 1077. FOR THE OFFICE OF FINANCIAL MANAGEMENT35p. 46 2EHB 1115.PL

Construction Contingency Pool (90000300)1The appropriation in this section is subject to the following2

conditions and limitations:3(1) The appropriation in this section is provided solely for4

construction projects that confront emergent and unavoidable costs in5excess of the construction contingency included in the project6appropriation. For requests occurring during a legislative session,7an agency must notify the legislative fiscal committees before8requesting contingency funds from the office of financial management.9Eligible agencies that may apply to the pool include higher education10institutions, the department of corrections, the department of social11and health services, the department of enterprise services, the12criminal justice training commission, the department of veterans13affairs, the parks and recreation commission, and the department of14fish and wildlife. Eligible construction projects are only projects15that had cost reductions as kept on file with the office of financial16management. The office of financial management must notify the17legislative evaluation and accountability program committee, the18house capital budget committee, and senate ways and means committee19as projects are approved for funding.20

(2)(a) The legislature intends to use the 1063 Block building21development project as a model of efficient space and energy use for22both owned and leased state office buildings.23

(b) To achieve this intent, the office of financial management24must reconsider tenants for the building, including consideration of25the utilities and transportation commission, all current tenants of26the general administration building with operations compatible with a27high density office building, and other possible tenants. The measure28of achieving a higher space efficiency is measured by the average29square feet per housed employee.30

(c) The office of financial management must provide a report to31the appropriate committees of the legislature on the redesign and the32increase space efficiency by October 15, 2015.33Appropriation:34

State Building Construction Account—State. . . . . . . $8,000,00035Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $036Future Biennia (Projected Costs). . . . . . . . . . . . . . . $037

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,000,00038

p. 47 2EHB 1115.PL

NEW SECTION. Sec. 1078. FOR THE OFFICE OF FINANCIAL MANAGEMENT1Emergency Repairs (90000301)2The appropriation in this section is subject to the following3

conditions and limitations: Emergency repair funding is provided4solely to address unexpected building or grounds failures that will5impact public health and safety and the day-to-day operations of the6facility. To be eligible for funds from the emergency repair pool, an7emergency declaration signed by the affected agency director must be8submitted to the office of financial management and the appropriate9legislative fiscal committees. The emergency declaration must include10a description of the health and safety hazard, the possible cause,11the proposed scope of emergency repair work and related cost12estimate, and identification of other funding that may be applied to13the project. For emergencies occurring during a legislative session,14an agency must notify the legislative fiscal committees before15requesting emergency funds from the office of financial management.16The office of financial management must notify the legislative17evaluation and accountability program committee, the house capital18budget committee, and senate ways and means committee as emergency19projects are approved for funding.20Appropriation:21

State Building Construction Account—State. . . . . . . $5,000,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00025

NEW SECTION. Sec. 1079. FOR THE OFFICE OF FINANCIAL MANAGEMENT26Emergency Repair Pool for K-12 Public Schools (90000302)27The appropriation in this section is subject to the following28

conditions and limitations: Emergency repair funding is provided29solely to address unexpected and imminent health and safety hazards30at K-12 public schools, including skill centers, that will impact the31day-to-day operations of the school facility. To be eligible for32funds from the emergency repair pool, an emergency declaration must33be signed by the school district board of directors and the34superintendent of public instruction, and submitted to the office of35financial management for consideration. The emergency declaration36must include a description of the imminent health and safety hazard,37

p. 48 2EHB 1115.PL

the possible cause, the proposed scope of emergency repair work and1related cost estimate, and identification of local funding to be2applied to the project. Grants of emergency repair moneys must be3conditioned upon the written commitment and plan of the school4district board of directors to repay the grant with any insurance5payments or other judgments that may be awarded, if applicable. The6office of financial management must notify the legislative evaluation7and accountability program committee, the house capital budget8committee, and the senate ways and means committee as emergency9projects are approved for funding.10Appropriation:11

Common School Construction Account—State. . . . . . . $5,000,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00015

NEW SECTION. Sec. 1080. FOR THE OFFICE OF FINANCIAL MANAGEMENT16Chehalis River Basin Flood Relief Projects (91000398)17

Reappropriation:18State Building Construction Account—State. . . . . . . . $206,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $4,794,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00022

NEW SECTION. Sec. 1081. FOR THE OFFICE OF FINANCIAL MANAGEMENT23Higher Education Preservation Information (91000431)24The appropriations in this section are subject to the following25

conditions and limitations: The appropriations are provided solely to26refresh preservation information that reside in the state's27comparable framework for higher education buildings including any28necessary revisions or adjustments that will enable more direct29translation of information, updates for last renewal or replacement30or major systems, and quality assurance field sampling. In executing31this continued capital study, the office of financial management32shall consult the legislative fiscal committees about its workplan to33ensure field sampling of facilities prioritized for renovation or34replacement, and timely delivery of assembled facilities information35and related capital models in an easy to understand format. Prior to36

p. 49 2EHB 1115.PL

submitting any higher education institution renovation or replacement1building project for consideration for funding as part of a capital2budget request, to the office of financial management or directly to3the legislature, colleges and universities must have completed and4submitted all necessary information as required by the state facility5inventory and condition assessment systems. As a general condition,6upon appropriations provided to higher education agencies in this7act, the state board for community and technical colleges and each8state baccalaureate institution shall provide requested facilities9information in a timely manner to enable the office of financial10management to complete the tasks and oversight assigned in this11section.12Appropriation:13

University of Washington Building Account—State. . . . . $116,00014Washington State University Building15

Account—State. . . . . . . . . . . . . . . . . . . . $85,00016Eastern Washington University Capital Projects17

Account—State. . . . . . . . . . . . . . . . . . . . $21,00018Central Washington University Capital Projects19

Account—State. . . . . . . . . . . . . . . . . . . . $17,00020The Evergreen State College Capital Projects21

Account—State. . . . . . . . . . . . . . . . . . . . $12,00022Western Washington University Capital Projects23

Account—State. . . . . . . . . . . . . . . . . . . . $19,00024Subtotal Appropriation. . . . . . . . . . . . . . . $270,00025

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $270,00028

NEW SECTION. Sec. 1082. FOR THE OFFICE OF FINANCIAL MANAGEMENT29Construction Contingency Pool (91000428)30The reappropriation in this section is subject to the following31

conditions and limitations: The reappropriation is subject to the32provisions of section 1091, chapter 19, Laws of 2013 2nd sp. sess.33Reappropriation:34

State Building Construction Account—State. . . . . . . $1,875,00035Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $036Future Biennia (Projected Costs). . . . . . . . . . . . . . . $037

p. 50 2EHB 1115.PL

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,875,0001

NEW SECTION. Sec. 1083. FOR THE OFFICE OF FINANCIAL MANAGEMENT2Equipment Benchmarks for Capital Projects Study (92000010)3The appropriation in this section is subject to the following4

conditions and limitations: The office of financial management shall5submit a higher education and skill center capital project equipment6cost study to the governor and the appropriate legislative fiscal7committees by December 1, 2015. The study must include benchmarks for8standard ranges of fixed and nonfixed equipment expenditures in9different types of facilities and an examination of alternatives for10financing equipment costs where the equipment has a life expectancy11that is less than the length of bond financing. The alternative12analysis must include a life-cycle cost analysis of the competing13alternatives to determine the most cost-effective options to the14state bond and general fund budget.15Appropriation:16

State Building Construction Account—State. . . . . . . . $250,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $250,00020

NEW SECTION. Sec. 1084. FOR THE OFFICE OF FINANCIAL MANAGEMENT21Culverts in Three State Agencies (92000004)22

Reappropriation:23State Building Construction Account—State. . . . . . . $4,516,00024Prior Biennia (Expenditures). . . . . . . . . . . . . $2,484,00025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,000,00027

NEW SECTION. Sec. 1085. FOR THE DEPARTMENT OF ENTERPRISE28SERVICES29

East Plaza - Water Infiltration and Elevator Repairs (30000548)30Reappropriation:31

State Building Construction Account—State. . . . . . . . $500,00032Prior Biennia (Expenditures). . . . . . . . . . . . . $2,603,00033Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034

p. 51 2EHB 1115.PL

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,103,0001

NEW SECTION. Sec. 1086. FOR THE DEPARTMENT OF ENTERPRISE2SERVICES3

NRB Garage Fire Suppression System Repairs (30000578)4Reappropriation:5

State Building Construction Account—State. . . . . . . . $500,0006Prior Biennia (Expenditures). . . . . . . . . . . . . $1,738,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,238,0009

NEW SECTION. Sec. 1087. FOR THE DEPARTMENT OF ENTERPRISE10SERVICES11

Minor Works Preservation (30000635)12Reappropriation:13

State Building Construction Account—State. . . . . . . $1,477,00014Thurston County Capital Facilities Account—State. . . . $501,00015

Subtotal Reappropriation. . . . . . . . . . . . . $1,978,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $2,050,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,028,00019

NEW SECTION. Sec. 1088. FOR THE DEPARTMENT OF ENTERPRISE20SERVICES21

Minor Works Preservation (30000722)22The appropriations in this section are subject to the following23

conditions and limitations: No minor works funds may be allotted24until the action part of the plan is provided. Up to $300,000 of the25appropriation in this section is provided for the department to26develop an implementation plan for a capitol campus parking strategy.27The action part of the plan must include: (1) During the legislative28sessions a reduction of agency reserve stalls from twenty-six percent29to fifteen percent as recommended by the 2014 state of Washington30parking and transportation study; (2) cost-benefit of incorporating31parking attendants or parking arms to accept payment for campus32parking during the legislative sessions; (3) installation of at least33two electronic boards, or other methods of providing the available34parking capacity in the east plaza garage. The department shall work35

p. 52 2EHB 1115.PL

in cooperation with the city of Olympia, and the city may provide a1proposal to enforce parking on the capitol campus. The department2shall report to all fiscal committees on its progress by November 1,32015.4Appropriation:5

Thurston County Capital Facilities Account—State. . . . $850,0006State Building Construction Account—State. . . . . . . $5,608,0007State Vehicle Parking Account—State. . . . . . . . . . . $900,0008

Subtotal Appropriation. . . . . . . . . . . . . . $7,358,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . $19,000,00011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $26,358,00012

NEW SECTION. Sec. 1089. FOR THE DEPARTMENT OF ENTERPRISE13SERVICES14

Old Capitol - Exterior and Interior Repairs (30000724)15Appropriation:16

Thurston County Capital Facilities Account—State. . . $1,000,00017State Building Construction Account—State. . . . . . . $2,000,00018

Subtotal Appropriation. . . . . . . . . . . . . . $3,000,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00022

NEW SECTION. Sec. 1090. FOR THE DEPARTMENT OF ENTERPRISE23SERVICES24

West Campus Historic Buildings Exterior Preservation (30000727)25Appropriation:26

State Building Construction Account—State. . . . . . . $2,000,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00030

NEW SECTION. Sec. 1091. FOR THE DEPARTMENT OF ENTERPRISE31SERVICES32

Capitol Campus Heating Systems Repairs - Phase 1 (30000730)33

p. 53 2EHB 1115.PL

The appropriation in this section is subject to the following1conditions and limitations: The appropriation in this section is2provided solely for the department to competitively contract an3energy audit on the capitol campus steam system. The audit must4consider converting to centralized hot water boilers and using a heat5recovery power system.6Appropriation:7

Thurston County Capital Facilities Account—State. . . . $500,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00011

NEW SECTION. Sec. 1092. FOR THE DEPARTMENT OF ENTERPRISE12SERVICES13

Expansion of Legislative Gift Center (92000014)14The appropriation in this section is subject to the following15

conditions and limitations: The appropriation in this section is16provided solely for building modifications and space improvements17required for the purpose of expanding the retail space allocated to18the legislative gift center created in chapter 44.73 RCW in the19legislative building. The office of legislative support services, the20house of representatives, and the senate shall cooperate to21accomplish this expansion within the existing space allocations, up22to and including the use of all or part of room 112, on the first23floor of the legislative building, no later than October 30, 2015.24Appropriation:25

State Building Construction Account—State. . . . . . . . $150,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $150,00029

NEW SECTION. Sec. 1093. FOR THE DEPARTMENT OF ENTERPRISE30SERVICES31

Capitol Campus Critical Network Standardization and Connectivity32(30000732)33

The appropriation in this section is subject to the following34conditions and limitations: The appropriation in this section is35

p. 54 2EHB 1115.PL

provided solely for installing any remaining building meters as1needed on the capitol campus, and providing building performance data2electronically. Dashboard displays must be installed in the three3legislative buildings.4Appropriation:5

Thurston County Capital Facilities Account—State. . . . $250,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $250,0009

NEW SECTION. Sec. 1094. FOR THE DEPARTMENT OF ENTERPRISE10SERVICES11

Capitol Court Major Exterior and Building Systems Renewal12(30000738)13

The appropriation in this section is subject to the following14conditions and limitations: The appropriation in this section is15provided solely for development of a plan that identifies the16existing building deficiencies and recommended project specific17improvements with cost estimates to be completed as funding becomes18available. Urgent repairs to this building will be prioritized19against the other projects in the department of enterprise services'20minor works project list.21Appropriation:22

Enterprise Services Account—State. . . . . . . . . . . . $150,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024Future Biennia (Projected Costs). . . . . . . . . . . $1,220,00025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,370,00026

NEW SECTION. Sec. 1095. FOR THE DEPARTMENT OF ENTERPRISE27SERVICES28

Capitol Lake Long-term Management Planning (30000740)29The appropriation in this section is subject to the following30

conditions and limitations:31(1) The appropriation is provided solely to make tangible32

progress on reaching broad agreement on a long-term plan for the33management of Capitol Lake/Deschutes Estuary/Lower Budd Inlet/34Deschutes River watershed, building on the recommendations of the35

p. 55 2EHB 1115.PL

2014 situation assessment for Capitol Lake management prepared by the1Ruckleshaus center and prior related reports.2

The department shall:3(a) Identify and summarize the findings of the best available4

science concerning water quality and habitat as they relate to5conceptual options of retaining or removing the dam;6

(b) Identify multiple hybrid options for future management of7Capitol Lake, which options must include substantial improvement in8fish and wildlife habitat and ecosystem functions, maintaining a9historic reflecting pool at the north end of the lake/estuary, and10adaptive management strategies;11

(c) Identify general cost estimates for construction and12maintenance of each conceptual option, in consultation with the13office of financial management;14

(d) Identify the range of public support for or concerns about15each option;16

(e) Identify conceptual options and degree of general support for17shared funding by state, local, and federal governments and18potentially other entities;19

(f) Identify one or more conceptual options for long-term shared20governance of a future management plan, including consideration of an21option similar to state lake management districts, chapter 36.61 RCW22or shellfish protection districts, chapter 90.72 RCW.23

(g) Engage in other related activities which would contribute to24reaching broad agreement on the long-term management plan.25

The department shall conduct its information gathering and report26preparation with a pro-active approach to public engagement, and may27create such advisory entities as it determines would be helpful.28

(2) The department may contract for facilitation, research, or29other services to assist in the preparation of this report.30

(3) The department shall make periodic reports to the state31capitol committee, the office of financial management, and fiscal32committees of the legislature, with a final report to be submitted no33later than January 1, 2017. The reports must include visual34representations of proposals to aid the public and decision-makers to35understand and evaluate them.36Appropriation:37

Enterprise Services Account—State. . . . . . . . . . . . $250,00038Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $039

p. 56 2EHB 1115.PL

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $250,0002

NEW SECTION. Sec. 1096. FOR THE DEPARTMENT OF ENTERPRISE3SERVICES4

Engineering and Architectural Services: Staffing (30000762)5The appropriations in this section are subject to the following6

conditions and limitations:7(1) The appropriations in this section are provided solely for8

architectural and engineering services to manage public works9contracting for all state facilities pursuant to RCW 43.19.450. The10service charge is increased from 2.15 percent to 2.27 percent of11total project costs to reduce the number of projects assigned to each12manager. The intended results of the increased fee are improved13accountability, reduced project delays, and reduced the number and14cost of change orders. At the end of each fiscal year, the department15must report to the office of financial management and the fiscal16committees of the legislature on performance improvements resulting17from the increased management fee, including the following:18

(a) The number of projects managed by each manager compared to19previous biennia;20

(b) Projects that were not completed on schedule and the reasons21for delays; and22

(c) The number and cost of the change orders and the reason for23each change order.24

(2) The department shall convene a group of private sector25architects and contractors with state agency facilities personnel, at26a minimum of twice per year, to share at a minimum, information on27high performance methods, ideas, operating and maintenance issues,28and cost. The facility personnel must be from the community and29technical colleges, the four-year institutions of higher education,30and any other state agencies that have recently completed a new31building or are currently in the construction phase.32

(3) The department, with assistance from the capital projects33authority review board, shall provide recommendations to the34governor, house capital budget committee, and senate ways and means35committee, on ways to improve the project delivery methods. It must36include, at a minimum, methods to incorporate more architectural and37engineering firms and contractors to be eligible for design build38

p. 57 2EHB 1115.PL

projects, and methods for including high performance criteria with1incentives for the architectural and engineering firm and contractor2to meet the performance measures in design-bid-build project delivery3methods.4Appropriation:5

State Building Construction Account—State. . . . . . . $9,800,0006Thurston County Capital Facilities Account—State. . . $3,000,0007Charitable, Educational, Penal, and Reformatory8

Institutions Account—State. . . . . . . . . . . . $2,000,0009Subtotal Appropriation. . . . . . . . . . . . . . $14,800,00010

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,800,00013

NEW SECTION. Sec. 1097. FOR THE DEPARTMENT OF ENTERPRISE14SERVICES15

Campus Steam System and Chiller Upgrades (91000014)16The reappropriations in this section are subject to the following17

conditions and limitations: The reappropriations are subject to the18provisions of section 1106, chapter 19, Laws of 2013 2nd sp. sess.19Reappropriation:20

Thurston County Capital Facilities Account—State. . . $1,074,00021State Building Construction Account—State. . . . . . . $1,802,00022

Subtotal Reappropriation. . . . . . . . . . . . . $2,876,00023Prior Biennia (Expenditures). . . . . . . . . . . . . $1,121,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,997,00026

NEW SECTION. Sec. 1098. FOR THE DEPARTMENT OF ENTERPRISE27SERVICES28

Capitol Campus Exterior Lighting Upgrades (30000736)29The appropriation in this section is subject to the following30

conditions and limitations: The department shall pursue energy31services contracts as much as is feasible to provide funding.32Appropriation:33

Thurston County Capital Facilities Account—State. . . $1,000,00034Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $035

p. 58 2EHB 1115.PL

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,0002

NEW SECTION. Sec. 1099. FOR THE DEPARTMENT OF ENTERPRISE3SERVICES4

Archives Building and Capitol Court HVAC Upgrades (91000015)5The reappropriation in this section is subject to the following6

conditions and limitations: The reappropriation is subject to the7provisions of section 1107, chapter 19, Laws of 2013 2nd sp. sess.8Reappropriation:9

State Building Construction Account—State. . . . . . . . $70,00010Prior Biennia (Expenditures). . . . . . . . . . . . . . $930,00011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00013

NEW SECTION. Sec. 1100. FOR THE DEPARTMENT OF ENTERPRISE14SERVICES15

Capitol Campus Predesign (91000436)16The appropriation in this section is subject to the following17

conditions and limitations: The department shall develop a predesign18that will include at a minimum, uses for the pritchard building and19the pro arts site, the general administration building replacement or20rehabilitation, and the newhouse building replacement. The predesign21must include potential tenants, project costs, and schedules.22Appropriation:23

State Building Construction Account—State. . . . . . . . $200,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $200,00027

NEW SECTION. Sec. 1101. FOR THE DEPARTMENT OF ENTERPRISE28SERVICES29

State Capitol Master Plan (30000760)30The appropriation in this section is subject to the following31

conditions and limitations:32

p. 59 2EHB 1115.PL

(1) The appropriation in this section is provided solely for the1department to identify potential development sites, and any2infrastructure that may be needed for further development.3

(2) The department shall provide a list to all fiscal committees4of designated parking areas with: (a) Capitol campus employees; (b)5state agency reserve spaces; (c) state agency vehicles; (d) state6agency motor pool vehicles; and (e) nonstate agency vehicles. The7department shall also provide a prioritized list of parking spaces8that ranks campus employees as the highest priority. Other parking9locations in Thurston county may also be considered.10Appropriation:11

Thurston County Capital Facilities Account—State. . . . $250,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $250,00015

NEW SECTION. Sec. 1102. FOR THE DEPARTMENT OF ENTERPRISE16SERVICES17

1063 Block Replacement (91000016)18The reappropriation in this section is subject to the following19

conditions and limitations: The reappropriation is provided solely20for design, redesign, demolition and other costs required for the21project to replace the state building on the 1063 block. The building22will be alternatively financed as authorized by and subject to the23conditions of section 7002 of this act.24Reappropriation:25

State Building Construction Account—State. . . . . . . $8,017,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $4,983,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,000,00029

NEW SECTION. Sec. 1103. FOR THE DEPARTMENT OF ENTERPRISE30SERVICES31

Dolliver - Critical Building Repairs (30000726)32The appropriation in this section is provided solely for33

development of a plan that identifies the existing building34deficiencies and recommended project specific improvements with cost35estimates to be completed as funding becomes available. Urgent36

p. 60 2EHB 1115.PL

repairs to this building will be prioritized against the other1projects in the department of enterprise services' minor works2project list.3Appropriation:4

Enterprise Services Account—State. . . . . . . . . . . . $50,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $50,0008

NEW SECTION. Sec. 1104. FOR THE DEPARTMENT OF ENTERPRISE9SERVICES10

Feasibility Study for Restoring Skylights in Legislative Building11(92000010)12

The appropriation in this section is subject to the following13conditions and limitations: The appropriation in this section is14provided solely for a study to determine the feasibility and15requirements of replacing the materials covering the original16skylight openings that are located above the house of representatives17and senate chambers in the legislative building with safety glass to18allow as much natural light as possible into the chambers as19originally intended. The study must determine the cost, including the20relocation of existing equipment; the impact upon the sound, HVAC21system(s) and light levels within each chamber; any other22requirements needed to replace the materials with safety glass; and23an estimated schedule needed for the work. The replacement glass must24be of a quality that will provide for a reasonable assurance of25safety in the event of an earthquake.26Appropriation:27

State Building Construction Account—State. . . . . . . . $125,00028Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $125,00031

NEW SECTION. Sec. 1105. FOR THE DEPARTMENT OF ENTERPRISE32SERVICES33

Capitol Campus Utility Renewal Plan (92000012)34The appropriation in this section is subject to the following35

conditions and limitations: The appropriation is provided solely for36p. 61 2EHB 1115.PL

assessing the current condition of underground utilities on the1Capitol campus and developing a plan of renewal that stages the work2so that the systems and segments at highest risk of failure are3replaced or repaired in a sequence of work that is the most cost4effective. The plan must be submitted to the appropriate committees5of the legislature by October 1, 2016.6Appropriation:7

State Building Construction Account—State. . . . . . . . $650,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $650,00011

NEW SECTION. Sec. 1106. FOR THE DEPARTMENT OF ENTERPRISE12SERVICES13

Capital Furnishings Preservation Committee Projects (92000013)14Appropriation:15

State Building Construction Account—State. . . . . . . . $68,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $68,00019

NEW SECTION. Sec. 1107. FOR THE MILITARY DEPARTMENT20Pierce County Readiness Center (30000593)21

Reappropriation:22Military Department Capital Account—State. . . . . . . $2,758,00023State Building Construction Account—State. . . . . . . $3,269,00024General Fund—Federal. . . . . . . . . . . . . . . . . $24,876,00025

Subtotal Reappropriation. . . . . . . . . . . . . $30,903,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $2,698,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $33,601,00029

NEW SECTION. Sec. 1108. FOR THE MILITARY DEPARTMENT30Thurston County Readiness Center (30000594)31The reappropriation and appropriations in this section are32

subject to the following conditions and limitations: The legislature33intends to support the transfer of the Olympia armory to the Thurston34

p. 62 2EHB 1115.PL

county boys and girls club. The military department must execute an1agreement to transfer title of the property to the Thurston county2boys and girls club if the club agrees to use the facility as a boys3and girls club for a minimum of ten years. The transfer agreement4must specify a mutually agreed transfer date following the completion5of the Thurston county readiness center. The transfer agreement must6require the club to cover any closing costs and must specify a7purchase price of one dollar. The agreement must be reported to the8house of representatives capital budget committee, senate ways and9means committee, and the governor's office by January 1, 2016.10Reappropriation:11

State Building Construction Account—State. . . . . . . $2,750,00012Appropriation:13

State Building Construction Account—State. . . . . . . $7,883,00014General Fund—Federal. . . . . . . . . . . . . . . . . $34,207,00015

Subtotal Appropriation. . . . . . . . . . . . . . $42,090,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . $50,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $44,890,00019

NEW SECTION. Sec. 1109. FOR THE MILITARY DEPARTMENT20Minor Works Preservation - 2013-2015 Biennium (30000602)21

Reappropriation:22State Building Construction Account—State. . . . . . . . $307,00023General Fund—Federal. . . . . . . . . . . . . . . . . $1,082,00024

Subtotal Reappropriation. . . . . . . . . . . . . $1,389,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $3,837,00026Future Biennia (Projected Costs). . . . . . . . . . . $2,500,00027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,726,00028

NEW SECTION. Sec. 1110. FOR THE MILITARY DEPARTMENT29Minor Works Program - 2013-2015 Biennium (30000605)30

Reappropriation:31General Fund—Federal. . . . . . . . . . . . . . . . . $8,893,00032Prior Biennia (Expenditures). . . . . . . . . . . . . $4,032,00033Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,925,00035

p. 63 2EHB 1115.PL

NEW SECTION. Sec. 1111. FOR THE MILITARY DEPARTMENT1Minor Works Preservation - 2015-2017 Biennium (30000702)2

Appropriation:3State Building Construction Account—State. . . . . . . $5,110,0004General Fund—Federal. . . . . . . . . . . . . . . . . $7,488,0005

Subtotal Appropriation. . . . . . . . . . . . . . $12,598,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,598,0009

NEW SECTION. Sec. 1112. FOR THE MILITARY DEPARTMENT10Minor Works Program - 2015-2017 Biennium (30000744)11

Appropriation:12State Building Construction Account—State. . . . . . . $5,663,00013General Fund—Federal. . . . . . . . . . . . . . . . . $15,953,00014

Subtotal Appropriation. . . . . . . . . . . . . . $21,616,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . $21,616,00018

NEW SECTION. Sec. 1113. FOR THE MILITARY DEPARTMENT19Montesano Readiness Center Roof Replacement and Tenant20

Improvements (30000805)21Appropriation:22

General Fund—Federal. . . . . . . . . . . . . . . . . $1,500,00023State Building Construction Account—State. . . . . . . $3,750,00024

Subtotal Appropriation. . . . . . . . . . . . . . $5,250,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,250,00028

NEW SECTION. Sec. 1114. FOR THE DEPARTMENT OF ARCHAEOLOGY AND29HISTORIC PRESERVATION30

National Parks Service Maritime Heritage Grants (91000008)31The appropriation in this section is subject to the following32

conditions and limitations:33

p. 64 2EHB 1115.PL

(1) $28,000 of the appropriation is provided solely for the1center for wooden boats' historic small craft project.2

(2) $87,000 of the appropriation is provided solely for the3Northwest seaport's preservation of the national historic landmark41889 tugboat Arthur Foss.5Appropriation:6

General Fund—Federal. . . . . . . . . . . . . . . . . . $105,0007Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $105,00010

NEW SECTION. Sec. 1115. FOR THE DEPARTMENT OF ARCHAEOLOGY AND11HISTORIC PRESERVATION12

Historic County Courthouse Grants Program (30000010)13Appropriation:14

State Building Construction Account—State. . . . . . . $2,500,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016Future Biennia (Projected Costs). . . . . . . . . . . $10,400,00017

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,900,00018

NEW SECTION. Sec. 1116. FOR THE DEPARTMENT OF ARCHAEOLOGY AND19HISTORIC PRESERVATION20

Historic Courthouse Preservation Grants (92000001)21Reappropriation:22

State Building Construction Account—State. . . . . . . $1,696,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . $304,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00026

NEW SECTION. Sec. 1117. FOR THE DEPARTMENT OF ARCHAEOLOGY AND27HISTORIC PRESERVATION28

Heritage Barn Preservation Program (92000002)29Reappropriation:30

State Building Construction Account—State. . . . . . . . $256,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . $244,00032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00034p. 65 2EHB 1115.PL

NEW SECTION. Sec. 1118. FOR THE DEPARTMENT OF ARCHAEOLOGY AND1HISTORIC PRESERVATION2

Acquisition/Rehabilitation of Historic Matsuda and Mukai Sites3(91000006)4Appropriation:5

State Building Construction Account—State. . . . . . . . $500,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,0009

NEW SECTION. Sec. 1119. FOR THE DEPARTMENT OF ARCHAEOLOGY AND10HISTORIC PRESERVATION11

Heritage Barn Preservation Program (30000009)12Appropriation:13

State Building Construction Account—State. . . . . . . . $450,00014Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $015Future Biennia (Projected Costs). . . . . . . . . . . $2,000,00016

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,450,00017

(End of part)

p. 66 2EHB 1115.PL

PART 21HUMAN SERVICES2

NEW SECTION. Sec. 2001. FOR THE DEPARTMENT OF SOCIAL AND HEALTH3SERVICES4

Naselle Youth Camp - Three Cottages: Renovation (20081222)5Reappropriation:6

State Building Construction Account—State. . . . . . . $1,703,0007Prior Biennia (Expenditures). . . . . . . . . . . . . . $197,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,900,00010

NEW SECTION. Sec. 2002. FOR THE DEPARTMENT OF SOCIAL AND HEALTH11SERVICES12

Western State Hospital New Kitchen and Commissary Building13(20081319)14Appropriation:15

State Building Construction Account—State. . . . . . $29,000,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . $828,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $29,828,00019

NEW SECTION. Sec. 2003. FOR THE DEPARTMENT OF SOCIAL AND HEALTH20SERVICES21

Medical Lake Campus - Laundry Building: New Construction22(20082371)23Appropriation:24

State Building Construction Account—State. . . . . . . . $150,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . . $10,100,00027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,250,00028

NEW SECTION. Sec. 2004. FOR THE DEPARTMENT OF SOCIAL AND HEALTH29SERVICES30

Minor Works Preservation Projects: Statewide (91000037)31The appropriation in this section is subject to the following32

conditions and limitations: Up to $600,000 may be used for necessary33

p. 67 2EHB 1115.PL

renovations at the Maple Lane facility for the purpose of temporary1forensic beds.2Appropriation:3

State Building Construction Account—State. . . . . . $10,645,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,645,0007

NEW SECTION. Sec. 2005. FOR THE DEPARTMENT OF SOCIAL AND HEALTH8SERVICES9

Fircrest School Electrical Service Rehabilitation (30000415)10The appropriation in this section is provided solely for11

electrical service rehabilitation and improvements on campus. The12department of social and health services will also coordinate with13the department of health to install a new and separate electrical14service for the public health laboratory.15Appropriation:16

State Building Construction Account—State. . . . . . . $5,200,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,200,00020

NEW SECTION. Sec. 2006. FOR THE DEPARTMENT OF SOCIAL AND HEALTH21SERVICES22

Minor Works Program Projects: Statewide (30001859)23Appropriation:24

State Building Construction Account—State. . . . . . . . $755,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,755,00028

NEW SECTION. Sec. 2007. FOR THE DEPARTMENT OF SOCIAL AND HEALTH29SERVICES30

Minor Works Preservation Projects: Statewide (30002235)31Reappropriation:32

State Building Construction Account—State. . . . . . . $4,000,00033

p. 68 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . $10,155,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,155,0003

NEW SECTION. Sec. 2008. FOR THE DEPARTMENT OF SOCIAL AND HEALTH4SERVICES5

Child Study and Treatment Center - Orcas: Acute Treatment6Addition (30002733)7Appropriation:8

State Building Construction Account—State. . . . . . . $1,100,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,100,00012

NEW SECTION. Sec. 2009. FOR THE DEPARTMENT OF SOCIAL AND HEALTH13SERVICES14

Western State Hospital - South Hall: Building Systems Replacement15(30002735)16Appropriation:17

Charitable, Educational, Penal, and Reformatory18Institutions Account—State. . . . . . . . . . . . $4,450,00019

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,450,00022

NEW SECTION. Sec. 2010. FOR THE DEPARTMENT OF SOCIAL AND HEALTH23SERVICES24

Fircrest School: Campus Master Plan (30002738)25Appropriation:26

Charitable, Educational, Penal, and Reformatory27Institutions Account—State. . . . . . . . . . . . . $100,00028

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $100,00031

NEW SECTION. Sec. 2011. FOR THE DEPARTMENT OF SOCIAL AND HEALTH32SERVICES33

p. 69 2EHB 1115.PL

Eastern State Hospital - Westlake: Nurse Call System (30002739)1Appropriation:2

State Building Construction Account—State. . . . . . . $1,200,0003Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,200,0006

NEW SECTION. Sec. 2012. FOR THE DEPARTMENT OF SOCIAL AND HEALTH7SERVICES8

Rainier School: Campus Master Plan and Forest Management Plan9(30002740)10Appropriation:11

Charitable, Educational, Penal, and Reformatory12Institutions Account—State. . . . . . . . . . . . . $200,00013

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $200,00016

NEW SECTION. Sec. 2013. FOR THE DEPARTMENT OF SOCIAL AND HEALTH17SERVICES18

Yakima Valley School - Main Building: Roofing Replacement19(30002742)20Appropriation:21

State Building Construction Account—State. . . . . . . $1,500,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,00025

NEW SECTION. Sec. 2014. FOR THE DEPARTMENT OF SOCIAL AND HEALTH26SERVICES27

Green Hill School: New Acute Mental Health Unit (30002745)28Appropriation:29

State Building Construction Account—State. . . . . . . $4,950,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,950,00033

p. 70 2EHB 1115.PL

NEW SECTION. Sec. 2015. FOR THE DEPARTMENT OF SOCIAL AND HEALTH1SERVICES2

Western State Hospital - Forensic Services: Two Wards Addition3(30002765)4Appropriation:5

State Building Construction Account—State. . . . . . . $1,800,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . $20,700,0008

TOTAL. . . . . . . . . . . . . . . . . . . . . . $22,500,0009

NEW SECTION. Sec. 2016. FOR THE DEPARTMENT OF SOCIAL AND HEALTH10SERVICES11

Western State Hospital - East Campus: Psychiatric Intensive Care12Unit and Competency Restoration (30002773)13Appropriation:14

State Building Construction Account—State. . . . . . . $2,200,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,200,00018

NEW SECTION. Sec. 2017. FOR THE DEPARTMENT OF SOCIAL AND HEALTH19SERVICES20

Eastern State Hospital - Water System: Improvements (30003215)21Appropriation:22

State Building Construction Account—State. . . . . . . $2,115,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,115,00026

NEW SECTION. Sec. 2018. FOR THE DEPARTMENT OF SOCIAL AND HEALTH27SERVICES28

Yakima Valley School: Center for Excellence (30003236)29Appropriation:30

Charitable, Educational, Penal, and Reformatory31Institutions Account—State. . . . . . . . . . . . . $200,00032

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034

p. 71 2EHB 1115.PL

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $200,0001

NEW SECTION. Sec. 2019. FOR THE DEPARTMENT OF SOCIAL AND HEALTH2SERVICES3

Western State Hospital - South Hall: Wards Preservation and4Renewal (30003240)5Appropriation:6

State Building Construction Account—State. . . . . . . $1,350,0007Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,350,00010

NEW SECTION. Sec. 2020. FOR THE DEPARTMENT OF SOCIAL AND HEALTH11SERVICES12

Western State Hospital - East Campus: Wards Preservation and13Renewal (30003241)14Appropriation:15

State Building Construction Account—State. . . . . . . $1,600,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,600,00019

NEW SECTION. Sec. 2021. FOR THE DEPARTMENT OF SOCIAL AND HEALTH20SERVICES21

Western State Hospital - East Campus: Building Systems22Replacement (30003244)23Appropriation:24

State Building Construction Account—State. . . . . . . $3,400,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,400,00028

NEW SECTION. Sec. 2022. FOR THE DEPARTMENT OF SOCIAL AND HEALTH29SERVICES30

Eastern State Hospital and Western State Hospital - All Wards:31Patient Safety Improvements (91000019)32Reappropriation:33

p. 72 2EHB 1115.PL

Charitable, Educational, Penal, and Reformatory1Institutions Account—State. . . . . . . . . . . . $2,000,0002

Appropriation:3Charitable, Educational, Penal, and Reformatory4

Institutions Account—State. . . . . . . . . . . . $2,569,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $2,800,0006Future Biennia (Projected Costs). . . . . . . . . . . $3,180,0007

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,549,0008

NEW SECTION. Sec. 2023. FOR THE DEPARTMENT OF SOCIAL AND HEALTH9SERVICES10

ESH-15 Bed Addition for Substitute Senate Bill No. 588911(92000016)12Appropriation:13

State Building Construction Account—State. . . . . . . $1,400,00014Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,400,00017

NEW SECTION. Sec. 2024. FOR THE DEPARTMENT OF HEALTH18Newborn Screening Wing Addition (30000301)19

Appropriation:20State Building Construction Account—State. . . . . . . $3,049,00021Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,049,00024

NEW SECTION. Sec. 2025. FOR THE DEPARTMENT OF HEALTH25Newborn Screening Lab Conversion (30000302)26

Appropriation:27State Building Construction Account—State. . . . . . . $1,141,00028Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,141,00031

NEW SECTION. Sec. 2026. FOR THE DEPARTMENT OF HEALTH32Minor Works - Program (30000315)33

p. 73 2EHB 1115.PL

Appropriation:1State Building Construction Account—State. . . . . . . . $322,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $322,0005

NEW SECTION. Sec. 2027. FOR THE DEPARTMENT OF HEALTH6Drinking Water Assistance Program (30000323)7

Reappropriation:8Drinking Water Assistance Account—Federal. . . . . . $23,225,0009Prior Biennia (Expenditures). . . . . . . . . . . . . $5,575,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,800,00012

NEW SECTION. Sec. 2028. FOR THE DEPARTMENT OF HEALTH13Minor Works - Facility Preservation (30000328)14

Appropriation:15State Building Construction Account—State. . . . . . . . $277,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $277,00019

NEW SECTION. Sec. 2029. FOR THE DEPARTMENT OF HEALTH20Drinking Water Preconstruction Loans (30000334)21

Appropriation:22Drinking Water Assistance Repayment Account—State. . . $6,000,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024Future Biennia (Projected Costs). . . . . . . . . . . $24,000,00025

TOTAL. . . . . . . . . . . . . . . . . . . . . . $30,000,00026

NEW SECTION. Sec. 2030. FOR THE DEPARTMENT OF HEALTH27Drinking Water Assistance Program (30000336)28

Appropriation:29Drinking Water Assistance Account—Federal. . . . . . $32,000,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . $128,000,00032

p. 74 2EHB 1115.PL

TOTAL. . . . . . . . . . . . . . . . . . . . . . $160,000,0001

NEW SECTION. Sec. 2031. FOR THE DEPARTMENT OF HEALTH2Safe Reliable Drinking Water Grants (92000002)3

Reappropriation:4State Building Construction Account—State. . . . . . . $1,428,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $10,210,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,638,0008

NEW SECTION. Sec. 2032. FOR THE DEPARTMENT OF VETERANS AFFAIRS9Walla Walla Nursing Facility (20082008)10

Reappropriation:11State Building Construction Account—State. . . . . . $14,357,00012General Fund—Federal. . . . . . . . . . . . . . . . . $24,000,00013

Subtotal Reappropriation. . . . . . . . . . . . . $38,357,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $2,568,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,925,00017

NEW SECTION. Sec. 2033. FOR THE DEPARTMENT OF VETERANS AFFAIRS18Minor Works Facilities Preservation (30000094)19

Reappropriation:20State Building Construction Account—State. . . . . . . . $675,00021Prior Biennia (Expenditures). . . . . . . . . . . . . . $638,00022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,313,00024

NEW SECTION. Sec. 2034. FOR THE DEPARTMENT OF VETERANS AFFAIRS25Feasibility Study/Predesign for Washington Soldiers Home Skilled26

Nursing Replacement (30000090)27Appropriation:28

Charitable, Educational, Penal, and Reformatory29Institutions Account—State. . . . . . . . . . . . . $125,00030

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $125,00033p. 75 2EHB 1115.PL

NEW SECTION. Sec. 2035. FOR THE DEPARTMENT OF VETERANS AFFAIRS1Minor Works Facilities Preservation (30000174)2The appropriation in this section is subject to the following3

conditions and limitations: $250,000 of the appropriation in this4section is provided solely for the restoration and preservation of5the Washington soldiers home cemetery.6Appropriation:7

State Building Construction Account—State. . . . . . . $3,095,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09Future Biennia (Projected Costs). . . . . . . . . . . $9,690,00010

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,785,00011

NEW SECTION. Sec. 2036. FOR THE DEPARTMENT OF VETERANS AFFAIRS12South Central Washington State Veterans Cemetery Feasibility13

(30000151)14Appropriation:15

Charitable, Educational, Penal, and Reformatory16Institutions Account—State. . . . . . . . . . . . . $100,00017

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $100,00020

NEW SECTION. Sec. 2037. FOR THE DEPARTMENT OF VETERANS AFFAIRS21Eastern Washington Cemetery Upgrade (30000152)22

Appropriation:23State Building Construction Account—State. . . . . . . . $270,00024General Fund—Federal. . . . . . . . . . . . . . . . . $2,422,00025

Subtotal Appropriation. . . . . . . . . . . . . . $2,692,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,692,00029

NEW SECTION. Sec. 2038. FOR THE DEPARTMENT OF CORRECTIONS30Monroe Correctional Complex: Close Sewer Lagoon (20082022)31

Reappropriation:32State Building Construction Account—State. . . . . . . . $214,00033

p. 76 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . $1,177,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,391,0003

NEW SECTION. Sec. 2039. FOR THE DEPARTMENT OF CORRECTIONS4Washington Corrections Center: Transformers and Switches5

(30000143)6Appropriation:7

State Building Construction Account—State. . . . . . . . $150,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09Future Biennia (Projected Costs). . . . . . . . . . . $12,699,00010

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,849,00011

NEW SECTION. Sec. 2040. FOR THE DEPARTMENT OF CORRECTIONS12Washington Corrections Center: Roof and Equipment Replacement13

(30000195)14Appropriation:15

State Building Construction Account—State. . . . . . . $5,658,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,658,00019

NEW SECTION. Sec. 2041. FOR THE DEPARTMENT OF CORRECTIONS20Clallam Bay Corrections Center: MSC and Rec Building Roofs21

(30000548)22Appropriation:23

State Building Construction Account—State. . . . . . . $1,808,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,808,00027

NEW SECTION. Sec. 2042. FOR THE DEPARTMENT OF CORRECTIONS28Monroe Correctional Complex: WSR Replace Fire Alarm System29

(30000724)30Reappropriation:31

State Building Construction Account—State. . . . . . . $2,001,00032

p. 77 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . . $615,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,616,0003

NEW SECTION. Sec. 2043. FOR THE DEPARTMENT OF CORRECTIONS4Airway Heights Corrections Center: Replace Fire Alarm System5

(30000725)6Reappropriation:7

State Building Construction Account—State. . . . . . . $2,007,0008Prior Biennia (Expenditures). . . . . . . . . . . . . $1,392,0009Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,399,00011

NEW SECTION. Sec. 2044. FOR THE DEPARTMENT OF CORRECTIONS12Airway Heights Corrections Center: Security Electronics13

Renovations (30000726)14Reappropriation:15

State Building Construction Account—State. . . . . . . $3,830,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $1,217,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,047,00019

NEW SECTION. Sec. 2045. FOR THE DEPARTMENT OF CORRECTIONS20Washington Corrections Center for Women: Replace Fire Alarm21

System (30000727)22Reappropriation:23

State Building Construction Account—State. . . . . . . . $950,00024Prior Biennia (Expenditures). . . . . . . . . . . . . $1,699,00025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,649,00027

NEW SECTION. Sec. 2046. FOR THE DEPARTMENT OF CORRECTIONS28Monroe Correctional Complex: TRU Support Building Repair Fire29

Detection System (30000733)30Reappropriation:31

State Building Construction Account—State. . . . . . . . $250,00032

p. 78 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . . $808,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,058,0003

NEW SECTION. Sec. 2047. FOR THE DEPARTMENT OF CORRECTIONS4Monroe Correctional Complex: TRU Security Video System (30000801)5

Reappropriation:6State Building Construction Account—State. . . . . . . $2,908,0007Prior Biennia (Expenditures). . . . . . . . . . . . . . $968,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,876,00010

