Upload
hoangbao
View
218
Download
0
Embed Size (px)
Citation preview
Scale 1" = 3000'
INDIANA DEPARTMENT OF TRANSPORTATION DATE
DATE
PHONE NUMBER
FOR LETTING:
APPROVED
CERTIFIED BY:
PREPARED BY:
PLANS
PROJECT LOCATION SHOWN BY
LOCATION MAP
PROJECT
DESIGNATION
CONTRACT
of
SHEETSSURVEY BOOK
BRIDGE FILE
1625 N. Post RoadIndianapolis, Indiana 46219Phone: 317-895-2585Fax: 317-895-2596 Web: www.ucindy.com
UNITEDConsulting
[INDIANA DEPARTMENT OF TRANSPORTATION
STANDARD SPECIFICATIONS DATED 2016 TO BE
USED WITH THESE PLANS]
P.E.
CONST.
FOR SPANS OVER 20 FEET
INDIANA DEPARTMENT
OF TRANSPORTATION
I65 OVER DENOIS CREEK
BRIDGE REHABILITATION PLANS
PROJECT NO. 0501212
R-28940 0501212
1383528 & 1383529
I65-065-04663 BNBL & BSBL
1 4
PROJECT NO. 0501212
R-28940
Part 14 of 14
UNITED CONSULTING 317-895-2585
File Name: P:\C3D\MK16-465\Bridge\Bridge Str 30\Title.dwg Plot Date: 4/25/2017 Plotted By: Zola, David
BARTHOLOMEW COUNTY
DESIGN DATA
TERRAIN
RURAL/URBAN
70 M.P.H.
TRUCKS
FUNCTIONAL CLASSIFICATION
DESIGN SPEED
DIRECTIONAL DISTRIBUTION
D.H.V. (2039)
A.D.T. (2039)
A.D.T. (2019)
TRAFFIC DATA*
PROJECT DESIGN CRITERIA
ACCESS CONTROL
38% A.A.D.T.
2,740 V.P.H.
31,320 V.P.D.
34,310 V.P.D.
I-65
PARTIAL RECONSTRUCTION 4R (FREEWAY)
INTERSTATE
RURAL
LEVEL
FULL
50%
29% D.H.V.
PROJECT LOCATION
I65-065-04663 BNBL
I65-065-04663 BSBL
KIN DESIGNATION NUMBERS
DESIGNATION DESCRIPTION
1601732 & 1601733 I-65 OVER CSX RAILROAD
1592538 & 1592536
1592568 & 1592576
1592575 & 1592589
1592590 & 1592592
1592595 & 1592594
I-65 OVER MUTTON CREEK DITCH
I-65 OVER EAST FORK OF WHITE RIVER, OVERFLOW NO. 1
1592600 & 1592599
I-65 OVER EAST FORK OF WHITE RIVER, OVERFLOW NO. 2
I-65 OVER EAST FORK OF WHITE RIVER, OVERFLOW NO. 3
I-65 OVER L & I RAILROAD
I-65 OVER ABLE DITCH
I-65 OVER SMALLS CREEK
0501212 I-65 ROAD PLANS
I-65 OVER EAST FORK OF WHITE RIVER
0501212 I-65 TRAFFIC PLANS
PART
1
0501212 I-65 CROSS SECTIONS2
3
4
5
6
7
8
9
10
11
1601840 & 1601970
1601841 & 1601920
12
13 ENOS ROAD OVER I-651700256
CR 800 NORTH OVER I-651700257
REDDING ROAD OVER I-651700258
SR 11 OVER I-651700259
COUNTYLINE ROAD OVER I-651700260
CR 950 SOUTH OVER I-651700261
CR 625 SOUTH OVER I-651700262
13
13
13
13
13
13
14 I-65 OVER DENOIS CREEK1383528 & 1383529
PROJECT DESIGNATION
CONTRACT
STATIONSPAN AND SKEW OVER
INDEX
TYPESTRUCTURE
BRIDGE FILE
BRIDGE REHABILITATION
TWIN CONTINUOUS
REINFORCED CONCRETE SLAB
BRIDGES
1383528 & 1383529
I65-065-04663 BNBL & BSBLR-28940
0501212
STA. 3037+75 "A"I-65 OVER DENOIS CREEKI65-065-04663 BNBL
I65-065-04663 BSBL
3 SPANS:
27'-6", 36'-8", 27'-6"
SKEW: 0°
This Bridge Rehabilitation is on Interstate 65 over Denois Creek
Located in Section 3, of Township 8 North, Range 5 East, Columbus Township,
in Bartholomew County Indiana.
