Building Conc. 100%

  • View
    101

  • Download
    5

Embed Size (px)

Text of Building Conc. 100%

  1. 1. W2.0 132 LFF-5 2 EAF-4 6 EAPier 1 7 EASOG 1,383 SFFooting Steps 9 EAMAT 86 SF14" CMU Wall 140 LF8" CMU 5 LFIsolation Joints 20 LFControl Joints 52 LFOriole Park (23) (176% of Scale); MD stadium 100%; Projects 10 v1.0; 12/1/2011 01:33 AM
  2. 2. Concrete Pad over Roof Membrane 1,329 SFOriole Park (14) (147% of Scale); MD stadium 100%; Projects 10 v1.0; 12/1/2011 01:34 AM
  3. 3. FootingsW2.0TypicalFooting Description LengthWidth Hieght SFCAFormsQTYWaste% TotalFooting132 2 1 264 10 CY 5% 10.3CY Formwork None,UsingEarthKeyWay None CMUWall Description LengthWidth Hieght SFCAFormsQTYWaste% Total 14"CMUWallGrouted 1401 3016 CY 5% 16.3CY8"CMUWallGrouted50.5300CY 5% 0.3 CY14"CMUapproxQTY473ea 8"CMUapproxQTY 20ea HorizontalRebars(continuous)DescriptionLengthRbarSize #ofRbars RbarMult. QTY Waste% Total3#5contin. 154 #53 1.043462 LF 10% 0.27Tons508 Length Doweling(oldtonew)detail2#54 1.043 8LF0% 0.0 Tons 8LengthRbarTies Description [email protected](ft) RbarSize RbarMult. QTY Waste% Total#[email protected]"O.C 1.54#4 0.66850LF 10% 0.02Tons36 Pieces WallFTGCorner24x242 6#5 1.04812LF0% 0.01Tons 6 Pieces CMUWall Description LengthWidth Hieght SFCAForms QTY Waste% Total 14"CMUWallGrouted 1401 3016CY5% 16.3CY8"CMUWallGrouted50.5300 CY5% 0.3 CY14"CMUapproxQTY473ea 8"CMUapproxQTY 20ea Rebar Description [email protected](ft) RbarSize RbarMult. QTY Waste% Total#[email protected]"O.C 3.5 2.67#5 1.043190 LF 10% 0.11Tons78 PiecesNOTE:Budgetfor9StepFootings TotalRbar#5Length 718 TotalRbar#4Length 36TOTALAirentrainedConcrete(3000psi)CY10TOTALRbarTons 0.29
  4. 4. ColumnFootingFootingType QTY Length WidthHieght CY Waste%TotalCY SFCA Size QtyLengthWaste% TotalLength Tons F4 9 44 1 5.335% 5.6016 #5 85760%5760.30 TopofFTG 9 3.25 3.250.672.365% 2.4813 F5 2 55 1 1.855% 1.9420 #5102000%2000.10 TopofFTG 2 4.25 4.250.670.905% 0.9417 MattFoundation FootingType QTY Length Width Hieght CY Waste%TotalCY SFCA Size QtyLengthWaste% TotalLength TonsMAT11 119.2513.775% 3.96 40.5#542850.50%8510.44KeyWay 33LF Total4000psiConc.14.92TotalRbar#5Length1627 TOTALRbarTons0.85
  5. 5. PierP1Footing Description Length WidthHieght SFCAFormsQTY Waste% TotalFooting(7ea)1.341.671.67631 CY5%1.3CY Formwork81 SFCAVirticleRebars Description LengthRbarSize #ofRbars RbarMult. QTYWaste% Total (8)#6Vert. 1.34#68 1.502 75 LF 10%0.06Tons83Length (8)#6Vert. 2.25#64 1.502 63 LF110%0.10Tons132 LengthRbarTies Description [email protected](ft) RbarSize RbarMult.QTY Waste% Total #3CollarTies8"O.C60.67#3 0.376 84LF 10% 0.02Tons 2 PiecesTotalRbar#6Length 215TotalRbar#3Length 92 TOTALAirentrainedConcrete(3000psi)CY 1TOTALRbarTons0.18
  6. 6. SlabonGradeDescription Length HieghtSF QTYWaste% TotalConcrete3000PSI,BroomFinish0.341383 17 CY 5% 18CY WWF,6x6w2.1x2.1w 13831383SF10%1521 SF10MilVaporBarrier 13831383SF10%1521 SF 4"CompactedStoneBase 0.341383 17 CY10% 19CYIsolationJoints20 20 LF 0% 20LF Control&ConstructionJoints52 52 LF 0% 52LFSlabonGrade(OnRoof)LowSideDescription Length Hieght SFQTYWaste%Total2"LightWeightConc. 0.17 717 5CY 5% 5CY 2"ConcreteTopping 0.17 717 5CY 5% 5CYSlabonGrade(OnRoof)HighSide DescriptionLength Hieght SFQTYWaste%Total 2"LightWeightConc.0.17 613 4CY 5% 4 CY2"ConcreteTopping0.17 613 4CY 5% 4 CYStyrofoamHighLoadInsulation 4.5 613613 SF 5%644SF1/2"CementBoard 0.5 613613 SF 5%644SF
  7. 7. ConcreteWallFoundation(Elevator)WallFoundation DescriptionLengthWidth Hieght SFCAFormsQTYWaste% TotalConcrete 24.75 0.67 402CY 5% 2.6 CYConcrete 8.250.83 401CY 5% 1.1 CY Formwork 264 SFCAHorizontalRebars(continuous) DescriptionLengthRbarSize #ofRbars RbarMult.QTYWaste% Total#[email protected]"O.C 24.75 #54 1.04399 LF10% 0.06Tons109 Length#[email protected]"O.C 8.25#54 1.04333 LF10% 0.02Tons36LengthRbarTiesDescription [email protected](ft) RbarSize RbarMult. QTY Waste% TotalDowels#[email protected]"O.C6.341#5 1.043157 LF 10% 0.09Tons27 PiecesTotalRbar#5Length 318 TotalRbarTons 0.15TotalFormWK(SFCA)264TotalCYAirentrained3500psiConc. 4