NEW SECTION. Sec. 2048. FOR THE DEPARTMENT OF CORRECTIONS11Washington Corrections Center: Security Video System (30000791)12

Reappropriation:13State Building Construction Account—State. . . . . . . $6,000,00014Prior Biennia (Expenditures). . . . . . . . . . . . . . $972,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,972,00017

NEW SECTION. Sec. 2049. FOR THE DEPARTMENT OF CORRECTIONS18Monroe Correctional Complex: WSR Security Video System (30000795)19

Reappropriation:20State Building Construction Account—State. . . . . . . $4,200,00021Prior Biennia (Expenditures). . . . . . . . . . . . . $1,033,00022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,233,00024

NEW SECTION. Sec. 2050. FOR THE DEPARTMENT OF CORRECTIONS25Minor Works Preservation (30000734)26

Reappropriation:27State Building Construction Account—State. . . . . . . $1,500,00028Prior Biennia (Expenditures). . . . . . . . . . . . . $8,600,00029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,100,00031

p. 79 2EHB 1115.PL

NEW SECTION. Sec. 2051. FOR THE DEPARTMENT OF CORRECTIONS1Clallam Bay Corrections Center: Security Video System (30000800)2

Appropriation:3State Building Construction Account—State. . . . . . . $6,038,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,038,0007

NEW SECTION. Sec. 2052. FOR THE DEPARTMENT OF CORRECTIONS8Washington Corrections Center for Women: Security Video System9

(30000802)10Reappropriation:11

State Building Construction Account—State. . . . . . . $2,917,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . $504,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,421,00015

NEW SECTION. Sec. 2053. FOR THE DEPARTMENT OF CORRECTIONS16Monroe Correctional Complex: SOU IMU Security Video (30000803)17

Reappropriation:18State Building Construction Account—State. . . . . . . $2,000,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . $640,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,640,00022

NEW SECTION. Sec. 2054. FOR THE DEPARTMENT OF CORRECTIONS23Washington State Penitentiary: Education Building Roof (30000820)24

Appropriation:25State Building Construction Account—State. . . . . . . $1,525,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,525,00029

NEW SECTION. Sec. 2055. FOR THE DEPARTMENT OF CORRECTIONS30Monroe Correctional Complex: MSU Bathroom Renovation (30000975)31

Appropriation:32

p. 80 2EHB 1115.PL

State Building Construction Account—State. . . . . . . $1,720,0001Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,720,0004

NEW SECTION. Sec. 2056. FOR THE DEPARTMENT OF CORRECTIONS5Statewide: Minor Works - Preservation Projects (30001013)6

Appropriation:7State Building Construction Account—State. . . . . . $11,396,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09Future Biennia (Projected Costs). . . . . . . . . . . $65,095,00010

TOTAL. . . . . . . . . . . . . . . . . . . . . . $76,491,00011

NEW SECTION. Sec. 2057. FOR THE DEPARTMENT OF CORRECTIONS12Clallam Bay Corrections Center: Access Road Culvert Replacement13

and Road Resurfacing (30001078)14Appropriation:15

State Building Construction Account—State. . . . . . . $1,500,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,00019

NEW SECTION. Sec. 2058. FOR THE DEPARTMENT OF CORRECTIONS20Washington State Penitentiary: Program and Support Building21

(30001101)22Appropriation:23

State Building Construction Account—State. . . . . . . $1,900,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . . $15,014,00026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,914,00027

NEW SECTION. Sec. 2059. FOR THE DEPARTMENT OF CORRECTIONS28Prison Capacity Expansion (30001105)29The appropriation in this section is subject to the following30

conditions and limitations:31(1) The department shall research best practices for treatment of32

mental illness for offenders, and design and construct the facility33p. 81 2EHB 1115.PL

to provide this treatment. The department shall also include costs1for continuing mental health supervision with community supervision2in the predesign. The department may assign minimum security3offenders for maintenance or other activities as needed.4

(2) The department shall report to the senate ways and means5committee, the house of representatives capital budget committee, and6the governor's office options on methods of converting existing7minimum security housing units to medium security housing units. The8report must contain methods, construction cost estimates, length of9time to complete, facility locations where this is feasible, and10changes to capacity.11

(3) The department, in cooperation with the department of social12and health services, shall report to the senate ways and means13committee, the house of representatives capital budget committee, and14the governor's office, options for including juveniles diagnosed with15a mental illness that are housed at a juvenile rehabilitation16facility at the maple lane facility. The report must include cost17benefits, added construction costs, and any changes required in state18or federal law.19Appropriation:20

State Building Construction Account—State. . . . . . . $4,800,00021Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022Future Biennia (Projected Costs). . . . . . . . . . $184,000,00023

TOTAL. . . . . . . . . . . . . . . . . . . . . . $188,800,00024

NEW SECTION. Sec. 2060. FOR THE CRIMINAL JUSTICE TRAINING25COMMISSION26

Omnibus Minor Works (30000017)27Appropriation:28

State Building Construction Account—State. . . . . . . . $456,00029Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $456,00032

(End of part)

p. 82 2EHB 1115.PL

PART 31NATURAL RESOURCES2

NEW SECTION. Sec. 3001. FOR THE DEPARTMENT OF ECOLOGY3Water Supply Facilities (19742006)4

Reappropriation:5State and Local Improvements Revolving Account (Water6

Supply Facilities)—State. . . . . . . . . . . . . . $345,0007Prior Biennia (Expenditures). . . . . . . . . . . . . $20,205,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,550,00010

NEW SECTION. Sec. 3002. FOR THE DEPARTMENT OF ECOLOGY11Low-Level Nuclear Waste Disposal Trench Closure (19972012)12The appropriations in this section are subject to the following13

conditions and limitations: The department of ecology and department14of health shall work with the Yakama nation to engage a third party15to evaluate the specific technical concerns the tribe has identified16with respect to the timing of the phase 1 cover. Funds may not be17expended to place a cover over the trenches which are releasing or18are projected to release contaminants until the third party review is19completed and collaboratively resolved. A report on the above20referenced work, including recommendations and the means for meeting21health and cancer risks, must be delivered to the appropriate22committees of the legislature by December 1, 2015.23Reappropriation:24

Site Closure Account—State. . . . . . . . . . . . . . $10,917,00025Appropriation:26

Site Closure Account—State. . . . . . . . . . . . . . $3,675,00027Prior Biennia (Expenditures). . . . . . . . . . . . . $4,516,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,108,00030

NEW SECTION. Sec. 3003. FOR THE DEPARTMENT OF ECOLOGY31Twin Lake Aquifer Recharge Project (20042951)32

Reappropriation:33State Building Construction Account—State. . . . . . . . $156,00034

p. 83 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . . $594,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $750,0003

NEW SECTION. Sec. 3004. FOR THE DEPARTMENT OF ECOLOGY4Water Supply Facilities (20044006)5

Reappropriation:6State and Local Improvements Revolving Account (Water7

Supply Facilities)—State. . . . . . . . . . . . . . . $50,0008Prior Biennia (Expenditures). . . . . . . . . . . . . $13,468,0009Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,518,00011

NEW SECTION. Sec. 3005. FOR THE DEPARTMENT OF ECOLOGY12Quad Cities Water Right Mitigation (20052852)13

Reappropriation:14State Building Construction Account—State. . . . . . . . $421,00015Prior Biennia (Expenditures). . . . . . . . . . . . . $1,179,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,600,00018

NEW SECTION. Sec. 3006. FOR THE DEPARTMENT OF ECOLOGY19Watershed Plan Implementation and Flow Achievement (20062003)20The reappropriation in this section is subject to the following21

conditions and limitations: The reappropriation is subject to the22provisions in section 136, chapter 371, Laws of 2006.23Reappropriation:24

State Building Construction Account—State. . . . . . . . $317,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $12,483,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,800,00028

NEW SECTION. Sec. 3007. FOR THE DEPARTMENT OF ECOLOGY29Columbia River Basin Water Supply Development Program (20062950)30

p. 84 2EHB 1115.PL

The reappropriations in this section are subject to the following1conditions and limitations: The reappropriations are subject to the2provisions of section 3008, chapter 49, Laws of 2011 1st sp. sess.3Reappropriation:4

Columbia River Basin Taxable Bond Water Supply5Development Account—State. . . . . . . . . . . . . $1,770,0006

Columbia River Basin Water Supply Development Account—7State. . . . . . . . . . . . . . . . . . . . . . . $6,075,0008Subtotal Reappropriation. . . . . . . . . . . . . $7,845,0009

Prior Biennia (Expenditures). . . . . . . . . . . . . $83,655,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $91,500,00012

NEW SECTION. Sec. 3008. FOR THE DEPARTMENT OF ECOLOGY13Transfer of Water Rights for Cabin Owners (20081951)14

Reappropriation:15State Building Construction Account—State. . . . . . . . $161,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . $289,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $450,00019

NEW SECTION. Sec. 3009. FOR THE DEPARTMENT OF ECOLOGY20Remedial Action Grants (20084008)21

Reappropriation:22State Building Construction Account—State. . . . . . $11,754,00023Prior Biennia (Expenditures). . . . . . . . . . . . . $81,121,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . $92,875,00026

NEW SECTION. Sec. 3010. FOR THE DEPARTMENT OF ECOLOGY27Centennial Clean Water Program (20084010)28

Reappropriation:29State Building Construction Account—State. . . . . . . . $221,00030Water Quality Capital Account—State. . . . . . . . . . . $43,00031State Toxics Control Account—State. . . . . . . . . . . $570,00032

Subtotal Reappropriation. . . . . . . . . . . . . . $834,00033

p. 85 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . $66,036,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . $66,870,0003

NEW SECTION. Sec. 3011. FOR THE DEPARTMENT OF ECOLOGY4Water Pollution Control Loan Program (20084011)5

Reappropriation:6Water Pollution Control Revolving Account—State. . . $14,581,0007Prior Biennia (Expenditures). . . . . . . . . . . . $125,419,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . $140,000,00010

NEW SECTION. Sec. 3012. FOR THE DEPARTMENT OF ECOLOGY11Yakima River Basin Water Storage Feasibility Study (20084026)12The reappropriation in this section is subject to the following13

conditions and limitations: The reappropriation is subject to the14provisions in section 3035, chapter 497, Laws of 2009.15Reappropriation:16

State Building Construction Account—State. . . . . . . . $82,00017Prior Biennia (Expenditures). . . . . . . . . . . . . $5,168,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,250,00020

NEW SECTION. Sec. 3013. FOR THE DEPARTMENT OF ECOLOGY21Watershed Plan Implementation and Flow Achievement (20084029)22The reappropriation in this section is subject to the following23

conditions and limitations: The reappropriation is subject to the24provisions in section 3054, chapter 520, Laws of 2007.25Reappropriation:26

State Building Construction Account—State. . . . . . . $1,456,00027Prior Biennia (Expenditures). . . . . . . . . . . . . $12,544,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,000,00030

NEW SECTION. Sec. 3014. FOR THE DEPARTMENT OF ECOLOGY31Water Pollution Control Revolving Fund Program (30000007)32

p. 86 2EHB 1115.PL

Reappropriation:1Water Pollution Control Revolving Account—Federal2

ARRA. . . . . . . . . . . . . . . . . . . . . . . . $766,0003Water Pollution Control Revolving Account—State. . . . $3,970,0004

Subtotal Reappropriation. . . . . . . . . . . . . $4,736,0005Prior Biennia (Expenditures). . . . . . . . . . . . $173,964,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . $178,700,0008

NEW SECTION. Sec. 3015. FOR THE DEPARTMENT OF ECOLOGY9Centennial Clean Water Program (30000008)10

Reappropriation:11State Building Construction Account—State. . . . . . . $3,838,00012Prior Biennia (Expenditures). . . . . . . . . . . . . $26,162,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . $30,000,00015

NEW SECTION. Sec. 3016. FOR THE DEPARTMENT OF ECOLOGY16Watershed Plan Implementation and Flow Achievement (30000028)17

Reappropriation:18State Building Construction Account—State. . . . . . . . $715,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $5,285,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,00022

NEW SECTION. Sec. 3017. FOR THE DEPARTMENT OF ECOLOGY23Kittitas Groundwater Study (30000029)24The reappropriation in this section is subject to the following25

conditions and limitations: The reappropriation is subject to the26provisions in section 3001, chapter 36, Laws of 2010 1st sp. sess.27Reappropriation:28

State and Local Improvements Revolving Account (Water29Supply Facilities)—State. . . . . . . . . . . . . . . $76,00030

Prior Biennia (Expenditures). . . . . . . . . . . . . . $624,00031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $700,00033

p. 87 2EHB 1115.PL

NEW SECTION. Sec. 3018. FOR THE DEPARTMENT OF ECOLOGY1Remedial Action Grant Program (30000039)2The reappropriations in this section are subject to the following3

conditions and limitations: The reappropriations are subject to the4provisions of section 3006, chapter 36, Laws of 2010 1st sp. sess.5Reappropriation:6

State Building Construction Account—State. . . . . . . $1,327,0007Local Toxics Control Account—State. . . . . . . . . . $9,165,0008

Subtotal Reappropriation. . . . . . . . . . . . . $10,492,0009Prior Biennia (Expenditures). . . . . . . . . . . . . $65,419,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $75,911,00012

NEW SECTION. Sec. 3019. FOR THE DEPARTMENT OF ECOLOGY13Water Pollution Control Revolving Fund Program (30000142)14

Reappropriation:15Water Pollution Control Revolving Account—Federal. . . $1,792,00016Water Pollution Control Revolving Account—State. . . $21,050,00017

Subtotal Reappropriation. . . . . . . . . . . . . $22,842,00018Prior Biennia (Expenditures). . . . . . . . . . . . . $14,158,00019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $37,000,00021

NEW SECTION. Sec. 3020. FOR THE DEPARTMENT OF ECOLOGY22Clean Up Toxics Sites - Puget Sound (30000144)23The reappropriations in this section are subject to the following24

conditions and limitations: The reappropriations are subject to the25provisions of section 3021, chapter 48, Laws of 2011 1st sp. sess.26Reappropriation:27

Cleanup Settlement Account—State. . . . . . . . . . . $1,959,00028State Toxics Control Account—State. . . . . . . . . . $3,666,00029

Subtotal Reappropriation. . . . . . . . . . . . . $5,625,00030Prior Biennia (Expenditures). . . . . . . . . . . . . $35,573,00031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

TOTAL. . . . . . . . . . . . . . . . . . . . . . $41,198,00033

NEW SECTION. Sec. 3021. FOR THE DEPARTMENT OF ECOLOGY34p. 88 2EHB 1115.PL

Settlement Funding to Clean Up Toxic Sites (30000145)1Reappropriation:2

Cleanup Settlement Account—State. . . . . . . . . . . . $185,0003Prior Biennia (Expenditures). . . . . . . . . . . . . $8,315,0004Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,500,0006

NEW SECTION. Sec. 3022. FOR THE DEPARTMENT OF ECOLOGY7Centennial Clean Water Program (30000208)8The reappropriation in this section is subject to the following9

conditions and limitations: The reappropriation is subject to the10provisions of section 3024, chapter 48, Laws of 2011 1st sp. sess.11Reappropriation:12

State Toxics Control Account—State. . . . . . . . . . $12,341,00013Prior Biennia (Expenditures). . . . . . . . . . . . . $21,759,00014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . $34,100,00016

NEW SECTION. Sec. 3023. FOR THE DEPARTMENT OF ECOLOGY17Water Pollution Control Revolving Fund Program (30000209)18

Reappropriation:19Water Pollution Control Revolving Account—Federal. . $51,095,00020Water Pollution Control Revolving Account—State. . . $85,631,00021

Subtotal Reappropriation. . . . . . . . . . . . $136,726,00022Prior Biennia (Expenditures). . . . . . . . . . . . . $55,418,00023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . $192,144,00025

NEW SECTION. Sec. 3024. FOR THE DEPARTMENT OF ECOLOGY26Watershed Plan Implementation and Flow Achievement (30000213)27The reappropriation in this section is subject to the following28

conditions and limitations: The reappropriation is subject to the29provisions of section 3030, chapter 49, Laws of 2011 1st sp. sess.30Reappropriation:31

State Building Construction Account—State. . . . . . . $2,254,00032Prior Biennia (Expenditures). . . . . . . . . . . . . $5,746,00033

p. 89 2EHB 1115.PL

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,000,0002

NEW SECTION. Sec. 3025. FOR THE DEPARTMENT OF ECOLOGY3Remedial Action Grant Program (30000216)4

Reappropriation:5Local Toxics Control Account—State. . . . . . . . . . $32,216,0006Prior Biennia (Expenditures). . . . . . . . . . . . . $31,618,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . $63,834,0009

NEW SECTION. Sec. 3026. FOR THE DEPARTMENT OF ECOLOGY10Eastern Washington Clean Sites Initiative (30000217)11

Reappropriation:12State Toxics Control Account—State. . . . . . . . . . $2,117,00013Prior Biennia (Expenditures). . . . . . . . . . . . . $3,883,00014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,00016

NEW SECTION. Sec. 3027. FOR THE DEPARTMENT OF ECOLOGY17Safe Soils Remediation Program - Central Washington (30000263)18

Reappropriation:19State Toxics Control Account—State. . . . . . . . . . . $682,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $3,029,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,711,00023

NEW SECTION. Sec. 3028. FOR THE DEPARTMENT OF ECOLOGY24Clean Up Toxics Sites - Puget Sound (30000265)25

Reappropriation:26State Toxics Control Account—State. . . . . . . . . . $1,896,00027Prior Biennia (Expenditures). . . . . . . . . . . . . $14,504,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,400,00030

NEW SECTION. Sec. 3029. FOR THE DEPARTMENT OF ECOLOGY31

p. 90 2EHB 1115.PL

Yakima Basin Integrated Water Management Plan Implementation1(30000278)2Reappropriation:3

State Building Construction Account—State. . . . . . . . $208,0004Prior Biennia (Expenditures). . . . . . . . . . . . . $1,792,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,0007

NEW SECTION. Sec. 3030. FOR THE DEPARTMENT OF ECOLOGY8ASARCO - Tacoma Smelter Plume and Mines (30000280)9

Reappropriation:10Cleanup Settlement Account—State. . . . . . . . . . . $6,841,00011Prior Biennia (Expenditures). . . . . . . . . . . . . $13,806,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,647,00014

NEW SECTION. Sec. 3031. FOR THE DEPARTMENT OF ECOLOGY15Padilla Bay Federal Capital Projects (30000282)16

Reappropriation:17General Fund—Federal. . . . . . . . . . . . . . . . . . $791,00018Prior Biennia (Expenditures). . . . . . . . . . . . . . . $9,00019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $800,00021

NEW SECTION. Sec. 3032. FOR THE DEPARTMENT OF ECOLOGY22Coastal Wetlands Federal Funds Administration (30000283)23

Reappropriation:24General Fund—Federal. . . . . . . . . . . . . . . . . $10,695,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $12,505,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $23,200,00028

NEW SECTION. Sec. 3033. FOR THE DEPARTMENT OF ECOLOGY29Statewide Storm Water Projects (30000294)30

p. 91 2EHB 1115.PL

The reappropriation in this section is subject to the following1conditions and limitations: The reappropriation is subject to the2provisions of section 3041, chapter 4, Laws of 2011 1st sp. sess.3Reappropriation:4

Local Toxics Control Account—State. . . . . . . . . . $14,411,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $15,589,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . $30,000,0008

NEW SECTION. Sec. 3034. FOR THE DEPARTMENT OF ECOLOGY9Waste Tire Pile Cleanup and Prevention (30000322)10

Reappropriation:11Waste Tire Removal Account—State. . . . . . . . . . . . $388,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . $612,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00015

NEW SECTION. Sec. 3035. FOR THE DEPARTMENT OF ECOLOGY16Mercury Switch Removal (30000323)17

Reappropriation:18State Toxics Control Account—State. . . . . . . . . . . $365,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . $135,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00022

NEW SECTION. Sec. 3036. FOR THE DEPARTMENT OF ECOLOGY23Reducing Toxic Diesel Emissions (30000324)24

Reappropriation:25State Toxics Control Account—State. . . . . . . . . . $2,380,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $2,120,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,500,00029

NEW SECTION. Sec. 3037. FOR THE DEPARTMENT OF ECOLOGY30Reducing Toxic Wood Stove Emissions (30000325)31

Reappropriation:32

p. 92 2EHB 1115.PL

State Toxics Control Account—State. . . . . . . . . . $2,180,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $1,820,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,0004

NEW SECTION. Sec. 3038. FOR THE DEPARTMENT OF ECOLOGY5Centennial Clean Water Program (30000326)6The reappropriation in this section is subject to the following7

conditions and limitations: The reappropriation is subject to the8provisions of section 3066, chapter 19, Laws of 2013 2nd sp. sess.9Reappropriation:10

Environmental Legacy Stewardship Account—State. . . . $36,634,00011Prior Biennia (Expenditures). . . . . . . . . . . . . $13,366,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,00014

NEW SECTION. Sec. 3039. FOR THE DEPARTMENT OF ECOLOGY15Water Pollution Control Revolving Program (30000327)16The reappropriations in this section are subject to the following17

conditions and limitations: The reappropriations are subject to the18provisions of section 3067, chapter 19, Laws of 2013 2nd sp. sess.19Reappropriation:20

Water Pollution Control Revolving Account—Federal. . $50,000,00021Water Pollution Control Revolving Account—State. . . $184,110,00022

Subtotal Reappropriation. . . . . . . . . . . . $234,110,00023Prior Biennia (Expenditures). . . . . . . . . . . . . $15,890,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . $250,000,00026

NEW SECTION. Sec. 3040. FOR THE DEPARTMENT OF ECOLOGY27Coastal Wetlands Federal Funds (30000328)28

Reappropriation:29General Fund—Federal. . . . . . . . . . . . . . . . . $9,800,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,800,00033

p. 93 2EHB 1115.PL

NEW SECTION. Sec. 3041. FOR THE DEPARTMENT OF ECOLOGY1Watershed Plan Implementation and Flow Achievement (30000331)2

Reappropriation:3State Building Construction Account—State. . . . . . . $8,695,0004Prior Biennia (Expenditures). . . . . . . . . . . . . $1,305,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,0007

NEW SECTION. Sec. 3042. FOR THE DEPARTMENT OF ECOLOGY8Sunnyside Valley Irrigation District Water Conservation9

(30000332)10Reappropriation:11

State Building Construction Account—State. . . . . . . $3,048,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . . $7,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,055,00015

NEW SECTION. Sec. 3043. FOR THE DEPARTMENT OF ECOLOGY16Dungeness Water Supply and Mitigation (30000333)17The reappropriation in this section is subject to the following18

conditions and limitations: The reappropriation is subject to the19provisions in section 3082, chapter 19, Laws of 2013 2nd sp. sess.20Reappropriation:21

State Building Construction Account—State. . . . . . . $2,003,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . $47,00023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,050,00025

NEW SECTION. Sec. 3044. FOR THE DEPARTMENT OF ECOLOGY26ASARCO Cleanup (30000334)27The appropriation and reappropriations in this section are28

subject to the following conditions and limitations: Up to $400,00029of the reappropriation in this section is provided solely for the30department to contract, after a competitive bidding process, for the31clean up and remediation of the former Ruston Way tunnel.32Reappropriation:33

p. 94 2EHB 1115.PL

State Building Construction Account—State. . . . . . . . $717,0001Cleanup Settlement Account—State. . . . . . . . . . . $26,672,0002

Subtotal Reappropriation. . . . . . . . . . . . . $27,389,0003Appropriation:4

State Building Construction Account—State. . . . . . . $2,000,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $7,271,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . $36,660,0008

NEW SECTION. Sec. 3045. FOR THE DEPARTMENT OF ECOLOGY9Padilla Bay Federal Capital Projects - Programmatic (30000335)10

Reappropriation:11General Fund—Federal. . . . . . . . . . . . . . . . . . $500,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00015

NEW SECTION. Sec. 3046. FOR THE DEPARTMENT OF ECOLOGY16Clean Up Toxics Sites - Puget Sound (30000337)17

Reappropriation:18Environmental Legacy Stewardship Account—State. . . . $19,100,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $12,400,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $31,500,00022

NEW SECTION. Sec. 3047. FOR THE DEPARTMENT OF ECOLOGY23Eastern Washington Clean Sites Initiative (30000351)24

Reappropriation:25Environmental Legacy Stewardship Account—State. . . . $6,735,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $3,565,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,300,00029

NEW SECTION. Sec. 3048. FOR THE DEPARTMENT OF ECOLOGY30Columbia River Water Supply Development Program (30000372)31

Reappropriation:32Columbia River Basin Water Supply Development Account—33

p. 95 2EHB 1115.PL

State. . . . . . . . . . . . . . . . . . . . . . $16,052,0001Columbia River Basin Taxable Bond Water Supply2

Development Account—State. . . . . . . . . . . . $28,113,0003Subtotal Reappropriation. . . . . . . . . . . . . $44,165,0004

Prior Biennia (Expenditures). . . . . . . . . . . . . $30,335,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . $74,500,0007

NEW SECTION. Sec. 3049. FOR THE DEPARTMENT OF ECOLOGY8Local Toxics Grants for Cleanup and Prevention (20064008)9

Reappropriation:10State Building Construction Account—State. . . . . . . $8,296,00011Prior Biennia (Expenditures). . . . . . . . . . . . . $90,604,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $98,900,00014

NEW SECTION. Sec. 3050. FOR THE DEPARTMENT OF ECOLOGY15Yakima River Basin Water Supply (30000373)16

Reappropriation:17State Building Construction Account—State. . . . . . $12,162,00018Prior Biennia (Expenditures). . . . . . . . . . . . . $19,938,00019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,100,00021

NEW SECTION. Sec. 3051. FOR THE DEPARTMENT OF ECOLOGY22Remedial Action Grants (30000374)23

Reappropriation:24Local Toxics Control Account—State. . . . . . . . . . $45,779,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $16,758,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $62,537,00028

NEW SECTION. Sec. 3052. FOR THE DEPARTMENT OF ECOLOGY29Water Irrigation Efficiencies Program (30000389)30The reappropriation in this section is subject to the following31

conditions and limitations: The reappropriation is subject to the32provisions of section 3080, chapter 19, Laws of 2013 2nd sp. sess.33

p. 96 2EHB 1115.PL

Reappropriation:1State Building Construction Account—State. . . . . . . $3,804,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . $196,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,0005

NEW SECTION. Sec. 3053. FOR THE DEPARTMENT OF ECOLOGY6Coordinated Prevention Grants (CPG) (30000426)7

Appropriation:8State Building Construction Account—State. . . . . . $15,000,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . $120,000,00011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $135,000,00012

NEW SECTION. Sec. 3054. FOR THE DEPARTMENT OF ECOLOGY13Centennial Clean Water Program (30000427)14The appropriations in this section are subject to the following15

conditions and limitations:16(1) For projects involving repair, replacement, or improvement of17

a wastewater treatment plant or other public works facility for which18an investment grade efficiency audit is obtainable, the department of19ecology must require as a contract condition that the project sponsor20undertake an investment grade efficiency audit. The project sponsor21may finance the costs of the audit as part of its centennial clean22water program grant.23

(2) The agency must encourage local government use of federally24funded water pollution control infrastructure programs operated by25the United States department of agriculture - rural development.26Appropriation:27

State Building Construction Account—State. . . . . . $10,000,00028Local Toxics Control Account—State. . . . . . . . . . $10,000,00029

Subtotal Appropriation. . . . . . . . . . . . . . $20,000,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . $160,000,00032

TOTAL. . . . . . . . . . . . . . . . . . . . . . $180,000,00033

NEW SECTION. Sec. 3055. FOR THE DEPARTMENT OF ECOLOGY34p. 97 2EHB 1115.PL

Reducing Toxic Diesel Emissions (30000428)1Appropriation:2

State Toxics Control Account—State. . . . . . . . . . $1,000,0003Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04Future Biennia (Projected Costs). . . . . . . . . . . $8,000,0005

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,000,0006

NEW SECTION. Sec. 3056. FOR THE DEPARTMENT OF ECOLOGY7Reducing Toxic Woodstove Emissions (30000429)8

Appropriation:9State Toxics Control Account—State. . . . . . . . . . $2,000,00010Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011Future Biennia (Projected Costs). . . . . . . . . . . $8,000,00012

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00013

NEW SECTION. Sec. 3057. FOR THE DEPARTMENT OF ECOLOGY14Waste Tire Pile Cleanup and Prevention (30000431)15

Appropriation:16Waste Tire Removal Account—State. . . . . . . . . . . $1,000,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . $4,000,00019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00020

NEW SECTION. Sec. 3058. FOR THE DEPARTMENT OF ECOLOGY21Eastern Washington Clean Sites Initiative (30000432)22

Appropriation:23State Toxics Control Account—State. . . . . . . . . . $11,000,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . . $13,772,00026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,772,00027

NEW SECTION. Sec. 3059. FOR THE DEPARTMENT OF ECOLOGY28Remedial Action Grants (30000458)29

Appropriation:30Local Toxics Control Account—State. . . . . . . . . . $65,050,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032

p. 98 2EHB 1115.PL

Future Biennia (Projected Costs). . . . . . . . . . $300,000,0001TOTAL. . . . . . . . . . . . . . . . . . . . . . $365,050,0002

NEW SECTION. Sec. 3060. FOR THE DEPARTMENT OF ECOLOGY3Leaking Tank Model Remedies (30000490)4

Appropriation:5State Toxics Control Account—State. . . . . . . . . . $2,000,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . $8,000,0008

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,0009

NEW SECTION. Sec. 3061. FOR THE DEPARTMENT OF ECOLOGY10Water Pollution Control Revolving Program (30000534)11The appropriations in this section are subject to the following12

conditions and limitations:13(1) $12,000,000 of the water pollution control revolving account—14

state is provided solely as state match for federal clean water15funds.16

(2) For projects involving repair, replacement, or improvement of17a wastewater treatment plant or other public works facility for which18an investment grade efficiency audit is obtainable, the department of19ecology must require as a contract condition that the project sponsor20undertake an investment grade efficiency audit. The project sponsor21may finance the costs of the audit as part of its water pollution22control program loan.23

(3) The agency must encourage local government use of federally24funded water pollution control infrastructure programs operated by25the United States department of agriculture - rural development.26Appropriation:27

Water Pollution Control Revolving Account—Federal. . $50,000,00028Water Pollution Control Revolving Account—State. . . $153,000,00029

Subtotal Appropriation. . . . . . . . . . . . . $203,000,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . $800,000,00032

TOTAL. . . . . . . . . . . . . . . . . . . . . $1,003,000,00033

NEW SECTION. Sec. 3062. FOR THE DEPARTMENT OF ECOLOGY34Storm Water Financial Assistance Program (30000535)35

p. 99 2EHB 1115.PL

The appropriations in this section are subject to the following1conditions and limitations:2

(1) The appropriations are provided solely for the storm water3financial assistance program.4

(2) $981,000 of the appropriation is provided solely for the5Washington State University LID frontage - water quality project.6Appropriation:7

Local Toxics Control Account—State. . . . . . . . . . $33,000,0008State Building Construction Account—State. . . . . . $20,000,0009

Subtotal Appropriation. . . . . . . . . . . . . . $53,000,00010Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011Future Biennia (Projected Costs). . . . . . . . . . $280,000,00012

TOTAL. . . . . . . . . . . . . . . . . . . . . . $333,000,00013

NEW SECTION. Sec. 3063. FOR THE DEPARTMENT OF ECOLOGY14Coastal Wetlands Federal Funds (30000536)15

Appropriation:16General Fund—Federal. . . . . . . . . . . . . . . . . $10,000,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . $40,000,00019

TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,00020

NEW SECTION. Sec. 3064. FOR THE DEPARTMENT OF ECOLOGY21Floodplains by Design (30000537)22

Appropriation:23State Building Construction Account—State. . . . . . $35,560,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . . $92,000,00026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $127,560,00027

NEW SECTION. Sec. 3065. FOR THE DEPARTMENT OF ECOLOGY28ASARCO Cleanup (30000538)29

Appropriation:30Cleanup Settlement Account—State. . . . . . . . . . . $12,146,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032Future Biennia (Projected Costs). . . . . . . . . . . $67,900,00033

p. 100 2EHB 1115.PL

TOTAL. . . . . . . . . . . . . . . . . . . . . . $80,046,0001

NEW SECTION. Sec. 3066. FOR THE DEPARTMENT OF ECOLOGY2Cleanup Toxics Sites – Puget Sound (30000542)3

Appropriation:4State Toxics Control Account—State. . . . . . . . . . $22,550,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . $72,763,0007

TOTAL. . . . . . . . . . . . . . . . . . . . . . $95,313,0008

NEW SECTION. Sec. 3067. FOR THE DEPARTMENT OF ECOLOGY9Water Irrigation Efficiencies Program (30000587)10The appropriation in this section is subject to the following11

conditions and limitations:12(1) The appropriation is provided solely for technical assistance13

and grants to conservation districts for the purpose of implementing14water conservation measures and irrigation efficiencies. The15department of ecology and the state conservation commission shall16give preference in order of priority to projects located in the 1617fish critical basins, other water short basins, and basins with18significant water resource and instream flow problems. Projects that19are not within basins as described in this subsection are also20eligible to receive funding.21

(2) Conservation districts statewide are eligible for grants22listed in subsection (1) of this section. A conservation district23receiving funds shall manage each grant to ensure that a portion of24the water saved by the water conservation measure or irrigation25efficiency will be placed as a purchase or a lease in the trust water26rights program to enhance instream flows. The proportion of saved27water placed in the trust water rights program must be equal to the28percentage of the public investment in the conservation measure or29irrigation efficiency. The percentage of the public investment may30not exceed eighty-five percent of the total cost of the conservation31measure or irrigation efficiency.32

(3) Up to $300,000 of the appropriation in this section may be33allocated for the purchase and installation of flow meters that are34implemented in cooperation with the Washington State Department of35Fish and Wildlife fish screening program authorized under RCW3677.57.070.37

p. 101 2EHB 1115.PL

Appropriation:1State Building Construction Account—State. . . . . . . $4,000,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . $16,000,0004

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,000,0005

NEW SECTION. Sec. 3068. FOR THE DEPARTMENT OF ECOLOGY6Columbia River Water Supply Development Program (30000588)7The appropriations in this section are subject to the following8

conditions and limitations:9(1) $2,000,000 of the Columbia River basin water supply10

development account—state is provided solely for the Sullivan Lake11water supply project to replace funds that were diverted to fund12repairs to the Moses Lake irrigation and reclamation district dam.13

(2) The balance of the appropriations are provided solely for:14Coordinated water conservation plan projects; Walla Walla integrated15planning; Icicle Creek integrated planning; new water supply16projects; the Methow Valley irrigation district instream flow17improvement project; the port of Walla Walla water leasing project;18the 2016 water supply and demand forecast; Columbia River off-channel19storage feasibility project development; the HHH Switzler storage20project environmental impact statement; water acquisitions; the21Stemilt WRIA 40A storage study; office of Columbia River staffing22costs; department of fish and wildlife support; a water service23contract with the United States bureau of reclamation to provide24water from Lake Roosevelt to end users; and other projects under the25Columbia River water supply development program.26

(3) In any future requests for project funding under the Columbia27River water supply development program, the department must prepare28and submit with the budget request an analysis that estimates the29total costs of developing and delivering water through the project.30For each project, the department must:31

(a) Identify the project beneficiaries;32(b) Estimate the project timeline, from feasibility through water33

development and delivery;34(c) Delineate the total estimated public and private costs and35

fund sources for developing the water; and36(d) Delineate the total estimated public and private costs and37

fund sources for delivering the water.38p. 102 2EHB 1115.PL

(4) The department must prepare and submit the same analysis as1required in subsection (3) of this section for existing water2development projects, including those in the feasibility phase.3Appropriation:4

Columbia River Basin Water Supply Revenue Recovery5Account—State. . . . . . . . . . . . . . . . . . . $2,200,0006

Columbia River Basin Water Supply Development Account—7State. . . . . . . . . . . . . . . . . . . . . . $16,800,0008Subtotal Appropriation. . . . . . . . . . . . . . $19,000,0009

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . $19,761,00011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $38,761,00012

NEW SECTION. Sec. 3069. FOR THE DEPARTMENT OF ECOLOGY13Sunnyside Valley Irrigation District Water Conservation14

(30000589)15Appropriation:16

State Building Construction Account—State. . . . . . . $3,055,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . $15,600,00019

TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,655,00020

NEW SECTION. Sec. 3070. FOR THE DEPARTMENT OF ECOLOGY21Yakima River Basin Water Supply (30000590)22The appropriations in this section are subject to the following23

conditions and limitations:24(1) The appropriations in this section are provided solely for:25

Tributary/mainstem enhancement and watershed acquisitions; fish26passage projects at the Cle Elum, Keechelus, Kachess, and Tieton27reservoirs; the Keechelus to Kachess pipeline; the Cle Elum pool28raise and Kachess reservoir drought relief pumping plant projects;29selected aquifer storage and recovery projects; agricultural and30municipal conservation projects; water bank and exchange programs;31and other projects under the Yakima integrated plan.32

(2)(a) The legislature finds that it is important to apportion33financial responsibility for the substantial capital projects34proposed under the Yakima River basin integrated plan consistent with35RCW 90.38.120 which directs that "at least one-half of the total36

p. 103 2EHB 1115.PL

costs to finance the implementation of the [Yakima] integrated1plan. . . be funded through federal, private, and other nonstate2sources, including a significant contribution of funding from local3project beneficiaries."4

(b) By December 15, 2015, the department must prepare and submit5a report to the legislature estimating the cost per acre of land and6the cost per acre-foot of water to finance the construction of the7Keechelus to Kachess pipeline project and the Kachess Reservoir8drought relief pumping plant project. The primary objective is to9inform the long-term financial planning of the project beneficiaries,10the proratable irrigation districts and their ratepayers, who will11bear the construction, maintenance and operation costs.12Appropriation:13

State Building Construction Account—State. . . . . . . $9,800,00014State Taxable Building Construction15

Account—State. . . . . . . . . . . . . . . . . . $20,200,00016Subtotal Appropriation. . . . . . . . . . . . . . $30,000,00017

Prior Biennia (Expenditures). . . . . . . . . . . . . $32,100,00018Future Biennia (Projected Costs). . . . . . . . . . $120,000,00019

TOTAL. . . . . . . . . . . . . . . . . . . . . . $182,100,00020

NEW SECTION. Sec. 3071. FOR THE DEPARTMENT OF ECOLOGY21Watershed Plan Implementation and Flow Achievement (30000591)22

Appropriation:23State Building Construction Account—State. . . . . . . $5,000,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00027

NEW SECTION. Sec. 3072. FOR THE DEPARTMENT OF ECOLOGY28Habitat Mitigation (91000007)29

Reappropriation:30State Building Construction Account—State. . . . . . . $3,051,00031Prior Biennia (Expenditures). . . . . . . . . . . . . $1,349,00032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,400,00034

p. 104 2EHB 1115.PL

NEW SECTION. Sec. 3073. FOR THE DEPARTMENT OF ECOLOGY1Clean Up Toxics Sites - Puget Sound (91000032)2

Reappropriation:3State Toxics Control Account—State. . . . . . . . . . $6,637,0004Prior Biennia (Expenditures). . . . . . . . . . . . . $2,633,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,270,0007

NEW SECTION. Sec. 3074. FOR THE DEPARTMENT OF ECOLOGY8FY 2012 Statewide Stormwater Grant Program (91000053)9

Reappropriation:10Local Toxics Control Account—State. . . . . . . . . . $14,789,00011Prior Biennia (Expenditures). . . . . . . . . . . . . $9,284,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,073,00014

NEW SECTION. Sec. 3075. FOR THE DEPARTMENT OF ECOLOGY15Stormwater Retrofit and LID Competitive Grants (91000054)16

Reappropriation:17Local Toxics Control Account—State. . . . . . . . . . $6,952,00018Prior Biennia (Expenditures). . . . . . . . . . . . . $7,511,00019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,463,00021

NEW SECTION. Sec. 3076. FOR THE DEPARTMENT OF ECOLOGY22Skagit Mitigation (91000181)23

Reappropriation:24State Building Construction Account—State. . . . . . . $1,423,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . $802,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,225,00028

NEW SECTION. Sec. 3077. FOR THE DEPARTMENT OF ECOLOGY29Protect Communities from Flood and Drought (92000002)30

Reappropriation:31State Building Construction Account—State. . . . . . . . $228,00032

p. 105 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . $14,747,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,975,0003

NEW SECTION. Sec. 3078. FOR THE DEPARTMENT OF ECOLOGY4Wastewater Treatment and Water Reclamation (92000041)5The reappropriation in this section is subject to the following6

conditions and limitations: The reappropriation is subject to the7provisions of section 3016, chapter 36, Laws of 2010 1st sp. sess.8Reappropriation:9

State Building Construction Account—State. . . . . . . . $151,00010Prior Biennia (Expenditures). . . . . . . . . . . . . $3,279,00011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,430,00013

NEW SECTION. Sec. 3079. FOR THE DEPARTMENT OF ECOLOGY14Flood Levee Improvements (92000057)15The reappropriations in this section are subject to the following16

conditions and limitations: The reappropriations are subject to the17provisions of section 503, chapter 1, Laws of 2012 2nd sp. sess.18Reappropriation:19

State Building Construction Account—State. . . . . . . . $301,00020Local Toxics Control Account—State. . . . . . . . . . $2,510,00021

Subtotal Reappropriation. . . . . . . . . . . . . $2,811,00022Prior Biennia (Expenditures). . . . . . . . . . . . . $5,689,00023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,500,00025

NEW SECTION. Sec. 3080. FOR THE DEPARTMENT OF ECOLOGY26Ground Water Management Yakima Basin (92000061)27

Reappropriation:28Columbia River Basin Water Supply Development Account—29

State. . . . . . . . . . . . . . . . . . . . . . . . $189,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . $261,00031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $450,00033

p. 106 2EHB 1115.PL

NEW SECTION. Sec. 3081. FOR THE DEPARTMENT OF ECOLOGY1Storm Water Improvements (92000076)2The reappropriation in this section is subject to the following3

conditions and limitations: The reappropriation is subject to the4provisions of section 3081, chapter 19, Laws of 2013 2nd sp. sess.5Reappropriation:6

Environmental Legacy Stewardship Account—State. . . . $91,456,0007Prior Biennia (Expenditures). . . . . . . . . . . . . $8,544,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . $100,000,00010

NEW SECTION. Sec. 3082. FOR THE DEPARTMENT OF ECOLOGY11Floodplain Management and Control Grants (92000078)12The reappropriation in this section is subject to the following13

conditions and limitations: The reappropriation is subject to the14provisions of section 3069, chapter 19, Laws of 2013 2nd sp. sess.15Reappropriation:16

State Building Construction Account—State. . . . . . $40,389,00017Prior Biennia (Expenditures). . . . . . . . . . . . . $9,611,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,00020

NEW SECTION. Sec. 3083. FOR THE DEPARTMENT OF ECOLOGY21Lower Yakima GWMA Program Development (92000085)22

Reappropriation:23State Building Construction Account—State. . . . . . . $1,614,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,614,00027

NEW SECTION. Sec. 3084. FOR THE DEPARTMENT OF ECOLOGY28Drought Response (92000142)29

Appropriation:30State Building Construction Account—State. . . . . . . $2,000,00031State Drought Preparedness Account—State. . . . . . . $14,000,00032

Subtotal Appropriation. . . . . . . . . . . . . . $16,000,00033

p. 107 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,000,0003

NEW SECTION. Sec. 3085. FOR THE POLLUTION LIABILITY INSURANCE4AGENCY5

Underground Storage Tank Capital Program Demonstration and Design6(30000001)7

The appropriation in this section is subject to the following8conditions and limitations:9

(1) The appropriation in this section must be used for projects10that provide a benefit to the public through removal, replacement or11upgrade of underground storage tank fuel systems, retrofit existing12systems to disperse renewable or alternative fuels, and cleanup of13contamination caused by legacy petroleum releases. All projects must14develop and acquire assets that have a useful life of at least15thirteen years. These requirements must be specified in funding16agreements issued by the agency.17

(2)(a) $1,800,000 of the appropriation is provided solely to18design a capital financial assistance program to provide underground19storage tank owners and operators with financial resources to remove,20replace or upgrade underground storage tank fuel systems, retrofit21existing systems to disperse renewable or alternative fuels, and to22clean up contamination caused by legacy petroleum releases.23

(b) The design must:24(i) Assess options for program structure and administration, and25

develop a recommended program design, financial management plan and26staffing model;27

(ii) Include data and legal analysis of statewide need,28availability of existing fund sources for grants and loans,29assessment of owner and operator willingness to participate and30potential environmental and economic impacts of the loan program.31

