1 Campus Master Plan Joliet Junior College February 26, 2008

Campus Master Plan

Embed Size (px)

DESCRIPTION

Campus Master Plan. Joliet Junior College February 26, 2008. JJC Performance. Enrollment District residents may be choosing other colleges: Market share is in the bottom third of Illinois Community Colleges (2002-06) - PowerPoint PPT Presentation

Citation preview

Page 1: Campus Master       Plan

1

Campus Master Plan

Joliet Junior CollegeFebruary 26, 2008

Page 2: Campus Master       Plan

2

JJC Performance

Enrollment

District residents may be choosing other colleges: – Market share is in the bottom third of Illinois Community Colleges

(2002-06)– High school senior market share below national average (2002-06)– 2003-06 enrollment (headcount) changes: JJC: -3%, Lewis: 18%,

St. Francis: -17%, Devry: 26%,

Westwood: 35%, all for-profit: 14%

Happening while population of district increased 20%

Page 3: Campus Master       Plan

3

Other Performance Indicators

Transfer rates to other community colleges500 students per year are choosing other

community colleges

Graduation Rate

JJC Graduation rate: 12% State average: 23%

Minority representation and achievement gap

Student success services are disjointed

Page 4: Campus Master       Plan

4

Facilities are important“Buildings are a manifestation of what a

college values and what it thinks of its students”

“Space has an integral role in learning”

Data source: American Association of Community College/American Physical Plant Association survey of college students, published as The Impact of Facilities on Recruitment & Retention of Students, Facilities Manager Magazine, March/April 2006.

Page 5: Campus Master       Plan

5

Facilities are ImportantOver half of students determine if a campus is right for them upon an initial

visit and impression of the campus.

67% assert that quality facilities are essential when choosing an institution (higher than quality academic advising, prestige, or extracurricular activities).

66% of students agree/strongly agree that facility conditions are extremely important in the college choice decision.

Facilities missing from rejected institutions: major facilities, open space, recreation, technology, and student-friendly space.

Most important facilities to see on a visit: Facilities in a Major, Library, Classrooms, Technology Facilities, Student Space, & Open Space.

Data source(s): American Association of Community College/American Physical Plant Association survey of college students, published as The Impact of Facilities on Recruitment & Retention of Students, Facilities Manager Magazine, March/April 2006.

Page 6: Campus Master       Plan

6

Facilities are important

What do JJC students think of our facilities?

Likes: Campus grounds & accessibility.

Dislikes: Parking, smoking, outdated facilities, aesthetically old, form and function.

Data source: JJC Master Plan Survey, Fall 2007

Page 7: Campus Master       Plan

7

Experience at JJC

• Natural areas positive asset

• Send closed messages to students – the Purple Door effect

• Little room for students to wait for services, other than in lines

Page 8: Campus Master       Plan

8

First Impression

JJC

Page 9: Campus Master       Plan

9

J Building Entrance

JJC

Page 10: Campus Master       Plan

10

First Interior ImpressionJJC

Page 11: Campus Master       Plan

11

JJC Front Door

JJC

Page 12: Campus Master       Plan

12

Campus Center at DuPage

DUPAGE

Page 13: Campus Master       Plan

13

Model Entry Ways

HARPERHARPER

HARPER

Page 14: Campus Master       Plan

14

AdmissionsDUPAGE

JJC

Page 15: Campus Master       Plan

15

Registration

DUPAGEJJC

Page 16: Campus Master       Plan

16

Financial Aid

MORAINE VALLEY

JJC

Page 17: Campus Master       Plan

17

Counseling/Advising

MORAINE VALLEY

JJC

Page 18: Campus Master       Plan

18

StAR/Disability Support

MORAINE VALLEY

JJC

Page 19: Campus Master       Plan

19

Unwelcome Messages at JJC

FINANCIAL AID

REGISTRATION

SERVICE CENTER

Page 20: Campus Master       Plan

20

JJC

Page 21: Campus Master       Plan

21

Open Space for Students

HARPER

JJC

Page 22: Campus Master       Plan

22

Libraries

DUPAGE MORAINE VALLEY

Page 23: Campus Master       Plan

23

JJC Library

JJC

JJC

Page 24: Campus Master       Plan

24

Greenhouses

HARPER

Page 25: Campus Master       Plan

25

JJC Greenhouse

JJC

Page 26: Campus Master       Plan

26

Critical Careers

Nursing/Allied Health

Service industries such as hospitality, culinary and automotive

Occupations leading to Bachelor’s Degrees

Page 27: Campus Master       Plan

27

Allied HealthJJC devotes second floor of C building to Nursing

JJC

JJC

JJC

Page 28: Campus Master       Plan

28

Competitor programs

• Allied health buildings exist or are being rebuilt right now at all surrounding community colleges

