case study

This project involved the remodelling and extension of the ITU / HDU departments.The works were initially anticiptaed to be carried out in 6 Phases, and within a live fully operational enviroment.

The were challenges of working in a live environment including minimizing noise, dust and other disturbance which could have affected the recuperation of neurological patients in adjoining wards, these critical issues were successfully avoided.

The demands of the patients and day to day operations of the live wards meant that the works The demands of the patients and day to day operations of the live wards meant that the works had to be carried out in stages within each phase. This required careful planning with flexibility.

Completed on time and within Budget.

Walton Neurological CentreIntensive Care & High Dependancy Units

Page 7: Braithwaite Company Profile

case study

To Strip back existing ward to shell of structure including all ceilings, walls & floor coverings and cart away from site through live hospital surroundings.

The unit has 9 beds each in separate rooms which have their own filtered air supply to de-crease the infection risk

A close working relationship with the Design Team & Staff working in close proximity had to be maintained at al times to ensure a smooth transaction throughout the contract.

Site Management was paramount to maintain quality workmanship at all times.

Close coordination of trades and the programme was under close scrutiny at all times.

Completed on time and within Budget.

Bone Marrow Transplantation Unit Ward 10Z - Royal Liverpool University Hospital

Page 8: Braithwaite Company Profile
Page 9: Braithwaite Company Profile
Page 10: Braithwaite Company Profile
Page 11: Braithwaite Company Profile
Page 12: Braithwaite Company Profile

case study

The scheme involved the refurbishment of the old Royal Infirmery, transforming it into an executive lounge with conference suites and state of the art audio and visual equipment. The refurbishment included the fit-out of 5no rooms to a very high specification to ceilings, wall, new lighting system and mechanical works to provide both heating and ventilation. Bespoke manufactured joinery items were manufactured and installed from our workshop. The work was undertaken within a occupied building, open 12 hours each week day, and involved close involvement and close consultation throughout the Contract Period with the Client, End User, Architect, Project Manager and M&E Consultants.

We had a permanent Site Working Foreman who reported to a Contracts Manager who visited three times a week and who reported to a Director, all of whom where part of an overall team intent on providing a First Class, Succesfull Contract, delivered on time and within budget.

Foresight CentreBlock J - The Hub

Page 13: Braithwaite Company Profile

We undertook works for 60 Hope Street Ltd, to convert a derelict building to a fusion themed Asian Restaurant.

The Derelict Building required a complete Fit-Out, Including a New Staircase and extensive Partioning to turn it into an operationally and functionally efficient Restaurant.

The works undertaken were to create an open plan Kitchen were diners could view the food The works undertaken were to create an open plan Kitchen were diners could view the food being created, Two High-End bars incorporating Materials sourced from Europe, Converting the basement into Staff areas along with Storage and both Customer and Staff Restrooms. Full Mechanical and Electrical Systems throughout to both Ground Floor and Basement, New MF Ceiling System throughout along with a full Hardwood Floor.