5
CASAGRANDE S.p.A. | Via Malignani, 1 – 33074 Fontanafredda – Italy | www.casagrandegroup.com 1 Bored Piles with B360XP PROJECT DESCRIPTION NEWFOUNDLAND TOWER, LONDON Project description: Construction of foundation piles and secant walls as permanent support for excavation Main contractor: Canary Wharf Construction Schedule: started on September 2015 PROJECT QUANTITIES AND GENERAL DATA Type of piles: Secant bored piles Diameter: 1000 mm Distance center-center: 800 mm (overlapping 200 mm) Depth: 16 m Reinforcement cages: full length - only secondary piles Type of piles: Bored piles for foundations Diameter: 1500 - 1800 – 2100 - 2400 mm Depth: to 64 m Reinforcement cages: full length

Bored Piles with B360XP - Drilling and Piling … Word - B360xp Bored Piles London UK 2015_corretto MF.docx Author m.valeri Created Date 1/7/2016 11:48:49 AM

Embed Size (px)

Citation preview

Page 1: Bored Piles with B360XP - Drilling and Piling … Word - B360xp Bored Piles London UK 2015_corretto MF.docx Author m.valeri Created Date 1/7/2016 11:48:49 AM

CASAGRANDE S.p.A. | Via Malignani, 1 – 33074 Fontanafredda – Italy | www.casagrandegroup.com 1

Bored Piles with B360XP

PROJECT DESCRIPTION

NEWFOUNDLAND TOWER, LONDON Project description: Construction of foundation piles and secant walls

as permanent support for excavation Main contractor: Canary Wharf Construction Schedule: started on September 2015

PROJECT QUANTITIES AND GENERAL DATA

Type of piles: Secant bored piles Diameter: 1000 mm Distance center-center: 800 mm (overlapping 200 mm) Depth: 16 m Reinforcement cages: full length - only secondary piles

Type of piles: Bored piles for foundations Diameter: 1500 - 1800 – 2100 - 2400 mm Depth: to 64 m Reinforcement cages: full length

Page 2: Bored Piles with B360XP - Drilling and Piling … Word - B360xp Bored Piles London UK 2015_corretto MF.docx Author m.valeri Created Date 1/7/2016 11:48:49 AM

CASAGRANDE S.p.A. | Via Malignani, 1 – 33074 Fontanafredda – Italy | www.casagrandegroup.com 2

PRODUCTION DATA

Secant Piles Ø 1000 mm x 16 m depth:

Drilling primary pile: 1,5 h/pile Drilling secondary piles: 2,5 h/pile

Piles Ø 2400 mm x 64 m depth | 10 m cased:

Single pile average production: 1 pile/day

SOIL FEATURES

0 ÷ 30 m: London Clay 30 ÷ 64 m: Thanet Sand

EQUIPMENT

Casagrande B360xp arranged with:

Engine CAT C15 – 403 kW – emission stage 3B Main winch – 415 kN nominal line pull Pull down winch: · 600 kN nominal extraction/crowd force

· 17 m stroke H40 rotary head with casing driver with cardan joint S50 HD 4 x 19 m interlocking kelly bars

Casings: Double wall casings (O.D. 1000 mm – I.D.920 mm) - for secant piles Tool: Soil bucket with tapered end and flat end

GENERAL NOTES

Some of the single piles (e.g. Ø 2400 mm – 64 m depth) are drilled close to the underground railway lines so they are drilled at night.

Page 3: Bored Piles with B360XP - Drilling and Piling … Word - B360xp Bored Piles London UK 2015_corretto MF.docx Author m.valeri Created Date 1/7/2016 11:48:49 AM

CASAGRANDE S.p.A. | Via Malignani, 1 – 33074 Fontanafredda – Italy | www.casagrandegroup.com 3

Page 4: Bored Piles with B360XP - Drilling and Piling … Word - B360xp Bored Piles London UK 2015_corretto MF.docx Author m.valeri Created Date 1/7/2016 11:48:49 AM

CASAGRANDE S.p.A. | Via Malignani, 1 – 33074 Fontanafredda – Italy | www.casagrandegroup.com 4

Page 5: Bored Piles with B360XP - Drilling and Piling … Word - B360xp Bored Piles London UK 2015_corretto MF.docx Author m.valeri Created Date 1/7/2016 11:48:49 AM

CASAGRANDE S.p.A. | Via Malignani, 1 – 33074 Fontanafredda – Italy | www.casagrandegroup.com 5