53
Castlemaine Goldfields Limited Investor Presentation Not for release or distribution in the United States November 2011 For personal use only

Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Castlemaine Goldfields Limited

Investor Presentation

Not for release or distribution in the United States November 2011

For

per

sona

l use

onl

y

Page 2: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Castlemaine Goldfields Ltd

Page 2

DisclaimerThe presentation (in this projected form and as verbally presented) (“Presentation”) has been prepared by Castlemaine Goldfields Ltd in relation to the pro-rata non-renounceable offer and placement of

new Castlemaine ordinary shares. This presentation is provided on the basis that none of the Company nor its respective officers, shareholders, related bodies corporate, partners, affiliates, employees,

representatives and advisers make any representation or warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material contained in the Presentation and nothing

contained in the Presentation is, or may be relied upon as a promise, representation or warranty, whether as to the past or the future. The Company hereby excludes all warranties that can be excluded

by law.

The Presentation contains prospective financial material which is predictive in nature and may be affected by inaccurate assumptions or by known or unknown risks and uncertainties and may differ

materially from results ultimately achieved.

The Presentation contains ”forward-looking statements”. All statements other than those of historical facts included in the Presentation are forward-looking statements. Where the Company expresses

or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, forward-looking statements are

subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks

include, but are not limited to, gold and other metals price volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, as

well as political and operational risks and governmental regulation and judicial outcomes. The Company does not undertake any obligation to release publicly any revisions to any “forward-looking

statement”.

The Presentation contains general background information about the Company and its activities current as at the date of this presentation. The information in this Presentation is in summary form only

and does not contain all the information necessary to fully evaluate any transaction or investment. It should be read in conjunction with the Company’s other periodic and continuous disclosure

announcements lodged with the ASX, which are available at www.asx.com.au and other publicly available information on the Company.

This Presentation is not a prospectus, disclosure document or other offering document. It is for information purposes only and does not constitute an offer, invitation or recommendation to subscribe for

or purchase any security and does not form the basis of any contract or commitment. All persons should consider seeking appropriate professional advice in reviewing the Presentation and the

Company.

The information in this presentation that relates to Exploration Results, Mineral Resources and Exploration Potential is based on information compiled by Mr Wessley Edgar. Mr Edgar is an employee of

Castlemaine Goldfields Ltd, is a member of the Australian Institute of Mining and Metallurgy and The Society of Economic Geologists and is a Competent Person as defined in the 2004 edition of the

‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code)’. The Exploration Potential described in this Presentation is conceptual in nature, and there

is insufficient information to establish whether further exploration will result in the determination of a Mineral Resource. Mr Edgar consents to the publication of this information in the form and

content in which it appears.

The project planning, mining schedule and any resources referred to in this presentation, other than those explicitly identified as Mineral Resources in accordance with the JORC Code, are not based on

estimations of Ore Reserves or Mineral Resources made in accordance with the JORC Code for the Ballarat East goldfield and caution should be exercised in any external technical or economic evaluation.

Considering the style of mineralisation, and particularly the uncertainty of gold grade continuity, Mineral Resource estimates of higher confidence than the Inferred Resource classification will only be

possible once mining has accessed the Lower Llanberris and Britannia gold mineralisation to gain further geological and grade information. The wide spaced drilling in the Britannia mineralisation is not

currently sufficient to produce a Mineral Resource estimation. CGT emphasises that no Ore Reserve currently exists and cannot be estimated until drilling results can be correlated with bulk tonnage

mining outcomes.

For

per

sona

l use

onl

y

Page 3: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 3

1. Company Overview

2. Current Status

3. Ballarat Mine

4. Offer Details and Key Risks

5. Appendix

CONTENTSF

or p

erso

nal u

se o

nly

Page 4: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Company Overview – its Assets

Page 4

AssetHistoric

production Strategy Next steps

1 Ballarat 12Mozs Targeted production of 50koz p.a.

Commence 6 to 9 month ramp-up from Q3, 2011

$400m plant and development in place at Ballarat

Near mine targeted exploration program

Regional exploration activities will be curtailed during 2012 to allow focus on the Ballarat operations.

Possible future production profile from regional targets:-

AssetHistoric

production Strategy Next steps

2 Castlemaine 5.6Mozs Feasibility study On hold for 2012

3 Berringa 1.0Mozs Advanced exploration drilling

Possible JV

4 Tarnagulla 0.7Mozs Advanced exploration drilling

On hold for 2012

5 Sebastian and Raydarra

0.2Mozs Geophysics and targeted drilling

Farm-in agreement with Navarre Minerals

1

2

3

4

5

80km

CGT’s five gold projects shown in blue

with past production from these prominent goldfields.

For

per

sona

l use

onl

y

Page 5: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 5

• Castlemaine Goldfields Limited (“CGT”) is an ASX listed gold explorer and producer, havingcommenced a 9 month ramp-up in gold production in September this year.

• The company has a market capitalisation of $15 million. A$10 million cash as at end October2011.

• Projects located in Central Victoria (historic gold production of 64Moz).

• CGT’s five key assets:

1. Ballarat - historic production in excess of 12Moz, established infrastructure (total capex of>$400m), re-commenced gold production Q3 2011, significant exploration potential withdefined drilling program.

2. Castlemaine - historic production 5.6Moz, first JORC Inferred Resource estimate of686k ozs in 2008, 2 clear projects to be explored at Chewton – Wattle Gully.

3. Berringa - historic production 1Moz, just 25km from Ballarat – high grade potential.

4. Tarnagulla - historic production >700Koz – high grade potential.

5. Sebastian / Raydarra - historic production 187Koz – near surface potential.

• Board & Management team with depth and relevant experience to execute growth strategy.

Company OverviewF

or p

erso

nal u

se o

nly

Page 6: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 6

• The Ballarat underground gold mine commenced production in September 2011.

• Realistic production profile targeting 50,000 ounces per year from late 2012.

• Cash operating cost per ounce ~A$730 to $790/oz1.

• Business Plan has assumed A$1,550/oz Gold price for revenue purposes.

• 9 month ramp-up in gold production has commenced.

• Initial 2 year production profile delineated , contingent on ongoing exploration success, primarily in the Llanberris and Britannia compartments (gold bearing Mako Fault Zone identified there).

• Successful initial exploration drilling by CGT has validated the Ballarat acquisition.

• An Independent Technical Review has confirmed a JORC compliant Inferred Resource for the Makoin Llanberris, and has provided independent support for the Company’s Exploration Targets atBallarat, including the Britannia compartment.

