Catalog for Transformer Explosion Prevention and Fire Extinguishing System

Embed Size (px)

Citation preview

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    1/16

    INCREDIBLE SOLUTIONS

    CTR MANUFACTURING INDUSTRIES LTD

    CTR

    TRANSF ORMER EXPLOSIO N PREVENTION AND

    FIRE EXTINGUISHING SYSTEM

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    2/16

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    3/16

    l

    l System can be installed on existing transformers at site with minimal outage period.

    l System can be tested on energised transformers, unlike the other systems.

    l Multi signal activation, eliminates possibility of mal-operation.

    l Patented in over 80 countries.

    l Low investment compared to other systems. l Minimal post-fire and no secondary damage.

    l Low maintenance and running cost compared to other systems.

    l Fool proof design to avoid ingress of nitrogen due to climatic changes into energised

    transformer.

    l Suitable for indoor, outdoor and unmanned substations.

    l Models available to protect OLTC and cable box.

    l Extinguishes external fire in bushing and/or radiator also.

    l Back up provision ensures nitrogen injection for fail safe operation.

    l Suitable for oil filled generator / furnace / rectifier / power transformers and reactors.

    l Approved by leading transformer manufacturers and utilities worldwide.

    On receipt of required activating signals, depressurizing commences by draining of a

    predetermined quantity of oil. Simultaneously Nitrogen is injected under pressure at a pre-

    detemined flow rate to create a stirring action thereby bringing the temperature of top oil surface

    below ignition point. Additionally in case of external fire, it is extinguished within 30 seconds

    maximum. Nitrogen gas occupies the space created by oil drain and acts as an insulating layer

    between the top layer of oil in the transformer tank and oxygen in the atmosphere. TransformerConservator Isolation Valve blocks the passage of oil and isolates conservator oil thereby

    preventing escalation of fire.

    Reliable l Dedicated system l Saved over 5000 MVA of transformers from explosion

    TYPICAL INSTALLATION

    3

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    4/16

    Internal heavy faults result in short circuit and consequent imbalance of input and output current

    leads to operation of differential relay. Faults lead to consequent oil surge / turbulance in the

    transformer tank leading to operation of buchholz relay and/or Rapid pressure rise relay.

    Immediate reduction of pressure is achieved by partially draining oil from the top of the

    transformer tank. Conservator oil is isolated simultaneously due to operation of TCIV. The

    drained oil is collected in the covered oil pit / tank. Refer to exhibit 1A.

    TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)

    BUCHHOLZ RELAY

    FIRE DETECTOR

    OIL DRAIN

    TRANSFORMER

    OPERATINGSIGNALSFROM

    CONTROLROOM /RELAYPANEL

    CUBICLE

    CONTROL

    BOX

    N2

    N2 RELEASEDEVICE

    CIVILWORK

    DIFFERENTIALRELAY

    BUCHHOLZ /OIL SURGE RELAY

    RAPID PRESSURERISE RELAY

    CONSERVATOR OIL ISOLATION BYTRANSFORMER CONSERVATOR

    ISOLATION VALVE (TCIV)

    OIL DRAIN

    MASTER TRIP /HV+LV CB TRIP

    NITROGENINJECTION

    NITROGENINJECTION

    RAPIDPRESSURERISE RELAY

    (RPRR)

    COVEREDOIL PIT/TANK

    QUICK DEPRESSURISATIONVALVE ASSEMBLY

    EXHIBIT 1A

    AUTO EXPLOSION PREVENTION MODE

    4

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    5/16

    AUTO EXTINCTION MODE

    5

    FIRE DETECTOR

    OIL DRAIN

    MASTER TRIP /HV+LV CB TRIP

    NITROGENINJECTION

    CONSERVATOR OIL ISOLATION BYTRANSFORMER CONSERVATOR

    ISOLATION VALVE (TCIV)

    RAPID PRESSURERISE RELAY

    Simultaneous with oil drain, nitrogen gas is injected at a predetermined flow rate and pressure

    from the bottom side valves of the transformer tank. Stirring action by the nitrogen gas of the

    transformer oil reduces the temperature of the top layer of the oil eliminating the possibility of fire

    on the top surface of the oil. Continuous nitrogen injection for upto 45 minutes cools the oil to

    ambient temperature. Refer to exhibit 1B.

