8
8/6/2019 CCA Proposal Group3 http://slidepdf.com/reader/full/cca-proposal-group3 1/8 CCA Pro osals Group 3 (Indonesia) by Mr. Iding Srihadi Adiwinata r. Iding Srihadi Adiwinata or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequence of their use. Terminology used may not necessarily be consistent with ADB official terms.

CCA Proposal Group3

Embed Size (px)

Citation preview

Page 1: CCA Proposal Group3

8/6/2019 CCA Proposal Group3

http://slidepdf.com/reader/full/cca-proposal-group3 1/8

CCA Pro osalsGroup 3

(Indonesia)

by

Mr. Iding Srihadi Adiwinatar. Iding Srihadi Adiwinata

or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent.ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for anyconsequence of their use. Terminology used may not necessarily be consistent with ADB official terms.

Page 2: CCA Proposal Group3

8/6/2019 CCA Proposal Group3

http://slidepdf.com/reader/full/cca-proposal-group3 2/8

Proposal No. 11. PROJECT PROPONENT : Water Resource Management. PROJECT PROPONENT : Water Resource Management

Services Agency, West Java2. PROJECT TITLE : Strengthening of the local institutions to adapt

to Climate Changeo Climate Change

3. PROJECT OBJECTIVES :

a) awareness of CC

b) increase public participation

4. POTENTIAL PROJECT PARTNERS :

a) NAHRIMb) ADB

Page 3: CCA Proposal Group3

8/6/2019 CCA Proposal Group3

http://slidepdf.com/reader/full/cca-proposal-group3 3/8

P l N 1 ( t )roposal No. 1 (cont.)5. MAIN PROJECT ACTIVITIES :

a) media campaignsb) community-based programmesc) dialoguesd) education curriculums) education curriculums

6. MAIN PROJECT OUTPUTS :

a) Support from local decision makers (major/head of districts toi l d CC d t ti i l l li & )nclude CC adaptation in local policy & programmes)

b) Community participitation in water conservation programmes(water saving, reforestation, waste management)

c) Corporate responsibility to support CC adaptationprogrammes ( reforestation, garbage management,community development )

7. INDICATIVE BUDGET :

2009 – USD500,000.00 ( West, Central & East Java )

Page 4: CCA Proposal Group3

8/6/2019 CCA Proposal Group3

http://slidepdf.com/reader/full/cca-proposal-group3 4/8

Proposal No. 21. PROJECT PROPONENT : Director General Of Water. PROJECT PROPONENT : Director General Of Water

Resources, Ministry Of Public Works.2. PROJECT TITLE : Strengthening of Hydrological Data

Managementanagement

3. PROJECT OBJECTIVES

a) improvement of hydrological stations

b) sharing of hydrological data among related agencies

c) analysis and simulation of impacts such as climate change

4. POTENTIAL PROJECT PARTNERS :a) Meteorological And Geophysical Agency, Indonesian

b) WMO Indonesian) WMO, Indonesian

c) Team Japan

Page 5: CCA Proposal Group3

8/6/2019 CCA Proposal Group3

http://slidepdf.com/reader/full/cca-proposal-group3 5/8

P l N 2 ( t )roposal No. 2 (cont.)5. MAIN PROJECT ACTIVITIES. MAIN PROJECT ACTIVITIES

a) Capacity building of officersb) Rehabilitation of existing hydrological station and build new

ones

c) Revitalise hydrological networks

d) Improvement of database information system) Improvement of database information system

6. MAIN PROJECT OUTPUTS :

a) Better management of hydrological data

b) Accurate, accessible and realtime data

7. INDICATIVE BUDGET :

2009 – USD500,000.00 (for primary stations & training)

2010 – USD500,000.00 ( for primary stations & training )

Page 6: CCA Proposal Group3

8/6/2019 CCA Proposal Group3

http://slidepdf.com/reader/full/cca-proposal-group3 6/8

Proposal No. 31. PROJECT PROPONENT : Research Centre For Water. PROJECT PROPONENT : Research Centre For Water

Resources, Ministry Of Public Works2. PROJECT TITLE : Distributed Hydrological Modelling Using

Global Data Setlobal Data Set

3. PROJECT OBJECTIVES

a) Promote integrated water resources management bymaking usable information from Global Earth ObservationSystem of Systems (GEOSS) to address the commonwater-related issues in Asia. According to the needs of

h d i b i di ib d h d l i lach demonstration basin, a distributed hydrologicalmodel;

b) Develop and strengthen early warning systems andinformation networks in disaster risk management;

Page 7: CCA Proposal Group3

8/6/2019 CCA Proposal Group3

http://slidepdf.com/reader/full/cca-proposal-group3 7/8

Proposal No. 3 (cont.)c) Develop and strengthen capacity at all levels to collect and) Develop and strengthen capacity at all levels to collect and

disseminate scientific and technical information, includingthe improvement of early warning systems for predictingextreme weather events, especially El Nino/La Nina,through the provision of assistance to institutions devotedto addressing such events;

d) Improve technique and methodologies for assessing the) p o e tec que a d et odo og es o assess g t eeffects of climate change, and encourage the continuingassessment of those adverse effects;

4 POTENTIAL PROJECT PARTNERS :. POTENTIAL PROJECT PARTNERS :

a) Asian Water Cycle Initiative (AWCI)

b) Team Japan

Page 8: CCA Proposal Group3

8/6/2019 CCA Proposal Group3

http://slidepdf.com/reader/full/cca-proposal-group3 8/8

Proposal No 3 (cont )roposal No. 3 (cont.)5. MAIN PROJECT ACTIVITIES

a) Real time flood management using quantitative) Real-time flood management using quantitative

precipitation forecast;b) Improving early warning and floodforecasting systems in

the river basin, including observations on water resourcesavailability and trends;

c) Flood forecasting forced by meso-scale High ResolutionModel

d) Optimal dam operation,

e) Reduce the risks of flooding in vulnerable areas by) Reduce the risks of flooding in vulnerable areas by,watershed protection and restoration, improved land-useplanning, improving and applying more widely techniquesand methodologies for assessing the potential adverse