• Current market levels represent an attractive investment entry point.

1 Cash operating cost includes costs associated with the mining and processing of material to produce gold bullion, including

the site support functions associated with administration, safety, security and environment. The cost does not includehead office costs, royalties, depreciation, amortisation or expenditure of a capital nature.

Company Overview (continued)F

or p

erso

nal u

se o

nly

Page 7: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Capital Structure

Page 7

ASX Code: CGT

• Fully paid shares on issue 152.8M

– Options unlisted 315,000

• Share price range (12 months) 10c - 74c (equivalent post share consolidation)

• Market Cap (@ 10c/share) $15M

• Cash on hand $10M (as at October 31 2011)

• Enterprise Value $ 5M

• No debt ($1.1m in equipment financing)

Major shareholders (as at 6 October)

ICF 17.1%Baker Steel Capital Managers 15.2%JP Morgan Chase & Co. 8.1%

Top 20 shareholders 66.5%

Market reaction

to 7 November

announcement

For

per

sona

l use

onl

y

Page 8: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 8

Directors

Mr Gary Scanlan Mr Matthew Gill Mr Drew Henry Mr Peter McCarthy Mr Peter Lester

(Non-Exec Chairman) (MD & CEO) (Non-Exec Director) (Non-Exec Director) (Non-Exec Director)Minerals Financier & Accountant Mining Engineer B.Eng (Hons) Geologist B.Sc. (Geol) Mining Engineer BSc, MSc Mining engineer B.Eng (Mining) (Hons)

FAusIMM, ACA M.Eng.Sc, MAusIMM, GAICD FAusIMM FAusIMM, CPEng, MAICD MAusIMM, MAICD

Non-Ex Director of Red 5 Limited Non-Ex Chairman of Unity Mining Ltd Non-Ex Director of Toro Energy

Chairman of AMC Consultants Non-ex Director of Nord Gold

Experienced Management team in place

• Toni Griffith - Chief Financial Officer Accountant. B.Com, FCPA

• Sue-Ann Higgins – Company Secretary Lawyer.BA LLB (Hons), ACIS, GAICD

• Lance Faulkner – Mine General Manager Mining Engineer. B.Eng (Mining) (Hons), MAusIMM

• Mark Davies – Processing Manager Metallurgist. B.Sc, MAusIMM

• Wessley Edgar – Exploration Manager Geologist. B.Sc (Hons), M.Sc (Mineral Economics), MSEG, MAusIMM

Castlemaine Goldfields Ltd – It’s peopleF

or p

erso

nal u

se o

nly

Page 9: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 9

CURRENT STATUS

For

per

sona

l use

onl

y

Page 10: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 10

The Ballarat underground gold mine was re-commissioned on schedule inSeptember 2011 embarking on a 6-9 month ramp up in activities.

To date over 1,700 metres of underground development has been achievedsafely and within budget parameters.

Mining of the higher grade Mako target remains the primary objective.

This is notwithstanding the shortfall in tonnes and grade from upper and smallersatellite targets mined while development continues.

A forecast shortfall of some 8,000 ounces prompted a review and decision tonow focus purely on accessing the Mako Fault zone.

Underground development is just 400 metres from this primary objective.

Other areas of expenditure have been eliminated or cut back as appropriate.

Regional exploration activities will be curtailed during 2012 to allow focus on theBallarat operations.

Current StatusF

or p

erso

nal u

se o

nly

Page 11: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 11

Engagement of Snowden Mining Industry Consultants to assist in the review.

o They found no fatal flaws and commented favorably on the quality of the data base .

o They endorse the company strategy of drilling for structure and driving for grade.

o A JORC Inferred Resource was reported for the Llanberris Mako Fault zone.

o An Exploration Target range was also reported.

o The technical challenges at Ballarat were commented on.

o “Ballarat in common with many gold vein systems is challenging to evaluate

and is a “drill for structure and drive for grade” proposition. Snowden

therefore endorses CGT’s approach of drilling for preliminary evaluation and

development to determine economic viability.”

Current Status (continued)

Snowden Mining Industry Consultants“Ballarat Gold Project Independent Technical Review”18 November 2011

For

per

sona

l use

onl

y

Page 12: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 12

The Independent Technical Review by Snowden made the following comments:-

An 1Inferred Mineral Resource totalling 100,000 t at 10.5 g/t Au for 33,100 oz Au is reported in

accordance with the 2004 JORC Code for the Llanberris Mako Fault Zone. Resource grade is reported

within a range of 5 g/t Au to 12 g/t Au to indicate likely variability. The resource estimate is global in nature

and reported at a 0 g/t Au cut-off. Based on a review of mining and cost parameters, Snowden considers

that the resource has reasonable prospects for economic extraction.

An 2Exploration Target in the range 400,000 t to 750,000 t at a grade of between 4 g/t Au and 8 g/t Au

for 70,000 oz Au to 165,000 oz Au has been determined for the Llanberris (Tiger) and Britannia (Mako)

Compartments of the First Chance Line, and the Llanberris and Britannia Compartments on the Sulieman

Line. The Victoria Compartment on both the First Chance and Sulieman Lines carries additional potential not

currently quantified as a Target.

1Mineral Resources which are not Ore Reserves do not have demonstrated economic viability. The estimate of Mineral

Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, operational

cost, metal price, mining control, dilution or other relevant issues. There has been insufficient exploration to define these

Inferred Mineral Resources as an Indicated or Measured Mineral Resource, as there are insufficient close-spaced drill hole

data to adequately define grade and geological continuity for this structurally complex deposit. It is uncertain if further

exploration will result in upgrading the Inferred Mineral Resource to an Indicated or Measured Mineral Resource category or to

Ore Reserves.

2An Exploration Target is a hypothetical view of mineralised reef which is not necessarily economic. It is not a Mineral

Resource or Ore Reserve. There is no guarantee that tonnages will be either realised or economic. Further study, including

underground development and diamond drilling is required.