    BUCHHOLZ RELAY

    FIRE DETECTOR

    OIL DRAIN

    OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL

    CUBICLE

    CONTROL

    BOX

    N2

    N2 RELEASEDEVICE

    TRANSFORMER

    NITROGENINJECTION

    RAPIDPRESSURE

    RISE RELAY(RPRR)

    COVEREDOIL PIT/TANK

    CIVILWORK

    QUICK DEPRESSURISATIONVALVE ASSEMBLY

    EXHIBIT 1B

    TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)

    BUCHHOLZ /OIL SURGE RELAY

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    6/16

    EXHIBIT 2A

    TYPICAL LOGIC 1

    Upon receipt of system activation signals, immediate draining of top layer of oil in the transformer

    tank commences, reducing any pressure in the transformer tank. The top layer of oil gets

    drained and collected in a covered oil pit / tank. Refer to exhibit 2B.

    TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)

    BUCHHOLZ RELAY

    FIRE DETECTOR

    OIL DRAIN

    TRANSFORMER

    OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL

    CUBICLE

    CONTROL

    BOX

    N2

    N2 RELEASEDEVICE

    NITROGENINJECTION

    6

    COVEREDOIL PIT/TANK

    TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)

    BUCHHOLZ RELAY

    FIRE DETECTOR

    OIL DRAIN

    TRANSFORMER

    OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL

    CUBICLE

    CONTROL

    BOX

    N2

    N2 RELEASEDEVICE

    NITROGENINJECTION

    System will also operate in case of bushing failure or transformer tank rupture. Since oil from

    conservator will flow at an abnormal rate resulting in operation of TCIV, which isolates the

    conservator oil preventing aggravation and spread of fire. Consequently buchholz relay operates

    due to non availability of oil in the relay. Refer to exhibit 2A.

    RAPIDPRESSURE

    RISE RELAY(RPRR)

    COVEREDOIL PIT/TANK

    CIVILWORK

    CIVILWORK

    RAPIDPRESSURERISE RELAY

    (RPRR)

    QUICK DEPRESSURISATIONVALVE ASSEMBLY

    QUICK DEPRESSURISATIONVALVE ASSEMBLY

    EXHIBIT 2B

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    7/16

    EXHIBIT 2C

    TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)

    BUCHHOLZ RELAY

    FIRE DETECTOR

    OIL DRAIN

    OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL

    CUBICLE

    CONTROL

    BOX

    N2

    N2 RELEASEDEVICE

    NITROGENINJECTION

    TRANSFORMER

    Simultaneous with oil drain, nitrogen gas is injected at a predetermined flow rate and pressure

    from the bottom side valves of the transformer tank. Stirring action by the nitrogen gas of the

    transformer oil reduces the temperature of the top layer of the oil extinguishing any fire on the top

    surface of the oil. Continuous nitrogen injection for upto 45 minutes cools the oil to ambient

    temperature. Refer to exhibit 2C.

    COVEREDOIL PIT/TANK

    RAPIDPRESSURERISE RELAY

    (RPRR)

    REMOTE MANUAL MODE

    EXTINGUISHINGRELEASE SWITCH ON

    CONSERVATOR OIL ISOLATION BYTRANSFORMER CONSERVATOR

    ISOLATION VALVE (TCIV)

    OIL DRAIN

    MASTER TRIP /HV+LV CB TRIP

    NITROGENINJECTION

    7

    QUICK DEPRESSURISATIONVALVE ASSEMBLY

    In case of an emergency, the system can also be operated in remote manual mode by breaking

    the glass window provided on the control box and by turning on extinguishing release switch to

    'ON' position.

    CIVILWORK

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    8/16

    LOCAL MANUAL MODE

    In case of an unlikely event of failure of power source, the system can be still be operated

    manually from the cubicle.

    OPERATE ANOTHER LEVERFOR NITROGEN INJECTION

    CONSERVATOR OIL ISOLATION BYTRANSFORMER CONSERVATOR

    ISOLATION VALVE (TCIV)

    OPERATE FIRST LEVER FOROIL DRAIN

    8

    FIRE DETECTOR

    BUCHHOLZ RELAY

    TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)

    OIL DRAIN

    NITROGENINJECTION

    RAPIDPRESSURERISE RELAY

    (RPRR) TRANSFORMER

    OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL

    CUBICLE

    CONTROL

    BOX

    N2

    N2 RELEASEDEVICE

    COVEREDOIL PIT/TANK

    OLTC

    TYPICAL LAYOUT OPTIONAL FOR OLTC PROTECTION

    QUICK DEPRESSURISATIONVALVE ASSEMBLY

    CIVILWORK

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    9/16

    TYPICAL LAYOUT FOR OPTIONAL CABLE BOX

    FIRE DETECTOR

    BUCHHOLZ RELAY

    TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)