• Most have or are building state of the art facilities in other career areas

Page 29: Campus Master       Plan

29

Model Nursing Space

HARPER

HARPER

Page 30: Campus Master       Plan

30

SIM Lab at Harper

HARPER

Page 31: Campus Master       Plan

31

Model Dental Hygiene

HARPER

HARPER

Page 32: Campus Master       Plan

32

Massage Therapy

HARPER

Page 33: Campus Master       Plan

33

Science Labs

HARPER

JJC

Page 34: Campus Master       Plan

34

Model Culinary Space

CITY COLLEGE OF CHICAGO

WASHBURNE CULINARY INSTITUTEat KENNEDY KING COLLEGE

Page 35: Campus Master       Plan

35

Culinary at JJC

Page 36: Campus Master       Plan

36

Automotive Lab

JJC

JJC

Page 37: Campus Master       Plan

37

JJC Recreational/Open Space

JJC

JJC

Page 38: Campus Master       Plan

38

Swimming Pool at DuPage

DUPAGE

Page 39: Campus Master       Plan

39

Student Space Taken for Offices

Service Center

Human Resources

Bridge

D-1010

JJC

JJC

Page 40: Campus Master       Plan

40

Challenges

• Campus entrance cramped and uninviting• Enrollment services not consolidated• No allied health building

– Reject over 200 Nursing and Radiology students

• 34 year old culinary facility– No dedicated hospitality space

• Cannot teach auto body repair or fix large diesel engines

• Lack of focus at extended sites• No room to respond to emerging careers

Page 41: Campus Master       Plan

41

Actions to Move Forward

1. Realignment created organizational foundation for success

2. Strategic plan built with operational objectives that clearly link actions to priorities

3. Campus Master Plan that responds to critical needs at JJC

Page 42: Campus Master       Plan

42

Campus Master PlanThe Process

• Master Plan Steering Committee• Campus survey• Assess strengths and challenges• Evaluate utilization of existing space• Determine space needs• Evaluate three options• Community feedback• Propose consensus master plan• Propose workable financing mechanisms

Page 43: Campus Master       Plan

43

Steering Committee Members

Susan Block Tony HoustonPete Comanda Sandy MolDick Dystrup Jennifer KloberdanzBob Klein Pam DildayMary Beth Luna Ryan SmithJohn Griffis Judy MitchellPat Van Duyne Jacquelyn Klika

Page 44: Campus Master       Plan

44

Campus/Community Survey

LikesNatural AreasOpenness surrounding campusGroundsNatural lightClean buildingsFitness centerModern architectureAccessibility

Page 45: Campus Master       Plan

45

Campus/Community Survey

DislikesParkingAestheticsSmokingStudents services spread outNo connection between J and TPoor nursing space; no allied health buildingMonotone color of buildingsBuilding temperatureCity center in disrepairCrowded bridgeUgly restrooms

Page 46: Campus Master       Plan

46

Steering Committee Objectives

Natural Areas- preserve

Front Door- clarify

Parking- align with classrooms

Traffic- improve flow

Pedestrian Access- improve throughout

Proposed road- investigate

Page 47: Campus Master       Plan

47

Steering Committee Objectives

Campus Center- best locationTemporary Buildings- replaceNursing/Allied Health- need improvementsScience- explore needCulinary- need improvementsLibrary- investigate locationConnectivity- study new bridgeAcoustics- noise reductionPartnerships- explore at City CenterAthletics- improve sitesNorth Campus- explore opportunities

Page 48: Campus Master       Plan

48

Existing ConditionsOriginal versus actual front door and center

Page 49: Campus Master       Plan

49

Actual Front Door and Center

Page 50: Campus Master       Plan

50

Existing Conditions

Growth of district

Development zones

Entry experience

Landscaping

Student Spaces

Space Utilization

Infrastructure conditions

Page 51: Campus Master       Plan

51

Utilization

Benchmark is 65% utilizationOverall peak utilization is 62.4%Peak morning utilization is 83%Afternoon/evenings at 55% and 48%Student services over 100%

space half of peers studiedBetter utilization needed through scheduling

in afternoon and evenings

Page 52: Campus Master       Plan

52

Key Findings

• JJC needs a “front door”• Student services must be centralized and easily

accessible at the center of campus• The center of campus is between A and C

buildings• Growth over the next thirty years will occur to the

south and west of main campus• Current space cannot be modified for career

programs such as health and culinary

Page 53: Campus Master       Plan

53

Key Findings

• Existing space must be better scheduled for general education classes

• The campus should be attractive and inviting• Landscaping well maintained but not defined• Student space is important and should be open• Parking inventory must match demand• Campus roads require better navigation