UTILITIES
REVISIONS
SHEET No. DATE REVISION
SHEET NO. DESCRIPTION
1 TITLE
2 INDEX
3 MAINTENANCE OF TRAFFIC
4 GENERAL PLAN - I-65 OVER DENOIS CREEK
INDEXGENERAL NOTES
File Name: P:\C3D\MK16-465\Bridge\Bridge Str 30\Index.dwg Plot Date: 4/25/2017 Plotted By: Zola, David
DESIGNED:
CHECKED:
DRAWN:
CHECKED:
RECOMMENDED
FOR APPROVAL
DESIGN ENGINEER DATE
SHEETS
of
VERTICAL SCALE
HORIZONTAL SCALE
CONTRACT
BRIDGE FILE
PROJECT
DESIGNATION
SURVEY BOOK
CJD DJZ
BSF CJD
AS NOTED
AS NOTED
I65-065-04663 BNBL & BSBL
1383528 & 1383529
-
R-28940
2 4
0501212
INDEX
I-65 OVER DENOIS CREEK
INDIANA
DEPARTMENT OF TRANSPORTATION
1625 N. Post RoadIndianapolis, IN 46219Phone 317-895-2585Fax 317-895-2596www.ucindy.com
ConsultingUNITED
NOTE TO REVIEWER:
Layout sheet will be provided after award of the
contract. The proposed scope of work has been
identified on the General Plan sheet.
42'4' Out to out Coping 22'-10 112· 22'-10 112·
1'-7 1/2" 39'-6" Clear Roadway l'-7 l/2" 1'-7 112·
2'-0"
1'-0"
~ 11'-0" 11'--0" ~I~ Bl:,
-~ ' _ I 1 ' - 11'-0" - ' 1
:t {]. {]. I I II I~ L :_-_-_-_-_-_-_-_-_-_-_-_-_-_-:_-_-_-_-_-_-_-_-_~----_-_-_-_-_~_-_-_-~ -J
I-65 Southbound PHASE 1
42'~ Out to out Coping 22'-10 112· 22'-10 112·
1'-7 1/2" 39'-6" Clear Roadway 1'-7 l/2" 1'-7 l/2"
2'-0"
1'-0" r-;- 11'-0" 11'--0"
~I~ ~ - ~ ' I I ' 11'-0" - ' I
:t {]. {]. I I II li' L :---~------_-_-_-_-:_-_-_-_-_-_-_-_-_-_-_-_-~ :_~_-_-_-_-_-_-_-_-_-~ _ J
I-65 Southbound PHASE 2
42'~ Out to out Coping 22'-10 112· 22'-10 112·
1'-7 1/2" 39'-6" Clear Roadway 1'-7 1/2" 1'-7 l/2"
12'--0" 12'-0" 2'--0" 2'-0"
n L _~---~_-_-_-_-_-_-_-_-_-_-_-_-_ ~ _ :_ -- -- --- --- -_-_-_-:_ -- -_ J
I-65 Southbound PHASE 3
42'~ Out to out Coping 22'-10 112· 22'-10 112·
1'-7 1/2" 39'-6" Clear Roadway 1'-7 l/2" 1'-7 l/2"
2'-0"2'-0'fl 12'-D" 4 1-10,. I
1 n D lf \ --- -- I L-----------------------------------------~
I " ........ I-65 Southbound PHASE 4
~~!Q 1625 N. Post Road RECOMMltlDBl
FOR APPROVAL Indtanapolis, IN 46219 Phone 317-895-2585 Fax 317-895-2596 DESIGNED: CJD
www.ucindy.com OiEO<ED: BSF
File Name: P:\ClD\MK16-<165\Bridge\Bridge str 30\MOT.dwg Plot Date: 5/3/2017 PlotU:d By: Jones, Richard S.
42'-9" out to out Coping
39'~" Clear Roadway l'-7 1/2"
2r-o" 2•-on 12'--0" 2'-()"
~ n fr f
I-65 Northbound
42'-9" out to out Coping
39'~" Clear Roadway l'-7 1/2"
4'-1011 12'--011 eZ'-0" 2'--0"
~ fr n f \ =============~= =" I L-----------------------------------------~
I-65 Northbound
42'-9" out to out Coping
39'~" Clear Roadway 1'-7 1/2"
l'-0" 1'--0" r-;- 11'--0" 11•-o• 11'--0" ~
~ D- n II II 1 \ '====~~~~~~""="'=~~~~~~~~~~~~d I L-----------------------------------------~
I-65 Northbound
42'-9" out to out Coping
39'~" Clear Roadway l'-7 1/2"
2'--0"
1'-0" 1'--0" u~· 1'--0" r-;- 11'--0" ----;-i 11'-0" 11'--0" ~
~ D n fr fr f \ I L-----------------------------------------~
I-65 Northbound
DESIGN ENGINEER DATE
INDIANA DEPARTMENT OF TRANSPORTATION
DRAWN: DJZ
OiEC<Bl: BSF
MAINTENANCE OF TRAFFIC 1-65 OVER DENOIS CREEK
HORIZONTAL SC'ALE BRIDGE FILE 3/16" = 1'--0" 165-065-04663 BNBL & BSBL
VERTICAL SC'ALE DESIGNATION
3/16" = 1'--0" 1383528 & 1383529
SURVEY BOOK SHEETS
3 lof I 4 CONTRACT PROJECT
R-28940 0501212
℄ Pier 3
Sta. 3037+93.33
℄ Bent 4
Sta. 3038+20.83
℄ Pier 2
Sta. 3037+93.33
℄ Bent 1
Sta. 3038+20.83
27'-6" C-C Brg. 27'-6" C-C Brg.36'-8" C-C Brg.