(iii) As part of the program design, the agency must conduct a32pilot demonstration of a capital grant program that includes three33study sites with aging tanks, demonstrated impact to either soil or34groundwater, or both, and serious financial hardship, as defined in35chapter 374-60 WAC. Each study site may not cost more than $600,000.36

p. 108 2EHB 1115.PL

(3) The agency shall conduct the study in consultation with the1office of financial management, and internal and external agency2stakeholders.3

(4) The agency must provide a final report of the program design,4as well as any associated legislative and budget recommendations, to5the governor and legislature by October 1, 2015.6

Appropriation:7Pollution Liability Insurance Program Trust8

Account—State. . . . . . . . . . . . . . . . . . . $1,800,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,800,00012

NEW SECTION. Sec. 3086. FOR THE STATE PARKS AND RECREATION13COMMISSION14

Dosewallips Wastewater Treatment System (30000523)15Reappropriation:16

State Building Construction Account—State. . . . . . . . $27,00017Prior Biennia (Expenditures). . . . . . . . . . . . . $4,505,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,532,00020

NEW SECTION. Sec. 3087. FOR THE STATE PARKS AND RECREATION21COMMISSION22

Lewis & Clark Replace Wastewater System (30000544)23Reappropriation:24

State Building Construction Account—State. . . . . . . . $947,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . $130,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,077,00028

NEW SECTION. Sec. 3088. FOR THE STATE PARKS AND RECREATION29COMMISSION30

Deception Pass - Kukutali Access and Interpretation (30000774)31Reappropriation:32

State Building Construction Account—State. . . . . . . . $161,00033

p. 109 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . . . $64,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $225,0003

NEW SECTION. Sec. 3089. FOR THE STATE PARKS AND RECREATION4COMMISSION5

Flaming Geyser State Park Infrastructure (30000810)6Reappropriation:7

State Building Construction Account—State. . . . . . . . $848,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . $477,0009Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,325,00011

NEW SECTION. Sec. 3090. FOR THE STATE PARKS AND RECREATION12COMMISSION13

Millersylvania Replace Environmental Learning Center Cabins14(30000821)15Reappropriation:16

State Building Construction Account—State. . . . . . . . $481,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . $608,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,089,00020

NEW SECTION. Sec. 3091. FOR THE STATE PARKS AND RECREATION21COMMISSION22

Minor Works - Facility and Infrastructure Preservation (30000845)23Reappropriation:24

State Building Construction Account—State. . . . . . . $1,797,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $8,203,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00028

NEW SECTION. Sec. 3092. FOR THE STATE PARKS AND RECREATION29COMMISSION30

Wallace Falls Footbridge (91000047)31Reappropriation:32

State Building Construction Account—State. . . . . . . . $150,00033p. 110 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . . $336,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $486,0003

NEW SECTION. Sec. 3093. FOR THE STATE PARKS AND RECREATION4COMMISSION5

Spencer Spit Water System Replacement (30000140)6Reappropriation:7

State Building Construction Account—State. . . . . . . . $695,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . $288,0009Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $983,00011

NEW SECTION. Sec. 3094. FOR THE STATE PARKS AND RECREATION12COMMISSION13

Fort Worden - Housing Areas Exterior Improvements (30000287)14Appropriation:15

State Building Construction Account—State. . . . . . . . $500,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . $2,858,00018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,358,00019

NEW SECTION. Sec. 3095. FOR THE STATE PARKS AND RECREATION20COMMISSION21

Mount Spokane Road Improvements, Stage 2D (30000693)22Appropriation:23

State Building Construction Account—State. . . . . . . $2,400,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,400,00027

NEW SECTION. Sec. 3096. FOR THE STATE PARKS AND RECREATION28COMMISSION29

Camano Island Day Use Access and Facility Renovation (30000782)30Reappropriation:31

State Building Construction Account—State. . . . . . . . $107,00032

p. 111 2EHB 1115.PL

Appropriation:1State Building Construction Account—State. . . . . . . $1,212,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . $194,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,513,0005

NEW SECTION. Sec. 3097. FOR THE STATE PARKS AND RECREATION6COMMISSION7

Belfair Replace Failing Electrical Supply to Main Camp Loop8(30000813)9Appropriation:10

State Building Construction Account—State. . . . . . . $1,180,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,180,00014

NEW SECTION. Sec. 3098. FOR THE STATE PARKS AND RECREATION15COMMISSION16

Fort Flagler - Replace Failing Electrical Power Historic District17(30000815)18Appropriation:19

State Building Construction Account—State. . . . . . . $1,173,00020Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,173,00023

NEW SECTION. Sec. 3099. FOR THE STATE PARKS AND RECREATION24COMMISSION25

Kopachuck Day Use Development (30000820)26Reappropriation:27

State Building Construction Account—State. . . . . . . . $10,00028Prior Biennia (Expenditures). . . . . . . . . . . . . . $309,00029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $319,00031

NEW SECTION. Sec. 3100. FOR THE STATE PARKS AND RECREATION32COMMISSION33

p. 112 2EHB 1115.PL

Flaming Geyser Day Use Renovation (30000832)1Reappropriation:2

State Building Construction Account—State. . . . . . . . $642,0003Prior Biennia (Expenditures). . . . . . . . . . . . . . $360,0004Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,002,0006

NEW SECTION. Sec. 3101. FOR THE STATE PARKS AND RECREATION7COMMISSION8

Minor Works - Health and Safety (30000839)9Appropriation:10

State Building Construction Account—State. . . . . . . $5,160,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,160,00014

NEW SECTION. Sec. 3102. FOR THE STATE PARKS AND RECREATION15COMMISSION16

Fort Worden Maintenance Shop Relocation (30000960)17Appropriation:18

State Building Construction Account—State. . . . . . . $1,600,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,600,00022

NEW SECTION. Sec. 3103. FOR THE STATE PARKS AND RECREATION23COMMISSION24

Twanoh State Park Stormwater Improvements (30000851)25Reappropriation:26

State Building Construction Account—State. . . . . . . . $160,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . $194,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $354,00030

NEW SECTION. Sec. 3104. FOR THE STATE PARKS AND RECREATION31COMMISSION32

Rocky Reach - Trail Development (30000853)33p. 113 2EHB 1115.PL

Reappropriation:1State Building Construction Account—State. . . . . . . . $535,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $3,220,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,755,0005

NEW SECTION. Sec. 3105. FOR THE STATE PARKS AND RECREATION6COMMISSION7

Lake Sammamish State Park: Sunset Beach Bathhouse Replacement8(30000653)9Reappropriation:10

State Building Construction Account—State. . . . . . . . $50,00011Prior Biennia (Expenditures). . . . . . . . . . . . . $2,439,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,489,00014

NEW SECTION. Sec. 3106. FOR THE STATE PARKS AND RECREATION15COMMISSION16

Minor Works - Revenue Generation (30000847)17Reappropriation:18

State Building Construction Account—State. . . . . . . . $25,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $2,959,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,984,00022

NEW SECTION. Sec. 3107. FOR THE STATE PARKS AND RECREATION23COMMISSION24

Fish Barrier Removal (30000854)25Reappropriation:26

State Building Construction Account—State. . . . . . . . $767,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . $281,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,048,00030

NEW SECTION. Sec. 3108. FOR THE STATE PARKS AND RECREATION31COMMISSION32

Clean Vessel Boating Pump-Out Grants (30000856)33p. 114 2EHB 1115.PL

Appropriation:1General Fund—Federal. . . . . . . . . . . . . . . . . $2,600,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $2,600,0003Future Biennia (Projected Costs). . . . . . . . . . . $10,400,0004

TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,600,0005

NEW SECTION. Sec. 3109. FOR THE STATE PARKS AND RECREATION6COMMISSION7

Local Grant Authority (30000857)8Appropriation:9

Parks Renewal and Stewardship Account—Private/Local. . $1,000,00010Prior Biennia (Expenditures). . . . . . . . . . . . . $1,200,00011Future Biennia (Projected Costs). . . . . . . . . . . $4,000,00012

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,200,00013

NEW SECTION. Sec. 3110. FOR THE STATE PARKS AND RECREATION14COMMISSION15

Federal Grant Authority (30000858)16Appropriation:17

General Fund—Federal. . . . . . . . . . . . . . . . . . $750,00018Prior Biennia (Expenditures). . . . . . . . . . . . . $1,750,00019Future Biennia (Projected Costs). . . . . . . . . . . $3,000,00020

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,500,00021

NEW SECTION. Sec. 3111. FOR THE STATE PARKS AND RECREATION22COMMISSION23

Sequim Bay Address Failing Retaining Wall (30000861)24Appropriation:25

State Building Construction Account—State. . . . . . . $1,122,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,122,00029

NEW SECTION. Sec. 3112. FOR THE STATE PARKS AND RECREATION30COMMISSION31

Mount Spokane - Nordic Area Improvements and Horse Camp32Development (30000877)33

p. 115 2EHB 1115.PL

Appropriation:1State Building Construction Account—State. . . . . . . . $182,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $182,0005

NEW SECTION. Sec. 3113. FOR THE STATE PARKS AND RECREATION6COMMISSION7

Statewide - Cabins, Yurts, and Associated Park Improvement8(30000883)9Appropriation:10

State Building Construction Account—State. . . . . . . $1,153,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,153,00014

NEW SECTION. Sec. 3114. FOR THE STATE PARKS AND RECREATION15COMMISSION16

Fish Barrier Removal (Lawsuit) (30000944)17Appropriation:18

State Building Construction Account—State. . . . . . . $2,034,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,034,00022

NEW SECTION. Sec. 3115. FOR THE STATE PARKS AND RECREATION23COMMISSION24

Statewide - Facility and Infrastructure Backlog Reduction25(30000946)26Appropriation:27

State Building Construction Account—State. . . . . . . $6,000,00028Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029Future Biennia (Projected Costs). . . . . . . . . . . $18,000,00030

TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,000,00031

NEW SECTION. Sec. 3116. FOR THE STATE PARKS AND RECREATION32COMMISSION33

p. 116 2EHB 1115.PL

Fort Flagler - WWI Historic Facilities Preservation (30000100)1Appropriation:2

State Building Construction Account—State. . . . . . . . $430,0003Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $430,0006

NEW SECTION. Sec. 3117. FOR THE STATE PARKS AND RECREATION7COMMISSION8

Riverside Fisk Property Lake Spokane (Long Lake) Initial Park9Access (30000971)10Appropriation:11

State Building Construction Account—State. . . . . . . $1,072,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,072,00015

NEW SECTION. Sec. 3118. FOR THE STATE PARKS AND RECREATION16COMMISSION17

Minor Works - Facilities and Infrastructures (30000947)18Appropriation:19

State Building Construction Account—State. . . . . . $11,117,00020Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . . $250,00022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,367,00023

NEW SECTION. Sec. 3119. FOR THE STATE PARKS AND RECREATION24COMMISSION25

Steamboat Rock - Replace Failing Sewage Lift Stations (30000948)26Appropriation:27

State Building Construction Account—State. . . . . . . $1,229,00028Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,229,00031

NEW SECTION. Sec. 3120. FOR THE STATE PARKS AND RECREATION32COMMISSION33

p. 117 2EHB 1115.PL

Mount Spokane - Maintenance Facility Relocation from Harms Way1(30000959)2Appropriation:3

State Building Construction Account—State. . . . . . . . $384,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $384,0007

NEW SECTION. Sec. 3121. FOR THE STATE PARKS AND RECREATION8COMMISSION9

Parkland Acquisition (30000976)10The appropriation in this section is subject to the following11

conditions and limitations:12(1) Except for subsection (2) of this section, the appropriation13

is provided solely to acquire land that is adjacent or within14existing state parks. For this purpose, adjacent means a parcel of15real property that shares a border with a state park. The state parks16and recreation commission may dispose of property that is surplus to17the needs of the state parks and recreation commission by June 30,182017. Disposal may include sale of the surplus property or long-term19lease of the property if such a lease is negotiated and managed by20the commercial lands portfolio management unit of the department of21natural resources. The commission and the department must agree on an22appropriate management fee for the department's land management23services.24

(2) $225,000 of the appropriation is provided solely for the25purchase of Young Island.26

(3) In order to improve noxious weed control and achieve improved27land stewardship and wild fire response, the parks and recreation28commission must transfer property ownership of segments of unused29trails, specified below, to adjacent property owners, who request30such a transfer, in exchange for those adjacent property owners31granting the parks and recreation commission a permanent easement for32any future utilities the commission desires to place on the33transferred property. No other compensation is required for the34transfers. If the trail is ever developed upon legislative approval35ownership will revert to the parks and recreation commission. The36unused trail segments are those along the trail from Whitman county37

p. 118 2EHB 1115.PL

trailhead at Williams lake road up to Martin road trail head in1Spokane county.2Appropriation:3

Parkland Acquisition Account—State. . . . . . . . . . $2,000,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05Future Biennia (Projected Costs). . . . . . . . . . . $8,000,0006

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,0007

NEW SECTION. Sec. 3122. FOR THE STATE PARKS AND RECREATION8COMMISSION9

Backlog Repairs and Enhanced Amenities (92000007)10Reappropriation:11

State Building Construction Account—State. . . . . . . . $794,00012Prior Biennia (Expenditures). . . . . . . . . . . . . $8,610,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,404,00015

NEW SECTION. Sec. 3123. FOR THE STATE PARKS AND RECREATION16COMMISSION17

Goldendale Observatory - Phase 3 Expansion (30000709)18Appropriation:19

State Building Construction Account—State. . . . . . . $2,649,00020Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . $2,650,00022

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,299,00023

NEW SECTION. Sec. 3124. FOR THE STATE PARKS AND RECREATION24COMMISSION25

Sun Lakes State Park: Dry Falls Campground Renovation (30000305)26Appropriation:27

State Building Construction Account—State. . . . . . . . $402,00028Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029Future Biennia (Projected Costs). . . . . . . . . . . $3,951,00030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,353,00031

NEW SECTION. Sec. 3125. FOR THE STATE PARKS AND RECREATION32COMMISSION33

p. 119 2EHB 1115.PL

Lake Chelan State Park Moorage Dock Pile Replacement (30000416)1Appropriation:2

State Building Construction Account—State. . . . . . . . $248,0003Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04Future Biennia (Projected Costs). . . . . . . . . . . $1,448,0005

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,696,0006

NEW SECTION. Sec. 3126. FOR THE STATE PARKS AND RECREATION7COMMISSION8

Cape Disappointment North Head Parking (30000522)9Appropriation:10

State Building Construction Account—State. . . . . . . $1,365,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . $925,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,290,00014

NEW SECTION. Sec. 3127. FOR THE STATE PARKS AND RECREATION15COMMISSION16

Steamboat Rock Build Dunes Campground (30000729)17Appropriation:18

State Building Construction Account—State. . . . . . . $3,499,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,499,00022

NEW SECTION. Sec. 3128. FOR THE STATE PARKS AND RECREATION23COMMISSION24

Dosewallips Replace Failing Electrical Supply (30000814)25Appropriation:26

State Building Construction Account—State. . . . . . . $1,040,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,040,00030

NEW SECTION. Sec. 3129. FOR THE STATE PARKS AND RECREATION31COMMISSION32

Fort Worden - Replace Failing Sewer Lines (30000860)33p. 120 2EHB 1115.PL

Appropriation:1State Building Construction Account—State. . . . . . . . $234,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . $2,406,0004

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,640,0005

NEW SECTION. Sec. 3130. FOR THE STATE PARKS AND RECREATION6COMMISSION7

Iron Horse - Tunnel 46 and 47 Repairs (30000870)8Appropriation:9

State Building Construction Account—State. . . . . . . $1,481,00010Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011Future Biennia (Projected Costs). . . . . . . . . . . $1,600,00012

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,081,00013

NEW SECTION. Sec. 3131. FOR THE STATE PARKS AND RECREATION14COMMISSION15

Lake Sammamish Dock Grant Match (30000872)16Appropriation:17

State Building Construction Account—State. . . . . . . $1,100,00018Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,100,00021

NEW SECTION. Sec. 3132. FOR THE STATE PARKS AND RECREATION22COMMISSION23

Field Spring Replace Failed Sewage System and Non-ADA Comfort24Station (30000951)25Appropriation:26

State Building Construction Account—State. . . . . . . . $101,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028Future Biennia (Projected Costs). . . . . . . . . . . . $959,00029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,060,00030

NEW SECTION. Sec. 3133. FOR THE STATE PARKS AND RECREATION31COMMISSION32

p. 121 2EHB 1115.PL

Sun Lakes - Dry Falls - Upgrade Failing Water Supply Systems1(30000962)2Appropriation:3

State Building Construction Account—State. . . . . . . . $750,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05Future Biennia (Projected Costs). . . . . . . . . . . . $881,0006

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,631,0007

NEW SECTION. Sec. 3134. FOR THE STATE PARKS AND RECREATION8COMMISSION9

Statewide - Depression Era Structures Restoration Assessment10(30000966)11Appropriation:12

State Building Construction Account—State. . . . . . . . $121,00013Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014Future Biennia (Projected Costs). . . . . . . . . . . $4,963,00015

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,084,00016

NEW SECTION. Sec. 3135. FOR THE STATE PARKS AND RECREATION17COMMISSION18

Ocean City - Replace Noncompliant Comfort Stations (30000970)19Appropriation:20

State Building Construction Account—State. . . . . . . . $152,00021Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022Future Biennia (Projected Costs). . . . . . . . . . . $1,291,00023

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,443,00024

NEW SECTION. Sec. 3136. FOR THE STATE PARKS AND RECREATION25COMMISSION26

Minor Works - Program (30000975)27Appropriation:28

State Building Construction Account—State. . . . . . . . $491,00029Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $491,00032

p. 122 2EHB 1115.PL

NEW SECTION. Sec. 3137. FOR THE STATE PARKS AND RECREATION1COMMISSION2

Dash Point - Replace Bridge (Pedestrian) (30000972)3Appropriation:4

State Building Construction Account—State. . . . . . . . $165,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . $1,443,0007

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,608,0008

NEW SECTION. Sec. 3138. FOR THE STATE PARKS AND RECREATION9COMMISSION10

Mount Spokane Guest Services (91000429)11Appropriation:12

State Building Construction Account—State. . . . . . . $1,000,00013Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00016

NEW SECTION. Sec. 3139. FOR THE RECREATION AND CONSERVATION17FUNDING BOARD18

Washington Wildlife Recreation Grants (20084011)19The reappropriations in this section are subject to the following20

conditions and limitations: The reappropriations are subject to the21provisions of section 3146, chapter 520, Laws of 2007.22Reappropriation:23

Outdoor Recreation Account—State. . . . . . . . . . . . $291,00024Habitat Conservation Account—State. . . . . . . . . . $2,523,00025

Subtotal Reappropriation. . . . . . . . . . . . . $2,814,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $95,678,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $98,492,00029

NEW SECTION. Sec. 3140. FOR THE RECREATION AND CONSERVATION30FUNDING BOARD31

Salmon Recovery Funding Board Programs (20084851)32Reappropriation:33

State Building Construction Account—State. . . . . . . . $639,00034p. 123 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . $59,361,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . $60,000,0003

NEW SECTION. Sec. 3141. FOR THE RECREATION AND CONSERVATION4FUNDING BOARD5

Washington Wildlife Recreation Grants (30000002)6Reappropriation:7

Farmlands Preservation Account—State. . . . . . . . . . $257,0008Outdoor Recreation Account—State. . . . . . . . . . . . $307,0009Riparian Protection Account—State. . . . . . . . . . . . $911,00010Habitat Conservation Account—State. . . . . . . . . . $3,672,00011

Subtotal Reappropriation. . . . . . . . . . . . . $5,147,00012Prior Biennia (Expenditures). . . . . . . . . . . . . $64,298,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . $69,445,00015

NEW SECTION. Sec. 3142. FOR THE RECREATION AND CONSERVATION16FUNDING BOARD17

Puget Sound Acquisition and Restoration (30000080)18Reappropriation:19

State Building Construction Account—State. . . . . . . . $366,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $32,634,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $33,000,00023

NEW SECTION. Sec. 3143. FOR THE RECREATION AND CONSERVATION24FUNDING BOARD25

Boating Facilities Program (30000138)26Reappropriation:27

Recreation Resources Account—State. . . . . . . . . . $1,589,00028Prior Biennia (Expenditures). . . . . . . . . . . . . $6,411,00029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,000,00031

NEW SECTION. Sec. 3144. FOR THE RECREATION AND CONSERVATION32FUNDING BOARD33

p. 124 2EHB 1115.PL

Washington Wildlife Recreation Grants (30000139)1The reappropriations in this section are subject to the following2

conditions and limitations: The reappropriations are provided solely3for the list of projects in LEAP capital document No. 2011-3A,4developed May 24, 2011.5Reappropriation:6

Farmlands Preservation Account—State. . . . . . . . . . $195,0007Outdoor Recreation Account—State. . . . . . . . . . . $3,694,0008Habitat Conservation Account—State. . . . . . . . . . $3,985,0009

Subtotal Reappropriation. . . . . . . . . . . . . $7,874,00010Prior Biennia (Expenditures). . . . . . . . . . . . . $34,126,00011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . $42,000,00013

NEW SECTION. Sec. 3145. FOR THE RECREATION AND CONSERVATION14FUNDING BOARD15

Salmon Recovery Funding Board Programs (30000140)16Reappropriation:17

State Building Construction Account—State. . . . . . . $3,497,00018General Fund—Federal. . . . . . . . . . . . . . . . . $23,169,00019

Subtotal Reappropriation. . . . . . . . . . . . . $26,666,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $43,396,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $70,062,00023

NEW SECTION. Sec. 3146. FOR THE RECREATION AND CONSERVATION24FUNDING BOARD25

Land and Water Conservation Fund (30000142)26Reappropriation:27

General Fund—Federal. . . . . . . . . . . . . . . . . $1,313,00028Prior Biennia (Expenditures). . . . . . . . . . . . . $2,687,00029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,00031

NEW SECTION. Sec. 3147. FOR THE RECREATION AND CONSERVATION32FUNDING BOARD33

Aquatic Lands Enhancement Account (30000143)34

p. 125 2EHB 1115.PL

The reappropriation in this section is subject to the following1conditions and limitations: The reappropriation is provided solely2for the list of projects in LEAP capital document No. 2011-3B,3revised April 10, 2013.4Reappropriation:5

Aquatic Lands Enhancement Account—State. . . . . . . . . $845,0006Prior Biennia (Expenditures). . . . . . . . . . . . . $5,616,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,461,0009

NEW SECTION. Sec. 3148. FOR THE RECREATION AND CONSERVATION10FUNDING BOARD11

Recreational Trails Program (30000146)12Reappropriation:13

General Fund—Federal. . . . . . . . . . . . . . . . . $1,328,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $3,672,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00017

NEW SECTION. Sec. 3149. FOR THE RECREATION AND CONSERVATION18FUNDING BOARD19

Puget Sound Restoration (30000147)20The reappropriation in this section is subject to the following21

conditions and limitations: The reappropriation may not be expended22on the acquisition of lands by state agencies.23Reappropriation:24

State Building Construction Account—State. . . . . . . $2,975,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $12,025,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,000,00028

NEW SECTION. Sec. 3150. FOR THE RECREATION AND CONSERVATION29FUNDING BOARD30

Puget Sound Estuary and Salmon Restoration Program (30000148)31

p. 126 2EHB 1115.PL

The reappropriation in this section is subject to the following1conditions and limitations: The reappropriation may not be expended2on the acquisition of lands by state agencies.3Reappropriation:4

State Building Construction Account—State. . . . . . . . $560,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $4,440,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0008

NEW SECTION. Sec. 3151. FOR THE RECREATION AND CONSERVATION9FUNDING BOARD10

Washington Wildlife Recreation Grants (30000205)11The reappropriations in this section are subject to the following12

conditions and limitations: The reappropriations are subject to the13provisions of section 3161, chapter 19, Laws of 2013 2nd sp. sess.14Reappropriation:15

Farmlands Preservation Account—State. . . . . . . . . $3,218,00016Riparian Protection Account—State. . . . . . . . . . . $4,973,00017Habitat Conservation Account—State. . . . . . . . . . $14,918,00018Outdoor Recreation Account—State. . . . . . . . . . . $14,918,00019

Subtotal Reappropriation. . . . . . . . . . . . . $38,027,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $26,973,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $65,000,00023

NEW SECTION. Sec. 3152. FOR THE RECREATION AND CONSERVATION24FUNDING BOARD25

Salmon Recovery Funding Board Programs (30000206)26The reappropriations in this section are subject to the following27

conditions and limitations: The reappropriations are subject to the28provisions of section 3162, chapter 19, Laws of 2013 2nd sp. sess.29Reappropriation:30

State Building Construction Account—State. . . . . . . $7,886,00031General Fund—Federal. . . . . . . . . . . . . . . . . $37,278,00032

Subtotal Reappropriation. . . . . . . . . . . . . $45,164,00033Prior Biennia (Expenditures). . . . . . . . . . . . . $29,836,00034

p. 127 2EHB 1115.PL

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . $75,000,0002

NEW SECTION. Sec. 3153. FOR THE RECREATION AND CONSERVATION3FUNDING BOARD4

Boating Facilities Program (30000207)5Reappropriation:6

Recreation Resources Account—State. . . . . . . . . . $3,309,0007Prior Biennia (Expenditures). . . . . . . . . . . . . $3,054,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,363,00010

NEW SECTION. Sec. 3154. FOR THE RECREATION AND CONSERVATION11FUNDING BOARD12

Nonhighway Off-Road Vehicle Activities (30000208)13Reappropriation:14

NOVA Program Account—State. . . . . . . . . . . . . . $5,100,00015Prior Biennia (Expenditures). . . . . . . . . . . . . $3,400,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,500,00018

NEW SECTION. Sec. 3155. FOR THE RECREATION AND CONSERVATION19FUNDING BOARD20

Aquatic Lands Enhancement Account (30000210)21The reappropriation in this section is subject to the following22

conditions and limitations: The reappropriation in this section is23provided solely for the list of projects in LEAP capital document No.242013-2B, developed April 10, 2013.25Reappropriation:26

Aquatic Lands Enhancement Account—State. . . . . . . . $3,900,00027Prior Biennia (Expenditures). . . . . . . . . . . . . $2,100,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,00030

NEW SECTION. Sec. 3156. FOR THE RECREATION AND CONSERVATION31FUNDING BOARD32

Puget Sound Acquisition and Restoration (30000211)33

p. 128 2EHB 1115.PL

Reappropriation:1State Building Construction Account—State. . . . . . $44,058,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $25,942,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . $70,000,0005

NEW SECTION. Sec. 3157. FOR THE RECREATION AND CONSERVATION6FUNDING BOARD7

Puget Sound Estuary and Salmon Restoration Program (30000212)8Reappropriation:9

State Building Construction Account—State. . . . . . . $5,500,00010Prior Biennia (Expenditures). . . . . . . . . . . . . $4,500,00011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00013

NEW SECTION. Sec. 3158. FOR THE RECREATION AND CONSERVATION14FUNDING BOARD15

Firearms and Archery Range Recreation (30000213)16The reappropriation in this section is subject to the following17

conditions and limitations: The reappropriation is subject to the18provisions of section 3168, chapter 19, Laws of 2013 2nd sp. sess.19Reappropriation:20

Firearms Range Account—State. . . . . . . . . . . . . . $315,00021Prior Biennia (Expenditures). . . . . . . . . . . . . . $485,00022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $800,00024

NEW SECTION. Sec. 3159. FOR THE RECREATION AND CONSERVATION25FUNDING BOARD26

Recreational Trails Program (30000214)27Reappropriation:28

General Fund—Federal. . . . . . . . . . . . . . . . . $1,500,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $3,500,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00032

p. 129 2EHB 1115.PL

NEW SECTION. Sec. 3160. FOR THE RECREATION AND CONSERVATION1FUNDING BOARD2

Boating Infrastructure Grants (30000215)3Reappropriation:4

General Fund—Federal. . . . . . . . . . . . . . . . . . $880,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $1,320,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,200,0008

NEW SECTION. Sec. 3161. FOR THE RECREATION AND CONSERVATION9FUNDING BOARD10

Land and Water Conservation (30000216)11Reappropriation:12

General Fund—Federal. . . . . . . . . . . . . . . . . $3,400,00013Prior Biennia (Expenditures). . . . . . . . . . . . . . $600,00014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,00016

NEW SECTION. Sec. 3162. FOR THE RECREATION AND CONSERVATION17FUNDING BOARD18

Family Forest Fish Passage Program (30000218)19Reappropriation:20

State Building Construction Account—State. . . . . . . . $990,00021Prior Biennia (Expenditures). . . . . . . . . . . . . $1,010,00022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00024

NEW SECTION. Sec. 3163. FOR THE RECREATION AND CONSERVATION25FUNDING BOARD26

Washington Wildlife Recreation Grants (30000220)27The appropriations in this section are subject to the following28

conditions and limitations:29(1) The appropriations in this section are provided solely for30

the list of projects in LEAP capital document No. 2015-1, developed31June 30, 2015.32

(2)(a) $60,000 of the appropriation is provided solely for the33Washington state recreation and conservation office to convene and34

p. 130 2EHB 1115.PL

facilitate a stakeholder process to review and make recommendations1for statutory revisions to the Washington wildlife and recreation2program. The review must be conducted with consideration of the3potential impacts to existing and future relationships with local4governments, the federal government, and Tribal Nations. The review5must include analysis of the program design, including criteria,6information and coordination required for projects to proceed through7the ranking and selection processes. Existing allocation categories8and percentages must be evaluated to determine how well the system9balances the many current statewide needs, including effectiveness in10assessing and serving the needs of smaller and traditionally11underserved populations, as well as communities with lower per-capita12income levels. The ability of the general public to access program-13funded projects must also be considered, as well as support for14projects and landscapes with multiple values. The review must include15examination of ways in which lands are acquired by state agencies16through the program, such as gifts, mitigation, acquisition through17direct negotiation with landowners, acquisition from land trusts and18other nongovernmental organizations that are intermediaries or short-19term owners for which long-term ownership and management by a public20agency was the purpose of the nongovernmental organization's21acquisition, easement acquisitions, and other pathways by which22habitat lands are either acquired or managed, or both, by the state.23Advantages and disadvantages of all approaches used by the program24must be considered, including acquisition and stewardship costs,25timing of land availability when compared to funding availability by26the state, and other conservation alternatives that could be27considered instead of state ownership, such as long-term management28by a nongovernmental organization, another public agency, or29conservation through less-than-fee approaches such as by easement or30other landowner agreements.31

(b) The recreation and conservation office may convene32stakeholders and facilitate activities as needed. The agency must33seek input and meaningfully involve a broad base of interested34stakeholders that includes Tribal governments and those with specific35subject-matter expertise relevant to the project categories of the36Washington wildlife and recreation program. They shall seek broad and37diverse legislative input and invite interested legislators to38provide information and ideas, including, at a minimum, the majority39and minority leadership of the capital committees in the senate and40

p. 131 2EHB 1115.PL

house of representatives. They shall coordinate with the appropriate1standing committees of the legislature and may consult with other2interested parties, as may be appropriate, for technical advice and3assistance.4

(c) The final report must include recommended statutory and5policy changes to the appropriate committees of the legislature on or6before December 1, 2015.7Appropriation:8

Farmlands Preservation Account—State. . . . . . . . . $4,379,0009Riparian Protection Account—State. . . . . . . . . . . $5,548,00010Habitat Conservation Account—State. . . . . . . . . . $22,699,00011Outdoor Recreation Account—State. . . . . . . . . . . $22,697,00012

Subtotal Appropriation. . . . . . . . . . . . . . $55,323,00013Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014Future Biennia (Projected Costs). . . . . . . . . . $300,000,00015

TOTAL. . . . . . . . . . . . . . . . . . . . . . $355,323,00016

NEW SECTION. Sec. 3164. FOR THE RECREATION AND CONSERVATION17FUNDING BOARD18

Salmon Recovery Funding Board Programs (30000221)19The appropriations in this section are subject to the following20

conditions and limitations: $500,000 of the state building21construction account—state is provided solely for the city of Bothell22to preserve the Wayne golf course land, situated along the Sammamish23river and Burke-Gilman trail, for fish habitat.24Appropriation:25

State Building Construction Account—State. . . . . . $16,500,00026General Fund—Federal. . . . . . . . . . . . . . . . . $50,000,00027

Subtotal Appropriation. . . . . . . . . . . . . . $66,500,00028Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029Future Biennia (Projected Costs). . . . . . . . . . $400,000,00030

TOTAL. . . . . . . . . . . . . . . . . . . . . . $466,500,00031

NEW SECTION. Sec. 3165. FOR THE RECREATION AND CONSERVATION32FUNDING BOARD33

Boating Facilities Program (30000222)34Appropriation:35

p. 132 2EHB 1115.PL

Recreation Resources Account—State. . . . . . . . . . $9,360,0001Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02Future Biennia (Projected Costs). . . . . . . . . . . $37,800,0003

TOTAL. . . . . . . . . . . . . . . . . . . . . . $47,160,0004

NEW SECTION. Sec. 3166. FOR THE RECREATION AND CONSERVATION5FUNDING BOARD6

Nonhighway Off-Road Vehicle Activities (30000223)7Appropriation:8

NOVA Program Account—State. . . . . . . . . . . . . . $8,670,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . $34,770,00011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $43,440,00012

NEW SECTION. Sec. 3167. FOR THE RECREATION AND CONSERVATION13FUNDING BOARD14

Youth Athletic Facilities (30000224)15The appropriation in this section is subject to the following16

conditions and limitations: The appropriation is provided solely for17grants for acquisition, development or renovation of youth athletic18fields. The recreation conservation office must require grant19recipients of youth recreation field grants to have a fee waiver20policy for youth athletic clubs who use the fields acquired,21developed or renovation with funds from this appropriation. The fee22waiver policy must discount or waive fees based on the youth athletic23club's rates charged and scholarships provided to low-income athletes24compared to other clubs using the fields. $7,000,000 of the25appropriation is provided for grants awarded through the recreation26conservation office's competitive grant program. $3,000,000 of the27appropriation is provided for the following projects:28Marymoor park/Lake Washington youth soccer association. . $1,000,00029Northwest soccer park turf project. . . . . . . . . . . . $2,000,00030Appropriation:31

State Building Construction Account—State. . . . . . $10,000,00032Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033Future Biennia (Projected Costs). . . . . . . . . . . $12,000,00034

TOTAL. . . . . . . . . . . . . . . . . . . . . . $22,000,00035

p. 133 2EHB 1115.PL

NEW SECTION. Sec. 3168. FOR THE RECREATION AND CONSERVATION1FUNDING BOARD2

Aquatic Lands Enhancement Account (30000225)3The appropriations in this section are subject to the following4

conditions and limitations: The appropriations in this section are5provided solely for the list of projects in LEAP capital document No.62015-2, developed June 30, 2015.7Appropriation:8

Aquatic Lands Enhancement Account—State. . . . . . . . $5,269,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . $14,400,00011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,669,00012

NEW SECTION. Sec. 3169. FOR THE RECREATION AND CONSERVATION13FUNDING BOARD14

Puget Sound Acquisition and Restoration (30000226)15The appropriation in this section is subject to the following16

conditions and limitations: $300,000 is provided solely to the17Illahee forest preserve for the purchase of the twenty-five acre18forested parcel adjacent to the southwest border of the Illahee19preserve.20Appropriation:21

State Building Construction Account—State. . . . . . $37,000,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . $160,000,00024

TOTAL. . . . . . . . . . . . . . . . . . . . . . $197,000,00025

NEW SECTION. Sec. 3170. FOR THE RECREATION AND CONSERVATION26FUNDING BOARD27

Puget Sound Estuary and Salmon Restoration Program (30000227)28Appropriation:29

State Building Construction Account—State. . . . . . . $8,000,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . . $40,000,00032

TOTAL. . . . . . . . . . . . . . . . . . . . . . $48,000,00033

p. 134 2EHB 1115.PL

NEW SECTION. Sec. 3171. FOR THE RECREATION AND CONSERVATION1FUNDING BOARD2

Firearms and Archery Range Recreation (30000228)3Appropriation:4

Firearms Range Account—State. . . . . . . . . . . . . . $580,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . $2,320,0007

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,900,0008

NEW SECTION. Sec. 3172. FOR THE RECREATION AND CONSERVATION9FUNDING BOARD10

Recreational Trails Program (30000229)11Appropriation:12

General Fund—Federal. . . . . . . . . . . . . . . . . $5,000,00013Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00015

TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00016

NEW SECTION. Sec. 3173. FOR THE RECREATION AND CONSERVATION17FUNDING BOARD18

Boating Infrastructure Grants (30000230)19Appropriation:20

General Fund—Federal. . . . . . . . . . . . . . . . . $2,200,00021Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022Future Biennia (Projected Costs). . . . . . . . . . . $8,800,00023

TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,000,00024

NEW SECTION. Sec. 3174. FOR THE RECREATION AND CONSERVATION25FUNDING BOARD26

Land and Water Conservation (30000231)27Appropriation:28

General Fund—Federal. . . . . . . . . . . . . . . . . $4,000,00029Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . $16,000,00031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,000,00032

p. 135 2EHB 1115.PL

NEW SECTION. Sec. 3175. FOR THE RECREATION AND CONSERVATION1FUNDING BOARD2

Family Forest Fish Passage Program (30000233)3Appropriation:4

State Building Construction Account—State. . . . . . . $5,000,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . $20,000,0007

TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,0008

NEW SECTION. Sec. 3176. FOR THE RECREATION AND CONSERVATION9FUNDING BOARD10

Family Forest Fish Passage Program (91000097)11Reappropriation:12

State Toxics Control Account—State. . . . . . . . . . $1,118,00013Prior Biennia (Expenditures). . . . . . . . . . . . . $8,882,00014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00016

NEW SECTION. Sec. 3177. FOR THE RECREATION AND CONSERVATION17FUNDING BOARD18

Coastal Restoration Grants (91000448)19The appropriation in this section is subject to the following20

conditions and limitations: The appropriation is provided solely for21the following list of projects:22 23 Project Authorized Amount

24 Black river watershed conservation and restoration $650,000

25 Cathlamet selective fisheries $300,000

26 Coal creek culvert to bridge $162,000

27 Darlin creek conservation and restoration $1,300,000

28 Ellsworth creek watershed restoration $950,000

29 Greenhead slough barrier removal $75,000

30 Improved gears for the lower Columbia fishery $200,000

31 Lower Forks creek restoration $2,150,000

32 Makah tribe salmon restoration $174,000

33 Middle fork Hoquiam culvert correction $76,000

p. 136 2EHB 1115.PL

1 Middle fork Satsop culvert correction $97,000

2 Moses Prairie Restoration $64,000

3 Pulling together: Jobs in restoration $550,000

4 Quinault nearshore habitat restoration $343,000

5 Restoration of Elochoman and Grays river basins $535,000

6 Restoration of prairies and wetlands $200,000

7 Rue Creek salmon restoration $982,000

8 Satsop river watershed restoration $150,000

9 Scammon creek barrier removal $188,000

10 Sullivan ponds restoration $43,000

11 Upper Quinault river restoration $1,900,000

12 West fork Satsop culvert correction $96,000

13 Total $11,185,000

Appropriation:14State Building Construction Account—State. . . . . . $11,185,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,185,00018

NEW SECTION. Sec. 3178. FOR THE RECREATION AND CONSERVATION19FUNDING BOARD20

Youth Recreation Grants (92000055)21The reappropriation in this section is subject to the following22

conditions and limitations: The reappropriation is subject to the23provisions of section 3173, chapter 19, Laws of 2013, 2nd sp. sess.24Reappropriation:25

State Building Construction Account—State. . . . . . . $1,942,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $1,688,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,630,00029

NEW SECTION. Sec. 3179. FOR THE RECREATION AND CONSERVATION30FUNDING BOARD31

Recreation and Conservation Office Recreation Grants (92000131)32

p. 137 2EHB 1115.PL

The appropriations in this section are subject to the following1conditions and limitations: The recreation and conservation office2may retain up to four percent of these appropriations to administer3the grants.4Appropriation:5

State Building Construction Account—State. . . . . . $32,785,0006Outdoor Recreation Account—State. . . . . . . . . . . $5,611,0007

Subtotal Appropriation. . . . . . . . . . . . . . $38,396,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . $38,396,00011

NEW SECTION. Sec. 3180. FOR THE STATE CONSERVATION COMMISSION12CREP Riparian Cost Share - State Match (30000009)13

Reappropriation:14State Building Construction Account—State. . . . . . . . $800,00015

Appropriation:16State Building Construction Account—State. . . . . . . $2,600,00017Prior Biennia (Expenditures). . . . . . . . . . . . . $1,790,00018Future Biennia (Projected Costs). . . . . . . . . . . $11,400,00019

TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,590,00020

NEW SECTION. Sec. 3181. FOR THE STATE CONSERVATION COMMISSION21Natural Resources Investment for the Economy and Environment22

(30000010)23The appropriation in this section is subject to the following24

conditions and limitations: The appropriation is provided solely for25grants to complete natural resource enhancement projects necessary to26improve water quality in nonshellfish growing areas.27Reappropriation:28

General Fund—Federal. . . . . . . . . . . . . . . . . $1,000,00029State Building Construction Account—State. . . . . . . $1,250,00030

Subtotal Reappropriation. . . . . . . . . . . . . $2,250,00031Appropriation:32

State Building Construction Account—State. . . . . . . $4,000,00033Prior Biennia (Expenditures). . . . . . . . . . . . . $7,750,00034

p. 138 2EHB 1115.PL

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,000,0002

NEW SECTION. Sec. 3182. FOR THE STATE CONSERVATION COMMISSION3CREP PIP Loan Program (30000011)4

Reappropriation:5Conservation Assistance Revolving Account—State. . . . . $150,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . $30,0007Future Biennia (Projected Costs). . . . . . . . . . . . $400,0008

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $580,0009

NEW SECTION. Sec. 3183. FOR THE STATE CONSERVATION COMMISSION10CREP Riparian Contract Funding (30000012)11

Reappropriation:12State Building Construction Account—State. . . . . . . . $500,00013

Appropriation:14State Building Construction Account—State. . . . . . . $2,231,00015Prior Biennia (Expenditures). . . . . . . . . . . . . $1,731,00016Future Biennia (Projected Costs). . . . . . . . . . . $8,924,00017

TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,386,00018

NEW SECTION. Sec. 3184. FOR THE STATE CONSERVATION COMMISSION19Match for Federal RCPP Program (30000017)20The appropriations in this section are subject to the following21

conditions and limitations:22(1) The general fund—federal appropriation is provided solely for23

implementation of the five conservation projects in Washington state24approved for grant awards as part of the United States department of25agriculture regional conservation partnership program authorized26under the 2014 farm bill:27

(a) Palouse river watershed implementation partnership;28(b) Precision conservation for salmon and water quality in the29

Puget Sound;30(c) Upper Columbia irrigation enhancement project;31(d) Yakama nation on-reservation lower Yakima basin restoration32

project; and33

p. 139 2EHB 1115.PL

(e) Confederated tribes of the Colville reservation water quality1and habitat improvement project.2

(2) The state building construction account—state is provided3solely for state match to the United States department of agriculture4regional conservation partnership program.5Appropriation:6

State Building Construction Account—State. . . . . . . $5,000,0007General Fund—Federal. . . . . . . . . . . . . . . . . $23,000,0008

Subtotal Appropriation. . . . . . . . . . . . . . $28,000,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,000,00012

NEW SECTION. Sec. 3185. FOR THE STATE CONSERVATION COMMISSION13Improve Shellfish Growing Areas (30000018)14The appropriation in this section is subject to the following15

conditions and limitations: The appropriation is provided solely for16grants to complete natural resource enhancement projects necessary to17improve water quality in shellfish growing areas.18Appropriation:19

State Building Construction Account—State. . . . . . . $4,000,00020Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . $16,000,00022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,000,00023

NEW SECTION. Sec. 3186. FOR THE STATE CONSERVATION COMMISSION24R&D Grant - Deep Furrow Conservation Drill to Conserve Soil/Water25

(92000008)26The appropriation in this section is subject to the following27

conditions and limitations: The appropriation is provided solely for28a grant to support the continued development of a deep furrow29conservation drill to conserve soil and water in areas of wheat30farming susceptible to soil erosion.31Appropriation:32

State Building Construction Account—State. . . . . . . . $350,00033Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034Future Biennia (Projected Costs). . . . . . . . . . . . . . . $035

p. 140 2EHB 1115.PL

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $350,0001

NEW SECTION. Sec. 3187. FOR THE STATE CONSERVATION COMMISSION2Dairy Nutrient Demonstration Low Interest Loans (92000009)3The appropriation in this section is subject to the following4

conditions and limitations: The appropriation is provided solely for5low interest loans for two or more dairy nutrient management6demonstration projects, with at least one located west of the7cascades and one east of the cascades.8Appropriation:9

State Taxable Building Construction Account—State. . . $5,000,00010Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00013