Page 54: Campus Master       Plan

54

Three Options

Bridge Scheme

Front Lawn

Town Square

Extended Campus options

Page 55: Campus Master       Plan

55

Campus/Community Feedback

Prefer Town Square

LikesCompact layoutMore parkingCentral front doorAesthetically pleasing

DislikesStill need more parkingPossible negative impact on traffic

Page 56: Campus Master       Plan

56

Consensus Master PlanSummary

New front doorCampus center with all servicesLibrary in campus center228,000 additional square footage for academic

career programs23 new classrooms in career areas18 renovated classrooms35 new laboratory spacesFocused satellite campusesRevitalized entries and new landscaping

Page 57: Campus Master       Plan

57

Current Front Door

JJC

Page 58: Campus Master       Plan

58

New Front Door

Page 59: Campus Master       Plan

59

Campus Center

• Located between A and C• All services centralized on first floor• Library on second floor• Student testing and tutoring in Library• B building incorporated into campus center to

save funds• Childcare on first floor• Administrative offices on second floor• Connect A and C buildings

Page 60: Campus Master       Plan

60

Benefits

– Inviting first impression– Central location– Double space for Admissions, Financial Aid,

Career Counseling, Multicultural Student Development

– Quadruple space for Counseling and Advising– Keeps library, bookstore and cafeteria close– Greater access to parking

Page 61: Campus Master       Plan

61

Necessary Changes

Greenhouses moved to HouboltUtilize old farmstead

Horticulture plants moved to new facility

“Temporary” buildings removed!

Four classrooms transferred to other buildings

New Facility Services building north of J building

Page 62: Campus Master       Plan

62

Nursing/Allied Health

• New building north of T building

• Allows access to other academic and student services

• Expands Nursing, Radiology and other health programs

• Adds new programs and certificates

Page 63: Campus Master       Plan

63

New Health Programs

Dietetic TechnicianMedical Laboratory Technician

Physical Therapy AssistantOccupational Therapy AssistantFitness TrainerMassage TherapyRecreational Therapy

Dental AssistantDental Hygiene

Page 64: Campus Master       Plan

64

New Health Programs

Respiratory TherapySurgical Technician

Ultrasound TechnicianMammographyRadiation TherapyComputerized TomographyMRI

Optometry TechnicianAudiology Technician

Page 65: Campus Master       Plan

65

New Health Certificates

Gerontology

Home Health

Asian Medicine

Aesthetics (Skin Care)

Angiography

Page 66: Campus Master       Plan

66

J Building

-New enclosed bridge connecting T and J building

-First and Second floors converted to classrooms

-Fine arts studios, labs and classrooms on third floor

-Student Gallery in old Bookstore space

-LSTS consolidated on second floor

-Cafeteria space retained for conference/meeting rooms (connected to T building)

Page 67: Campus Master       Plan

67

Existing Bridge

Restore most areas to student space

Small theater space at south end of bridgeOpens to new theater lobby

Remove HR offices

Student Activities moved to D-1010

Page 68: Campus Master       Plan

68

Fitness Center/G building

• Partnership with YMCA• 100,000 square foot facility• Larger fitness center• Competition sized gymnasiums• Swimming pools• Family programs• New competition and practice fields• New tennis courts• Athletic administration• Previous fitness center returned to student space• Police Department expanded into G building first floor• Current Gymnasium retained

Page 69: Campus Master       Plan

69

E Building

• Addition to south of building

• 8 additional classroom/laboratories

• $500,000 to remodel each of the existing science labs

• Will not be a “gut” rehabilitation

Page 70: Campus Master       Plan

70

C Building

• Automotive expanded for body work and diesel engine repair

• Second floor nursing labs renovated to replace vacated classrooms

Page 71: Campus Master       Plan

71

North Campus

• North Campus returned to full service

• New focus on large senior market in Weber Rd. corridor

• Community Library on 135th St. north of campus

• Compatible development on 20 acres west of campus

• Funds devoted to North campus

Page 72: Campus Master       Plan

72

North Campus

Page 73: Campus Master       Plan

73

City Center

Culinary Arts and Hospitality consolidatedRenaissance center remodeledNew building to northHotel demolished!

