Upload
tholgasenel
View
231
Download
0
Embed Size (px)
Citation preview
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
1/16
INCREDIBLE SOLUTIONS
CTR MANUFACTURING INDUSTRIES LTD
CTR
TRANSF ORMER EXPLOSIO N PREVENTION AND
FIRE EXTINGUISHING SYSTEM
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
2/16
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
3/16
l
l System can be installed on existing transformers at site with minimal outage period.
l System can be tested on energised transformers, unlike the other systems.
l Multi signal activation, eliminates possibility of mal-operation.
l Patented in over 80 countries.
l Low investment compared to other systems. l Minimal post-fire and no secondary damage.
l Low maintenance and running cost compared to other systems.
l Fool proof design to avoid ingress of nitrogen due to climatic changes into energised
transformer.
l Suitable for indoor, outdoor and unmanned substations.
l Models available to protect OLTC and cable box.
l Extinguishes external fire in bushing and/or radiator also.
l Back up provision ensures nitrogen injection for fail safe operation.
l Suitable for oil filled generator / furnace / rectifier / power transformers and reactors.
l Approved by leading transformer manufacturers and utilities worldwide.
On receipt of required activating signals, depressurizing commences by draining of a
predetermined quantity of oil. Simultaneously Nitrogen is injected under pressure at a pre-
detemined flow rate to create a stirring action thereby bringing the temperature of top oil surface
below ignition point. Additionally in case of external fire, it is extinguished within 30 seconds
maximum. Nitrogen gas occupies the space created by oil drain and acts as an insulating layer
between the top layer of oil in the transformer tank and oxygen in the atmosphere. TransformerConservator Isolation Valve blocks the passage of oil and isolates conservator oil thereby
preventing escalation of fire.
Reliable l Dedicated system l Saved over 5000 MVA of transformers from explosion
TYPICAL INSTALLATION
3
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
4/16
Internal heavy faults result in short circuit and consequent imbalance of input and output current
leads to operation of differential relay. Faults lead to consequent oil surge / turbulance in the
transformer tank leading to operation of buchholz relay and/or Rapid pressure rise relay.
Immediate reduction of pressure is achieved by partially draining oil from the top of the
transformer tank. Conservator oil is isolated simultaneously due to operation of TCIV. The
drained oil is collected in the covered oil pit / tank. Refer to exhibit 1A.
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
BUCHHOLZ RELAY
FIRE DETECTOR
OIL DRAIN
TRANSFORMER
OPERATINGSIGNALSFROM
CONTROLROOM /RELAYPANEL
CUBICLE
CONTROL
BOX
N2
N2 RELEASEDEVICE
CIVILWORK
DIFFERENTIALRELAY
BUCHHOLZ /OIL SURGE RELAY
RAPID PRESSURERISE RELAY
CONSERVATOR OIL ISOLATION BYTRANSFORMER CONSERVATOR
ISOLATION VALVE (TCIV)
OIL DRAIN
MASTER TRIP /HV+LV CB TRIP
NITROGENINJECTION
NITROGENINJECTION
RAPIDPRESSURERISE RELAY
(RPRR)
COVEREDOIL PIT/TANK
QUICK DEPRESSURISATIONVALVE ASSEMBLY
EXHIBIT 1A
AUTO EXPLOSION PREVENTION MODE
4
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
5/16
AUTO EXTINCTION MODE
5
FIRE DETECTOR
OIL DRAIN
MASTER TRIP /HV+LV CB TRIP
NITROGENINJECTION
CONSERVATOR OIL ISOLATION BYTRANSFORMER CONSERVATOR
ISOLATION VALVE (TCIV)
RAPID PRESSURERISE RELAY
Simultaneous with oil drain, nitrogen gas is injected at a predetermined flow rate and pressure
from the bottom side valves of the transformer tank. Stirring action by the nitrogen gas of the
transformer oil reduces the temperature of the top layer of the oil eliminating the possibility of fire
on the top surface of the oil. Continuous nitrogen injection for upto 45 minutes cools the oil to
ambient temperature. Refer to exhibit 1B.