NEW SECTION. Sec. 3188. FOR THE STATE CONSERVATION COMMISSION14Conservation Commission Ranch and Farmland Preservation Projects15

(92000004)16The appropriation in this section is subject to the following17

conditions and limitations: The appropriation is provided solely for18the following list of ranch land preservation projects:19Lust family farm and ranch preservation. . . . . . . . . . $1,619,00020Imrie ranches Rock creek agricultural easement. . . . . . $4,913,00021Kelley ranches agricultural easement. . . . . . . . . . . $2,316,00022Dungeness watershed farmland protection phase 3. . . . . . . $344,00023Appropriation:24

State Building Construction Account—State. . . . . . . $9,192,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,192,00028

NEW SECTION. Sec. 3189. FOR THE DEPARTMENT OF FISH AND WILDLIFE29Deschutes Watershed Center (20062008)30The reappropriation in this section is subject to the following31

conditions and limitations: The reappropriation is subject to the32provisions of section 3205, chapter 19, Laws of 2013 2nd sp. sess.33Reappropriation:34

p. 141 2EHB 1115.PL

State Building Construction Account—State. . . . . . . $7,004,0001Appropriation:2

State Building Construction Account—State. . . . . . . $5,000,0003Prior Biennia (Expenditures). . . . . . . . . . . . . $3,491,0004Future Biennia (Projected Costs). . . . . . . . . . . $21,454,0005

TOTAL. . . . . . . . . . . . . . . . . . . . . . $36,949,0006

NEW SECTION. Sec. 3190. FOR THE DEPARTMENT OF FISH AND WILDLIFE7Voights Creek Hatchery (20081003)8

Reappropriation:9State Building Construction Account—State. . . . . . . $3,398,00010Prior Biennia (Expenditures). . . . . . . . . . . . . $11,899,00011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,297,00013

NEW SECTION. Sec. 3191. FOR THE DEPARTMENT OF FISH AND WILDLIFE14Migratory Waterfowl Habitat (20082045)15

Appropriation:16State Wildlife Account—State. . . . . . . . . . . . . . $600,00017Prior Biennia (Expenditures). . . . . . . . . . . . . $1,080,00018Future Biennia (Projected Costs). . . . . . . . . . . $2,400,00019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,080,00020

NEW SECTION. Sec. 3192. FOR THE DEPARTMENT OF FISH AND WILDLIFE21Mitigation Projects and Dedicated Funding (20082048)22The reappropriation in this section is subject to the following23

conditions and limitations: The reappropriation is subject to the24provisions of section 3191, chapter 19, Laws of 2013 2nd sp. sess.25Reappropriation:26

State Wildlife Account—State. . . . . . . . . . . . . . $500,00027Special Wildlife Account—Private/Local. . . . . . . . $1,077,00028General Fund—Private/Local. . . . . . . . . . . . . . $1,866,00029General Fund—Federal. . . . . . . . . . . . . . . . . $27,008,00030

Subtotal Reappropriation. . . . . . . . . . . . . $30,451,00031Appropriation:32

State Wildlife Account—State. . . . . . . . . . . . . . $500,00033

p. 142 2EHB 1115.PL

General Fund—Private/Local. . . . . . . . . . . . . . $1,000,0001Special Wildlife Account—Federal. . . . . . . . . . . $1,000,0002Special Wildlife Account—Private/Local. . . . . . . . $1,000,0003General Fund—Federal. . . . . . . . . . . . . . . . . $9,000,0004

Subtotal Appropriation. . . . . . . . . . . . . . $12,500,0005Prior Biennia (Expenditures). . . . . . . . . . . . $104,524,0006Future Biennia (Projected Costs). . . . . . . . . . . $54,000,0007

TOTAL. . . . . . . . . . . . . . . . . . . . . . $201,475,0008

NEW SECTION. Sec. 3193. FOR THE DEPARTMENT OF FISH AND WILDLIFE9Lake Rufus Woods Fishing Access (91000151)10

Appropriation:11State Building Construction Account—State. . . . . . . $2,000,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00015

NEW SECTION. Sec. 3194. FOR THE DEPARTMENT OF FISH AND WILDLIFE16Minor Works Preservation (30000727)17

Appropriation:18State Building Construction Account—State. . . . . . . $9,230,00019State Wildlife Account—State. . . . . . . . . . . . . . $300,00020

Subtotal Appropriation. . . . . . . . . . . . . . $9,530,00021Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022Future Biennia (Projected Costs). . . . . . . . . . . $80,000,00023

TOTAL. . . . . . . . . . . . . . . . . . . . . . $89,530,00024

NEW SECTION. Sec. 3195. FOR THE DEPARTMENT OF FISH AND WILDLIFE25Kalama Falls Hatchery Renovate Adult Handling Facilities26

(30000480)27Appropriation:28

State Building Construction Account—State. . . . . . . $4,000,00029Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,00032

NEW SECTION. Sec. 3196. FOR THE DEPARTMENT OF FISH AND WILDLIFE33

p. 143 2EHB 1115.PL

Wooten Wildlife Area Improve Flood Plain (30000481)1The reappropriations in this section are subject to the following2

conditions and limitations: The reappropriation is subject to the3provisions of section 3207, chapter 19, Laws of 2013 2nd sp. sess.4Reappropriation:5

State Building Construction Account—State. . . . . . . . $106,0006General Fund—Federal. . . . . . . . . . . . . . . . . $1,000,0007

Subtotal Reappropriation. . . . . . . . . . . . . $1,106,0008Appropriation:9

General Fund—Federal. . . . . . . . . . . . . . . . . $2,600,00010State Building Construction Account—State. . . . . . . $2,000,00011

Subtotal Appropriation. . . . . . . . . . . . . . $4,600,00012Prior Biennia (Expenditures). . . . . . . . . . . . . $1,994,00013Future Biennia (Projected Costs). . . . . . . . . . . $12,722,00014

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,422,00015

NEW SECTION. Sec. 3197. FOR THE DEPARTMENT OF FISH AND WILDLIFE16Clarks Creek Hatchery Rebuild (92000038)17The appropriation in this section is subject to the following18

conditions and limitations: The appropriation is provided solely to19substantially rebuild the Clarks creek (Puyallup) hatchery and20fulfill Washington department of transportation mitigation21requirements as agreed to with the Puyallup Indian nation for the22widening of Interstate 5. The new hatchery must be devoted to salmon23production. The department must relocate trout production to other24hatcheries.25Appropriation:26

State Building Construction Account—State. . . . . . . $5,000,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00030

NEW SECTION. Sec. 3198. FOR THE DEPARTMENT OF FISH AND WILDLIFE31Eells Spring Hatchery Renovation (30000214)32

Appropriation:33State Building Construction Account—State. . . . . . . . $500,00034

p. 144 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01Future Biennia (Projected Costs). . . . . . . . . . . $11,722,0002

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,222,0003

NEW SECTION. Sec. 3199. FOR THE DEPARTMENT OF FISH AND WILDLIFE4Samish Hatchery Intakes (30000276)5

Appropriation:6State Building Construction Account—State. . . . . . . . $700,0007Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08Future Biennia (Projected Costs). . . . . . . . . . . $4,221,0009

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,921,00010

NEW SECTION. Sec. 3200. FOR THE DEPARTMENT OF FISH AND WILDLIFE11Minter Hatchery Intakes (30000277)12

Appropriation:13State Building Construction Account—State. . . . . . . . $250,00014Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $015Future Biennia (Projected Costs). . . . . . . . . . . $7,948,00016

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,198,00017

NEW SECTION. Sec. 3201. FOR THE DEPARTMENT OF FISH AND WILDLIFE18Hoodsport Hatchery Adult Pond Renovation (30000686)19

Appropriation:20State Building Construction Account—State. . . . . . . . $700,00021Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022Future Biennia (Projected Costs). . . . . . . . . . . $3,346,00023

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,046,00024

NEW SECTION. Sec. 3202. FOR THE DEPARTMENT OF FISH AND WILDLIFE25Nasselle Hatchery Renovation (30000671)26

Appropriation:27State Building Construction Account—State. . . . . . . . $275,00028Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029Future Biennia (Projected Costs). . . . . . . . . . . $13,556,00030

TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,831,00031

p. 145 2EHB 1115.PL

NEW SECTION. Sec. 3203. FOR THE DEPARTMENT OF FISH AND WILDLIFE1Replace Fire Damaged Fencing (30000655)2

Reappropriation:3State Building Construction Account—State. . . . . . . $1,225,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . $387,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,612,0007

NEW SECTION. Sec. 3204. FOR THE DEPARTMENT OF FISH AND WILDLIFE8Soos Creek Hatchery Renovation (30000661)9

Appropriation:10State Building Construction Account—State. . . . . . $15,000,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . $9,103,00013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,103,00014

NEW SECTION. Sec. 3205. FOR THE DEPARTMENT OF FISH AND WILDLIFE15Edmonds Pier Renovation (30000664)16

Appropriation:17State Building Construction Account—State. . . . . . . . $800,00018Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $800,00021

NEW SECTION. Sec. 3206. FOR THE DEPARTMENT OF FISH AND WILDLIFE22Marblemount Hatchery - Renovating Jordan Creek Intake (30000666)23

Appropriation:24State Building Construction Account—State. . . . . . . $2,293,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,293,00028

NEW SECTION. Sec. 3207. FOR THE DEPARTMENT OF FISH AND WILDLIFE29Lake Whatcom Hatchery - Replace Intake and Pipeline (30000667)30

Appropriation:31State Building Construction Account—State. . . . . . . $1,354,00032

p. 146 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,354,0003

NEW SECTION. Sec. 3208. FOR THE DEPARTMENT OF FISH AND WILDLIFE4Fir Island Farm Estuary Restoration Project (30000673)5

Appropriation:6State Building Construction Account—State. . . . . . . . $500,0007General Fund—Federal. . . . . . . . . . . . . . . . . $15,500,0008

Subtotal Appropriation. . . . . . . . . . . . . . $16,000,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,000,00012

NEW SECTION. Sec. 3209. FOR THE DEPARTMENT OF FISH AND WILDLIFE13Minor Works - Programmatic (30000682)14The appropriations in this section are subject to the following15

conditions and limitations: $2,200,000 of the appropriations in this16section are provided solely for the department to conduct research17and study methods for the department to coordinate with private18landowners in order to support the continued varied use of public19land. Research may be contracted out and must aim to learn about20successful methods being used in Washington and in other states to21support the multiple uses of public land. The research must be done22in consultation with landowners and other stakeholders.23Appropriation:24

State Building Construction Account—State. . . . . . . $2,500,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,500,00028

NEW SECTION. Sec. 3210. FOR THE DEPARTMENT OF FISH AND WILDLIFE29Eells Springs Production Shift (30000723)30

Appropriation:31State Building Construction Account—State. . . . . . . $4,620,00032Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034

p. 147 2EHB 1115.PL

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,620,0001

NEW SECTION. Sec. 3211. FOR THE DEPARTMENT OF FISH AND WILDLIFE2Mitchell Act Federal Grant (91000021)3

Reappropriation:4General Fund—Federal. . . . . . . . . . . . . . . . . $1,014,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $1,986,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,0008

NEW SECTION. Sec. 3212. FOR THE DEPARTMENT OF FISH AND WILDLIFE9Fishway Improvements/Diversions (91000033)10

Reappropriation:11State Building Construction Account—State. . . . . . . $7,003,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . $997,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,000,00015

NEW SECTION. Sec. 3213. FOR THE DEPARTMENT OF FISH AND WILDLIFE16Hatchery Improvements (91000036)17

Reappropriation:18State Building Construction Account—State. . . . . . $16,109,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $18,666,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $34,775,00022

NEW SECTION. Sec. 3214. FOR THE DEPARTMENT OF FISH AND WILDLIFE23Minor Works - Access Sites (91000044)24

Reappropriation:25State Building Construction Account—State. . . . . . . $2,518,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $4,888,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,406,00029

NEW SECTION. Sec. 3215. FOR THE DEPARTMENT OF FISH AND WILDLIFE30Minor Works - Fish Passage Barriers (Culverts) (91000045)31

p. 148 2EHB 1115.PL

Reappropriation:1State Building Construction Account—State. . . . . . . . $515,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . $980,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,495,0005

NEW SECTION. Sec. 3216. FOR THE DEPARTMENT OF FISH AND WILDLIFE6Leque Island Highway 532 Road Protection (92000019)7

Reappropriation:8State Building Construction Account—State. . . . . . . . $390,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . $290,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $680,00012

NEW SECTION. Sec. 3217. FOR THE DEPARTMENT OF FISH AND WILDLIFE13Beebe Springs Development (92000026)14

Reappropriation:15State Building Construction Account—State. . . . . . . . $640,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $1,251,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,891,00019

NEW SECTION. Sec. 3218. FOR THE DEPARTMENT OF FISH AND WILDLIFE20Beebe Springs (92000034)21

Reappropriation:22State Building Construction Account—State. . . . . . . . $497,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . . $3,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00026

NEW SECTION. Sec. 3219. FOR THE DEPARTMENT OF FISH AND WILDLIFE27Minor Works Preservation (30000479)28

Reappropriation:29State Building Construction Account—State. . . . . . . $2,500,00030Prior Biennia (Expenditures). . . . . . . . . . . . . $7,475,00031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

p. 149 2EHB 1115.PL

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,975,0001

NEW SECTION. Sec. 3220. FOR THE PUGET SOUND PARTNERSHIP2Community Partnership Restoration Grants (30000007)3

Reappropriation:4General Fund—Federal. . . . . . . . . . . . . . . . . $1,575,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . $50,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,625,0008

NEW SECTION. Sec. 3221. FOR THE DEPARTMENT OF NATURAL RESOURCES9Land Acquisition Grants (20052021)10

Reappropriation:11General Fund—Federal. . . . . . . . . . . . . . . . . $2,360,00012

Appropriation:13General Fund—Federal. . . . . . . . . . . . . . . . . $5,000,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $82,158,00015Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00016

TOTAL. . . . . . . . . . . . . . . . . . . . . . $109,518,00017

NEW SECTION. Sec. 3222. FOR THE DEPARTMENT OF NATURAL RESOURCES18Forest Legacy (30000060)19

Reappropriation:20General Fund—Federal. . . . . . . . . . . . . . . . . $4,020,00021

Appropriation:22General Fund—Federal. . . . . . . . . . . . . . . . . $14,000,00023Prior Biennia (Expenditures). . . . . . . . . . . . . $16,980,00024Future Biennia (Projected Costs). . . . . . . . . . . $56,000,00025

TOTAL. . . . . . . . . . . . . . . . . . . . . . $91,000,00026

NEW SECTION. Sec. 3223. FOR THE DEPARTMENT OF NATURAL RESOURCES27Forest Riparian Easement Program (30000198)28

Appropriation:29State Building Construction Account—State. . . . . . . $3,500,00030Prior Biennia (Expenditures). . . . . . . . . . . . . $2,999,00031Future Biennia (Projected Costs). . . . . . . . . . . $14,000,00032

p. 150 2EHB 1115.PL

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,499,0001

NEW SECTION. Sec. 3224. FOR THE DEPARTMENT OF NATURAL RESOURCES2Trust Land Transfer (30000200)3The appropriation in this section is subject to the following4

conditions and limitations:5(1) The appropriation is provided solely to the department to6

transfer from trust status, or enter into fifty year leases for,7certain trust lands of statewide significance deemed appropriate for8state park, fish and wildlife habitat, natural area preserve, natural9resources conservation area, department of natural resources10community forest open space, or recreation purposes. The approved11list of properties for lease or transfer is identified in the LEAP12capital document No. 2015-3, developed June 30, 2015.13

(2) Property transferred under this section must be appraised and14transferred at fair market value. By September 30, 2015, the15department must deposit in the common school construction account the16portion of the appropriation in this section that represents the17estimated value of the timber on the transferred properties. This18transfer must be made in the same manner as timber revenues from19other common school trust lands. No deduction may be made for the20resource management cost account under RCW 79.64.040. The portion of21the appropriation in this section that represents the value of the22land transferred must be deposited in the natural resources real23property replacement account.24

(3) Property subject to lease agreements under this section must25be appraised at fair market value. Lease terms must be fifty years26with options to renew for an additional fifty years. Lease payments27must be lump sum payments for the entire term of the lease at the28beginning of the lease. The department shall calculate such lump sum29payments using professional appraisal standards. These lease payments30may not exceed the fee simple purchase price based on current fair31market value and must be deposited by the department to the common32school construction account in the same manner as lease revenues from33other common school trust lands. No deduction may be made for the34resource management cost account under RCW 79.64.040.35

(4) All reasonable costs incurred by the department to implement36this section are authorized to be paid out of the appropriations.37Authorized costs include the actual cost of appraisals, staff time,38

p. 151 2EHB 1115.PL

environmental reviews, surveys, and other similar costs and may not1exceed one and nine-tenths percent of the appropriation.2

(5) Intergrant exchanges between common school and other trust3lands of equal value may occur if the exchange is in the interest of4each trust, as determined by the board of natural resources.5

(6) Prior to or concurrent with conveyance of these properties,6the department, with full cooperation of the receiving agencies,7shall execute and record a real property instrument that dedicates8the transferred properties to the purposes identified in subsection9(1) of this section. Fee transfer agreements for properties10identified in subsection (1) of this section must include terms that11perpetually restrict the use of the property to the intended purpose.12Lease agreements for properties identified in subsection (1) of this13section must include terms that restrict use of the property to the14intended purpose for the term of the lease. Transfer and lease15agreements may include provisions for receiving agencies to request16alternative uses of the property, provided the alternative uses are17compatible with the originally intended public purpose and the18department and legislature approves such uses.19

(7) The department and receiving agencies shall work in good20faith to carry out the intent of this section. However, the21department or receiving agencies may remove a property from the22transfer list based on new, substantive information, if it is23determined that transfer of the property is not in the statewide24interest of either the common school trust or the receiving agency.25

(8) By June 30, 2017, the state treasurer shall transfer to the26common school construction account any unexpended balance of the27appropriation in this section.28Appropriation:29

State Building Construction Account—State. . . . . . . $9,784,00030Prior Biennia (Expenditures). . . . . . . . . . . . $115,735,00031Future Biennia (Projected Costs). . . . . . . . . . $240,000,00032

TOTAL. . . . . . . . . . . . . . . . . . . . . . $365,519,00033

NEW SECTION. Sec. 3225. FOR THE DEPARTMENT OF NATURAL RESOURCES34Sustainable Recreation (30000207)35

Appropriation:36State Building Construction Account—State. . . . . . . $4,600,00037

p. 152 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . $2,500,0001Future Biennia (Projected Costs). . . . . . . . . . . $18,400,0002

TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,500,0003

NEW SECTION. Sec. 3226. FOR THE DEPARTMENT OF NATURAL RESOURCES4Road Maintenance and Abandonment Plans (RMAP) (30000211)5

Reappropriation:6State Building Construction Account—State. . . . . . . . $138,0007Prior Biennia (Expenditures). . . . . . . . . . . . . $1,862,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00010

NEW SECTION. Sec. 3227. FOR THE DEPARTMENT OF NATURAL RESOURCES11Rivers and Habitat Open Space Program (30000221)12

Appropriation:13State Building Construction Account—State. . . . . . . $1,000,00014Prior Biennia (Expenditures). . . . . . . . . . . . . . $500,00015Future Biennia (Projected Costs). . . . . . . . . . . $8,000,00016

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,500,00017

NEW SECTION. Sec. 3228. FOR THE DEPARTMENT OF NATURAL RESOURCES18Trust Land Replacement (30000222)19

Appropriation:20Comm/Tech College Forest Reserve Account—State. . . . . $500,00021Nat Res Real Property Replacement—State. . . . . . . $30,000,00022Resources Management Cost Account—State. . . . . . . $30,000,00023

Subtotal Appropriation. . . . . . . . . . . . . . $60,500,00024Prior Biennia (Expenditures). . . . . . . . . . . . . $50,500,00025Future Biennia (Projected Costs). . . . . . . . . . $242,000,00026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $353,000,00027

NEW SECTION. Sec. 3229. FOR THE DEPARTMENT OF NATURAL RESOURCES28State Forest Land Replacement (30000223)29The appropriation in this section is subject to the following30

conditions and limitations:31(1) The appropriation in this section is provided solely to the32

department to transfer from state forest land status to natural33p. 153 2EHB 1115.PL

resources conservation area status certain state forest lands in1Skamania county.2

(2) Property transferred under this section must be appraised and3transferred at fair market value, without consideration of management4or regulatory encumbrances associated with wildlife species listed5under the federal endangered species act. The value of the timber and6other valuable materials transferred must be distributed as provided7in RCW 79.64.110. The value of the land transferred must be deposited8in the park land trust revolving account and be used solely to buy9replacement state forest land, consistent with RCW 79.22.060.10

(3) Prior to or concurrent with conveyance of these properties,11the department shall execute and record a real property instrument12that dedicates the transferred properties to the purposes identified13in subsection (1) of this section. Transfer agreements for properties14identified in subsection (1) of this section must include terms that15restrict the use of the property to the intended purpose.16

(4) The department and Skamania county shall work in good faith17to carry out the intent of this section. The department shall18identify eligible properties for transfer, consistent with subsection19(1) of this section, in consultation with Skamania county, and may20not execute any property transfers that are not in the statewide21interest of either the state forest trust or the natural resources22conservation area program.23Appropriation:24

State Building Construction Account—State. . . . . . . $3,000,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $1,500,00026Future Biennia (Projected Costs). . . . . . . . . . . $6,000,00027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,500,00028

NEW SECTION. Sec. 3230. FOR THE DEPARTMENT OF NATURAL RESOURCES29Forest Hazard Reduction (30000224)30The appropriation in this section is subject to the following31

conditions and limitations:32(1)(a) $9,000,000 is provided solely for forest health hazard33

reduction treatments primarily on state lands, and within certain34circumstances, on small nonindustrial private timber lands. The35appropriation may be used for mechanical treatments, project36planning, site preparation, permitting, or prescribed burning. Forest37treatments to reduce insect, disease, and wildfire hazards on private38

p. 154 2EHB 1115.PL

lands, that protect state trust lands and mitigate the risk of large-1scale damage, shall require a contract with the department of natural2resources to provide at least a one-to-one nonstate or in-kind fund3match, and to provide a fifteen-year landowner maintenance agreement.4Satisfaction of the maintenance requirement at fifteen years is5defined, at minimum, as returning the property's forest conditions to6the original contract specifications for tree spacing and fuel7loading. A landowner failing to meet the maintenance requirement is8responsible for recompensing the full amount of state funding9received.10

(b) A minimum of $800,000 of this appropriation must be spent on11restoration activities on department of fish and wildlife managed12lands. The department of natural resources must work with the13department of fish and wildlife to prioritize and conduct these14forest hazard reduction treatments.15

(2) $1,000,000 is provided solely for grants to local16communities, counties, fire districts, and conservation districts to17establish new firewise communities and complete near-term actions to18increase public safety. The department must implement policies and19procedures to follow by local communities, counties, fire districts,20and conservation districts that seek to enroll in the firewise21program.22Appropriation:23

State Building Construction Account—State. . . . . . $10,000,00024Prior Biennia (Expenditures). . . . . . . . . . . . . $4,000,00025Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $34,000,00027

NEW SECTION. Sec. 3231. FOR THE DEPARTMENT OF NATURAL RESOURCES28Department of Natural Resources Olympic Region Shop Fire Recovery29

(30000225)30Appropriation:31

State Building Construction Account—State. . . . . . . $1,053,00032Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,053,00035

NEW SECTION. Sec. 3232. FOR THE DEPARTMENT OF NATURAL RESOURCES36

p. 155 2EHB 1115.PL

Blanchard Working Forest (30000231)1Appropriation:2

State Building Construction Account—State. . . . . . . $2,000,0003Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04Future Biennia (Projected Costs). . . . . . . . . . . $5,500,0005

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,500,0006

NEW SECTION. Sec. 3233. FOR THE DEPARTMENT OF NATURAL RESOURCES72015-2017 Minor Works Programmatic (30000237)8

Appropriation:9State Building Construction Account—State. . . . . . . . $250,00010Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $250,00013

NEW SECTION. Sec. 3234. FOR THE DEPARTMENT OF NATURAL RESOURCES142015-2017 Minor Works Preservation (30000238)15

Appropriation:16State Building Construction Account—State. . . . . . . $3,836,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,836,00020

NEW SECTION. Sec. 3235. FOR THE DEPARTMENT OF NATURAL RESOURCES21Contaminated Sites Cleanup and Settlement (30000240)22The appropriation in this section is subject to the following23

conditions and limitations:24(1) $261,000 is provided solely for the state's share of25

liability under the model toxics control act for the cleanup of lead26contamination at a rock pit now owned by plum creek timber company.27

(2) $95,000 is provided solely for the contaminated soils cleanup28at the Cedar creek correction center.29

(3) $125,000 is provided solely for the webster nursery30pesticides and groundwater cleanup.31

(4) $375,000 is provided solely for the underground storage tank32cleanup of contaminated soils of an old fueling station at the33department of natural resources, SE region headquarters' parking lot34

p. 156 2EHB 1115.PL

that is within the city of Ellensburg new drinking water supply1wellhead protection area.2Appropriation:3

Environmental Legacy Stewardship Account—State. . . . . $856,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $856,0007

NEW SECTION. Sec. 3236. FOR THE DEPARTMENT OF NATURAL RESOURCES8Natural Areas Facilities Preservation and Access (30000241)9

Appropriation:10State Building Construction Account—State. . . . . . . $3,100,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . $8,000,00013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,100,00014

NEW SECTION. Sec. 3237. FOR THE DEPARTMENT OF NATURAL RESOURCES15Road Maintenance and Abandonment Plan (RMAP) (91000040)16

Appropriation:17State Building Construction Account—State. . . . . . . $5,000,00018Prior Biennia (Expenditures). . . . . . . . . . . . . $6,594,00019Future Biennia (Projected Costs). . . . . . . . . . . $5,424,00020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,018,00021

NEW SECTION. Sec. 3238. FOR THE DEPARTMENT OF NATURAL RESOURCES22Puget Sound Corps (91000046)23The appropriation in this section is subject to the following24

conditions and limitations:25(1) $1,200,000 of the state building construction account—state26

is provided solely for implementation of chapter 191, Laws of 201527(concerning the management of forage fish resources).28

(2) The remainder of the appropriation is provided solely for the29Puget Sound corps projects. Portions of the appropriation may be used30by the Puget Sound corps to install fishing line collection and31recycling devices, provided that the department of fish and wildlife32designs and supplies the devices, and specifies where they should be33installed.34

p. 157 2EHB 1115.PL

Reappropriation:1Aquatic Lands Enhancement Account—State. . . . . . . . . $200,0002

Appropriation:3State Building Construction Account—State. . . . . . . $8,000,0004Prior Biennia (Expenditures). . . . . . . . . . . . . $12,800,0005Future Biennia (Projected Costs). . . . . . . . . . . $24,000,0006

TOTAL. . . . . . . . . . . . . . . . . . . . . . $45,000,0007

NEW SECTION. Sec. 3239. FOR THE DEPARTMENT OF NATURAL RESOURCES8Barbeque Flats Road Access (91000081)9

Reappropriation:10State Building Construction Account—State. . . . . . . . $480,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . $20,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00014

NEW SECTION. Sec. 3240. FOR THE DEPARTMENT OF NATURAL RESOURCES15Quinault Coastal Forest and Watershed Restoration Grant16

(92000019)17Reappropriation:18

State Building Construction Account—State. . . . . . . . $500,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $1,300,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,800,00022

NEW SECTION. Sec. 3241. FOR THE DEPARTMENT OF NATURAL RESOURCES23Research on Transfer of Federal Lands to Washington State24

(91000085)25The appropriation in this section is subject to the following26

conditions and limitations:27(1) The legislature intends to study the feasibility of acquiring28

certain federal lands for possible inclusion in the various trust29lands managed by the department of natural resources. The30appropriation is provided solely for the department to contract with31the Washington state institute for public policy.32

(2) The Washington state institute for public policy shall33research the potential costs, revenues, and policy impacts of34

p. 158 2EHB 1115.PL

transferring certain federal lands to state ownership. The Washington1state institute for public policy may contract with higher education2institutions or private consultants as necessary, may consult as3needed with legislative staff, and must work with the Washington4economic and revenue forecast council for modeling consistency.5

(3) The research shall focus primarily on federal forest and6range lands. Federal lands to be excluded are: National parks;7national historic areas or sites; national recreational areas;8national volcanic areas; designated national wilderness preservation9system lands; United States military or department of energy lands;10and Indian tribal lands.11

(4) By December 1, 2016, the Washington state institute for12public policy must submit a report to appropriate legislative13committees that presents its findings including:14

(a) Potential costs to the state of: (i) Land management related15to wildfires, forest health, invasive species management, and public16access; (ii) addressing deferred forest health issues and ongoing17maintenance; (iii) payments in lieu of taxes; (iv) state program18development; and (v) other potential costs.19

(b) Potential revenues to the state from: (i) Current and20increased timber cut-rates; (ii) mineral lease revenues; (iii)21recreation fees; (iv) grazing fees; (v) permanent common school22account investment income; and (vi) other potential revenues.23

(c) Policy research related to the endangered species act, the24mining law of 1872, and other relevant federal-state impacts; and25

(d) Estimated fiscal impacts, including impacts on trust revenues26over a one hundred-year period, if the state were to sell all newly27acquired federal lands and all existing state-owned public lands.28

(5) By December 1, 2015, the Washington state institute for29public policy must submit a preliminary report to appropriate30legislative committees that (a) summarizes any initial findings; and31(b) subject to legislative approval, outlines the remaining scope of32work, timelines and approach.33Appropriation:34

Resources Management Cost Account—State. . . . . . . . . $500,00035Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $036Future Biennia (Projected Costs). . . . . . . . . . . . . . . $037

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00038

p. 159 2EHB 1115.PL

NEW SECTION. Sec. 3242. FOR THE DEPARTMENT OF AGRICULTURE1Animal Disease Traceability (91000004)2The reappropriation in this section is subject to the following3

conditions and limitations: The reappropriation in this section is4provided solely for the department to work with industry partners to5continue and to enhance development of the in-state animal disease6traceability system. The reappropriation shall be used to develop or7enhance electronic cattle transaction reporting, electronic8certificate of veterinary inspection, and, as resources permit,9electronic livestock inspection systems.10Reappropriation:11

Public Facility Construction Loan Revolving12Account—State. . . . . . . . . . . . . . . . . . . . $249,00013

Prior Biennia (Expenditures). . . . . . . . . . . . . . $632,00014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $881,00016

NEW SECTION. Sec. 3243. FOR THE DEPARTMENT OF AGRICULTURE17Grants to Improve Safety and Access at Fairs (91000005)18

Appropriation:19State Building Construction Account—State. . . . . . . $2,000,00020Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00023

(End of part)

p. 160 2EHB 1115.PL

PART 41TRANSPORTATION2

NEW SECTION. Sec. 4001. FOR THE WASHINGTON STATE PATROL3FTA Access Road Reconstruction (30000059)4

Appropriation:5Fire Service Training Account—State. . . . . . . . . . . $900,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . . $950,0008

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,850,0009

NEW SECTION. Sec. 4002. FOR THE WASHINGTON STATE PATROL10Fire Training Academy Burn Building Replacement (30000071)11

Reappropriation:12Fire Service Training Account—State. . . . . . . . . . . $200,00013Prior Biennia (Expenditures). . . . . . . . . . . . . $1,300,00014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,00016

NEW SECTION. Sec. 4003. FOR THE WASHINGTON STATE PATROL17FTA Campus Communication Infrastructure Improvement (30000101)18

Appropriation:19Fire Service Training Account—State. . . . . . . . . . . $400,00020Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $400,00023

(End of part)

p. 161 2EHB 1115.PL

PART 51EDUCATION2

NEW SECTION. Sec. 5001. FOR THE SUPERINTENDENT OF PUBLIC3INSTRUCTION4

Pierce County Skills Center (20084856)5Reappropriation:6

State Building Construction Account—State. . . . . . . $5,432,0007School Construction and Skills Center Building8

Account—State. . . . . . . . . . . . . . . . . . . . $30,0009Subtotal Reappropriation. . . . . . . . . . . . . $5,462,00010

Prior Biennia (Expenditures). . . . . . . . . . . . . $30,083,00011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . $35,545,00013

NEW SECTION. Sec. 5002. FOR THE SUPERINTENDENT OF PUBLIC14INSTRUCTION15

2007-09 School Construction Assistance Grant Program (20084200)16Reappropriation:17

Common School Construction Account—State. . . . . . . . $283,00018Prior Biennia (Expenditures). . . . . . . . . . . . $791,476,00019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $791,759,00021

NEW SECTION. Sec. 5003. FOR THE SUPERINTENDENT OF PUBLIC22INSTRUCTION23

Northeast King County Skills Center (20084855)24Reappropriation:25

School Construction and Skill Centers Building Account26(Bonds)—State. . . . . . . . . . . . . . . . . . . . $41,00027

Prior Biennia (Expenditures). . . . . . . . . . . . . $8,561,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,602,00030

NEW SECTION. Sec. 5004. FOR THE SUPERINTENDENT OF PUBLIC31INSTRUCTION32

2009-11 School Construction Asst. Grant Program (30000031)33

p. 162 2EHB 1115.PL

The reappropriation in this section is subject to the following1conditions and limitations: The reappropriation is subject to the2provisions of section 5004, chapter 19, Laws of 2013 2nd sp. sess.3Reappropriation:4

Common School Construction Account—State. . . . . . . $7,968,0005Prior Biennia (Expenditures). . . . . . . . . . . . $389,161,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . $397,129,0008

NEW SECTION. Sec. 5005. FOR THE SUPERINTENDENT OF PUBLIC9INSTRUCTION10

2011-13 School Construction Assistance Program (30000071)11Reappropriation:12

Common School Construction Account—State. . . . . . . $60,935,00013Prior Biennia (Expenditures). . . . . . . . . . . . $497,839,00014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . $558,774,00016

NEW SECTION. Sec. 5006. FOR THE SUPERINTENDENT OF PUBLIC17INSTRUCTION18

Yakima Valley Technical Skills Center (30000076)19Reappropriation:20

State Building Construction Account—State. . . . . . . $2,060,00021Prior Biennia (Expenditures). . . . . . . . . . . . . $21,503,00022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . $23,563,00024

NEW SECTION. Sec. 5007. FOR THE SUPERINTENDENT OF PUBLIC25INSTRUCTION26

SEA-Tech Branch Campus of Tri-Tech Skills Center (30000078)27Reappropriation:28

State Building Construction Account—State. . . . . . . . $338,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $11,181,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,519,00032

p. 163 2EHB 1115.PL

NEW SECTION. Sec. 5008. FOR THE SUPERINTENDENT OF PUBLIC1INSTRUCTION2

Grant County Branch Campus of Wenatchee Valley Skills Center3(30000091)4Reappropriation:5

State Building Construction Account—State. . . . . . . $1,183,0006Prior Biennia (Expenditures). . . . . . . . . . . . . $18,225,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,408,0009

NEW SECTION. Sec. 5009. FOR THE SUPERINTENDENT OF PUBLIC10INSTRUCTION11

Clark County Skills Center (30000093)12Reappropriation:13

State Building Construction Account—State. . . . . . . $1,100,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $6,801,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,901,00017

NEW SECTION. Sec. 5010. FOR THE SUPERINTENDENT OF PUBLIC18INSTRUCTION19

2013-15 School Construction Assistance Program - Maintenance20(30000145)21

The reappropriation in this section is subject to the following22conditions and limitations: The reappropriation is subject to the23provisions of section 5020, chapter 19, Laws of 2013 2nd sp. sess.24and section 6022 of this act.25Reappropriation:26

State Building Construction Account—State. . . . . . $255,339,00027Prior Biennia (Expenditures). . . . . . . . . . . . $132,250,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . $387,589,00030

NEW SECTION. Sec. 5011. FOR THE SUPERINTENDENT OF PUBLIC31INSTRUCTION32

Tri-Tech Skills Center East Growth (30000159)33

p. 164 2EHB 1115.PL

The appropriation in this section is subject to the following1conditions and limitations:2

(1) Funding is provided solely as a grant to constitute local3funding available to the Tri-tech skills center in order to be4eligible for state funding assistance through the school construction5assistance program pursuant to RCW 28A.525.166.6

(2) Funds provided in this section may not be used for any7project with total project costs per square foot that exceed the8construction cost allocation for calculating state funding assistance9in subsection (1) by more than thirty-five percent.10Appropriation:11

State Building Construction Account—State. . . . . . . $1,702,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,702,00015

NEW SECTION. Sec. 5012. FOR THE SUPERINTENDENT OF PUBLIC16INSTRUCTION17

Capital Program Administration (30000165)18The appropriation in this section is subject to the following19

conditions and limitations:20(1) The superintendent of public instruction shall publish to its21

web site and report to the office of financial management, the22appropriate committees of the legislature, and the legislative23evaluation and accountability program a list of local school district24projects submitted for school construction assistance within seven25business days of the grant program deadline. The report must be26updated within seven days following the superintendent of public27instruction's final grant award decisions. Prior versions of the28report must be maintained on the web site in order to monitor changes29in estimates as the grant process progresses. The report must30include, but not be limited to:31

(a) School district;32(b) Project name;33(c) Estimated square footage by proposed project type;34(d) Estimated total of all project costs and estimated total35

construction contract cost;36(e) Funding sources and election dates, if applicable; and37

p. 165 2EHB 1115.PL

(f) Intent to front-fund the project.1(2) The superintendent of public instruction shall provide to the2

office of financial management and the legislative evaluation and3accountability program committee in electronic database form the4following:5

(a) Study and survey information beginning with grants awarded6July 1, 2015, or later; and7

(b) All available inventory and condition of schools data.8(3) The office of the superintendent of public instruction shall9

contract with educational service district 112 construction services10group to perform an analysis of school construction costs. The11analysis must include a significant sample of new and modernization12school construction projects completed over the past ten years, with13costs adjusted for construction inflation. The analysis must14determine the major sources of variation in total school construction15costs among different kinds of projects, districts, and regions. The16analysis must estimate the cost difference due to variations in:17

(a) The size of the project including the size per expected18enrollment;19

(b) Whether it is a new school or modernization project;20(c) Whether it is an elementary school, middle school, high21

school, or skills center;22(d) The extent of specialized higher cost facilities such as23

laboratories, shops, performing arts and indoor athletic facilities;24(e) Delivering specialized programs at skill centers including25

but not limited to: Dental and medical assisting, mechanical and26engineering programs, first responder training, culinary programs,27cyber security, and others;28

(f) Site requirements;29(g) Durability of construction materials, finishes, building30

system components, and general life expectancy of the building; and31(h) Other design and construction feature that may contribute to32

cost variations.33(4) The office of the superintendent of public instruction must34

prepare a report on the findings from subsection (3) of this section35and submit the report to the appropriate committees of the36legislature and the office of financial management by September 1,372016.38Appropriation:39

p. 166 2EHB 1115.PL

Common School Construction Account—State. . . . . . . $2,924,0001Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02Future Biennia (Projected Costs). . . . . . . . . . . $12,244,0003

TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,168,0004

NEW SECTION. Sec. 5013. FOR THE SUPERINTENDENT OF PUBLIC5INSTRUCTION6

2015-17 School Construction Assistance Program (30000169)7The appropriations in this section are subject to the following8

conditions and limitations:9(1) $990,000 of the common school construction account—state is10

provided solely for the Spokane Valley technical skills center to11construct five science classrooms.12

(2) $675,000 of the common school construction account—state is13provided solely for study and survey grants. In calculating study and14survey grants, for the 2015-2017 fiscal biennium, the office of the15superintendent of public instruction shall award no more than fifty16percent of the dollar amount for the minimum grants and square17footage allocations. School districts receiving these grants in the182015-2017 fiscal biennium must use data collected or validated by the19Washington State University extension energy office for the inventory20and condition of existing school facilities.21

(3) School districts receiving funding through the 2015-17 school22construction assistance program must map the design of new facilities23and remap the design of facilities to be remodeled.24

(4) The office of the superintendent of public instruction must25weight and prioritize grant requests on the following criteria and in26the following order: (a) Will provide facility capacity needs to27reduce kindergarten through third grade class sizes at high poverty28schools; (b) will provide facility capacity needs to reduce29kindergarten through third grade class sizes in remaining schools.30

(5) The office of the superintendent of public instruction must31expedite allocation and distribution of any eligible funds under the32school construction assistance grant program for the appropriations33provided to the superintendent of public instruction in this act for34distressed schools, STEM pilot projects, or skill centers. For35purposes of determining state funding assistance, eligible area must36be calculated as follows: (a) Eligible area for STEM pilot projects37is 1,440 square feet per science lab or classroom combination, or38

p. 167 2EHB 1115.PL

both; and 1,040 square feet per science classroom. Total eligible1area per STEM pilot project must not exceed 15,840 square feet; (b)2eligible area for skill centers is gross square feet of the proposed3project as submitted to the office of financial management as4requested by the superintendent for consideration in the 2015-20175capital budget. Eligible area for the Spokane Valley technical skills6center must not exceed 5,400 square feet, and; (c) eligible area for7replacement of the cafeteria at Marysville-Pilchuck high school is813,500 square feet.9Appropriation:10

State Building Construction Account—State. . . . . . $302,121,00011Common School Construction Account—State. . . . . . $305,978,00012Common School Construction Account—Federal. . . . . . $3,000,00013

Subtotal Appropriation. . . . . . . . . . . . . $611,099,00014Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $015Future Biennia (Projected Costs). . . . . . . . . $3,638,150,00016

TOTAL. . . . . . . . . . . . . . . . . . . . . $4,249,249,00017

NEW SECTION. Sec. 5014. FOR THE SUPERINTENDENT OF PUBLIC18INSTRUCTION19

Healthy Kids - Healthy Schools Grants (91000406)20The appropriation in this section is subject to the following21

conditions and limitations:22(1) The office of the superintendent of public instruction, after23

consulting with maintenance and operations administrators of school24districts and the department of health, shall develop criteria for25providing funding and outcomes for specific projects to stay within26the appropriation level provided in this section consistent with the27healthiest next generation priorities. The criteria must include, but28are not limited to, the following: (a) Districts or schools may apply29for grants but no single district may receive more than $200,000 of30the appropriation; (b) requiring any district receiving funding31provided in this section to demonstrate a consistent commitment to32addressing school facilities' needs; and (c) prioritizing applicants33with a high percentage of students who are eligible and enrolled in34the free and reduced-price meals program.35

(2) A maximum of $1,000,000 of the appropriation is for the36purchase and installation of water bottle filling stations.37

p. 168 2EHB 1115.PL

(3) The remainder of the appropriation may be used to purchase1equipment or make repairs and renovations related to improving2children's health and may include, but are not limited to, the3following: (a) Fitness playground equipment, covered play, physical4education equipment or related structures or renovation; (b) garden5related structures and greenhouses to provide students access to6fresh produce; and (c) kitchen equipment or upgrades.7

(4) The office of the state treasurer must manage the issuance of8bonds associated with these grants so as to incur the lowest possible9cost of funds in recognition of the short useful life of the10equipment purchased with the bond proceeds.11Appropriation:12

State Building Construction Account—State. . . . . . . $5,000,00013Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00016

NEW SECTION. Sec. 5015. FOR THE SUPERINTENDENT OF PUBLIC17INSTRUCTION18

Energy Efficiency Grants for K-12 Schools (91000017)19Reappropriation:20

State Building Construction Account—State. . . . . . . . $415,00021Prior Biennia (Expenditures). . . . . . . . . . . . . $39,585,00022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,00024

NEW SECTION. Sec. 5016. FOR THE SUPERINTENDENT OF PUBLIC25INSTRUCTION26

Distressed Schools (91000024)27The reappropriation in this section is subject to the following28

conditions and limitations: The reappropriation is subject to the29provisions of section 5021, chapter 19, Laws of 2013 2nd sp. sess.30Reappropriation:31

State Building Construction Account—State. . . . . . $10,000,00032Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00035

p. 169 2EHB 1115.PL

NEW SECTION. Sec. 5017. FOR THE SUPERINTENDENT OF PUBLIC1INSTRUCTION2

Energy Efficiency Grants for K-12 Schools (91000025)3Reappropriation:4

State Building Construction Account—State. . . . . . . $4,186,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $2,814,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,000,0008

NEW SECTION. Sec. 5018. FOR THE SUPERINTENDENT OF PUBLIC9INSTRUCTION10

San Juan Island School District STEM Vocational Bldg Renovation11(91000027)12Reappropriation:13

State Building Construction Account—State. . . . . . . . $166,00014Prior Biennia (Expenditures). . . . . . . . . . . . . . $834,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00017