15 new Culinary/Hospitality labs and classrooms on first floors

Retain Workforce Services and Adult Education

Partner with private developer to save moneyMixed used development and save money

Page 74: Campus Master       Plan

74

City Center

Page 75: Campus Master       Plan

75

Other Sites

No change to Morris Campus; monitor growth

Lease five classrooms at new Bolingbrook facility

No change to Weitendorf Agriculture Center

Page 76: Campus Master       Plan

76

Landscaping

Six new entry upgrades

Landscaping around buildings rejuvenated and unified

Natural areas revitalizedRemove invasive species

Restore native plants

Three maintenance zones

Emphasis on native plants

HARPER

Page 77: Campus Master       Plan

77

Lake

HARPERHARPERHARPERHARPERHARPERHARPER

HARPER

HARPER

JJC

Page 78: Campus Master       Plan

78

Parking and Site

• Widen Centennial Drive• Greenway to campus center• Retain existing entry/exit roads• New inner ring road and service drive• Reorient existing parking lots for safety and more spaces• Two new parking lots• Paths connecting Arboretum, Lake, Natural Areas,

Forest Preserve bike path and I&M canal trail• Outdoor porches in courtyard• Activity space in courtyard such as graduation

Page 79: Campus Master       Plan

79

Other

Bridge to somewhere

Page 80: Campus Master       Plan

80

Sustainability

• Green roofs planted on bridges• LEED certification for new buildings• Alternative energy used such as solar and

geo-thermal• Permeable parking lots and pavement• Sustainability educational path• Improved lake and storm water management• Native, drought resistant plantings

Page 81: Campus Master       Plan

81

Green Roof

Page 82: Campus Master       Plan

82

Future Growth

• Plan allows for growth through 2015

• Requires better utilization of buildings

• Dedicate vacated space for classrooms

• Parking sufficient with two new lots

• Parking may need to expand into open areas and reduce parking space size after 2015

• Parking decks?

Page 83: Campus Master       Plan

83

Infrastructure

• Good shape

• No major surprises from Facility Condition Assessment

• Wait to fund J building chiller– Retain place in funding– Prepare for contingencies

Page 84: Campus Master       Plan

84

PrioritizationMajor Projects

1. Campus Center/Library-requires new greenhouses, J building remodeling, boiler house expansion, site work

2. Allied Health Building3. Science Expansion and Renovation4. Culinary/Hospitality (City Center)5. Automotive expansion6. Facility Services Building7. Additional Parking8. YMCA Partnership9. LEED Certification, green roofs, solar panels10. Bridge between J and T buildings

Page 85: Campus Master       Plan

85

Financing the Plan

Page 86: Campus Master       Plan

86

Parameters

Total cost $220 million

Shared responsibility– Students– Community– Private/Not for Profit Sector

Modest amounts

Page 87: Campus Master       Plan

87

Shared Responsibility

Page 88: Campus Master       Plan

88

Finance Strategy

1. Students support student services

2. Residents support creation of jobs

3. Private and not for profit sector partner to build amenities and save costs

Page 89: Campus Master       Plan

89

Student’s Support:

• Campus Center

• Library

• Testing/tutoring

• Childcare

• Relocate displaced classrooms

• Clear temporaries for new parking

• Total cost $57 million

Page 90: Campus Master       Plan

90

Detail Budget

• Campus Center/Library $42 million

• Facility Services $5 million

• J Building renovation $3 million

• Greenhouse move $2 million

• Boiler plant expansion $3 million

• Site $2 million

TOTAL $57 million

Page 91: Campus Master       Plan

91

Tuition Backed Borrowing

• Tuition increase of $13 per credit hour would be required

• Can creatively use savings from retiring debt

• Layer new debt over existing debt

Page 92: Campus Master       Plan

92

Tuition Backed Borrowing

• Two dollar increase in each of the next four years

• Two dollar increase needed for operations in 2011

• 20 year debt certificate• Debt sale as early as June• Horticulture relocation by September• Groundbreaking by December• Completion by 2011

Page 93: Campus Master       Plan

93

Affordability

Tuition and fee total will still be in mid-range of peer colleges

FY 2008 FY 2009Harper $99.00 N/ROakton $84.60 N/RLake County $90.00 N/RElgin $91.00 N/RMoraine Valley $74.00 N/RWaubonsee $75.00 $80.00Triton $66.00 N/RJoliet $76.00 $80.00

Average $81.95 N/A

N/R- data not yet reported

Page 94: Campus Master       Plan

94

Community Supports:

Academic programs

Job growth

Institutional sustainability

Page 95: Campus Master       Plan

95

Community Supports:

