NACTO BRT WorkshopNew York, NY

April 6, 2010

Bus Rapid Transit in New York City

Page 2: Bus Rapid Transit in New York City - NYU Wagner

Bus Rapid Transit in New York CityBus Rapid Transit

– High capacity, low cost system to improve urban mobility

Select Bus Service– New York City’s first phase

of BRT – Improves bus speed,

reliability, and attractiveness

– Being implemented on five corridors across NYC

Page 3: Bus Rapid Transit in New York City - NYU Wagner

Bus Lanes

Pre-Payment

Stations

Bus Signal Priority

Passenger Info

SBS

Branding

Select Bus Service Features

Page 4: Bus Rapid Transit in New York City - NYU Wagner

Background

• MTA New York City Transit: – Operator of New York City’s public transit system– Part of Metropolitan Transportation Authority (New York

State)– Over 5.2 million subway and 2.3 million bus trips per day

• New York City Department of Transportation:– Operator of New York City’s streets, free bridges, and

Staten Island Ferry– Maintains street and traffic signal infrastructure

• Agency partnership key to project success

Page 5: Bus Rapid Transit in New York City - NYU Wagner

8 .1

9 .71 0 .5

1 1 .2

1 2 .3

0

2

4

6

8

1 0

1 2

1 4

New York Chicago Boston Washington Los Angeles

Ave

rage

Spe

ed (M

PH

)Background: Slow Bus Speed

Page 6: Bus Rapid Transit in New York City - NYU Wagner

9 .1

8 .48 .1

5

6

7

8

9

1 0

1 9 9 6 2 0 0 2 2 0 0 6

Ave

rage

Spe

ed (M

PH

)Background: Declining Bus Speed

Page 7: Bus Rapid Transit in New York City - NYU Wagner

0

4 0 0 ,0 0 0 ,0 0 0

8 0 0 ,0 0 0 ,0 0 0

1 ,2 0 0 ,0 0 0 ,0 0 0

1 ,6 0 0 ,0 0 0 ,0 0 0

19

94

19

96

19

98

20

00

20

02

20

04

20

06

20

08

Subway Ridership Bus Ridership

Presenter
Presentation Notes
Lowest average bus speeds among comparable systems Falling bus speeds citywide Declining bus ridership in Manhattan Slowing speeds declining operating efficiency Rising fuel and labor costs Growing capacity problems on the subway Long time frame required to expand capacity High costs of new subway construction will limit future system expansion Even if MTA finances are stabilized, resources for system expansion will be limited Rising gas prices Increasing city population and employment Pressure from public and elected officials
Page 8: Bus Rapid Transit in New York City - NYU Wagner

Background: Sources of Bus Delay

Dwell Time2 2 %

In Mot ion Time5 4 %

St op Delays2 1 %

Other Delays 3%

Page 9: Bus Rapid Transit in New York City - NYU Wagner

Phase I BRT Corridors

Page 10: Bus Rapid Transit in New York City - NYU Wagner

Bx12 Select Bus Service Fordham Road-Pelham Parkway

Presenter
Presentation Notes
The first SBS corridor will be on Fordham Road and eventually extended to Pelham Parkway. Here you can see the route it will follow and the stops it will make. It follows route of the existing Bx12 Limited from the Inwood neighborhood of Manhattan to Bay Plaza in the Bronx. It will not only provide service to this bustling corridor but also provide connections to seven different subway lines and MetroNorth.
Page 11: Bus Rapid Transit in New York City - NYU Wagner

Corridor Ridership

Bus Route Weekday Ridership (2009)

Bx12 47,793

Bx17 12,431

Bx9 28,900

Bx22 18,312

W60-61 (Westchester Co.) 6,427

TOTAL: 113,863

Presenter
Presentation Notes
This new service will provide an initial 10 % improvement in travel time for Fordham Road bus riders, over one hundred thousand people and we project that the BRT features are refined that savings will grow to 20%. Reliability will be increased and access will be improved to destinations such as Jacobi Medical Center, the Bronx Zoo, and of course, the New York Botanical Gardens. All these improvements, taken together, will allow for more people to use buses, instead of cars to travel along this critical east-west corridor. SBS service on Fordham Road will roll out shortly. But we also have detailed plans for BRT routes in Manhattan and Brooklyn that could be established in under a year and half. Unfortunately, with the Assembly’s rejection of congestion pricing, we lost over $350 million in federal funding, over $100 million of which would have been directed to BRT projects. Nevertheless, we are looking for alternative funding soures and I’d like to quickly share with you our plans for 1st and 2nd Avenues and Nostrand Avenue/
Page 12: Bus Rapid Transit in New York City - NYU Wagner