Inferred Resource and Exploration TargetsF

or p

erso

nal u

se o

nly

Page 13: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 13

THE BALLARAT UNDERGROUND GOLD MINE

For

per

sona

l use

onl

y

Page 14: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 14

Lower LlanberrisBritannia

(in-fill drilling required)

VictoriaCompartment

Existing

development

• 2.5km of decline and 850 metres of access waste development

• Intersected first Lower Llanberris mineralisation in Q3 2011

• Have advanced >1,700 metres since re-commencement in March 2011

Proposed development

Future potential

Ballarat – Proposed Mine Development

We are now here

Started

here

For

per

sona

l use

onl

y

Page 15: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Ballarat

• Targeting a production rate of 50,000 oz p.a. by late 2012, with a 9 month ramp-up starting Q3, 2011

• Two potential Ore Sources identified:-

• Llanberris and Britannia mineralisation

• Volumes

• targeting 200,000tpa

• Assumptions

• 7.5g/t to 8.5g/t gold*

• Initial 2 year production period

• Anticipated cash operating cost $730 to $790/oz**

• Underground Mine and Processing Plant fully operational

• First gold poured

• September 2011

• Exploration commitment

• Near mine – Britannia, Victoria, Sulieman Line

* See next slide** See next slide Page 15

Modeled mineralisation. First

mining objective

Second mining objective (further drilling required)

Future potential for MFZ lodes in the

Victoria compartment.

Britannia6.4m @ 61.2 g/t2.5m @ 49.5 g/t

0.5m @ 126.3 g/t6m @ 13.4 g/t11m @ 8.1 g/t0.5m @ 87 g/t

1.9m @ 17.7 g/t

For

per

sona

l use

onl

y

Page 16: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Ballarat

* The key data supporting the basis for this range are the exploration results achieved from the company’s

diamond drill program since May 2010, and the fact that the historical goldfield recovered grade was 8.9g/t.

This grade range is conceptual in nature and there has been insufficient exploration to date to define a

mineral resource above the Inferred category, and it is uncertain if further exploration will result in the

upgrading of an Inferred Resource.

* An Independent Technical Review by Snowden made the following comments:-

An Inferred Mineral Resource totalling 100,000 t at 10.5 g/t Au for 33,100 oz Au is reported in accordance

with the 2004 JORC Code for the Llanberris Mako Fault Zone. Resource grade is reported within a range of

5 g/t Au to 12 g/t Au to indicate likely variability. The resource estimate is global in nature and reported at a

0 g/t Au cut-off. Based on a review of mining and cost parameters, Snowden considers that the resource

has reasonable prospects for economic extraction.

* An Exploration Target in the range 400,000 t to 750,000 t at a grade of between 4 g/t Au and 8 g/t Au

for 70,000 oz Au to 165,000 oz Au has been determined for the Llanberris (Tiger) and Britannia (Mako)

Compartments of the First Chance Line, and the Llanberris and Britannia Compartments on the Sulieman

Line. The Victoria Compartment on both the First Chance and Sulieman Lines carries additional potential.

** cash operating cost includes costs associated with the mining and processing of material to produce gold

bullion, including the site support functions associated with administration, safety, security and environment.

The cost does not include head office costs, royalties, depreciation, amortisation or expenditure of a capital

nature.

Page 16

For

per

sona

l use

onl

y

Page 17: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Ballarat – Future Growth

• Near mine exploration targets

• Exploration Targets totalling approx. 400 to 750kt @ 4 to 8g/t Au for 70,000 to 165,000 oz Au identified*

• Focus on northern compartments (geological and mining conditions are favourable)

• Significant growth potential

• Sulieman Line Upholes. Open to the north. Intersections include:

• Sulieman Line – Basking Fault Zone –close proximity to existing development, intersections include:

• Victoria compartment

Sulieman Line

* The Exploration Targets described in this Presentation are conceptual in nature,

and there is insufficient information to establish whether further exploration will

result in the determination of a Mineral Resource. Refer Page 2 and 5 also.

Page 17

• 1.1m @ 119 g/t

• 0.5m @ 163 g/t

• 7.8m @ 13.8 g/t

• 5.5m @ 61 g/t

• 7.3m @ 7 g/t

• 12.7m @ 10 g/t

• 1.3m @ 54 g/t

• 8.0m @ 7.3 g/t

• 1.4m @ 26.6 g/t

• 1.2m @ 69 g/t

• 8.8m @ 9.2 g/t,

• 12.7m @ 7.1 g/t

• 1.3m @ 65 g/t

• 2.7m @ 118 g/t

29.1m @ 32.1g/t

For

per

sona

l use

onl

y

Page 18: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 18

OFFER DETAILSAND

KEY RISKS

For

per

sona

l use

onl

y

Page 19: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 19

Capital Raising

• 1:1 partially underwritten accelerated non-renounceable entitlement offer to raise up to approximately $15M

• Offer Price: $0.10 per share

• Discount to 5 day VWAP: 16%

Proposed Use of Funds (next six months)

Replace revenue shortfall and accelerate mine development to the Mako Lode mineralisation

• Mine development to the Mako Lode A$5.1M

• Diamond drilling of the Mako Lode A$1.9M

• Maintain regional exploration in good standing A$0.4M

• Continue gold production ramp-up A$ Nil (use current cash) Includes ore mining, processing, maintenance and admin support

• Working Capital* A$7.6M

TOTAL ~A$15M

* Note. Revenues from bullion produced (estimated to be between 1,000 and 3,000 ounces over the next 4 to 5 months)will go towards the gold production ramp-up and working capital. Working capital includes current creditors.

For

per

sona

l use

onl

y

Page 20: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 20

Timetable

Entitlement Offer

Institutional bookbuild: 5.00pm to 7.00pm Thursday ,24 November 2011

Record Date: 7.00pm Monday ,28 November 2011

Retail Entitlement Offer opens: Tuesday, 29 November

Settlement of Institutional Component: Thursday, 1 December 2011

Allotment of Institutional Component New Shares: Friday, 2 December 2011

Retail Entitlement Offer closes: 5.00pm Tuesday, 13 December 2011

Results of Retail Entitlement Offer announced on ASX: Before 10.00am Friday, 16 December 2011

Settlement of Retail Entitlement Offer: Wednesday, 21 December 2011

Allotment of New Shares under Retail Entitlement Offer: Thursday, 22 December 2011

Retail Trading Date: Friday, 23 December 2011

** Timetable is indicative only and subject to change

For

per

sona

l use

onl

y

Page 21: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 21

The following contains a summary of some of the key risks associated with an investment in CGT. This summary of risks below should be considered in the context of previous disclosures made by CGT in accordance with its periodic and continuous disclosure obligations. The following is not intended to be an exhaustive list of the risk factors to which CGT is exposed.

Summary of Key Risks

Financing Risks CGT may not be able to raise sufficient funds from the capital raising. There is no guarantee that the entitlement offer willbe fully subscribed. There is no assurance that CGT will be able to secure additional funding for the mine development of the Ballarat Gold Project on acceptable terms, or at all. In addition, CGT may require further financing in due course in addition to amounts raised under this capital raising. Any additional equity financing will dilute shareholdings. If CGT is unable to obtain additional financing as needed, it may be required to reduce the scope of its operations.