• Nursing/Allied Health $45 million

• Science expansion $20 million

• Culinary/Hospitality $15 million

• Automotive expansion $5 million

• New parking/site work $4 million

TOTAL $89 million

Page 96: Campus Master       Plan

96

Referendum

• No increase in the total tax rate

• Residents pay more only if values increase

Page 97: Campus Master       Plan

97

Why Last Referendum Failed

• Proposed tax rate increase• No shared responsibility• No acknowledgement of taxpayer attitudes

towards higher education• Too large at $251 million• Not focused on high-demand labor market areas• Growth focus• Campaign/Lack of targeting

Page 98: Campus Master       Plan

98

Referendum Success

• No increase in total tax rate• Modest dollar amount• Referendum to create jobs, not respond to

growth• Will create 8,000 jobs from new programs

and construction• Sufficient time for campaign• Presidential election turnout likely to be

high; 81% success rate in 2004

Page 99: Campus Master       Plan

99

Calendar for a Successful Referendum 07/08/08 08/05/08 08/19/08 08/26/08 09/02/08 09/16/08 09/30/08 10/07/08 10/24/08 11/04/08 11/07/08

ESTABLISH NEED FOR THE BOND ISSUE

Prepare Building Plans

Obtain Professional Assistance

Involve Key Community Leaders and Citizen Support Staff

Disseminate Information to Constituents

Devise Financing Approaches to Incorporating Tax Effects

Build Board and Community Consensus

Determine Ballot Language

PREPARE FOR THE ELECTION

Devise Best Method to Organize and Staff the Election Effort

Develop a Citizen Committee(s) for Marketing and Public Relations Efforts

Research Voter Trends, Turnout and Voting Records

Conduct Pre-Election Pool and Surveys

Target Specific Voters in a Registration Drive

Develop a Referendum Theme

Prepare Campaign Literature

WORKING THE CAMPAIGN

Pass Required Board Resolution Prior to September 2, 2008 to Place the Measureon the November 4, 2008 Ballot

Certify Resolution by the Local Election Official Prior to September 4, 2008

County Clerk Publishes Election Notice Between October 4 and October 24, 2008

County Clerk Posts Copy of Election Notice at its Office No Later Than October 24, 2008

District Posts Copy of Election Notice at its Office No Later Than October 24, 2008

Obtain Media Support

"Kick-off" the Campaign with a Highly Publicized Event

Monitor Staff's Door-to-door Efforts of Precinct Coverage

Follow-up with Voter Registration and Absentee Ballots for Potential YES Voters

ELECTION DAY

Establish Phone Banks

Establish Poll Watchers

Question Voters Prior to Entering the Polls for a Response on Referendum

Update Polling Four Times Daily for Number of Voters Voting YES

Get Out the YES Vote

Monitor Polls and Elections

POST ELECTION DAY

Celebrate with a Post Election Party and Thank All Workers and Voters

Review the Correlation Between Projected Votes and Actual Votes

Update Voter Lists and Prepare for Next Election

Begin Process for the Bond Issue

Page 100: Campus Master       Plan

100

Timing

• November 8, 2008 election

• Bond sale in January 2009

• Ground breaking in Summer 2009

• Buildings completed by Summer 2012

Page 101: Campus Master       Plan

101

Partnerships

• YMCA/JJC Partnership

• Total cost up to $30 million

• Capital costs funded through donations, grants, and contributions

• Operating costs through memberships

• Potential bond sale

• Groundbreaking 2010; completion 2011

Page 102: Campus Master       Plan

102

Partnerships

• City center high rise and renovation

• Total cost $30 million

• Funds from TIF, City of Joliet, leases, grants, other

• $15 million from referendum will be JJC share

• Begin Spring 2009

Page 103: Campus Master       Plan

103

Other Items

• Bridge funded with donation ($5 million)

• Paths funded with grants, state funding

• Sustainability elements funded with grants and creative financing such as energy contracts or tax credits

Page 104: Campus Master       Plan

104

Summary

• Inviting and reinvigorated campus• 220,000 of added instructional space• 8,000 jobs created over 10 years• Enrollment and retention increased (market

share) by improving services• 37 new or renovated classrooms and

laboratories• Modest finance plan with shared responsibility• JJC becomes college of first choice

Page 105: Campus Master       Plan

105

Thank You!

• Steering Committee• Darlene Boyle and Mary Cwikla• Geoff Rusch and Jeff Fisher• Architectural Team of Legat, JJR, KLOA• Finance support from PMA• Institutional Research• Entire campus community for their

feedback

Page 106: Campus Master       Plan

106

Questions