NEW SECTION. Sec. 5019. FOR THE SUPERINTENDENT OF PUBLIC18INSTRUCTION19

Wenatchee Valley Skills Center (92000004)20Reappropriation:21

State Building Construction Account—State. . . . . . . $2,167,00022Prior Biennia (Expenditures). . . . . . . . . . . . . $7,333,00023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,500,00025

NEW SECTION. Sec. 5020. FOR THE SUPERINTENDENT OF PUBLIC26INSTRUCTION27

NEWTECH (Spokane Area Professional-Technical Skills Center)28(92000005)29

The appropriations in this section are subject to the following30conditions and limitations: Funding is provided solely to the NEWTECH31(Spokane area professional-technical skills center) to modernize a32science, technology, engineering, and mathematics building. The skill33center may not be eligible for additional state funding assistance34

p. 170 2EHB 1115.PL

through the school construction assistance program pursuant to RCW128A.525.166.2Reappropriation:3

State Building Construction Account—State. . . . . . . $7,786,0004Appropriation:5

State Building Construction Account—State. . . . . . . $7,493,0006School Construction and Skill Centers Building7

Account. . . . . . . . . . . . . . . . . . . . . . . $657,0008Subtotal Appropriation. . . . . . . . . . . . . . $8,150,0009

Prior Biennia (Expenditures). . . . . . . . . . . . . $5,901,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $21,837,00012

NEW SECTION. Sec. 5021. FOR THE SUPERINTENDENT OF PUBLIC13INSTRUCTION14

Puget Sound Skills Center (92000007)15The appropriations in this section are subject to the following16

conditions and limitations:17(1) Funding is provided solely to the Puget Sound skills center18

to construct a health sciences building. The skill center may not be19eligible for additional state funding assistance through the school20construction assistance program pursuant to RCW 28A.525.166.21

(2) The skill center must negotiate an agreement with the King22county public health department to provide periodic monitoring of the23dental clinic operations in the health sciences building.24Reappropriation:25

State Building Construction Account—State. . . . . . . . $59,00026Appropriation:27

State Building Construction Account—State. . . . . . $19,433,00028Prior Biennia (Expenditures). . . . . . . . . . . . . $1,441,00029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,933,00031

NEW SECTION. Sec. 5022. FOR THE SUPERINTENDENT OF PUBLIC32INSTRUCTION33

Distressed Schools (92000009)34

p. 171 2EHB 1115.PL

The reappropriation in this section is subject to the following1conditions and limitations: The reappropriation is subject to the2provisions of section 602, chapter 1, Laws of 2012 2nd sp. sess.3Reappropriation:4

State Building Construction Account—State. . . . . . . . $510,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $26,890,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . $27,400,0008

NEW SECTION. Sec. 5023. FOR THE SUPERINTENDENT OF PUBLIC9INSTRUCTION10

Yakima Valley Technical Skills Center Sunnyside Satellite11(92000013)12Reappropriation:13

State Building Construction Account—State. . . . . . . . $343,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $5,882,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,225,00017

NEW SECTION. Sec. 5024. FOR THE SUPERINTENDENT OF PUBLIC18INSTRUCTION19

School Security Improvement Grants (92000015)20The reappropriation in this section is subject to the following21

conditions and limitations: The reappropriation is subject to the22provisions of section 5025, chapter 19, Laws of 2013 2nd sp. sess.23Reappropriation:24

State Building Construction Account—State. . . . . . . $5,756,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . $900,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,656,00028

NEW SECTION. Sec. 5025. FOR THE SUPERINTENDENT OF PUBLIC29INSTRUCTION30

Delta High School (92000017)31Reappropriation:32

State Building Construction Account—State. . . . . . . $3,228,00033

p. 172 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . $2,172,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,400,0003

NEW SECTION. Sec. 5026. FOR THE SUPERINTENDENT OF PUBLIC4INSTRUCTION5

STEM Pilot Program (91000402)6The appropriation in this section is subject to the following7

conditions and limitations:8(1) The amounts in this section are provided solely for the9

superintendent of public instruction to provide STEM pilot project10grants to school districts. These grants constitute the districts'11local funding for purposes of eligibility for the school construction12assistance program under RCW 28A.525.166. Subject to the terms in13this section, school districts are eligible to receive grants if they14have a special housing burden due to lack of sufficient space for15science classrooms and labs to enable students to meet statutory16graduation requirements.17

(2) The superintendent shall award grants to eligible school18districts under the following conditions:19

(a) A district must demonstrate a lack of sufficient space of20science classrooms and labs to facilitate meeting statutory21graduation requirements;22

(b) The district has secured private donations of cash, like-23kind, or equipment in a value of no less than $100,000. Before the24superintendent may provide funding assistance through the school25construction assistance program, the district must provide26verification of the donation to the superintendent;27

(c) At least one grant award is made to school districts located28in southwest Washington;29

(d) At least one grant award is made to school districts located30in the Puget Sound region; and31

(e) At least two grant awards are made to school districts32located east of the Cascade mountains.33

(3) The STEM pilot project grants program must be administered by34the superintendent of public instruction in consultation with the35STEM education innovation alliance specified in RCW 28A.188.030 and36the statewide STEM organization specified in RCW 28A.188.050. The37superintendent of public instruction must develop grant application38

p. 173 2EHB 1115.PL

materials and criteria in consultation with the statewide STEM1organization, must review applications for accuracy and financial2reasonableness, and must administer awarded grants. With funds3specifically appropriated for this purpose, the superintendent of4public instruction must contract with the statewide STEM organization5specified in RCW 28A.188.050 to evaluate applications against the6criteria developed for the program and develop a single prioritized7list. The superintendent of public instruction must award grants8within the appropriated funding and may only depart from the9recommended prioritized list after notifying the office of financial10management and the appropriate committees of the legislature with an11explanation of the reasons for departing from the list. The criteria12must include, but are not limited to, the following:13

(a) Priority for school districts that secure private donations14of cash, like-kind, or equipment in value no less than $100,00015weighted by the ratio of school district enrollments to value of16donation;17

(b) A district's ability to raise funds through levies or bonds18in the prior ten-year period;19

(c) Priority for applicants with a high percentage of students20who are eligible and enrolled in the free and reduced-price meals21program;22

(d) The extent that existing STEM facilities are inadequate23including the lack of adequate STEM facilities to meet graduation24requirements in RCW 28A.150.220;25

(e) A demonstration that existing STEM faculty are in place and26are qualified to deliver an interactive, project-based STEM27curriculum in the proposed specialized STEM facilities, or a plan and28budget are in place to recruit or train such STEM faculty;29

(4) For purposes of grant applications made in the 2015-201730biennium, additional square footage funded through this grant program31is excluded from the school district's inventory of available32educational space for determining eligibility for state assistance33for new construction for (a) five years following acceptance of the34project by the school district board of directors, or (b) the date of35the final review of the latest study and survey of the affected36school district following acceptance of the project by the school37district board of directors; whichever date is earliest.38

(5) Each school district is limited to one grant award of no more39than $4,000,000.40

p. 174 2EHB 1115.PL

(6) The office of the superintendent of public instruction may1charge fees consistent with capital budget guidelines established by2the office of financial management for administering the grants.3

(7) The superintendent of public instruction must report to the4appropriate committees of the legislature and the office of financial5management on the timing and use of the funds by the end of each6fiscal year, until the funds are fully expended.7

(8) $200,000 of the appropriation is provided for the contract8with the statewide STEM organization specified in RCW 28A.188.050.9Appropriation:10

State Building Construction Account—State. . . . . . $12,500,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,500,00014

NEW SECTION. Sec. 5027. FOR THE SUPERINTENDENT OF PUBLIC15INSTRUCTION16

Distressed Schools (91000404)17The appropriation in this section is subject to the following18

conditions and limitations:19(1) $10,000,000 of the appropriation in this section is provided20

solely for renovations of Magnolia elementary school and E.C. Hughes21elementary school.22

(2) $5,000,000 of the appropriation is provided solely for the23replacement of the Marysville Pilchuck high school cafeteria.24Appropriation:25

State Building Construction Account—State. . . . . . $15,000,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,000,00029

NEW SECTION. Sec. 5028. FOR THE SUPERINTENDENT OF PUBLIC30INSTRUCTION31

K-3 Class-Size Reduction Grants (92000039)32The appropriation in this section is subject to the following33

conditions and limitations:34(1) $10,000,000 of this appropriation is provided solely for35

Seattle public schools to provide additional state assistance for36p. 175 2EHB 1115.PL

public school facilities necessary to support all-day kindergarten1and class size reduction in kindergarten through third grade.2

(2) The remaining appropriation is for the K-3 class size3reduction construction pilot grant program specified in section 201,4chapter . . . (Engrossed Substitute Senate Bill No. 6080), Laws of52015, 3rd sp. sess. to provide additional state assistance for public6school facilities necessary to support all-day kindergarten and class7size reduction in kindergarten through third grade.8

(3) Within the remaining appropriation, a maximum of $750,000 is9provided for the office of superintendent of public instruction to10administer the K-3 class size reduction construction grant pilot11program. The office may not use these funds for indirect costs.12

(4) Should Seattle public schools have received additional state13funds, in excess of the block grant provided in subsection (1) of14this section, through the K-3 class size reduction construction grant15pilot program, Seattle public schools may receive the amount provided16by the calculated grant in the pilot program in excess of the block17grant.18

(5) The funding provided in subsection (1) of this section may19not constitute local funding available to the Seattle public schools20in order to be eligible for state funding assistance through the21school construction assistance program pursuant to RCW 28A.525.166.22Appropriation:23

State Building Construction Account—State. . . . . . $200,000,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $200,000,00027

NEW SECTION. Sec. 5029. FOR THE STATE SCHOOL FOR THE BLIND28General Campus Preservation (30000033)29

Reappropriation:30State Building Construction Account—State. . . . . . . . $100,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . $400,00032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00034

NEW SECTION. Sec. 5030. FOR THE STATE SCHOOL FOR THE BLIND35General Campus Preservation (30000088)36

p. 176 2EHB 1115.PL

Appropriation:1State Building Construction Account—State. . . . . . . . $640,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . $1,920,0004

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,560,0005

NEW SECTION. Sec. 5031. FOR THE WASHINGTON STATE CENTER FOR6CHILDHOOD DEAFNESS AND HEARING LOSS7

Minor Works - Preservation (30000025)8Appropriation:9

State Building Construction Account—State. . . . . . . . $500,00010Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011Future Biennia (Projected Costs). . . . . . . . . . . $2,000,00012

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,500,00013

NEW SECTION. Sec. 5032. FOR THE UNIVERSITY OF WASHINGTON14Denny Hall Renovation (20081002)15

Reappropriation:16State Building Construction Account—State. . . . . . $27,300,00017Prior Biennia (Expenditures). . . . . . . . . . . . . $5,590,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,890,00020

NEW SECTION. Sec. 5033. FOR THE UNIVERSITY OF WASHINGTON21Lewis Hall Renovation (20081003)22

Reappropriation:23State Building Construction Account—State. . . . . . . . $150,00024Prior Biennia (Expenditures). . . . . . . . . . . . . $3,915,00025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,065,00027

NEW SECTION. Sec. 5034. FOR THE UNIVERSITY OF WASHINGTON28Burke Museum (20082850)29

Reappropriation:30State Building Construction Account—State. . . . . . . . $650,00031

Appropriation:32

p. 177 2EHB 1115.PL

State Building Construction Account—State. . . . . . $26,000,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $3,150,0002Future Biennia (Projected Costs). . . . . . . . . . . $24,200,0003

TOTAL. . . . . . . . . . . . . . . . . . . . . . $54,000,0004

NEW SECTION. Sec. 5035. FOR THE UNIVERSITY OF WASHINGTON5Health Sciences Education Phase I - T-Wing Renovation/Addition6

(30000486)7Appropriation:8

State Building Construction Account—State. . . . . . . . $623,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . $93,377,00011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $94,000,00012

NEW SECTION. Sec. 5036. FOR THE UNIVERSITY OF WASHINGTON13University of Washington Bothell (30000378)14The appropriation in this section is subject to the following15

conditions and limitations: The appropriation in this section is16provided solely for predesign, which may also serve as bridging17documents, design, competition honoraria, project management, and18other planning activities including permits. The building may be19delivered using design build, as defined by chapter 39.10 RCW with a20guarantee for energy, operations, and maintenance performance. The21term for performance guarantee must not be less than one year. The22state may use state employees for services not related to building23performance. Criteria for selecting the design build contractor must24include life cycle costs, energy costs, or energy use index.25Contractors, and architectural and engineering firms may be eligible26for additional points during the scoring process if they have27experience with the state agency, or if they are considered a small28business. The building must be built using sustainable building29standards as defined in section 7008 of this act.30Appropriation:31

State Building Construction Account—State. . . . . . . . $500,00032Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033Future Biennia (Projected Costs). . . . . . . . . . . $57,600,00034

TOTAL. . . . . . . . . . . . . . . . . . . . . . $58,100,00035

p. 178 2EHB 1115.PL

NEW SECTION. Sec. 5037. FOR THE UNIVERSITY OF WASHINGTON1University of Washington Minor Capital Repairs - Preservation2

(30000494)3Reappropriation:4

University of Washington Building Account—State. . . . $4,200,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $42,554,0006

TOTAL. . . . . . . . . . . . . . . . . . . . . . $46,754,0007

NEW SECTION. Sec. 5038. FOR THE UNIVERSITY OF WASHINGTON8School of Nursing Simulation Learning Lab (30000600)9

Appropriation:10State Building Construction Account—State. . . . . . . $4,000,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,00014

NEW SECTION. Sec. 5039. FOR THE UNIVERSITY OF WASHINGTON15Health Sciences Interprofessional Education Classroom Phase I16

(30000602)17Appropriation:18

State Building Construction Account—State. . . . . . . $2,710,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,710,00022

NEW SECTION. Sec. 5040. FOR THE UNIVERSITY OF WASHINGTON23Computer Science and Engineering Expansion (30000603)24

Appropriation:25State Building Construction Account—State. . . . . . $17,500,00026University of Washington Building Account—State. . . $15,000,00027

Subtotal Appropriation. . . . . . . . . . . . . . $32,500,00028Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,500,00031

NEW SECTION. Sec. 5041. FOR THE UNIVERSITY OF WASHINGTON32

p. 179 2EHB 1115.PL

University of Washington Minor Capital Repairs - Preservation1(30000604)2Appropriation:3

University of Washington Building Account—State. . . $28,175,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05Future Biennia (Projected Costs). . . . . . . . . . $172,700,0006

TOTAL. . . . . . . . . . . . . . . . . . . . . . $200,875,0007

NEW SECTION. Sec. 5042. FOR THE UNIVERSITY OF WASHINGTON8Preventive Facility Maintenance and Building System Repairs9

(30000714)10Appropriation:11

University of Washington Building Account—State. . . $25,825,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013Future Biennia (Projected Costs). . . . . . . . . . $103,300,00014

TOTAL. . . . . . . . . . . . . . . . . . . . . . $129,125,00015

NEW SECTION. Sec. 5043. FOR THE UNIVERSITY OF WASHINGTON16University of Washington Tacoma Classroom Building Renovation -17

Urban Solutions Center (91000014)18Reappropriation:19

State Building Construction Account—State. . . . . . . . $500,00020Appropriation:21

State Building Construction Account—State. . . . . . $16,000,00022Prior Biennia (Expenditures). . . . . . . . . . . . . $1,400,00023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,900,00025

NEW SECTION. Sec. 5044. FOR THE UNIVERSITY OF WASHINGTON26University of Washington Tacoma Campus Soil Remediation27

(92000002)28Appropriation:29

State Toxics Control Account—State. . . . . . . . . . $1,000,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . . $4,000,00032

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00033

p. 180 2EHB 1115.PL

NEW SECTION. Sec. 5045. FOR THE UNIVERSITY OF WASHINGTON1Center for Advanced Materials and Clean Energy Research Test Beds2

(91000016)3Appropriation:4

State Building Construction Account—State. . . . . . . $9,000,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,000,0008

NEW SECTION. Sec. 5046. FOR THE WASHINGTON STATE UNIVERSITY9Washington State University Pullman - Troy Hall Renovation10

(20061030)11Reappropriation:12

State Building Construction Account—State. . . . . . . . $850,00013Washington State University Building Account—State. . . $400,00014

Subtotal Reappropriation. . . . . . . . . . . . . $1,250,00015Appropriation:16

State Building Construction Account—State. . . . . . $20,682,00017Washington State University Building Account—State. . $9,600,00018

Subtotal Appropriation. . . . . . . . . . . . . . $30,282,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . $771,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,303,00022

NEW SECTION. Sec. 5047. FOR THE WASHINGTON STATE UNIVERSITY23Clean Technology Laboratory (30000069)24

Reappropriation:25State Building Construction Account—State. . . . . . . $8,000,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $24,835,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,835,00029

NEW SECTION. Sec. 5048. FOR THE WASHINGTON STATE UNIVERSITY302013-15 Minor Works - Preservation, Safety, and Infrastructure31

(30000849)32Reappropriation:33

State Building Construction Account—State. . . . . . . . $650,00034p. 181 2EHB 1115.PL

Washington State University Building1Account—State. . . . . . . . . . . . . . . . . . . $1,720,0002Subtotal Reappropriation. . . . . . . . . . . . . $2,370,0003

Prior Biennia (Expenditures). . . . . . . . . . . . . $26,194,0004Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05

TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,564,0006

NEW SECTION. Sec. 5049. FOR THE WASHINGTON STATE UNIVERSITY72015-17 Minor Works - Preservation (30001188)8

Appropriation:9Washington State University Building Account—10

State. . . . . . . . . . . . . . . . . . . . . . $27,000,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . $134,340,00013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $161,340,00014

NEW SECTION. Sec. 5050. FOR THE WASHINGTON STATE UNIVERSITY15Washington State University Tri-Cities - Academic Building16

(30001190)17Appropriation:18

Washington State University Building Account—19State. . . . . . . . . . . . . . . . . . . . . . . . $400,00020

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . $68,600,00022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $69,000,00023

NEW SECTION. Sec. 5051. FOR THE WASHINGTON STATE UNIVERSITY24Preventive Facility Maintenance and Building System Repairs25

(30001324)26Appropriation:27

Washington State University Building Account—28State. . . . . . . . . . . . . . . . . . . . . . $10,115,00029

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,115,00032

NEW SECTION. Sec. 5052. FOR THE WASHINGTON STATE UNIVERSITY33

p. 182 2EHB 1115.PL

Everett University Center (91000026)1Reappropriation:2

State Building Construction Account—State. . . . . . . $4,000,0003Appropriation:4State Building Construction Account—State. . . . . . . . $54,563,0005

Prior Biennia (Expenditures). . . . . . . . . . . . . $6,000,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . $64,563,0008

NEW SECTION. Sec. 5053. FOR THE WASHINGTON STATE UNIVERSITY9Joint Center for Deployment and Research in Earth Abundant10

Materials (91000029)11The appropriation in this section is subject to the following12

conditions and limitations:13(1) Funding is provided solely for capital improvements,14

infrastructure, and equipment, to support: (a) A transformative15program in earth-abundant materials to accelerate the development of16next generation clean energy and transportation technologies in17Washington; (b) a coordinated framework and resources that can18facilitate and promote multi-institution collaborations to drive19research, development, and deployment efforts in the use of earth-20abundant materials for manufactured clean technologies or recycling21of advanced materials used in clean technologies; and (c)22environmentally responsible processes in the areas of manufacturing23and recycling of advanced materials used in clean technologies.24

(2) Administration of the appropriation is under the authority of25the Washington State University in collaboration with the University26of Washington. Washington State University and the University of27Washington, in consultation with the regional universities, the28Pacific Northwest national laboratory, and industry experts, shall29develop criteria for providing grant funding for specific projects at30public four-year institutions of higher education to stay within the31appropriation level provided in this section. Funding for32administrative offices may be provided for administrative offices33west of the crest of the Cascade mountains only.34

(3) The office of the state treasurer must manage the issuance of35bonds associated with these grants so as to incur the lowest possible36cost of funds in recognition of the short useful life of the37equipment purchased with the bond proceeds.38

p. 183 2EHB 1115.PL

Appropriation:1State Building Construction Account—State. . . . . . . $2,000,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,0005

NEW SECTION. Sec. 5054. FOR THE WASHINGTON STATE UNIVERSITY6Inventory and Condition of Schools Data Collection (91000033)7The appropriation in this section is subject to the following8

conditions and limitations:9(1) The legislature intends to complete the data collection,10

input, and verification of the inventory and condition of public11school facilities in order to make informed decisions about K-1212school facility data collection processes and classroom capacity13needs to fulfill current educational graduation requirements and14class-size ratios. These decisions are best made when based on15accurate data collected in a thorough and consistent manner by16professionals experienced in making such inventory and condition17assessments for public institutions.18

(2) The appropriation is provided solely for the Washington State19University extension energy office to complete collection, input, and20verification of selected data of public school facilities, including21skill centers, in the inventory and condition of schools system22administered and maintained by the superintendent of public23instruction.24

(3) The Washington State University extension energy office shall25conduct on-site visits to assess inventory and condition of all26facilities for school districts that have no current study and survey27as defined in RCW 28A.525.050 on file with the superintendent of28public instruction as of July 1, 2015, or no pending study and survey29to be filed with the superintendent through an outstanding study and30survey grant award. The data collected, sufficient to meet the study31and survey requirements for school facilities space inventory and32condition analysis, through on-site visits must be input into the33inventory and condition of schools system.34

(4) The Washington State University extension energy office shall35input into the inventory and condition of schools system applicable36data of inventory and condition of school facilities from all current37studies and surveys on file with the superintendent of public38

p. 184 2EHB 1115.PL

instruction as of July 1, 2015. The data must be input into the1system in a manner that captures older information and data first. As2studies and surveys from outstanding grant awards are filed with the3superintendent, the Washington State University extension energy4office shall input data into the system once current study and survey5data has been input. Activities conducted pursuant to this subsection6must occur concurrently with activities in subsection (3) of this7section.8

(5) The Washington State University extension energy office shall9conduct on-site verification of data for school districts whose10current studies and surveys on file with the superintendent will11expire by June 30, 2017. Data verification must be conducted to12evaluate the study and survey process as a tool to collect accurate13inventory and condition of schools data upon which policymakers can14make informed decisions regarding school facility and capacity needs.15Activities conducted pursuant to this subsection must occur16concurrently with activities in subsection (3) of this section and17once sufficient data has been input into the system per subsection18(4) of this section to conduct on-site visits to verification.19

(6)(a) The Washington State University extension energy office,20concurrent with activities conducted in subsections (3), (4), and (5)21of this section, must collect data to determine the information in22(c)(i) through (vii) of this subsection. Additional on-site data23collection for this task or collection of data from "as-built"24documents or other valid sources must be accomplished to produce a25valid sample for determining:26

(b) The accuracy of reported number of classrooms in the most27recent survey of classrooms and building data by the office of the28superintendent of public instruction; and29

(c) The variation in the size of schools and the allocation of30space to the categories described in (c)(i) through (vii) of this31subsection. The sample must be sufficient to determine this32information for elementary, middle, high schools, and skills centers33in districts of different sizes, growth rates, age, and relative34property values.35

(i) The square footage and number of classrooms. Classrooms are36rooms that are used as classrooms or that could be used as classrooms37under building code requirements and must include labs, shops,38computer rooms used for instruction, art, and music classrooms. For39

p. 185 2EHB 1115.PL

this purpose, a music classroom is not a room designed to seat an1audience;2

(ii) The square footage of libraries;3(iii) The square footage of cafeteria and kitchen space;4(iv) The square footage of gymnasiums, locker rooms, and other5

indoor athletic facilities;6(v) The square footage of auditoriums and other performing arts7

space not counted as classrooms;8(vi) The square footage of administrative offices, and space used9

primarily by staff; and10(vii) The square footage of other space such as bathrooms,11

general circulation, mechanical rooms, and the balance of the total12facility square footage not included in (c)(i) through (vi) of this13subsection;14

(d) The data included in (c)(i) through (vii) of this subsection15must indicate whether the space is in a structure with a permanent16foundation or not.17

(7) As a general condition of appropriations provided to the18superintendent of public instruction in this act, the superintendent19of public instruction and each state school district shall provide20requested facilities information and access to facilities in a timely21manner to enable the Washington State University extension energy22office to complete the tasks, oversight, and reporting requirements23assigned in this section.24

(8) The Washington State University extension energy office shall25report progress of data collection, input, and verification to the26appropriate committees of the legislature no later than December 1,272015. The Washington State University extension energy office must28complete all work in this section and make a final report to the29appropriate committees of the legislature no later than December 1,302016.31Appropriation:32

Common School Construction Account—State. . . . . . . $1,550,00033Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034Future Biennia (Projected Costs). . . . . . . . . . . . . . . $035

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,550,00036

NEW SECTION. Sec. 5055. FOR THE WASHINGTON STATE UNIVERSITY37

p. 186 2EHB 1115.PL

Washington State University Pullman - Plant Sciences Building1(REC#5) (30000519)2Appropriation:3

Washington State University Building Account—State. . $6,600,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . $500,0005Future Biennia (Projected Costs). . . . . . . . . . . $58,900,0006

TOTAL. . . . . . . . . . . . . . . . . . . . . . $66,000,0007

NEW SECTION. Sec. 5056. FOR THE EASTERN WASHINGTON UNIVERSITY8University Science Center - Science I (30000001)9

Appropriation:10State Building Construction Account—State. . . . . . . $4,791,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . $400,00012Future Biennia (Projected Costs). . . . . . . . . . . $55,444,00013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $60,635,00014

NEW SECTION. Sec. 5057. FOR THE EASTERN WASHINGTON UNIVERSITY15Upgrade/Repair Campus Water System (30000422)16

Reappropriation:17State Building Construction Account—State. . . . . . . $3,683,00018Eastern Washington University Capital Projects Account—19

State. . . . . . . . . . . . . . . . . . . . . . . $1,770,00020Subtotal Reappropriation. . . . . . . . . . . . . $5,453,00021

Prior Biennia (Expenditures). . . . . . . . . . . . . $1,825,00022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,278,00024

NEW SECTION. Sec. 5058. FOR THE EASTERN WASHINGTON UNIVERSITY25Eastern Washington University Minor Works Preservation (30000468)26

Reappropriation:27Eastern Washington University Capital Projects28

Account—State. . . . . . . . . . . . . . . . . . . $2,673,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $5,827,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,500,00032

NEW SECTION. Sec. 5059. FOR THE EASTERN WASHINGTON UNIVERSITY33p. 187 2EHB 1115.PL

Infrastructure Renewal I (30000506)1Appropriation:2

State Building Construction Account—State. . . . . . . $9,949,0003Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,949,0006

NEW SECTION. Sec. 5060. FOR THE EASTERN WASHINGTON UNIVERSITY7Renovate Science (30000507)8

Appropriation:9State Building Construction Account—State. . . . . . . . $350,00010Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011Future Biennia (Projected Costs). . . . . . . . . . . $52,000,00012

TOTAL. . . . . . . . . . . . . . . . . . . . . . $52,350,00013

NEW SECTION. Sec. 5061. FOR THE EASTERN WASHINGTON UNIVERSITY14Minor Works - Facility Preservation (30000513)15

Appropriation:16State Building Construction Account—State. . . . . . . $4,000,00017Eastern Washington University Capital Projects Account—18

State. . . . . . . . . . . . . . . . . . . . . . . $7,667,00019Subtotal Appropriation. . . . . . . . . . . . . . $11,667,00020

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . $56,000,00022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $67,667,00023

NEW SECTION. Sec. 5062. FOR THE EASTERN WASHINGTON UNIVERSITY24Minor Works - Program (30000516)25

Appropriation:26Eastern Washington University Capital Projects Account—27

State. . . . . . . . . . . . . . . . . . . . . . . $1,500,00028Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029Future Biennia (Projected Costs). . . . . . . . . . . $16,000,00030

TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,500,00031

NEW SECTION. Sec. 5063. FOR THE EASTERN WASHINGTON UNIVERSITY32Preventive Maintenance and Building System Repairs (30000547)33

p. 188 2EHB 1115.PL

Appropriation:1Eastern Washington University Capital Projects Account—2

State. . . . . . . . . . . . . . . . . . . . . . . $2,217,0003Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04Future Biennia (Projected Costs). . . . . . . . . . . $8,868,0005

TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,085,0006

NEW SECTION. Sec. 5064. FOR THE CENTRAL WASHINGTON UNIVERSITY7Science Building (30000045)8

Reappropriation:9State Building Construction Account—State. . . . . . $42,000,00010Prior Biennia (Expenditures). . . . . . . . . . . . . $21,771,00011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . $63,771,00013

NEW SECTION. Sec. 5065. FOR THE CENTRAL WASHINGTON UNIVERSITY14Samuelson Communication and Technology Center (SCTC) (30000451)15

Reappropriation:16State Building Construction Account—State. . . . . . . $1,600,00017

Appropriation:18State Building Construction Account—State. . . . . . $56,041,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $3,400,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $61,041,00022

NEW SECTION. Sec. 5066. FOR THE CENTRAL WASHINGTON UNIVERSITY23Combined Utilities (30000448)24

Reappropriation:25State Building Construction Account—State. . . . . . . . $430,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $9,780,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,210,00029

NEW SECTION. Sec. 5067. FOR THE CENTRAL WASHINGTON UNIVERSITY30Nutrition Science (30000456)31

Appropriation:32

p. 189 2EHB 1115.PL

State Building Construction Account—State. . . . . . . $4,300,0001Prior Biennia (Expenditures). . . . . . . . . . . . . . $281,0002Future Biennia (Projected Costs). . . . . . . . . . . $44,400,0003

TOTAL. . . . . . . . . . . . . . . . . . . . . . $48,981,0004

NEW SECTION. Sec. 5068. FOR THE CENTRAL WASHINGTON UNIVERSITY5Minor Works Preservation (30000615)6

Reappropriation:7Central Washington University Capital Projects8

Account—State. . . . . . . . . . . . . . . . . . . $1,500,0009Prior Biennia (Expenditures). . . . . . . . . . . . . $5,500,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,000,00012

NEW SECTION. Sec. 5069. FOR THE CENTRAL WASHINGTON UNIVERSITY13Minor Works Preservation (30000684)14

Appropriation:15State Building Construction Account—State. . . . . . . $4,000,00016Central Washington University Capital Projects Account—17

State. . . . . . . . . . . . . . . . . . . . . . . $1,935,00018Subtotal Appropriation. . . . . . . . . . . . . . $5,935,00019

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . $18,640,00021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,575,00022

NEW SECTION. Sec. 5070. FOR THE CENTRAL WASHINGTON UNIVERSITY23Bouillon Hall Renovation (30000711)24

Appropriation:25State Building Construction Account—State. . . . . . . $4,977,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,977,00029

NEW SECTION. Sec. 5071. FOR THE CENTRAL WASHINGTON UNIVERSITY30Minor Works Program (30000723)31

Appropriation:32Central Washington University Capital Projects Account—33

p. 190 2EHB 1115.PL

State. . . . . . . . . . . . . . . . . . . . . . . $3,777,0001Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02Future Biennia (Projected Costs). . . . . . . . . . . $4,768,0003

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,545,0004

NEW SECTION. Sec. 5072. FOR THE CENTRAL WASHINGTON UNIVERSITY5Lind Hall Renovation (30000738)6

Appropriation:7State Building Construction Account—State. . . . . . . $4,900,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,900,00011

NEW SECTION. Sec. 5073. FOR THE CENTRAL WASHINGTON UNIVERSITY12Combined Utilities (30000740)13

Appropriation:14State Building Construction Account—State. . . . . . . $8,000,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016Future Biennia (Projected Costs). . . . . . . . . . . $32,000,00017

TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,00018

NEW SECTION. Sec. 5074. FOR THE CENTRAL WASHINGTON UNIVERSITY19Old Heat - Plant Annex (30000767)20

Appropriation:21State Building Construction Account—State. . . . . . . $4,900,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,900,00025

NEW SECTION. Sec. 5075. FOR THE CENTRAL WASHINGTON UNIVERSITY26Preventive Maintenance and Building System Repairs (30000770)27

Appropriation:28Central Washington University Capital Projects Account—29

State. . . . . . . . . . . . . . . . . . . . . . . $2,422,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

p. 191 2EHB 1115.PL

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,422,0001

NEW SECTION. Sec. 5076. FOR THE EVERGREEN STATE COLLEGE2Facility Preservation (30000084)3

Reappropriation:4The Evergreen State College Capital Projects5

Account—State. . . . . . . . . . . . . . . . . . . . $100,0006Prior Biennia (Expenditures). . . . . . . . . . . . . $6,600,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,700,0009

NEW SECTION. Sec. 5077. FOR THE EVERGREEN STATE COLLEGE10Science Center - Lab II, 2nd Floor Renovation (30000117)11

Reappropriation:12State Building Construction Account—State. . . . . . . . $575,00013Prior Biennia (Expenditures). . . . . . . . . . . . . $4,119,00014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,694,00016

NEW SECTION. Sec. 5078. FOR THE EVERGREEN STATE COLLEGE17Science Center - Lab I Basement Renovation (30000118)18

Reappropriation:19State Building Construction Account—State. . . . . . . $1,525,00020

Appropriation:21State Building Construction Account—State. . . . . . . $3,240,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . $280,00023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,045,00025

NEW SECTION. Sec. 5079. FOR THE EVERGREEN STATE COLLEGE26Seminar I Renovation (30000125)27

Appropriation:28State Building Construction Account—State. . . . . . . . $400,00029Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . $23,318,00031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $23,718,00032

p. 192 2EHB 1115.PL

NEW SECTION. Sec. 5080. FOR THE EVERGREEN STATE COLLEGE1Facilities Preservation (30000457)2

Appropriation:3State Building Construction Account—State. . . . . . . $4,720,0004The Evergreen State College Capital Projects Account—5

State. . . . . . . . . . . . . . . . . . . . . . . $5,628,0006Subtotal Appropriation. . . . . . . . . . . . . . $10,348,0007

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08Future Biennia (Projected Costs). . . . . . . . . . . $40,180,0009

TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,528,00010

NEW SECTION. Sec. 5081. FOR THE EVERGREEN STATE COLLEGE11Minor Works Program (30000487)12

Appropriation:13The Evergreen State College Capital Projects14

Account—State. . . . . . . . . . . . . . . . . . . $1,164,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016Future Biennia (Projected Costs). . . . . . . . . . . $9,140,00017

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,304,00018

NEW SECTION. Sec. 5082. FOR THE EVERGREEN STATE COLLEGE19Lecture Hall Remodel (30000493)20

Reappropriation:21State Building Construction Account—State. . . . . . . . $300,00022

Appropriation:23State Building Construction Account—State. . . . . . $16,310,00024Prior Biennia (Expenditures). . . . . . . . . . . . . $1,251,00025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,861,00027

NEW SECTION. Sec. 5083. FOR THE EVERGREEN STATE COLLEGE28Preventive Facility Maintenance and Building System Repairs29

(30000612)30Appropriation:31

The Evergreen State College Capital Projects Account—32State. . . . . . . . . . . . . . . . . . . . . . . . $783,00033

p. 193 2EHB 1115.PL

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01Future Biennia (Projected Costs). . . . . . . . . . . $3,132,0002

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,915,0003

NEW SECTION. Sec. 5084. FOR THE WESTERN WASHINGTON UNIVERSITY4Carver Academic Renovation (20081060)5

Reappropriation:6State Building Construction Account—State. . . . . . . . $323,0007

Appropriation:8State Building Construction Account—State. . . . . . $58,600,0009Western Washington University Capital Projects10

Account—State. . . . . . . . . . . . . . . . . . . $5,400,00011Subtotal Appropriation. . . . . . . . . . . . . . $64,000,00012

Prior Biennia (Expenditures). . . . . . . . . . . . . $7,051,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . $71,374,00015

NEW SECTION. Sec. 5085. FOR THE WESTERN WASHINGTON UNIVERSITY16North Campus Utility Upgrade (30000426)17

Reappropriation:18State Building Construction Account—State. . . . . . . . $600,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $2,982,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,582,00022

NEW SECTION. Sec. 5086. FOR THE WESTERN WASHINGTON UNIVERSITY23Performing Arts Exterior Renewal (30000428)24

Reappropriation:25State Building Construction Account—State. . . . . . . . $387,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $2,560,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,947,00029

NEW SECTION. Sec. 5087. FOR THE WESTERN WASHINGTON UNIVERSITY30Classroom and Lab Upgrades Phase 2 (30000518)31

Reappropriation:32

p. 194 2EHB 1115.PL

State Building Construction Account—State. . . . . . . $1,800,0001Western Washington University Capital Projects Account—2

State. . . . . . . . . . . . . . . . . . . . . . . . $400,0003Subtotal Reappropriation. . . . . . . . . . . . . $2,200,0004

Prior Biennia (Expenditures). . . . . . . . . . . . . $2,546,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,746,0007

NEW SECTION. Sec. 5088. FOR THE WESTERN WASHINGTON UNIVERSITY8Minor Works - Preservation (30000524)9

Reappropriation:10Western Washington University Capital Projects11

Account—State. . . . . . . . . . . . . . . . . . . . $750,00012Prior Biennia (Expenditures). . . . . . . . . . . . . $6,750,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,500,00015

NEW SECTION. Sec. 5089. FOR THE WESTERN WASHINGTON UNIVERSITY16Minor Works - Preservation (30000615)17

Appropriation:18State Building Construction Account—State. . . . . . . $3,572,00019Western Washington University Capital Projects20

Account—State. . . . . . . . . . . . . . . . . . . $4,886,00021Subtotal Appropriation. . . . . . . . . . . . . . $8,458,00022

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . . $64,422,00024

TOTAL. . . . . . . . . . . . . . . . . . . . . . $72,880,00025

NEW SECTION. Sec. 5090. FOR THE WESTERN WASHINGTON UNIVERSITY26Preventive Facility Maintenance and Building System Repairs27

(30000757)28Appropriation:29

Western Washington University Capital Projects Account—30State. . . . . . . . . . . . . . . . . . . . . . . $3,614,00031

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032Future Biennia (Projected Costs). . . . . . . . . . . $14,456,00033

TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,070,00034

p. 195 2EHB 1115.PL

NEW SECTION. Sec. 5091. FOR THE WORKFORCE TRAINING AND1EDUCATION COORDINATING BOARD2

Central Area Community Opportunity Center (91000002)3The appropriation in this section is subject to the following4

conditions and limitations: $100,000 is provided solely for the5purposes of predesign, development, and transition costs at the6Seattle Vocational Institute to create the central area community7opportunity center and clearinghouse. During predesign and8development phase, community needs and input must be considered for9project transition and completion. During this process, the board10must work with the department of enterprise services to identify11current available space within the Seattle Vocational Institute12building, and shall prescribe methods of maximizing space efficiency13for both current and potential tenants. The board and the department14of enterprise services shall also identify costs associated with any15renovation work needed to create additional usable space. The Seattle16Central College shall work with the board on this effort. A report17must be delivered to the legislature by December 1, 2015.18Appropriation:19

State Building Construction Account—State. . . . . . . . $100,00020Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $100,00023

NEW SECTION. Sec. 5092. FOR THE WASHINGTON STATE HISTORICAL24SOCIETY25

Washington Heritage Grants (20074004)26The reappropriation in this section is subject to the following27

conditions and limitations:28(1) The reappropriation in this section is subject to the29

provisions of RCW 27.34.330.30(2) The reappropriation in this section is subject to the project31

list in section 5137, chapter 520, Laws of 2007.32(3) The reappropriation in this section is subject to the33

provisions of section 5044, chapter 36, Laws of 2010 1st sp. sess.34Reappropriation:35

State Building Construction Account—State. . . . . . . . $340,00036Prior Biennia (Expenditures). . . . . . . . . . . . . $9,565,00037

p. 196 2EHB 1115.PL

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,905,0002

NEW SECTION. Sec. 5093. FOR THE WASHINGTON STATE HISTORICAL3SOCIETY4

Washington Heritage Project Capital Grants (30000011)5The reappropriation in this section is subject to the following6

conditions and limitations:7(1) The reappropriation in this section is subject to the8

provisions of section 5120, chapter 497, Laws of 2009.9(2) The reappropriation in this section is subject to the10

provisions of section 5045, chapter 36, Laws of 2010 1st sp. sess.11Reappropriation:12

State Building Construction Account—State. . . . . . . . $200,00013Prior Biennia (Expenditures). . . . . . . . . . . . . $9,225,00014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,425,00016

NEW SECTION. Sec. 5094. FOR THE WASHINGTON STATE HISTORICAL17SOCIETY18

Washington Heritage Grants (30000117)19The reappropriation in this section is subject to the following20

conditions and limitations:21(1) The reappropriation in this section is subject to the22

provisions of RCW 27.34.330.23(2) The reappropriation in this section is subject to the24

provisions of section 622, chapter 1, Laws of 2012 2nd sp. sess.25Reappropriation:26

State Building Construction Account—State. . . . . . . . $300,00027Prior Biennia (Expenditures). . . . . . . . . . . . . $6,782,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,082,00030

NEW SECTION. Sec. 5095. FOR THE WASHINGTON STATE HISTORICAL31SOCIETY32

Facilities Preservation - Minor Works Projects (30000164)33Reappropriation:34

p. 197 2EHB 1115.PL

State Building Construction Account—State. . . . . . . . $830,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $1,653,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,483,0004

NEW SECTION. Sec. 5096. FOR THE WASHINGTON STATE HISTORICAL5SOCIETY6

Heritage Capital Grants Projects (30000170)7The reappropriation in this section is subject to the following8

conditions and limitations:9(1) The reappropriation in this section is subject to the10

provisions of RCW 27.34.330.11(2) The reappropriation in this section is subject to the project12

list in section 5093, chapter 19, Laws of 2013 2nd sp. sess.13Reappropriation:14

State Building Construction Account—State. . . . . . . $4,700,00015Prior Biennia (Expenditures). . . . . . . . . . . . . $5,131,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,831,00018

NEW SECTION. Sec. 5097. FOR THE WASHINGTON STATE HISTORICAL19SOCIETY20

History Museum Membrane System Replacement (30000220)21Appropriation:22

State Building Construction Account—State. . . . . . . $1,805,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,805,00026

NEW SECTION. Sec. 5098. FOR THE WASHINGTON STATE HISTORICAL27SOCIETY28

Facilities Preservation – Minor Works Projects (30000222)29Appropriation:30

State Building Construction Account—State. . . . . . . $2,515,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032Future Biennia (Projected Costs). . . . . . . . . . . $10,000,00033

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,515,00034p. 198 2EHB 1115.PL

NEW SECTION. Sec. 5099. FOR THE WASHINGTON STATE HISTORICAL1SOCIETY2

Washington Heritage Grants (30000237)3The appropriation in this section is subject to the following4

conditions and limitations:5(1) The appropriation is subject to the provisions of RCW6

27.34.330.7(2) The appropriation is provided solely for the following list8

of projects:9Project Authorized Amount10Pantages centennial: Façade restoration. . . . . . . . . . . $685,00011Chong Wa parapet preservation. . . . . . . . . . . . . . . . $66,00012Rehabilitation of historic structures. . . . . . . . . . . . $750,00013Renovation heating of interior space of Balfour dock. . . $1,000,00014Town hall historic restoration: Phase one of construction. $1,000,00015Washington hall restoration. . . . . . . . . . . . . . . . . $452,00016Rehabilitation of Ritzville library for ADA compliance. . . $138,00017Quartermaster and dental surgery renovation project. . . . . $309,00018Skagit city school restoration. . . . . . . . . . . . . . . . $91,00019Yamasaki courtyard restoration project. . . . . . . . . . . $129,00020Prairie line trail historic interpretation project. . . . . $400,00021Ancich netshed restoration. . . . . . . . . . . . . . . . . $662,00022Chimney, gutter, and kitchen restoration. . . . . . . . . . . $11,00023Federal building rehabilitation - phases II and III. . . . . $920,00024Preservation of the Colville Indian agency cabin in Chewelah. $33,00025Arthur Foss preservation and restoration phase II. . . . . . $166,00026Seaport landing development - renovation of building #8. . $1,000,00027Si view community center rehabilitation project phase II. . $130,00028Revitalization to historic wells house for community use. . . $26,00029Chiyo's garden phase II. . . . . . . . . . . . . . . . . . . $108,00030Historic community center, library, and city hall restoration $185,00031Sea mar latino history and cultural center. . . . . . . . . $654,00032Olympia waldorf school - the next 100 years. . . . . . . . . $20,00033Chinook school restoration - final phase. . . . . . . . . . . $79,00034Phase III of Worthington park - Quilcene. . . . . . . . . . $244,00035El centro de la raza community access and security project. $100,00036Steam locomotives changed everything. . . . . . . . . . . . $199,00037The artifact/exhibit environmental conservation project. . . . $8,00038F/V Shenandoah restoration project - phase three. . . . . . . $41,00039

p. 199 2EHB 1115.PL

Henderson house and Tumwater historic district interpretive. $50,0001Carnegie library renovation phase II. . . . . . . . . . . . $344,0002Total. . . . . . . . . . . . . . . . . . . . . . . . . . $10,000,0003Appropriation:4

