Brandspruit CollierySasol Mining
CM retrieval from goaf Section 17
SACMA 15 November 2007Presenter: Johan Steyn
PDF created with pdfFactory Pro trial version www.pdffactory.com
THE FIRST PICTURE OF THE GOAFED CM
PDF created with pdfFactory Pro trial version www.pdffactory.com
Presentation content1. Pillar extraction at Sasol Mining2. Incident Section 17 Brandspruit 2# and cause3. Safe retrieval4. Repair on Continuous miner5. Preventative actions and learning's6. Acknowledgements
PDF created with pdfFactory Pro trial version www.pdffactory.com
1 2 3 4 7 111095 6 8 12 1413 15 16
1. Pillar extraction Sasol Mining§ Cutting Sequence and tramming route (Stooping)
PDF created with pdfFactory Pro trial version www.pdffactory.com
NEVID Extraction method (Neels Joubert and David Postma)
PDF created with pdfFactory Pro trial version www.pdffactory.com
2. Incident summary and cause 8 June during Day shift (9h30) the CM was buried in the goaf14 June during Afternoon shift (20h00) the CM was recovered withdamages14 shifts to remove the CM – Loss in productionCM repair from 15 June to 20 August underground in production
CAUSE of incident: Horisontal stresses and floor contours (See plans)
PDF created with pdfFactory Pro trial version www.pdffactory.com
PDF created with pdfFactory Pro trial version www.pdffactory.com
What happened
PDF created with pdfFactory Pro trial version www.pdffactory.com
What happened
PDF created with pdfFactory Pro trial version www.pdffactory.com
What happened
PDF created with pdfFactory Pro trial version www.pdffactory.com
What happened
PDF created with pdfFactory Pro trial version www.pdffactory.com
What happened
PDF created with pdfFactory Pro trial version www.pdffactory.com
What happened
PDF created with pdfFactory Pro trial version www.pdffactory.com
What do we know
PDF created with pdfFactory Pro trial version www.pdffactory.com
3. Safe retrieval of CM
LoadingLoading
DrillingDrilling
BlastingBlasting
LoadingLoading
DrillingDrilling
BlastingBlasting
HookingHooking
PullingPulling
etcetc
PDF created with pdfFactory Pro trial version www.pdffactory.com
Loading work with LHD’s
PDF created with pdfFactory Pro trial version www.pdffactory.com
Drilling with stonework team facedrill
PDF created with pdfFactory Pro trial version www.pdffactory.com
At last some sign of CM
PDF created with pdfFactory Pro trial version www.pdffactory.com
Huge roof fall
Brow supported with roof bolts Brow supported with roof bolts Installed with new generation Installed with new generation roof bolterroof bolter
PDF created with pdfFactory Pro trial version www.pdffactory.com
Expose Conveyor boom and install sticks.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Change of plan. Safety risk!!Change of plan. Safety risk!!
PDF created with pdfFactory Pro trial version www.pdffactory.com
Build canopy in segments and push in place with LHD
PDF created with pdfFactory Pro trial version www.pdffactory.com
Continuous construction work
Price for timber and labour Price for timber and labour -- R108,000R108,000Total price including steel Total price including steel –– R200,000 R200,000
PDF created with pdfFactory Pro trial version www.pdffactory.com
Pin the canopy with Hilti drill
PDF created with pdfFactory Pro trial version www.pdffactory.com
Put “tandetrekker” in position
PDF created with pdfFactory Pro trial version www.pdffactory.com
No movement and breakage of chain
160t160t
PDF created with pdfFactory Pro trial version www.pdffactory.com
More blasting work
PDF created with pdfFactory Pro trial version www.pdffactory.com
Twistdraai Colliery assist with 2nd
“Tandetrekker”
PDF created with pdfFactory Pro trial version www.pdffactory.com
Twistdraai team
PietPiet DoctorDoctor
PDF created with pdfFactory Pro trial version www.pdffactory.com
Brandspruit team
LoodLood
JohanJohan
PDF created with pdfFactory Pro trial version www.pdffactory.com
At last!!
