1
Boone Dam Seepage Remediation Stage 3 – Diaphragm Wall Construction Earthen Embankment Blanket Drain Control Building Epikarst – Intermixed Soil and Rock Diaphragm Wall Karst Limestone Bedrock Foundation Soils Reservoir PENDING ENVIRONMENTAL REVIEW

Boone Dam Seepage Remediation Stage 3 – … Content/News/boone/boone...Boone Dam Seepage Remediation Stage 3 – Diaphragm Wall Construction Earthen Embankment Blanket Drain Control

Embed Size (px)

Citation preview

Boone Dam Seepage Remediation

Stage 3 – Diaphragm Wall Construction

Earthen Embankment

Blanket Drain

Control Building

Epikarst – Intermixed Soil and Rock

Diaphragm Wall

Karst Limestone Bedrock

Foundation Soils

Reservoir

PENDING ENVIRONMENTAL REVIEW