Development Risks

There is no assurance the CGT will be able to complete the underground development of the Ballarat Gold Project to reach the Mako Fault Zone on time or to budget. Potential delays and/or cost increases in the development of the Ballarat Gold Project could have an adverse impact on CGT’s financial performance.

Operating Risks CGT’s financial performance will substantially depend on the operations of the Ballarat Gold Project. The production forecasts are estimates only, based on assumptions including those in relation to geology, gold grade, mining conditions and performance and operational issues and are subject to uncertainty. Capital/operating cost estimates for the Ballarat Gold Project are also based on assumptions and are subject to uncertainty. An increase in capital/operating costs and/or a decrease in production could have an adverse impact on CGT’s performance.

Mineral Resources and Exploration Targets

Mineral Resources which are not Ore Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, operational cost, metal price, mining control, dilution or other relevant issues. There has been insufficient exploration to define the Inferred Mineral Resources as an Indicated or Measured Mineral Resource, as there are insufficient close-spaced drill hole data to adequately define grade and geological continuity for this structurally complex deposit. It is uncertain if further exploration will result in upgrading the Inferred Mineral Resource to an Indicated or Measured Mineral Resource category or to Ore Reserves. Actual production less than currently estimated based on Mineral Resources could have an adverse impact on CGT’s financial performance. The expected tonnages and gold grades for satellite lodes are Exploration Targets only. An Exploration Target is a hypothetical view of a mineralised reef which is not necessarily economic. It is not a Mineral Resource or Ore Reserve. There is no guarantee that tonnages will be either realised or economic. Further study, including underground development and diamond drilling is required.

For

per

sona

l use

onl

y

Page 22: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Summary of Key Risks (continued)

Commodity Prices

Fluctuations in the market price for gold could have an adverse impact on CGT’s financial performance.

General economic climate

CGT’s funding position and financial performance is impacted by a variety of general global economic and business conditions. A deterioration in these conditions could have an adverse impact on CGT’s financial performance.

Reliance on Key Personnel

The responsibility of overseeing the day-to-day operations and the strategic management of CGT depends substantially on its directors and its key personnel. There can be no assurance given that there will be no detrimental impact on CGT if one or more of these employees cease their employment.

Trading Liquidity As a small entity there is likely to be only limited trading liquidity in CGT’s shares. CGT might not be covered by a broad base of research analysts which may make it harder for shares to be traded.

Market Conditions

The market price of the shares in CGT can fall as well as rise and may be subject to varied and unpredictable influences on the market for equities in general and resource exploration stocks in particular. Neither CGT nor the directors warrant the future performance of CGT or any return on an investment in CGT.

Environmental Risks

The operations and proposed activities of CGT are subject to Australian State and Federal laws and regulations concerning the environment. As with most exploration projects and mining operations, CGT’s activities are expected to have an impact on the environment, particularly if advanced exploration or mine development proceeds. It is CGT’s intention to conduct its activities to the highest standard of environmental obligation, including compliance with all environmental laws, in order tominimise damage to the environment and risk of liability. Nevertheless, there are certain risks inherent in CGT’s activitieswhich could subject CGT to extensive liability.

Occupational health and safety

The mining industry has become subject to increasing occupational health and safety responsibility and liability. The potential for liability is a constant risk. If CGT fails to comply with necessary OH&S legislative requirements, it could result in fines, penalties and compensation for damages as well as reputational damage.

For

per

sona

l use

onl

y

Page 23: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 23

• ASX listed gold explorer and gold producer with a market capitalisation of $15 million.

• Low capital entry cost (<$10M). No debt (other than $1.1M equipment lease facility).

• Strong asset base:-

• Ballarat – Six to nine month production ramp-up commenced. First gold poured.

• Realistic production profile targeting 50,000 ounces per year from late 2012 from the Llanberris and Britannia compartments (contingent on exploration success).

• Regional growth profile from 4 significant goldfields with activities curtailed in 2012 to focus on Ballarat.

• Significant mining, ore processing and supporting infrastructure already in place (over $400M previously spent) , plant commissioned and all permitting in place (de-risked).

• Clear growth path to exploit assets:-

• Defined path to ramp-up production commencing Q3, 2011.

• In-fill and exploration drilling commitment at Ballarat to firm-up the Mako in Llanberrisand allow four months of drilling in the Britannia compartment before any decision ismade to re-commence mine development to access any identified mineralisation in thatcompartment.

ConclusionF

or p

erso

nal u

se o

nly

Page 24: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 24

APPENDIX

For

per

sona

l use

onl

y

Page 25: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 25

• Recent market reaction to a mine plan review now creates an attractive investment opportunity.

• Ballarat Mine re-start de-risked – Portal and declines in, processing plant built & commissioned, workforce in place, fully permitted to operate, ore mining has commenced.

• Gold production commenced in September 2011.

• Realistic production profile targeting 50,000 ounces per year from Ballarat from late 2012 (contingent on exploration success).

• Cash operating cost per ounce ~A$730 - $790/oz.

• Successful exploration drilling by CGT has validated Ballarat acquisition.

• An Independent Technical Review has confirmed a JORC compliant Inferred Resource and has provided independent support for the Company’s Exploration Targets at Ballarat.

• A nine month ramp-up in production has commenced. Initial 2 year production profile delineated.

• Near-mine and regional exploration targets clearly defined.

Investment HighlightsF

or p

erso

nal u

se o

nly

Page 26: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 26

• Ballarat: Mine & commission• Mine Exploration: +$3m spend• Regional Exploration: +$4m at

Castlemaine / Chewton, Berringa and Tarnagulla

GOLD PRODUCTION (2011)• Produce: Steady State targeting

50,000 oz pa• Ballarat Targets: Britannia,

Victoria, Sulieman Line• Ballarat South • Regional Targets: Chewton,

Berringa and Tarnagulla

GROW – 2012 to 2014

• Produce: Targeting 75 to 100,000 oz pa• Multiple Ballarat sources• Multiple regional ore sources

EXPAND - BEYOND

Clear path to value creation

World class infrastructure Add new production sources at Ballarat Targeted regional exploration program

Our Vision – Three HorizonsF

or p

erso

nal u

se o

nly

Page 27: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Ballarat - Overview

• History

• 12Moz gold mined from alluvial and quartz vein hosted deposits since 1850’s

• Lihir Gold Limited (LGL) acquired tenements in 2007 and completed construction of world class gold plant and related facilities

• Assets• ~18km of underground development

• World class plant and development including:

