We  undertook  works  for  60  Hope  Street  Ltd,  to  convert  a  derelict  building  to  a  fusion  themed  Asian  Restaurant.

The  Derelict  Building  required  a  complete  Fit-­Out,  Including  a  New  Staircase  and  extensive  Partioning  to  turn  it  into  an  operationally  and  functionally  efficient  Restaurant.

The  works  undertaken  were  to  create  an  open  plan  Kitchen  were  diners  could  view  the  food  The  works  undertaken  were  to  create  an  open  plan  Kitchen  were  diners  could  view  the  food  being  created,  Two  High-­End  bars  incorporating  Materials  sourced  from  Europe,  Converting  the  basement  into  Staff  areas  along  with  Storage  and  both  Customer  and  Staff  Restrooms.  Full  Mechanical  and  Electrical  Systems  throughout  to  both  Ground  Floor  and  Basement,  New  MF  Ceiling  System  throughout  along  with  a  full  Hardwood  Floor.  

The  end  result  was  well  received  by  both  Client  and  Customer,  and  the  Project  opened  on  time  and  within  Budget,

Page 7: Braithwaite Case Study Fit Out

case study

The  scheme  involved  the  refurbishment  of  the  old  Royal  Infirmery,  transforming  it  into  an  executive  lounge  with  conference  suites  and  state  of  the  art  audio  and  visual  equipment.  The  refurbishment  included  the  fit-­out  of  5no  rooms  to  a  very  high  specification  to  ceilings,  wall,  new  lighting  system  and  mechanical  works  to  provide  both  heating  and  ventilation.  Bespoke  manufactured  joinery  items  were  manufactured  and  installed  from  our  workshop.    The  work  was  undertaken  within  a  occupied  building,  open  12  hours  each  week  day,  and  involved  close  involvement  and  close  consultation  throughout  the  Contract  Period  with  the  Client,  End  User,  Architect,  Project  Manager  and  M&E  Consultants.

We  had  a  permanent  Site  Working  Foreman  who  reported  to  a  Contracts  Manager  who  visited  three  times  a  week  and  who  reported  to  a  Director,  all  of  whom  where  part  of  an  overall  team  intent  on  providing  a  First  Class,    Succesfull  Contract,  delivered  on  time  and  within  budget.

Foresight  CentreBlock J -­ The Hub

Page 8: Braithwaite Case Study Fit Out
Page 9: Braithwaite Case Study Fit Out
Page 10: Braithwaite Case Study Fit Out
Page 11: Braithwaite Case Study Fit Out
Page 12: Braithwaite Case Study Fit Out
Page 13: Braithwaite Case Study Fit Out
Page 14: Braithwaite Case Study Fit Out
Page 15: Braithwaite Case Study Fit Out