State Building Construction Account—State. . . . . . $10,000,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,0008

NEW SECTION. Sec. 5100. FOR THE EASTERN WASHINGTON STATE9HISTORICAL SOCIETY10

Exhibit Hall/Cowles Center Renovation (30000036)11The appropriation in this section is subject to the following12

conditions and limitations: The eastern Washington state historical13society shall conduct a predesign study for a renovation to the14exhibit hall and the Cheney Cowles center that will include15strategies to increase nonstate revenues for the operation of the16museum and estimate the minimum amount of state funding necessary to17preserve, maintain, and protect state-owned facilities and assets.18The predesign study must be submitted to the office of financial19management and the fiscal committees of the legislature by October 1,202016.21Appropriation:22

State Building Construction Account—State. . . . . . . . $200,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $200,00026

NEW SECTION. Sec. 5101. FOR THE EASTERN WASHINGTON STATE27HISTORICAL SOCIETY28

Minor Works - Preservation (30000038)29Appropriation:30

State Building Construction Account—State. . . . . . . . $702,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $702,00034

p. 200 2EHB 1115.PL

NEW SECTION. Sec. 5102. FOR THE COMMUNITY AND TECHNICAL COLLEGE1SYSTEM2

Spokane Falls Community College: Campus Classrooms (20062696)3Reappropriation:4

State Building Construction Account—State. . . . . . . . $417,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $19,199,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,616,0008

NEW SECTION. Sec. 5103. FOR THE COMMUNITY AND TECHNICAL COLLEGE9SYSTEM10

South Puget Sound Community College: Learning Resource Center11(20062698)12Reappropriation:13

State Building Construction Account—State. . . . . . . . $953,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $32,708,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . $33,661,00017

NEW SECTION. Sec. 5104. FOR THE COMMUNITY AND TECHNICAL COLLEGE18SYSTEM19

Clover Park Technical College: Allied Health Care Facility20(20062699)21Reappropriation:22

State Building Construction Account—State. . . . . . . . $944,00023Prior Biennia (Expenditures). . . . . . . . . . . . . $21,389,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . $22,333,00026

NEW SECTION. Sec. 5105. FOR THE COMMUNITY AND TECHNICAL COLLEGE27SYSTEM28

Spokane Community College: Technical Education Building29(20081220)30Reappropriation:31

State Building Construction Account—State. . . . . . . $3,294,00032Prior Biennia (Expenditures). . . . . . . . . . . . . $23,136,00033Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034

p. 201 2EHB 1115.PL

TOTAL. . . . . . . . . . . . . . . . . . . . . . $26,430,0001

NEW SECTION. Sec. 5106. FOR THE COMMUNITY AND TECHNICAL COLLEGE2SYSTEM3

Everett Community College: Index Hall Replacement (20081221)4Reappropriation:5

State Building Construction Account—State. . . . . . . $1,194,0006Prior Biennia (Expenditures). . . . . . . . . . . . . $35,120,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . $36,314,0009

NEW SECTION. Sec. 5107. FOR THE COMMUNITY AND TECHNICAL COLLEGE10SYSTEM11

Green River Community College: Trades and Industry Building12(20081222)13Reappropriation:14

State Building Construction Account—State. . . . . . $11,606,00015Prior Biennia (Expenditures). . . . . . . . . . . . . $17,013,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,619,00018

NEW SECTION. Sec. 5108. FOR THE COMMUNITY AND TECHNICAL COLLEGE19SYSTEM20

Grays Harbor College: Science and Math Building (20081226)21Reappropriation:22

State Building Construction Account—State. . . . . . $14,700,00023Prior Biennia (Expenditures). . . . . . . . . . . . . $29,444,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . $44,144,00026

NEW SECTION. Sec. 5109. FOR THE COMMUNITY AND TECHNICAL COLLEGE27SYSTEM28

Tacoma Community College: Health Careers Center (20082701)29Reappropriation:30

State Building Construction Account—State. . . . . . . $7,639,00031Prior Biennia (Expenditures). . . . . . . . . . . . . $33,534,00032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

p. 202 2EHB 1115.PL

TOTAL. . . . . . . . . . . . . . . . . . . . . . $41,173,0001

NEW SECTION. Sec. 5110. FOR THE COMMUNITY AND TECHNICAL COLLEGE2SYSTEM3

Bellevue Community College: Health Science Building (20082702)4Reappropriation:5

State Building Construction Account—State. . . . . . . $9,636,0006Prior Biennia (Expenditures). . . . . . . . . . . . . $22,090,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . $31,726,0009

NEW SECTION. Sec. 5111. FOR THE COMMUNITY AND TECHNICAL COLLEGE10SYSTEM11

Bates Technical College: Mohler Communications Technology Center12(20082703)13Reappropriation:14

State Building Construction Account—State. . . . . . $15,428,00015Prior Biennia (Expenditures). . . . . . . . . . . . . $11,019,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . $26,447,00018

NEW SECTION. Sec. 5112. FOR THE COMMUNITY AND TECHNICAL COLLEGE19SYSTEM20

Columbia Basin College: Social Science Center (20082704)21Reappropriation:22

State Building Construction Account—State. . . . . . . . $595,00023Appropriation:24

State Building Construction Account—State. . . . . . $14,505,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . $481,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,581,00028

NEW SECTION. Sec. 5113. FOR THE COMMUNITY AND TECHNICAL COLLEGE29SYSTEM30

Clark College: Health and Advanced Technologies Building31(20082705)32Reappropriation:33

p. 203 2EHB 1115.PL

State Building Construction Account—State. . . . . . $29,979,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $7,073,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . $37,052,0004

NEW SECTION. Sec. 5114. FOR THE COMMUNITY AND TECHNICAL COLLEGE5SYSTEM6

Peninsula College: Fort Worden Building 202 (30000114)7Reappropriation:8

State Building Construction Account—State. . . . . . . $3,876,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . $501,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,377,00012

NEW SECTION. Sec. 5115. FOR THE COMMUNITY AND TECHNICAL COLLEGE13SYSTEM14

Seattle Central Community College: Seattle Maritime Academy15(30000120)16Reappropriation:17

State Building Construction Account—State. . . . . . $14,590,00018Prior Biennia (Expenditures). . . . . . . . . . . . . $2,238,00019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,828,00021

NEW SECTION. Sec. 5116. FOR THE COMMUNITY AND TECHNICAL COLLEGE22SYSTEM23

Yakima Valley Community College: Palmer Martin Building24(30000121)25Reappropriation:26

State Building Construction Account—State. . . . . . . $5,947,00027Prior Biennia (Expenditures). . . . . . . . . . . . . $14,293,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,240,00030

NEW SECTION. Sec. 5117. FOR THE COMMUNITY AND TECHNICAL COLLEGE31SYSTEM32

Olympic College: College Instruction Center (30000122)33

p. 204 2EHB 1115.PL

Reappropriation:1State Building Construction Account—State. . . . . . . $1,152,0002

Appropriation:3State Building Construction Account—State. . . . . . $46,516,0004Prior Biennia (Expenditures). . . . . . . . . . . . . $2,472,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,140,0007

NEW SECTION. Sec. 5118. FOR THE COMMUNITY AND TECHNICAL COLLEGE8SYSTEM9

Centralia Community College: Student Services (30000123)10Reappropriation:11

State Building Construction Account—State. . . . . . . . $631,00012Appropriation:13

State Building Construction Account—State. . . . . . $32,089,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $1,886,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . $34,606,00017

NEW SECTION. Sec. 5119. FOR THE COMMUNITY AND TECHNICAL COLLEGE18SYSTEM19

Peninsula College: Allied Health and Early Childhood Development20Center (30000126)21Reappropriation:22

State Building Construction Account—State. . . . . . . . $903,00023Appropriation:24

State Building Construction Account—State. . . . . . $23,790,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . $907,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,600,00028

NEW SECTION. Sec. 5120. FOR THE COMMUNITY AND TECHNICAL COLLEGE29SYSTEM30

South Seattle Community College: Cascade Court (30000128)31Reappropriation:32

State Building Construction Account—State. . . . . . . . $983,00033

p. 205 2EHB 1115.PL

Appropriation:1State Building Construction Account—State. . . . . . $28,231,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $1,104,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . $30,318,0005

NEW SECTION. Sec. 5121. FOR THE COMMUNITY AND TECHNICAL COLLEGE6SYSTEM7

North Seattle Community College: Technology Building Renewal8(30000129)9Reappropriation:10

State Building Construction Account—State. . . . . . . $1,922,00011Prior Biennia (Expenditures). . . . . . . . . . . . . $23,497,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,419,00014

NEW SECTION. Sec. 5122. FOR THE COMMUNITY AND TECHNICAL COLLEGE15SYSTEM16

Renton Technical College: Automotive Complex Renovation17(30000134)18Reappropriation:19

State Building Construction Account—State. . . . . . . . $449,00020Appropriation:21

State Building Construction Account—State. . . . . . $15,250,00022Prior Biennia (Expenditures). . . . . . . . . . . . . $1,134,00023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,833,00025

NEW SECTION. Sec. 5123. FOR THE COMMUNITY AND TECHNICAL COLLEGE26SYSTEM27

Edmonds Community College: Science, Engineering, Technology28Building (30000137)29Reappropriation:30

State Building Construction Account—State. . . . . . . $6,581,00031Prior Biennia (Expenditures). . . . . . . . . . . . . $1,239,00032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

p. 206 2EHB 1115.PL

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,820,0001

NEW SECTION. Sec. 5124. FOR THE COMMUNITY AND TECHNICAL COLLEGE2SYSTEM3

Whatcom Community College: Learning Commons (30000138)4Reappropriation:5

State Building Construction Account—State. . . . . . . $1,029,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . $793,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,822,0009

NEW SECTION. Sec. 5125. FOR THE COMMUNITY AND TECHNICAL COLLEGE10SYSTEM11

Minor Works - Program (30000723)12Reappropriation:13

Community/Technical College Capital Projects14Account—State. . . . . . . . . . . . . . . . . . . $1,765,00015

Community and Technical College Forest Reserve16Account—State. . . . . . . . . . . . . . . . . . . . $60,00017

Gardner-Evans Higher Education Construction18Account—State. . . . . . . . . . . . . . . . . . . . $115,00019Subtotal Reappropriation. . . . . . . . . . . . . $1,940,00020

Prior Biennia (Expenditures). . . . . . . . . . . . . $16,852,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,792,00023

NEW SECTION. Sec. 5126. FOR THE COMMUNITY AND TECHNICAL COLLEGE24SYSTEM25

Minor Works - Preservation (30000779)26Reappropriation:27

Community/Technical College Capital Projects28Account—State. . . . . . . . . . . . . . . . . . . . $965,00029

Prior Biennia (Expenditures). . . . . . . . . . . . . $16,635,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,600,00032

p. 207 2EHB 1115.PL

NEW SECTION. Sec. 5127. FOR THE COMMUNITY AND TECHNICAL COLLEGE1SYSTEM2

Roof Repairs (30000844)3Reappropriation:4

Community/Technical College Capital Projects5Account—State. . . . . . . . . . . . . . . . . . . . $554,0006

Prior Biennia (Expenditures). . . . . . . . . . . . . $7,231,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,785,0009

NEW SECTION. Sec. 5128. FOR THE COMMUNITY AND TECHNICAL COLLEGE10SYSTEM11

Facility Repairs (30000897)12Reappropriation:13

State Building Construction Account—State. . . . . . . $2,905,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $19,229,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . $22,134,00017

NEW SECTION. Sec. 5129. FOR THE COMMUNITY AND TECHNICAL COLLEGE18SYSTEM19

Site Repairs (30000941)20Reappropriation:21

Community/Technical College Capital Projects22Account—State. . . . . . . . . . . . . . . . . . . . $71,00023

Prior Biennia (Expenditures). . . . . . . . . . . . . $2,503,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,574,00026

NEW SECTION. Sec. 5130. FOR THE COMMUNITY AND TECHNICAL COLLEGE27SYSTEM28

Edmonds Community College: Washington Aerospace Training and29Research Center (30000979)30

The reappropriation in this section is subject to the following31conditions and limitations: The reappropriation is subject to the32provisions of section 4, chapter 1, Laws of 2013, 3rd sp. sess.33Reappropriation:34

p. 208 2EHB 1115.PL

State Building Construction Account—State. . . . . . . . $840,0001Prior Biennia (Expenditures). . . . . . . . . . . . . . $660,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,0004

NEW SECTION. Sec. 5131. FOR THE COMMUNITY AND TECHNICAL COLLEGE5SYSTEM6

Big Bend: Professional-Technical Education Center (30000981)7Appropriation:8

State Building Construction Account—State. . . . . . . $2,040,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . $34,490,00011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $36,530,00012

NEW SECTION. Sec. 5132. FOR THE COMMUNITY AND TECHNICAL COLLEGE13SYSTEM14

Spokane: Main Building South Wing Renovation (30000982)15The appropriation in this section is subject to the following16

conditions and limitations: The appropriation in this section is17provided solely for predesign, which may also serve as bridging18documents, design, competition honoraria, project management, and19other planning activities including permits. The building may be20delivered using design build, as defined by chapter 39.10 RCW with a21guarantee for energy, operations, and maintenance performance. The22term for performance guarantee must not be less than one year. The23state may use state employees for services not related to building24performance. Criteria for selecting the design build contractor must25include life cycle costs, energy costs, or energy use index.26Contractors, and architectural and engineering firms may be eligible27for additional points during the scoring process if they have28experience with the state agency, or if they are considered a small29business. The building must be built using sustainable building30standards as defined in section 7008 of this act.31Appropriation:32

State Building Construction Account—State. . . . . . . $2,823,00033Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034Future Biennia (Projected Costs). . . . . . . . . . . $24,742,00035

p. 209 2EHB 1115.PL

TOTAL. . . . . . . . . . . . . . . . . . . . . . $27,565,0001

NEW SECTION. Sec. 5133. FOR THE COMMUNITY AND TECHNICAL COLLEGE2SYSTEM3

Highline: Health and Life Sciences (30000983)4Appropriation:5

State Building Construction Account—State. . . . . . . $2,932,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . $23,850,0008

TOTAL. . . . . . . . . . . . . . . . . . . . . . $26,782,0009

NEW SECTION. Sec. 5134. FOR THE COMMUNITY AND TECHNICAL COLLEGE10SYSTEM11

Minor Works - Program (30001038)12Appropriation:13

State Building Construction Account—State. . . . . . $22,456,00014Community/Technical College Capital Projects Account—15

State. . . . . . . . . . . . . . . . . . . . . . . $1,744,00016Subtotal Appropriation. . . . . . . . . . . . . . $24,200,00017

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,200,00020

NEW SECTION. Sec. 5135. FOR THE COMMUNITY AND TECHNICAL COLLEGE21SYSTEM22

Minor Works - Preservation (30001106)23Appropriation:24

Community/Technical College Capital Projects Account—25State. . . . . . . . . . . . . . . . . . . . . . $19,360,00026

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,360,00029

NEW SECTION. Sec. 5136. FOR THE COMMUNITY AND TECHNICAL COLLEGE30SYSTEM31

Roof Repairs (30001155)32Appropriation:33

p. 210 2EHB 1115.PL

Community/Technical College Capital Projects Account—1State. . . . . . . . . . . . . . . . . . . . . . $12,534,0002

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,534,0005

NEW SECTION. Sec. 5137. FOR THE COMMUNITY AND TECHNICAL COLLEGE6SYSTEM7

Facility Repairs (30001182)8Appropriation:9

Community/Technical College Capital Projects Account—10State. . . . . . . . . . . . . . . . . . . . . . $20,733,00011

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,733,00014

NEW SECTION. Sec. 5138. FOR THE COMMUNITY AND TECHNICAL COLLEGE15SYSTEM16

Site Repairs (30001216)17Appropriation:18

Community/Technical College Capital Projects Account—19State. . . . . . . . . . . . . . . . . . . . . . . $2,829,00020

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,829,00023

NEW SECTION. Sec. 5139. FOR THE COMMUNITY AND TECHNICAL COLLEGE24SYSTEM25

Preventive Maintenance and Building System Repairs (30001286)26Appropriation:27

Community/Technical College Capital Projects Account—28State. . . . . . . . . . . . . . . . . . . . . . $22,800,00029

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . $91,200,00031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $114,000,00032

p. 211 2EHB 1115.PL

NEW SECTION. Sec. 5140. FOR THE COMMUNITY AND TECHNICAL COLLEGE1SYSTEM2

Clover Park: Center for Advanced Manufacturing Technologies3(30000984)4

The appropriation in this section is subject to the following5conditions and limitations: The appropriation in this section is6provided solely for predesign, which may also serve as bridging7documents, design, competition honoraria, project management, and8other planning activities including permits. The building may be9delivered using design build, as defined by chapter 39.10 RCW with a10guarantee for energy, operations, and maintenance performance. The11term for performance guarantee must not be less than one year. The12state may use state employees for services not related to building13performance. Criteria for selecting the design build contractor must14include life cycle costs, energy costs, or energy use index.15Contractors, and architectural and engineering firms may be eligible16for additional points during the scoring process if they have17experience with the state agency, or if they are considered a small18business. The building must be built using sustainable building19standards as defined in section 7008 of this act.20Appropriation:21

State Building Construction Account—State. . . . . . . $3,144,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . . $33,497,00024

TOTAL. . . . . . . . . . . . . . . . . . . . . . $36,641,00025

(End of part)

p. 212 2EHB 1115.PL

PART 612015 SUPPLEMENTAL CAPITAL BUDGET2

NEW SECTION. Sec. 6001. A new section is added to 2013 2nd3sp.s. c 19 (uncodified) to read as follows:4FOR THE DEPARTMENT OF COMMERCE5

Building for the Arts Grants (30000006)6The reappropriation in this section is subject to the following7

conditions and limitations:8(1) The reappropriation in this section is subject to the9

provisions of section 1011, chapter 36, Laws of 2010 1st sp. sess.10(2) The reappropriation in this section is provided solely for11

the Federal Way performing arts center.12Reappropriation:13

State Building Construction Account—State. . . . . . . . $218,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $8,481,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,699,00017

Sec. 6002. 2013 2nd sp.s. c 19 s 1073 (uncodified) is amended to18read as follows:19FOR THE DEPARTMENT OF COMMERCE20

Drinking Water State Revolving Fund Loan Program (30000189)21The appropriations in this section are subject to the following22

conditions and limitations:23(1) (($4,400,000 for fiscal year 2014 and $4,400,000)) $4,000,00024

from the drinking water assistance account—state for fiscal year 201525is provided solely as state match for federal safe drinking water26funds.27

(2) For projects involving repair, replacement, or improvement of28a clean water infrastructure facility or other public works facility29for which an investment grade efficiency audit is obtainable, the30public works board must require as a contract condition that the31project sponsor undertake an investment grade efficiency audit. The32project sponsor may finance the costs of the audit as part of its33drinking water state revolving fund program loan.34Appropriation:35

((State Building Construction Account—State. . . . . $8,800,000))36p. 213 2EHB 1115.PL

Drinking Water Assistance Account—State. . . . . . . . $4,000,0001Drinking Water Assistance Repayment Account—2

State. . . . . . . . . . . . . . . . . . . . . . $200,000,0003Subtotal Appropriation. . . . . . . . . . . (($208,800,000))4

$204,000,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . $680,000,0007

TOTAL. . . . . . . . . . . . . . . . . . . . (($888,800,000))8$884,000,0009

Sec. 6003. 2013 3rd sp.s. c 1 s 3 (uncodified) is amended to10read as follows:11FOR THE DEPARTMENT OF COMMERCE12

Renton Aerospace Training Center Construction (((92000151)))13(30000724)14

The appropriation in this section is subject to the following15conditions and limitations: The appropriation in this section is16provided solely for construction of the Renton aerospace training17center.18Appropriation:19

State Building Construction Account—State. . . . . (($5,000,000))20 $10,000,00021

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . (($5,000,000))24$10,000,00025

Sec. 6004. 2013 2nd sp.s. c 19 s 1074 (uncodified) is amended to26read as follows:27FOR THE DEPARTMENT OF COMMERCE28

Clean Energy and Energy Freedom Program (91000582)29The appropriations in this section are subject to the following30

conditions and limitations:31(1) All expenditures from the state taxable building construction32

account—state appropriation in this section must be used for projects33that provide a benefit to the public through development,34demonstration, and deployment of clean energy technologies that save35energy and reduce energy costs, reduce harmful air emissions or36

p. 214 2EHB 1115.PL

otherwise increase energy independence for the state. All1expenditures must be used for projects that develop and acquire2assets that have a useful life of at least thirteen years. These3requirements must be specified in funding agreements issued by the4department.5

(2) For any project funded from the state taxable building6construction account—state appropriation in this section, state funds7must not exceed fifty percent of the estimated cost of a project, and8funding preference must be provided to projects that offer a higher9percentage of nonstate match funds.10

(3)(a) $15,000,000 of the state taxable building construction11account—state appropriation in this section is provided solely to12create a revolving loan fund to support the widespread use of proven13building energy efficiency and renewable energy technologies now14inhibited by lack of access to capital.15

(b) To create the loan fund, the department shall provide grant16funds to a competitively selected nonprofit lender that will provide17matching private capital and will administer the loan fund. The18department must select the loan fund administrator through a19competitive process, with scoring conducted by a group of qualified20experts, applying criteria specified by the department.21

(c) The department must establish guidelines for the lender22related to applicant eligibility, the screening process, and23evaluation and selection criteria. The criteria must include24requiring evidence of support for the proposed project from the25impacted community and consistency with economic growth strategies26and plans of the affected local governments. Applications for loans27from the revolving fund must disclose all sources of public funding28to be provided for a project. The nonprofit lender must use the29revolving loan fund to make affordable loans for projects including,30but not limited to: Residential and commercial energy retrofits,31residential and community-scale solar installations, anaerobic32digesters to treat dairy and organic waste, and combined heat and33power projects using woody biomass as a fuel source.34

(d) The department must conduct due diligence activities35associated with the use of public funds, including oversight of the36project selection process and project monitoring.37

(e) Projects seeking financing of solar installations under this38section must agree in contract to not participate in the cost-39recovery program under RCW 82.16.120.40

p. 215 2EHB 1115.PL

(4) $15,000,000 of the state taxable building construction1account—state appropriation in this section is provided solely for2grants to advance renewable energy technologies by public and private3electrical utilities that serve retail customers in the state. The4department shall work with utilities to offer matching grants for5projects that demonstrate new smart grid technologies. The department6shall develop a grant application process to competitively select7projects for grant awards, to include scoring conducted by a group of8qualified experts with application of criteria specified by the9department. Applications for grants must disclose all sources of10public funding to be provided for a project. The grant funds must be11used to fund projects that demonstrate how to: Integrate intermittent12renewables through energy storage and information technology,13dispatch energy storage resources from utility control rooms, use the14thermal properties and electric load of commercial buildings and15district energy systems to store energy, or otherwise improve the16reliability and reduce the costs of intermittent or distributed17renewable energy.18

(5) $6,000,000 of the state taxable building construction account19—state appropriation in this section is provided solely for grants to20match federal funds used to develop and demonstrate clean energy21technologies. The department shall work with the University of22Washington, Washington State University, and the Pacific Northwest23National Laboratory to offer matching funds for projects including,24but not limited to: Advancing energy storage and solar technologies,25and federal manufacturing innovation centers related to use of light-26weight carbon fiber components to advance energy efficiency in the27aeronautical, automotive, and marine sectors.28

(6) The department must report on number and results of projects29funded through the clean energy fund, including the number of job30hours created and the number of jobs maintained and created, to the31governor and the legislature, by November 1, 2014.32

(7) The energy recovery act account—federal appropriation in this33section is provided solely for loans, loan guarantees, and grants34that encourage the establishment of innovative and sustainable35industries for renewable energy and energy efficiency technology,36consistent with provisions of RCW 43.325.040 (energy freedom37account).38Appropriation:39

p. 216 2EHB 1115.PL

State Taxable Building Construction Account—1State. . . . . . . . . . . . . . . . . . . . . . $36,000,0002

Energy Recovery Act Account—((Federal)) State. . . . . $4,000,0003Subtotal Appropriation. . . . . . . . . . . . . . $40,000,0004

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,0007

Sec. 6005. 2013 2nd sp.s. c 19 s 1077 (uncodified) is amended to8read as follows:9FOR THE DEPARTMENT OF COMMERCE10

Projects for Jobs and Economic Development (92000151)11The appropriations in this section are subject to the following12

conditions and limitations:13(1) Except as directed otherwise prior to the effective date of14

this section, the department shall not expend the appropriations in15this section unless and until the nonstate share of project costs16have been either expended, or firmly committed, or both, in an amount17sufficient to complete the project or a distinct phase of the project18that is useable to the public for the purpose intended by the19legislature. This requirement does not apply to projects where a20share of the appropriations are released for design costs only.21

(2) Prior to receiving funds, project recipients must demonstrate22that the project site is under control for a minimum of ten years,23either through ownership or a long-term lease. This requirement does24not apply to appropriations for preconstruction activities or25appropriations whose sole purpose is to purchase real property that26does not include a construction or renovation component.27

(3) Projects funded in this section may be required to comply28with Washington's high performance building standards as required by29chapter 39.35D RCW.30

(4) Project funds are available on a reimbursement basis only,31and shall not be advanced under any circumstances.32

(5) Projects funded in this section must be held by the recipient33for a minimum of ten years and used for the same purpose or purposes34intended by the legislature as required in RCW 43.63A.125(6).35

(6) Projects funded in this section, including those that are36owned and operated by nonprofit organizations, are generally required37to pay state prevailing wages.38

p. 217 2EHB 1115.PL

(7) The appropriations are provided solely for the following list1of projects:2 3 Projects for Jobs & Economic Development Authorized Amount

4 City of Bremerton Puget Sound Naval Safety Project $1,300,000

5 Fairchild Airforce Base $2,700,000

6 City of Lynnwood Main Street Improvements $250,000

7 Port of Everett: Roll-On/Roll-Off Cargo Berth $1,500,000

8 Kittitas County Infrastructure and Facilities $5,000,000

9 City of Kennewick Industrial Land $1,000,000

10 Perry Tech Institute Building $1,000,000

11 City of Buckley Drinking Water Improvements $350,000

12 ((Coronado)) Carbonado Reservoir Replacement $525,000

13 Hopelink Cleveland Street Project $1,000,000

14 Redmond Connector $1,300,000

15 Washougal ((Storm Water Decant Facility)) Wastewater Treatment Plant $1,000,000

16 Roslyn Renaissance Northwest Improvement Company Building $500,000

17 Everett/Tulalip Water Pipeline Construction $1,000,000

18 ((Renton Aerospace Training Center Construction $5,000,000))

19 Renton Riverview Bridge Replacement $1,100,000

20 Omak City Sewer, Collection System, and Treatment Plant $2,000,000

21 Harper Pier Replacement $800,000

22 University Place Main Street Redevelopment $975,000

23 Sultan Alder Avenue Water/Sewer Line Replacement $185,000

24 Quincy Industrial Water Reclamation & Reuse $700,000

25 NW Medical School $136,000

26 Ione - 8th St Lift Station Replacement $165,000

27 Stevens PUD Projects $532,000

28 Port Orchard Bay St. Pedestrian Path - Phase 2 $336,000

29 Dekalb Pier - Phase 2 $255,000

30 Kenmore Village $300,000

31 South Kirkland TOD/Cross Kirkland Corridor $1,300,000

32 Washington Agriculture Discovery Center $100,000

p. 218 2EHB 1115.PL

1 Mountlake Terrace Mainstreet Grant $2,000,000

2 Issaquah - North Roadway Network Improvement $5,000,000

3 TRIDEC Development of Small Modular Reactor Proposal $500,000

4 City of Shelton Wastewater $1,500,000

5 Port of Moses Lake Firefighting System $300,000

6 Seattle Chinatown/ID Development $500,000

7

8 9TOTAL (($42,109,000))

$37,109,000

Appropriation:10State Building Construction Account—State. . . . (($35,009,000))11

$30,009,00012Public Facility Construction Loan Revolving13

Account—State. . . . . . . . . . . . . . . . . . . $7,100,00014Subtotal Appropriation. . . . . . . . . . . . (($42,109,000))15

$37,109,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . (($42,109,000))19$37,109,00020

Sec. 6006. 2013 2nd sp.s. c 19 s 1078 (uncodified) is amended to21read as follows:22FOR THE DEPARTMENT OF COMMERCE23

Projects That Strengthen Communities and Quality of Life24(92000230)25

The appropriations in this section are subject to the following26conditions and limitations:27

(1) Except as directed otherwise prior to the effective date of28this section, the department shall not expend the appropriation in29this section unless and until the nonstate share of project costs30have been either expended, or firmly committed, or both, in an amount31sufficient to complete the project or a distinct phase of the project32that is useable to the public for the purpose intended by the33legislature. This requirement does not apply to projects where a34share of the appropriation is released for design costs only.35

p. 219 2EHB 1115.PL

(2) Prior to receiving funds, project recipients must demonstrate1that the project site is under control for a minimum of ten years,2either through ownership or a long-term lease. This requirement does3not apply to appropriations for preconstruction activities or4appropriations whose sole purpose is to purchase real property that5does not include a construction or renovation component.6

(3) Projects funded in this section may be required to comply7with Washington's high performance building standards as required by8chapter 39.35D RCW.9

(4) Project funds are available on a reimbursement basis only,10and shall not be advanced under any circumstances.11

(5) Projects funded in this section must be held by the recipient12for a minimum of ten years and used for the same purpose or purposes13intended by the legislature as required in RCW 43.63A.125(6).14

(6) Projects funded in this section, including those that are15owned and operated by nonprofit organizations, are generally required16to pay state prevailing wages.17

(7) $1,500,000 of the appropriation in this section from the18state building construction account—state is provided solely for19design development to align ongoing planning for the replacement of20the Seattle multimodal terminal at Colman dock with the creation of a21public park. The scope of work must provide a design plan that22includes an elevated park and corresponding amenities above the23terminal. Design development shall be delivered through the city of24Seattle. The scope of this project does not preclude any current25plans for Colman dock to replace or seismically upgrade the facility,26nor does it reduce the amount of general and commercial traffic, high27occupancy vehicles, transit, bicyclist and pedestrian movement.28

(8) $500,000 of the appropriation from the environmental legacy29stewardship account—state is provided solely for an investigation of30possible contaminated soils around the Colman dock.31

(9) The appropriation is provided solely for the following list32of projects:33 34 Projects that Strengthen Communities & Quality of Life Authorized Amount

35 Ft. Vancouver - Mother Joseph Academy & Infantry Barracks $1,000,000

36 LaConner Boardwalk $1,600,000

37 Kent Interurban Trail Connector $750,000

38 Town of Concrete Public Safety Building $785,000

p. 220 2EHB 1115.PL

1 Complete Development of Ashford Park Facilities $1,000,000

2 Jackson Park Renovation $1,000,000

3 South Whatcom Library Construction $90,000

4 Guemes Channel Trail Project $700,000

5 Seabrook Trail $437,000

6 Vashon Island Allied Arts $2,000,000

7 Federal Way Performing Arts $2,000,000

8 Japanese Gulch Land Acquisition $1,000,000

9 Milton - Triangle Park ADA Upgrades $225,000

10 Langston Hughes Performing Arts Center - Storage $150,000

11 Wood Pellet Heat in Schools Pilot $500,000

12 ((Snohomish County Sheriff's Office South Precinct)) Young Island $1,000,000

13 Ravensdale Park $650,000

14 Worthington Park $210,000

15 Eastside Tacoma Community Center $400,000

16 ((228th Street Trail $500,000))

17 Institute for Community Leadership $275,000

18 FISH of Vancouver/Nonprofit Community Service Center $1,000,000

19 Yelm Community Center $1,000,000

20 Ellensburg Depot $500,000

21 Roslyn City Hall $400,000

22 Northwest Carriage Museum $375,000

23 People's Community Center and Pool $500,000

24 ((Town of Concrete Fire and Life Safety Facility $500,000))

25 Chehalis Pool $250,000

26 Mount Rainier Park Ranger Memorial $60,000

27 McAllister Air Museum $500,000

28 Repairs to Stevenson Grange $50,000

29 Meydenbauer Park Improvements $3,000,000

30 Sixty Acres Park Enhancements $750,000

31 Covington Community Park Phase 2 $2,100,000

32 Johnson Farm Museum - Anderson Island $250,000

p. 221 2EHB 1115.PL

1 Nikolai Project $40,000

2 Ft. Steilacoom Building Preservation $250,000

3 Plaza Roberto Maestas - Building the Beloved Community $1,000,000

4 Seattle Multimodal Terminal at Colman Dock/Public Park $2,000,000

5 Confluence Project $747,000

6 Castle Rock Citywide Residential Street Project $504,000

7 UWAVE $30,000

8 Transit-Community Center $800,000

9 Mt. Spokane Lodge $250,000

10

11 12TOTAL (($33,128,000))

$32,128,000

Appropriation:13State Building Construction Account—State. . . . (($32,628,000))14

$31,628,00015Environmental Legacy Stewardship Account—16

State. . . . . . . . . . . . . . . . . . . . . . . . $500,00017Subtotal Appropriation. . . . . . . . . . . . (($33,128,000))18

$32,128,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . (($33,128,000))22$32,128,00023

Sec. 6007. 2013 2nd sp.s. c 19 s 1091 (uncodified) is amended to24read as follows:25FOR THE OFFICE OF FINANCIAL MANAGEMENT26

Construction Contingency Pool (91000428)27The appropriation in this section is subject to the following28

conditions and limitations: The appropriation in this section is29provided solely for construction projects that confront emergent and30unavoidable costs in excess of the construction contingency and31management reserves included in the project appropriation. For32requests occurring during a legislative session, an agency must33notify the legislative fiscal committees before requesting34contingency funds from the office of financial management. Eligible35

p. 222 2EHB 1115.PL

agencies that may apply to the pool include higher education1institutions, the state parks and recreation commission, the2department of corrections, the department of enterprise services, and3the department of health. Eligible construction projects are only4projects that had project cost reductions. The office of financial5management must notify the legislative evaluation and accountability6program committee, the house capital budget committee, and senate7ways and means committee as projects are approved for funding.8Appropriation:9

State Building Construction Account—State. . . . . (($4,000,000))10 $1,875,00011

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . (($4,000,000))14$1,875,00015

Sec. 6008. 2013 2nd sp.s c 19 s 1109 (uncodified) is amended to16read as follows:17FOR THE DEPARTMENT OF ENTERPRISE SERVICES18

1063 Block Replacement (91000016)19The appropriation in this section is subject to the following20

conditions and limitations: The appropriation in this section is21provided solely for predesign and bridging documents, design,22competition honoraria, project management, demolition, and other23planning activities including permits. The predesign must specify the24tenants of the building as directed by the office of financial25management. The predesign must indicate the estimated annual cost26increase for state agency tenants compared to the cost of their27existing leases. The estimated cost increase may take into account28estimated cost savings in staff costs and other costs that may result29in more efficient building design and layout of office space. The30director of the office of financial management must review these cost31estimates and submit a report to the appropriate committees of the32legislature indicating the budget increase that would be required33sixty days prior to executing any construction contracts for the34building. The lease for any prospective tenant may not be extended35beyond the anticipated occupancy date of the building. ((The building36will be alternatively financed as authorized in section 7014 of this37act.))38

p. 223 2EHB 1115.PL

Appropriation:1State Building Construction Account—State. . . . . . $13,000,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,000,0005

Sec. 6009. 2013 2nd sp.s. c 19 s 1093 (uncodified) is amended to6read as follows:7FOR THE DEPARTMENT OF ENTERPRISE SERVICES8

Natural Resource Building Roof Replacement/Exterior Foam9Insulation Repairs (30000546)10Reappropriation:11

State Building Construction Account—State. . . . . . (($510,000))12 $33,00013

Prior Biennia (Expenditures). . . . . . . . . . . (($3,972,000))14 $4,409,00015

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016TOTAL. . . . . . . . . . . . . . . . . . . . . (($4,482,000))17

$4,442,00018

Sec. 6010. 2013 2nd sp.s. c 19 s 1099 (uncodified) is amended to19read as follows:20FOR THE DEPARTMENT OF ENTERPRISE SERVICES21

Legislative Building Critical Hydronic Loop Repairs (30000584)22Reappropriation:23

State Building Construction Account—State. . . . . (($1,075,000))24 $1,013,00025Appropriation:26

State Building Construction Account—State. . . . . . (($851,000))27 $410,00028

Prior Biennia (Expenditures). . . . . . . . . . . . (($104,000))29 $166,00030

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031TOTAL. . . . . . . . . . . . . . . . . . . . . (($2,030,000))32

$1,589,00033

p. 224 2EHB 1115.PL

Sec. 6011. 2013 2nd sp.s. c 19 s 1108 (uncodified) is amended to1read as follows:2FOR THE DEPARTMENT OF ENTERPRISE SERVICES3

Legislative Building Exterior Repairs (30000604)4Appropriation:5

State Building Construction Account—State. . . . . (($1,000,000))6 $1,075,0007

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . (($1,000,000))10$1,075,00011

Sec. 6012. 2013 2nd sp.s. c 19 s 1104 (uncodified) is amended to12read as follows:13FOR THE DEPARTMENT OF ENTERPRISE SERVICES14

Capitol Campus Underground Utility Repairs (30000687)15Appropriation:16

State Building Construction Account—State. . . . . (($1,983,000))17 $2,613,00018

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019Future Biennia (Projected Costs). . . . . . . . . . . $8,827,00020

TOTAL. . . . . . . . . . . . . . . . . . . . (($10,810,000))21$11,440,00022

Sec. 6013. 2013 2nd sp.s. c 19 s 1105 (uncodified) is amended to23read as follows:24FOR THE DEPARTMENT OF ENTERPRISE SERVICES25

Natural Resource Building Repairs Phase 1 (91000009)26The appropriations in this section are subject to the following27

conditions and limitations: The natural resource building repairs28phase 1 project must include at a minimum the multipurpose room water29infiltration project and the roof project. After this work is30completed, the department may include work that was in the31department's 2013-2015 capital budget request for other repairs to32the building.33Appropriation:34

State Building Construction Account—State. . . . . (($4,161,000))35

p. 225 2EHB 1115.PL

$4,041,0001Thurston County Capital Facilities Construction2

Account—State. . . . . . . . . . . . . . . . . . . . $940,0003Subtotal Appropriation. . . . . . . . . . . . (($5,101,000))4

$4,981,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . (($5,101,000))8$4,981,0009

Sec. 6014. 2013 2nd sp.s. c 19 s 2024 (uncodified) is amended to10read as follows:11FOR THE DEPARTMENT OF CORRECTIONS12

Monroe Corrections Center: WSR Living Units Roofs (30000542)13Appropriation:14

State Building Construction Account—State. . . . . (($1,785,000))15 $1,868,00016

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . (($1,785,000))19$1,868,00020

Sec. 6015. 2013 2nd sp.s. c 19 s 2028 (uncodified) is amended to21read as follows:22FOR THE DEPARTMENT OF CORRECTIONS23

Washington Corrections Center for Women: Replace Fire Alarm24System (30000727)25Appropriation:26

State Building Construction Account—State. . . . . (($2,569,000))27 $2,649,00028

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . (($2,569,000))31$2,649,00032

Sec. 6016. 2013 2nd sp.s. c 19 s 3067 (uncodified) is amended to33read as follows:34FOR THE DEPARTMENT OF ECOLOGY35

p. 226 2EHB 1115.PL

Water Pollution Control Revolving Program (30000327)1The appropriations in this section are subject to the following2

conditions and limitations:3(1) (($7,750,000 for fiscal year 2014 and $7,750,000))4

$15,500,000 for fiscal year 2015 of the ((state building5construction)) water pollution control revolving account—state is6provided solely as state match for federal clean water funds.7

(2) For projects involving repair, replacement, or improvement of8a wastewater treatment plant or other public works facility for which9an investment grade efficiency audit is obtainable, the department of10ecology must require as a contract condition that the project sponsor11undertake an investment grade efficiency audit. The project sponsor12may finance the costs of the audit as part of its water pollution13control loan program ((loan)).14Appropriation:15

((State Building Construction Account—State. . . . $15,500,000))16Water Pollution Control Revolving Account—17

State. . . . . . . . . . . . . . . . . . . . (($184,500,000))18 $200,000,00019

Water Pollution Control Revolving20Account—Federal. . . . . . . . . . . . . . . . . $50,000,00021Subtotal Appropriation. . . . . . . . . . . . . $250,000,00022

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . $510,000,00024

TOTAL. . . . . . . . . . . . . . . . . . . . . . $760,000,00025

Sec. 6017. 2013 2nd sp.s. c 19 s 3058 (uncodified) is amended to26read as follows:27FOR THE DEPARTMENT OF ECOLOGY28

Skagit Mitigation (91000181)29The reappropriation in this section is subject to the following30

conditions and limitations: The reappropriation in this section is31provided solely for the department to develop mitigation options and32alternative water sources or tools to make water available for stream33flows and for rural domestic permit-exempt uses within the34((Carpenter/Fisher, East Nookachamps, and Upper Nookachamps35subbasins)) Skagit River watershed. Up to $500,000 of the amount36specified shall be used to develop a rural domestic demonstration37

p. 227 2EHB 1115.PL

project to determine if surface or groundwater infiltration can1mitigate for ground water use during low flow periods to meet the2mitigation requirements of chapter 173-503 WAC.3Reappropriation:4

State Building Construction Account—State. . . . . . . $2,156,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . $69,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,225,0008

Sec. 6018. 2013 2nd sp.s. c 19 s 3101 (uncodified) is amended to9read as follows:10FOR THE STATE PARKS AND RECREATION COMMISSION11

Dosewallips: Wastewater Treatment System (30000523)12Appropriation:13

State Building Construction Account—State. . . . . (($4,079,000))14 $4,532,00015

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . (($4,079,000))18$4,532,00019

Sec. 6019. 2013 2nd sp.s. c 19 s 3190 (uncodified) is amended to20read as follows:21FOR THE DEPARTMENT OF FISH AND WILDLIFE22

Mitchell Act Federal Grant (91000021)23Reappropriation:24

General Fund—Federal. . . . . . . . . . . . . . . . . $2,328,00025Appropriation:26

General Fund—Federal. . . . . . . . . . . . . . . . . $4,000,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . $672,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . (($3,000,000))30$7,000,00031

Sec. 6020. 2013 2nd sp.s. c 19 s 3212 (uncodified) is amended to32read as follows:33FOR THE PUGET SOUND PARTNERSHIP34

p. 228 2EHB 1115.PL

Community Partnership Restoration Grants (30000007)1Reappropriation:2

General Fund—Federal. . . . . . . . . . . . . . . (($1,155,000))3 $1,575,0004

Prior Biennia (Expenditures). . . . . . . . . . . . (($445,000))5 $50,0006

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07TOTAL. . . . . . . . . . . . . . . . . . . . . (($1,600,000))8

$1,625,0009

Sec. 6021. 2013 2nd sp.s. c 19 s 5007 (uncodified) is amended to10read as follows:11FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION12

Yakima Valley Technical Skills Center (30000076)13Reappropriation:14

State Building Construction Account—State. . . . (($12,962,000))15 $11,082,00016

Prior Biennia (Expenditures). . . . . . . . . . . . . $12,481,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . (($25,443,000))19$23,563,00020

Sec. 6022. 2013 2nd sp.s. c 19 s 5020 (uncodified) is amended to21read as follows:22FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION23

2013-2015 School Construction Assistance Program - Maintenance24(30000145)25

The appropriations in this section are subject to the following26conditions and limitations:27

(1) $1,340,000 of the common school construction account—state28appropriation is provided solely for study and survey grants and for29completing inventory and building condition assessments for all30public school districts once every six years.31

(2) $933,000 of the common school construction account—state32appropriation is provided solely for mapping the design of new33facilities and remapping the design of facilities to be remodeled,34for school construction projects funded through the school35construction assistance program.36

p. 229 2EHB 1115.PL

(3) The office of the superintendent of public instruction must1improve web-based access by taxpayers to school capacity and actual2enrollment in order to understand possible opportunities to increase3efficiency through consolidation. The office of the superintendent of4public instruction must post this capacity and enrollment information5on its web site.6

(4) Funds from this appropriation may be used to match federal7dollars provided by the office of economic adjustment for school8replacement facilities located on military bases.9

(5) The office of the superintendent of public instruction must10expedite allocation and distribution of any eligible funds under the11school construction assistance grant program to the Evergreen (Clark12County) School District to address the school construction emergency13resulting from the fire that destroyed the Crestline School.14