170t + 180t = 350t170t + 180t = 350t
PDF created with pdfFactory Pro trial version www.pdffactory.com
Damage on CM
PDF created with pdfFactory Pro trial version www.pdffactory.com
The “garage”
PDF created with pdfFactory Pro trial version www.pdffactory.com
Johan Pretorius investigating the CM
““TierTier””
PDF created with pdfFactory Pro trial version www.pdffactory.com
4. Repair of CM1.1. Original quote Original quote ––
R4.7millionR4.7million
2.2. Repaired in house at Repaired in house at Sasol Mining Central Sasol Mining Central workshopsworkshops
3.3. Repair work (Left panel, Repair work (Left panel, scrubber and box, frame scrubber and box, frame repairs, piping and repairs, piping and wiring, conveyor boom wiring, conveyor boom and booster pump)and booster pump)
4.4. Cost of repair R780 000Cost of repair R780 000
5.5. Team dedication with Team dedication with workshop facilities and workshop facilities and supportsupport
6.6. Involved learner artisans Involved learner artisans for experiencefor experience
PDF created with pdfFactory Pro trial version www.pdffactory.com
5. Preventative actions and learning
5.1 5.1 MindmapMindmap to take determine focusto take determine focus
PDF created with pdfFactory Pro trial version www.pdffactory.com
5.2 Changes in approved stooping plans to improve risk managemen5.2 Changes in approved stooping plans to improve risk managementt
BEFOREBEFORE
PDF created with pdfFactory Pro trial version www.pdffactory.com
AfterAfter
1.1. Expected Expected phasesphases
2.2. NorthNorth--south south stressesstresses
3.3. Pillar colours Pillar colours in expected in expected high riskshigh risks
PDF created with pdfFactory Pro trial version www.pdffactory.com
Phase 2Phase 2
PDF created with pdfFactory Pro trial version www.pdffactory.com
1.1. StressesStresses
2.2. Description Description of marked of marked pillarspillars
3.3. Leave red Leave red pillarspillars
PDF created with pdfFactory Pro trial version www.pdffactory.com
Additional preventative actions
Adapt pillar centre's to do more development and less stooping per pillarPro active canopy and tools required in case of an incidentReflective “policemen”. Trigger when roof starts to take pressure
Learnings
Pro active measures better than cure.Never be to proud to ask. Get 2nd “tandetrekker” immediatelyWe learn everyday by adapting stooping plansKeep the engineer calm
PDF created with pdfFactory Pro trial version www.pdffactory.com
PDF created with pdfFactory Pro trial version www.pdffactory.com
A BIG thank you to the following people for their help
Jurie Blignaut (Waypoint)
Johan Swanepoel
Johan Steyn
Johan Pretorius
Johan Grabie
Gert Venter
Gerrie du Preez
Gerhardt vd Merwe
Frikkie van Eeden
Frik Grobbelaar
Frans van Dyk
Frans Moolman
Frans (Artisan 71)
Frank Richards
Deon Annandale
Dawie Combrink
David Postma
Basimane Motlhabane
Awie Richter (LM)
Ash Boodhram
Alex Thompson
Abraham Ramaele
Lood Lewies
Lipson
Leon Wolmarans
Lazarus
Khabela (CM)
Royston
Robert Nkale
Rita Steenkamp
Pieter du Preez
Piet Shabalala
Philani Mahaye
Petros (Lamproom)
Patrick Fumo
Moses (Konstruksie)
Mike Fourie
Martin Steenkamp
Mark Jacobs
Marius Coetzer
Mamzi (Belde)
Lucky (Eimco)
Willie Smit
Willie Phyffer
Willem Page
Wally Claassen
Tinus Roos
Tinus (App)
Steven (App)
Shane Membrey
Sakkie Roux
Pacule
D Nel(59)
R Cronje
Z Naude
M Gelderblom (26)
W v d Westhuisen (47)
R Hendriks (39) Salvador
Petrus
Vusi 03
Anton
Fabio
Andile
Clemont
Monabisi
Johannes
Joseph
Lappies
Jose
Inama 03
Wellington
Samuel
Ephion
Chief
Zakhele
Macamo
Kleinboy
Daniel
Luwiza
Daniel
Jose
Isaja
Piet & Doctor from Piet & Doctor from TwistdraaiTwistdraai
Jurie Botha (Waypoint)Jurie Botha (Waypoint) Sasol Mining Central Sasol Mining Central workshopsworkshops
PDF created with pdfFactory Pro trial version www.pdffactory.com
TEAM WORK with Support and Help from our Heavenly Father
PDF created with pdfFactory Pro trial version www.pdffactory.com
Vision of Brandspruit Colliery:
Together we will BEAT our Safety (SHE) and Continuous Improvement (CI) targets
Beat = Rhythm of our production sections:
7 (7) loads per hour per Shuttle car (BH)
Zero Harm, Weekly Safety Topics, Monthly Shaft
Communication, Daily Stats, Non Conformance Meeting,
News Flash Communication, Monday Accident Presentations
Safe Making Behaviour
2050 tps for Shuttle car production sections
1700 - 2100 tps for Battery Hauler production sections
PDF created with pdfFactory Pro trial version www.pdffactory.com