BUCHHOLZ RELAY
FIRE DETECTOR
OIL DRAIN
OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL
CUBICLE
CONTROL
BOX
N2
N2 RELEASEDEVICE
TRANSFORMER
NITROGENINJECTION
RAPIDPRESSURE
RISE RELAY(RPRR)
COVEREDOIL PIT/TANK
CIVILWORK
QUICK DEPRESSURISATIONVALVE ASSEMBLY
EXHIBIT 1B
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
BUCHHOLZ /OIL SURGE RELAY
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
6/16
EXHIBIT 2A
TYPICAL LOGIC 1
Upon receipt of system activation signals, immediate draining of top layer of oil in the transformer
tank commences, reducing any pressure in the transformer tank. The top layer of oil gets
drained and collected in a covered oil pit / tank. Refer to exhibit 2B.
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
BUCHHOLZ RELAY
FIRE DETECTOR
OIL DRAIN
TRANSFORMER
OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL
CUBICLE
CONTROL
BOX
N2
N2 RELEASEDEVICE
NITROGENINJECTION
6
COVEREDOIL PIT/TANK
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
BUCHHOLZ RELAY
FIRE DETECTOR
OIL DRAIN
TRANSFORMER
OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL
CUBICLE
CONTROL
BOX
N2
N2 RELEASEDEVICE
NITROGENINJECTION
System will also operate in case of bushing failure or transformer tank rupture. Since oil from
conservator will flow at an abnormal rate resulting in operation of TCIV, which isolates the
conservator oil preventing aggravation and spread of fire. Consequently buchholz relay operates
due to non availability of oil in the relay. Refer to exhibit 2A.
RAPIDPRESSURE
RISE RELAY(RPRR)
COVEREDOIL PIT/TANK
CIVILWORK
CIVILWORK
RAPIDPRESSURERISE RELAY
(RPRR)
QUICK DEPRESSURISATIONVALVE ASSEMBLY
QUICK DEPRESSURISATIONVALVE ASSEMBLY
EXHIBIT 2B
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
7/16
EXHIBIT 2C
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
BUCHHOLZ RELAY
FIRE DETECTOR
OIL DRAIN
OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL
CUBICLE
CONTROL
BOX
N2
N2 RELEASEDEVICE
NITROGENINJECTION
TRANSFORMER
Simultaneous with oil drain, nitrogen gas is injected at a predetermined flow rate and pressure
from the bottom side valves of the transformer tank. Stirring action by the nitrogen gas of the
transformer oil reduces the temperature of the top layer of the oil extinguishing any fire on the top
surface of the oil. Continuous nitrogen injection for upto 45 minutes cools the oil to ambient
temperature. Refer to exhibit 2C.
COVEREDOIL PIT/TANK
RAPIDPRESSURERISE RELAY
(RPRR)
REMOTE MANUAL MODE
EXTINGUISHINGRELEASE SWITCH ON
CONSERVATOR OIL ISOLATION BYTRANSFORMER CONSERVATOR
ISOLATION VALVE (TCIV)
OIL DRAIN
MASTER TRIP /HV+LV CB TRIP
NITROGENINJECTION
7
QUICK DEPRESSURISATIONVALVE ASSEMBLY
In case of an emergency, the system can also be operated in remote manual mode by breaking
the glass window provided on the control box and by turning on extinguishing release switch to
'ON' position.
CIVILWORK
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
8/16
LOCAL MANUAL MODE
In case of an unlikely event of failure of power source, the system can be still be operated
manually from the cubicle.