(6) The space allocations for state funding assistance purposes15for districts with senior or four-year high schools with fewer than16four hundred students, as outlined in WAC 392-343-035, must be17computed in accordance with the following formula:18 19 20

Number of Headcount

Student-Grades 9-12

Maximum Space

Allocation Per Facility

21 0-200 42,000 square feet

22 201-300 48,000 square feet

23 301-or more 52,000 square feet

(7) $775,000 of the common school construction account—state24appropriation is provided solely as state funding assistance in25addition to any previously awarded state funding assistance for the26La Conner middle school replacement.27Appropriation:28

State Building Construction Account—State. . . . (($285,355,000))29 $382,563,00030

Common School Construction Account—State. . . . (($208,232,000))31 $1,526,00032

Common School Construction Account—Federal. . . . (($1,500,000))33 $3,500,00034

Subtotal Appropriation. . . . . . . . . . . (($495,087,000))35$387,589,00036

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $037

p. 230 2EHB 1115.PL

Future Biennia (Projected Costs). . . . . . . (($3,099,310,000))1 $3,099,270,0002

TOTAL. . . . . . . . . . . . . . . . . . . (($3,594,397,000))3$3,486,859,0004

Sec. 6023. 2013 2nd sp.s. c 19 s 5015 (uncodified) is amended to5read as follows:6FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION7

WA-NIC (Washington Network for Innovative Careers) Skills Center8- Snoqualmie Valley School District/Bellevue Community College9(92000006)10Reappropriation:11

State Building Construction Account—State. . . . . (($1,715,000))12 $31,00013

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . (($1,715,000))16$31,00017

Sec. 6024. 2013 2nd sp.s. c 19 s 5025 (uncodified) is amended to18read as follows:19FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION20

School Security Improvement Grants (92000015)21The appropriation in this section is subject to the following22

conditions and limitations: The appropriation is provided solely for23nonrecurring costs associated with school facility safety projects24consistent with chapter 233, Laws of 2013 (Second Engrossed25Substitute Senate Bill No. 5197).26Appropriation:27

State Building Construction Account—State. . . . (($10,000,000))28 $6,656,00029

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . (($10,000,000))32$6,656,00033

Sec. 6025. 2013 2nd sp.s. c 19 s 5055 (uncodified) is amended to34read as follows:35

p. 231 2EHB 1115.PL

FOR THE WASHINGTON STATE UNIVERSITY1Washington State University Pullman Pedestrian Bridge (91000028)2

Appropriation:3Washington State University Building4

Account—State. . . . . . . . . . . . . . . . . (($1,500,000))5 $06

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . (($1,500,000))9$010

Sec. 6026. 2013 2nd sp.s. c 19 s 5108 (uncodified) is amended to11read as follows:12FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM13

Bates Technical College: Mohler Communications Technology Center14(20082703)15Reappropriation:16

State Building Construction Account—State. . . . . . . . $219,00017Appropriation:18

State Building Construction Account—State. . . . (($23,808,000))19 $24,519,00020

Prior Biennia (Expenditures). . . . . . . . . . . . . $1,709,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . (($25,736,000))23$26,447,00024

Sec. 6027. 2013 2nd sp.s. c 19 s 5110 (uncodified) is amended to25read as follows:26FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM27

Clark College: Health and Advanced Technologies Building28(20082705)29Reappropriation:30

State Building Construction Account—State. . . . . . . $1,335,00031Appropriation:32

State Building Construction Account—State. . . . (($33,784,000))33 $34,478,00034

Prior Biennia (Expenditures). . . . . . . . . . . . . $1,239,00035p. 232 2EHB 1115.PL

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . (($36,358,000))2

$37,052,0003

Sec. 6028. 2013 2nd sp.s. c 19 s 7043 (uncodified) is amended to4read as follows:5FOR THE STATE TREASURER—TRANSFERS6State Toxic Control Account: For transfer to the7

Local Toxic Control Account. . . . . . . . . . . . . . $4,000,0008Environmental Legacy Stewardship Account: For9

transfer to the Local Toxic Control Account. . . . . $12,000,00010State Taxable Building Construction Account: For11

transfer to the drinking water assistance12account, $4,000,000 for fiscal year 2015. . . . . . . $4,000,00013

State Taxable Building Construction Account: For14transfer to the water pollution control15revolving account, $15,500,000 for fiscal16year 2015. . . . . . . . . . . . . . . . . . . . . . $15,500,00017

Sec. 6029. RCW 43.160.080 and 2010 1st sp.s. c 36 s 6011 are18each amended to read as follows:19

There shall be a fund in the state treasury known as the public20facilities construction loan revolving account, which shall consist21of all moneys collected under this chapter and any moneys22appropriated to it by law. Disbursements from the revolving account23shall be on authorization of the board. In order to maintain an24effective expenditure and revenue control, the public facilities25construction loan revolving account shall be subject in all respects26to chapter 43.88 RCW. ((During the 2009-2011 biennium, sums in the27public facilities construction loan revolving account may be used for28community economic revitalization board export assistance grants and29loans in section 1018, chapter 36, Laws of 2010 1st sp. sess. and for30matching funds for the federal energy regional innovation cluster in31section 1017, chapter 36, Laws of 2010 1st sp. sess.)) During the322013-2015 biennium, amounts in the public facilities construction33loan revolving account may be used for the animal disease34traceability project in section 3247, chapter 19, Laws of 2013 2nd35sp. sess., administered by the department of agriculture. During the362013-2015 biennium, sums in the public facilities construction loan37

p. 233 2EHB 1115.PL

revolving account may be used for the clean energy partnership1project in section 1038, chapter 19, Laws of 2013 2nd sp. sess.2

NEW SECTION. Sec. 6030. A new section is added to 2013 2nd3sp.s. c 19 (uncodified) to read as follows:4

To the extent that any appropriation authorizes expenditures of5state funds from the state building construction account, or from any6other capital project account in the state treasury, for a capital7project or program that is specified to be funded with proceeds from8the sale of bonds, the legislature declares that any such9expenditures for that project or program made prior to the issue date10of the applicable bonds are intended to be reimbursed from proceeds11of those bonds in a maximum amount equal to the amount of such12appropriation.13

NEW SECTION. Sec. 6031. 2013 2nd sp.s. c 19 ss 1090 and 701314(uncodified) are each repealed.15

(End of part)

p. 234 2EHB 1115.PL

PART 71MISCELLANEOUS PROVISIONS2

NEW SECTION. Sec. 7001. RCW 43.88.031 requires the disclosure3of the estimated debt service costs associated with new capital bond4appropriations. The estimated debt service costs for the5appropriations contained in this act are thirty-six million eight6hundred thirteen thousand dollars for the 2015-2017 biennium, two7hundred thirty-three million two hundred eighty-six thousand dollars8for the 2017-2019 biennium, and three hundred twenty-seven million9two hundred thirty-four thousand dollars for the 2019-2021 biennium.10

NEW SECTION. Sec. 7002. ACQUISITION OF PROPERTIES AND11FACILITIES THROUGH FINANCIAL CONTRACTS. (1) The following agencies12may enter into financial contracts, paid from any funds of an agency,13appropriated or nonappropriated, for the purposes indicated and in14not more than the principal amounts indicated, plus financing15expenses and required reserves pursuant to chapter 39.94 RCW. When16securing properties under this section, agencies shall use the most17economical financial contract option available, including long-term18leases, lease-purchase agreements, lease-development with option to19purchase agreements or financial contracts using certificates of20participation. Expenditures made by an agency for one of the21indicated purposes before the issue date of the authorized financial22contract and any certificates of participation therein are intended23to be reimbursed from proceeds of the financial contract and any24certificates of participation therein to the extent provided in the25agency's financing plan approved by the state finance committee.26

State agencies may enter into agreements with the department of27enterprise services and the state treasurer's office to develop28requests to the legislature for acquisition of properties and29facilities through financial contracts. The agreements may include30charges for services rendered.31

(2) Those noninstructional facilities of higher education32institutions authorized in this section to enter into financial33contracts are not eligible for state funded maintenance and34operations. Instructional space that is available for regularly35scheduled classes for academic transfer, basic skills, and workforce36training programs may be eligible for state funded maintenance and37operations.38

p. 235 2EHB 1115.PL

(3) Department of enterprise services: Enter into a financing1contract for up to $69,000,000 plus financing expenses and required2reserves pursuant to chapter 39.94 RCW to construct a new office3building at 1063 Capitol Way South, Olympia.4

(4) Department of enterprise services: Enter into a financing5contract for up to $8,077,000 plus financing expenses and required6reserves pursuant to chapter 39.94 RCW to repair the natural7resources building parking garage fire suppression system.8

(5) Department of ecology: Enter into a financing contract for up9to $180,000 plus financing expenses and required reserves pursuant to10chapter 39.94 RCW for programmatic improvements to the headquarters11building and the eastern regional office.12

(6) Department of ecology: Enter into a financing contract for up13to $760,000 plus financing expenses and required reserves pursuant to14chapter 39.94 RCW for preservation improvements to the headquarters15building.16

(7) Central Washington University: Enter into a financing17contract for up to $8,414,000 plus financing expenses and required18reserves pursuant to chapter 39.94 RCW to construct a welcome center.19

(8) The Evergreen State College: Enter into a financing contract20for up to $12,500,000 plus financing expenses and required reserves21pursuant to chapter 39.94 RCW to purchase a permanent location for22the Tacoma program.23

(9) Western Washington University: Enter into a financing24contract for up to $6,000,000 plus financing expenses and required25reserves pursuant to chapter 39.94 RCW for the carver building26renovation.27

(10) Eastern Washington University: Enter into a financing28contract for up to $10,000,000 plus financing expenses and required29reserves pursuant to chapter 39.94 RCW for the Washington street30facility project. The university shall not use their building account31or other appropriated account as a fund source for the certificate of32participation.33

(11) Community and technical colleges:34(a) Enter into a financing contract on behalf of Centralia35

Community College for up to $5,000,000 plus financing expenses and36required reserves pursuant to chapter 39.94 RCW to renovate the37student services building.38

(b) Enter into a financing contract on behalf of Centralia39Community College for up to $3,000,000 plus financing expenses and40

p. 236 2EHB 1115.PL

required reserves pursuant to chapter 39.94 RCW to purchase or1construct student housing.2

(c) Enter into a financing contract on behalf of Clark College3for up to $8,500,000 plus financing expenses and required reserves4pursuant to chapter 39.94 RCW to renovate the culinary arts facility.5

(d) Enter into a financing contract on behalf of Clark College6for up to $35,000,000 plus financing expenses and required reserves7pursuant to chapter 39.94 RCW to design and construct a student8recreation center.9

(e) Enter into a financing contract on behalf of Columbia Basin10College for up to $7,000,000 plus financing expenses and required11reserves pursuant to chapter 39.94 RCW to design and construct a12health science center.13

(f) Enter into a financing contract on behalf of Green River14College for up to $15,000,000 plus financing expenses and required15reserves pursuant to chapter 39.94 RCW to construct an aviation16program center.17

(g) Enter into a financing contract on behalf of Highline College18for up to $1,500,000 plus financing expenses and required reserves19pursuant to chapter 39.94 RCW to renovate the maintenance and grounds20building.21

(h) Enter into a financing contract on behalf of Lower Columbia22College for up to $3,000,000 plus financing expenses and required23reserves pursuant to chapter 39.94 RCW to renovate the main building.24

(i) Enter into a financing contract on behalf of Lower Columbia25College for up to $3,000,000 plus financing expenses and required26reserves pursuant to chapter 39.94 RCW to renovate and expand the27Myklebust gymnasium.28

(j) Enter into a financing contract on behalf of Tacoma Community29College for up to $12,000,000 plus financing expenses and required30reserves pursuant to chapter 39.94 RCW to expand a health and31wellness center.32

(k) Enter into a financing contract on behalf of Walla Walla33Community College for up to $1,500,000 plus financing expenses and34required reserves pursuant to chapter 39.94 RCW to construct a35workforce and business development center.36

(12) Washington state patrol: Enter into a financing contract for37up to $13,700,000 plus financing expenses and required reserves38pursuant to chapter 39.94 RCW to replace the fire training academy39burn building; however, local agencies that use the burn building40

p. 237 2EHB 1115.PL

must have indicated support for required fee increases to pay for the1debt service for the financing contract. Indication of support means2at least sixty percent of local agencies which have used the facility3within the prior ten years support the fee increase.4

(13) Department of corrections: Enter into a financing contract5for up to $2,163,000 plus financing expenses and required reserves6for the remodel of the correctional industry's food factory.7

NEW SECTION. Sec. 7003. (1) The legislature finds that use of8life-cycle cost analysis will aid public entities, architects,9engineers, and contractors in making design and construction10decisions that positively impact both the initial construction cost11and the ongoing operating and maintenance cost of a project. To12ensure that the total cost of a project is accounted for and the most13reasonable and cost efficient design is used, agencies shall develop14life-cycle costs for any construction project over $10,000,000. The15life-cycle costs must represent the present value sum of capital16costs, installation costs, operating costs, and maintenance costs17over the life expectancy of the project. The legislature further18finds the most effective approach to the life-cycle cost analysis is19to integrate it into the early part of the design process.20

(2) Agencies shall develop a minimum of three project21alternatives for use in the life-cycle cost analysis. These22alternatives must be both distinctly different and viable solutions23to the issue being addressed. The chosen alternative must be the most24reasonable and cost-effective solution. A brief description of each25project alternative and why it was chosen must be included in the26life-cycle cost analysis section of the predesign.27

(3) The office of financial management shall: (a) Make available28a life-cycle cost model to be used for analysis; (b) in consultation29with the department of enterprise services, provide assistance in30using the life-cycle cost model; and (c) update the life-cycle cost31model annually including assumptions for inflation rates, discount32rates, and energy rates.33

(4) Agencies shall consider architectural and engineering firms'34and general contractors' experience using life-cycle costs, operating35costs, and energy efficiency measures when selecting an architectural36and engineering firm, or when selecting contractors using alternative37contracting methods.38

p. 238 2EHB 1115.PL

NEW SECTION. Sec. 7004. To ensure that major construction1projects are carried out in accordance with legislative and executive2intent, appropriations in this act in excess of $10,000,000 may not3be expended or encumbered until the office of financial management4has reviewed and approved the agency's predesign. The predesign5document must include, but not be limited to, program, site, and cost6analysis, including life-cycle cost, in accordance with the predesign7manual adopted by the office of financial management. The results of8life-cycle cost analysis must be a primary consideration in the9selection of a building design. Construction may proceed only upon10providing to the office of financial management the life-cycle costs.11To improve monitoring of major construction projects, progress12reports must be submitted by the agency administering the project to13the office of financial management and to the fiscal committees of14the house of representatives and senate. Reports must be submitted on15July 1st and December 31st each year in a format to be developed by16the office of financial management.17

NEW SECTION. Sec. 7005. (1) Allotments for appropriations in18this act shall be provided in accordance with the capital project19review requirements adopted by the office of financial management and20in compliance with RCW 43.88.110. Projects that will be employing21alternative public works construction procedures under chapter 39.1022RCW are subject to the allotment procedures defined in this section23and RCW 43.88.110.24

(2) Each project is defined as proposed in the legislative budget25notes or in the governor's budget document.26

NEW SECTION. Sec. 7006. (1) The office of financial management27may authorize a transfer of appropriation authority provided for a28capital project that is in excess of the amount required for the29completion of such project to another capital project for which the30appropriation is insufficient. No such transfer may be used to expand31the capacity of any facility beyond that intended in making the32appropriation. Such transfers may be effected only between capital33appropriations to a specific department, commission, agency, or34institution of higher education and only between capital projects35that are funded from the same fund or account. No transfers may occur36between projects to local government agencies except where the grants37are provided within a single omnibus appropriation and where such38

p. 239 2EHB 1115.PL

transfers are specifically authorized by the implementing statutes1that govern the grants.2

(2) The office of financial management may find that an amount is3in excess of the amount required for the completion of a project only4if: (a) The project as defined in the notes to the budget document is5substantially complete and there are funds remaining; or (b) bids6have been let on a project and it appears to a substantial certainty7that the project as defined in the notes to the budget document can8be completed within the biennium for less than the amount9appropriated in this act.10

(3) For the purposes of this section, the intent is that each11project be defined as proposed to the legislature in the governor's12budget document, unless it clearly appears from the legislative13history that the legislature intended to define the scope of a14project in a different way.15

(4) A report of any transfer effected under this section, except16emergency projects or any transfer under $250,000, shall be filed17with the legislative fiscal committees of the senate and house of18representatives by the office of financial management at least thirty19days before the date the transfer is effected. The office of20financial management shall report all emergency or smaller transfers21within thirty days from the date of transfer.22

NEW SECTION. Sec. 7007. (1) It is expected that projects be23ready to proceed in a timely manner depending on the type or phase of24the project or program that is the subject of the appropriation in25this act. Except for major projects that customarily may take more26than two biennia to complete from predesign to the end of27construction, or large infrastructure grant or loan programs28supporting projects that often take more than two biennia to29complete, the legislature generally does not intend to reappropriate30funds more than once, particularly for smaller grant programs, local/31community projects, and minor works.32

(2) Agencies shall expedite the expenditure of reappropriations33and appropriations in this act in order to: (a) Rehabilitate34infrastructure resources; (b) accelerate environmental rehabilitation35and restoration projects for the improvement of the state's natural36environment; (c) reduce additional costs associated with acquisition37and construction inflationary pressures; and (d) provide additional38employment opportunities associated with capital expenditures.39

p. 240 2EHB 1115.PL

(3) To the extent feasible, agencies are directed to accelerate1expenditure rates at their current level of permanent employees and2shall use contracted design and construction services wherever3necessary to meet the goals of this section.4

NEW SECTION. Sec. 7008. (1) Any building project that receives5over $10,000,000 in funding from the capital budget must be built to6sustainable standards. "Sustainable building" means a building that7integrates and optimizes all major high-performance building8attributes, including energy efficiency, durability, life-cycle9performance, and occupant productivity. The following design and10construction attributes must be integrated into the building project:11

(a) Employ integrated design principles: Use a collaborative,12integrated planning and design process that initiates and maintains13an integrated project team in all stages of a project's planning and14delivery. Establish performance goals for siting, energy, water,15materials, and indoor environmental quality along with other16comprehensive design goals and ensures incorporation of these goals17throughout the design and life-cycle of the building. Considers all18stages of the building's life-cycle, including deconstruction.19

(b) Commissioning: Employ commissioning practices tailored to the20size and complexity of the building and its system components in21order to verify performance of building components and systems and22help ensure that design requirements are met. This should include an23experienced commissioning provider, inclusion of commissioning24requirements in construction documents, a commissioning plan,25verification of the installation and performance of systems to be26commissioned, and a commissioning report.27

(c) Optimize energy performance: Establish a whole building28performance target that takes into account the intended use,29occupancy, operations, plug loads, other energy demands, and design30to earn the ENERGY STAR targets for new construction and major31renovation where applicable. For new construction target low energy32use index. For major renovations, reduce the energy use by fifty33percent below pre-renovations baseline.34

(d) On-site renewable energy: Meet at least thirty percent of the35hot water demand through the installation of solar hot water heaters,36when life-cycle cost effective. Implement renewable energy generation37projects on agency property for agency use, when life-cycle cost38effective.39

p. 241 2EHB 1115.PL

(e) Measurement and verification: Install building level1electricity meters in new major construction and renovation projects2to track and continuously optimize performance. Include equivalent3meters for natural gas and steam, where natural gas and steam are4used. Install dashboards inside buildings to display and incentivize5occupants on energy use.6

(f) Benchmarking: Compare actual performance data from the first7year of operation with the energy design target. Verify that the8building performance meets or exceeds the design target. For other9building and space types, use an equivalent benchmarking tool for10laboratory buildings. Web-based data collection and dashboards must11also be provided.12

NEW SECTION. Sec. 7009. State agencies, including institutions13of higher education, shall allot and report full-time equivalent14staff for capital projects in a manner comparable to staff reporting15for operating expenditures.16

NEW SECTION. Sec. 7010. Executive Order No. 05-05,17archaeological and cultural resources, was issued effective November1810, 2005. Agencies and higher education institutions shall comply19with the requirements set forth in this executive order.20

NEW SECTION. Sec. 7011. PUGET SOUND PROTECTION AND RESTORATION.21Consistent with RCW 90.71.340, when expending appropriations under22this act that contribute to Puget Sound protection and recovery,23agencies shall consult with the Puget Sound partnership to ensure24that projects and expenditures are either in, or consistent with the252020 action agenda. These consultations shall include the exchange of26information on specific actions, projects, associated funding,27performance measures, and other information necessary to track28project implementation and ensure alignment with the action agenda.29In situations where the Puget Sound partnership finds that a project30is not in, or is not consistent with the action agenda, Puget Sound31partnership shall document this finding and report back to the32governor and legislative fiscal committees.33

NEW SECTION. Sec. 7012. FOR THE ARTS COMMISSION—ART WORK34ALLOWANCE. (1) One-half of one percent of moneys appropriated in this35

p. 242 2EHB 1115.PL

act for original construction of school plant facilities is provided1solely for the purposes of RCW 28A.335.210.2

(2) One-half of one percent of moneys appropriated in this act3for original construction or any major renovation or remodel work4exceeding $200,000 by colleges or universities is provided solely for5the purposes of RCW 28B.10.027.6

(3) One-half of one percent of moneys appropriated in this act7for original construction of any public building by a state agency8identified in RCW 43.17.020 is provided solely for the purposes of9RCW 43.17.200.10

(4) At least eighty-five percent of the moneys spent by the11Washington state arts commission during the 2015-2017 biennium for12the purposes of RCW 28A.335.210, 28B.10.027, and 43.17.200 must be13expended solely for direct acquisition of works of art. Art14allocations not expended within the ensuing two biennia will lapse.15The commission may use up to $100,000 of this amount to conserve or16maintain existing pieces in the state art collection pursuant to RCW1728A.335.210.18

(5) The executive director of the arts commission shall appoint a19study group to review the operations of the one-half of one percent20for works of art purchased or commissioned as required by RCW2128A.335.210, 28B.10.027, and 43.17.200. The findings of the review22must be reported annually to the office of financial management and23the fiscal committees of the legislature by August 15th. The review24must include, but is not limited to, the following: (a) Projects25purchased or commissioned per biennium; (b) partner agencies; (c)26funding sources by fiscal year; (d) artwork costs; (e) administrative27costs; (f) collection care costs; and (g) project status.28

NEW SECTION. Sec. 7013. It is confirmed that the director of29the department of enterprise services is authorized under chapter3035A.14 RCW to petition for annexation of the former northern state31hospital property to the city of Sedro-Woolley upon the director's32determination that such annexation is appropriate and in furtherance33of the interests of the state. The director shall consult with the34office of financial management prior to making such determination.35

Sec. 7014. RCW 27.34.330 and 2006 c 371 s 232 are each amended36to read as follows:37

p. 243 2EHB 1115.PL

The Washington state historical society shall establish a1competitive process to solicit proposals for and prioritize heritage2capital projects for potential funding in the state capital budget.3The society shall adopt rules governing project eligibility and4evaluation criteria. Application for funding of specific projects may5be made to the society by local governments, public development6authorities, nonprofit corporations, tribal governments, and other7entities, as determined by the society. The society, with the advice8of leaders in the heritage field, including but not limited to9representatives from the office of the secretary of state, the10eastern Washington state historical society, and the department of11archaeology and historic preservation, shall establish and submit a12prioritized list of heritage capital projects to the governor and the13legislature in the society's biennial capital budget request. The14list shall include a description of each project, the amount of15recommended state funding, and documentation of nonstate funds to be16used for the project. The total amount of recommended state funding17for projects on a biennial project list shall not exceed ten million18dollars. The prioritized list shall be developed through open and19public meetings and the amount of state funding shall not exceed20thirty-three and thirty-three one hundredths percent of the total21cost of the project. The nonstate portion of the total project cost22may include cash, the value of real property when acquired solely for23the purpose of the project, and in-kind contributions. The department24shall not sign contracts or otherwise financially obligate funds25under this section until the legislature has approved a specific list26of projects. In contracts for grants authorized under this section,27the society shall include provisions requiring that capital28improvements be held by the grantee for a specified period of time29appropriate to the amount of the grant and that facilities be used30for the express purpose of the grant. If the grantee is found to be31out of compliance with provisions of the contract, the grantee shall32repay to the state general fund the principal amount of the grant33plus interest calculated at the rate of interest on state of34Washington general obligation bonds issued most closely to the date35of authorization of the grant.36

NEW SECTION. Sec. 7015. To carry out the provisions of this37act, the governor may assign responsibility for predesign, design,38construction, and other related activities to any appropriate agency.39

p. 244 2EHB 1115.PL

NEW SECTION. Sec. 7016. If any federal moneys appropriated by1this act for capital projects are not received by the state, the2department or agency to which the moneys were appropriated may3replace the federal moneys with funds available from private or local4sources. No replacement may occur under this section without the5prior approval of the director of financial management in6consultation with the senate ways and means committee and the house7of representatives capital budget committee.8

NEW SECTION. Sec. 7017. (1) Unless otherwise stated, for all9appropriations under this act that require a match of nonstate money10or in-kind contributions, the following requirement, consistent with11RCW 43.88.150, shall apply: Expenditures of state money shall be12timed so that the state share of project expenditures never exceeds13the intended state share of total project costs.14

(2) Provision of the full amount of required matching funds is15not required to permit the expenditure of capital budget16appropriations for phased projects if a proportional amount of the17required matching funds is provided for each distinct, identifiable18phase of the project.19

Sec. 7018. RCW 28A.525.166 and 2013 2nd sp.s. c 18 s 514 are20each amended to read as follows:21

Allocations to school districts of state funds provided by RCW2228A.525.162 through 28A.525.180 shall be made by the superintendent23of public instruction and the amount of state funding assistance to a24school district in financing a school plant project shall be25determined in the following manner:26

(1) The boards of directors of the districts shall determine the27total cost of the proposed project, which cost may include the cost28of acquiring and preparing the site, the cost of constructing the29building or of acquiring a building and preparing the same for school30use, the cost of necessary equipment, taxes chargeable to the31project, necessary architects' fees, and a reasonable amount for32contingencies and for other necessary incidental expenses: PROVIDED,33That the total cost of the project shall be subject to review and34approval by the superintendent.35

(2) The state funding assistance percentage for a school district36shall be computed by the following formula:37

p. 245 2EHB 1115.PL

The ratio of the school district's adjusted valuation per pupil1divided by the ratio of the total state adjusted valuation per pupil2shall be subtracted from three, and then the result of the foregoing3shall be divided by three plus (the ratio of the school district's4adjusted valuation per pupil divided by the ratio of the total state5adjusted valuation per pupil).6

7 District adjusted Total state

8 3-valuation ÷ adjusted valuation

9 Computed per pupil per pupil State

10 State = ———————————————— = - % Funding

11 Ratio District adjusted Total state Assistance

12 3+valuation ÷ adjusted valuation

13 per pupil per pupil

PROVIDED, That in the event the state funding assistance percentage14to any school district based on the above formula is less than twenty15percent and such school district is otherwise eligible for state16funding assistance under RCW 28A.525.162 through 28A.525.180, the17superintendent may establish for such district a state funding18assistance percentage not in excess of twenty percent of the approved19cost of the project, if the superintendent finds that such additional20assistance is necessary to provide minimum facilities for housing the21pupils of the district.22

(3) In addition to the computed state funding assistance23percentage developed in subsection (2) of this section, a school24district shall be entitled to additional percentage points determined25by the average percentage of growth for the past three years. One26percent shall be added to the computed state funding assistance27percentage for each percent of growth, with a maximum of twenty28percent.29

(4) In computing the state funding assistance percentage in30subsection (2) of this section and adjusting the percentage under31subsection (3) of this section, students residing outside the school32district who are enrolled in alternative learning experience courses33under RCW 28A.232.010 shall be excluded from the count of total34pupils. In lieu of the exclusion in this subsection, a district may35submit an alternative calculation for excluding students enrolled in36alternative learning experience courses. The alternative calculation37must show the student headcount use of district classroom facilities38

p. 246 2EHB 1115.PL

on a regular basis for a reasonable duration by out-of-district1alternative learning experience students subtracted by the headcount2of in-district alternative learning experience students not using3district classroom facilities on a regular basis for a reasonable4duration. The alternative calculation must be submitted in a form5approved by the office of the superintendent of public instruction.6The office of the superintendent of public instruction must develop7rules to define "regular basis" and "reasonable duration."8

(5) The approved cost of the project determined in the manner9prescribed in this section multiplied by the state funding assistance10percentage derived as provided for in this section shall be the11amount of state funding assistance to the district for the financing12of the project: PROVIDED, That need therefor has been established to13the satisfaction of the superintendent: PROVIDED, FURTHER, That14additional state funding assistance may be allowed if it is found by15the superintendent, considering policy recommendations from the16school facilities citizen advisory panel that such assistance is17necessary in order to meet (a) a school housing emergency resulting18from the destruction of a school building by fire, the condemnation19of a school building by properly constituted authorities, a sudden20excessive and clearly foreseeable future increase in school21population, or other conditions similarly emergent in nature; or (b)22a special school housing burden resulting from projects of statewide23significance or imposed by virtue of the admission of nonresident24students into educational programs established, maintained and25operated in conformity with the requirements of law; or (c) a26deficiency in the capital funds of the district resulting from27financing, subsequent to April 1, 1969, and without benefit of the28state funding assistance provided by prior state assistance programs,29the construction of a needed school building project or projects30approved in conformity with the requirements of such programs, after31having first applied for and been denied state funding assistance32because of the inadequacy of state funds available for the purpose,33or (d) a condition created by the fact that an excessive number of34students live in state owned housing, or (e) a need for the35construction of a school building to provide for improved school36district organization or racial balance, or (f) conditions similar to37those defined under (a), (b), (c), (d), and (e) of this subsection,38creating a like emergency.39

p. 247 2EHB 1115.PL

(6) For the 2015-2017 biennium, schools determined to have a lack1of sufficient space to provide science classrooms or labs, to meet2the requirements of law, have a special housing burden condition3similar to those defined under subsection (5)(b) of this section,4creating a like emergency. For the 2015-2017 biennium, school5districts are entitled to additional percentage points for school6construction projects that have a special housing burden condition7only and have received private donations in the form of cash, in-8kind, or equipment of more than one hundred thousand dollars. The9additional percentage points are determined by (a) school district10student enrollments in the free and reduced-price meals program, (b)11school district class as defined by RCW 28A.300.065, and (c) the12funding assistance percentage as calculated in subsection (2) of this13section. The additional percentage points under (a) of this14subsection are twenty percent of the percent of student enrollments15eligible and enrolled in the free and reduced-price meals program.16The additional percentage points under (b) of this subsection are ten17for second class school districts. The additional percentage points18under (c) of this subsection are ten for school districts with19funding assistance percentages of more than fifty percent.20

NEW SECTION. Sec. 7019. STATE TREASURER REPORT ON SHORT-TERM21BOND FINANCING. By December 1, 2015, the office of the state22treasurer must prepare a report to the Legislature on all various23purpose general obligation bond issuances for capital projects from242005 through 2015. The report must:25

(1) Categorize the bond issuances in terms of final maturities;26(2) Explain the current practice of repaying debt in equal debt27

service installments over a twenty-five-year period, regardless of28the useful life of the specific projects or properties being29financed; and30

(3) Recommend a pilot approach to short-term bond financing that31matches final maturities with the useful life of specific projects or32properties being financed.33

NEW SECTION. Sec. 7020. NONTAXABLE AND TAXABLE BOND PROCEEDS.34Portions of the appropriation authority granted by this act from the35state building construction account, or any other account receiving36bond proceeds, may be transferred to the state taxable building37construction account as deemed necessary by the state finance38

p. 248 2EHB 1115.PL

committee to comply with the federal internal revenue service rules1and regulations pertaining to the use of nontaxable bond proceeds.2Portions of the general obligation bond proceeds authorized by3chapter . . ., Laws of 2015 3rd sp. sess. (Engrossed House Bill No.41166, the general obligation bond bill) for deposit into the state5taxable building construction account that are in excess of amounts6required to comply with the federal internal revenue service rules7and regulations shall be deposited into the state building8construction account. The state treasurer shall submit written9notification to the director of financial management if it is10determined that a shift of appropriation authority between the state11building construction account, or any other account receiving bond12proceeds, and the state taxable building construction account is13necessary, or that a shift of appropriation authority from the state14taxable building construction account to the state building15construction account may be made.16

NEW SECTION. Sec. 7021. COLUMBIA RIVER BASIN NONTAXABLE AND17TAXABLE BOND PROCEEDS. Portions of the appropriation authority18granted by this act from the Columbia river basin water supply19development account may be transferred to the Columbia river basin20taxable bond water supply development account as deemed necessary by21the state finance committee to comply with the federal internal22revenue service rules and regulations pertaining to the use of23nontaxable bond proceeds. The state treasurer shall submit written24notification to the director of financial management if it is25determined that a shift of appropriation authority between the26Columbia river basin water supply development account and the27Columbia river basin taxable bond water supply development account is28necessary, or that a shift of appropriation authority from the29Columbia river basin taxable bond water supply development account to30the Columbia river basin water supply development account may be31made.32

NEW SECTION. Sec. 7022. The office of financial management, in33consultation with the fiscal committees of the legislature, may34select capital projects that have completed predesign to undergo a35budget evaluation study. The budget evaluation study team approach36using value engineering techniques and life cycle cost analysis must37be utilized by the office of financial management in conducting the38

p. 249 2EHB 1115.PL

studies. The office of financial management shall select the budget1evaluation team members, contract for the study, and report the2results to the legislature and agencies in a timely manner following3the study. Funds from the project appropriation must be used by the4office of financial management through an interagency agreement with5the affected agencies to cover the cost of the study.6

NEW SECTION. Sec. 7023. JLARC WWRP & STATE LAND ACQUISITION7STUDY. (1) The joint legislative audit and review committee must8conduct a review of state and local efforts to protect and conserve9habitat and expand outdoor recreation since 1990.10

(2) The review has two objectives:11(a) To determine what existing or potential objective outcome12

measures can be used to evaluate the success of major regulatory13programs or state expenditures that are intended to protect and14conserve habitat and expand outdoor recreation; and15

(b) To compare the amount of habitat lands protected through16acquisitions and easements with the amount of lands protected through17the major regulatory programs within three counties west of the18cascades and three counties east of the cascades.19

(3) The review must include state expenditures and local and20federal expenditures used to match state funding in the following21programs:22

(a) Salmon recovery funding board expenditures;23(b) Puget Sound acquisition and restoration;24(c) Puget Sound estuary and salmon restoration;25(d) The Washington wildlife and recreation program;26(e) State parks and recreation commission expenditures that27

expand recreational lands and facilities;28(f) Trust land transfer program and other expenditures by the29

department of natural resources that protect habitat or expand30recreation; and31

(g) Other state expenditures that expand recreational lands and32facilities.33

(3) The review must also include the following regulatory34programs:35

(a) Growth management regulations regarding critical areas;36(b) Wetland restrictions;37(c) Shoreline management rules;38(d) Forest practices regulation; and39

p. 250 2EHB 1115.PL

(e) Hydraulic project approval program.1(4) The review must identify other objective benefits provided by2

each of the included programs, such as public safety, habitat3protection, environmental quality, public health, protection of4intrastructure, and economic development.5

(5) The review must also examine a sample of recreation and6habitat land acquisition by state agencies within the past ten years7to determine whether the state agencies have a land stewardship8program for the land parcels, what that program entails, and the9extent of compliance with that program. Land stewardship includes,10but is not limited to, restoring or developing the land to meet the11objectives of the acquisition, suppressing invasive weeds, securing12the property to prevent damage, and maintaining the land to prevent13wildfires.14

(6) In undertaking the review, the joint legislative audit and15review committee may contract with experts in measuring the outcomes16of regulatory and funding programs to protect and conserve habitat.17

(7) By December 1, 2016, the joint legislative audit and review18committee must submit a report to the appropriate committees of the19senate and the house of representatives that presents information and20findings from the study. The report is to include recommendations for21accountability measures for determining the achievement of intended22outcomes for protecting, acquiring, and improving habitat and23recreation lands and facilities.24

NEW SECTION. Sec. 7024. SCHOOL SITING TASK FORCE. (1) The25legislature recognizes that school districts are responsible for26siting, building, and maintaining school facilities that provide a27learning environment supportive of student achievement, and that28schools are integral to the communities they serve. The legislature29intends to create the legislative task force on school siting, as30provided in subsection (2) of this section, to review school facility31challenges created by enrollment increases and recent education32reforms, including expansion of full-day kindergarten and smaller33class sizes.34

(2) A legislative task force on school siting is established,35with members as provided in this subsection. All member appointments36or selections must be made by August 1, 2015.37

p. 251 2EHB 1115.PL

(a) The president of the senate shall appoint as members, the1chairs and ranking members of the committees on government operations2and security and the committee on early learning and K-12 education.3

(b) The speaker of the house of representatives shall appoint as4members, the chairs and ranking members of the committees on local5government and education.6

(c) The governor shall appoint one member who represents7environmental concerns related to school siting, one member who8represents active transportation concerns, and one member who9represents the building industry.10

(d) The task force must also include:11(i) A representative of the association of Washington cities;12(ii) A representative of the Washington state association of13

counties;14(iii) Two representatives of school districts, who represent15

school districts that serve students in urban areas and currently are16experiencing difficulty finding suitable siting locations, selected17by the Washington association of school administrators;18

(iv) Two representatives of school districts, who represent19school districts that serve students in rural areas and currently are20experiencing difficulty finding suitable siting locations, selected21by the Washington association of school administrators; and22

(v) A representative of the Washington state association of23county and regional planning directors.24

(3) The task force shall choose its chair from among its25legislative membership.26

(4) The task force shall review the issue of siting schools27inside and outside of urban growth areas. In reviewing this issue,28the task force must achieve the planning goals and requirements set29forth in chapter 36.70A RCW, the needs of school districts facing30capacity issues, and the infrastructure needs of local governments.31The task force shall also consider the following:32

(a) A comparison of providing transportation to and from schools33in urban and rural areas;34

(b) The impacts of schools on local and regional plans for growth35when they are constructed in urban and rural areas;36

(c) The availability and cost of water, sewer, transportation,37law enforcement, emergency response facilities and services, and38other necessary public facilities and services in urban and rural39areas; and40

p. 252 2EHB 1115.PL

(d) Identify school locations that provide the most financially1sustainable facilities and make the most efficient use of total tax2dollars for each impacted jurisdiction, including school districts,3cities, county unincorporated areas, sewer/water districts, fire4districts, and the state;5

(5) Staff from the office of the superintendent of public6instruction and from affected school districts, counties, and cities7must support the task force by providing local information as needed.8Support provided by staff from the office of the superintendent of9public instruction must be provided within existing resources.10

(6) Staff support for the task force must be provided within11existing resources by the association of Washington cities, the12Washington state association of counties, the Washington association13of school administrators, and the Washington state association of14county and regional planning directors.15

(7) Legislative members of the task force must be reimbursed for16travel expenses in accordance with RCW 44.04.120. Nonlegislative17members, except those representing an employer or organization, are18entitled to be reimbursed for travel expenses in accordance with RCW1943.03.050 and 43.03.060.20

(8) The expenses of the task force must be paid jointly by the21senate and the house of representatives. Task force expenditures are22subject to approval by the senate facilities and operations committee23and the house of representatives executive rules committee, or their24successor committees.25

(9) The task force shall provide a summary of the task force's26discussions and any recommendations to the appropriate committees of27the legislature by December 1, 2015.28

(10) This section expires January 1, 2016.29

Sec. 7025. RCW 28B.20.725 and 2013 2nd sp.s. c 19 s 7027 are30each amended to read as follows:31

The board is hereby empowered:32(1) To reserve the right to issue bonds later on a parity with33

any bonds being issued;34(2) To authorize the investing of moneys in the bond retirement35

fund and any reserve account therein;36(3) To authorize the transfer of money from the University of37

Washington building account to the bond retirement fund when38

p. 253 2EHB 1115.PL

necessary to prevent a default in the payments required to be made1out of such fund;2

(4) To create a reserve account or accounts in the bond3retirement fund to secure the payment of the principal of and4interest on any bonds;5

(5) To authorize the transfer to the University of Washington6building account of any money on deposit in the bond retirement fund7in excess of debt service for a period of three years from the date8of such transfer on all outstanding bonds payable out of such fund.9((However, during the 2011-2013 fiscal biennium, the legislature may10transfer to the University of Washington building account moneys that11are in excess of the debt service due within one year of the date of12transfer on all outstanding bonds payable out of the bond retirement13fund.)) However, during the 2013-2015 fiscal biennium, the14legislature may transfer to the University of Washington building15account moneys that are in excess of the debt service due within the162013-2015 fiscal biennium from the date of such transfer on all17outstanding bonds payable out of the bond retirement fund. However,18during the 2015-2017 fiscal biennium, the legislature may transfer to19the University of Washington building account moneys that are in20excess of the debt service due within the 2015-2017 fiscal biennium21from the date of such transfer on all outstanding bonds payable out22of the bond retirement fund.23

Sec. 7026. RCW 28B.15.310 and 2013 2nd sp.s. c 19 s 7028 are24each amended to read as follows:25

Within thirty-five days from the date of collection thereof, all26building fees shall be paid and credited as follows: To the27Washington State University bond retirement fund, one-half or such28larger portion as may be necessary to prevent a default in the29payments required to be made out of such bond retirement fund; and30the remainder thereof to the Washington State University building31account.32

The sum so credited to the Washington State University building33account shall be expended by the board of regents for buildings,34equipment, or maintenance on the campus of Washington State35University as may be deemed most advisable and for the best interests36of the university, and for certificates of participation under37chapter 39.94 RCW, except for any sums transferred as authorized by38law. ((During the 2011-2013 biennium, sums credited to the Washington39

p. 254 2EHB 1115.PL

State University building account shall also be used for routine1facility maintenance and utility costs.)) During the 2013-20152biennium, sums credited to the Washington State University building3account shall also be used for routine facility maintenance, utility4costs, and facility condition assessments. During the 2015-20175biennium, sums credited to the Washington State University building6account shall also be used for routine facility maintenance, utility7costs, and facility condition assessments. Expenditures so made shall8be accounted for in accordance with existing law and shall not be9expended until appropriated by the legislature.10

The sum so credited to the Washington State University bond11retirement fund shall be used to pay and secure the payment of the12principal of and interest on building bonds issued by the university,13except for any sums which may be transferred out of such fund as14authorized by law.15

Sec. 7027. RCW 28B.15.210 and 2013 2nd sp.s. c 19 s 7026 are16each amended to read as follows:17

Within thirty-five days from the date of collection thereof, all18building fees at the University of Washington, including building19fees to be charged students registering in the schools of medicine20and dentistry, shall be paid into the state treasury and credited as21follows:22

One-half or such larger portion as may be necessary to prevent a23default in the payments required to be made out of the bond24retirement fund to the "University of Washington bond retirement25fund" and the remainder thereof to the "University of Washington26building account." The sum so credited to the University of27Washington building account shall be used exclusively for the purpose28of erecting, altering, maintaining, equipping, or furnishing29buildings, and for certificates of participation under chapter 39.9430RCW, except for any sums transferred as authorized in RCW3128B.20.725(3). The sum so credited to the University of Washington32bond retirement fund shall be used for the payment of principal of33and interest on bonds outstanding as provided by chapter 28B.20 RCW34except for any sums transferred as authorized in RCW 28B.20.725(5).35During the 2013-2015 biennium, sums credited to the University of36Washington building account shall also be used for routine facility37maintenance, utility costs, and facility condition assessments.38During the 2015-2017 biennium, sums credited to the University of39

p. 255 2EHB 1115.PL

Washington building account shall also be used for routine facility1maintenance, utility costs, and facility condition assessments.2

Sec. 7028. RCW 28B.30.750 and 2013 2nd sp.s. c 19 s 7029 are3each amended to read as follows:4

The board is hereby empowered:5(1) To reserve the right to issue bonds later on a parity with6

any bonds being issued;7(2) To authorize the investing of moneys in the bond retirement8

fund and any reserve account therein;9(3) To authorize the transfer of money from the Washington State10

University building account to the bond retirement fund when11necessary to prevent a default in the payments required to be made12out of such fund;13

(4) To create a reserve account or accounts in the bond14retirement fund to secure the payment of the principal of and15interest on any bonds;16