• 600ktpa processing plant

• Golden Point ventilation shaft

• Extensive surface infrastructure

• Mining licences and extensive exploration ground

• Profile• Two declines at the right location to mine

• Focus on 4 geological compartments

• Nuggetty quartz reefs avg. 8.9g/t (historical)

Page 27

For

per

sona

l use

onl

y

Page 28: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Ballarat – Existing Mine Workings

Cross Section

Page 28

Current activities

Suliemanline of reef

Plan View

First Chanceline of reef

The Future

The graphic shows the present historical development with ounces per vertical metre (OVM) as presented by LGL

For

per

sona

l use

onl

y

Page 29: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Gravity + Leach Processing Plant

Maintenance Shed

600ktpa TSFWetland water QC

500 person car park & office building

Reverse osmosis water treatment plant

Mine Portal

Page 29

• Ballarat Gold Project surface infrastructure is of a high standard and has the ability to easily support the planned operation

• We have acquired

– The immediate potential of the northern area of Ballarat East.

– Drill platforms already existed to within ≈200m of initial targets from the 2 declines at depths of 400 & 500m.

– A gold plant together with mining and drilling equipment, stores stock and freehold property.

– Fully permitted operation currently reduced to care & maintenance state in proper order.

– Large exploration tenement package (123km2).

Ballarat Plant – modern, qualityF

or p

erso

nal u

se o

nly

Page 30: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Indicative Timeline

2011 2012

J F M A M J J A S O N D J F M A

Feasibility study and award contract

Mobilise contractor and start mining

Develop to Lower Llanberris1st

ore

Develop Britannia

Gold Plant refurbishment

Workforce recruitment

Gold Production1st

gold

Infill resource drilling

Ballarat exploration drilling

Castlemaine exploration

Tarnagulla & Berringa

Technical Review

Sulieman Line

Chewton, Quartz Hill, Bicentennial

>1,700 metres done to date

100 people employed

18,000 metres drilled to date

7,800 metres drilled to date

From the Sovereign

compartment

6 to 9 month Production Ramp-Up

First ore from the Mako

On hold until Mako confirmed

Mako in-fill drilling Llanberris & Britannia

On hold

For

per

sona

l use

onl

y

Page 31: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 31

Ballarat Gold Project

More than A$400m has been spent by others developing first class facilities

• Purchased for <$10M.

• No Debt.

• Project Approvals.

• Construction.

• Commissioning.

• Recruitment.

All done.For

per

sona

l use

onl

y

Page 32: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Ballarat – the Town & its Goldfields

Page 32

Lake

Wendouree

University

TSF

Mine

Site

CBD

Lake

Wendouree

University

TSF

Mine

Site

CBD

Ballarat WestGoldfield

Ballarat EastGoldfield

BallaratSouth

Goldfield

Golden Point

Vent Shaft

Northern

Exploration

Targets

Northern

Exploration

Targets

Northern

Exploration

Targets

Ballarat Goldfield 100% controlled by CGT

For

per

sona

l use

onl

y

Page 33: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Ballarat Goldfield – East and West

Page 33

Ballarat East

WE

South Star

960m

West

East

1.5M Ounces produced

@ 8.9g/tBallarat West

1.5 kilometres

0.7M Ounces produced

@ 16.1g/t

For

per

sona

l use

onl

y

Page 34: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Ballarat East GoldfieldBlack Hill

open pit

mine

+18 km of UG mine development in place

1.5 km

Potential

For

per

sona

l use

onl

y

Page 35: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Ballarat East Goldfield

Sovereign Mining area

Llanberris Mining area.

Mako the primary target

Britannia Mining area (contingent

on successful diamond drilling)

Mako Fault Zone ore sources

Victoria -future mining

area?

For

per

sona

l use

onl

y

Page 36: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 36

First Chance Line of Mineralisation

Anticline

Modeled mineralisation. First

mining objective

Second mining objective

Future potential for MFZ lodes in the

Victoria compartment.

For

per

sona

l use

onl

y

Page 37: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

North Footwall

Fault Lode

South

FW

Lode

BEP1573

2m / 26 g/t

BDD008A

2m / 31.5 g/t

Tiger South

Exploration Target

Lower Llanberris Exploration Results

New assay result/drill hole

No Significant Result / new

hole

Existing Re-interpreted

Result

Assay result awaited

CBP0008 : Mako1.8m @ 135.1 g/t

CBP0009 : Flat Makes2.8m @ 4.1 g/t Au3.5m @ 7.0 g/t Au

CBP0009 : Mako2.5m @ 34.0 g/t Au1.3m @ 4.8 g/t Au

1.0m @ 4.3 g/t Au

0.5m @ 10.5 g/t Au0.8m @ 9.8 g/t Au

CBP0037 : Mako5.4m @ 16.3 g/t

CBP0037 : Flat Make9.2m @ 33.2 g/t

Tiger UpDip LodeCBP0002: 7.3m @ 30.9 g/t AuCBP0001: 2.7m @ 3.5 g/t Au

CBP0043: 14.6m @ 15.3 g/t AuCBP0005: NSR, above lode

CBP0006: 4.2m @ 2.7 g/t Au CBP0007: 15m @ 8.6 g/t AuCBP0042: NSR, above lode

1.6m @ 2.4 g/t Au

4m @ 5.1 g/t 2.5m @ 3.5

CBP0045 : Mako8.7m @ 31.0 g/t

Mako Flat Makes

For

per

sona

l use

onl

y

Page 38: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

North

Footwall Fault

Lode

South

FW

Lode

Mako Flat Makes

Mako Fault Lodes – Block Model Results

Tiger South

Exploration Target

For

per

sona

l use

onl

y

Page 39: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Fault related Spur /

Tension Veining Page 39

Ballarat East

Fissure Lode

Mineralisation StylesBasking Fault Flat Make – Sulieman Line - northern wall

For

per

sona

l use

onl

y

Page 40: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Regional Assets and Exploration

Page 40

Wattle Gully Mine (1934 – 1989)

415,000 ozs @ 12g/t

For

per

sona

l use

onl

y

Page 41: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Victorian gold productionSince 1851 = 2,500 tonnes(2% of the world’s gold!)