OPERATE ANOTHER LEVERFOR NITROGEN INJECTION
CONSERVATOR OIL ISOLATION BYTRANSFORMER CONSERVATOR
ISOLATION VALVE (TCIV)
OPERATE FIRST LEVER FOROIL DRAIN
8
FIRE DETECTOR
BUCHHOLZ RELAY
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
OIL DRAIN
NITROGENINJECTION
RAPIDPRESSURERISE RELAY
(RPRR) TRANSFORMER
OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL
CUBICLE
CONTROL
BOX
N2
N2 RELEASEDEVICE
COVEREDOIL PIT/TANK
OLTC
TYPICAL LAYOUT OPTIONAL FOR OLTC PROTECTION
QUICK DEPRESSURISATIONVALVE ASSEMBLY
CIVILWORK
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
9/16
TYPICAL LAYOUT FOR OPTIONAL CABLE BOX
FIRE DETECTOR
BUCHHOLZ RELAY
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
OIL DRAIN
NITROGENINJECTION
RAPIDPRESSURERISE RELAY
(RPRR) TRANSFORMER
OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL
CUBICLE
CONTROL
BOX
N2
N2 RELEASEDEVICE
COVEREDOIL PIT/TANK
QUICKDEPRESSURISATION
VALVE ASSEMBLY
Service engineers are available for supervision of system installation, commissioning
and training. CTR warranty is valid, if system is commissioned by CTR representative
authorised in writing. Worldwide representatives are available for spares and service.
Marketing enquiry questionnaire form PTFS 1005 should be entered completely for
prompt response and offering of most appropriate model. Operation and maintenance
manual is supplied in English language, unless specifically requested for otherwise.
Please also specify number of copies required both in digital and hard format and to
whom these should be delivered.
INSTALLATION AND COMMISSIONING
9
CIVILWORK
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
10/16
TESTIMONIALS
10
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
11/16
SOME INTERNATIONAL PATENTS
11
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
12/16
Depressurisation : Commences before static pressure build up and
consequent explosion
Fire Extinguishing period : Maximum 30 seconds from commencement of
N2 injection
0Fire detector heat : 141 C
sensing temperature
Transformer conservator : Settable for flow rate depending
isolation valve upon transformer and conservator pipe size.
Control Box : 110 V DC / 125V DC/220 V DC and 110 V AC/230 V AC
Cubicle : 110 V AC / 230 V AC
:Cubicle
Dimensions in mm
L B H
250 MVA and above 1600 600 1900 600
10 MVA to 249 MVA 1200 500 1900 500
2 MVA to 10 MVA 1200 500 1700 450
Below 2 MVA 1200 500 1200 350
Height includes 100 mm for Base
Control Box :Dimensions in mm
L B H
Electro-mechanical 500 320 700 45
PLC 500 320 700 40
PLC with mimic 500 320 700 40
PLC with SCADA 500 320 700 40
TECHNICAL HIGHLIGHTS
Transformer rating
Types Weight in Kgs
12
Weight in Kgs
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
13/16
DMJ:fpPTFS.1005.D.0412.R2 TURNOVER
Conservator pipe angle :mmConservator pipe dia :
d
g
d=0
g=0
No
Type DType C
Yes
Dimension :
If yes : Arrangement
Builtin onload Tapchanger :
c
a
Type B
Type A
B =
Main Dimensions of tank :
CUSTOMER
PROTECTION
TRANSFORMER
/R
EACTOR
DETAILS
Oil temp.indicator trip1 Nr. NOpotential free
HV circuit breakers &LV circuit breakersignal, 1 Nr Each, NCpotential free
Restricted Earth
fault relay signal
1 Nr. No
potential free
1 Nr. NOpotential free
Buchholz Signal
125 V 110 V 48 V 24 V
230 V
230 V
110 V 50 Hz 60 Hz
110 V 50 Hz 60 Hz
Lts Oil Qty in Cable box : Lts
Trs. Sr. Nr. :
Voltage Ratio :
Top cover Drg Nr.:
(Enclosed)
Enquiry Ref :
Quantity :
Oil Qty in tank :
(Enclosed)
Rating : MVA/MVAR
G.A. Drg Nr. :
D.C. Supply available in Control Room :
A.C. Supply available near Transformer :
A.C. Supply available in Control Room :
Customer :
Work Order Nr/Tender Nr :
End User :
Manufacturer :
MK ENQUIRY QUESTIONAIRE FORM
SR.NR.
