Brochure 20-01EN

Bored Piles

Large diameter bored piles of concrete or reinforced concrete are an economical means of supporting high structural loads with minimum settlement.

Page 2: Bored Piles - Keller Holding Large diameter bored piles are particularly effective in transferring high loads. They are thus excellently suited for foundation works in ... Miguel Yuste

Drilling tools for application in all types of soil

drilling auger for stiff or medium dense soils

core barrel for cutting rocks

box auger with cleaning edge

Grafi

k: BA

UER

Grafi

k: BA

UER

Grafi

k: BA

UER

If you have further ques-tions, please contact us or visit our website. Here you can order a DVD or a USB stick with all Keller publica-tions.

Bored Piles

Construction methods

Drilling Reinforcement

Con

stru

ctio

n pr

oce

ss

(Sys

tem

Kel

ly)

Piles are a powerful, state-of-the-art construction element with many applications in civil engineering and building. As contiguous, or secant pile walls in water bearing soils they are used to secure deep excavations or retain slopes. In piled foundations they are used at various diameters as single piles or pile groups.

Depending on the application, all bores are either concrete filled (with or without reinforcement), or filled with removed spoil. Occasionally steel sections are inserted as plunge columns or in cases of high lateral load.

FOW Drilling

Grab excavations

Using a special rig, front of wall (FOW) piles with diameters of 406 or 508 mm can be executed to a depth of up to 12.5 m – allowing work close to buildings or walls.

In Alpine regions we use grab drilling with diameters of 880 and 1180 mm.

Kelly bored piles

Continuous Flight Auger Drilling

We can install Kelly piles using augers or core barrels in the common diameters 620, 880, 1180 and 1500 mm. The piles can be installed to depths of up to 40 m either vertically or inclined, with casing, or with suspension support.

We execute CFA (continuous flight auger) piles with diameters of 430, 550, 630 and 880 mm to a depth of up to 26 m.

Page 3: Bored Piles - Keller Holding Large diameter bored piles are particularly effective in transferring high loads. They are thus excellently suited for foundation works in ... Miguel Yuste

1 2

4

3

4 InfrastructureWhether in tunnelling, in road or bridge construction or in measures for flood protection, large bored piles can be used in a multitude of ways and are often found in infrastructure projects.

3 Slope StabilisationSlope stabilisation is necessary to prevent landslides and protect existing buildings and structures. Here, large diameter bored piles are regularly used often combined with other techniques such as ground anchors or soil nails.

2 Stabilisation of excavation pitsIn inner-city areas it is essential that the spaces between buildings are fully utilised. Piled walls are an established method of retention on the boundary or close to adjacent buildings. They can be combined with other geotechnical solutions such as Jet Grouting to form near water tight pits.

1 FoundationsLarge diameter bored piles are particularly effective in transferring high loads. They are thus excellently suited for foundation works in nearly all types of soil.

Concreting Withdrawal of casing Completed pile head

Digital recording and logging of the execution parameters

Large diameter bored piles usually have to withstand high loads, and we therefore use a variety of quality-assurance methods for our products.

Integrity testing

Applications

Quality Assurance

Pile loading tests

Load (MN)

Pile

-cap

set

tlem

ent 

(mm

)

Pile B

Pile APile C

Page 4: Bored Piles - Keller Holding Large diameter bored piles are particularly effective in transferring high loads. They are thus excellently suited for foundation works in ... Miguel Yuste

Reference Projects

� Foundation

2015 Park & Ride complex, Perfektastraße, Vienna (CFA piles)2015 Crematorium, St. Marienkirchen an der Polsenz

(Kelly piles)2015 Silo Mayr-Melnhof Karton, Frohnleiten (Kelly piles)2014 Sterilisation Plant Mediscan, Kremsmünster (CFA piles)2013 Liese Prokop School, Maria Enzersdorf (CFA piles)2013 BMW Heiligenstadt, Vienna (CFA piles)2013 Dental clinic, Graz (CFA piles)2013 Beck plot, Hohenems (CFA piles)2012 Housing complex and Kindergarten Löwenpark,

Melk (CFA piles)2012 MED Campus ZWT, Graz (Kelly piles)2012 Fire-brigade building, Götzis (CFA piles)

� Excavation pits / Retaining walls

2015 Semmering base tunnel BL 2.1, Tunnel Fröschnitzgraben – shafts (Grab piles)

2015 Housing complex Gemeindeaugasse, Vienna (FOW piles)2015 Multi-storey Car Park, Nordbahnstraße, Vienna

(Kelly piles)2015 Plant room Münze Austria, Vienna (CFA piles)2015 Housing complex, Graz (CFA piles)2014 Housing complex Agnesstraße, Klosterneuburg

(FOW piles)2014 Housing complex Paulusgasse/Petrusgasse,

Vienna (FOW piles)2014 Housing complex Rennweg, Vienna (FOW piles)2014 Housing complex Spallartgasse, Vienna (FOW piles)2014 Housing complex Plüddemanngasse, Graz (CFA piles)2014 Housing complex Gutenbergstraße, Vienna (FOW piles)2013 Shopping centre Stadtoase, Tulln (CFA piles)2013 Housing complex Migazziplatz, Vienna (CFA piles)2013 Logistics building hospital Graz (Kelly and CFA piles)2013 MED Campus Module 1, Graz (CFA piles)2013 House and office Friesacher, Anif (Kelly piles)2012 Housing complex Angeligasse, Vienna (FOW piles)

� Slope Stabilisation

2015 Semmering base tunnel BL 2.1, Tunnel Fröschnitzgraben (Kelly piles)

2012 New Hofer branch, Pischelsdorf (CFA piles)

� Infrastructure

2014 Bypass S36, St. Georgen ob Judenburg (Kelly piles)2014 Lambach North Bypass, East Section (Kelly piles)2011 Flood Protection Spitz/Danube (Kelly piles)

w w w.KellerHolding.com A company of Keller Group plc

Keller Group plcGround Engineering Contractorswww.keller.co.uk

Keller Holding GmbHwww.kellerholding.com

Europe

Keller Grundbau GmbHKaiserleistrasse 863067 OffenbachGermanywww.kellergrundbau.de

Keller Fondations Spéciales2 rue Denis Papin - CS 69224 Duttlenheim67129 Molsheim CedexFrancewww.keller-france.com

Keller Grundbau Ges.mbHMariahilfer Strasse 127a1150 ViennaAustriawww.kellergrundbau.at

Keller UKOxford Road · Ryton-on-DunsmoreCoventry CV8 3EGUnited Kingdomwww.keller-uk.com

Keller Polska Sp. z o.o.ul. Poznańska 17205-850 Ożarów Mazowiecki (Warsaw)Polandwww.keller.com.pl

Keller Cimentaciones, S.L.U.Miguel Yuste 45, bis28037 MadridSpainwww.keller-cimentaciones.com

Middle East

Keller Grundbau GmbHDubai BranchOffice No. 408Al Mansour Building Damascus Street, Al QusaisDubai, UAEwww.kellerme.com

Africa

Franki Africa674 Pretoria Main Road,Wynberg, 2090 SandtonP.O. Box 39075, Bramley, 2018 South Africawww.franki.co.za

0715

· 20

-01E

N