    OIL DRAIN

    NITROGENINJECTION

    RAPIDPRESSURERISE RELAY

    (RPRR) TRANSFORMER

    OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL

    CUBICLE

    CONTROL

    BOX

    N2

    N2 RELEASEDEVICE

    COVEREDOIL PIT/TANK

    QUICKDEPRESSURISATION

    VALVE ASSEMBLY

    Service engineers are available for supervision of system installation, commissioning

    and training. CTR warranty is valid, if system is commissioned by CTR representative

    authorised in writing. Worldwide representatives are available for spares and service.

    Marketing enquiry questionnaire form PTFS 1005 should be entered completely for

    prompt response and offering of most appropriate model. Operation and maintenance

    manual is supplied in English language, unless specifically requested for otherwise.

    Please also specify number of copies required both in digital and hard format and to

    whom these should be delivered.

    INSTALLATION AND COMMISSIONING

    9

    CIVILWORK

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    10/16

    TESTIMONIALS

    10

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    11/16

    SOME INTERNATIONAL PATENTS

    11

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    12/16

    Depressurisation : Commences before static pressure build up and

    consequent explosion

    Fire Extinguishing period : Maximum 30 seconds from commencement of

    N2 injection

    0Fire detector heat : 141 C

    sensing temperature

    Transformer conservator : Settable for flow rate depending

    isolation valve upon transformer and conservator pipe size.

    Control Box : 110 V DC / 125V DC/220 V DC and 110 V AC/230 V AC

    Cubicle : 110 V AC / 230 V AC

    :Cubicle

    Dimensions in mm

    L B H

    250 MVA and above 1600 600 1900 600

    10 MVA to 249 MVA 1200 500 1900 500

    2 MVA to 10 MVA 1200 500 1700 450

    Below 2 MVA 1200 500 1200 350

    Height includes 100 mm for Base

    Control Box :Dimensions in mm

    L B H

    Electro-mechanical 500 320 700 45

    PLC 500 320 700 40

    PLC with mimic 500 320 700 40

    PLC with SCADA 500 320 700 40

    TECHNICAL HIGHLIGHTS

    Transformer rating

    Types Weight in Kgs

    12

    Weight in Kgs

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    13/16

    DMJ:fpPTFS.1005.D.0412.R2 TURNOVER

    Conservator pipe angle :mmConservator pipe dia :

    d

    g

    d=0

    g=0

    No

    Type DType C

    Yes

    Dimension :

    If yes : Arrangement

    Builtin onload Tapchanger :

    c

    a

    Type B

    Type A

    B =

    Main Dimensions of tank :

    CUSTOMER

    PROTECTION

    TRANSFORMER

    /R

    EACTOR

    DETAILS

    Oil temp.indicator trip1 Nr. NOpotential free

    HV circuit breakers &LV circuit breakersignal, 1 Nr Each, NCpotential free

    Restricted Earth

    fault relay signal

    1 Nr. No

    potential free

    1 Nr. NOpotential free

    Buchholz Signal

    125 V 110 V 48 V 24 V

    230 V

    230 V

    110 V 50 Hz 60 Hz

    110 V 50 Hz 60 Hz

    Lts Oil Qty in Cable box : Lts

    Trs. Sr. Nr. :

    Voltage Ratio :

    Top cover Drg Nr.:

    (Enclosed)

    Enquiry Ref :

    Quantity :

    Oil Qty in tank :

    (Enclosed)

    Rating : MVA/MVAR

    G.A. Drg Nr. :

    D.C. Supply available in Control Room :

    A.C. Supply available near Transformer :

    A.C. Supply available in Control Room :

    Customer :

    Work Order Nr/Tender Nr :

    End User :

    Manufacturer :

    MK ENQUIRY QUESTIONAIRE FORM

    SR.NR.