(5) To authorize the transfer to the Washington State University17building account of any money on deposit in the bond retirement fund18in excess of debt service for a period of three years from the date19of such transfer on all outstanding bonds payable out of such fund.20((However, during the 2011-2013 fiscal biennium, the legislature may21transfer to the Washington State University building account moneys22that are in excess of the debt service due within one year of the23date of transfer on all outstanding bonds payable out of the bond24retirement fund.)) However, during the 2013-2015 fiscal biennium, the25legislature may transfer to the Washington State University building26account moneys that are in excess of the debt service due within the272013-2015 fiscal biennium from the date of such transfer on all28outstanding bonds payable out of the bond retirement fund. However,29during the 2015-2017 fiscal biennium, the legislature may transfer to30the Washington State University building account moneys that are in31excess of the debt service due within the 2015-2017 fiscal biennium32from the date of such transfer on all outstanding bonds payable out33of the bond retirement fund.34

Sec. 7029. RCW 28B.35.370 and 2013 2nd sp.s. c 19 s 7030 are35each amended to read as follows:36

Within thirty-five days from the date of collection thereof all37building fees of each regional university and The Evergreen State38

p. 256 2EHB 1115.PL

College shall be paid into the state treasury and these together with1such normal school fund revenues as provided in RCW 28B.35.751 as are2received by the state treasury shall be credited as follows:3

(1) On or before June 30th of each year the board of trustees of4each regional university and The Evergreen State College, if issuing5bonds payable out of its building fees and above described normal6school fund revenues, shall certify to the state treasurer the7amounts required in the ensuing twelve months to pay and secure the8payment of the principal of and interest on such bonds. The amounts9so certified by each regional university and The Evergreen State10College shall be a prior lien and charge against all building fees11and above described normal school fund revenues of such institution.12The state treasurer shall thereupon deposit the amounts so certified13in the Eastern Washington University capital projects account, the14Central Washington University capital projects account, the Western15Washington University capital projects account, or The Evergreen16State College capital projects account respectively, which accounts17are hereby created in the state treasury. The amounts deposited in18the respective capital projects accounts shall be used to pay and19secure the payment of the principal of and interest on the building20bonds issued by such regional universities and The Evergreen State21College as authorized by law. If in any twelve month period it shall22appear that the amount certified by any such board of trustees is23insufficient to pay and secure the payment of the principal of and24interest on the outstanding building and above described normal25school fund revenue bonds of its institution, the state treasurer26shall notify the board of trustees and such board shall adjust its27certificate so that all requirements of moneys to pay and secure the28payment of the principal of and interest on all such bonds then29outstanding shall be fully met at all times.30

(2) All normal school fund revenue pursuant to RCW 28B.35.75131shall be deposited in the Eastern Washington University capital32projects account, the Central Washington University capital projects33account, the Western Washington University capital projects account,34or The Evergreen State College capital projects account respectively,35which accounts are hereby created in the state treasury. The sums36deposited in the respective capital projects accounts shall be37appropriated and expended to pay and secure the payment of the38principal of and interest on bonds payable out of the building fees39and normal school revenue and for the construction, reconstruction,40

p. 257 2EHB 1115.PL

erection, equipping, maintenance, demolition and major alteration of1buildings and other capital assets, and the acquisition of sites,2rights-of-way, easements, improvements or appurtenances in relation3thereto except for any sums transferred therefrom as authorized by4law. ((During the 2011-2013 biennium, sums in the respective capital5accounts shall also be used for routine facility maintenance and6utility costs.)) However, during the 2013-2015 biennium, sums in the7respective capital accounts shall also be used for routine facility8maintenance, utility costs, and facility condition assessments.9However, during the 2015-2017 biennium, sums in the respective10capital accounts shall also be used for routine facility maintenance,11utility costs, and facility condition assessments.12

(3) Funds available in the respective capital projects accounts13may also be used for certificates of participation under chapter1439.94 RCW.15

Sec. 7030. RCW 28B.50.360 and 2013 2nd sp.s. c 19 s 7031 are16each amended to read as follows:17

Within thirty-five days from the date of start of each quarter18all collected building fees of each such community and technical19college shall be paid into the state treasury, and shall be credited20as follows:21

(1) On or before June 30th of each year the college board if22issuing bonds payable out of building fees shall certify to the state23treasurer the amounts required in the ensuing twelve-month period to24pay and secure the payment of the principal of and interest on such25bonds. The state treasurer shall thereupon deposit the amounts so26certified in the community and technical college capital projects27account. Such amounts of the funds deposited in the community and28technical college capital projects account as are necessary to pay29and secure the payment of the principal of and interest on the30building bonds issued by the college board as authorized by this31chapter shall be devoted to that purpose. If in any twelve-month32period it shall appear that the amount certified by the college board33is insufficient to pay and secure the payment of the principal of and34interest on the outstanding building bonds, the state treasurer shall35notify the college board and such board shall adjust its certificate36so that all requirements of moneys to pay and secure the payment of37the principal and interest on all such bonds then outstanding shall38be fully met at all times.39

p. 258 2EHB 1115.PL

(2) The community and technical college capital projects account1is hereby created in the state treasury. The sums deposited in the2capital projects account shall be appropriated and expended to pay3and secure the payment of the principal of and interest on bonds4payable out of the building fees and for the construction,5reconstruction, erection, equipping, maintenance, demolition and6major alteration of buildings and other capital assets owned by the7state board for community and technical colleges in the name of the8state of Washington, and the acquisition of sites, rights-of-way,9easements, improvements or appurtenances in relation thereto,10engineering and architectural services provided by the department of11enterprise services, and for the payment of principal of and interest12on any bonds issued for such purposes. ((During the 2011-201313biennium, sums in the capital projects account shall also be used for14routine facility maintenance and utility costs.)) However, during the152013-2015 biennium, sums in the capital projects account shall also16be used for routine facility maintenance and utility costs. However,17during the 2015-2017 biennium, sums in the capital projects account18shall also be used for routine facility maintenance and utility19costs.20

(3) Funds available in the community and technical college21capital projects account may also be used for certificates of22participation under chapter 39.94 RCW.23

Sec. 7031. RCW 43.19.501 and 2011 1st sp.s. c 50 s 943 are each24amended to read as follows:25

The Thurston county capital facilities account is created in the26state treasury. The account is subject to the appropriation and27allotment procedures under chapter 43.88 RCW. Moneys in the account28may be expended for capital projects in facilities owned and managed29by the department in Thurston county. For the 2007-2009 biennium,30moneys in the account may be used for predesign identified in section311037, chapter 328, Laws of 2008. For the 2015-2017 biennium, moneys32in the account may be used for studies related to real estate.33

During the 2009-2011 and 2011-2013 fiscal biennia, the34legislature may transfer from the Thurston county capital facilities35account to the state general fund such amounts as reflect the excess36fund balance of the account.37

p. 259 2EHB 1115.PL

Sec. 7032. RCW 43.155.050 and 2013 2nd sp.s. c 4 s 983 are each1amended to read as follows:2

The public works assistance account is hereby established in the3state treasury. Money may be placed in the public works assistance4account from the proceeds of bonds when authorized by the legislature5or from any other lawful source. Money in the public works assistance6account shall be used to make loans and to give financial guarantees7to local governments for public works projects. Moneys in the account8may also be appropriated to provide for state match requirements9under federal law for projects and activities conducted and financed10by the board under the drinking water assistance account. Not more11than fifteen percent of the biennial capital budget appropriation to12the public works board from this account may be expended or obligated13for preconstruction loans, emergency loans, or loans for capital14facility planning under this chapter; of this amount, not more than15ten percent of the biennial capital budget appropriation may be16expended for emergency loans and not more than one percent of the17biennial capital budget appropriation may be expended for capital18facility planning loans. During the ((2011-2013 and 2013-2015))192015-2017 fiscal biennium, the legislature may transfer from the20public works assistance account to the general fund, the water21pollution control revolving account, and the drinking water22assistance account such amounts as reflect the excess fund balance of23the account. ((During the 2011-2013 fiscal biennium, the legislature24may appropriate moneys from the account for economic development,25innovation, and export grants, including brownfields; main street26improvement grants; and the loan program consolidation board.))27During the 2013-2015 fiscal biennium, the legislature may transfer28from the public works assistance account to the education legacy29trust account such amounts as specified by the legislature.30

Sec. 7033. RCW 43.155.070 and 2013 2nd sp.s. c 19 s 7032 are31each amended to read as follows:32

(1) To qualify for financial assistance under this chapter the33board must determine that a local government meets all of the34following conditions:35

(a) The city or county must be imposing a tax under chapter 82.4636RCW at a rate of at least one-quarter of one percent;37

(b) The local government must have developed a capital facility38plan; and39

p. 260 2EHB 1115.PL

(c) The local government must be using all local revenue sources1which are reasonably available for funding public works, taking into2consideration local employment and economic factors.3

(2) Except where necessary to address a public health need or4substantial environmental degradation, a county, city, or town5planning under RCW 36.70A.040 may not receive financial assistance6under this chapter unless it has adopted a comprehensive plan,7including a capital facilities plan element, and development8regulations as required by RCW 36.70A.040. This subsection does not9require any county, city, or town planning under RCW 36.70A.040 to10adopt a comprehensive plan or development regulations before11requesting or receiving financial assistance under this chapter if12such request is made before the expiration of the time periods13specified in RCW 36.70A.040. A county, city, or town planning under14RCW 36.70A.040 that has not adopted a comprehensive plan and15development regulations within the time periods specified in RCW1636.70A.040 may apply for and receive financial assistance under this17chapter if the comprehensive plan and development regulations are18adopted as required by RCW 36.70A.040 before executing a contractual19agreement for financial assistance with the board.20

(3) In considering awarding financial assistance for public21facilities to special districts requesting funding for a proposed22facility located in a county, city, or town planning under RCW2336.70A.040, the board must consider whether the county, city, or town24planning under RCW 36.70A.040 in whose planning jurisdiction the25proposed facility is located has adopted a comprehensive plan and26development regulations as required by RCW 36.70A.040.27

(4) The board must develop a priority process for public works28projects as provided in this section. The intent of the priority29process is to maximize the value of public works projects30accomplished with assistance under this chapter. The board must31attempt to assure a geographical balance in assigning priorities to32projects. The board must consider at least the following factors in33assigning a priority to a project:34

(a) Whether the local government receiving assistance has35experienced severe fiscal distress resulting from natural disaster or36emergency public works needs;37

(b) Except as otherwise conditioned by RCW 43.155.110, whether38the entity receiving assistance is a Puget Sound partner, as defined39in RCW 90.71.010;40

p. 261 2EHB 1115.PL

(c) Whether the project is referenced in the action agenda1developed by the Puget Sound partnership under RCW 90.71.310;2

(d) Whether the project is critical in nature and would affect3the health and safety of a great number of citizens;4

(e) Whether the applicant's permitting process has been certified5as streamlined by the office of regulatory assistance;6

(f) Whether the applicant has developed and adhered to guidelines7regarding its permitting process for those applying for development8permits consistent with section 1(2), chapter 231, Laws of 2007;9

(g) The cost of the project compared to the size of the local10government and amount of loan money available;11

(h) The number of communities served by or funding the project;12(i) Whether the project is located in an area of high13

unemployment, compared to the average state unemployment;14(j) Whether the project is the acquisition, expansion,15

improvement, or renovation by a local government of a public water16system that is in violation of health and safety standards, including17the cost of extending existing service to such a system;18

(k) Except as otherwise conditioned by RCW 43.155.120, and19effective one calendar year following the development of model20evergreen community management plans and ordinances under RCW2135.105.050, whether the entity receiving assistance has been22recognized, and what gradation of recognition was received, in the23evergreen community recognition program created in RCW 35.105.030;24

(l) The relative benefit of the project to the community,25considering the present level of economic activity in the community26and the existing local capacity to increase local economic activity27in communities that have low economic growth; and28

(m) Other criteria that the board considers advisable.29(5) For the ((2013-2015)) 2015-2017 fiscal biennium, in place of30

the criteria, ranking, and submission processes for construction loan31lists provided in subsections (4) and (7) of this section:32

(a) The board must develop a process for numerically ranking33applications for construction loans submitted by local governments.34The board must consider, at a minimum and in any order, the following35factors in assigning a numerical ranking to a project:36

(i) Whether the project is critical in nature and would affect37the health and safety of many people;38

(ii) The extent to which the project leverages nonstate funds;39

p. 262 2EHB 1115.PL

(iii) The extent to which the project is ready to proceed to1construction;2

(iv) Whether the project is located in an area of high3unemployment, compared to the average state unemployment;4

(v) Whether the project promotes the sustainable use of resources5and environmental quality;6

(vi) Whether the project consolidates or regionalizes systems;7(vii) Whether the project encourages economic development through8

mixed-use and mixed income development consistent with chapter 36.70A9RCW;10

(viii) Whether the system is being well-managed in the present11and for long-term sustainability;12

(ix) Achieving equitable distribution of funds by geography and13population;14

(x) The extent to which the project meets the following state15policy objectives:16

(A) Efficient use of state resources;17(B) Preservation and enhancement of health and safety;18(C) Abatement of pollution and protection of the environment;19(D) Creation of new, family wage jobs, and avoidance of shifting20

existing jobs from one Washington state community to another;21(E) Fostering economic development consistent with chapter 36.70A22

RCW;23(F) Efficiency in delivery of goods and services, public transit,24

and transportation;25(G) Avoidance of additional costs to state and local governments26

that adversely impact local residents and small businesses; and27(H) Reduction of the overall cost of public infrastructure; and28(xi) Other criteria that the board considers necessary to achieve29

the purposes of this chapter.30(b) Before November 1, ((2014)) 2016, the board must develop and31

submit to the appropriate fiscal committees of the senate and house32of representatives a ranked list of qualified public works projects33which have been evaluated by the board and are recommended for34funding by the legislature. The maximum amount of funding that the35board may recommend for any jurisdiction is ten million dollars per36biennium. For each project on the ranked list, as well as for37eligible projects not recommended for funding, the board must38document the numerical ranking that was assigned.39

p. 263 2EHB 1115.PL

(6) Existing debt or financial obligations of local governments1may not be refinanced under this chapter. Each local government2applicant must provide documentation of attempts to secure additional3local or other sources of funding for each public works project for4which financial assistance is sought under this chapter.5

(7) Before November 1st of each even-numbered year, the board6must develop and submit to the appropriate fiscal committees of the7senate and house of representatives a description of the loans made8under RCW 43.155.065, 43.155.068, and subsection (10) of this section9during the preceding fiscal year and a prioritized list of projects10which are recommended for funding by the legislature, including one11copy to the staff of each of the committees. The list must include,12but not be limited to, a description of each project and recommended13financing, the terms and conditions of the loan or financial14guarantee, the local government jurisdiction and unemployment rate,15demonstration of the jurisdiction's critical need for the project and16documentation of local funds being used to finance the public works17project. The list must also include measures of fiscal capacity for18each jurisdiction recommended for financial assistance, compared to19authorized limits and state averages, including local government20sales taxes; real estate excise taxes; property taxes; and charges21for or taxes on sewerage, water, garbage, and other utilities.22

(8) The board may not sign contracts or otherwise financially23obligate funds from the public works assistance account before the24legislature has appropriated funds for a specific list of public25works projects. The legislature may remove projects from the list26recommended by the board. The legislature may not change the order of27the priorities recommended for funding by the board.28

(9) Subsection (8) of this section does not apply to loans made29under RCW 43.155.065, 43.155.068, and subsection (10) of this30section.31

(10) Loans made for the purpose of capital facilities plans are32exempted from subsection (8) of this section.33

(11) To qualify for loans or pledges for solid waste or recycling34facilities under this chapter, a city or county must demonstrate that35the solid waste or recycling facility is consistent with and36necessary to implement the comprehensive solid waste management plan37adopted by the city or county under chapter 70.95 RCW.38

(12) After January 1, 2010, any project designed to address the39effects of storm water or wastewater on Puget Sound may be funded40

p. 264 2EHB 1115.PL

under this section only if the project is not in conflict with the1action agenda developed by the Puget Sound partnership under RCW290.71.310.3

(13) During the ((2013-2015)) 2015-2017 fiscal biennium, for4projects involving repair, replacement, or improvement of a5wastewater treatment plant or other public works facility for which6an investment grade efficiency audit is obtainable, the public works7board must require as a contract condition that the project sponsor8undertake an investment grade efficiency audit. The project sponsor9may finance the costs of the audit as part of its public works10assistance account program loan.11

(14)(a) ((For public works assistance account application rounds12conducted during the 2013-2015 fiscal biennium, the board must13implement policies and procedures designed to maximize local14government use of federally funded drinking water and clean water15state revolving funds operated by the state departments of health and16ecology. The board, department of ecology, and department of health17must jointly develop evaluation criteria and application procedures18that will increase access of eligible drinking water and wastewater19projects to the public works assistance account for short-term20preconstruction financing and to the federally funded state revolving21funds for construction financing. The procedures must also strengthen22coordinated funding of preconstruction and construction projects.))23For public works assistance account application rounds conducted24during the 2015-2017 fiscal biennium, the board must implement25policies and procedures designed to maximize local government use of26federal funds to finance local infrastructure including, but not27limited to, drinking water and clean water state revolving funds28operated by the state departments of health and ecology. Projects29that are eligible for the drinking water and clean water state30revolving funds may receive public works board preconstruction loans.31Projects that are eligible for the drinking water and clean water32state revolving funds are not eligible for public works board33construction loans. For purposes of this subsection "eligible for34drinking water and clean water state revolving funds" means:35

(i) Projects that have applied to the state revolving funds and36are awaiting a funding decision;37

(ii) Projects that have been rejected for funding solely due to38not meeting readiness requirements; and39

p. 265 2EHB 1115.PL

(iii) Projects that have not applied, but would likely be1eligible if the project applied and met the project readiness2requirements.3

(b) For all construction loan projects proposed to the4legislature for funding during the ((2013-2015)) 2015-2017 fiscal5biennium, the board must base interest rates on the average daily6market interest rate for tax-exempt municipal bonds as published in7the bond buyer's index for the period from sixty to thirty days8before the start of the application cycle. For projects with a9repayment period between five and twenty years, the rate must be10sixty percent of the market rate. For projects with a repayment11period under five years, the rate must be thirty percent of the12market rate. The board must also provide reduced interest rates,13extended repayment periods, or forgivable principal loans for14projects that meet financial hardship criteria as measured by the15affordability index or similar standard measure of financial16hardship.17

(((c) By December 1, 2013, the board must recommend to the18appropriate committees of the legislature statutory language to make19permanent these new criteria, procedures, and financing policies.))20

Sec. 7034. RCW 43.160.080 and 2010 1st sp.s. c 36 s 6011 are21each amended to read as follows:22

There shall be a fund in the state treasury known as the public23facilities construction loan revolving account, which shall consist24of all moneys collected under this chapter and any moneys25appropriated to it by law. Disbursements from the revolving account26shall be on authorization of the board. In order to maintain an27effective expenditure and revenue control, the public facilities28construction loan revolving account shall be subject in all respects29to chapter 43.88 RCW. ((During the 2009-2011 biennium, sums in the30public facilities construction loan revolving account may be used for31community economic revitalization board export assistance grants and32loans in section 1018, chapter 36, Laws of 2010 1st sp. sess. and for33matching funds for the federal energy regional innovation cluster in34section 1017, chapter 36, Laws of 2010 1st sp. sess.)) During the352015-2017 biennium, sums in the public facilities construction loan36revolving account may be used to continue and enhance the animal37disease traceability project in section 3247, chapter 19, Laws of382013 2nd sp. sess., administered by the department of agriculture.39

p. 266 2EHB 1115.PL

During the 2015-2017 biennium, sums in the public facilities1construction loan revolving account may be used for the clean energy2partnership project in section 1038, chapter 19, Laws of 2013 2nd sp.3sess.4

Sec. 7035. RCW 70.105D.070 and 2013 2nd sp.s. c 19 s 7033 and52013 2nd sp.s. c 4 s 992 are each reenacted and amended to read as6follows:7

(1) The state toxics control account and the local toxics control8account are hereby created in the state treasury.9

(2)(a) Moneys collected under RCW 82.21.030 must be deposited as10follows: Fifty-six percent to the state toxics control account under11subsection (3) of this section and forty-four percent to the local12toxics control account under subsection (4) of this section. When the13cumulative amount of deposits made to the state and local toxics14control accounts under this section reaches the limit during a fiscal15year as established in (b) of this subsection, the remainder of the16moneys collected under RCW 82.21.030 during that fiscal year must be17deposited into the environmental legacy stewardship account created18in RCW 70.105D.170.19

(b) The limit on distributions of moneys collected under RCW2082.21.030 to the state and local toxics control accounts for the21fiscal year beginning July 1, 2013, is one hundred forty million22dollars.23

(c) In addition to the funds required under (a) of this24subsection, the following moneys must be deposited into the state25toxics control account: (i) The costs of remedial actions recovered26under this chapter or chapter 70.105A RCW; (ii) penalties collected27or recovered under this chapter; and (iii) any other money28appropriated or transferred to the account by the legislature.29

(3) Moneys in the state toxics control account must be used only30to carry out the purposes of this chapter, including but not limited31to the following activities:32

(a) The state's responsibility for hazardous waste planning,33management, regulation, enforcement, technical assistance, and public34education required under chapter 70.105 RCW;35

(b) The state's responsibility for solid waste planning,36management, regulation, enforcement, technical assistance, and public37education required under chapter 70.95 RCW;38

p. 267 2EHB 1115.PL

(c) The hazardous waste clean-up program required under this1chapter;2

(d) State matching funds required under federal cleanup law;3(e) Financial assistance for local programs in accordance with4

chapters 70.95, 70.95C, 70.95I, and 70.105 RCW;5(f) State government programs for the safe reduction, recycling,6

or disposal of paint and hazardous wastes from households, small7businesses, and agriculture;8

(g) Oil and hazardous materials spill prevention, preparedness,9training, and response activities;10

(h) Water and environmental health protection and monitoring11programs;12

(i) Programs authorized under chapter 70.146 RCW;13(j) A public participation program;14(k) Public funding to assist potentially liable persons to pay15

for the costs of remedial action in compliance with clean-up16standards under RCW 70.105D.030(2)(e) but only when the amount and17terms of such funding are established under a settlement agreement18under RCW 70.105D.040(4) and when the director has found that the19funding will achieve both: (i) A substantially more expeditious or20enhanced cleanup than would otherwise occur; and (ii) the prevention21or mitigation of unfair economic hardship;22

(l) Development and demonstration of alternative management23technologies designed to carry out the hazardous waste management24priorities of RCW 70.105.150;25

(m) State agriculture and health programs for the safe use,26reduction, recycling, or disposal of pesticides;27

(n) Storm water pollution control projects and activities that28protect or preserve existing remedial actions or prevent hazardous29clean-up sites;30

(o) Funding requirements to maintain receipt of federal funds31under the federal solid waste disposal act (42 U.S.C. Sec. 6901 et32seq.);33

(p) Air quality programs and actions for reducing public exposure34to toxic air pollution;35

(q) Public funding to assist prospective purchasers to pay for36the costs of remedial action in compliance with clean-up standards37under RCW 70.105D.030(2)(e) if:38

(i) The facility is located within a redevelopment opportunity39zone designated under RCW 70.105D.150;40

p. 268 2EHB 1115.PL

(ii) The amount and terms of the funding are established under a1settlement agreement under RCW 70.105D.040(5); and2

(iii) The director has found the funding meets any additional3criteria established in rule by the department, will achieve a4substantially more expeditious or enhanced cleanup than would5otherwise occur, and will provide a public benefit in addition to6cleanup commensurate with the scope of the public funding;7

(r) Petroleum-based plastic or expanded polystyrene foam debris8cleanup activities in fresh or marine waters;9

(s) Appropriations to the local toxics control account or the10environmental legacy stewardship account created in RCW 70.105D.170,11if the legislature determines that priorities for spending exceed12available funds in those accounts;13

(t) During the 2013-2015 and 2015-2017 fiscal ((biennium))14biennia, the department of ecology's water quality, shorelands,15environmental assessment, administration, and air quality programs;16

(u) During the 2013-2015 fiscal biennium, actions at the state17conservation commission to improve water quality for shellfish;18((and))19

(v) During the 2013-2015 fiscal biennium, actions at the20University of Washington for reducing ocean acidification;21

(w) During the 2015-2017 fiscal biennium, for the University of22Washington Tacoma soil remediation project;23

(x) For the 2013-2015 fiscal biennium, moneys in the state toxics24control account may be spent on projects in section ((3159)) 3160,25chapter 19, Laws of 2013 2nd sp. sess. and for transfer to the local26toxics control account; and27

(((x))) (y) For the 2013-2015 fiscal biennium, moneys in the28state toxics control account may be transferred to the radioactive29mixed waste account.30

(4)(a) The department shall use moneys deposited in the local31toxics control account for grants or loans to local governments for32the following purposes in descending order of priority:33

(i) Extended grant agreements entered into under (((c)[(e)])) (e)34(i) of this subsection;35

(ii) Remedial actions, including planning for adaptive reuse of36properties as provided for under (((c)[(e)])) (e)(iv) of this37subsection. The department must prioritize funding of remedial38actions at:39

p. 269 2EHB 1115.PL

(A) Facilities on the department's hazardous sites list with a1high hazard ranking for which there is an approved remedial action2work plan or an equivalent document under federal cleanup law;3

(B) Brownfield properties within a redevelopment opportunity zone4if the local government is a prospective purchaser of the property5and there is a department-approved remedial action work plan or6equivalent document under the federal cleanup law;7

(iii) Storm water pollution source projects that: (A) Work in8conjunction with a remedial action; (B) protect completed remedial9actions against recontamination; or (C) prevent hazardous clean-up10sites;11

(iv) Hazardous waste plans and programs under chapter 70.105 RCW;12(v) Solid waste plans and programs under chapters 70.95, 70.95C,13

70.95I, and 70.105 RCW;14(vi) Petroleum-based plastic or expanded polystyrene foam debris15

cleanup activities in fresh or marine waters; and16(vii) Appropriations to the state toxics control account or the17

environmental legacy stewardship account created in RCW 70.105D.170,18if the legislature determines that priorities for spending exceed19available funds in those accounts.20

(b) Funds for plans and programs must be allocated consistent21with the priorities and matching requirements established in chapters2270.105, 70.95C, 70.95I, and 70.95 RCW.23

(c) During the 2013-2015 fiscal biennium, the local toxics24control account may also be used for local government storm water25planning and implementation activities.26

(d) During the 2013-2015 fiscal biennium, the legislature may27transfer from the local toxics control account to the state general28fund, such amounts as reflect the excess fund balance in the account.29

(e) To expedite cleanups throughout the state, the department may30use the following strategies when providing grants to local31governments under this subsection:32

(i) Enter into an extended grant agreement with a local33government conducting remedial actions at a facility where those34actions extend over multiple biennia and the total eligible cost of35those actions exceeds twenty million dollars. The agreement is36subject to the following limitations:37

(A) The initial duration of such an agreement may not exceed ten38years. The department may extend the duration of such an agreement39

p. 270 2EHB 1115.PL

upon finding substantial progress has been made on remedial actions1at the facility;2

(B) Extended grant agreements may not exceed fifty percent of the3total eligible remedial action costs at the facility; and4

(C) The department may not allocate future funding to an extended5grant agreement unless the local government has demonstrated to the6department that funds awarded under the agreement during the previous7biennium have been substantially expended or contracts have been8entered into to substantially expend the funds;9

(ii) Enter into a grant agreement with a local government10conducting a remedial action that provides for periodic reimbursement11of remedial action costs as they are incurred as established in the12agreement;13

(iii) Enter into a grant agreement with a local government prior14to it acquiring a property or obtaining necessary access to conduct15remedial actions, provided the agreement is conditioned upon the16local government acquiring the property or obtaining the access in17accordance with a schedule specified in the agreement;18

(iv) Provide integrated planning grants to local governments to19fund studies necessary to facilitate remedial actions at brownfield20properties and adaptive reuse of properties following remediation.21Eligible activities include, but are not limited to: Environmental22site assessments; remedial investigations; health assessments;23feasibility studies; site planning; community involvement; land use24and regulatory analyses; building and infrastructure assessments;25economic and fiscal analyses; and any environmental analyses under26chapter 43.21C RCW;27

(v) Provide grants to local governments for remedial actions28related to area-wide groundwater contamination. To receive the29funding, the local government does not need to be a potentially30liable person or be required to seek reimbursement of grant funds31from a potentially liable person;32

(vi) The director may alter grant matching requirements to create33incentives for local governments to expedite cleanups when one of the34following conditions exists:35

(A) Funding would prevent or mitigate unfair economic hardship36imposed by the clean-up liability;37

(B) Funding would create new substantial economic development,38public recreational opportunities, or habitat restoration39opportunities that would not otherwise occur; or40

p. 271 2EHB 1115.PL

(C) Funding would create an opportunity for acquisition and1redevelopment of brownfield property under RCW 70.105D.040(5) that2would not otherwise occur;3

(vii) When pending grant applications under (((c)[(e)])) (e)(iv)4and (v) of this subsection (4) exceed the amount of funds available,5designated redevelopment opportunity zones must receive priority for6distribution of available funds.7

(((d) [(f)])) (f) To expedite multiparty clean-up efforts, the8department may purchase remedial action cost-cap insurance. For the92013-2015 fiscal biennium, moneys in the local toxics control account10may be spent on projects in sections 3024, 3035, 3036, and 3059,11chapter 19, Laws of 2013 2nd sp. sess.12

(5) Except for unanticipated receipts under RCW 43.79.260 through1343.79.282, moneys in the state and local toxics control accounts may14be spent only after appropriation by statute.15

(6) No moneys deposited into either the state or local toxics16control account may be used for: Natural disasters where there is no17hazardous substance contamination; high performance buildings; solid18waste incinerator facility feasibility studies, construction,19maintenance, or operation; or after January 1, 2010, for projects20designed to address the restoration of Puget Sound, funded in a21competitive grant process, that are in conflict with the action22agenda developed by the Puget Sound partnership under RCW 90.71.310.23However, this subsection does not prevent an appropriation from the24state toxics control account to the department of revenue to enforce25compliance with the hazardous substance tax imposed in chapter 82.2126RCW.27

(7) Except during the 2011-2013 fiscal biennium, one percent of28the moneys collected under RCW 82.21.030 shall be allocated only for29public participation grants to persons who may be adversely affected30by a release or threatened release of a hazardous substance and to31not-for-profit public interest organizations. The primary purpose of32these grants is to facilitate the participation by persons and33organizations in the investigation and remedying of releases or34threatened releases of hazardous substances and to implement the35state's solid and hazardous waste management priorities. No grant may36exceed sixty thousand dollars. Grants may be renewed annually. Moneys37appropriated for public participation that are not expended at the38close of any biennium revert to the state toxics control account.39

p. 272 2EHB 1115.PL

(8) The department shall adopt rules for grant or loan issuance1and performance. To accelerate both remedial action and economic2recovery, the department may expedite the adoption of rules necessary3to implement chapter 1, Laws of 2013 2nd sp. sess. using the4expedited procedures in RCW 34.05.353. The department shall initiate5the award of financial assistance by August 1, 2013. To ensure the6adoption of rules will not delay financial assistance, the department7may administer the award of financial assistance through interpretive8guidance pending the adoption of rules through July 1, 2014.9

(9) Except as provided under subsection (3)(k) and (q) of this10section, nothing in chapter 1, Laws of 2013 2nd sp. sess. ((effects11[affects])) affects the ability of a potentially liable person to12receive public funding.13

(10) During the ((2013-2015)) 2015-2017 fiscal biennium the local14toxics control account may also be used for the centennial clean15water program ((and for storm water grants)) and for the storm water16financial assistance program administered by the department of17ecology.18

NEW SECTION. Sec. 7036. (1) Funds appropriated in this act for19minor works may not be allotted until final project lists are20submitted to the office of financial management. Revisions to the21project lists are allowed for projects not anticipated at the time of22budget development but must be submitted to the office of financial23management, the house of representatives capital budget committee,24and the senate ways and means committee for review and comment and25must include an explanation of variances from the prior lists before26funds may be expended on the revisions. Any project list revisions27must be approved by the office of financial management before funds28may be expended from the minor works appropriation.29

(2)(a) Minor works project lists are single line appropriations30that include multiple projects of a similar nature and that are31valued between $25,000 and $1,000,000 each, with the exception of32higher education minor works projects that may be valued up to33$2,000,000. All projects must meet the criteria included in this34subsection (2)(a) with the exception of minor works appropriations35for the department of fish and wildlife for the 2015-2017 biennium.36These projects should be completed within two years of the37appropriation with the funding provided. Agencies are prohibited from38including projects on their minor works lists that are a phase of a39

p. 273 2EHB 1115.PL

larger project, and that if combined over a continuous period of1time, would exceed $1,000,000, or $2,000,000 for higher education2minor works projects. Improvements for accessibility in compliance3with the Americans with disabilities act may be included in any of4the minor works categories.5

(b) Minor works appropriations may not be used for the following:6Studies, except for technical or engineering reviews or designs that7lead directly to and support a project on the same minor works list;8planning; design outside the scope of work on a minor works list;9moveable, temporary, and traditionally funded operating equipment not10in compliance with the equipment criteria established by the office11of financial management; software not dedicated to control of a12specialized system; moving expenses; land or facility acquisition;13rolling stock; computers; or to supplement funding for projects with14funding shortfalls unless expressly authorized. The office of15financial management may make an exception to the limitations16described in this subsection (2)(b) for exigent circumstances after17notifying the legislative fiscal committees and waiting ten days for18comments by the legislature regarding the proposed exception.19

(c) Minor works preservation projects may include program20improvements of no more than twenty-five percent of the individual21minor works preservation project cost.22

NEW SECTION. Sec. 7037. FOR THE STATE TREASURER—TRANSFERS23Public works assistance account—state: For transfer24

to the water pollution control revolving account,25$6,000,000 for fiscal year 2016 and $6,000,000 for26fiscal year 2017. . . . . . . . . . . . . . . . . . . . . $12,000,00027

Public works assistance account—state: For transfer28to the drinking water assistance account, $4,000,00029for fiscal year 2016 and $4,000,000 for fiscal30year 2017. . . . . . . . . . . . . . . . . . . . . . . . . $8,000,00031

NEW SECTION. Sec. 7038. STATE TREASURER TRANSFER AUTHORITY32State toxics control account: For transfer to the33

environmental legacy trust account. . . . . . . . . . . . $24,000,00034Local toxics control account: For transfer to the35

environmental legacy trust account. . . . . . . . . . . . $30,000,00036

p. 274 2EHB 1115.PL

(1) As directed by the department of ecology in consultation with1the office of financial management, the state treasurer shall2transfer amounts among the state toxics control account, the local3toxics control account, and the environmental legacy stewardship4account as needed during the 2015-2017 fiscal biennium to maintain5positive account balances in all three accounts.6

(2) As directed by the department of ecology in consultation with7the office of financial management, the state treasurer shall8transfer amounts from the cleanup settlement account established in9RCW 70.105D.130 to the state toxics control account, the local toxics10control account or the environmental legacy stewardship account to11maintain positive account balances up to an amount not to exceed12$13,000,000 that must be considered an inter fund loan that must be13repaid with interest to the cleanup settlement account in three equal14repayments in fiscal years 2018, 2019, and 2020.15

(3) If, after using the inter-fund transfer authority granted in16this section, the department of ecology determines that further17reductions are needed to maintain positive account balances in the18state toxics control account, the local toxics control account, and19the environmental legacy stewardship account, the department is20authorized to delay the start of clean-up projects based on acuity of21need, readiness to proceed, cost-efficiency, or need to ensure22geographic distribution. If the department uses this authority, the23department must submit a prioritized list of projects that may be24delayed to the office of financial management and the appropriate25fiscal committees of the legislature.26

NEW SECTION. Sec. 7039. To the extent that any appropriation27authorizes expenditures of state funds from the state building28construction account, or from any other capital project account in29the state treasury, for a capital project or program that is30specified to be funded with proceeds from the sale of bonds, the31legislature declares that any such expenditures for that project or32program made prior to the issue date of the applicable bonds are33intended to be reimbursed from proceeds of those bonds in a maximum34amount equal to the amount of such appropriation.35

NEW SECTION. Sec. 7040. Fiscal or related staff from the office36of financial management shall form a four-year prioritized capital37

p. 275 2EHB 1115.PL

project list technical work group with staff from the office of1program research, senate committee services, four-year institutions2of higher education receiving appropriations in this act, and the3council of presidents. The work group shall examine and determine key4elements, data sources, process improvement, data needs by project5category types, scoring and weighting alternatives, and how to better6align to the process for budget decisions. The work group shall7report options and alternatives to the appropriate legislative8committees by December 15, 2015.9

Sec. 7041. RCW 43.131.413 and 2010 c 245 s 12 are each amended10to read as follows:11

The alternative process for awarding contracts established in RCW1228B.20.744 terminates June 30, ((2015)) 2017, as provided in RCW1343.131.414.14

Sec. 7042. RCW 43.131.414 and 2010 c 245 s 13 are each amended15to read as follows:16

RCW 28B.20.744, as now existing or hereafter amended, is17repealed, effective June 30, ((2016)) 2018.18

Sec. 7043. RCW 28B.20.744 and 2010 c 245 s 11 are each amended19to read as follows:20

(1) This section provides an alternative process for awarding21contracts for construction, building, renovation, remodeling,22alteration, repair, or improvement of university buildings and23facilities in which critical patient care or highly specialized24medical research is located. These provisions may be used, in lieu of25other procedures to award contracts for such work, when the estimated26cost of the work is equal to or less than five million dollars and27the project involves construction, renovation, remodeling, or28alteration of improvements within a building that is used directly29for critical patient care or highly specialized medical research.30

(2) The university may create a single critical patient care or31specialized medical research facilities roster or may create multiple32critical patient care or specialized medical research facilities33rosters for different trade specialties or categories of anticipated34work. At least once a year, the university shall publish in a35newspaper of general circulation a notice of the existence of the36roster or rosters and solicit a statement of qualifications from37

p. 276 2EHB 1115.PL

contractors who wish to be on the roster or rosters of prime1contractors. In addition, qualified contractors shall be added to the2roster or rosters at any time they submit a written request,3necessary records, and meet the qualifications established by the4university. The university may require eligible contractors desiring5to be placed on a roster to keep current records of any applicable6licenses, certifications, registrations, bonding, insurance, or other7appropriate matters on file with the university as a condition of8being placed on a roster or rosters. Placement on a roster shall be9on the basis of qualifications.10

(3) The public solicitation of qualifications shall include but11not be limited to:12

(a) A description of the types of projects to be completed and13where possible may include programmatic, performance, and technical14requirements and specifications;15

(b) The reasons for using the critical patient care and16specialized medical research roster process;17

(c) A description of the qualifications to be required of a18contractor, including submission of an accident prevention program;19

(d) A description of the process the university will use to20evaluate qualifications, including evaluation factors and the21relative weight of factors;22

(e) The form of the contract to be awarded;23(f) A description of the administrative process by which the24

required qualifications, evaluation process, and project types may be25appealed; and26

(g) A description of the administrative process by which27decisions of the university may be appealed.28

(4) The university shall establish a committee to evaluate the29contractors submitting qualifications. Evaluation criteria for30selection of the contractor or contractors to be included on a roster31shall include, but not be limited to:32

(a) Ability of a contractor's professional personnel;33(b) A contractor's past performance on similar projects,34

including but not limited to medical facilities, and involving either35negotiated work or other public works contracts;36

(c) The contractor's ability to meet time and budget37requirements;38

(d) The contractor's ability to provide preconstruction services,39as appropriate;40

p. 277 2EHB 1115.PL

(e) The contractor's capacity to successfully complete the1project;2

(f) The contractor's approach to executing projects;3(g) The contractor's approach to safety and the contractor's4

safety history; and5(h) The contractor's record of performance, integrity, judgment,6

and skills.7(5) Contractors meeting the evaluation committee's criteria for8

selection must be placed on the applicable roster or rosters.9(6) When a project is selected for delivery through this roster10

process, the university must establish a procedure for securing11written quotations from all contractors on a roster to assure that a12competitive price is established. Invitations for quotations shall13include an estimate of the scope and nature of the work to be14performed as well as materials and equipment to be furnished. Plans15and specifications must be included in the invitation but may not be16detailed. Award of a project must be made to the responsible bidder17submitting the lowest responsive bid.18

(7) The university shall make an effort to solicit proposals from19certified minority or certified woman-owned contractors to the extent20permitted by the Washington state civil rights act, RCW 49.60.400.21

(8) Beginning in September 2010 and every other ((year))22September thereafter, the university shall provide a report to the23capital projects advisory review board which must, at a minimum,24include a list of rosters used, contracts awarded, and a description25of outreach to and participation by women and minority-owned26businesses.27

(9) Beginning in September 2015 and every September thereafter,28the university shall report to the office of minority and women's29business enterprises and to the appropriate legislative fiscal30committees the number of qualified women and minority-owned business31contractors on the roster or rosters and the number of contracts32awarded to women and minority-owned businesses.33

NEW SECTION. Sec. 7044. (1) The office of financial management34shall develop a master plan for museums and research facilities to35address the statewide need for providing storage, research, and36display space for collections of art and artifacts, archaeological37research materials, DNA tissue samples, tribal artifacts, and other38related items of an historical nature.39

p. 278 2EHB 1115.PL

(2) The office of financial management shall identify the1following: (a) Types of space needed to store, research, and display2items and collections depending on types of items; (b) an inventory3of existing spaces that the state may utilize to fill storage,4research, and display needs; (c) recommendations regarding the5highest and best use of the capital museum in Olympia; (d)6collections and other state assets that may be divested or7transferred to more appropriate entities for storage, research, and8display; (e) database systems used or needed to inventory collections9of items of an historical nature and the ability to display those10collections on the internet; and (f) other items related to the11storage, research, and display of collections of an historical12nature.13

(3) The office of the financial management or its contractor must14consult with the following agencies in developing the statewide15master plan for museums and research centers: (a) The Washington16state historical society; (b) state parks and recreation; (c) the17burke museum; (d) the eastern Washington state historical society;18and (e) other entities as necessary.19

(4) The office of financial management must present the statewide20museum master plan to the appropriate committees of the legislature21by December 31, 2015.22

NEW SECTION. Sec. 7045. This act is necessary for the immediate23preservation of the public peace, health, or safety, or support of24the state government and its existing public institutions, and takes25effect immediately.26

(End of Bill)

p. 279 2EHB 1115.PL

INDEX PAGE #CENTRAL WASHINGTON UNIVERSITY . . . . . . . . . . . . . . . . . . 189COMMUNITY AND TECHNICAL COLLEGE SYSTEM . . . . . . . . . . . . . 201DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION . . . . . . . 66DEPARTMENT OF CORRECTIONS . . . . . . . . . . . . . . . . . . . . 76DEPARTMENT OF ECOLOGY . . . . . . . . . . . . . . . . . . . . . . 83DEPARTMENT OF ENTERPRISE SERVICES . . . . . . . . . . . . . . . . 51DEPARTMENT OF FISH AND WILDLIFE . . . . . . . . . . . . . . . . . 141DEPARTMENT OF HEALTH . . . . . . . . . . . . . . . . . . . . . . . 73DEPARTMENT OF NATURAL RESOURCES . . . . . . . . . . . . . . . . . 150DEPARTMENT OF SOCIAL AND HEALTH SERVICES . . . . . . . . . . . . . 67DEPARTMENT OF VETERANS AFFAIRS . . . . . . . . . . . . . . . . . . 75EASTERN WASHINGTON STATE HISTORICAL SOCIETY . . . . . . . . 200, 200EASTERN WASHINGTON UNIVERSITY . . . . . . . . . . . . . . . . . . 187HOUSE OF REPRESENTATIVES . . . . . . . . . . . . . . . . . . . . . 2MILITARY DEPARTMENT . . . . . . . . . . . . . . . . . . . . . . . 62OFFICE OF FINANCIAL MANAGEMENT . . . . . . . . . . . . . . . . . . 45POLLUTION LIABILITY INSURANCE AGENCY . . . . . . . . . . . . . . 108PUGET SOUND PARTNERSHIP . . . . . . . . . . . . . . . . . . . . . 150RECREATION AND CONSERVATION FUNDING BOARD . . . . . . . . . . . . 123SECRETARY OF STATE . . . . . . . . . . . . . . . . . . . . . . . . 4STATE CONSERVATION COMMISSION . . . . . . . . . . . . . . . . . . 138SUPERINTENDENT OF PUBLIC INSTRUCTION . . . . . . . . . . . . . . 162UNIVERSITY OF WASHINGTON . . . . . . . . . . . . . . . . . . . . 177WASHINGTON STATE HISTORICAL SOCIETY . . . . . . . . . . . . . . . 196WASHINGTON STATE PATROL . . . . . . . . . . . . . . . . . . . . . 161WASHINGTON STATE UNIVERSITY . . . . . . . . . . . . . . . . . . . 181WESTERN WASHINGTON UNIVERSITY . . . . . . . . . . . . . . . . . . 194WORKFORCE TRAINING AND EDUCATION COORDINATING BOARD . . . . . . . 196

--- END ---

p. 280 2EHB 1115.PL