Expanded/Improved Bus Lanes

• Expanded:– Existing peak period bus lanes expanded to

all-day operation– Bus lanes extended geographically

• Improved:– High visibility red bus lanes– Overhead signage– Increased NYPD bus lane enforcement

Page 13: Bus Rapid Transit in New York City - NYU Wagner

Expanded/Improved Bus Lanes

Page 14: Bus Rapid Transit in New York City - NYU Wagner

Fordham Road Delivery Window

Presenter
Presentation Notes
To accommodate the existing businesses on Fordham Road, delivery windows will be created. Delivery hours on the south side of the street will take place on University Avenue to Grand Concourse, 10:00 a.m. to Noon and on Grand Concourse to Webster Road, Noon to 2:00 p.m. Delivery hours on the north side of the street will take place on Jerome Ave to Grand Concourse, Noon to 2:00 p.m. and w are considering extension of delivery area on north side of street. And delivery zones and additional parking areas will be established on certain side streets.
Page 15: Bus Rapid Transit in New York City - NYU Wagner

Transit Signal Priority• Opticom radio/GPS signal

priority system• Installed at 20 of 35

intersections along the route• Initially weekday peak periods-

expanded to mid days and weekends

• Early green/extended green available based on existing signal parameters

• Signals timings also optimized

Page 16: Bus Rapid Transit in New York City - NYU Wagner

Leading Bus Interval / Queue Jump

• Provides 6 second advance green for all buses approaching in the bus lane

• Bus lane operates at all times to provide free path for bus

• Currently activated on every signal phase; may be actuated in the future

Page 17: Bus Rapid Transit in New York City - NYU Wagner

Proof-of-Payment Fare Collection

• Customers pay at fare payment machines and obtain a proof-of-payment receipt before boarding

• Customers board the bus at either door and hold receipt for inspection – receipt valid for 1 hour

• Two types of machines in use– Re-purposed MetroCard “express” machine for

customers with MetroCards– Re-purposed Parkeon multi-space parking meter for

customers with coins

Page 18: Bus Rapid Transit in New York City - NYU Wagner

Proof-of-Payment Fare Collection

Page 19: Bus Rapid Transit in New York City - NYU Wagner

Proof-of-Payment Fare Collection

Page 20: Bus Rapid Transit in New York City - NYU Wagner

Proof-of-Payment Fare Inspection

• Fare inspectors on vehicles and at stations (not police/peace officers)

• On-board cameras to document incidents

• Anyone without receipt is subject to $100 summons

Page 21: Bus Rapid Transit in New York City - NYU Wagner

Improved Service Plan• SBS buses uniformly

operate full length of route

• Local buses operate between Sedgwick Avenue and Pelham Bay Park with summer extension to Orchard Beach

Page 22: Bus Rapid Transit in New York City - NYU Wagner

Enhanced Stations

Page 23: Bus Rapid Transit in New York City - NYU Wagner

Branding

Presenter
Presentation Notes
Reduce overlap
Page 24: Bus Rapid Transit in New York City - NYU Wagner

On-Board Cameras

• Currently used for security and liability protection

• Supports off-board fare collection

• Potential future use for bus lane enforcement

Page 25: Bus Rapid Transit in New York City - NYU Wagner

Improved Customer Information

Page 26: Bus Rapid Transit in New York City - NYU Wagner

Launch Elements

• Customer Ambassadors

• Enforcement blitz• Operator training• On-going refinement

Page 27: Bus Rapid Transit in New York City - NYU Wagner

Bx12 Select Bus Service

Page 28: Bus Rapid Transit in New York City - NYU Wagner

Bx12 Select Bus Service

Page 29: Bus Rapid Transit in New York City - NYU Wagner

Bx12 Select Bus Service

Page 30: Bus Rapid Transit in New York City - NYU Wagner

Bx12 Select Bus Service

Page 31: Bus Rapid Transit in New York City - NYU Wagner

Results – Customer Response

Ridership: • 30% increase in Limited to Select

Bus ridership• 7% overall route increase• Overall Bronx bus ridership level

Customer Satisfaction: • 98% satisfied or very satisfied• 89% of customers said that SBS

service is better than the limited• 68% of customers said that paying

on the street was more convenient

Bx1 2 Daily Ridership

2 4 ,7 7 73 2 ,1 7 6

1 9 ,5 1 41 6 ,3 3 4

0

1 0 ,0 0 0

2 0 ,0 0 0

3 0 ,0 0 0

4 0 ,0 0 0

5 0 ,0 0 0

6 0 ,0 0 0

Oct ober 2 0 0 7 Oct ober 2 0 0 8

Bx1 2 LocalBx1 2 SBS/Limit ed

Page 32: Bus Rapid Transit in New York City - NYU Wagner

Results – Running Time

Page 33: Bus Rapid Transit in New York City - NYU Wagner

Results – Fare Collection

• Both types of machines operating dependably (98% availability)– Transaction time for MetroCard machines = 3

sec.– Transaction time for Coin machines slower– Occasional power issues at stations

• Fare evasion rate comparable to or better than conditions prior to implementation.