    POONA

    CTR FIRE SYSTEMS DIVISION

    "

    Cuthere

    Oil Qty in Conservator :

    Confirm availability of spare contacts in relay panel :Differentialrelay signal1 Nr. NOpotential free

    Winding temp.indicator trip1 Nr. NOpotential free

    Master relay(86) Trip1 Nr. NOpotential free

    If numeric relay for Differential relay :

    Remarks :

    Self reset Manual reset

    H =

    a =

    c =

    mm

    mm

    mm

    mm

    B L

    H

    H

    B L

    d =

    g =

    mm

    mm

    Degree

    L = mm

    OLTC oil surgerelay trip1 Nr. NOpotential free

    Rapid Pressurerise relay signal1 Nr. NOpotential free

    13

    Lts

    Tank

    Cable box

    Tank

    Cable box

    Tank

    Cable box

    Tank

    Cable box

    Tank Cable box Tank Cable box

    TRANSFORMER

    /REACTOR

    DETAILS

    220 V

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    14/16

    Arrangement of Bushing :

    a) HV

    LV

    TV

    others

    HV

    LV

    TV

    others

    HV

    LV

    TV

    others

    p p

    b) c)

    p = mm p = mm

    d)

    p

    HV

    LV

    TV

    others

    e)

    p

    HV

    LV

    TV

    othersp = mm p = mm

    f)

    p

    p = mm

    HV

    LV

    TV

    others

    g) HV

    LV

    TV

    others

    HV

    LV

    TV

    others

    h)

    Cooling details :if OF type, NR. OF PUMPS :

    KW/HP :

    HEAD :

    FLOW :

    Installation : New Post

    Dist. from Trs. to Control Room through Cable Trench :

    Dist. from Relay panel to Control Room through Cable Trench : mtrs

    Valve Schedule Drawing to be attached : Drg. Nr :

    Availability of valves :

    Between Conservator and Buchholz Relay :

    Between Buchhloz Relay and Transformer :

    ** If valve not available enclose detailed pipe drawing for Tank and conservator along with buchholzvalve flange details.

    Available

    Available

    Not Available

    Not Available

    **

    **

    Oil pit/tank :Available Not Available Dist from Trs : mtrs

    Capacity : LtsDimensions ( L X B X D ) mm :

    mmSize of pipe connecting Trs. to Oil pit :

    Site Details :

    Sub-station layout drawing to be attached

    Sub-station foundation drawing to be attached

    Sub-station cable trench drawing to be attached

    Drg. Nr.

    Drg. Nr.

    Drg. Nr.

    Manuals : Nrs. Language : English Other ............

    Packing : Export Domestic

    Instructions required for packing :

    NAME :

    DESIGNATION :

    FOR CTR USE Quotation Nr. :

    SIGNATURE :

    DATE :

    STAMP

    OR

    SEAL

    PTFS.1005.D.0412.R2

    DMJ:fp

    GENERAL

    INSTALLATION

    TRANSFORMER

    /REACTOR

    DETAIL

    S

    mtrs

    14

    Tank Cable box

    Tank Cable box

    Tank Cable box

    Tank Cable box

    **

    **

    Qty

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    15/16

    CTR : System : Cubicle

    : Control box

    : Transformer conservator

    isolation valve (TCIV)

    : Required number of fire

    detectors

    : Signal box

    Other : Fire survival cable

    : Fire resistant low smoke

    (FRLS) cables

    : Pipe connections between

    Transformer and Cubicle

    : Pipe connections between

    cubicle and oil pit

    TRANSFORMER On transformer : Oil drain opening.

    MANUFACTURER / : Nitrogen injection openings

    BUYER : : Brackets for Fire detector

    fixing

    : TCIV fixing arrangement.

    : Signal box fixing

    arrangement.

    USER : Other : Civil work for cubicle.

    : Civil work for piping.

    : Civil work for Oil pit / Oil gas

    separation Tank.

    : Oil gas separation tank (optional)

    : Potential free contacts in relay

    panel.

    : Power supply.

    : Oil for topping up transformer.

    # Rights reserved to amend design data without prior notification.

    SCOPE OF SUPPLY / WORK

    15

  • 8/13/2019 Catalog for Transformer Explosion Prevention and Fire Extinguishing System

    16/16

    FIRE SYSTEMS DIVISIONCTR MANUFACTURING INDUSTRIES LTD

    NAGAR ROAD, PUNE 411014, INDIA.

    PHONE : 91 20 26633402/3/4/5. FAX : 91 20 26633425

    [email protected] / [email protected]

    CTR Pune

    PM FS.1005

    APRIL 2013

    CTR

    WORLDWIDE MARKETING NETWORK

    CTR Pune

    INSTALLATIONS

    INDIA

    ECUADOR