POONA
CTR FIRE SYSTEMS DIVISION
"
Cuthere
Oil Qty in Conservator :
Confirm availability of spare contacts in relay panel :Differentialrelay signal1 Nr. NOpotential free
Winding temp.indicator trip1 Nr. NOpotential free
Master relay(86) Trip1 Nr. NOpotential free
If numeric relay for Differential relay :
Remarks :
Self reset Manual reset
H =
a =
c =
mm
mm
mm
mm
B L
H
H
B L
d =
g =
mm
mm
Degree
L = mm
OLTC oil surgerelay trip1 Nr. NOpotential free
Rapid Pressurerise relay signal1 Nr. NOpotential free
13
Lts
Tank
Cable box
Tank
Cable box
Tank
Cable box
Tank
Cable box
Tank Cable box Tank Cable box
TRANSFORMER
/REACTOR
DETAILS
220 V
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
14/16
Arrangement of Bushing :
a) HV
LV
TV
others
HV
LV
TV
others
HV
LV
TV
others
p p
b) c)
p = mm p = mm
d)
p
HV
LV
TV
others
e)
p
HV
LV
TV
othersp = mm p = mm
f)
p
p = mm
HV
LV
TV
others
g) HV
LV
TV
others
HV
LV
TV
others
h)
Cooling details :if OF type, NR. OF PUMPS :
KW/HP :
HEAD :
FLOW :
Installation : New Post
Dist. from Trs. to Control Room through Cable Trench :
Dist. from Relay panel to Control Room through Cable Trench : mtrs
Valve Schedule Drawing to be attached : Drg. Nr :
Availability of valves :
Between Conservator and Buchholz Relay :
Between Buchhloz Relay and Transformer :
** If valve not available enclose detailed pipe drawing for Tank and conservator along with buchholzvalve flange details.
Available
Available
Not Available
Not Available
**
**
Oil pit/tank :Available Not Available Dist from Trs : mtrs
Capacity : LtsDimensions ( L X B X D ) mm :
mmSize of pipe connecting Trs. to Oil pit :
Site Details :
Sub-station layout drawing to be attached
Sub-station foundation drawing to be attached
Sub-station cable trench drawing to be attached
Drg. Nr.
Drg. Nr.
Drg. Nr.
Manuals : Nrs. Language : English Other ............
Packing : Export Domestic
Instructions required for packing :
NAME :
DESIGNATION :
FOR CTR USE Quotation Nr. :
SIGNATURE :
DATE :
STAMP
OR
SEAL
PTFS.1005.D.0412.R2
DMJ:fp
GENERAL
INSTALLATION
TRANSFORMER
/REACTOR
DETAIL
S
mtrs
14
Tank Cable box
Tank Cable box
Tank Cable box
Tank Cable box
**
**
Qty
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
15/16
CTR : System : Cubicle
: Control box
: Transformer conservator
isolation valve (TCIV)
: Required number of fire
detectors
: Signal box
Other : Fire survival cable
: Fire resistant low smoke
(FRLS) cables
: Pipe connections between
Transformer and Cubicle
: Pipe connections between
cubicle and oil pit
TRANSFORMER On transformer : Oil drain opening.
MANUFACTURER / : Nitrogen injection openings
BUYER : : Brackets for Fire detector
fixing
: TCIV fixing arrangement.
: Signal box fixing
arrangement.
USER : Other : Civil work for cubicle.
: Civil work for piping.
: Civil work for Oil pit / Oil gas
separation Tank.
: Oil gas separation tank (optional)
: Potential free contacts in relay
panel.
: Power supply.
: Oil for topping up transformer.
# Rights reserved to amend design data without prior notification.
SCOPE OF SUPPLY / WORK
15
8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System
16/16
FIRE SYSTEMS DIVISIONCTR MANUFACTURING INDUSTRIES LTD
NAGAR ROAD, PUNE 411014, INDIA.
PHONE : 91 20 26633402/3/4/5. FAX : 91 20 26633425
[email protected] / [email protected]
CTR Pune
PM FS.1005
APRIL 2013
CTR
WORLDWIDE MARKETING NETWORK
CTR Pune
INSTALLATIONS
INDIA
ECUADOR