1/46
Universitatea "POLITEHNICA" din Timisoara
Facultatea de Arhi tectura
Curs -1 Proiectarea StructurilorAnul IV, sem I, 2012-2013
Curs: Sl.dr.ing Mircea Cristutiu
Seminar: Sl.dr.ing Mircea Cristutiu
Bibliografie:
1. V. Gioncu, MECANICA I PROIECTAREA STRUCTURILOR,
Curs pentru arhiteci, IPT, Timioara, 1979.2. V. Gioncu, TEORIA STRUCTURILOR, IPT, Timioara, 1974.
3. V. Gioncu, STRUCTURI N ARHITECTUR, IPT, 19744. Peter Trebilcock and Mark Lawson. ARCHITECTURAL DESIGN IN STEEL.
2004 Steel Construction Institute. Spon Press is an imprint of the Taylor & Francis Group
5. J. Wardenier- HOLLOW SECTIONS IN STRUCTURAL APPLICATIONS,
Comit International pour le Dveloppement et l'Etude de la Construction Tubulaire. 2001
8/21/2019 C1-Modelare Incarcari 1
2/46
8/21/2019 C1-Modelare Incarcari 1
3/46
8/21/2019 C1-Modelare Incarcari 1
4/46
8/21/2019 C1-Modelare Incarcari 1
5/46
8/21/2019 C1-Modelare Incarcari 1
6/46
8/21/2019 C1-Modelare Incarcari 1
7/46
8/21/2019 C1-Modelare Incarcari 1
8/46
8/21/2019 C1-Modelare Incarcari 1
9/46
8/21/2019 C1-Modelare Incarcari 1
10/46
8/21/2019 C1-Modelare Incarcari 1
11/46
8/21/2019 C1-Modelare Incarcari 1
12/46
8/21/2019 C1-Modelare Incarcari 1
13/46
8/21/2019 C1-Modelare Incarcari 1
14/46
8/21/2019 C1-Modelare Incarcari 1
15/46
8/21/2019 C1-Modelare Incarcari 1
16/46
8/21/2019 C1-Modelare Incarcari 1
17/46
8/21/2019 C1-Modelare Incarcari 1
18/46
8/21/2019 C1-Modelare Incarcari 1
19/46
8/21/2019 C1-Modelare Incarcari 1
20/46
8/21/2019 C1-Modelare Incarcari 1
21/46
8/21/2019 C1-Modelare Incarcari 1
22/46
8/21/2019 C1-Modelare Incarcari 1
23/46
8/21/2019 C1-Modelare Incarcari 1
24/46
8/21/2019 C1-Modelare Incarcari 1
25/46
1. London 2012 - Velodrome
8/21/2019 C1-Modelare Incarcari 1
26/46
Figure - Velodrome sit ting in
landscaped setting
Figure - Pared down racing bike:
an example of performance engineering
8/21/2019 C1-Modelare Incarcari 1
27/46
Figure - Velopark in legacy format
8/21/2019 C1-Modelare Incarcari 1
28/46
Figure - Early design concept
sketches (image courtesy of Hopkins
Archi tects )
8/21/2019 C1-Modelare Incarcari 1
29/46
Figure -
Shrink-wrapping of faade
onto structure
Figure - Integrated structure of
roof tied into supporting bowl structure
8/21/2019 C1-Modelare Incarcari 1
30/46
Figure - ODA comparison of embodied energy
across 2012 (and previous Olympic) venues
8/21/2019 C1-Modelare Incarcari 1
31/46
Figure - Environmental diagram showing
a) summer mode using natural ventilation
b) winter heating mode (image courtesy BDSP)
8/21/2019 C1-Modelare Incarcari 1
32/46
Figure - 3D modelling of upper
tier to integrate services, terracing and
structure was essential early in
the process:
a) Overlaid model from build ing inside
b) from outside during construction
8/21/2019 C1-Modelare Incarcari 1
33/46
Figure - Four principal systems
resisting roof cable tensions
8/21/2019 C1-Modelare Incarcari 1
34/46
Figure - Comparison of embodiedCO2 at various stages in Velodrome
design (reproduced from ODA Learning
Legacy)
8/21/2019 C1-Modelare Incarcari 1
35/46
Figure - Cut section through centreof Velodrome indicating primary force
path
8/21/2019 C1-Modelare Incarcari 1
36/46
Figure - Non-linear whole building analysis model with
significant simplifi cations from sub analysis
8/21/2019 C1-Modelare Incarcari 1
37/46
Figure - Fundamental mode of
structure, 2.2Hz, with half of roof area
acting as a mass at tip of canti lever
8/21/2019 C1-Modelare Incarcari 1
38/46
Figure - 3D exploded roof with cable
net, clamping node, connection
brackets allowing movement,
prefabricated timber pane, blanket
Insulation and standing seam covering
8/21/2019 C1-Modelare Incarcari 1
39/46
Figure - Diagrammatic representation
of panel connection and movements
8/21/2019 C1-Modelare Incarcari 1
40/46
Figure - Computational panel opt imisation
reduced 1050 panel shapes to just 19
8/21/2019 C1-Modelare Incarcari 1
41/46
8/21/2019 C1-Modelare Incarcari 1
42/46
8/21/2019 C1-Modelare Incarcari 1
43/46
Figure -
Radial concrete post-tensioned piers
Figure a) Truss fabricationb) Site erection
8/21/2019 C1-Modelare Incarcari 1
44/46
Figure
a) Cables laid loose over infi eld
and clamped together at ground level
b) Stage 1 of cable liftc) Stage 2 of cable li ft note
slack cables in foreground
8/21/2019 C1-Modelare Incarcari 1
45/46
Figure - Installation of
prefabricated roof
panels and
gutter panels,
reminiscent of boatbuilding
Figure -
Installation of track
Figure - Outside
finished building
looking
across from bridge
over River Lee
8/21/2019 C1-Modelare Incarcari 1
46/46
Figure - Inside completed
bui lding Velodrome track under test