Page 34: Bus Rapid Transit in New York City - NYU Wagner

Results – Cost

• ~ $10.5 M for full 9 Mile corridor.• $6M in increased annual Operating Costs.

This includes additional service, and new staff for maintaining fare equipment, revenue collection and enforcement.

• Red bus lanes and on-street branding wear out over time – replacement cycle TBD

Page 35: Bus Rapid Transit in New York City - NYU Wagner

Lessons Learned

• Importance of Partnership– Staff level– Executive level– Commitment to problem solving

• Value of Simple/Cheap Solutions– Red-marked bus lanes– Off-board fare collection– Transit Signal Priority

Page 36: Bus Rapid Transit in New York City - NYU Wagner

Lessons Learned

• Training Makes a Difference– Bus operators– Customer outreach

• Effective Outreach Required– Community Boards– Business Improvement District

Page 37: Bus Rapid Transit in New York City - NYU Wagner

Next Steps• Bx12 SBS

– Bus Lanes on Pelham Parkway– Three door, low floor articulated buses– Improved fare collection machines

• Phase I Routes– First Avenue/Second Avenue: Fall 2010– Nostrand Avenue: 2012– 34th Street: 2012– Hylan Boulevard: 2013

• Continue development of additional BRT routes

Page 38: Bus Rapid Transit in New York City - NYU Wagner

First Avenue/Second Avenue SBS8.5 miles from South Ferry to 125th Street

Currently served by M15 bus route

Over 57,000 weekday riders

Bus speeds have been declining

Ridership has been decreasing

Within a ¼ mile:537,000 residents

78% of households do not own a car

57% of residents commute by transit

Page 39: Bus Rapid Transit in New York City - NYU Wagner

SBS FeaturesFeatures Current

M15M15 SBS (2010)

M15 SBS (2012)

Local service Yes Yes Yes

Limited service Yes No NoSimpler service pattern No YesOff-board fare collection No YesRegular bus fare Yes YesImproved bus lanes No YesLow-floor, three-door articulated buses

No Yes

Bus bulbs No No YesTransit Signal Priority No No Yes (below

Houston St)

Page 40: Bus Rapid Transit in New York City - NYU Wagner

Public OutreachCommunity Advisory Committee

Composed of:Elected Officials

Community Boards

Major Institutions

Community Organizations

Business Representatives

Transit CustomersMeetings in May 2009, September 2009, January 2010

Community Board MeetingsBoard 1 meeting: December 2009Meetings with Boards 3, 6, 8 and 11: February/March 2010

Public Open HousesMarch 18 and 24, 2010

Page 41: Bus Rapid Transit in New York City - NYU Wagner

Project Schedule

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Outreach

Project Milestones

Finalize Phase 1 design

Complete installation of

physical elements

Phase 1 SBS Service begins

CAC meeting #4:

curb regulations

Second open house

CAC meeting

#5

CB meetings, First open

house

CAC meeting

#3: street design

Finalize station

locations

Begin installation of physical elements

Page 42: Bus Rapid Transit in New York City - NYU Wagner

Design A

Page 43: Bus Rapid Transit in New York City - NYU Wagner

Design A

Page 44: Bus Rapid Transit in New York City - NYU Wagner

Design A

Page 45: Bus Rapid Transit in New York City - NYU Wagner

Design A with bus bulb

Page 46: Bus Rapid Transit in New York City - NYU Wagner

Design B

Page 47: Bus Rapid Transit in New York City - NYU Wagner

Design B

Page 48: Bus Rapid Transit in New York City - NYU Wagner

Design C

Page 49: Bus Rapid Transit in New York City - NYU Wagner

Design C

Page 50: Bus Rapid Transit in New York City - NYU Wagner

Corridor Map

Page 51: Bus Rapid Transit in New York City - NYU Wagner

Overall Lesson: Agency Support• Agency principals provided

strong plan support• Bus improvement program

featured in:– PlaNYC– MTA Capital Plan– Sustainable Streets (DOT

Strategic Plan)

• Congestion pricing provided planning context

Page 52: Bus Rapid Transit in New York City - NYU Wagner

Ted OroszDirector, Long Range Bus PlanningMTA New York City Transit2 Broadway A.17.53New York, NY [email protected]

Joseph BarrDirector, Transit DevelopmentNew York City Department of Transportation55 Water Street, 9th FloorNew York, NY [email protected]