80% of Victoria’s gold has come from the Bendigo-Ballarat Zone

51% of all Victorian Gold has come from the Bendigo-Castlemaine-

Ballarat fields

41% of all Victorian Gold is from quartz reef primary mining

The Victorian government estimates between 15Mozs to over 70Mozs of gold is to be

discovered

Castlemaine Goldfields Ltd – Gold Projects

Bendigo-Ballarat

Zone

+ 64 M ozsRest of Victoria

~ 15 M ozs

Page 41

Ballarat

Castlemaine

For

per

sona

l use

onl

y

Page 42: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Assets In an Australian context

Page 42

0

500

1000

1500

2000

2500

To

nn

es

G

old

P

rod

uce

d

DISTRIBUTION OF GOLDFIELDS IN AUSTRALIA

100% ownership of two of Australia’s biggest historical goldfields

CGT

Combining the Ballarat, Castlemaine and the Berringa goldfields makes CGT owner of Australia’s fourth largesthistorical gold only producing tenements (excludes multi commodity fields like Olympic Dam and Telfer (Cu credits)).

For

per

sona

l use

onl

y

Page 43: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

CGT Projects outside Ballarat

Other ore-supply potential at

Castlemaine and Tarnagulla

80kmCastlemaine to Ballarat

Page 43

Existing JORC

Resources

High grade mines

1oz/t – 3 oz/t

Also potential from the Berringa goldfieldFor

per

sona

l use

onl

y

Page 44: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Increased production profile - Castlemaine

• History

• Produced 5.6Moz gold (substantially from alluvial sources)

• Wattle Gully gold mine within CGT licence area (produced over 400koz @ 12g/t head grade)

• Chewton Resource estimate June 2008

• Independent scoping of Chewton completed June 2009

• Assets

• Chewton Deposit (JORC Inferred Resource of 574koz of gold)

• Wattle Gully (JORC Inferred Resource of 112koz of gold)

• Strategy (currently on hold to focus on Ballarat)

• Resource confirmation drilling

• Advance feasibility study

• Convert Resource to mill feed for Ballarat

2

80 kms

Page 44

For

per

sona

l use

onl

y

Page 45: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Castlemaine Project

•JORC Inferred Resource of 574,000oz at the Chewton Deposit.

•JORC Inferred Resource of 112,000oz at the Wattle Gully Mine.

• Infill drill program conducted in 2011 to increase Resource

confidence and assess underground mining potential.

Page 45

• Outcomes suggest further work could be to

the immediate north of the Wattle Gully /

Chewton deposits, at depth.

Our tenements cover the entire goldfield (past historical production of 5.6 million ozs)

Chewton

Deposit

Drill program

Bicentennial

Drill program

Nth Quartz Hill

Drill programCappers

Drill program

For

per

sona

l use

onl

y

Page 46: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Regional : Berringa Project – 25kms to Ballarat Mill

• Victoria’s ninth largest historical goldfield

960,000 ozs

• Alluvial gold discovered in Kangaroo Gully in 1856

• Small scale quartz mining between 1865 to 1898

• Large scale quartz mining beginning in 1898 and lasting until 1917 (WW1)

• Historical production (1898 to 1917) – 292,000oz from 1,080,000 tonnes (8.4g/t)*

• Underground exploration at the Berringa Mine in the 1970’s and 1980’s with limited work done

Birthday Tunnel

Kangaroo

William Fancy

South BirthdayFreehold

* = Recovered

Deep drilling for repeat gold?

For

per

sona

l use

onl

y

Page 47: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Regional: - Tarnagulla

Page 47

RC drilling conducted in 2011

Historical

production

Offers a high grade source 80kms from Ballarat with proven modern mining history (1994-2000)

82 named gold-bearing veins at surface.

Numerous un-named, unknown for gold.

How many under the surface?

For

per

sona

l use

onl

y

Page 48: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

Page 48

Navarre AC result

10m @ 34 g/t Au from 37m

Depth of cover = 19m

Figure c/- Catalyst Metals – May 2011

CGT Projects

Frederick the Great minesPast production 187,000 ozs at

~10g/t Au

North of Bendigo

Sebastian / Raydarra

Bendigo goldfieldPast production 22 million ounces

Farm-in agreement

with Navarre Minerals

For

per

sona

l use

onl

y

Page 49: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

This document does not constitute an offer of new ordinary shares ("New Shares") of the Company in any jurisdiction in which it would

be unlawful. New Shares may not be offered or sold in any country outside Australia except to the extent permitted below.

Canada (British Columbia, Ontario and Quebec provinces)

This document constitutes an offering of New Shares only in the Provinces of British Columbia, Ontario and Quebec (the "Provinces") and to those persons to whom

they may be lawfully distributed in the Provinces, and only by persons permitted to sell such New Shares. This document is not, and under no circumstances is to be

construed as, an advertisement or a public offering of securities in the Provinces. This document may only be distributed in the Provinces to persons that are

"accredited investors" within the meaning of NI 45-106 – Prospectus and Registration Exemptions, of the Canadian Securities Administrators.

No securities commission or similar authority in the Provinces has reviewed or in any way passed upon this document, the merits of the New Shares or the offering

of New Shares and any representation to the contrary is an offence.

No prospectus has been, or will be, filed in the Provinces with respect to the offering of New Shares or the resale of such securities. Any person in the Provinces

lawfully participating in the offer will not receive the information, legal rights or protections that would be afforded had a prospectus been filed and receipted by the

securities regulator in the applicable Province. Furthermore, any resale of the New Shares in the Provinces must be made in accordance with applicable Canadian

securities laws which may require resales to be made in accordance with exemptions from dealer registration and prospectus requirements.

The Company, and the directors and officers of the Company, may be located outside Canada, and as a result, it may not be possible for Canadian purchasers to

effect service of process within Canada upon the Company or its directors or officers. All or a substantial portion of the assets of the Company and such persons

may be located outside Canada, and as a result, it may not be possible to satisfy a judgment against the Company or such persons in Canada or to enforce a

judgment obtained in Canadian courts against the Company or such persons outside Canada.

Any financial information contained in this document has been prepared in accordance with Australian Accounting Standards and also comply with International

Financial Reporting Standards and interpretations issued by the International Accounting Standards Board. Unless stated otherwise, all dollar amounts contained in

this document are in Australian dollars.

Statutory rights of action for damages or rescission

Securities legislation in certain of the Provinces may provide purchasers with, in addition to any other rights they may have at law, rights of rescission or to damages,

or both, when an offering memorandum that is delivered to purchasers contains a misrepresentation. These rights and remedies must be exercised within

prescribed time limits and are subject to the defenses contained in applicable securities legislation. Prospective purchasers should refer to the applicable provisions

of the securities legislation of their respective Province for the particulars of these rights or consult with a legal adviser.

