28
DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT Konferencija „Budućnost centralnih toplinskih sustava u Republici Hrvatskoj2.10.2014, Zagreb Centralni toplinski sustavi: izazovi i perspektiva Prof.dr.sc. Neven Duić Zavod za energetiku, energetska postrojenja i ekologiju Fakultet strojarstva i brodogradnje Sveučilište u Zagrebu, Croatia

Centralni toplinski sustavi: izazovi i perspektiva - POWERLABpowerlab.fsb.hr/cts/doc/CTS Konferencija prezentacije/2_Neven Duic.pdf · Centralni toplinski sustavi: izazovi i perspektiva

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Konferencija „Budućnost centralnih toplinskih sustava u Republici Hrvatskoj“

2.10.2014, Zagreb

Centralni toplinski sustavi: izazovi i

perspektiva

Prof.dr.sc. Neven DuićZavod za energetiku, energetska postrojenja i ekologiju

Fakultet strojarstva i brodogradnje

Sveučilište u Zagrebu, Croatia

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

3 options for heat sector

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Individual heating

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Heat networks

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Surplus heat today in Europe

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

EHI proportional

to square root of

degree days,

100 EHI = 2600

degree days

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Power sector developments

EU electricity generation installed capacity net change,

2000-2013 [GW], EWEA

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Wind share in electricity demand 2013Denmark – 34%

Portugal – 24% Spain – 21%

Cape Verde – 19% Ireland – 17%

Germany – 10% Romania – 9%

Estonia, UK, EU – 8%

Greece, Sweden – 7%

Lithuania – 6%

Cyprus, Italy, Netherlands – 5%

India, US, Austria, Belgium, Bulgaria, Poland – 4%

Canada, Costa Rica, Australia, Morocco, Croatia, France– 3%

World, China, Hungary, Latvia, Luxembourg – 2%

Wind share in electricity demand

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

11

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

PV revolucija

12

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

PV revolution

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

PV revolution

Solar share in electricity demand 2013Greece, Italy – 7%

Germany, Spain – 5%

Bulgaria – 4%

Belgium, Czech Rep. – 3%

Luxembourg, Slovakia – 2%

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Electricity price = marginal cost

Demand

Supply

HE

NE

Coal

Import Gas

Fuel oil

Marginal cost

Base load

Electricity market

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Demand

Supply

HE

NE

Coal

ImportsGas

Fuel oil

Marginal costBase load –

windy nightWind

Electricity price = marginal cost

Electricity market

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Wind and solar: Coal vs. gas?

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Go-live!

NWE+CWE price

coupling on

February 4, 2014

75% of European

power marketES+PT connected in

May 2014

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Consequences of market liberalisation: Demission of base load

The importance of balancing power (gas, hydro)

Cycling of old coal power plants (4000 hours by 2020)

End of need for feed-in tariff

Market arbitrage (time delay, power-heat, power-water, demand management)

Markets and RES

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Case: Skagen CHP plant

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Skagen CHP plant

CHP capacity: 13 MWe and 16 MWth

(Three 4.3 MWe Wärtsilä Natural Gas

engines)

250 MWh heat storage

37 MW peak load boilers

10 MW electric boiler

Heat Pumps Investment under consideration

Operated together with a Waste Incineration plant (heat only).

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Primary reserves (frequency controlled production)

Secondary reserves (controlled by status of primary reserves)

Manuel regulating power (Tertiary reserves)

30 sec

15 min

Intra day market

Day ahead spot market

1 hour > 12 hours

The main electricity markets

The M.Sc. Programmes in Environm. Managem. & Sustainable Energy Planning and Management, 8. Semester, http://people.plan.aau.dk/~ana

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Skagen

Day ahead spot market in Jan. 2005

Regulating power market in approx. 2006

Automatic primary reserve market

in Nov. 2009

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Cost of entering primary automatic reserves market

Cost of making +- 1.4 MW available on the

engines: Only approx. 27.000 EUR.

Investing in 10 MW electric boiler:

Approx 0.7 MEUR.

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Skagen CHP plant

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

DH in Sweden

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

4th generation district heating Low temperature 60-70/40

Low ratio heating/hot water – continuity of heat load

Heat storage (4 m3/customer)

CHP – follows electricity market

Waste heat from various sources (power plants, waste to energy, industry)

Heat from solar, biomass, gas

Electric heaters – primary reserve market (in future heat pumps, also secondary reserve)

District heating

DEPARTMENT OF ENERGY, POWER ENGINEERING AND ENVIRONMENT

Thank you for your attention!

[email protected]

Scientists have hitherto only interpreted the world in various ways; the point is to change it.