93'-2" Out to Out Bridge Floor
27'-6" C-C Brg. 27'-6" C-C Brg.36'-8" C-C Brg.
93'-2" Out to Out Bridge Floor
42'-9" O
ut O
ut Coping
39'-6" Clear Roadw
ay
42'-9" O
ut O
ut Coping
39'-6" Clear Roadw
ay
20'-6" R.C.
Approach
20'-6" R.C.
Approach
A
A
B C
B C
E
DD
E
DD
F
F
F
F
G G
G G
NORTHBOUND I-65
SOUTHBOUND I-65
22'-10 1/2"
22'-10 1/2"
Line "A"
42'-9" Out to Out Coping
39'-6" Clear Roadway
5'-6"12'-0"12'-0"10'-0"
1'-7 1/2"1'-7 1/2"
Limits of
Surface Seal
Profile Grade
Variable Depth Latex Modified
or Microsilica Concrete Overlay
(1 1/2" Min.)
Partial and Full
Depth Patching at all
delaminated areas
Limits of
Surface Seal
3"
3/8"
Circular Crown
22'-10 1/2"
Line "A"
Northbound
Symmetrical
about Line "A"
DESIGNED:
CHECKED:
DRAWN:
CHECKED:
RECOMMENDED
FOR APPROVAL
DESIGN ENGINEER DATE
SHEETS
of
VERTICAL SCALE
HORIZONTAL SCALE
CONTRACT
BRIDGE FILE
PROJECT
DESIGNATION
SURVEY BOOK
MRL DJZ
BSF BSF
AS NOTED
AS NOTED
I65-065-04663 BNBL & BSBL
1383528 & 1383529
-
R-28940
4 4
0501212
GERERAL PLAN
I-65 OVER DENOIS CREEK
INDIANA
DEPARTMENT OF TRANSPORTATION
1625 N. Post RoadIndianapolis, IN 46219Phone 317-895-2585Fax 317-895-2596www.ucindy.com
ConsultingUNITED
SCALE: 3/32" = 1'-0"
PLAN
TWIN CONTINUOUS REINFORCED
CONCRETE SLAB BRIDGES
3 SPANS: 27'-6", 36'-8", 27'-6"
39'-6" CLEAR ROADWAYS
NO SKEW
I-65 OVER DENOIS CREEK
LEGEND
B
C
A
D
Surface mill the existing bridge deck and perform hydro-demolition to remove
any unsound concrete.
All delaminated areas of bridge deck shall be partial or full depth patched.
Remove and replace the existing overlay.
Remove existing bridge joint expansion material and replace with
E
GENERAL NOTES
1. Existing plans for this structure are on file in the records unit of
the Indiana Department of Transportation as Bridge File
I65-065-04663 ANBL & ASBL.
2. Where new work is to be fitted to old work, the Contractor shall
check all dimensions and conditions in the field and report any
discrepancies to the Engineer and assume responsibility for their
correctness and fit of the new part to the old.
3. Reinforcing steel covering shall be 2 1/2" in top and 1" min. in
bottom of floor slabs, and 2" in all other parts, unless noted.
4. Surface seal all exposed surfaces of approach slabs, face of deck
coping and outer 6" of the underside of deck.
5. Stations shown are from the existing plans on file. The stations
will be updated for the proposed alignment for Final Deign.
DESIGN DATA
Designed for HS-20-44 loading in accordance with 2002 AASHTO
Standard Specifications for Highway Bridges 17th Edition and all
Subsequent Interim Specifications.
ULTIMATE DESIGN STRESSES
Class "A" Concrete f'c = 3,500 p.s.i.
Class "B" Concrete f'c = 3,000 p.s.i.
Class "C" Concrete f'c = 4,000 p.s.i.
Reinforcing Steel (Grade 60) fy = 60,000 p.s.i.
Structural Steel ASTM A709 (Grade 50) fy = 50,000 p.s.i.
Limits of Removal
Existing bridge railing and copings to remain shall be surface sealed.F
Place a variable depth latex modified or micro silica concrete deck overlay.
File Name: P:\C3D\MK16-465\Bridge\Bridge Str 30\GP STR 30.dwg Plot Date: 4/25/2017 Plotted By: Zola, David
Structural Expansion Joint Sealing System.
Patch piers, superstructure and underside of deck as necessary to repairG
all delamination and spalling.
SCALE: 3/8" = 1'-0"
TYPICAL SECTION
(Northbound Shown)