The following is a summary of the statutory rights of rescission or to damages, or both, available to purchasers in Ontario. In Ontario, every purchaser of the New

Shares purchased pursuant to this document (other than (a) a "Canadian financial institution" or a "Schedule III bank" (each as defined in NI 45-106), (b) the

Business Development Bank of Canada or (c) a subsidiary of any person referred to in (a) or (b) above, if the person owns all the voting securities of the subsidiary,

except the voting securities required by law to be owned by the directors of that subsidiary) shall have a statutory right of action for damages and/or rescission

against the Company if this document or any amendment thereto contains a misrepresentation. If a purchaser elects to exercise the right of action for rescission,

the purchaser will have no right of action for damages against the Company. This right of action for rescission or damages is in addition to and without derogation

from any other right the purchaser may have at law.

International Offer RestrictionsF

or p

erso

nal u

se o

nly

Page 50: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

In particular, Section 130.1 of the Securities Act (Ontario) provides that, if this document contains a misrepresentation, a purchaser who purchases the New Shares during

the period of distribution shall be deemed to have relied on the misrepresentation if it was a misrepresentation at the time of purchase and has a right of action for

damages or, alternatively, may elect to exercise a right of rescission against the Company, provided that (a) the Company wil l not be liable if it proves that the purchaser

purchased the New Shares with knowledge of the misrepresentation; (b) in an action for damages, the Company is not liable for all or any portion of the damages that the

Company proves does not represent the depreciation in value of the New Shares as a result of the misrepresentation relied upon; and (c) in no case shall the amount

recoverable exceed the price at which the New Shares were offered.

Section 138 of the Securities Act (Ontario) provides that no action shall be commenced to enforce these rights more than (a) in the case of any action for rescission, 180

days after the date of the transaction that gave rise to the cause of action or (b) in the case of any action, other than an action for rescission, the earlier of (i) 180 days

after the purchaser first had knowledge of the fact giving rise to the cause of action or (ii) three years after the date of the transaction that gave rise to the cause of action.

These rights are in addition to and not in derogation from any other right the purchaser may have.

Certain Canadian income tax considerations. Prospective purchasers of the New Shares should consult their own tax adviser with respect to any taxes payable in

connection with the acquisition, holding, or disposition of the New Shares as any discussion of taxation related maters in this document is not a comprehensive description

and there are a number of substantive Canadian tax compliance requirements for investors in the Provinces.

Language of documents in Canada. Upon receipt of this document, each investor in Canada hereby confirms that it has expressly requested that all documents

evidencing or relating in any way to the sale of the New Shares (including for greater certainty any purchase confirmation or any notice) be drawn up in the English

language only. Par la réception de ce document, chaque investisseur canadien confirme par les présentes qu’il a expressément exigé que tous les documents faisant foi

ou se rapportant de quelque manière que ce soit à la vente des valeurs mobilières décrites aux présentes (incluant, pour plus de certitude, toute confirmation d’achat ou

tout avis) soient rédigés en anglais seulement.

European Economic Area – Germany

The information in this document has been prepared on the basis that all offers of New Shares will be made pursuant to an exemption under the Directive 2003/71/EC

("Prospectus Directive"), as implemented in Member States of the European Economic Area (each, a "Relevant Member State"), from the requirement to produce a

prospectus for offers of securities.

An offer to the public of New Shares has not been made, and may not be made, in a Relevant Member State except pursuant to one of the following exemptions under

the Prospectus Directive as implemented in that Relevant Member State:

(a) to legal entities that are authorised or regulated to operate in the financial markets or, if not so authorised or regulated, whose corporate purpose is solely to invest in

securities;

(b) to any legal entity that has two or more of (i) an average of at least 250 employees during its last fiscal year; (ii) a total balance sheet of more than €43,000,000 (as

shown on its last annual unconsolidated or consolidated financial statements) and (iii) an annual net turnover of more than €50,000,000 (as shown on its last annual

unconsolidated or consolidated financial statements);

(c) to fewer than 100 natural or legal persons (other than qualified investors within the meaning of Article 2(1)(e) of the Prospectus Directive) subject to obtaining the prior

consent of the Company or any underwriter for any such offer; or

(d) in any other circumstances falling within Article 3(2) of the Prospectus Directive, provided that no such offer of New Shares shall result in a requirement for the

publication by the Company of a prospectus pursuant to Article 3 of the Prospectus Directive.

International Offer RestrictionsF

or p

erso

nal u

se o

nly

Page 51: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

International Offer Restrictions

France

This document is not being distributed in the context of a public offering of financial securities (offre au public de titres financiers) in France within the meaning of

Article L.411-1 of the French Monetary and Financial Code (Code monétaire et financier) and Articles 211-1 et seq. of the General Regulation of the French Autorité

des marchés financiers ("AMF"). The New Shares have not been offered or sold and will not be offered or sold, directly or indirectly, to the public in France.

This document and any other offering material relating to the New Shares have not been, and will not be, submitted to the AMF for approval in France and,

accordingly, may not be distributed or caused to distributed, directly or indirectly, to the public in France.

Such offers, sales and distributions have been and shall only be made in France to (i) qualified investors (investisseurs qualifiés) acting for their own account, as

defined in and in accordance with Articles L.411-2-II-2° and D.411-1 to D.411-3, D. 744-1, D.754-1 and D.764-1 of the French Monetary and Financial Code and any

implementing regulation and/or (ii) a restricted number of non-qualified investors (cercle restreint d’investisseurs) acting for their own account, as defined in and in

accordance with Articles L.411-2-II-2° and D.411-4, D.744-1, D.754-1 and D.764-1 of the French Monetary and Financial Code and any implementing regulation.

Pursuant to Article 211-3 of the General Regulation of the AMF, investors in France are informed that the New Shares cannot be distributed (directly or indirectly) to

the public by the investors otherwise than in accordance with Articles L.411-1, L.411-2, L.412-1 and L.621-8 to L.621-8-3 of the French Monetary and Financial Code.

Switzerland

The New Shares may not be publicly offered in Switzerland and will not be listed on the SIX Swiss Exchange ("SIX") or on any other stock exchange or regulated

trading facility in Switzerland. This document has been prepared without regard to the disclosure standards for issuance prospectuses under art. 652a or art. 1156 of

the Swiss Code of Obligations or the disclosure standards for listing prospectuses under art. 27 ff. of the SIX Listing Rules or the listing rules of any other stock

exchange or regulated trading facility in Switzerland. Neither this document nor any other offering or marketing material relating to the New Shares may be publicly

distributed or otherwise made publicly available in Switzerland.

Neither this document nor any other offering or marketing material relating to the New Shares have been or will be filed with or approved by any Swiss regulatory

authority. In particular, this document will not be filed with, and the offer of New Shares will not be supervised by, the Swiss Financial Market Supervisory Authority

(FINMA).

This document is personal to the recipient only and not for general circulation in Switzerland.

China

The information in this document does not constitute a public offer of the New Shares, whether by way of sale or subscription, in the People's Republic of China

(excluding, for purposes of this paragraph, Hong Kong Special Administrative Region, Macau Special Administrative Region and Taiwan). The New Shares may not

be offered or sold directly or indirectly in the PRC to legal or natural persons other than directly to "qualified domestic institutional investors”.

For

per

sona

l use

onl

y

Page 52: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

International Offer Restrictions

Malaysia

This document may not be distributed or made available in Malaysia. No approval from the Securities Commission of Malaysia has been or will be obtained in relation

to any offer of New Shares. The New Shares may not be offered or made available for purchase in Malaysia except in an exemption from the prospectus and

approval requirements of Securities Commission of Malaysia.

Singapore

This document and any other materials relating to the New Shares have not been, and will not be, lodged or registered as a prospectus in Singapore with the

Monetary Authority of Singapore. Accordingly, this document and any other document or materials in connection with the offer or sale, or invitation for subscription or

purchase, of New Shares, may not be issued, circulated or distributed, nor may the New Shares be offered or sold, or be made the subject of an invitation for

subscription or purchase, whether directly or indirectly, to persons in Singapore except pursuant to and in accordance with exemptions in Subdivision (4) Division 1,

Part XIII of the Securities and Futures Act, Chapter 289 of Singapore (the "SFA"), or as otherwise pursuant to, and in accordance with the conditions of any other

applicable provisions of the SFA.

Hong Kong

WARNING: This document has not been, and will not be, registered as a prospectus under the Companies Ordinance (Cap. 32) of Hong Kong (the "Companies

Ordinance"), nor has it been authorised by the Securities and Futures Commission in Hong Kong pursuant to the Securities and Futures Ordinance (Cap. 571) of the

Laws of Hong Kong (the "SFO"). No action has been taken in Hong Kong to authorise or register this document or to permit the distribution of this document or any

documents issued in connection with it. Accordingly, the New Shares have not been and will not be offered or sold in Hong Kong by means of any document, other

than (i) to "professional investors" (as defined in the SFO) or (ii) in other circumstances that do not result in this document being a "prospectus" (as defined in the

Companies Ordinance) or that do not constitute an offer to the public within the meaning of that ordinance.

No advertisement, invitation or document relating to the New Shares has been or will be issued, or has been or will be in the possession of any person for the

purpose of issue, in Hong Kong or elsewhere that is directed at, or the contents of which are likely to be accessed or read by, the public of Hong Kong (except if

permitted to do so under the securities laws of Hong Kong) other than with respect to New Shares that are or are intended to be disposed of only to persons outside

Hong Kong or only to professional investors (as defined in the SFO and any rules made under that ordinance). No person allotted New Shares may sell, or offer to

sell, such shares in circumstances that amount to an offer to the public in Hong Kong within six months following the date of issue of such shares.

The contents of this document have not been reviewed by any Hong Kong regulatory authority. You are advised to exercise caution in relation to the offer. If you are

in doubt about any contents of this document, you should obtain independent professional advice.

For

per

sona

l use

onl

y

Page 53: Castlemaine Goldfields Limited Investor Presentation · Castlemaine Goldfields Limited Investor Presentation ... possible once mining has accessed the Lower Llanberris and Britannia

International Offer RestrictionsNew Zealand

This document has not been registered, filed with or approved by any New Zealand regulatory authority under the Securities Act 1978 (New Zealand).

The New Shares in the entitlement offer are not being offered to the public in New Zealand other than to existing shareholders of the Company with registered

addresses in New Zealand to whom the offer of New Shares is being made in reliance on the Securities Act (Overseas Companies) Exemption Notice 2002 (New

Zealand).

Other than in the entitlement offer, New Shares may be offered and sold in New Zealand only to:

• persons whose principal business is the investment of money or who, in the course of and for the purposes of their business , habitually invest money; or

• persons who are each required to (i) pay a minimum subscription price of at least NZ$500,000 for the securities before allo tment or (ii) have previously paid a

minimum subscription price of at least NZ$500,000 for securities of the Company ("initial securities") in a single transaction before the allotment of such initial

securities and such allotment was not more than 18 months prior to the date of this document.

United Kingdom

Neither the information in this document nor any other document relating to the offer has been delivered for approval to the Financial Services Authority in the United

Kingdom and no prospectus (within the meaning of section 85 of the Financial Services and Markets Act 2000, as amended ("FSMA")) has been published or is

intended to be published in respect of the New Shares. This document is issued on a confidential basis to "qualified investors" (within the meaning of section 86(7) of

FSMA) in the United Kingdom, and the New Shares may not be offered or sold in the United Kingdom by means of this document, any accompanying letter or any

other document, except in circumstances which do not require the publication of a prospectus pursuant to section 86(1) FSMA. This document should not be

distributed, published or reproduced, in whole or in part, nor may its contents be disclosed by recipients to any other person in the United Kingdom.

Any invitation or inducement to engage in investment activity (within the meaning of section 21 of FSMA) received in connection with the issue or sale of the New

Shares has only been communicated or caused to be communicated and will only be communicated or caused to be communicated in the United Kingdom in

circumstances in which section 21(1) of FSMA does not apply to the Company.

In the United Kingdom, this document is being distributed only to, and is directed at, persons (i) who have professional experience in matters relating to investments

falling within Article 19(5) (investment professionals) of the Financial Services and Markets Act 2000 (Financial Promotions) Order 2005 ("FPO"), (ii) who fall within

the categories of persons referred to in Article 49(2)(a) to (d) (high net worth companies, unincorporated associations, etc.) of the FPO or (iii) to whom it may

otherwise be lawfully communicated (together "relevant persons"). The investments to which this document relates are available only to, and any invitation, offer or

agreement to purchase will be engaged in only with, relevant persons. Any person who is not a relevant person should not act or rely on this document or any of its

contents.

United States

This document may not be released or distributed in the United States. This document does not constitute an offer to sell, or a solicitation of an offer to buy, securities

in the United States. Any securities described in this document have not been, and will not be, registered under the US Securities Act of 1933 and may not be offered

or sold in the United States except in transactions exempt from, or not subject to, registration under the US Securities Act and applicable US state securities laws.

For

per

sona

l use

onl

y